EP2699359B1 - Treatment unit, installation and method for the surface treatment of articles - Google Patents
Treatment unit, installation and method for the surface treatment of articles Download PDFInfo
- Publication number
- EP2699359B1 EP2699359B1 EP12715589.3A EP12715589A EP2699359B1 EP 2699359 B1 EP2699359 B1 EP 2699359B1 EP 12715589 A EP12715589 A EP 12715589A EP 2699359 B1 EP2699359 B1 EP 2699359B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- conveying
- robot
- application
- treatment
- path
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B16/00—Spray booths
- B05B16/90—Spray booths comprising conveying means for moving objects or other work to be sprayed in and out of the booth, e.g. through the booth
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
- B05B13/0431—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with spray heads moved by robots or articulated arms, e.g. for applying liquid or other fluent material to 3D-surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B16/00—Spray booths
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/04—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
- B05B13/0447—Installation or apparatus for applying liquid or other fluent material to conveyed separate articles
Definitions
- the surface treatment takes place in particular in the form of painting, in particular body parts are treated or painted.
- the body parts are conveyed on workpiece carriers through the treatment room of a treatment unit of the type mentioned above and coated with a lacquer by means of one or more multiaxial application robots, as they are known per se.
- the body parts can be conveyed continuously or intermittently through the treatment room; This is also the case with the present invention.
- Some body parts can be effectively treated or painted in different orientations in space, so in different application situations, which for certain body parts differently executed systems are represented on the market, which are adapted to one or the other application position of the objects to be treated.
- the bumpers can be mounted in a so-called installation position on the workpiece carrier. In this installation position, they are approximately aligned, as is the case with a bumper mounted on a vehicle, so that the front side of the bumper points largely in a horizontal direction perpendicular to the conveying direction. Bumpers in the installed position are arranged on the workpiece carrier in the vertical direction one above the other and usually such that their longitudinal extent between their two opposite side ends parallel to the conveying direction runs.
- the bumpers can be mounted in a so-called sleeper position on the workpiece carrier, in which its front side is oriented upwards.
- the bumpers are usually rotated relative to the mounting position about a vertical axis by 90 ° and extend perpendicular to the conveying direction. Bumpers in the sleeper position are usually arranged on the workpiece carrier in a horizontal plane one behind the other.
- bumpers are to be treated which are conveyed through the treatment room in the installation position, the treatment must be carried out from the side.
- the application robot is moved parallel to the conveying direction of the bumper.
- the application device guided by the application robot such as a spray gun or a rotary atomizer, is moved laterally next to the workpiece carrier for this purpose.
- the treatment In the case of bumpers in the sleeper position, however, the treatment must be carried out from above, for which purpose the application device is guided by the application robot correspondingly above the bumpers.
- bumpers can often only be painted in one of the two application layers.
- bumpers, or objects to be treated in general have to assume a position on a workpiece carrier during treatment phases before painting, which does not correspond to the application position required for the treatment unit.
- the bumpers or other objects must be transferred before painting on another workpiece carrier and thereby brought into the required application position. This takes time and reduces accordingly the possible total turnover of the plant. Paint shops are off WO0183119 or GB2235421 known.
- the objects are moved in a fixed conveying direction and the application robot or on a fixed rectilinear trajectory either only in parallel directions or only in directions perpendicular to each other.
- these can thus be treated in a corresponding treatment unit either only in the installation position or only in the sleeper position.
- the relative movement between the application robot and the objects to be treated can now be changed and given for bumpers, for example, depending on the application position in which they are conveyed through the treatment space.
- Relative movement means that either the object or objects can or can be moved relative to the stationary application robot or the application robot with respect to the object (s).
- the application robot is moved parallel to the conveying direction of the bumper.
- the application robot can be moved perpendicular to the conveying direction of the bumper when the bumpers are conveyed through the treatment room in the sleeper position. This applies mutatis mutandis to other objects than bumpers.
- the at least one application robot is movably mounted on a guide rail, which predefines the robot movement path and is arranged at a height level above the objects to be treated, which are conveyed through the treatment space.
- the objects can then travel under the application robot, as a result of which the movement path of the application robot and the conveying path of the objects can intersect without the risk of a collision.
- the application robot should be guided in such a way that the objects are accessible to it for painting, both from above and from the side. This is also possible if the application robot is guided in a different way.
- the conveyor system comprises a conveyor rail system, on which workpiece carriers can be moved, which carry the objects to be treated.
- the conveyor system comprises a points unit, through which portions of the conveyor rail system are connected to each other, which in the same direction or at an angle to each other, so that optionally different conveying paths for the objects can be specified, the conveying direction of the articles optionally during their promotion by the Treatment room to be changed.
- objects in different orientations can be arranged on a single workpiece carrier. After, for example, bumpers have been painted in the installation position, the conveying direction can be changed relative to the application robot and bumpers can be painted in the sleeper position.
- the robot trajectory has a curved course at least in regions.
- a single existing rectilinear conveying path for the articles may suffice, since the desired and required change in the relative movement between the articles and the application robot can be achieved by a cornering of the application robot.
- the robot trajectory preferably comprises two rectilinear portions connected by a curve region which are at an angle of 90 ° to one another.
- the treatment space has at least one inlet and at least one outlet, which via a Conveying path are interconnected.
- variants are advantageous in which the treatment space has an inlet or a first inlet and a second inlet, wherein each existing inlet is connected via a delivery path to an outlet or a first outlet and a second outlet.
- a single inlet may be connected to a single outlet or to first and second outlets.
- a first inlet and a second inlet may be connected to a single outlet.
- a first inlet may be connected to a first outlet and a second inlet may be connected to a second outlet.
- a first inlet may be connected to a first outlet and a second inlet may be connected to the first outlet and a second outlet.
- first and second inlets may be connected to first and second outlets, respectively.
- the various available inlets and outlets provide space for a suitably designed conveyor rail system, which allows a variety of delivery routes between the existing inlets and outlets on which the objects can be moved relative to the application robot, that the desired relative movements are possible.
- the above-mentioned object is achieved in that at least one treatment unit with some or all of the above-mentioned features is present.
- the at least one application robot is moved on a guide rail which predefines the robot trajectory and is arranged at a height level above the objects to be treated, which are conveyed through the treatment space.
- the application robot is guided in such a way that the articles are accessible to it for painting, both from above and from the side. This is also possible with another type of leadership.
- a secure delivery of the objects through the treatment room is possible if workpiece carriers, which carry the objects to be treated, are moved on a conveyor rail system.
- the desired flexibility is achieved, in particular, if different delivery paths for the objects are specified can be.
- the at least one application robot can be moved on a rectilinear robot movement path.
- the at least one application robot is moved on an at least partially curved robot trajectory.
- FIGS. 1 to 4 is designated at 10 in total designed as a spray booth treatment cabin according to a first embodiment.
- the painting booth 10 is shown in a treatment plant 12 for the surface treatment of articles 14, which in the present embodiment are exemplified as body parts in the form of bumpers for motor vehicles, which are designated 14a and 14b. This will be explained again below.
- other objects can be treated as body parts, for example, as different items such as white goods, golf balls, radio panels, vehicle wheels or the like.
- the paint booth 10 defines a treatment space 16 which is bounded by four vertical side walls 18, 20, 22 and 24.
