EP2743405A2 - Method for anchoring a foundation structure of an offshore platform to the sea floor, foundation structure and support element - Google Patents

Method for anchoring a foundation structure of an offshore platform to the sea floor, foundation structure and support element Download PDF

Info

Publication number
EP2743405A2
EP2743405A2 EP13005287.1A EP13005287A EP2743405A2 EP 2743405 A2 EP2743405 A2 EP 2743405A2 EP 13005287 A EP13005287 A EP 13005287A EP 2743405 A2 EP2743405 A2 EP 2743405A2
Authority
EP
European Patent Office
Prior art keywords
pile
foundation
foundation structure
support
spacer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP13005287.1A
Other languages
German (de)
French (fr)
Inventor
Sigurd Weise
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weserwind Offshore Construction Georgsmarienhuette GmbH
Original Assignee
Weserwind Offshore Construction Georgsmarienhuette GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weserwind Offshore Construction Georgsmarienhuette GmbH filed Critical Weserwind Offshore Construction Georgsmarienhuette GmbH
Publication of EP2743405A2 publication Critical patent/EP2743405A2/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Definitions

  • the invention relates to a method for anchoring a foundation structure of an offshore installation on the seabed according to the preamble of claim 1. Furthermore, the invention relates to a foundation structure for an offshore installation according to the preamble of claim 6. Finally, the invention relates to a support element for a foundation structure according to the preamble of claim 12.
  • Foundation structures for offshore installations are anchored to the seabed with foundation piles.
  • the foundation piles are for this purpose introduced into the seabed, for example, rammed.
  • the connection with the foundation structure takes place by means of pile pins, so-called “pins”, or by means of pile sleeves, so-called “pileguides”.
  • interstices are available, which serve to compensate for tolerances.
  • These intermediate spaces are filled with a hardening or hardenable filling material, for example a cement suspension, in particular a so-called grout material.
  • the filler material accordingly solidifies after some time, typically days. It then establishes a permanent and solid connection between the pile pegs or pile sleeves and the respective foundation piles.
  • the foundation structure is lowered for mounting at the destination in the direction of the seabed until the piles engage in already anchored in the seabed foundation piles.
  • the piles or pile sleeves have at a distance from their lower end faces arranged stops, such as support rings on. The stops are located on the upper end faces of the foundation piles.
  • the invention has for its object to provide a method, a foundation structure and a storage, which at the same time ensure a simple foundation and improved force introduction into the foundation piles and / or in the seabed.
  • a method for achieving this object comprises the measures of claim 1. Accordingly, it is provided that the foundation structure or the pile pegs and / or the pile sleeves are mounted only temporarily and / or only a few days by means of their serving as support elements stops or bearing rings frictionally on and / or on the foundation piles. This means that the load of the foundation structure is transmitted only over a limited period of time via the support elements directly to the foundation piles. The load of the foundation structure is therefore introduced first via the stops or support elements and later after the introduction and solidification of the filling material on the filler directly and only in the pile sleeves and above in the seabed.
  • the support elements are at least partially so modified and / or partially removed that the non-positive support of the foundation structure on the support elements is reduced and / or eliminated, preferably completely eliminated. This is brought about after the curing of the filling material and the resulting support or embedding of the pile pegs or pile sleeves in the foundation piles.
  • the introduction of force from the foundation structure via the pile pegs or pile sleeves into the filling material takes place alternatively or optionally in addition to storage via the support elements and the foundation piles.
  • the non-positive mounting of the support elements on the foundation piles is at least partially canceled or eliminated, in particular by environmental influences such as the action of liquid, which may be fresh or salt water.
  • environmental influences such as the action of liquid, which may be fresh or salt water.
  • a successive elimination or cancellation of the frictional storage requires a period of time which is longer than the complete curing of the filling material.
  • the period up to a complete cancellation of storage is due in particular to a required exposure time or reaction time, such as salt water, fresh water or alternative media.
  • the support elements are formed by a plurality of bearing pieces.
  • the bearing pieces are preferably bearing rings with in particular a disc-shaped design.
  • the support rings are preferably formed with a central opening or a central opening. The openings are formed such that the associated pile pin can be passed, preferably with little play. Accordingly, the bearing pieces or the bearing rings surround the respective pile pin.
  • the bearing pieces are arranged substantially perpendicular to the longitudinal center axis of the pile pins.
  • the support elements have a sufficient size or a sufficient diameter to at least substantially allow an all-round resting on an upper end face of each foundation pile. Accordingly, the support members are typically formed with a larger diameter than the diameter of the respective foundation pile. Alternatively, pile sleeves can be slipped over the foundation piles.
  • the support elements are mounted inside the pile sleeves or on the outside of the foundation piles.
  • At least part of the support element in particular an upper support ring, permanently connected to the respective pile pin or the pile sleeve, in particular welded.
  • Particularly preferred is another, not attached to the pile pin or the pile sleeve part of the support element, in particular a lower support ring, in turn connected to the upper support ring.
  • This connection is designed in particular detachable.
  • a rigid Compound formed which can then be converted into a flexible connection or completely removed.
  • a spacer is provided between the upper and the lower support ring.
  • the spacer of the support member is initially rigid but convertible or removable into a flexible form.
  • the spacer, or its material by these surrounding media especially seawater, namely salt or fresh water, modified, rinsed, removed and / or dissolved.
  • the connection produced by the respective spacer between the support rings is released, completely or partially eliminated and / or at least converted from a rigid compound into a deformable or flexible connection, preferably by external influences such as water.
  • the pile pins of the foundation structure are used to set them up in a top opening of anchored in the seabed foundation piles.
  • the support elements are arranged in particular such that they rest on a particular upper end side of the foundation piles for supporting the foundation structure.
  • the foundation piles are inserted through the pile sleeves.
  • the support elements can then be arranged in particular, for example, in the interior of the pile sleeves. Possibly comes also an arrangement of special support elements on the foundation piles themselves into consideration. Thus, until the modification, dissolution, rinsing or removal of the support elements for an introduction of the load on the respective support elements are provided in the foundation piles.
  • This foundation structure is characterized in that preferably at least one variable support element for the temporary frictional mounting on the foundation piles at the pile pin or pile sleeves is provided, which can be canceled after the curing of filler in the foundation piles.
  • the support element is designed in several parts.
  • the support element has at least two bearing rings. The support element or the support rings are at least until hardening of the filling material for receiving and introducing the loads or the forces occurring, in particular the weight and the wind forces of the foundation structure, provided in the foundation piles.
  • At least one upper support ring is welded to the pile pin and / or to the pile sleeve.
  • at least one lower support ring is arranged on the pile pin or on the pile sleeve.
  • the lower support ring is arranged in particular movable relative to the pile pin and / or the pile sleeve. By reducing the thickness or removal of the spacer, the distance between the two bearing rings can be reduced.
  • the foundation structure is supported on the tops of the foundation piles and / or temporarily supported.
  • At least one spacer is arranged between the two support rings.
  • the spacer ensures a spacing of the two bearing rings from each other.
  • the spacer temporarily connects the lower support ring with the upper support ring. Accordingly, a connection between the two bearing rings is provided by the spacer.
  • the fixed connection is preferably suitable for frictionally supporting the lower support ring on the upper support ring.
  • the spacer is pillow-shaped, in particular with a flexible sheath and a filling material for firm and stable padding.
  • the spacer is preferably at least after its modification according to the invention variable in its vertical extent. Thus, the distance between the two bearing pieces, in particular the bearing rings, can be varied from each other to cancel the non-positive mounting.
  • the non-positive mounting of the support elements on the foundation piles can be reduced or canceled out, in particular by the action of salt and / or fresh water or other substances or agents, for example rinsed, abraded and / or dissolvable.
  • the spacers or at least the frictional bearing on the foundation piles are at least partially reduced by the surrounding water and / or removable.
  • at least a part of the material of the spacer is convertible and / or disposable, in particular by Dissolution, rinsing and / or draining.
  • the distance between the two bearing rings can be reduced.
  • the object underlying the invention is also achieved by a support element for a foundation structure with the features of claim 12.
  • the support element has two support rings, in particular a first support ring and a second support ring.
  • the first support ring is fixedly secured to the respective pile pin or a pile sleeve of the foundation structure, wherein the first support ring is connected to the second support ring only temporarily. After releasing this connection, the distance between the two bearing rings can be reduced.
  • a non-positive mounting of the foundation structure to which the support elements are fixed be subsequently removed on corresponding foundation piles, after a permanently stable frictional bearing between pile pegs or pile sleeves and the associated foundation piles is provided by a cured filler.
  • FIG. 1 only a foundation structure 10 is shown.
  • the illustrated foundation structure 10 is also referred to as a "jacket".
  • the invention is also suitable for other offshore installations, such as for offshore substations or differently shaped foundation structures, such as tripods or monopiles.
  • the in the Fig. 1 Founding structure 10 shown the offshore wind turbine or offshore wind turbine is designed like a truss.
  • the foundation structure 10 is mostly under water and carries at the upper end of a structure, not shown.
  • a structure for example, a tower of an offshore wind turbine comes into consideration.
  • four parallel vertical pegs 11 are arranged.
  • more or less than four pile pegs 11 may be provided.
  • the pile pins 11 may also have different lengths, they are the same length in the embodiment shown.
  • the pile pins 11 are used to set up the foundation structure 10, so they form, so to speak, their feet.
  • each of the pile pins 11 is connected to a tubular foundation pile 12, as in the Fig. 2 to 5 is shown.
  • the foundation piles 12 are at least substantially perpendicular in a substrate 13, namely the seabed, rammed, flushed or introduced in any other way. In this case, an upper end region protrudes out of the substrate 13 into the seawater above it.
  • Each pile post 11 associated with a foundation pile 12 has at the upper end in the region of its upper end face 15 an opening. This opening is formed in the embodiment of the free cross section or inner diameter of the foundation pile 12 accordingly.
  • the upper end face 15 extends at right angles to the longitudinal central axis 16 of the foundation pile 12.
  • the inner diameter Each foundation pile 12 is significantly larger than the outside diameter of the pile pin 11 assigned to it.
  • each bearing pin 11 is assigned a support element 14.
  • the support member 14 serves to settle the foundation structure 10 on the foundation piles 12 and support. Thus, the immersion depth of the pile pin 11 is limited in the foundation piles 12.
  • the support element 14 consists in the embodiment shown of several components, namely two spaced Auflager congressen, which are here designed as support rings 17, 20, and a spacer 21 or optionally also a plurality of, for example, superimposed spacers 21 between the support pieces or support rings 17, 20th
  • the upper support ring 17 has a central opening, which corresponds to the outer diameter of the associated peg 11. Accordingly, the pile pin 11 is passed through the opening.
  • the upper support ring 17 is welded to the pile pin 11 with a circumferential weld 19. As a result, the upper support ring 17 is fixedly connected to the pile pin 11.
  • the substantially identical to the upper support ring 17 lower support ring 20 is arranged at a distance below the upper support ring 17. However, the lower support ring 20 is not welded to the pile pin 11, but loose, that is axially freely displaceable, attached to this.
  • the spacer 21 is arranged in the area between the two bearing rings 17 and 20, in the area between the two bearing rings 17 and 20, the spacer 21 is arranged.
  • This spacer 21 is designed here as a circumferential ring, as in Fig. 6 is shown. However, it is also possible to provide a plurality of separate spacers 21. If necessary, the spacer 21 may be connected to both the upper support ring 17 and the lower support ring 20.
  • the spacer 21 is formed of a special material.
  • the material is chosen, for example, from slowly water-soluble granular material, that it dissolves over time, softened, rinsed and / or removed. This can be done mechanically, chemically, electrically and / or electrochemically.
  • the material of the spacer 21 is in the preferably dry initial state between the support rings 17, 20 hard, so that in the initial state of the spacer 21 has a solid, rigid shape. This is given in particular under pressure, thus sufficiently withstand the pressure forces exerted by the foundation piles 10.
  • the material of the spacer 21 Be salt or consist mainly of salt. This material is molded into a kind of salt pot, pressed or otherwise solidified to initially absorb sufficient compressive forces.
  • the two bearing rings 17 and 20 at least under pressure load on a fixed distance. Accordingly, the load of the foundation structure 10 via the respective pile pin 11 on the upper support ring 17, from there via the spacer 21 and the lower support ring 20 on the end face 15 of the associated foundation pile 12 is introduced into the same. This is especially indicated by the arrow in the Fig. 4 shown.
  • the spacer 21 is formed, in particular by the properties of its material, that it changes its external shape and / or pressure capacity in the water after a certain time. This can happen, for example, that the material of the spacer 21 in seawater or seawater, such as salt or fresh water, not permanently stable and preferably dissolves and / or can be washed or removed. As a result, the outer shape of the spacer 21 changes, so that it reduces in cross-section, preferably gradually dissolved completely by the water, removed, washed away and / or decomposed. As a result, the distance between the two bearing pieces 17 and 20 or their non-positive cohesion is removed over time. This is for example in Fig. 5 shown. There, the spacer 21 has already become much smaller compared to the Fig. 2 to 4 , Accordingly, no frictional connection between the upper bearing piece 17 and the lower bearing piece 20 longer exists.
  • the material for forming the spacer 21 is set so that only when a filler 24, which is located inside the foundation pile 12 around the pile pin 11 around and optionally in the same, is completely cured, the material of each spacer 21st , which previously carries the entire foundation structure 10, begins to dissolve and thereby loses its capacity. Accordingly, only after the hardening of the filling material 24, the load of the foundation structure 10 is transmitted via the pile pins 11 to the filling materials 24 on the foundation piles 12 and introduced by the latter into the seabed. This is indicated by the arrow in the Fig. 5 indicated.
  • pile sleeves 25 are provided. These are pipe sections that have a These pile sleeves 25 are at least below (ie at one end), but often also above (ie at both end regions) each provided with an opening which is larger in cross section than the cross section of the respective foundation pile 12.
  • Each pile sleeve 25 is slipped over an upper end portion of the already drilled in the seabed 13 foundation piles 12. Due to the support element 14 arranged here inside the pile sleeve 25, each pile sleeve 25 can only be lowered onto the end face 15 of the foundation pile 12 until the corresponding lower support ring 20 rests on it.
  • suitable openings filling material 24 can be filled in a gap 26 between each pile sleeve 25 and its associated foundation pile 12 and optionally in each foundation pile 12th
  • filling material 24 for example a cement suspension
  • the filling material 24 fills the interior of the foundation piles 12, so that the pile pegs 11 are embedded therein at least with lower portions.
  • the filling material 24 is not yet cured, so that further the load is applied via the support elements 14 directly to the foundation piles 12.
  • the spacers 21 and their material are designed so that the load capacity after the complete curing of the filling material 24 begins to relax and finally completely eliminated. This is caused for example by the fact that the material is gradually dissolved by the influence of water, rinsed by the water, removed or dissolved or otherwise removed. Like in the Fig. 5 can be seen, thus losing the support elements 14 their carrying capacity.
  • the initially created by the spacers 21 viable connection between the upper support ring 17 and the lower support ring 20 is removed by washing away, erosion, disintegration and / or dissolution of the spacers 21.
  • the filler 24 is cured, there is a direct load entry on the filler 24 in the substrate 13. This is in Fig. 5 shown.
  • a corresponding procedure takes place when using pile sleeves 25 instead of pile pegs 11.
  • the filling material 24 ensures a frictional mounting of the pile sleeves 25.
  • the corresponding support elements 14 are then introduced into the interior of the pile sleeve 25 or alternatively arranged, for example, on the outside of the foundation piles 12. In the latter case, however, the arrangement is modified so that the lower bearing rings 20 are welded to the foundation piles 12, whereby the spacer 21 and the upper bearing rings 17 rest on these and so carry the load of the pile sleeves 25.
  • the carrying capacity of the spacers 21 can be reduced continuously.
  • the spacers 21 are not limited to removal of the carrying capacity by fresh or salt water. Alternatively, for example, slow or time-delayed chemical, electrical and / or electrochemical reactions of the material of the spacers 21 can take place. Also, for example, temperature effects or the like come into consideration. In principle, mechanical methods for eliminating the carrying capacity of the spacers 21 may also be used.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The method involves anchoring the stake pins (11) and/or pile sleeves of the base structure (10) with the pile-driven into the seabed foundation piles to the sea floor. The spaces remain to be filled with a hardening filling material after insertion between the foundation piles, and the stake pins and pole sleeves. The base structure and/or the stake pins and pile sleeves are supported only initially to the foundation piles. An independent claim is included for a foundation structure for offshore facility with stake pins and/or pile sleeves to seabed over foundation piles.

