EP2715213A1 - Gas heating system for gas pressure reducing systems and method for obtaining said heating effect - Google Patents

Gas heating system for gas pressure reducing systems and method for obtaining said heating effect

Info

Publication number
EP2715213A1
EP2715213A1 EP12729195.3A EP12729195A EP2715213A1 EP 2715213 A1 EP2715213 A1 EP 2715213A1 EP 12729195 A EP12729195 A EP 12729195A EP 2715213 A1 EP2715213 A1 EP 2715213A1
Authority
EP
European Patent Office
Prior art keywords
gas
heating
temperature
outlet duct
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP12729195.3A
Other languages
German (de)
French (fr)
Other versions
EP2715213B1 (en
Inventor
Angelo Mapelli
Francesco Jamoletti
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP2715213A1 publication Critical patent/EP2715213A1/en
Application granted granted Critical
Publication of EP2715213B1 publication Critical patent/EP2715213B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H3/00Air heaters
    • F24H3/02Air heaters with forced circulation
    • F24H3/06Air heaters with forced circulation the air being kept separate from the heating medium, e.g. using forced circulation of air over radiators
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10LFUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
    • C10L3/00Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • F17D1/04Pipe-line systems for gases or vapours for distribution of gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • F17D1/04Pipe-line systems for gases or vapours for distribution of gas
    • F17D1/05Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • F17D1/065Arrangements for producing propulsion of gases or vapours
    • F17D1/075Arrangements for producing propulsion of gases or vapours by mere expansion from an initial pressure level, e.g. by arrangement of a flow-control valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/08Pipe-line systems for liquids or viscous products
    • F17D1/16Facilitating the conveyance of liquids or effecting the conveyance of viscous products by modification of their viscosity
    • F17D1/18Facilitating the conveyance of liquids or effecting the conveyance of viscous products by modification of their viscosity by heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/20Arrangements or systems of devices for influencing or altering dynamic characteristics of the systems, e.g. for damping pulsations caused by opening or closing of valves