- the painting booth 10 has at the top a horizontal cabin ceiling 34, which is designed as a lower boundary of an air supply space 36. Air is introduced into the treatment chamber 16 via the air supply chamber 36, which then flows through the treatment chamber 16 from top to bottom.
- Down the treatment room 16 is open via a trained example as a grid floor 38 and leads to a flow area 40, from where the air coming from the treatment room 16 of cleaning and further conditioning can be supplied as it and is known.
- an application system 42 is present. This comprises a first and a second multi-axis, in the present embodiment, a total of seven-axis, application robot 44 and 46, which are arranged in the cabin space 16.
- the two application robots 44, 46 each carry a non-specifically provided with a reference numeral application device, for example in the form of a pointed gun or a rotary atomizer, with him.
- the first application robot 44 is provided on the cabin wall 20 and can be moved along a rectilinear horizontal guide rail 48 which extends above the inlet 28 of the cabin wall 20.
- a rectilinear horizontal guide rail 48 which extends above the inlet 28 of the cabin wall 20.
- the second application robot 46 is provided on the opposite cabin wall 24 and can be moved along a rectilinear horizontal guide rail 50 which extends above the passage 32 of the cabin wall 24.
- the guide rails 48 and 50 are arranged in total at a height level above the bumper 14 to be treated, which are conveyed through the treatment space 16.
- the bumpers 14 to be treated are conveyed through the treatment cabin 10 by means of a conveyor system 52.
- a plurality of bumpers 14 are mounted on a workpiece carrier 54, which in turn from a only in FIG. 2 to be detected carriage 56 is carried.
- the carriage 56 can be moved in a conveyor rail system 58, which is below the bottom 38 in the flow region 40 of the spray booth 10 is arranged.
- the conveyor rail system 58 and the floor 38 of the paint booth 10 are formed so that the workpiece carrier 54 protrudes upward through the floor 38 into the cabin space 16.
- the carriage 56 may be driven, for example, by an endless drive means such as a chain; this is known in and of itself.
- the workpiece carrier 54 is in the Figures 1 and 2 shown with bumpers 14 in two different application positions.
- bumpers 14a in the installation position explained in the introduction are fastened one above the other on the workpiece carrier 54 in the vertical direction.
- bumpers 14b are fastened in succession on the workpiece carrier 54 in a horizontal plane in the sleeper position likewise explained above.
- the workpiece carrier 54 is usually equipped either only with bumpers 14a in the installed position or only with bumpers 14b in the sleeper position.
- bumpers 14a in the installed position must be coated with paint from the side, while bumpers 14b must be provided from above in the sleeper position.
- the application robots 44 and 46 are arranged so that they can coat bumpers 14 optionally from above or from the side, so that each application robot 44, 46 can coat both bumpers 14a in the installation position and bumper 14b in the sleeper position.
- the cabin space 16 in FIGS. 3 to 8 is in four space quadrants A, B, C and D, respectively divided, which must be understood as a three-dimensional space.
- the space quadrants A and B are respectively accessible to the first application robot 44 and the space quadrants C and D are accessible to the second application robot 46.
- the first application robot 44 can also cover the space quadrant C and the second application robot 46 can also cover the space quadrant B. This will be discussed again below.
- This assignment of the spatial quadrants A, B, C and D does not mean that a particular application robot 44 or 46 actually needs to be able to reach any location in the assigned space quadrant A, B, C or D, so that the paint booth 10 can be operated properly. In the present case, it is only relevant that the application robot 44 or 46 can reach the respective bumpers 14 which are to be coated by it and which are located entirely or partially in a specific space quadrant A to D.
- FIG. 4 the trajectories of the first and the second application robot 44 and 46 are respectively shown with dashed lines along the respective associated guide rail 48 and 50 with a larger line width and designated 60 and 62 respectively.
- the conveyor rail system 58 for the bumper 14 to be treated comprises in which in FIGS. 1 to 4 1, a first straight rail track 64 leading from the first inlet 26 in the side wall 18 to the first outlet 30 in the side wall 22.
- the first rail track 64 is crossed by a second rectilinear rail track 66 which extends from the second inlet 28 in FIG the side wall 20 leads to the second outlet 32 in the side wall 24.
- the rail tracks 64, 66 are each divided into two sections 64a, 64b and 66a, 66b.
- a switch unit 68 which may be placed in different switch positions in which the rail track section 64a is connected to either the rail track section 64b or the rail track section 66b and the rail track section 66a to either the rail track section 66b or the rail track section 64b.
- the diverter unit 68 may interconnect the various sections 64a, 64b, 66a, 66b of the conveyor rail system 58 which are in the same direction or at an angle to each other.
- the bumpers 14 are now conveyed on the workpiece carrier 54 either through the first inlet 26 or through the second inlet 28 into the treatment space 16.
- FIG. 4 are the possible delivery routes on which the bumper 14 can be promoted by the treatment cabin 16 of the paint booth 10, shown with a larger line width with solid lines.
- a first conveying path 70 leads from the first inlet 26 to the opposite first outlet 30.
- a second conveying path 72 leads from the first inlet 26 to the second outlet 32.
- a third conveying path 74 leads from the second inlet 28 to the opposite second outlet 32 and a fourth conveying path 76 leads from second inlet 28 to the first outlet 30th
- a certain conveying path always extends between an inlet and an outlet and If a workpiece carrier 54 or bumpers 14 are always conveyed from an inlet to an outlet through the treatment space 16.
- the conveying path 70, 72, 74 or 76, along which the bumpers 14 can now be conveyed through the treatment space 16, thus depends on which of the two inlets 26 or 28 the bumpers 14 are placed on the workpiece carrier 54 in the treatment space 16 be and which point position the points unit 68 occupies.
- the points unit 68 can also be constructed so that only the conveying paths 70 and 72 and 74 or only the conveying paths 70 and 74 and 76 are possible.
- the workpiece carrier 54 or each bumper 14 in each position on the respective conveying path 70, 72, 74 or 76 predefines a conveying direction which is tangential to the conveying path 70, 72, 74 or 76 at the location. at which the workpiece carrier 54 or the considered bumper 14 is currently located.
- FIG. 4 shows schematically illustrated workpiece carriers 54 in different positions on the conveying paths 70, 72, 74 or 76 with arrows, which are each denoted by 78 and indicate the conveying direction for bumpers 14 and the respective workpiece carrier 54. If the workpiece carrier 54, for example, straight in one of the in FIG. 4 is indicated curve portions of the points unit 68, the conveying direction 78 is at an angle to the rectilinear conveying path 70 and the linear conveying path 74th
- the application system 42 and the conveyor system 52 are thus matched and set up in such a way that the application robots 44, 46 relative to Conveying direction 78 of a bumper 14 optionally with a movement component parallel to the conveying direction 78 of a bumper 14 and / or a movement component perpendicular to the conveying direction 78 of a bumper 14 can be moved.
- the workpiece carrier 54 If the workpiece carrier 54 is equipped only with bumpers 14a in the installed position, they are conveyed on the first conveying path 70 from the first inlet 26 to the opposite first outlet 30, wherein its longitudinal direction is parallel to the conveying direction 78, as in the bumpers 14a after the Figures 1 and 2 the case is.
- the movement paths 60, 62 of both the first and the second application robot 44, 46 are always parallel to the conveying direction 78 of the bumper 14a.