Description

Die Erfindung betrifft ein Verfahren zum Verankern einer Gründungsstruktur einer Offshore-Anlage am Meeresboden gemäß dem Oberbegriff des Anspruchs 1. Des Weiteren betrifft die Erfindung eine Gründungsstruktur für eine Offshore-Anlage gemäß dem Oberbegriff des Anspruchs 6. Schließlich betrifft die Erfindung ein Auflagerelement für eine Gründungsstruktur gemäß dem Oberbegriff des Anspruchs 12.The invention relates to a method for anchoring a foundation structure of an offshore installation on the seabed according to the preamble of claim 1. Furthermore, the invention relates to a foundation structure for an offshore installation according to the preamble of claim 6. Finally, the invention relates to a support element for a foundation structure according to the preamble of claim 12.

Gründungsstrukturen für Offshore-Anlagen, insbesondere für Offshore-Windenergieanlagen, werden mit Gründungspfählen auf dem Meeresboden verankert. Die Gründungspfähle werden dazu in den Meeresboden eingebracht, beispielsweise eingerammt. Die Verbindung mit der Gründungsstruktur erfolgt mittels Pfahlzapfen, sogenannten "Pins", oder mittels Pfahlhülsen, sogenannten "Pileguides".Foundation structures for offshore installations, in particular for offshore wind turbines, are anchored to the seabed with foundation piles. The foundation piles are for this purpose introduced into the seabed, for example, rammed. The connection with the foundation structure takes place by means of pile pins, so-called "pins", or by means of pile sleeves, so-called "pileguides".

Zwischen den Gründungspfählen und den Pfahlzapfen beziehungsweise Pfahlhülsen sind Zwischenräume vorhanden, die zum Ausgleich von Toleranzen dienen. Diese Zwischenräume werden mit einem aushärtenden beziehungsweise aushärtbaren Füllmaterial, zum Beispiel einer Zementsuspension, wie insbesondere einem sogenannten Grout-Material, ausgegossen. Das Füllmaterial wird dementsprechend nach einiger Zeit, typischerweise nach Tagen, fest. Es stellt dann eine dauerhafte und feste Verbindung zwischen den Pfahlzapfen beziehungsweise Pfahlhülsen und den jeweiligen Gründungspfählen her.Between the foundation piles and the pile pins or pile sleeves interstices are available, which serve to compensate for tolerances. These intermediate spaces are filled with a hardening or hardenable filling material, for example a cement suspension, in particular a so-called grout material. The filler material accordingly solidifies after some time, typically days. It then establishes a permanent and solid connection between the pile pegs or pile sleeves and the respective foundation piles.

Üblicherweise wird die Gründungsstruktur zur Montage am Bestimmungsort in Richtung Meeresboden abgesenkt bis die Pfahlzapfen in bereits im Meeresboden verankerte Gründungspfähle eingreifen. Die Pfahlzapfen beziehungsweise Pfahlhülsen weisen mit Abstand von ihren unteren Stirnseiten angeordnete Anschläge, beispielsweise Auflagerringe, auf. Die Anschläge liegen auf den oberen Stirnseiten der Gründungspfähle auf. Dies führt dazu, dass auch nach Einfüllen und Aushärten des Füllmaterials die Hauptlast der Gründungsstruktur über die oberen Stirnseiten der Gründungspfähle in den Meeresboden abgeleitet wird. Diese bekannte Art der Abstützung der Gründungsstruktur auf den Gründungspfählen hat sich als nachteilig erwiesen.Usually, the foundation structure is lowered for mounting at the destination in the direction of the seabed until the piles engage in already anchored in the seabed foundation piles. The piles or pile sleeves have at a distance from their lower end faces arranged stops, such as support rings on. The stops are located on the upper end faces of the foundation piles. As a result, even after filling and hardening of the filling material, the main load of the foundation structure is discharged into the seabed via the upper end faces of the foundation piles. This known type of support of the foundation structure on the foundation piles has proved to be disadvantageous.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren, eine Gründungsstruktur und eine Lagerung zu schaffen, die gleichzeitig eine einfache Gründung und eine verbesserte Krafteinleitung in die Gründungspfähle und/oder in den Meeresboden gewährleisten.The invention has for its object to provide a method, a foundation structure and a storage, which at the same time ensure a simple foundation and improved force introduction into the foundation piles and / or in the seabed.