Definitions

  • the present invention relates to a system for heating the gas inside systems for reducing the gas pressure in a main gas pipeline.
  • the present invention also concerns a method for heating the gas inside gas pressure reducing systems in a main gas pipeline.
  • distribution networks are used to transfer gas between remote geographical regions, and particularly to distribute fuel gas from a source to where it is supplied to the various industrial or civil users.
  • Such networks comprise a plurality of pipelines through which the gas being distributed flows.
  • the gas is delivered from a source into a gas main by means of which it is transported at a pre-set pressure, which typically varies in the range of 12 to 74 bars.
  • first-stage stations for the purpose of providing the physical connection between the gas main and the line reaching the users.
  • a primary purpose of these stations is to achieve a decompression of the gas, reducing it from the above-mentioned delivery pressure to a lower pressure for the line delivering the gas to the user, i.e. to pressure values typically in the range of 1.5 to 5 bars, and up to 12 bars in certain applications.
  • said stations provide for a phase in which the natural gas coming from the main is heated so that its temperature downstream of the pressure reducer does not drop to values below 0°C due to the effect of expansion.
  • Natural gas in fact, contains a very small percentage of water, which would freeze and could pose problems for the instrumentation and the pressure regulator at the station.
  • the temperature of the gas leaving said stations is therefore maintained preferably at an optimal value above zero, and advantageously at around 6°C.
  • This heating phase typically takes place through suitable systems with water/gas tube bundle heat exchangers fed with water that has been preheated with methane gas boilers.
  • the water/gas tube bundle heat exchangers release energy in the form of heat to the natural gas in transit.
  • the water preheating circuit preferably consists of one or more boilers for the production of hot water, preferably relying on thermopile power systems, plus a series of gate valves for intercepting the flow of water, one or more open expansion tanks, one or more circulators located on the delivery side of the hot water circuit, two or more water/gas heat exchangers, and all the necessary connection piping.
  • the natural gas is preheated, as mentioned earlier, before its pressure is reduced.
  • the temperature of the gas Downstream of the pressure regulators that reduce the pressure of the gas, the temperature of the gas is measured by means of a thermostat on the pipeline.
  • This pipeline thermostat controls the temperature of the outgoing gas and governs the switching on/off of the boilers, and the switching on/off of the circulators.
  • the preheating temperature for the hot water circuit is set manually by means of the thermostats installed on the boilers.
  • the switching on/off of the boilers and/or circulators is consequently governed by means of the pipeline thermostat.
  • the temperature of the water in the preheating circuit comes to be at a pre-set value that is adjusted manually by an operator taking action on the thermostats on the boilers.
  • the water temperature value is therefore set at said fixed value irrespective of the actual demand for energy to heat the gas.
  • the heating system for gas pressure reducing units of the known type has several drawbacks, however.
  • a first drawback lies in that, although the system is controlled by a pipeline thermostat, it constantly generates increases and decreases in the temperature of the gas leaving the unit. This temperature departs all the more from the optimal value of 6°C, the more the temperature of the water coming from the boilers differs from (i.e. it exceeds) the optimal minimum value sufficient to heat the gas.
  • Another drawback of the known art relates to the measurement of the temperature of outgoing gas.
  • the pipeline thermostat measures the ambient temperature instead of the temperature of the gas in transit, since the lack of consumption means there is no flow of gas, which remains practically at a standstill inside the pipeline. Due to the effect of the above-described conditions, the pipeline thermostat pointlessly enables the water to be heated in the boilers, with a further wastage of energy for the unit.
  • the object of the present invention is to overcome at least some of the drawbacks of the known art.
  • a further object of the invention is to optimise the thermal energy used in the heating systems of first-stage gas receiving and pressure reducing stations.
  • the present invention is based on the general consideration that the object is to provide a system for heating the gas inside a gas pressure reducing system in which the thermal power needed to heat the gas is adjusted on the basis of the instantaneous flow rate of the gas measured after the reduction of its pressure.
  • the subject of the present invention is a gas heating system according to claim 1, i.e. a gas heating system applicable to a gas in transit between an inlet duct and an outlet duct, wherein the pressure of said gas inside said inlet duct is higher than the pressure of said gas inside said outlet duct, and comprising:
  • said system comprising means for measuring the flow rate of said gas in said outlet duct that are connected to said means for controlling said thermal power generation means.
  • the system comprises means for measuring the temperature of the gas in the outlet duct that are connected to the means for controlling the thermal power generation means.
  • the thermal power generation means preferably comprise means for heating a heating fluid, and means for exchanging thermal energy between the heating fluid and the gas.
  • the control means advantageously comprise means for controlling the temperature of the heating fluid.
  • the thermal power generation means preferably comprise a line for delivering the fluid from the heating means to the exchanger means, and a line for returning the fluid from the exchanger means to the heating means.
  • the system comprises means for measuring the temperature of the fluid in said delivery line.
  • the system comprises means for measuring the temperature of the fluid in the return line.
  • the heating means preferably comprise a boiler for the production of hot water.
  • the exchanger means preferably comprise a tube bundle heat exchanger.
  • the means for measuring the gas flow rate advantageously comprise a gas meter operatively connected to a volume corrector suitable for producing the value of the gas flow rate as an output.
  • the control means preferably comprise a PLC unit.
  • the subject of the present invention is a system according to claim 7, i.e. a system for reducing the pressure of a gas between an inlet duct and an outlet duct, comprising pressure reducing means between said inlet duct and said outlet duct, the system comprising a heating system as described above.
  • the subject of the present invention is a method according to claim 8, i.e. a method for heating a gas in transit between an inlet duct and an outlet duct, wherein the pressure of said gas in the inlet duct is higher than the pressure of said gas in the outlet duct, comprising a phase for heating said gas between said inlet duct and said outlet duct, wherein said phase for heating said gas is controlled on the basis of the flow rate of said gas through said outlet duct.
  • the gas heating phase prefferably controlled on the basis of the temperature of the gas inside the outlet duct.
  • the gas heating phase comprises a phase for heating a fluid and a phase for exchanging the thermal energy of the fluid with the gas.
  • the temperature of the fluid in the heating phase is advantageously controlled on the basis of the gas flow rate in the outlet duct.
  • the temperature of the fluid in the fluid heating phase is controlled on the basis of the temperature of the gas in the outlet duct.
  • the temperature of the fluid in the fluid heating phase is controlled on the basis of the difference between the temperature of the gas in the outlet duct and a pre-selected reference temperature.
  • the thermal energy used in the gas heating phase is calculated preferably in relation to the efficiency of the heating system.
  • This efficiency value is preferably an estimated value.
  • the method advantageously comprises phases for recalculating the estimated efficiency value in relation to a real efficiency value for the heating system.
  • FIG. 1 is a functional diagram of a system according to a preferred embodiment of the invention.
  • - figure 2 shows a system according to a preferred embodiment of the invention
  • - figure 3 shows a simplified flowchart of the operations involved in a method according to a preferred embodiment of the invention, implemented in the system shown in figure 2;
  • figure 4 shows details of several operations in the flowchart in figure 3;
  • figure 5 shows details of several operations in the flowchart in figure 3;
  • figure 6 shows a variant of the system in figure 2.
  • the system according to the invention as described below is particularly suitable for reducing the pressure of the gas in a network for distributing gas to industrial and/or civil users.
  • Figure 1 is the functional diagram for a system 1 for reducing the pressure of a gas according to a preferred embodiment of the invention.
  • Figure 2 shows a system 1 for reducing the pressure of a gas consistently with the content of the diagram in figure 1.
  • the system 1 is used to reduce the pressure of natural gas coming from a gas main 2 and being delivered to an outlet duct 3.
  • the system 1 substantially consists of a pressure regulating and measuring unit, or first-stage pressure reducing station, wherein the gas main 2 is the primary line for carrying the natural gas and the outlet duct 3 is the line for delivering the gas to the users.
  • the gas main 2 and the outlet duct 3 are intercepted by respective opening/closing valves 2a and 3a.
  • the gas main 2 is the primary line for carrying the natural gas, which travels at a pre-set pressure Pi,gas that is typically in the range of 12 to 74 bar, and at a preset temperature Ti,gas that is typically in the range between 5°C and 20°C, with mean values around 5°C.
  • the outlet duct 3 is the line for delivering the gas to the users at a pressure Pu,gas typically in the range between 1.5 and 5 bar (and as high as 12 bar in certain applications), and at a pre-set temperature Tu,gas that may typically vary between 5°C and 15°C. It is preferably, as we shall see below, for the temperature Tu,gas of the gas at the outlet to be kept at values as close as possible to 6°C.
  • gas heating means 4 are located upstream of the gas pressure reducing means 5.
  • the gas pressure reducing means 5 preferably comprise piloted pressure regulators.
  • the heating means 4 (which are easier to see in figure 2) preferably comprise a water/gas tube bundle heat exchanger 6 connected to a boiler 7 for the production of hot water. Upstream of the exchanger 6, there is a filter 13 designed to remove any impurities contained in the natural gas to protect the regulating and measuring instruments.
  • the boiler 7 is preferably of the free-standing type with a thermopile power system.
  • the boiler 7 is preferably complete with a thermostat 7a for controlling the temperature of the heated water, which is connected in series with the digital thermostat typically installed on the boiler 7.
  • expansion tank 12 connected to the delivery line 8 that is designed to compensate for variations in the volume of water in the heating circuit and to maintain the appropriate quantity of heating water.