- the application robots 44, 46 then move correspondingly always parallel to this conveying direction 78 and can paint the bumpers 14a in each case in the space quadrants A and B or C and D from the side.
- the workpiece carrier 54 when the workpiece carrier 54 is equipped only with bumpers 14b in the sleeper position, they are conveyed on the third conveying path 74 from the second inlet 28 to the opposite second outlet 32, but their longitudinal direction is now perpendicular to the conveying direction 78.
- the movement paths 60, 62 of both the first and the second application robot 44, 46 are always perpendicular to the conveying direction 78 of the bumper 14.
- the application robot 44, 46 then move accordingly always perpendicular to this conveying direction 78 and the bumper 14b can be painted from above.
- the workpiece carrier is also conveyed on the first conveying path 70 from the first inlet 26 to the first outlet 30 through the treatment space 16.
- the longitudinal direction of both the bumper 14 a in the installed position and the bumper 14 b in the sleeper position runs parallel to the conveying direction 78.
- the workpiece carrier 54 is conveyed through the inlet 26 into the treatment space 16 and is initially located in the section 64a of the rail track 64.
- the bumpers 14a in the installed position are then located in the space quadrant A, are accessible to the first application robot 44 and become accessible to the first application robot 44 Help painted from the side.
- the bumpers 14b in the sleeper position are located in the space quadrant C, are accessible to the second application robot 46 and are painted from above with the aid thereof.
- the workpiece carrier 54 can thereby be conveyed through the treatment space 16 and move on the conveying path 70 to the first outlet 30.
- the points unit 68 is set so that the rail track section 64a of the rail track 64 is connected to the section 66b of the rail track 66.
- the workpiece carrier 54 runs out of the rail track section 64a in the point unit 68 and reaches the portion 66b of the rail line 66 and over to the outlet 32. Before reaching the points unit 68 of the painting process should be completed in the space quadrants A and C.
- the conveyor system 52 is configured such that the bumpers 14 or items to be handled generally maintain their orientation in the treatment space 16, or in other words change their orientation relative to the conveying direction 78 when the conveying direction 78 changes on the selected conveyor path.
- the bumpers 14a and 14b are reversely mounted on the workpiece carrier 54, as shown in the Figures 1 and 2 is shown, ie, instead of the bumper 14a in the installed position, the bumper 14b are in the sleeper position and vice versa, the workpiece carrier 54, for example along the third conveying path 74 from the second inlet 28 to the second outlet 32 are promoted.
- the longitudinal direction of both the bumper 14a in the installed position and the bumper 14b in the sleeper position runs perpendicular to the conveying direction 78.
- the bumpers 14b in the sleeper position are then painted in the rail track section 66a corresponding area of the space quadrants A and B by means of the first application robot 44, which can move perpendicular to the conveying direction 78 of the bumper 14.
- the bumpers 14a are painted in the installation position in the corresponding region of the space quadrants C and D by means of the second application robot 46, which can likewise move perpendicular to the conveying direction 78 of the bumper 14.
- the fourth conveying path 76 could also be envisaged as the conveying path.
- the second application robot 46 could paint the bumpers 14a in the installation position from the side when the workpiece carrier 54 is located in the rail track section 64a of the rail track 64.
- FIGS. 5 to 8 painting booths 80, 82, 84 and 86 are now shown as further embodiments, in which the conveyor system 52 and the application system 42 are set up such that the application robots 44, 46 relative to the conveying direction 78 of the bumper 14 optionally with a movement component parallel to the conveying direction 78th a bumper 14 and / or a movement component perpendicular to the conveying direction 78 of a bumper 14 is movable.
- the paint booths 80, 82, 84 and 86 are components that the components of the paint booth 10 after the FIGS. 1 to 4 correspond, provided with the same reference numerals.
- the above said to the spray booth 10 applies mutatis mutandis to the paint booths 80, 82, 84 and 86 accordingly, unless otherwise explained.
- the rail track 66 includes Here, only the rail section 66 b, which extends from the switch unit 68 to the second outlet 32.
- rail unit sections 64a and 64b or 64a and 66b can be connected by means of switch unit 68, whereby workpiece pallet 54 can be arranged only along conveyor path 70 between the only available inlet 26 and first outlet 30 or along conveyor path 72 between inlet 26 and second outlet 32 can be conveyed through the treatment room 16.
- the rail track 64 here comprises only the rail track section 64a, which extends from the first inlet 26 to the points unit 68.
- rail unit sections 64a and 66b or 66a and 66b can be connected by means of switch unit 68, whereby workpiece pallet 54 can be arranged only along conveying path 72 between first inlet 26 and the only existing outlet 32 or along conveying path 74 between second inlet 28 and the outlet 32 can be conveyed through the treatment room 16.
- the application robots 44 and 46 can be moved on partially curved trajectories 88 and 90, respectively.
- the first application robot 44 is assigned a regionally curved horizontal guide rail 92, which extends above the inlet 26 in the cabin wall 18.
- the guide rail 92 for the first application robot 44 includes a first rectilinear portion 92a on the first sidewall 18 of the paint booth 10 with the inlet 26, a second rectilinear portion 92b on the second sidewall 20 of the paint booth 10, and one connecting the two rectilinear portions 92a, 92b and corresponding curved portion 92c.
- a partially curved guide rail 94 for the second application robot 46 comprises a first rectilinear section 94a on the third side wall 22 of the spray booth 10 with the outlet 30, a second rectilinear section 94b on the fourth side wall 24 of the spray booth 10 and a correspondingly curved section 94c, which connects the two rectilinear sections 94a, 94b.
- the application robots 44, 46 can each be moved perpendicular to the conveying direction 78 of the bumper 14 when they are on their rail sections 92a and 94a of the guide rails 92 and 94, respectively.
- the application robots 44, 46 can in each case be moved parallel to the conveying direction 78 of the bumpers 14 when they are on their rail sections 92b or 94b.
- care must be taken neither in the case of the bumpers 14a in the installed position nor in the bumpers 14b in the sleeper position, as their longitudinal direction is aligned with the conveying direction 78.
- the rail track sections 64a and 66a are provided, which can be connected via a modified points unit 68 optionally with a rail track 100 which extends from the points unit 68 in the space quadrant D to the outlet 98 and with the rail track sections 64a and 66a each encloses an angle of 135 °.
- the delivery path 102 leads from the first inlet 26 to the outlet 98 and the delivery path 104 from the second inlet 28 to the outlet 98.
- both application robots 44, 46 can be moved parallel to the conveying direction 78 of the bumpers 14 and paint bumpers 14 which are positioned in the space quadrant A or C and which are aligned parallel to the conveying direction 78.
- the first application robot 44 can be moved perpendicular to the conveying direction 78 of the bumper 14. This is relevant for bumpers 14 which are mounted transversely to the conveying direction 78 on the workpiece carrier 54. These can then be painted again by the first application robot 44 in the respective area of the space quadrants A and B of the paint booth 86 into which the bumpers 14 protrude.
- the bumpers 14 for the second application robot 46 in the space quadrant D of the paint booth 86 are accessible and can be painted there.
- the bumpers 14 can be arranged on the workpiece carrier 54 either in the installed position or in the sleeper position either parallel or perpendicular to the conveying direction 78.