Ein Verfahren zur Lösung dieser Aufgabe weist die Maßnahmen des Anspruchs 1 auf. Demnach ist vorgesehen, dass die Gründungsstruktur beziehungsweise die Pfahlzapfen und/oder die Pfahlhülsen lediglich zeitweise und/oder nur wenige Tage mittels ihrer als Auflagerelemente dienenden Anschläge bzw. Auflagerringe kraftschlüssig auf und/oder an den Gründungspfählen gelagert werden. Dies bedeutet, dass die Last der Gründungsstruktur nur für einen begrenzten Zeitraum über die Auflagerelemente direkt auf die Gründungspfähle übertragen wird. Die Last der Gründungsstruktur wird demnach zunächst über die Anschläge bzw. Auflagerelemente und später nach der Einbringung und Verfestigung des Füllmaterials über das Füllmaterial direkt und nur noch in die Pfahlhülsen und darüber in den Meeresboden eingeleitet.A method for achieving this object comprises the measures of claim 1. Accordingly, it is provided that the foundation structure or the pile pegs and / or the pile sleeves are mounted only temporarily and / or only a few days by means of their serving as support elements stops or bearing rings frictionally on and / or on the foundation piles. This means that the load of the foundation structure is transmitted only over a limited period of time via the support elements directly to the foundation piles. The load of the foundation structure is therefore introduced first via the stops or support elements and later after the introduction and solidification of the filling material on the filler directly and only in the pile sleeves and above in the seabed.

Gemäß einer bevorzugten Ausführung der Erfindung werden die Auflagerelemente zumindest teilweise derart modifiziert und/oder teilweise entfernt, dass die kraftschlüssige Abstützung der Gründungsstruktur auf den Auflagerelementen reduziert und/oder aufgehoben, vorzugsweise vollständig beseitigt wird. Dies wird nach dem Aushärten des Füllmaterials und die dadurch erfolgte Abstützung bzw. Einbettung der Pfahlzapfen beziehungsweise Pfahlhülsen in den Gründungspfählen herbeigeführt. Damit erfolgt die Krafteinleitung von der Gründungsstruktur über die Pfahlzapfen beziehungsweise Pfahlhülsen in das Füllmaterial alternativ oder gegebenenfalls ergänzend zur Lagerung über die Auflagerelemente und die Gründungspfähle.According to a preferred embodiment of the invention, the support elements are at least partially so modified and / or partially removed that the non-positive support of the foundation structure on the support elements is reduced and / or eliminated, preferably completely eliminated. This is brought about after the curing of the filling material and the resulting support or embedding of the pile pegs or pile sleeves in the foundation piles. Thus, the introduction of force from the foundation structure via the pile pegs or pile sleeves into the filling material takes place alternatively or optionally in addition to storage via the support elements and the foundation piles.

Vorzugsweise wird die kraftschlüssige Lagerung der Auflagerelemente auf den Gründungspfählen zumindest teilweise aufgehoben beziehungsweise beseitigt, insbesondere durch Umgebungseinflüsse wie das Einwirken von Flüssigkeit, wobei es sich um Süß- oder Salzwasser handeln kann. Dies erfolgt gezielt nach dem Aushärten des Füllmaterials oder Grout-Materials. Bevorzugt benötigt eine sukzessive Beseitigung beziehungsweise Aufhebung der kraftschlüssigen Lagerung einen Zeitraum, der länger ist als das vollständige Aushärten des Füllmaterials. Der Zeitraum bis zu einem vollständigen Aufheben der Lagerung ist insbesondere auf eine erforderliche Einwirkzeit beziehungsweise Reaktionszeit zurückzuführen, wie Salzwasser, Süßwasser oder auch alternativer Medien. Alternativ oder zusätzlich kommen beispielsweise Licht, Temperatur, Chemikalien, Elektrizität oder ähnliches in Betracht, um für eine sukzessive Reduzierung der kraftschlüssigen Lagerung bis zu einem Aufheben derselben zu sorgen.Preferably, the non-positive mounting of the support elements on the foundation piles is at least partially canceled or eliminated, in particular by environmental influences such as the action of liquid, which may be fresh or salt water. This is done specifically after the curing of the filler or Grout material. Preferably, a successive elimination or cancellation of the frictional storage requires a period of time which is longer than the complete curing of the filling material. The period up to a complete cancellation of storage is due in particular to a required exposure time or reaction time, such as salt water, fresh water or alternative media. Alternatively or additionally, for example, light, temperature, chemicals, electricity or the like come into consideration, in order to ensure a successive reduction of the frictional storage up to a repeal of the same.

Besonders bevorzugt werden die Auflagerelemente durch mehrere Auflagerstücke gebildet. Bei den Auflagerstücken handelt es sich bevorzugt um Auflagerringe mit insbesondere einer scheibenförmigen Ausbildung. Die Auflagerringe werden vorzugsweise mit einer zentralen Öffnung beziehungsweise einem zentralen Durchbruch ausgebildet. Die Öffnungen sind dergestalt ausgebildet, dass der zugeordnete Pfahlzapfen hindurchgeführt werden kann, vorzugsweise mit geringem Spiel. Dementsprechend umgeben die Auflagerstücke beziehungsweise die Auflagerringe den jeweiligen Pfahlzapfen. Die Auflagerstücke werden im Wesentlichen senkrecht zur Längsmittelachse der Pfahlzapfen angeordnet. Die Auflagerelemente weisen eine hinreichende Größe beziehungsweise einen hinreichenden Durchmesser auf, um zumindest im Wesentlichen ein allseitiges Aufliegen auf eine obere Stirnfläche jedes Gründungspfahls zu ermöglichen. Dementsprechend werden die Auflagerelemente typischerweise mit einem größeren Durchmesser ausgebildet als der Durchmesser des jeweiligen Gründungspfahls. Alternativ können auch Pfahlhülsen über die Gründungspfähle gestülpt werden. Dabei werden die Auflagerelemente im Innern der Pfahlhülsen oder außen an den Gründungspfählen angebracht.Particularly preferably, the support elements are formed by a plurality of bearing pieces. The bearing pieces are preferably bearing rings with in particular a disc-shaped design. The support rings are preferably formed with a central opening or a central opening. The openings are formed such that the associated pile pin can be passed, preferably with little play. Accordingly, the bearing pieces or the bearing rings surround the respective pile pin. The bearing pieces are arranged substantially perpendicular to the longitudinal center axis of the pile pins. The support elements have a sufficient size or a sufficient diameter to at least substantially allow an all-round resting on an upper end face of each foundation pile. Accordingly, the support members are typically formed with a larger diameter than the diameter of the respective foundation pile. Alternatively, pile sleeves can be slipped over the foundation piles. The support elements are mounted inside the pile sleeves or on the outside of the foundation piles.

Weiter bevorzugt wird zumindest ein Teil des Auflagerelements, insbesondere ein oberer Auflagerring, dauerhaft mit dem jeweiligen Pfahlzapfen beziehungsweise der Pfahlhülse verbunden, insbesondere verschweißt. Besonders bevorzugt wird ein weiterer, am Pfahlzapfen bzw. der Pfahlhülse nicht befestigter Teil des Auflagerelements, insbesondere ein unterer Auflagerring, wiederum mit dem oberen Auflagerring verbunden. Diese Verbindung wird insbesondere lösbar ausgestaltet. Vorzugsweise wird zunächst eine starre Verbindung ausgebildet, die anschließend in eine flexible Verbindung umgewandelt oder ganz entfernt werden kann.More preferably, at least part of the support element, in particular an upper support ring, permanently connected to the respective pile pin or the pile sleeve, in particular welded. Particularly preferred is another, not attached to the pile pin or the pile sleeve part of the support element, in particular a lower support ring, in turn connected to the upper support ring. This connection is designed in particular detachable. Preferably, initially a rigid Compound formed, which can then be converted into a flexible connection or completely removed.

Besonders bevorzugt wird zwischen dem oberen und dem unteren Auflagerring ein Abstandshalter vorgesehen. Der Abstandshalter des Auflagerelements ist anfänglich starr ausgebildet, aber in eine flexible Form überführbar oder entfernbar. Vorzugsweise wird der Abstandshalter, beziehungsweise sein Material durch diese umgebende Medien, vor allem Meerwasser, und zwar Salz- oder Süßwasser, modifiziert, ausgespült, abgetragen und/oder aufgelöst. Bevorzugt wird die durch den jeweiligen Abstandshalter hergestellte Verbindung zwischen den Auflagerringen gelöst, ganz oder teilweise beseitigt und/oder zumindest von einer starren Verbindung in eine deformierbare beziehungsweise flexible Verbindung umgewandelt, vorzugsweise durch äußere Einflüsse wie zum Beispiel Wasser.Particularly preferably, a spacer is provided between the upper and the lower support ring. The spacer of the support member is initially rigid but convertible or removable into a flexible form. Preferably, the spacer, or its material by these surrounding media, especially seawater, namely salt or fresh water, modified, rinsed, removed and / or dissolved. Preferably, the connection produced by the respective spacer between the support rings is released, completely or partially eliminated and / or at least converted from a rigid compound into a deformable or flexible connection, preferably by external influences such as water.