  • the expansion tank could be connected to the return line 9 instead of the delivery line 8.
  • Circulators 30 are also located along the delivery line 8 (there are two of these in the embodiment illustrated) to enable a forced recirculation of the water in the heating circuit, since the expansion tank is open, in order to reduce the system's hysteresis times.
  • the boiler 7 is advantageously of the type fuelled with methane gas, in which case a suitable gas supply line 10 connects the boiler 7 to the outlet duct 3 in the system 1.
  • the heating means 4, and particularly the boiler 7, are appropriately connected to control logic 14.
  • the control logic 14 sends the thermostat 7a of the boiler 7 an indication of the temperature T1,H20 needed for the water that is to flow to the exchanger 6 through the delivery line 8.
  • a first temperature detector 15 measures the temperature of the water T1,H20 in the delivery line 8 and sends this value to the control logic 14.
  • a second temperature detector 16 measures the temperature of the water T2,H2O in the return line 9 and sends this value to the control logic 14.
  • a gas temperature detector 17 is associated with the outlet duct 3 and measures the temperature Tu,gas of the gas downstream of the gas pressure reducing means 5.
  • the gas temperature detector 17 is preferably in the form of a temperature sensor.
  • the temperature Tu,gas measurement is sent to the control logic 14.
  • Means 18 for measuring the instantaneous flow rate of the gas Qu,gas are associated with the outlet duct 3 and used to record the instantaneous flow rate of the gas downstream of the pressure reducing means 5.
  • This instantaneous gas flow rate Qu,gas measurement is sent to the control logic 14.
  • the means 18 for measuring the instantaneous gas flow rate Qu,gas comprise a gas meter 19 that sends an impulsive signal to a volume corrector 20 suited to produce the instantaneous flow rate Qu,gas as an output in the form of standard cubic metres per second, i.e. with a defined unit of time.
  • measuring device such as means for measuring mass, or a Venturi meter, to provide as output values that indicate the instantaneous flow rate of the gas Qu,gas.
  • the control logic 14 preferably consists of a programmable logic controller (PLC) unit of known type, i.e. a unit capable, among other things, of recording different signals coming from respective sensors/detectors and processing their values to generate suitable control signals.
  • PLC programmable logic controller
  • the output from the control logic 14 is a control signal for the thermostat 7a on the boiler 7 that establishes the temperature Tl,H2O to which the heated water must be heated. This command overrides the digital thermostat on the boiler 7, which is installed in series with the analogical thermostat 7a.
  • the instantaneous reading by the means 18 for measuring the gas flow rate Qu,gas, combined with the gas temperature measurement Tu,gas in the outlet duct 3, enables an appropriate control of the heating means 4 so as to optimise the energy needed to heat the gas, as we shall see more clearly below from the description of how the system 1 operates.
  • Figure 3 schematically shows the operating principle behind the system 1 in a methane gas distribution network. More in particular, it illustrates the operations performed by the control logic 14.
  • a first processing unit 100 the value of the instantaneous flow rate Qu,gas of the gas at the outlet and the value of the return temperature of the water T2,H2O are processed to provide as output a first value of the temperature at which the heated water V l,H2O has to be delivered.
  • the rated values for the system 1 are used for this calculation, which are:
  • the value for the instantaneous flow rate Qu,gas of the outgoing gas is calculated (unit 101) as follows:
  • pCH4 is the volumetric mass of the methane, expressed in kg/m3
  • Ah is the previously-calculated enthalpy change.
  • the next processing step takes into account the efficiency El of the heating system in the system 1 in order to calculate the effective thermal power C2 that the boiler 7 has to provide.
  • the value of the heating system's efficiency El is an estimate made by the operator, based on their know-how and experience in the field, and may depend on various factors, such as the insulation of the circuit where the water transits, the state of efficiency of the boiler, and so on. In a variant of the method, as we shall see in more detail later on, this efficiency value can be recalculated from time to time by the control logic 14, based on its processing of the values identified in the system 1. The calculated efficiency will thus tend towards the real and effective value of the efficiency of the heating system in the system 1.
  • the previously-calculated value of the thermal power C2 (at the outlet from unit
  • T' 1,H20 is the estimated temperature of the heated water produced by the boiler 7 and carried to the exchanger 6 through the delivery line 8;
  • T2,H2O is the temperature of the water in the return line 9 from the exchanger 6 to the boiler 7;
  • the temperature of the water in the return line T2,H20 is advantageously measured by the second temperature detector 16.
  • the water delivery temperature T' 1,H20 is then calculated by adding the value of the previously-calculated temperature difference ⁇ (at the outlet from unit
  • the temperature T' 1,H20 calculated in this way represents a first estimate of the temperature T' l,H2O at which the heated water must flow from the boiler 7.
  • This temperature T' l,H2O is calculated with no control being performed on the effective temperature Tu,gas on the gas in the outlet duct 3.
  • the previously-calculated first temperature value T' l,H2O is processed and corrected, taking into account the temperature of the gas Tu,gas actually measured at the outlet duct 3, and the desirable reference temperature for the outgoing gas Tu,gas_rif.
  • the final temperature value Tl,H2O at which the heated water has to flow from the boiler 7 is given at the outlet from said processing unit 150. This value is transmitted by the control logic 14 to the thermostat 7a on the boiler 7.
  • the temperature of the outgoing gas Tu.gas is advantageously recorded by the gas temperature detector 17 associated with the outlet duct 3.
  • the desirable reference temperature value for the outgoing gas Tu,gas_rif is advantageously set at 6°C.
  • the processing unit 150 is basically a feedback system for controlling the final temperature Tl,H2O at which the heated water has to flow from the boiler 7 as a function of the temperature of the outgoing gas Tu,gas.
  • Said control system may be of the proportional-integral-derivative type or based on any combination thereof, depending on the type and the dynamic conditions of the system.
  • the calculations performed in the processing unit 150 are implemented operatively in the control logic unit 14.
  • the deviation S between the value of the desirable reference temperature for the outgoing gas Tu,gas_rif (preferably set at 6°C) and the temperature value measured in the outgoing gas Tu,gas is calculated first, i.e.
  • This deviation S is used (in unit 151) to calculate a coefficient of error er (as output from unit 151), i.e.
  • - QH2O is the flow rate of the water from the boiler 7 to the exchanger 6, expressed in kg/s;
  • the temperature value T1,H20 thus represents the final temperature at which the heated water must flow from the boiler 7.
  • the thermal power needed to guarantee an optimal outgoing gas temperature can be calculated starting from the instantaneous flow rate measured for the gas in transit through the outlet duct.
  • the system consequently enables the amount of heat needed to heat the gas to be estimated using the instantaneous flow rate of the gas as a control parameter, whereas conventional systems rely on the temperature of the outgoing gas alone. This enables the inertia of the system to be limited, thereby increasing the efficiency of the system for regulating the temperature of the outgoing gas.
  • the system also enables an appropriate adjustment of the temperature of the water heated by the boiler to provide the effective thermal energy required by the system, with a consequent improvement in the system's energy efficiency by comparison with the known systems, in which the temperature of the heated water is substantially fixed.
  • a self-teaching function is included in the system 1 with a view to optimising its performance.
  • the mean value erm of the coefficient of error er the mean value Clm of the thermal power CI, and the mean value C2m of the thermal power C2 are calculated.
  • ATc C2m / ( mH2O * CpH2O ) + erm.
  • the thermal power C3 can be calculated, which corresponds to the real thermal power that the boiler 7 needs to provide, i.e.
  • this new efficiency value E' 1 for the heating system in the system 1 can be used instead of the efficiency value El estimated in advance.
  • the efficiency ⁇ will gradually tend towards the real value of the efficiency of the system 1.
  • Figure 6 shows a variant of the system 1 ' according to the invention that differs from the one shown in figure 1 in that it includes two boilers 7, 7', instead of one, and two parallel lines for the passage of the gas, fitted with respective gas heating means 4, 4' and gas pressure reducing means 5, 5'.
  • the two boilers 7, 7' are suitably connected in parallel and are connected to the same delivery line 8 and to the same return line 9.
  • a thermostat 7a is associated with both the boilers 7 and 7', and connected to the control logic 14.
  • Providing two boilers 7, 7' guarantees the continuity of the supply of heat even in the event of one of the two boilers being switched off or needing servicing 7, 7'.
  • Providing two parallel pipelines for the passage of the gas, with respective gas heating means 4, 4' and gas pressure reducing means 5, 5', guarantees the continuity of the supply and of the heating of the natural gas, even in the event of one of the two boilers 7, 7' being switched off or needing servicing.
  • the gas heating system described in the previous embodiments preferably comprises a boiler for heating the heated water and a water/gas tube bundle heat exchanger.
  • the heating system may be different, however, e.g. a system with a heat pump and a tube bundle exchanger, or boilers with plate exchangers, or even heat pumps combined with plate exchangers, etc.
  • the thermal power released to the gas before its expansion will be advantageously controlled on the basis of the gas flow rate identified after its pressure has been reduced.
  • the present invention enables the previously-stated objects to be achieved.
  • it enables the development of a gas pressure reducing system with a better energy performance than the known state of the art.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Combustion & Propulsion (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Percussion Or Vibration Massage (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention relates to a gas heating system applicable to a gas in transit between an inlet duct (2) and an outlet duct (3), wherein the pressure of the gas in the inlet duct (2) is higher than the pressure of the gas in the outlet duct (3), comprising thermal power generation means (4; 4') for heating the gas between the inlet duct (2) and the outlet duct (3); and means (14) for controlling the thermal power generation means (4; 4'). Said system comprises means (18) for measuring the flow rate (Qu,gas) of the gas in the outlet duct (3) connected to the means (14) for controlling the thermal power generation means (4; 4'). The invention also concerns a method suitable for achieving said heating of the gas.