- the application robot 44 and 46 must be parallel or perpendicular to the respective conveying direction 78th the bumper 14 can move. This is achieved by a corresponding assignment of the inlet and the outlet and the conveying path to be covered therebetween and additionally, if appropriate, by a point unit 68 which causes a rotation of the workpiece carrier 54, as described above.
- the workpiece carrier 54 is preferably constructed so that it carries bumper 14 in the installed position only on the side facing the application robot when the workpiece carrier 54 and the application robot are moved parallel to each other.
- a turntable or the like can also be provided in each case, so that the workpiece carrier 54 can ascend in an analogous manner from one rail track section to another.
- the switch unit 68 can be dispensed with.
- the first inlet 26 is connected via the conveying path 70 with the first outlet 30 and the second inlet 28 via the conveying path 74 with the second outlet 32, without a change in direction of the bumper 14 is possible while they are conveyed through the treatment space 16.
- the bumpers 14 have to be conveyed via a specific inlet 26 or 28 into the treatment space 16.
- the sidewalls can also be dispensed with and the air supply space 36 e.g. be supported with a frame structure.
- the sidewalls can also be dispensed with and the air supply space 36 e.g. be supported with a frame structure.
Description
Die Erfindung betrifft eine Behandlungseinheit zur Oberflächenbehandlung von Gegenständen mit
- a) wenigstens einem Behandlungsraum;
- b) einem Fördersystem, mittels welchem zu behandelnde Gegenstände in den Behandlungsraum hinein, entlang eines Förderweges durch den Behandlungsraum hindurch und wieder aus dem Behandlungsraum heraus förderbar sind, wobei von jedem Gegenstand in jeder Position auf dem Förderweg eine zum Förderweg tangentiale Förderrichtung vorgebbar ist;
- c) einem Applikationssystem, welches wenigstens einen mehrachsigen Applikationsroboter umfasst, der eine Applikationseinrichtung mit sich führt und entlang einer Roboterbewegungsbahn verfahrbar ist.
- a) at least one treatment room;
- b) a conveyor system, by means of which objects to be treated can be conveyed into the treatment space, along a conveying path through the treatment space and back out of the treatment space, wherein a conveying direction tangential to the conveying path can be predetermined for each object in each position on the conveying path;
- c) an application system which comprises at least one multi-axis application robot, which carries an application device with it and can be moved along a robot movement path.
Außerdem betrifft die Erfindung eine Anlage zur Oberflächenbehandlung von Gegenständen sowie ein Verfahren zur Oberflächenbehandlung von Gegenständen in einem Behandlungsraum, bei welchem
- a) die Gegenstände in den Behandlungsraum hinein, entlang einer Förderbahn durch den Behandlungsraum hindurch und wieder aus dem Behandlungsraum heraus gefördert werden und dabei in jeder Position auf dem Förderweg eine zum Förderweg tangentiale Förderrichtung vorgeben;
- b) wenigstens ein mehrachsiger Applikationsroboter, welcher eine Applikationseinrichtung mit sich führt, entlang einer Roboterbewegungsbahn verfahren wird.
- a) the objects are conveyed into the treatment space, along a conveying path through the treatment space and back out of the treatment space, thereby predetermining a conveying direction tangential to the conveying path in each position on the conveying path;
- b) at least one multi-axis application robot, which carries an application device with it, is moved along a robot movement path.
Die Oberflächenbehandlung findet insbesondere in Form von Lackieren statt, wobei insbesondere Karosserieteile behandelt bzw. lackiert werden.The surface treatment takes place in particular in the form of painting, in particular body parts are treated or painted.
Bei vom Markt her bekannten Lackieranlagen werden die Karosserieteile auf Werkstückträgern durch den Behandlungsraum einer Behandlungseinheit der eingangs genannten Art hindurch gefördert und mittels eines oder mehrerer mehrachsiger Applikationsroboter, wie sie an und für sich bekannt sind, mit einem Lack beschichtet. Die Karosserieteile können dabei kontinuierlich oder intermittierend durch den Behandlungsraum hindurch gefördert werden; dies ist auch bei der vorliegenden Erfindung der Fall.In the case of paint shops known from the market, the body parts are conveyed on workpiece carriers through the treatment room of a treatment unit of the type mentioned above and coated with a lacquer by means of one or more multiaxial application robots, as they are known per se. The body parts can be conveyed continuously or intermittently through the treatment room; This is also the case with the present invention.
Manche Karosserieteile können in unterschiedlichen Ausrichtungen im Raum, also in verschiedenen Applikationslagen, effektiv behandelt bzw. lackiert werden, wodurch für bestimmte Karosserieteile verschieden ausgeführte Anlagen am Markt vertreten sind, die an die eine oder die andere Applikationslage der zu behandelnden Gegenstände angepasst sind.Some body parts can be effectively treated or painted in different orientations in space, so in different application situations, which for certain body parts differently executed systems are represented on the market, which are adapted to one or the other application position of the objects to be treated.
Zum Beispiel haben sich beim Lackieren von Stoßfängern zwei alternative Applikationslagen der Stoßfänger auf Werkstückträgern etabliert, die zu verschiedenen Lackierabläufen führen. Einerseits können die Stoßfänger in einer so genannten Einbaulage auf dem Werkstückträger befestigt sein. In dieser Einbaulage sind sie etwa so ausgerichtet, wie es bei einem an einem Fahrzeug montierten Stoßfänger der Fall ist, so dass die Vorderseite der Stoßfänger weitgehend in eine horizontale Richtung senkrecht zur Förderrichtung weist. Stoßfänger in der Einbaulage sind auf dem Werkstückträger in vertikaler Richtung übereinander und in der Regel derart angeordnet, dass ihre Längserstreckung zwischen ihren beiden gegenüberliegenden Seitenenden parallel zur Förderrichtung verläuft. Andererseits können die Stoßfänger in einer so genannten Sleeperposition auf dem Werkstückträger befestigt sein, in welcher ihre Vorderseite nach oben ausgerichtet ist. In diesem Fall sind die Stoßfänger in der Regel auch gegenüber der Einbaulage um eine vertikale Achse um 90° verdreht und erstrecken sich senkrecht zur Förderrichtung. Stoßfänger in der Sleeperposition sind in der Regel auf dem Werkstückträger in einer horizontalen Ebene hintereinander angeordnet.For example, when painting bumpers, two alternative application layers of the bumpers on workpiece carriers have become established, leading to different painting processes. On the one hand, the bumpers can be mounted in a so-called installation position on the workpiece carrier. In this installation position, they are approximately aligned, as is the case with a bumper mounted on a vehicle, so that the front side of the bumper points largely in a horizontal direction perpendicular to the conveying direction. Bumpers in the installed position are arranged on the workpiece carrier in the vertical direction one above the other and usually such that their longitudinal extent between their two opposite side ends parallel to the conveying direction runs. On the other hand, the bumpers can be mounted in a so-called sleeper position on the workpiece carrier, in which its front side is oriented upwards. In this case, the bumpers are usually rotated relative to the mounting position about a vertical axis by 90 ° and extend perpendicular to the conveying direction. Bumpers in the sleeper position are usually arranged on the workpiece carrier in a horizontal plane one behind the other.