Weiter bevorzugt werden die Pfahlzapfen der Gründungsstruktur zur Aufstellung derselben in eine oberseitige Öffnung der im Meeresboden verankerten Gründungspfähle eingesetzt. Die Auflagerelemente werden insbesondere derart angeordnet, dass sie auf einer insbesondere oberen Stirnseite der Gründungspfähle aufliegen zum Tragen der Gründungsstruktur. Alternativ werden die Gründungspfähle durch die Pfahlhülsen hindurch gesteckt. Die Auflagerelemente können dann insbesondere beispielsweise im Inneren der Pfahlhülsen angeordnet sein. Eventuell kommt auch eine Anordnung spezieller Auflagerelemente an den Gründungspfählen selber in Betracht. Somit wird bis zum Modifizieren, Auflösen, Ausspülen bzw. Abtragen der Auflagerelemente für eine Einleitung der Last über die jeweiligen Auflagerelemente in die Gründungspfähle gesorgt.More preferably, the pile pins of the foundation structure are used to set them up in a top opening of anchored in the seabed foundation piles. The support elements are arranged in particular such that they rest on a particular upper end side of the foundation piles for supporting the foundation structure. Alternatively, the foundation piles are inserted through the pile sleeves. The support elements can then be arranged in particular, for example, in the interior of the pile sleeves. Possibly comes also an arrangement of special support elements on the foundation piles themselves into consideration. Thus, until the modification, dissolution, rinsing or removal of the support elements for an introduction of the load on the respective support elements are provided in the foundation piles.

Die eingangs genannte Aufgabe der Erfindung wird außerdem gelöst durch eine Gründungsstruktur für eine Offshore-Anlage mit den Merkmalen des Anspruchs 6. Diese Gründungsstruktur zeichnet sich dadurch aus, dass an den Pfahlzapfen beziehungsweise Pfahlhülsen vorzugsweise jeweils zumindest ein variables Auflagerelement zur zeitweisen kraftschlüssigen Lagerung auf den Gründungspfählen vorgesehen ist, die nach dem Aushärten von Füllmaterial in den Gründungspfählen aufhebbar ist. Das hat zur Folge, dass die Last der Gründungsstruktur später kraftschlüssig über das dann ausgehärtete Füllmaterial in die Gründungspfähle eingeleitet werden kann. Somit ist eine definierte Krafteinleitung möglich, ohne dass insbesondere Teile der Gründungsstruktur durch Kontakt mit den Gründungspfählen der Gefahr einer Beschädigung ausgesetzt sind. Bevorzugt ist das Auflagerelement mehrteilig ausgebildet. Insbesondere weist das Auflagerelement wenigstens zwei Auflagerringe auf. Das Auflagerelement beziehungsweise die Auflagerringe sind zumindest bis zum Aushärten des Füllmaterials zur Aufnahme und Einleitung der Lasten beziehungsweise der auftretenden Kräfte, wie insbesondere die Gewichtskraft und die Windkräfte der Gründungsstruktur, in die Gründungspfähle vorgesehen.The above-mentioned object of the invention is also achieved by a foundation structure for an offshore installation with the features of claim 6. This foundation structure is characterized in that preferably at least one variable support element for the temporary frictional mounting on the foundation piles at the pile pin or pile sleeves is provided, which can be canceled after the curing of filler in the foundation piles. This has the consequence that the load of the foundation structure can later be positively introduced via the then cured filler in the foundation piles. Thus, a defined introduction of force is possible, without in particular parts of the foundation structure being exposed to the risk of damage by contact with the foundation piles. Preferably, the support element is designed in several parts. In particular, the support element has at least two bearing rings. The support element or the support rings are at least until hardening of the filling material for receiving and introducing the loads or the forces occurring, in particular the weight and the wind forces of the foundation structure, provided in the foundation piles.

Bevorzugt ist wenigstens ein oberer Auflagerring am Pfahlzapfen und/oder an der Pfahlhülse angeschweißt. Damit ist eine feste Verbindung zwischen dem Auflagerring und dem Pfahlzapfen beziehungsweise der Pfahlhülse sichergestellt. Weiter bevorzugt ist wenigstens ein unterer Auflagerring am Pfahlzapfen beziehungsweise an der Pfahlhülse angeordnet. Der untere Auflagerring ist insbesondere beweglich gegenüber dem Pfahlzapfen und/oder der Pfahlhülse angeordnet. Durch Reduzierung der Dicke bzw. Beseitigung des Abstandshalters ist der Abstand der beiden Auflagerringe reduzierbar. Unmittelbar mit den unteren Auflagerringen ist die Gründungsstruktur auf den Oberseiten der Gründungspfähle gelagert und/oder temporär abgestützt.Preferably, at least one upper support ring is welded to the pile pin and / or to the pile sleeve. For a solid connection between the support ring and the pile pin or the pile sleeve is ensured. More preferably, at least one lower support ring is arranged on the pile pin or on the pile sleeve. The lower support ring is arranged in particular movable relative to the pile pin and / or the pile sleeve. By reducing the thickness or removal of the spacer, the distance between the two bearing rings can be reduced. Immediately with the lower support rings, the foundation structure is supported on the tops of the foundation piles and / or temporarily supported.

Besonders bevorzugt ist zwischen den beiden Auflagerringen wenigstens ein Abstandshalter angeordnet. Der Abstandshalter sorgt für eine Beabstandung der beiden Auflagerringe voneinander. Der Abstandshalter verbindet den unteren Auflagerring zeitweise mit dem oberen Auflagerring. Dementsprechend ist eine Verbindung zwischen den beiden Auflagerringen vom Abstandshalter geschaffen. Die feste Verbindung ist vorzugsweise dazu geeignet, den unteren Auflagerring am oberen Auflagerring kraftschlüssig abzustützen. Weiter bevorzugt ist der Abstandshalter kissenförmig ausgebildet, insbesondere mit einer flexiblen Umhüllung und einem Füllmaterial zur festen und stabilen Auspolsterung. Der Abstandshalter ist vorzugsweise zumindest nach seiner erfindungsgemäßen Modifikation variabel in seiner vertikalen Ausdehnung. Somit kann der Abstand der beiden Auflagerstücke, insbesondere der Auflagerringe, voneinander variiert werden, um die kraftschlüssige Lagerung aufzuheben.Particularly preferably, at least one spacer is arranged between the two support rings. The spacer ensures a spacing of the two bearing rings from each other. The spacer temporarily connects the lower support ring with the upper support ring. Accordingly, a connection between the two bearing rings is provided by the spacer. The fixed connection is preferably suitable for frictionally supporting the lower support ring on the upper support ring. More preferably, the spacer is pillow-shaped, in particular with a flexible sheath and a filling material for firm and stable padding. The spacer is preferably at least after its modification according to the invention variable in its vertical extent. Thus, the distance between the two bearing pieces, in particular the bearing rings, can be varied from each other to cancel the non-positive mounting.

Die kraftschlüssige Lagerung der Auflagerelemente auf den Gründungspfählen ist insbesondere durch Einwirkung von Salz- und/oder Süßwasser oder anderen Stoffen beziehungsweise Mitteln reduzierbar bzw. aufhebbar, zum Beispiel ausspülbar, abtragbar und/oder auflösbar. Vorzugsweise sind die Abstandshalter beziehungsweise zumindest die kraftschlüssige Lagerung auf den Gründungspfählen durch das umgebende Wasser zumindest teilweise reduzierbar und/oder entfernbar. Hierzu ist zumindest ein Teil des Materials des Abstandshalters umwandelbar und/oder beseitigbar, insbesondere durch Auflösung, Ausspülung und/oder Ausschwemmung. Bevorzugt ist auch der Abstand der beiden Auflagerringe verringerbar. Damit ist nach erfolgter vollständiger Aushärtung des Füllmaterials und damit fester Verbindung zwischen den Pfahlzapfen beziehungsweise Pfahlhülsen der Gründungsstruktur und den Gründungspfählen die kraftschlüssige Lagerung der Gründungsstruktur auf den Gründungspfählen mittels der Auflagerelemente beseitigbar.The non-positive mounting of the support elements on the foundation piles can be reduced or canceled out, in particular by the action of salt and / or fresh water or other substances or agents, for example rinsed, abraded and / or dissolvable. Preferably, the spacers or at least the frictional bearing on the foundation piles are at least partially reduced by the surrounding water and / or removable. For this purpose, at least a part of the material of the spacer is convertible and / or disposable, in particular by Dissolution, rinsing and / or draining. Preferably, the distance between the two bearing rings can be reduced. Thus, after complete curing of the filling material and thus a firm connection between the pile pegs or pile sleeves of the foundation structure and the foundation piles, the frictional mounting of the foundation structure on the foundation piles can be eliminated by means of the support elements.

Die der Erfindung zugrundeliegende Aufgabe wird außerdem gelöst durch ein Auflagerelement für eine Gründungsstruktur mit den Merkmalen des Anspruchs 12. Das Auflagerelement weist zwei Auflagerringe auf, insbesondere einen ersten Auflagerring und einen zweiten Auflagerring. Dabei ist der erste Auflagerring fest an dem jeweiligen Pfahlzapfen beziehungsweise einer Pfahlhülse der Gründungsstruktur befestigt, wobei der erste Auflagerring mit dem zweiten Auflagerring nur zeitweise verbunden ist. Nach dem Lösen dieser Verbindung ist der Abstand der beiden Auflagerringe verringerbar. Somit kann eine kraftschlüssige Lagerung der Gründungsstruktur, an der die Auflagerelemente befestigt sind, auf entsprechenden Gründungspfählen nachträglich beseitigt werden, nachdem für eine dauerhaft stabile kraftschlüssige Lagerung zwischen Pfahlzapfen beziehungsweise Pfahlhülsen und den zugehörigen Gründungspfählen durch ein ausgehärtetes Füllmaterial gesorgt ist.The object underlying the invention is also achieved by a support element for a foundation structure with the features of claim 12. The support element has two support rings, in particular a first support ring and a second support ring. In this case, the first support ring is fixedly secured to the respective pile pin or a pile sleeve of the foundation structure, wherein the first support ring is connected to the second support ring only temporarily. After releasing this connection, the distance between the two bearing rings can be reduced. Thus, a non-positive mounting of the foundation structure to which the support elements are fixed, be subsequently removed on corresponding foundation piles, after a permanently stable frictional bearing between pile pegs or pile sleeves and the associated foundation piles is provided by a cured filler.

Weitere vorteilhafte Weiterbildungen der Erfindung sind den Unteransprüchen zu entnehmen.Further advantageous developments of the invention can be found in the dependent claims.