Description

GAS HEATING SYSTEM FOR GAS PRESSURE REDUCING SYSTEMS AND METHOD FOR OBTAINING SAID HEATING
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a system for heating the gas inside systems for reducing the gas pressure in a main gas pipeline.
The present invention also concerns a method for heating the gas inside gas pressure reducing systems in a main gas pipeline.
DESCRIPTION OF THE STATE OF THE ART
It is common knowledge that distribution networks are used to transfer gas between remote geographical regions, and particularly to distribute fuel gas from a source to where it is supplied to the various industrial or civil users.
Such networks comprise a plurality of pipelines through which the gas being distributed flows.
According to the known state of the art, the gas is delivered from a source into a gas main by means of which it is transported at a pre-set pressure, which typically varies in the range of 12 to 74 bars.
Along this distribution line, there are units for regulating and measuring the gas flow, also called first-stage stations, for the purpose of providing the physical connection between the gas main and the line reaching the users. A primary purpose of these stations is to achieve a decompression of the gas, reducing it from the above-mentioned delivery pressure to a lower pressure for the line delivering the gas to the user, i.e. to pressure values typically in the range of 1.5 to 5 bars, and up to 12 bars in certain applications.
This reduction is achieved by means of special pressure regulators.
It is also well known that said stations provide for a phase in which the natural gas coming from the main is heated so that its temperature downstream of the pressure reducer does not drop to values below 0°C due to the effect of expansion. Natural gas, in fact, contains a very small percentage of water, which would freeze and could pose problems for the instrumentation and the pressure regulator at the station. The temperature of the gas leaving said stations is therefore maintained preferably at an optimal value above zero, and advantageously at around 6°C.
During the heating phase, a certain amount of thermal energy is consequently transferred to the natural gas coming from the main. This heating phase typically takes place through suitable systems with water/gas tube bundle heat exchangers fed with water that has been preheated with methane gas boilers.
The water/gas tube bundle heat exchangers release energy in the form of heat to the natural gas in transit.
The water preheating circuit preferably consists of one or more boilers for the production of hot water, preferably relying on thermopile power systems, plus a series of gate valves for intercepting the flow of water, one or more open expansion tanks, one or more circulators located on the delivery side of the hot water circuit, two or more water/gas heat exchangers, and all the necessary connection piping. The natural gas is preheated, as mentioned earlier, before its pressure is reduced.
Downstream of the pressure regulators that reduce the pressure of the gas, the temperature of the gas is measured by means of a thermostat on the pipeline. This pipeline thermostat controls the temperature of the outgoing gas and governs the switching on/off of the boilers, and the switching on/off of the circulators. The preheating temperature for the hot water circuit is set manually by means of the thermostats installed on the boilers. The switching on/off of the boilers and/or circulators is consequently governed by means of the pipeline thermostat. The temperature of the water in the preheating circuit comes to be at a pre-set value that is adjusted manually by an operator taking action on the thermostats on the boilers. The water temperature value is therefore set at said fixed value irrespective of the actual demand for energy to heat the gas.
The heating system for gas pressure reducing units of the known type has several drawbacks, however.
A first drawback lies in that, although the system is controlled by a pipeline thermostat, it constantly generates increases and decreases in the temperature of the gas leaving the unit. This temperature departs all the more from the optimal value of 6°C, the more the temperature of the water coming from the boilers differs from (i.e. it exceeds) the optimal minimum value sufficient to heat the gas.
In fact, the operators setting the thermostats on the boilers rely on their own experience and normally exaggerate when setting the temperature for the hot water on the boilers vis-a-vis the optimal minimum temperature required. This in order to avoid risking any problems in particularly demanding operating conditions, as in winter, for instance. This gives rise to a considerable waste of energy for the pressure reducing unit. Another drawback of the known art relates to the measurement of the temperature of outgoing gas. In the hours of lower gas consumption, and especially during the night in winter, when the gas flow rates are minimal, the pipeline thermostat measures the ambient temperature instead of the temperature of the gas in transit, since the lack of consumption means there is no flow of gas, which remains practically at a standstill inside the pipeline. Due to the effect of the above-described conditions, the pipeline thermostat pointlessly enables the water to be heated in the boilers, with a further wastage of energy for the unit. The object of the present invention is to overcome at least some of the drawbacks of the known art.
In particular, it is the object of the invention to provide a system for heating the gas in gas pressure reduction systems that has a better energy performance than the known systems.
It is another object of the invention to provide a gas heating system for gas pressure reducing systems that guarantees a temperature of the outgoing gas that is more stable than in the known systems.
A further object of the invention is to optimise the thermal energy used in the heating systems of first-stage gas receiving and pressure reducing stations.
SUMMARY OF THE PRESENT INVENTION
The present invention is based on the general consideration that the object is to provide a system for heating the gas inside a gas pressure reducing system in which the thermal power needed to heat the gas is adjusted on the basis of the instantaneous flow rate of the gas measured after the reduction of its pressure. According to a first embodiment, the subject of the present invention is a gas heating system according to claim 1, i.e. a gas heating system applicable to a gas in transit between an inlet duct and an outlet duct, wherein the pressure of said gas inside said inlet duct is higher than the pressure of said gas inside said outlet duct, and comprising:
- thermal power generation means for heating said gas between said inlet duct and said outlet duct;
- means for controlling said thermal power generation means,
said system comprising means for measuring the flow rate of said gas in said outlet duct that are connected to said means for controlling said thermal power generation means.
According to a preferred embodiment of the invention, the system comprises means for measuring the temperature of the gas in the outlet duct that are connected to the means for controlling the thermal power generation means. The thermal power generation means preferably comprise means for heating a heating fluid, and means for exchanging thermal energy between the heating fluid and the gas.
The control means advantageously comprise means for controlling the temperature of the heating fluid.
The thermal power generation means preferably comprise a line for delivering the fluid from the heating means to the exchanger means, and a line for returning the fluid from the exchanger means to the heating means.
According to a preferred embodiment, the system comprises means for measuring the temperature of the fluid in said delivery line.
According to another preferred embodiment, the system comprises means for measuring the temperature of the fluid in the return line.
The heating means preferably comprise a boiler for the production of hot water. The exchanger means preferably comprise a tube bundle heat exchanger.
The means for measuring the gas flow rate advantageously comprise a gas meter operatively connected to a volume corrector suitable for producing the value of the gas flow rate as an output.
The control means preferably comprise a PLC unit.
According to a second aspect, the subject of the present invention is a system according to claim 7, i.e. a system for reducing the pressure of a gas between an inlet duct and an outlet duct, comprising pressure reducing means between said inlet duct and said outlet duct, the system comprising a heating system as described above.
According to a third aspect, the subject of the present invention is a method according to claim 8, i.e. a method for heating a gas in transit between an inlet duct and an outlet duct, wherein the pressure of said gas in the inlet duct is higher than the pressure of said gas in the outlet duct, comprising a phase for heating said gas between said inlet duct and said outlet duct, wherein said phase for heating said gas is controlled on the basis of the flow rate of said gas through said outlet duct.
It is preferable for the gas heating phase to be controlled on the basis of the temperature of the gas inside the outlet duct.
According to a preferred embodiment of the invention, the gas heating phase comprises a phase for heating a fluid and a phase for exchanging the thermal energy of the fluid with the gas.
The temperature of the fluid in the heating phase is advantageously controlled on the basis of the gas flow rate in the outlet duct.
It is preferable for the temperature of the fluid in the fluid heating phase to be controlled on the basis of the temperature of the gas in the outlet duct.
It is even more preferable for the temperature of the fluid in the fluid heating phase to be controlled on the basis of the difference between the temperature of the gas in the outlet duct and a pre-selected reference temperature.