Wenn Stoßfänger behandelt werden sollen, die in der Einbaulage durch den Behandlungsraum gefördert werden, muss die Behandlung von der Seite her erfolgen. Der Applikationsroboter wird dabei parallel zur Förderrichtung der Stoßfänger verfahren. Beim Lackieren wird hierzu die vom Applikationsroboter geführte Applikationseinrichtung, wie eine Spritzpistole oder ein Rotationszerstäuber, seitlich neben dem Werkstückträger bewegt. Bei Stoßfängern in der Sleeperposition muss die Behandlung dagegen von oben erfolgen, wozu die Applikationseinrichtung entsprechend oberhalb der Stoßfänger von dem Applikationsroboter geführt wird.If bumpers are to be treated which are conveyed through the treatment room in the installation position, the treatment must be carried out from the side. The application robot is moved parallel to the conveying direction of the bumper. During painting, the application device guided by the application robot, such as a spray gun or a rotary atomizer, is moved laterally next to the workpiece carrier for this purpose. In the case of bumpers in the sleeper position, however, the treatment must be carried out from above, for which purpose the application device is guided by the application robot correspondingly above the bumpers.
In vom Markt her bekannten Anlagen können Stoßfänger häufig nur in einer der beiden Applikationslagen lackiert werden.In systems known from the market, bumpers can often only be painted in one of the two application layers.
Es kann jedoch vorkommen, dass Stoßfänger, oder allgemein zu behandelnde Gegenstände, bei Behandlungsphasen vor dem Lackieren eine Lage auf einem Werkstückträger einnehmen müssen, die nicht der für die Behandlungseinheit geforderten Applikationslage entspricht. In diesem Fall müssen die Stoßfänger oder andere Gegenstände vor dem Lackieren auf einen anderen Werkstückträger überführt und dabei in die erforderliche Applikationslage gebracht werden. Dies erfordert Zeit und verringert entsprechend den möglichen Gesamtumsatz der Anlage. Lackieranlagen sind aus
Es ist daher Aufgabe der Erfindung, eine Behandlungseinheit, eine Anlage und ein Verfahren der eingangs genannten Art zu schaffen, welche zu einer höhere Flexibilität im Hinblick auf die Applikationslage der zu behandelnden Gegenstände führen, in der diese durch den Behandlungsraum gefördert werden.It is therefore an object of the invention to provide a treatment unit, a system and a method of the type mentioned, which lead to a higher flexibility with regard to the application position of the objects to be treated, in which they are conveyed through the treatment room.
Diese Aufgabe wird bei einer Behandlungseinheit der eingangs genannten Art dadurch gelöst, dass
- d) das Fördersystem und das Applikationssystem derart eingerichtet sind, dass der wenigstens eine Applikationsroboter relativ zur Förderrichtung eines Gegenstandes wahlweise mit
- da) einer Bewegungskomponente parallel zur Förderrichtung des Gegenstandes
und/oder - db) einer Bewegungskomponente senkrecht zur Förderrichtung des Gegenstandes verfahrbar ist;
- da) einer Bewegungskomponente parallel zur Förderrichtung des Gegenstandes
- e) das Fördersystem (52) ein Förderschienensystem (58) umfasst, auf dem Werkstückträger (54) verfahrbar sind, welche die zu behandelnden Gegenstände (14) tragen;f) das Förderschienensystem (58) eine Weicheneinheit (68) umfasst, durch welche Abschnitte (64a, 64b, 66a, 66b) des Förderschienensystems (58) miteinander verbindbar sind, die in die gleiche Richtung oder in einem Winkel zueinander verlaufen, so dass wahlweise verschiedene Förderwege (70, 72, 74, 76, 102, 104) für die Gegenstände (14) vorgebbar sind.
- d) the conveyor system and the application system are arranged such that the at least one application robot relative to the conveying direction of an object optionally with
- da) a movement component parallel to the conveying direction of the object
and or - db) a movement component perpendicular to the conveying direction of the object is movable;
- da) a movement component parallel to the conveying direction of the object
- e) the conveyor system (52) comprises a conveyor rail system (58) on which workpiece carriers (54) are carried which carry the articles (14) to be treated; f) the conveyor rail system (58) comprises a points unit (68) through which sections (64a, 64b, 66a, 66b) of the delivery rail system (58) are connected to each other, which extend in the same direction or at an angle to each other, so that optionally different conveying paths (70, 72, 74, 76, 102, 104) for the Objects (14) can be specified.
Bei bekannten Anlagen werden die Gegenstände in einer unveränderlichen Förderrichtung und der oder die Applikationsroboter auf einer unveränderlichen geradlinigen Bewegungsbahn entweder nur in parallelen Richtungen oder nur in Richtungen senkrecht zueinander verfahren. Am Beispiel der angesprochenen Stoßfänger können diese somit in einer entsprechenden Behandlungseinheit entweder nur in Einbaulage oder nur in der Sleeperposition behandelt werden.In known systems, the objects are moved in a fixed conveying direction and the application robot or on a fixed rectilinear trajectory either only in parallel directions or only in directions perpendicular to each other. Using the example of the mentioned bumper, these can thus be treated in a corresponding treatment unit either only in the installation position or only in the sleeper position.
Erfindungsgemäß kann nun dagegen die Relativbewegung zwischen dem Applikationsroboter und den zu behandelnden Gegenständen geändert werden und bei Stoßfängern beispielsweise abhängig davon vorgegeben werden, in welcher Applikationslage diese durch den Behandlungsraum gefördert werden. Relativbewegung bedeutet, dass entweder der oder die Gegenstände gegenüber dem ruhenden Applikationsroboter oder der Applikationsroboter gegenüber dem bzw. den Gegenständen verfahren werden kann bzw. können.On the other hand, according to the invention, the relative movement between the application robot and the objects to be treated can now be changed and given for bumpers, for example, depending on the application position in which they are conveyed through the treatment space. Relative movement means that either the object or objects can or can be moved relative to the stationary application robot or the application robot with respect to the object (s).
Wenn z.B. Stoßfänger in Einbaulage in den Behandlungsraum gelangen, wird der Applikationsroboter parallel zur Förderrichtung der Stoßfänger verfahren. Wahlweise kann der Applikationsroboter jedoch senkrecht zur Förderrichtung der Stoßfänger verfahren werden, wenn die Stoßfänger in der Sleeperposition durch den Behandlungsraum gefördert werden. Dies gilt sinngemäß entsprechend für andere Gegenstände als Stoßfänger.If e.g. Go bumper in installation position in the treatment room, the application robot is moved parallel to the conveying direction of the bumper. Optionally, however, the application robot can be moved perpendicular to the conveying direction of the bumper when the bumpers are conveyed through the treatment room in the sleeper position. This applies mutatis mutandis to other objects than bumpers.
Es ist besonders günstig, wenn der wenigstens eine Applikationsroboter auf einer Führungsschiene verfahrbar gelagert ist, welche die Roboterbewegungsbahn vorgibt und auf einem Höhenniveau oberhalb der zu behandelnden Gegenstände angeordnet ist, die durch den Behandlungsraum gefördert werden. Dann können die Gegenstände unter dem Applikationsroboter entlang fahren, wodurch sich die Bewegungsbahn des Applikationsroboters und der Förderweg der Gegenstände kreuzen können, ohne das die Gefahr einer Kollision besteht. Allgemein ausgedrückt soll der Applikationsroboter derart geführt sein, dass die Gegenstände sowohl von oben als auch von der Seite her für ihn zum Lackieren zugänglich sind. Dies ist auch möglich, wenn der Applikationsroboter auf eine andere Weise geführt ist.It is particularly favorable when the at least one application robot is movably mounted on a guide rail, which predefines the robot movement path and is arranged at a height level above the objects to be treated, which are conveyed through the treatment space. The objects can then travel under the application robot, as a result of which the movement path of the application robot and the conveying path of the objects can intersect without the risk of a collision. Generally speaking, the application robot should be guided in such a way that the objects are accessible to it for painting, both from above and from the side. This is also possible if the application robot is guided in a different way.