Bevorzugte Ausführungsbeispiele der Erfindung werden nachfolgend anhand der Zeichnung näher erläutert. In dieser zeigen:

Fig. 1
eine Seitenansicht einer Gründungsstruktur einer Offshore-Windenergieanlage,
Fig. 2
eine vergrößerte Ansicht eines oberen Teils eines Gründungspfahls zur Verankerung der Gründungsstruktur im Meeresboden mit einem Pfahlzapfen der Gründungsstruktur während des Einsetzens,
Fig. 3
die Darstellung der Fig. 2 mit vollständig auf den Gründungspfahl abgesetzten Pfahlzapfen,
Fig. 4
die Darstellung der Fig. 3 mit skizzierter Lasteinleitung in den Gründungspfahl,
Fig. 5
die Darstellung der Fig. 3 mit Lasteinleitung über das Füllmaterial,
Fig. 6
eine Draufsicht auf ein beispielhaftes Auflagerelement, und
Fig. 7
ein alternatives Ausführungsbeispiel der Erfindung für eine Gründungsstruktur mit Pfahlhülsen.
Preferred embodiments of the invention will be explained in more detail with reference to the drawing. In this show:
Fig. 1
a side view of a foundation structure of an offshore wind turbine,
Fig. 2
an enlarged view of an upper part of a foundation pile for anchoring the foundation structure in the seabed with a pile pin of the foundation structure during insertion,
Fig. 3
the representation of Fig. 2 with stake pegs completely set down on the foundation pile,
Fig. 4
the representation of Fig. 3 with sketched load introduction into the foundation pile,
Fig. 5
the representation of Fig. 3 with load introduction via the filling material,
Fig. 6
a plan view of an exemplary support element, and
Fig. 7
an alternative embodiment of the invention for a foundation structure with pile sleeves.

Nachfolgend wird die Erfindung im Zusammenhang mit einer Offshore-Windenergieanlage beschrieben, von der beispielhaft in der Fig. 1 nur eine Gründungsstruktur 10 gezeigt ist. Die dargestellte Gründungsstruktur 10 wird auch als "Jacket" bezeichnet. Die Erfindung ist aber auch für andere Offshore-Anlagen geeignet, so beispielsweise für Offshore-Umspannwerke oder auch anders gestaltete Gründungsstrukturen, wie beispielsweise Tripods oder auch Monopiles.In the following, the invention will be described in connection with an offshore wind turbine, of which, by way of example, in FIG Fig. 1 only a foundation structure 10 is shown. The illustrated foundation structure 10 is also referred to as a "jacket". However, the invention is also suitable for other offshore installations, such as for offshore substations or differently shaped foundation structures, such as tripods or monopiles.

Die in der Fig. 1 gezeigte Gründungsstruktur 10 der Offshore-Windenergieanlage beziehungsweise Offshore-Windkraftanlage ist fachwerkartig ausgebildet. Die Gründungsstruktur 10 befindet sich größtenteils unter Wasser und trägt am oberen Ende einen nicht gezeigten Aufbau. Als Aufbau kommt beispielsweise ein Turm einer Offshore-Windenergieanlage in Betracht. Am unteren Ende der Gründungsstruktur 10 sind vier parallele, vertikale Pfahlzapfen 11 angeordnet. Es können aber auch mehr oder weniger als vier Pfahlzapfen 11 vorgesehen sein. Während die Pfahlzapfen 11 auch unterschiedliche Längen aufweisen können, sind sie im gezeigten Ausführungsbeispiel gleich lang. Die Pfahlzapfen 11 dienen zur Aufstellung der Gründungsstruktur 10, sie bilden also sozusagen deren Füße. Dazu ist jeder der Pfahlzapfen 11 mit einem rohrartigen Gründungspfahl 12 verbunden, wie er in den Fig. 2 bis 5 dargestellt ist. Die Gründungspfähle 12 sind zumindest im Wesentlichen senkrecht in einen Untergrund 13, nämlich den Meeresboden, eingerammt, eingespült oder in sonstiger Weise eingebracht. Dabei ragt ein oberer Endbereich aus dem Untergrund 13 heraus in das darüber befindliche Meerwasser. Durch Verbindung der Pfahlzapfen 11 mit den Gründungspfählen 12 wird eine Verankerung der Gründungsstruktur 10 auf und mit dem Meeresboden erreicht.The in the Fig. 1 Founding structure 10 shown the offshore wind turbine or offshore wind turbine is designed like a truss. The foundation structure 10 is mostly under water and carries at the upper end of a structure, not shown. As a structure, for example, a tower of an offshore wind turbine comes into consideration. At the lower end of the foundation structure 10 four parallel vertical pegs 11 are arranged. However, more or less than four pile pegs 11 may be provided. While the pile pins 11 may also have different lengths, they are the same length in the embodiment shown. The pile pins 11 are used to set up the foundation structure 10, so they form, so to speak, their feet. For this purpose, each of the pile pins 11 is connected to a tubular foundation pile 12, as in the Fig. 2 to 5 is shown. The foundation piles 12 are at least substantially perpendicular in a substrate 13, namely the seabed, rammed, flushed or introduced in any other way. In this case, an upper end region protrudes out of the substrate 13 into the seawater above it. By connecting the pile pins 11 with the foundation piles 12 anchoring of the foundation structure 10 is achieved on and with the seabed.

Jeder einem Pfahlzapfen 11 zugeordnete Gründungspfahl 12 weist am oberen Endbereich im Bereich seiner oberen Stirnfläche 15 eine Öffnung auf. Diese Öffnung ist im Ausführungsbeispiel dem freien Querschnitt beziehungsweise Innendurchmesser des Gründungspfahls 12 entsprechend ausgebildet. Die obere Stirnfläche 15 verläuft im rechten Winkel zur Längsmittelachse 16 des Gründungspfahls 12. Der Innendurchmesser jedes Gründungspfahls 12 ist deutlich größer als der Außendurchmesser des ihm zugeordneten Pfahlzapfens 11.Each pile post 11 associated with a foundation pile 12 has at the upper end in the region of its upper end face 15 an opening. This opening is formed in the embodiment of the free cross section or inner diameter of the foundation pile 12 accordingly. The upper end face 15 extends at right angles to the longitudinal central axis 16 of the foundation pile 12. The inner diameter Each foundation pile 12 is significantly larger than the outside diameter of the pile pin 11 assigned to it.

Erfindungsgemäß ist jedem Pfahlzapfen 11 ein Auflagerelement 14 zugeordnet. Das Auflagerelement 14 dient dazu, die Gründungsstruktur 10 auf den Gründungspfählen 12 abzusetzen und abstützen. Damit wird die Eintauchtiefe der Pfahlzapfen 11 in die Gründungspfähle 12 begrenzt.According to the invention, each bearing pin 11 is assigned a support element 14. The support member 14 serves to settle the foundation structure 10 on the foundation piles 12 and support. Thus, the immersion depth of the pile pin 11 is limited in the foundation piles 12.

Das Auflagerelement 14 besteht im gezeigten Ausführungsbeispiel aus mehreren Bestandteilen, und zwar zwei beabstandeten Auflagerstücken, die hier als Auflagerringe 17, 20 ausgebildet sind, und einem Abstandshalter 21 oder gegebenenfalls auch mehreren zum Beispiel übereinander angeordneten Abstandshaltern 21 zwischen den Auflagerstücken bzw. Auflagerringen 17, 20. Der obere Auflagerring 17 weist einen zentralen Durchbruch auf, der mit dem Außendurchmesser des zugeordneten Pfahlzapfens 11 korrespondiert. Dementsprechend wird der Pfahlzapfen 11 durch den Durchbruch hindurchgeführt. Der obere Auflagerring 17 ist an den Pfahlzapfen 11 mit einer umlaufenden Schweißnaht 19 angeschweißt. Dadurch ist der obere Auflagerring 17 fest mit dem Pfahlzapfen 11 verbunden. Der im wesentlichen zu dem oberen Auflagerring 17 identische untere Auflagerring 20 ist mit Abstand unterhalb des oberen Auflagerrings 17 angeordnet. Der untere Auflagerring 20 ist allerdings nicht mit dem Pfahlzapfen 11 verschweißt, sondern lose, das heißt axial frei verschieblich, auf diesen aufgesteckt.The support element 14 consists in the embodiment shown of several components, namely two spaced Auflagerstücken, which are here designed as support rings 17, 20, and a spacer 21 or optionally also a plurality of, for example, superimposed spacers 21 between the support pieces or support rings 17, 20th The upper support ring 17 has a central opening, which corresponds to the outer diameter of the associated peg 11. Accordingly, the pile pin 11 is passed through the opening. The upper support ring 17 is welded to the pile pin 11 with a circumferential weld 19. As a result, the upper support ring 17 is fixedly connected to the pile pin 11. The substantially identical to the upper support ring 17 lower support ring 20 is arranged at a distance below the upper support ring 17. However, the lower support ring 20 is not welded to the pile pin 11, but loose, that is axially freely displaceable, attached to this.

Im Bereich zwischen den beiden Auflagerringen 17 und 20 ist der Abstandshalter 21 angeordnet. Dieser Abstandshalter 21 ist hier als umlaufender Ring ausgestaltet, wie er in Fig. 6 dargestellt ist. Es können aber auch mehrere separate Abstandshalter 21 vorgesehen sein. Der Abstandshalter 21 kann erforderlichenfalls sowohl mit dem oberen Auflagerring 17 als auch mit dem unteren Auflagerring 20 verbunden sein.In the area between the two bearing rings 17 and 20, the spacer 21 is arranged. This spacer 21 is designed here as a circumferential ring, as in Fig. 6 is shown. However, it is also possible to provide a plurality of separate spacers 21. If necessary, the spacer 21 may be connected to both the upper support ring 17 and the lower support ring 20.