The thermal energy used in the gas heating phase is calculated preferably in relation to the efficiency of the heating system.
This efficiency value is preferably an estimated value.
The method advantageously comprises phases for recalculating the estimated efficiency value in relation to a real efficiency value for the heating system.
BRIEF DESCRIPTION OF THE FIGURES
Further advantages, objects and characteristics, as well as further embodiments, of the present invention are described in the claims and will be clarified below by means of a description in which reference is also made to the attached drawings. In said drawings, corresponding or equivalent characteristics and/or component parts of the present invention are identified by the same reference numbers. In particular, the drawings contain the following:
- figure 1 is a functional diagram of a system according to a preferred embodiment of the invention;
- figure 2 shows a system according to a preferred embodiment of the invention; - figure 3 shows a simplified flowchart of the operations involved in a method according to a preferred embodiment of the invention, implemented in the system shown in figure 2;
- figure 4 shows details of several operations in the flowchart in figure 3;
- figure 5 shows details of several operations in the flowchart in figure 3;
- figure 6 shows a variant of the system in figure 2.
DETAILED DESCRIPTION OF THE PRESENT INVENTION
Although the present invention is described below with reference to embodiments shown in the drawings, the present invention is not limited to the embodiments described below and illustrated in the drawings. The embodiments described and illustrated merely clarify certain aspects of the present invention, the object of which is stated in the claims.
The system according to the invention as described below is particularly suitable for reducing the pressure of the gas in a network for distributing gas to industrial and/or civil users.
This is on the understanding, however, that the inventive concept can be extended to any type of system in which a gas pressure reduction is required.
Figure 1 is the functional diagram for a system 1 for reducing the pressure of a gas according to a preferred embodiment of the invention.
Figure 2 shows a system 1 for reducing the pressure of a gas consistently with the content of the diagram in figure 1.
The system 1 is used to reduce the pressure of natural gas coming from a gas main 2 and being delivered to an outlet duct 3.
The system 1 substantially consists of a pressure regulating and measuring unit, or first-stage pressure reducing station, wherein the gas main 2 is the primary line for carrying the natural gas and the outlet duct 3 is the line for delivering the gas to the users.
The gas main 2 and the outlet duct 3 are intercepted by respective opening/closing valves 2a and 3a.
The gas main 2 is the primary line for carrying the natural gas, which travels at a pre-set pressure Pi,gas that is typically in the range of 12 to 74 bar, and at a preset temperature Ti,gas that is typically in the range between 5°C and 20°C, with mean values around 5°C. The outlet duct 3 is the line for delivering the gas to the users at a pressure Pu,gas typically in the range between 1.5 and 5 bar (and as high as 12 bar in certain applications), and at a pre-set temperature Tu,gas that may typically vary between 5°C and 15°C. It is preferably, as we shall see below, for the temperature Tu,gas of the gas at the outlet to be kept at values as close as possible to 6°C.
Between the gas main 2 and the outlet duct 3 there are gas heating means 4 and gas pressure reducing means 5. The gas heating means 4 are located upstream of the gas pressure reducing means 5.
The gas pressure reducing means 5 preferably comprise piloted pressure regulators.
The heating means 4 (which are easier to see in figure 2) preferably comprise a water/gas tube bundle heat exchanger 6 connected to a boiler 7 for the production of hot water. Upstream of the exchanger 6, there is a filter 13 designed to remove any impurities contained in the natural gas to protect the regulating and measuring instruments.
The boiler 7 is preferably of the free-standing type with a thermopile power system.
The boiler 7 is preferably complete with a thermostat 7a for controlling the temperature of the heated water, which is connected in series with the digital thermostat typically installed on the boiler 7.
Between the boiler 7 and the exchanger 6, there is a delivery line 8 that carries heated water from the boiler 7 to the exchanger 6, and a return line 9 that carries the cooled water from the exchanger 6 to the boiler 7.
There is an expansion tank 12 connected to the delivery line 8 that is designed to compensate for variations in the volume of water in the heating circuit and to maintain the appropriate quantity of heating water. In a variant of the invention, the expansion tank could be connected to the return line 9 instead of the delivery line 8.
Circulators 30 are also located along the delivery line 8 (there are two of these in the embodiment illustrated) to enable a forced recirculation of the water in the heating circuit, since the expansion tank is open, in order to reduce the system's hysteresis times.
The boiler 7 is advantageously of the type fuelled with methane gas, in which case a suitable gas supply line 10 connects the boiler 7 to the outlet duct 3 in the system 1.
The heating means 4, and particularly the boiler 7, are appropriately connected to control logic 14.
The control logic 14 sends the thermostat 7a of the boiler 7 an indication of the temperature T1,H20 needed for the water that is to flow to the exchanger 6 through the delivery line 8.
A first temperature detector 15 measures the temperature of the water T1,H20 in the delivery line 8 and sends this value to the control logic 14.
A second temperature detector 16 measures the temperature of the water T2,H2O in the return line 9 and sends this value to the control logic 14.
A gas temperature detector 17 is associated with the outlet duct 3 and measures the temperature Tu,gas of the gas downstream of the gas pressure reducing means 5. The gas temperature detector 17 is preferably in the form of a temperature sensor. The temperature Tu,gas measurement is sent to the control logic 14.
Means 18 for measuring the instantaneous flow rate of the gas Qu,gas are associated with the outlet duct 3 and used to record the instantaneous flow rate of the gas downstream of the pressure reducing means 5.
This instantaneous gas flow rate Qu,gas measurement is sent to the control logic 14.
In particular, the means 18 for measuring the instantaneous gas flow rate Qu,gas comprise a gas meter 19 that sends an impulsive signal to a volume corrector 20 suited to produce the instantaneous flow rate Qu,gas as an output in the form of standard cubic metres per second, i.e. with a defined unit of time.
In variants of the invention, other types of measuring device could be used, such as means for measuring mass, or a Venturi meter, to provide as output values that indicate the instantaneous flow rate of the gas Qu,gas.
The control logic 14 preferably consists of a programmable logic controller (PLC) unit of known type, i.e. a unit capable, among other things, of recording different signals coming from respective sensors/detectors and processing their values to generate suitable control signals. In the embodiment described herein, the output from the control logic 14 is a control signal for the thermostat 7a on the boiler 7 that establishes the temperature Tl,H2O to which the heated water must be heated. This command overrides the digital thermostat on the boiler 7, which is installed in series with the analogical thermostat 7a.
Along the various pipelines in the system 1, there is also a series of on/off valves, suitably positioned to allow for action to be taken for servicing purposes or to enable the flows in the water heating circuit to be controlled.
At suitable points along the various pipelines, there are also devices for recording the relative pressure of the natural gas in a known manner, consisting for instance of Bourdon spring pressure gauges, and possibly also pressure transducers suitably wired with electric connections.
According to the invention, the instantaneous reading by the means 18 for measuring the gas flow rate Qu,gas, combined with the gas temperature measurement Tu,gas in the outlet duct 3, enables an appropriate control of the heating means 4 so as to optimise the energy needed to heat the gas, as we shall see more clearly below from the description of how the system 1 operates.
For the description of how the system 1 in figure 2 operates, reference is made below to the diagrams shown in figures from 3 to 5.
Figure 3 schematically shows the operating principle behind the system 1 in a methane gas distribution network. More in particular, it illustrates the operations performed by the control logic 14.
In a first processing unit 100, the value of the instantaneous flow rate Qu,gas of the gas at the outlet and the value of the return temperature of the water T2,H2O are processed to provide as output a first value of the temperature at which the heated water V l,H2O has to be delivered.
The calculations performed in the processing unit 100, and operatively implemented in the control logic unit 14, are better illustrated in figure 4.
The rated values for the system 1 are used for this calculation, which are:
- the incoming pressure Pi,gas of the natural gas, expressed in bar;
- the outgoing pressure Pu,gas of the natural gas, expressed in bar;
- the incoming temperature Ti,gas of the gas inside the gas main 2.
These three values - Pi,gas, Pu,gas and Ti,gas - are used to calculate, with the aid of the enthalpy diagram for methane, the thermal energy that has to be transferred to the natural gas arriving in the system 1 in order for said gas to emerge downstream, after its pressure has been reduced, at a temperature Tu,gas of 6°C. From the enthalpy diagram for methane we thus obtain a value for the enthalpy change Ah, expressed in J/kg.