Das Fördersystem umfasst ein Förderschienensystem, auf dem Werkstückträger verfahrbar sind, welche die zu behandelnden Gegenstände tragen.The conveyor system comprises a conveyor rail system, on which workpiece carriers can be moved, which carry the objects to be treated.
Das Fördersystem umfasst eine Weicheneinheit, durch welche Abschnitte des Förderschienensystems miteinander verbindbar sind, die in die gleiche Richtung oder in einem Winkel zueinander verlaufen, so dass wahlweise verschiedene Förderwege für die Gegenstände vorgebbar sind, kann die Förderrichtung der Gegenstände wahlweise auch während deren Förderung durch den Behandlungsraum geändert werden. In diesem Fall können auch Gegenstände in unterschiedlichen Ausrichtungen auf einem einzigen Werkstückträger angeordnet sein. Nachdem beispielsweise Stoßfänger in der Einbaulage lackiert wurden, kann die Förderrichtung bezogen auf den Applikationsroboter geändert und können Stoßfänger in der Sleeperposition lackiert werden.The conveyor system comprises a points unit, through which portions of the conveyor rail system are connected to each other, which in the same direction or at an angle to each other, so that optionally different conveying paths for the objects can be specified, the conveying direction of the articles optionally during their promotion by the Treatment room to be changed. In this case also objects in different orientations can be arranged on a single workpiece carrier. After, for example, bumpers have been painted in the installation position, the conveying direction can be changed relative to the application robot and bumpers can be painted in the sleeper position.
Es ist dabei von Vorteil, wenn die Roboterbewegungsbahn geradlinig verläuft, da so keine aufwendige Leitungsführung für Versorgungs- und Energieleitungen des Applikationsroboters vorhanden sein muss.It is advantageous in this case if the robot movement path runs in a straight line, since in this way no complicated routing for supply and energy lines of the application robot must be present.
Es kann jedoch günstig sein, wenn die Roboterbewegungsbahn wenigstens bereichsweise einen gekrümmten Verlauf hat. In diesem Fall kann ein einziger vorhandener geradliniger Förderweg für die Gegenstände ausreichen, da die gewünschte und erforderliche Änderung der Relativbewegung zwischen den Gegenständen und dem Applikationsroboter durch eine Kurvenfahrt des Applikationsroboters erzielt werden kann. Vorzugsweise umfasst die Roboterbewegungsbahn in diesem Fall zwei geradlinige, durch einen Kurvenbereich verbundene Abschnitt, die in einem Winkel von 90° aufeinander stehen.However, it may be favorable if the robot trajectory has a curved course at least in regions. In this case, a single existing rectilinear conveying path for the articles may suffice, since the desired and required change in the relative movement between the articles and the application robot can be achieved by a cornering of the application robot. In this case, the robot trajectory preferably comprises two rectilinear portions connected by a curve region which are at an angle of 90 ° to one another.
Es ist vorteilhaft, wenn der Behandlungsraum wenigstens einen Einlass und wenigstens einen Auslass hat, die über einen Förderweg miteinander verbunden sind.It is advantageous if the treatment space has at least one inlet and at least one outlet, which via a Conveying path are interconnected.
Insbesondere sind dabei Varianten von Vorteil, bei denen der Behandlungsraum einen Einlass oder einen ersten Einlass und einen zweiten Einlass hat, wobei jeder vorhandene Einlass über einen Förderweg mit einem Auslass oder einem ersten Auslass und einem zweiten Auslass verbunden ist.In particular, variants are advantageous in which the treatment space has an inlet or a first inlet and a second inlet, wherein each existing inlet is connected via a delivery path to an outlet or a first outlet and a second outlet.
Es kann also ein einziger Einlass mit einem einzigen Auslass oder mit einem ersten und einem zweiten Auslass verbunden sein. Alternativ können ein erster Einlass und ein zweiter Einlass mit einem einzigen Auslass verbunden sein. Außerdem können ein erster Einlass mit einem ersten Auslass und ein zweiter Einlass mit einem zweiten Auslass verbunden sein. Ferner können ein erster Einlass mit einem ersten Auslass und ein zweiter Einlass mit dem ersten Auslass und einem zweiten Auslass verbunden sein. Zudem können ein erster und ein zweiter Einlass jeweils mit einem ersten und einem zweiten Auslass verbunden sein.Thus, a single inlet may be connected to a single outlet or to first and second outlets. Alternatively, a first inlet and a second inlet may be connected to a single outlet. In addition, a first inlet may be connected to a first outlet and a second inlet may be connected to a second outlet. Further, a first inlet may be connected to a first outlet and a second inlet may be connected to the first outlet and a second outlet. In addition, first and second inlets may be connected to first and second outlets, respectively.
Die verschiedenen vorhandenen Ein- und Auslässe bieten Raum für ein entsprechend ausgebildetes Förderschienensystem, welches die verschiedensten Förderwege zwischen den vorhandenen Einlässen und Auslässen ermöglicht, auf denen die Gegenstände so bezogen auf den Applikationsroboter bewegt werden können, dass die gewünschten Relativbewegungen möglich sind.The various available inlets and outlets provide space for a suitably designed conveyor rail system, which allows a variety of delivery routes between the existing inlets and outlets on which the objects can be moved relative to the application robot, that the desired relative movements are possible.
Im Hinblick auf die Anlage der eingangs genannten Art wird die oben genannte Aufgabe dadurch gelöst, dass wenigstens eine Behandlungseinheit mit einigen oder allen der oben erläuterten Merkmale vorhanden ist.With regard to the plant of the type mentioned above, the above-mentioned object is achieved in that at least one treatment unit with some or all of the above-mentioned features is present.
Was das Verfahren der eingangs genannten Art betrifft, wird die oben genannte Aufgabe dadurch gelöst, dass
- c) der wenigstens eine Applikationsroboter relativ zur Förderrichtung eines Gegenstandes wahlweise mit
- ca) einer Bewegungskomponente parallel zur Förderrichtung des Gegenstandes
und/oder - cb) einer Bewegungskomponente senkrecht zur Förderrichtung des Gegenstandes
verfahren wird.
- ca) einer Bewegungskomponente parallel zur Förderrichtung des Gegenstandes
- c) the at least one application robot relative to the conveying direction of an object optionally with
- ca) a movement component parallel to the conveying direction of the object
and or - cb) a movement component perpendicular to the conveying direction of the object
is moved.
- ca) a movement component parallel to the conveying direction of the object
Die Vorteile hiervon und die der nachfolgend erläuterten Maßnahmen entsprechen den Vorteilen der korrespondierenden Merkmale der erfindungsgemäßen Behandlungseinheit sinngemäß.The advantages thereof and the measures explained below correspond to the advantages of the corresponding features of the treatment unit according to the invention mutatis mutandis.