Der Abstandshalter 21 ist aus einem besonderen Material gebildet. Das Material ist so gewählt, beispielsweise aus langsam wasserlöslichem granulären Material, dass es sich mit der Zeit auflöst, erweicht, ausgespült und/oder abgetragen wird. Das kann mechanisch, chemisch, elektrisch und/oder elektro-chemisch erfolgen. Das Material des Abstandshalters 21 ist im vorzugsweise trockenen Ausgangszustand zwischen den Auflagerringen 17, 20 hart, so dass im Ausgangszustand der Abstandshalter 21 eine feste, starre Gestalt aufweist. Diese ist insbesondere auch unter Druckbelastung gegeben, hält also in ausreichendem Maße den von den Gründungspfählen 10 ausgeübten Druckkräften stand. Bevorzugt kann das Material des Abstandshalters 21 Salz sein oder hauptsächlich aus Salz bestehen. Dieses Material ist zu einer Art Salztopf geformt, gepresst oder in sonstiger Weise verfestigt, um anfänglich in ausreichendem Maße Druckkräfte aufnehmen zu können.The spacer 21 is formed of a special material. The material is chosen, for example, from slowly water-soluble granular material, that it dissolves over time, softened, rinsed and / or removed. This can be done mechanically, chemically, electrically and / or electrochemically. The material of the spacer 21 is in the preferably dry initial state between the support rings 17, 20 hard, so that in the initial state of the spacer 21 has a solid, rigid shape. This is given in particular under pressure, thus sufficiently withstand the pressure forces exerted by the foundation piles 10. Preferably, the material of the spacer 21 Be salt or consist mainly of salt. This material is molded into a kind of salt pot, pressed or otherwise solidified to initially absorb sufficient compressive forces.

Aufgrund der festen Struktur des Abstandshalters 21 weisen die beiden Auflagerringe 17 und 20 zumindest unter Druckbelastung einen fest definierten Abstand auf. Dementsprechend wird die Last der Gründungsstruktur 10 über den jeweiligen Pfahlzapfen 11 auf den oberen Auflagerring 17, von dort über den Abstandshalter 21 und den unteren Auflagerring 20 auf die Stirnfläche 15 des dazugehörenden Gründungspfahls 12 in denselben eingeleitet. Dies ist insbesondere durch den Pfeil in der Fig. 4 dargestellt.Due to the fixed structure of the spacer 21, the two bearing rings 17 and 20 at least under pressure load on a fixed distance. Accordingly, the load of the foundation structure 10 via the respective pile pin 11 on the upper support ring 17, from there via the spacer 21 and the lower support ring 20 on the end face 15 of the associated foundation pile 12 is introduced into the same. This is especially indicated by the arrow in the Fig. 4 shown.

Der Abstandshalter 21 ist so ausgebildet, und zwar insbesondere durch die Eigenschaften seines Materials, dass er seine äußere Form und/oder Druckbelastbarkeit im Wasser nach einer gewissen Zeit ändert. Dies kann beispielsweise dadurch geschehen, dass das Material des Abstandshalters 21 im See- bzw. Meerwasser, wie Salz- oder Süßwasser, nicht dauerhaft stabil ist und sich vorzugsweise auflöst und/oder auswaschen bzw. abtragen lässt. Dadurch ändert sich die äußere Form des Abstandshalters 21, so dass er sich im Querschnitt reduziert, vorzugsweise nach und nach vom Wasser ganz aufgelöst, abgetragen, weggespült und/oder zersetzt wird. Hierdurch wird der Abstand der beiden Auflagerstücke 17 und 20 beziehungsweise deren kraftschlüssiger Zusammenhalt mit der Zeit aufgehoben. Dies ist beispielsweise in Fig. 5 gezeigt. Dort ist der Abstandshalter 21 bereits deutlich kleiner geworden gegenüber den Fig. 2 bis 4. Dementsprechend ist keine kraftschlüssige Verbindung zwischen dem oberen Auflagerstück 17 und dem unteren Auflagerstück 20 mehr vorhanden.The spacer 21 is formed, in particular by the properties of its material, that it changes its external shape and / or pressure capacity in the water after a certain time. This can happen, for example, that the material of the spacer 21 in seawater or seawater, such as salt or fresh water, not permanently stable and preferably dissolves and / or can be washed or removed. As a result, the outer shape of the spacer 21 changes, so that it reduces in cross-section, preferably gradually dissolved completely by the water, removed, washed away and / or decomposed. As a result, the distance between the two bearing pieces 17 and 20 or their non-positive cohesion is removed over time. This is for example in Fig. 5 shown. There, the spacer 21 has already become much smaller compared to the Fig. 2 to 4 , Accordingly, no frictional connection between the upper bearing piece 17 and the lower bearing piece 20 longer exists.

Das Material zur Bildung des Abstandshalters 21 ist so ausgebildet bzw. eingestellt, dass erst dann, wenn ein Füllmaterial 24, das sich im Inneren des Gründungspfahls 12 um den Pfahlzapfen 11 herum und gegebenenfalls in demselben befindet, vollständig ausgehärtet ist, das Material jedes Abstandshalters 21, das zuvor die ganze Gründungssstruktur 10 trägt, beginnt sich aufzulösen und dadurch seine Tragkraft verliert. Dementsprechend wird erst nach dem Aushärten des Füllmaterials 24 die Last der Gründungsstruktur 10 über die Pfahlzapfen 11 auf die Füllmaterialien 24 auf die Gründungspfähle 12 übertragen und von letzteren in den Meeresboden eingeleitet. Dies ist durch den Pfeil in der Fig. 5 angedeutet.The material for forming the spacer 21 is set so that only when a filler 24, which is located inside the foundation pile 12 around the pile pin 11 around and optionally in the same, is completely cured, the material of each spacer 21st , which previously carries the entire foundation structure 10, begins to dissolve and thereby loses its capacity. Accordingly, only after the hardening of the filling material 24, the load of the foundation structure 10 is transmitted via the pile pins 11 to the filling materials 24 on the foundation piles 12 and introduced by the latter into the seabed. This is indicated by the arrow in the Fig. 5 indicated.

In der Fig. 7 ist ein alternatives Ausführungsbeispiel gezeigt. Dabei sind statt Pfahlzapfen 11 Pfahlhülsen 25 vorgesehen. Bei diesen handelt es sich um Rohrabschnitte, die einen größeren Durchmesser aufweisen als die ihnen zugeordneten Gründungspfähle 12. Diese Pfahlhülsen 25 sind zumindest unten (also an einem Endbereich), häufig aber auch oben (also an beiden Endbereichen) mit jeweils einer Öffnung versehen, die im Querschnitt größer ist als der Querschnitt des jeweiligen Gründungspfahls 12. Jede Pfahlhülse 25 wird über einen oberen Endbereich der bereits in den Meeresboden 13 eingerammten Gründungspfähle 12 gestülpt. Aufgrund des hier im Inneren der Pfahlhülse 25 angeordneten Auflagerelements 14 kann jede Pfahlhülse 25 nur bis zum Aufliegen des entsprechenden unteren Auflagerrings 20 auf die Stirnfläche 15 des Gründungspfahls 12 abgesenkt werden. Durch geeignete Öffnungen kann Füllmaterial 24 in einen Zwischenraum 26 zwischen jeder Pfahlhülse 25 und dem ihr zugeordneten Gründungspfahl 12 eingefüllt werden und gegebenenfalls auch in jeden Gründungspfahl 12.In the Fig. 7 an alternative embodiment is shown. Instead of pile pins 11 pile sleeves 25 are provided. These are pipe sections that have a These pile sleeves 25 are at least below (ie at one end), but often also above (ie at both end regions) each provided with an opening which is larger in cross section than the cross section of the respective foundation pile 12. Each pile sleeve 25 is slipped over an upper end portion of the already drilled in the seabed 13 foundation piles 12. Due to the support element 14 arranged here inside the pile sleeve 25, each pile sleeve 25 can only be lowered onto the end face 15 of the foundation pile 12 until the corresponding lower support ring 20 rests on it. Through suitable openings filling material 24 can be filled in a gap 26 between each pile sleeve 25 and its associated foundation pile 12 and optionally in each foundation pile 12th

Nachfolgend wird das erfindungsgemäße Verfahren unter Bezugnahme auf die Fig. 2 bis 5 näher erläutert:

  • Das Verfahren zeichnet sich dadurch aus, dass eine zunächst kraftschlüssige Lagerung bzw. Abstützung der Gründungsstruktur 10 auf den Stirnflächen 15 der Gründungspfähle 12 erfolgt. Hierzu ist an jedem Pfahlzapfen 11 ein Auflagerelement 14 angeschweißt, das die Last der Gründungsstruktur 10 von den Pfahlzapfen 11 auf die Gründungspfähle 12 überträgt, wenn die Auflagerelemente 14 auf den Stirnflächen 15 der Gründungspfähle 12 aufliegen. Aufgrund der anfangs druckstabilen Abstandshalter 21 wird somit eine kraftschlüssige Lagerung der Gründungsstruktur 10 mittels der Pfahlzapfen 11 und der Abstandselemente 14 auf den oberen Stirnflächen 15 der Gründungspfähle 12 herbeigeführt. Die Gründungsstruktur 10 wird dementsprechend mittels der Pfahlzapfen 11 auf bereits in den Meeresboden beziehungsweise Untergrund 13 durch zum Beispiel Einrammen oder Einspülen eingebrachte Gründungspfähle 12 abgesetzt. Damit erfolgt eine Lastübertragung über die Auflagerelemente 14.
Hereinafter, the inventive method with reference to the Fig. 2 to 5 explained in more detail:
  • The method is characterized in that an initially non-positive mounting or support of the foundation structure 10 takes place on the end faces 15 of the foundation piles 12. For this purpose, a support element 14 is welded to each pile pin 11, which transfers the load of the foundation structure 10 of the pile pin 11 on the foundation piles 12 when the support elements 14 rest on the end faces 15 of the foundation piles 12. Due to the initially pressure-stable spacers 21, a frictional mounting of the foundation structure 10 is thus brought about by means of the pile pins 11 and the spacer elements 14 on the upper end faces 15 of the foundation piles 12. The foundation structure 10 is accordingly deposited by means of the pile peg 11 on already in the seabed or substrate 13 by, for example, ramming or flushing introduced foundation piles 12. This results in a load transfer via the support elements 14th

In einem nächsten Schritt wird nun Füllmaterial 24, zum Beispiel eine Zementsuspension, in das Innere der aus dem Meeresboden 13 herausragenden Gründungspfähle 12 eingefüllt. Das Füllmaterial 24 füllt den Innenraum der Gründungspfähle 12 aus, so dass die Pfahlzapfen 11 zumindest mit unteren Abschnitten darin eingebettet sind. Zunächst ist das Füllmaterial 24 noch nicht ausgehärtet, so dass weiterhin der Lasteintrag über die Auflagerelemente 14 direkt auf die Gründungspfähle 12 erfolgt.In a next step, filling material 24, for example a cement suspension, is now filled into the interior of the foundation piles 12 protruding from the seabed 13. The filling material 24 fills the interior of the foundation piles 12, so that the pile pegs 11 are embedded therein at least with lower portions. First, the filling material 24 is not yet cured, so that further the load is applied via the support elements 14 directly to the foundation piles 12.