Using the value for the instantaneous flow rate Qu,gas of the outgoing gas, as measured by the measuring means 18 and expressed in standard cubic metres per second (sm3/s), the value of the thermal power CI, expressed in Watts, that has to be transferred to the incoming gas is calculated (unit 101) as follows:
Cl= Qu,gas*pCH4*Ah;
where pCH4 is the volumetric mass of the methane, expressed in kg/m3, and Ah is the previously-calculated enthalpy change.
The next processing step (unit 102) takes into account the efficiency El of the heating system in the system 1 in order to calculate the effective thermal power C2 that the boiler 7 has to provide.
The result will consequently be the thermal power C2 (at the outlet from the unit 102) that has to be used to heat the water in order to guarantee that the temperature of the outgoing gas, after the pressure reduction, will be 6°C, i.e. C2= C1/ E1
The value of the heating system's efficiency El is an estimate made by the operator, based on their know-how and experience in the field, and may depend on various factors, such as the insulation of the circuit where the water transits, the state of efficiency of the boiler, and so on. In a variant of the method, as we shall see in more detail later on, this efficiency value can be recalculated from time to time by the control logic 14, based on its processing of the values identified in the system 1. The calculated efficiency will thus tend towards the real and effective value of the efficiency of the heating system in the system 1. The previously-calculated value of the thermal power C2 (at the outlet from unit
102) is subsequently processed (unit 103) to provide a temperature value ΔΤ (at the outlet from unit 103). This temperature ΔΤ represents the temperature difference between the temperature T2,H2O in the heated water return line and the estimated temperature T' l,H2O of the heated water in the delivery line, i.e. ΔΤ = T' l ,H2O - T2,H20 = C2 / (mH2O*CpH2O)
where:
- T' 1,H20 is the estimated temperature of the heated water produced by the boiler 7 and carried to the exchanger 6 through the delivery line 8;
- T2,H2O is the temperature of the water in the return line 9 from the exchanger 6 to the boiler 7;
- mH2O is the mass flow rate, expressed in kg/s, of the water pumped by the boilers;
- CpH20 is the specific heat at a constant pressure of the water, expressed in J/(kg*°k).
The temperature of the water in the return line T2,H20 is advantageously measured by the second temperature detector 16.
The water delivery temperature T' 1,H20 is then calculated by adding the value of the previously-calculated temperature difference ΔΤ (at the outlet from unit
103) to the temperature T2,H2O measured in the water return line.
The temperature T' 1,H20 calculated in this way (at the outlet from the unit 100) represents a first estimate of the temperature T' l,H2O at which the heated water must flow from the boiler 7.
This temperature T' l,H2O is calculated with no control being performed on the effective temperature Tu,gas on the gas in the outlet duct 3.
Said control is performed in the next processing unit 150, as shown in figure 3.
The previously-calculated first temperature value T' l,H2O is processed and corrected, taking into account the temperature of the gas Tu,gas actually measured at the outlet duct 3, and the desirable reference temperature for the outgoing gas Tu,gas_rif. The final temperature value Tl,H2O at which the heated water has to flow from the boiler 7 is given at the outlet from said processing unit 150. This value is transmitted by the control logic 14 to the thermostat 7a on the boiler 7.
The temperature of the outgoing gas Tu.gas is advantageously recorded by the gas temperature detector 17 associated with the outlet duct 3.
The desirable reference temperature value for the outgoing gas Tu,gas_rif is advantageously set at 6°C.
The processing unit 150, shown in detail in figure 5, is basically a feedback system for controlling the final temperature Tl,H2O at which the heated water has to flow from the boiler 7 as a function of the temperature of the outgoing gas Tu,gas. Said control system may be of the proportional-integral-derivative type or based on any combination thereof, depending on the type and the dynamic conditions of the system.
An example of the possible feedback methods implemented in the processing unit 150 is given below.
The calculations performed in the processing unit 150 are implemented operatively in the control logic unit 14.
The deviation S between the value of the desirable reference temperature for the outgoing gas Tu,gas_rif (preferably set at 6°C) and the temperature value measured in the outgoing gas Tu,gas is calculated first, i.e.
S = Tu,gas_rif - Tu,gas
The value of this deviation S is used (in unit 151) to calculate a coefficient of error er (as output from unit 151), i.e.
er = S*( Qu,gas* Cpgas/QH2O*CpH2O);
where:
- Cpgas is the specific heat at a constant pressure of the gas in standard conditions, expressed in J/(kg*°k);
- QH2O is the flow rate of the water from the boiler 7 to the exchanger 6, expressed in kg/s;
- CpH20 is the specific heat under constant pressure of the water, expressed in J/(kg*°k).
This coefficient of error er represents the value to be added to the previously- calculated first temperature value T' 1,H20 (output from unit 100), i.e. Tl,H2O = T' l,H2O + er.
The temperature value T1,H20 thus represents the final temperature at which the heated water must flow from the boiler 7.
It is clear from the above description that the thermal power needed to guarantee an optimal outgoing gas temperature can be calculated starting from the instantaneous flow rate measured for the gas in transit through the outlet duct. The system consequently enables the amount of heat needed to heat the gas to be estimated using the instantaneous flow rate of the gas as a control parameter, whereas conventional systems rely on the temperature of the outgoing gas alone. This enables the inertia of the system to be limited, thereby increasing the efficiency of the system for regulating the temperature of the outgoing gas.
The system also enables an appropriate adjustment of the temperature of the water heated by the boiler to provide the effective thermal energy required by the system, with a consequent improvement in the system's energy efficiency by comparison with the known systems, in which the temperature of the heated water is substantially fixed.
In another embodiment of the invention, a self-teaching function is included in the system 1 with a view to optimising its performance.
As mentioned previously, this is achieved by means of a more accurate calculation of the value of the efficiency El of the heating system in the system 1 , using this parameter to calculate the thermal power C2 (unit 102, in figure 4). One way to calculate the value of the efficiency E' l to use in the above- mentioned formulas is explained below.
At regular intervals, the mean value erm of the coefficient of error er, the mean value Clm of the thermal power CI, and the mean value C2m of the thermal power C2 are calculated.
The values of er and C2m can be used to calculate a corrected value for ATc, i.e. ATc = C2m / ( mH2O * CpH2O ) + erm.
Then the thermal power C3 can be calculated, which corresponds to the real thermal power that the boiler 7 needs to provide, i.e.
C3 = ATc * mH2O * CpH2O
Finally, the new efficiency value E' 1 is calculated, i.e.
E' l = Clm / C3.
In subsequent calculations, this new efficiency value E' 1 for the heating system in the system 1 can be used instead of the efficiency value El estimated in advance. In successive calculations the efficiency ΕΊ will gradually tend towards the real value of the efficiency of the system 1.
Figure 6 shows a variant of the system 1 ' according to the invention that differs from the one shown in figure 1 in that it includes two boilers 7, 7', instead of one, and two parallel lines for the passage of the gas, fitted with respective gas heating means 4, 4' and gas pressure reducing means 5, 5'.
The two boilers 7, 7' are suitably connected in parallel and are connected to the same delivery line 8 and to the same return line 9.
A thermostat 7a is associated with both the boilers 7 and 7', and connected to the control logic 14.
Providing two boilers 7, 7' guarantees the continuity of the supply of heat even in the event of one of the two boilers being switched off or needing servicing 7, 7'. Providing two parallel pipelines for the passage of the gas, with respective gas heating means 4, 4' and gas pressure reducing means 5, 5', guarantees the continuity of the supply and of the heating of the natural gas, even in the event of one of the two boilers 7, 7' being switched off or needing servicing.
As far as the operating principle for this system 1 ' is concerned, the same applies as described above with reference to the preferred embodiment of the invention. The gas heating system described in the previous embodiments preferably comprises a boiler for heating the heated water and a water/gas tube bundle heat exchanger. In other embodiments, the heating system may be different, however, e.g. a system with a heat pump and a tube bundle exchanger, or boilers with plate exchangers, or even heat pumps combined with plate exchangers, etc. Here again in these variants, the thermal power released to the gas before its expansion will be advantageously controlled on the basis of the gas flow rate identified after its pressure has been reduced.
It has thus been demonstrated herein that the present invention enables the previously-stated objects to be achieved. In particular, it enables the development of a gas pressure reducing system with a better energy performance than the known state of the art.
While the present invention has been described with reference to the particular embodiments illustrated in the figures, this is on the understanding that the present invention is not limited to the particular embodiments illustrated and described therein. Further variants of said embodiments come within the scope of the present invention, as stated in the claims.