Folglich ist es günstig, wenn der wenigstens eine Applikationsroboter auf einer Führungsschiene verfahren wird, welche die Roboterbewegungsbahn vorgibt und auf einem Höhenniveau oberhalb der zu behandelnden Gegenstände angeordnet ist, die durch den Behandlungsraum gefördert werden. Der Applikationsroboter wird allgemein ausgedrückt derart geführt, dass die Gegenstände sowohl von oben als auch von der Seite her für ihn zum Lackieren zugänglich sind. Dies ist ebenfalls auch bei einer anderen Führungsart möglich.Consequently, it is favorable if the at least one application robot is moved on a guide rail which predefines the robot trajectory and is arranged at a height level above the objects to be treated, which are conveyed through the treatment space. In general terms, the application robot is guided in such a way that the articles are accessible to it for painting, both from above and from the side. This is also possible with another type of leadership.
Eine sichere Förderung der Gegenstände durch den Behandlungsraum ist möglich, wenn Werkstückträger, welche die zu behandelnden Gegenstände tragen, auf einem Förderschienensystem verfahren werden.A secure delivery of the objects through the treatment room is possible if workpiece carriers, which carry the objects to be treated, are moved on a conveyor rail system.
Die gewünschte Flexibilität wird insbesondere dann erreicht, wenn verschiedene Förderwege für die Gegenstände vorgegeben werden können.The desired flexibility is achieved, in particular, if different delivery paths for the objects are specified can be.
Dabei kann der wenigstens eine Applikationsroboter auf einer geradlinigen Roboterbewegungsbahn verfahren werden.In this case, the at least one application robot can be moved on a rectilinear robot movement path.
Alternativ oder gegebenenfalls ergänzend bei einem weiteren Applikationsroboter ist es von Vorteil, wenn der wenigstens eine Applikationsroboter auf einer wenigstens bereichsweise gekrümmten Roboterbewegungsbahn verfahren wird.Alternatively or optionally in addition to a further application robot, it is advantageous if the at least one application robot is moved on an at least partially curved robot trajectory.
Nachstehend werden Ausführungsbeispiele der Erfindung anhand der Zeichnungen näher erläutert. In diesen zeigen:
- Figur 1
- einen vertikalen Schnitt einer Lackierkabine gemäß einem ersten Ausführungsbeispiel entlang der Schnittlinie I-I in
Figur 2 , wobei Applikationsroboter und ein Fördersystem gezeigt sind; - Figur 2
- einen vertikalen Schnitt der Lackierkabine von Figur 1 entlang der dortigen Schnittlinie II-II;
- Figur 3
- einen horizontalen Schnitt der Lackierkabine von
Figur 1 entlang der dortigen Schnittlinie III-III, wobei das Fördersystem nicht dargestellt ist; - Figur 4
- den horizontalen Schnitt von
Figur 3 , bei dem mögliche Förderwege des Fördersystems, entlang welchen zu behandelnde Gegenstände förderbar sind, und Bewegungsbahnen der Applikationsroboter veranschaulicht sind; - Figuren 5 bis 8
- weitere Ausführungsbeispiele der Behandlungskabine mit abgewandelten Förder- und/oder Bewegungsbahnen.
- FIG. 1
- a vertical section of a paint booth according to a first embodiment along the section line II in
FIG. 2 showing application robots and a conveyor system; - FIG. 2
- a vertical section of the paint booth of Figure 1 along the section line II-II;
- FIG. 3
- a horizontal section of the paint booth of
FIG. 1 along the section line III-III, wherein the conveyor system is not shown; - FIG. 4
- the horizontal section of
FIG. 3 in which possible conveying paths of the conveying system, along which objects to be treated can be conveyed, and trajectories of the application robots are illustrated; - FIGS. 5 to 8
- Further embodiments of the treatment cabin with modified conveying and / or movement paths.
In den
In der Behandlungsanlage können auch andere Gegenstände als Karosserieteile behandelt werden, beispielsweise auch so unterschiedliche Gegenstände wie Weißwaren, Golfbälle, Radioblenden, Fahrzeugräder oder dergleichen.In the treatment system, other objects can be treated as body parts, for example, as different items such as white goods, golf balls, radio panels, vehicle wheels or the like.
Die Lackierkabine 10 definiert einen Behandlungsraum 16, welcher von vier vertikalen Seitenwänden 18, 20, 22 und 24 begrenzt ist. In den Seitenwänden 18 und 20 ist jeweils ein erster bzw. zweiter Einlass 26, 28 und in den Seitenwänden 22 und 24 jeweils ein erster bzw. zweiter Auslass 30, 32 vorgesehen, über welche die zu behandelnden Stoßfänger 14 von außen in den Behandlungsraum 16 hinein bzw. wieder aus diesem heraus gefördert werden können.The
Die Lackierkabine 10 weist oben eine horizontale Kabinendecke 34 auf, welche als untere Begrenzung eines Luftzuführraumes 36 ausgebildet ist. Über den Luftzuführraum 36 wird Luft in den Behandlungsraum 16 eingebracht, welche den Behandlungsraum 16 dann von oben nach unten durchströmt.The
Nach unten ist der Behandlungsraum 16 über einen beispielsweise als Gitterrost ausgebildeten Boden 38 offen und führt zu einem Strömungsbereich 40, von wo die aus dem Behandlungsraum 16 kommende Luft einer Reinigung und einer weiteren Konditionierung zugeführt werden kann, wie es an und für sich bekannt ist.Down the
Um die Stoßfänger 14 im Kabinenraum 16 zu lackieren, ist ein Applikationssystem 42 vorhanden. Dieses umfasst einen ersten und einen zweiten mehrachsigen, beim vorliegenden Ausführungsbeispiel insgesamt siebenachsigen, Applikationsroboter 44 bzw. 46, die im Kabinenraum 16 angeordnet sind. Die beiden Applikationsroboter 44, 46 führen jeweils eine nicht eigens mit einem Bezugszeichen versehene Applikationseinrichtung, beispielsweise in Form einer Spitzpistole oder eines Rotationszerstäubers, mit sich.To paint the bumper 14 in the
Der erste Applikationsroboter 44 ist an der Kabinenwand 20 vorgesehen und kann entlang einer geradlinigen horizontalen Führungsschiene 48, die oberhalb des Einlasses 28 der Kabinenwand 20 verläuft, verfahren werden. Somit ist eine der Bewegungsachsen des Applikationsroboters 44 dessen Verfahrachse. In entsprechender Weise ist der zweite Applikationsroboter 46 an der gegenüberliegenden Kabinenwand 24 vorgesehen und kann entlang einer geradlinigen horizontalen Führungsschiene 50, die oberhalb des Durchlasses 32 der Kabinenwand 24 verläuft, verfahren werden. Somit ist auch beim zweiten Applikationsroboter 46 eine der Bewegungsachsen dessen Verfahrachse. Die Führungsschienen 48 und 50 sind insgesamt auf einem Höhenniveau oberhalb der zu behandelnden Stoßfänger 14 angeordnet, die durch den Behandlungsraum 16 gefördert werden.The