Nachdem das Füllmaterial 24 nach in der Regel einigen Tagen ausgehärtet ist, erübrigt sich eine Lasteinleitung über die Auflagerelemente 14 in die Gründungspfähle 12. Hierzu sind die Abstandshalter 21 und ihr Material derart ausgebildet, dass die Tragfähigkeit nach dem vollständigen Aushärten des Füllmaterials 24 beginnt nachzulassen und schließlich vollständig entfällt. Dies wird beispielsweise dadurch hervorgerufen, dass das Material sich durch den Einfluss von Wasser allmählich auflöst, vom Wasser ausgespült, abgetragen bzw. aufgelöst oder auch auf andere Weise entfernt wird. Wie in der Fig. 5 zu sehen ist, verlieren damit die Auflagerelemente 14 ihre Tragfähigkeit. Die durch die Abstandshalter 21 ursprünglich geschaffene tragfähige Verbindung zwischen dem oberen Auflagerring 17 und dem unteren Auflagerring 20 wird durch Wegspülen, Abtragen, Zerfallen und/oder Auflösen der Abstandshalter 21 beseitigt. Da jedoch nun das Füllmaterial 24 ausgehärtet ist, erfolgt ein direkter Lasteintrag über das Füllmaterial 24 in den Untergrund 13. Dies ist in Fig. 5 dargestellt.After the filling material 24 has hardened after generally a few days, a load transfer on the support elements 14 in the foundation piles 12 is unnecessary. For this purpose the spacers 21 and their material are designed so that the load capacity after the complete curing of the filling material 24 begins to relax and finally completely eliminated. This is caused for example by the fact that the material is gradually dissolved by the influence of water, rinsed by the water, removed or dissolved or otherwise removed. Like in the Fig. 5 can be seen, thus losing the support elements 14 their carrying capacity. The initially created by the spacers 21 viable connection between the upper support ring 17 and the lower support ring 20 is removed by washing away, erosion, disintegration and / or dissolution of the spacers 21. However, since now the filler 24 is cured, there is a direct load entry on the filler 24 in the substrate 13. This is in Fig. 5 shown.

Eine entsprechende Vorgehensweise erfolgt bei der Verwendung von Pfahlhülsen 25 statt Pfahlzapfen 11. In diesem Fall muss lediglich dafür gesorgt werden, dass das Füllmaterial 24 für eine kraftschlüssige Lagerung der Pfahlhülsen 25 sorgt. Die entsprechenden Auflagerelemente 14 werden dann in das Innere der Pfahlhülse 25 eingebracht oder alternativ beispielsweise außen an den Gründungspfählen 12 angeordnet. In letzterem Fall wird die Anordnung jedoch dahingehend modifiziert, dass die unteren Auflagerringe 20 an den Gründungspfählen 12 angeschweißt werden, wodurch der Abstandshalter 21 und die oberen Auflagerringe 17 auf diesen aufliegen und so die Last der Pfahlhülsen 25 tragen. Nach dem Aushärten des eingebrachten Füllmaterials 24 kann beispielsweise durch Einwirken von Meerwasser die Tragfähigkeit der Abstandshalter 21 kontinuierlich reduziert werden.A corresponding procedure takes place when using pile sleeves 25 instead of pile pegs 11. In this case, it merely has to be ensured that the filling material 24 ensures a frictional mounting of the pile sleeves 25. The corresponding support elements 14 are then introduced into the interior of the pile sleeve 25 or alternatively arranged, for example, on the outside of the foundation piles 12. In the latter case, however, the arrangement is modified so that the lower bearing rings 20 are welded to the foundation piles 12, whereby the spacer 21 and the upper bearing rings 17 rest on these and so carry the load of the pile sleeves 25. After curing of the introduced filling material 24, for example, by the action of seawater, the carrying capacity of the spacers 21 can be reduced continuously.

Die Abstandshalter 21 sind nicht auf eine Beseitigung der Tragfähigkeit durch Süß- oder Salzwasser beschränkt. Alternativ können beispielsweise langsame oder zeitverzögert ablaufende chemische, elektrische und/oder elektro-chemische Reaktionen des Materials der Abstandshalter 21 erfolgen. Auch kommen beispielsweise Temperatureinflüsse oder ähnliches in Betracht. Ebenfalls können grundsätzlich auch mechanische Verfahren zum Beseitigen der Tragfähigkeit der Abstandshalter 21 Anwendung finden.The spacers 21 are not limited to removal of the carrying capacity by fresh or salt water. Alternatively, for example, slow or time-delayed chemical, electrical and / or electrochemical reactions of the material of the spacers 21 can take place. Also, for example, temperature effects or the like come into consideration. In principle, mechanical methods for eliminating the carrying capacity of the spacers 21 may also be used.

Bezugszeichenliste:LIST OF REFERENCE NUMBERS

1010
Gründungsstrukturfoundation structure
1111
Pfahlzapfenpile pin
1212
Gründungspfahlfoundation pile
1313
Untergrundunderground
1414
AuflagerelementSupport element
1515
Stirnflächeface
1616
Längsachselongitudinal axis
1717
oberer AuflagerringUpper bearing ring
1919
SchweißnahtWeld
2020
unterer Auflagerringlower support ring
2121
Abstandshalterspacer
2424
Füllmaterialfilling material
2525
Pfahlhülsepile sleeve
2626
Zwischenraumgap

Claims (13)