Claims

1. Gas heating system suited to be applied to a gas transiting between an inlet duct (2) and an outlet duct (3), in which the pressure of said gas in said inlet duct (2) exceeds the pressure of said gas in said outlet duct (3), comprising:
- thermal power generation means (4; 4') suited to heat said gas between said inlet duct (2) and said outlet duct (3);
- control means (14) of said thermal power generation means (4; 4'),
characterized in that it comprises means (18) for measuring the flow rate (Qu,gas) of said gas in said outlet duct (3) connected to said control means (14) of said thermal power generation means (4; 4').
2. System according to claim 1), characterized in that it comprises means (17) for measuring the temperature of said gas in said outlet duct (3) connected to said control means (14) of said thermal power generation means (4; 4').
3. System according to any of the preceding claims, characterized in that said thermal power generation means (4; 4') comprise means (7; 7') for heating a heating fluid and means (6; 6') for exchanging thermal energy between said heating fluid and said gas.
4. System according to claim 3), characterized in that said control means (14) comprise means for controlling the temperature (T1,H20) of said heating fluid.
5. System according to claim 3), characterized in that said thermal power generation means (4; 4') comprise a delivery line (8) of said fluid between said heating means (7; 7') and said exchanger means (6; 6'), and a return line (9) of said fluid between said exchanger means (6; 6') and said heating means (7; 7').
6. System according to any of the preceding claims, characterized in that said means (18) for measuring the flow rate (Qu,gas) of said gas comprise a gas meter (19) operatively connected to a volume corrector (20) suited to produce as an output the value of said flow rate (Qu,gas) of said gas.
7. System (1; ) for reducing the pressure of a gas between an inlet duct (2) and an outlet duct (3), comprising pressure reducing means (5; 5') between said inlet duct (2) and said outlet duct (3), characterized in that it comprises a heating system according to any of the preceding claims.
8. Method for heating a gas transiting between an inlet duct (2) and an outlet duct (3), in which the pressure of said gas in said inlet duct (2) exceeds the pressure of said gas in said outlet duct (3), comprising the step of heating said gas between said inlet duct (2) and said outlet duct (3), characterized in that said gas heating step is controlled based on the flow rate (Qu,gas) of said gas in said outlet duct (3).
9. Method according to claim 8), characterized in that said gas heating step is controlled based on the temperature (Tu,gas) of said gas in said outlet duct (3).
10. Method according to claim 8) or 9), characterized in that said gas heating step comprises a step in which a fluid is heated and a step in which the thermal energy is exchanged between said fluid and said gas.
11. Method according to claim 10), characterized in that the temperature (Tl, H2O) of said fluid during said fluid heating step is controlled based on the flow rate (Qu,gas) of said gas in said outlet duct (3).
12. Method according to claim 10) or 11), characterized in that the temperature (Tl, H2O) of said fluid during said fluid heating step is controlled based on the temperature (Tu,gas) of said gas in said outlet duct (3).
13. Method according to claim 12), characterized in that the temperature (Tl, H2O) of said fluid during said fluid heating step is controlled based on the deviation (S) of the temperature (Tu,gas) of said gas in said outlet duct (3) compared to a predetermined reference temperature (Tu,gas_rif).
14. Method according to any of the claims from 8) to 13), characterized in that the thermal energy used during said gas heating step is calculated based on the efficiency (El ; E' 1) of the system implementing said heating process.
15. Method according to claim 14), characterized in that the value of said efficiency (El) is an estimated value.
EP12729195.3A 2011-05-23 2012-05-18 Gas heating system for gas pressure reducing systems and method for obtaining said heating effect Active EP2715213B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT000132A ITVI20110132A1 (en) 2011-05-23 2011-05-23 HEATING SYSTEM OF A GAS IN GAS PRESSURE REDUCTION SYSTEMS AND A METHOD OF REALIZING SUCH HEATING.
PCT/IB2012/000983 WO2012160433A1 (en) 2011-05-23 2012-05-18 Gas heating system for gas pressure reducing systems and method for obtaining said heating effect

Publications (2)

Publication Number Publication Date
EP2715213A1 true EP2715213A1 (en) 2014-04-09
EP2715213B1 EP2715213B1 (en) 2015-09-16

Family

ID=44554861

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12729195.3A Active EP2715213B1 (en) 2011-05-23 2012-05-18 Gas heating system for gas pressure reducing systems and method for obtaining said heating effect

Country Status (3)

Country Link
EP (1) EP2715213B1 (en)
IT (1) ITVI20110132A1 (en)
WO (1) WO2012160433A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2517725C (en) 2013-08-29 2019-12-04 Utility Io Group Ltd Heater suitable for heating a flow of natural gas
IT201600100483A1 (en) * 2016-10-06 2018-04-06 Stefano Oldrati System for the thermal control of a gas
IT201900004675A1 (en) * 2019-03-28 2020-09-28 Me Te Ma Srl SYSTEM AND PROCEDURE FOR REGULATING THE PRESSURE OF METHANE GAS COMING FROM THE NETWORK.

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5606858A (en) * 1993-07-22 1997-03-04 Ormat Industries, Ltd. Energy recovery, pressure reducing system and method for using the same
US6155051A (en) * 1999-04-20 2000-12-05 Williams; Paul R. Method of heating natural gas in a city gate station
HU1991U (en) * 2000-09-25 2001-04-30 Fiorentini Hungary Korlstolt F Equipment group for operating gas pressure reductive station
CN2506848Y (en) * 2001-11-20 2002-08-21 玉建军 Compressed natural gas pressure regulator
DE10246170B4 (en) * 2002-10-02 2005-08-18 Stadtwerke Homburg Gmbh Device for preheating a gas in a gas pressure regulating and measuring system
EP1865249B1 (en) * 2006-06-07 2014-02-26 2Oc A gas pressure reducer, and an energy generation and management system including a gas pressure reducer
CN201285515Y (en) * 2008-09-02 2009-08-05 天津博思特石油天然气设备有限公司 Pressure control system for natural gas transmission station
KR20110047905A (en) * 2009-10-31 2011-05-09 유한회사 이지엠에너지홀딩스 Energy recovery apparatus of natural gas governing equipment and energy recovery method : Fuel Cell?Turboexpander integrated energy recovery system
CN201650505U (en) * 2010-05-04 2010-11-24 宁波九天仪表有限公司 Compressed natural gas pressure reducing regulator used for automobile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2012160433A1 *

Also Published As

Publication number Publication date
WO2012160433A1 (en) 2012-11-29
EP2715213B1 (en) 2015-09-16
ITVI20110132A1 (en) 2012-11-24

Similar Documents

Publication Publication Date Title
CN203375724U (en) Water temperature control device for water outlet of gas water heater
JP6077840B2 (en) Steam generation system and method for controlling operation of a steam generation system
CN103925641A (en) Heat supply pipe network hydraulic balance automatic adjustment method
EP2715213B1 (en) Gas heating system for gas pressure reducing systems and method for obtaining said heating effect
WO2006074850A3 (en) Method for regulating a thermal or calorimetric flowmeter
RU2425292C1 (en) Adaptive control system of actuators of heat supply objects of municipal housing economy
RU2340835C2 (en) Automated data system for control and monitoring of heating boiler-house with hot-water boilers operation
JP5840466B2 (en) Variable flow rate control device for heat source pump
RU2562782C1 (en) Control system of heat supply facilities
CN105066341A (en) Variable water temperature control system suitable for air conditioning secondary pump system
US20140102382A1 (en) Control of blowdown in steam boilers
CA2986606C (en) Heat exchanger control and diagnostic apparatus
CN108592396B (en) Constant-temperature constant-volume air outlet device of heat storage boiler and air outlet method thereof
RU2424472C2 (en) Remote control device of state of thermal plants
RU2580089C1 (en) System for controlling heat supply facilities
RU2012101350A (en) DEVICE FOR MEASURING THERMAL ENERGY RADIATED BY RADIATORS, CONVECTORS OR SIMILAR DEVICES, IN PARTICULAR, FOR PROPORTIONALLY DISTRIBUTING THE COST OF HEATING AND / OR CONDITIONING
RU2629169C1 (en) Subscriber input of heat supply system of building
CN212559527U (en) Heating steam control equipment and system of low-temperature multi-effect distillation seawater desalination equipment
JP2013148195A (en) Hydrogen gas replenishment control system
CN204594276U (en) The automatic steam heater of a kind of closed loop
EP3798520B1 (en) Electronically controlled by-pass
GB2507004B (en) Control of blowdown in steam boilers
CN203797856U (en) Indoor constant-temperature constant-humidity system
RU2678225C2 (en) Automatic regulator of hydraulic mode of heat network
RU126097U1 (en) DIAGRAM OF THE HEAT ITEM OF THE CENTRALIZED HEAT SUPPLY SYSTEM FOR CONNECTING CONSUMERS WITH AN INSUITABLE HEATING HEAD

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20131210

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150414

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 750107

Country of ref document: AT

Kind code of ref document: T

Effective date: 20151015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012010652

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151217

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151216

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 750107

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160116

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160118

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012010652

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20160617

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160518

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20170131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120518

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602012010652

Country of ref document: DE

Owner name: REGAS SRL, IT

Free format text: FORMER OWNERS: JAMOLETTI, FRANCESCO, BRIGNANO GERA D'ADDA, BERGAMO, IT; MAPELLI, ANGELO, VICENZA, IT

Ref country code: DE

Ref legal event code: R082

Ref document number: 602012010652

Country of ref document: DE

Representative=s name: GRUENECKER PATENT- UND RECHTSANWAELTE PARTG MB, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602012010652

Country of ref document: DE

Owner name: JAMOLETTI, FRANCESCO, BRIGNANO GERA D'ADDA, IT

Free format text: FORMER OWNERS: JAMOLETTI, FRANCESCO, BRIGNANO GERA D'ADDA, BERGAMO, IT; MAPELLI, ANGELO, VICENZA, IT

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20180927 AND 20181005

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150916

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602012010652

Country of ref document: DE

Owner name: REGAS SRL, IT

Free format text: FORMER OWNER: JAMOLETTI, FRANCESCO, BRIGNANO GERA D'ADDA, BERGAMO, IT

Ref country code: DE

Ref legal event code: R081

Ref document number: 602012010652

Country of ref document: DE

Owner name: REGAS S.P.A., IT

Free format text: FORMER OWNER: JAMOLETTI, FRANCESCO, BRIGNANO GERA D'ADDA, BERGAMO, IT

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20220106 AND 20220112

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230524

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230417

Year of fee payment: 12

Ref country code: DE

Payment date: 20230425

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230420

Year of fee payment: 12

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602012010652

Country of ref document: DE

Owner name: REGAS S.P.A., IT

Free format text: FORMER OWNER: REGAS SRL, MILANO, IT