Verfahren zum Verankern einer Gründungsstruktur (10) einer Offshore-Anlage am Meeresboden, wobei Pfahlzapfen (11) und/oder Pfahlhülsen (25) der Gründungsstruktur (10) mit in den Meeresboden eingerammten Gründungspfählen (12) auf dem Meeresboden verankert werden und nach dem Einsetzen zwischen den Gründungspfählen (12) und den Pfahlzapfen (11) beziehungsweise Pfahlhülsen (25) Zwischenräume (26) verbleiben, die mit einem aushärtenden Füllmaterial (24) ausgefüllt werden, dadurch gekennzeichnet, dass die Gründungsstruktur (10) und/oder deren Pfahlzapfen (11) beziehungsweise Pfahlhülsen (25) lediglich anfangs auf den Gründungspfählen (12) abgestützt werden.Method for anchoring a foundation structure (10) of an offshore installation on the seabed, wherein pile pegs (11) and / or pile sleeves (25) of the foundation structure (10) are anchored to the seabed with foundation piles (12) driven into the seabed and after insertion between the foundation piles (12) and the pile pins (11) or pile sleeves (25) remain spaces (26) filled with a hardening filler (24), characterized in that the foundation structure (10) and / or its pile pin (11 ) or pile sleeves (25) only initially supported on the foundation piles (12). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass sich die Pfahlzapfen (11) bzw. die Pfahlhülsen (25) mit Auflagerelementen (14) anfangs auf den Gründungspfählen (12) abstützen und nach dem Aushärten des Füllmaterials (24) diese Abstützung zumindest teilweise aufgehoben beziehungsweise beseitigt wird.A method according to claim 1, characterized in that the pile pins (11) and the pile sleeves (25) with support elements (14) initially supported on the foundation piles (12) and after curing of the filling material (24) this support at least partially canceled or is eliminated. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die kraftschlüssige Lagerung der Auflagerelemente (14) auf den Gründungspfählen (12) zumindest teilweise nach Aushärten des Füllmaterials (24) beseitigt wird durch Ausspülen, Abtragen, Auflösen und/oder Ausschwemmen, vorzugsweise durch Einwirkung von Salz- oder Süßwasser.A method according to claim 1 or 2, characterized in that the non-positive mounting of the support elements (14) on the foundation piles (12) is at least partially eliminated after curing of the filling material (24) by rinsing, Removal, dissolution and / or flushing, preferably by the action of salt or fresh water. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass jedes Auflagerelement (14) zwei beabstandete Auflagerringe (17, 20) aufweist, wobei ein oberer Auflagerring (17) dauerhaft mit dem Pfahlzapfen (11) beziehungsweise der Pfahlhülse (25) verbunden wird und ein unterer Auflagerring (20) lösbar mit dem oberen Auflagerring (17) verbunden wird.Method according to one of the preceding claims, characterized in that each support element (14) has two spaced support rings (17, 20), wherein an upper support ring (17) is permanently connected to the pile pin (11) or the pile sleeve (25) and a lower support ring (20) releasably connected to the upper support ring (17) is connected. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zwischen dem oberen und unteren Auflagerring (17, 20) ein Abstandshalter (21) angeordnet wird, der an der Umgebung, beispielsweise durch Salz- oder Süßwasser, modifiziert wird, bevorzugt umgewandelt, entfernt, abgetragen und/oder aufgelöst wird.Method according to one of the preceding claims, characterized in that between the upper and lower support ring (17, 20) a spacer (21) is arranged, which is modified, preferably converted, removed from the environment, for example by salt or fresh water, is removed and / or dissolved. Gründungsstruktur für eine Offshore-Anlage mit Pfahlzapfen (11) und/oder Pfahlhülsen (25), die mit dem Meeresboden über Gründungspfähle (12) verbindbar sind, wobei zwischen den Gründungspfählen (12) und den Pfahlzapfen (11) beziehungsweise Pfahlhülsen (25) Zwischenräume (26) verbleiben, die zur Herstellung einer dauerhaften Verbindung zwischen den Gründungspfählen (12) und den Pfahlzapfen (11) beziehungsweise Pfahlhülsen (25) mit einem aushärtenden Füllmaterial (24) ausfüllbar sind und an den Pfahlzapfen (11) beziehungsweise Pfahlhülsen (25) jeweils zumindest ein Auflagerelement (14) zur kraftschlüssigen Lagerung auf den Gründungspfählen (12) vorgesehen ist, dadurch gekennzeichnet, dass die Auflagerelemente (14) ausgebildet sind, um nach einer gewissen Zeit ihre Lastaufnahmefähigkeit zumindest teilweise zu verlieren.Foundation structure for an offshore installation with pile pegs (11) and / or pile sleeves (25) which are connectable to the seabed via foundation piles (12), with intermediate spaces between the foundation piles (12) and the pile pegs (11) or pile sleeves (25) (26) which can be filled with a hardening filling material (24) to produce a permanent connection between the foundation piles (12) and the pile pins (11) or pile sleeves (25) and respectively to the pile pins (11) or pile sleeves (25) at least one support element (14) is provided for non-positive mounting on the foundation piles (12), characterized in that the support elements (14) are designed to lose their load-bearing capacity at least partially after a certain time. Gründungsstruktur nach Anspruch 6, dadurch gekennzeichnet, dass jedes Auflagerelement (14) mehrteilig ausgebildet ist.Foundation structure according to claim 6, characterized in that each support element (14) is designed in several parts. Gründungsstruktur nach Anspruch 6 oder 7, dadurch gekennzeichnet, dass das Auflagerelement (14) zumindest zwei beabstandete Auflagerringe (17, 20) und mindestens einen Abstandshalter (21) aufweist.Foundation structure according to claim 6 or 7, characterized in that the support element (14) has at least two spaced support rings (17, 20) and at least one spacer (21). Gründungsstruktur nach einem der Ansprüche 6 bis 8, dadurch gekennzeichnet, dass ein oberer Auflagerring (17) fest mit dem jeweiligen Pfahlzapfen (11) und/oder der jeweiligen Pfahlhülse (25) verbunden ist und ein unterer Auflagerring (20) axial auf dem Pfahlzapfen (11) oder in der Pfahlhülse (25) beweglich ist.Foundation structure according to any one of claims 6 to 8, characterized in that an upper bearing ring (17) fixed to the respective pole pin (11) and / or of the respective pile sleeve (25) and a lower bearing ring (20) axially (to the pole pin 11) or in the pile sleeve (25) is movable. Gründungsstruktur nach einem der Ansprüche 6 bis 9, dadurch gekennzeichnet, dass zwischen dem unteren Auflagerring (20) und dem oberen Auflagerring (17) der wenigstens eine Abstandshalter (21) angeordnet ist, wobei der untere Auflagerring (20) sich zeitweise über den Abstandshalter (21) unter dem oberen Auflagerring (17) abstützt.Foundation structure according to one of claims 6 to 9, characterized in that between the lower support ring (20) and the upper support ring (17) of the at least one spacer (21) is arranged, wherein the lower support ring (20) at times over the spacer ( 21) under the upper bearing ring (17) is supported. Gründungsstruktur nach einem der Ansprüche 6 bis 10, dadurch gekennzeichnet, dass die Abstandshalter (21) der Auflagerelemente (14) aus einem Material gebildet sind, das anfangs starr ist, aber nach einer gewissen Zeit nachgiebig wird und/oder sich auflöst, vorzugsweise durch Einwirkung von Meerwasser, insbesondere durch Beseitigung, Ausspülung, Abtrag und/oder Auflösung.Foundation structure according to one of claims 6 to 10, characterized in that the spacers (21) of the support elements (14) are formed of a material which is initially rigid, but after a certain time becomes yielding and / or dissolves, preferably by action of seawater, in particular by removal, rinsing, erosion and / or dissolution. Auflagerelement für eine Gründungsstruktur (10) insbesondere nach einem der Ansprüche 6 bis 11, mit einem fest an einem jeweiligen Pfahlzapfen (11) beziehungsweise einer jeweiligen Pfahlhülse (25) der Gründungsstruktur (10) befestigbaren ersten Auflagerring (17), dadurch gekennzeichnet, dass mit Abstand unter dem ersten Auflagerring (17) ein zweiter Auflagerring (20) vorgesehen ist und zwischen den Auflagerringen (17, 20) mindestens ein Abstandshalter (21) angeordnet ist, der aus einem Material gebildet ist, das seine Festigkeit mit der Zeit verliert.Support element for a foundation structure (10) in particular according to one of claims 6 to 11, with a fixed to a respective pile pin (11) or a respective pile sleeve (25) of the foundation structure (10) attachable first support ring (17), characterized in that Space below the first bearing ring (17) is provided a second bearing ring (20) and between the support rings (17, 20) at least one spacer (21) is arranged, which is formed of a material that loses its strength over time. Auflagerelement nach Anspruch 12, dadurch gekennzeichnet, dass das Material des Abstandshalters (21) vom ihn umgebenden Medium nach und nach auflösbar, ausspülbar, abtragbar und/oder ausschwemmbar ist.Support element according to claim 12, characterized in that the material of the spacer (21) from the surrounding medium is gradually dissolvable, rinsed, ablatable and / or ausschwemmbar.
EP13005287.1A 2012-12-12 2013-11-09 Method for anchoring a foundation structure of an offshore platform to the sea floor, foundation structure and support element Withdrawn EP2743405A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102012024263 2012-12-12
DE201310004762 DE102013004762A1 (en) 2012-12-12 2013-03-19 Method for anchoring a foundation structure of an offshore installation on the seabed, foundation structure and support element

Publications (1)

Publication Number Publication Date
EP2743405A2 true EP2743405A2 (en) 2014-06-18

Family

ID=49619781

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13005287.1A Withdrawn EP2743405A2 (en) 2012-12-12 2013-11-09 Method for anchoring a foundation structure of an offshore platform to the sea floor, foundation structure and support element

Country Status (2)

Country Link
EP (1) EP2743405A2 (en)
DE (1) DE102013004762A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088087A (en) * 2016-08-15 2016-11-09 中国电建集团华东勘测设计研究院有限公司 A kind of embedding rock single pile bitubular construction auxiliary device and construction method thereof
EP3222783B1 (en) * 2016-03-24 2023-06-14 SPT Equipment BV Floating marine structure with suction piles

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017007685A1 (en) * 2017-08-16 2019-02-21 OWT Offshore Wind Technologie GmbH Method and device for establishing preferably offshore installations

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO339381B1 (en) * 2009-07-22 2016-12-05 Owec Tower As Method and apparatus for controlling power transmission between a structure and its foundation during installation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3222783B1 (en) * 2016-03-24 2023-06-14 SPT Equipment BV Floating marine structure with suction piles
CN106088087A (en) * 2016-08-15 2016-11-09 中国电建集团华东勘测设计研究院有限公司 A kind of embedding rock single pile bitubular construction auxiliary device and construction method thereof
CN106088087B (en) * 2016-08-15 2018-07-03 中国电建集团华东勘测设计研究院有限公司 A kind of embedding rock single pile bitubular construction auxiliary device and its construction method

Also Published As

Publication number Publication date
DE102013004762A1 (en) 2014-06-12

Similar Documents

Publication Publication Date Title
EP2877638B1 (en) Foundation for a wind motor
DE69837524T2 (en) Method for producing an anchoring, anchoring part and tensioning element for this purpose
DE69812399T2 (en) CIRCULAR BRACKETS AND TIES FOR THE REINFORCEMENT OF COMPONENTS, COMPONENTS STRENGTHENED BY CIRCULAR BRACKETS OR TIES AND METHOD FOR THE CONSTRUCTION OF SUCH COMPONENTS
DE102018107421A1 (en) Foundation for a structure prestressed by means of a plurality of tendons and structure prestressed by means of a plurality of prestressed tendons
DE2534341A1 (en) METHOD OF INSERTING AN ANCHORING BODY INTO THE SOIL AND ANCHORING BODY
EP2420623A2 (en) Sandwich base structure for off-shore wind turbines
EP2931977B1 (en) Method for anchoring a foundation structure, and foundation structure
WO2014114520A1 (en) Hydraulic power plant
AT521432A1 (en) Foundation for a wind power plant
WO2017089244A1 (en) Protective device
EP2666912A1 (en) Method for anchoring offshore facilities to the sea bed, foundation structure for offshore facilities and device
EP2743405A2 (en) Method for anchoring a foundation structure of an offshore platform to the sea floor, foundation structure and support element
EP0351582B1 (en) Great length pre-stressing strand for prestressed concrete with grouted anchoring, and method for installing it
DE102017118375A1 (en) Offshore construction
DE102019126558A1 (en) Foundation for a wind turbine
EP2669437A1 (en) Method for producing a conductive connection for an offshore facility with foundation piles and foundation structure for an offshore facility
WO2019162102A1 (en) Floating base for an off-shore system and off-shore system having a floating base
DE102018121024A1 (en) Foundation for a wind turbine
DE10239278B4 (en) Foundation for hydraulic structures
EP3078778B1 (en) Foundation of a wind energy system
EP4069908B1 (en) Wind turbine foundation structure, and method for producing a wind turbine foundation structure
WO2002012657A1 (en) Construction module for producing bridges, buildings and towers, for example for wind power plants
EP2677086B1 (en) Method for anchoring a structure to a bed of a body of water and underwater foundation
DE112010004883T5 (en) Method of constructing a tower of a wind turbine and tower
DE102020202011A1 (en) Joint element as well as method

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20131109

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

19U Interruption of proceedings before grant

Effective date: 20150401

19W Proceedings resumed before grant after interruption of proceedings

Effective date: 20211102

PUAJ Public notification under rule 129 epc

Free format text: ORIGINAL CODE: 0009425

32PN Public notification

Free format text: MITTEILUNG GEMAESS REGEL 142 EPUE (WIEDERAUFNAHME DES VERFAHRENS NACH REGEL 142 (2) EPUE VOM 10.05.2021)

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

PUAJ Public notification under rule 129 epc

Free format text: ORIGINAL CODE: 0009425

32PN Public notification

Free format text: FESTSTELLUNG EINES RECHTSVERLUSTS NACH REGEL 112(1) EPUE (EPA FORM 2524 VOM 15.07.2022)

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20220503