Die zu behandelnden Stoßfänger 14 werden mittels eines Fördersystems 52 durch die Behandlungskabine 10 gefördert. Hierzu sind mehrere Stoßfänger 14 auf einem Werkstückträger 54 befestigt, der seinerseits von einem nur in
Um die eingangs erläuterten Applikationslagen der Stoßfänger 14 zu veranschaulichen, ist der Werkstückträger 54 in den
In der Praxis ist der Werkstückträger 54 üblicherweise jedoch entweder nur mit Stoßfängern 14a in der Einbaulage oder nur mit Stoßfängern 14b in der Sleeperposition bestückt.In practice, however, the
Wie eingangs erläutert wurde, müssen Stoßfänger 14a in der Einbaulage von der Seite her mit Lack beschichtet werden, während dies bei Stoßfängern 14b in der Sleeperposition von oben erfolgen muss. Die Applikationsroboter 44 und 46 sind so eingerichtet, dass sie Stoßfänger 14 wahlweise von oben oder von der Seite her beschichten können, so dass jeder Applikationsroboter 44, 46 sowohl Stoßfänger 14a in der Einbaulage als auch Stoßfänger 14b in der Sleeperposition beschichten kann.As explained in the introduction,
Für die Applikationsroboter 44 und 46 ist jeweils ein bestimmtes Arbeitvolumen in dem Kabinenraum 16 zugänglich. Um dies zu veranschaulichen, ist der Kabinenraum 16 in den Figuren 3 bis 8 in jeweils vier Raumquadranten A, B, C und D unterteilt, welche als dreidimensionaler Raum verstanden werden müssen.For the
Bei den in den
Diese Zuordnung der Raumquadranten A, B, C und D bedeutet nicht, dass ein bestimmter Applikationsroboter 44 oder 46 tatsächlich jede Stelle in den im zugeordneten Raumquadranten A, B, C oder D erreichen können muss, damit die Lackierkabine 10 ordnungsgemäß betrieben werden kann. Relevant ist vorliegend lediglich, dass der Applikationsroboter 44 oder 46 die jeweils von ihm zu beschichtenden Stoßfänger 14 erreichen kann, die sich ganz oder bereichsweise in einem bestimmten Raumquadranten A bis D befinden.This assignment of the spatial quadrants A, B, C and D does not mean that a
In
Das Förderschienensystem 58 für die zu behandelnden Stoßfänger 14 umfasst bei dem in den
Durch die Kreuzung sind die Schienenstränge 64, 66 jeweils in zwei Abschnitte 64a, 64b und 66a, 66b unterteilt. Es ist außerdem eine Weicheneinheit 68 vorgesehen, welche in unterschiedliche Weichenstellungen gebracht werden kann, in denen der Schienenstrangabschnitt 64a entweder mit dem Schienenstrangabschnitt 64b oder dem Schienenstrangabschnitt 66b und der Schienenstrangabschnitt 66a entweder mit dem Schienenstrangabschnitt 66b oder dem Schienenstrangabschnitt 64b verbunden ist.Through the intersection, the rail tracks 64, 66 are each divided into two
Somit kann die Weicheneinheit 68 die verschiedenen Abschnitte 64a, 64b, 66a, 66b des Förderschienensystems 58 miteinander verbinden, die in die gleiche Richtung oder in einem Winkel zueinander verlaufen.Thus, the
Die Stoßfänger 14 werden auf dem Werkstückträger 54 nun entweder durch den ersten Einlass 26 oder durch den zweiten Einlass 28 in den Behandlungsraum 16 hinein gefördert.The bumpers 14 are now conveyed on the
In
Allgemein ausgedrückt erstreckt sich somit ein bestimmter Förderweg stets zwischen einem Einlass und einem Auslass und wird ein Werkstückträger 54 bzw. werden die Stoßfänger 14 stets von einem Einlass zu einem Auslass durch den Behandlungsraum 16 gefördert.Generally speaking, therefore, a certain conveying path always extends between an inlet and an outlet and If a
Der Förderweg 70, 72, 74 oder 76, entlang welchem die Stoßfänger 14 nun durch den Behandlungsraum 16 hindurch gefördert werden können, hängt somit davon ab, durch welchen der beiden Einlässe 26 oder 28 die Stoßfänger 14 auf dem Werkstückträger 54 in den Behandlungsraum 16 eingebracht werden und welche Weichenstellung die Weicheneinheit 68 einnimmt.The conveying
In einer Abwandlung kann die Weicheneinheit 68 auch so aufgebaut sein, dass lediglich die Förderwege 70 und 72 und 74 oder lediglich die Förderwege 70 und 74 und 76 möglich sind.In a modification, the
Auf dem Weg durch den Behandlungsraum 16 gibt der Werkstückträger 54 bzw. jeder Stoßfänger 14 in jeder Position auf dem jeweiligen Förderweg 70, 72, 74 oder 76 eine Förderrichtung vor, die tangential zum Förderweg 70, 72, 74 oder 76 an der Stelle ist, an der sich der Werkstückträger 54 bzw. der betrachtete Stoßfänger 14 gerade befindet. Dies veranschaulicht
Auf diese Weise sind das Applikationssystem 42 und das Fördersystem 52 somit derart aufeinander abgestimmt und eingerichtet, dass die Applikationsroboter 44, 46 relativ zur Förderrichtung 78 eines Stoßfängers 14 wahlweise mit einer Bewegungskomponente parallel zur Förderrichtung 78 eines Stoßfängers 14 und/oder einer Bewegungskomponente senkrecht zur Förderrichtung 78 eines Stoßfängers 14 verfahren werden können.In this way, the
Hierdurch ist es möglich, dass die in ihren voneinander verschiedenen Lagen auf dem Werkstückträger 54 angebrachten Stoßfänger 14a, 14b in ein und derselben Lackierkabine 10 lackiert werden können.This makes it possible for the
Wenn der Werkstückträger 54 nur mit Stoßfängern 14a in der Einbaulage bestückt ist, werden diese auf dem ersten Förderweg 70 vom ersten Einlass 26 zum gegenüberliegenden ersten Auslass 30 gefördert, wobei ihre Längsrichtung parallel zur Förderrichtung 78 verläuft, wie es bei den Stoßfängern 14a nach den
Dann verlaufen die Bewegungsbahnen 60, 62 sowohl des ersten als auch des zweiten Applikationsroboters 44, 46 stets parallel zur Förderrichtung 78 der Stoßfänger 14a. Die Applikationsroboter 44, 46 bewegen sich dann entsprechend stets parallel zu dieser Förderrichtung 78 und können die Stoßfänger 14a jeweils in den Raumquadranten A und B bzw. C und D von der Seite her lackieren.Then, the
Wenn der Werkstückträger 54 dagegen nur mit Stoßfängern 14b in der Sleeperposition bestückt ist, werden diese auf dem dritten Förderweg 74 vom zweiten Einlass 28 zum gegenüberliegenden zweiten Auslass 32 gefördert, wobei ihre Längsrichtung nun jedoch senkrecht zur Förderrichtung 78 steht. In diesem Fall verlaufen die Bewegungsbahnen 60, 62 sowohl des ersten als auch des zweiten Applikationsroboters 44, 46 stets senkrecht zur Förderrichtung 78 der Stoßfänger 14. Die Applikationsroboter 44, 46 bewegen sich dann entsprechend stets senkrecht zu dieser Förderrichtung 78 und können die Stoßfänger 14b von oben her lackieren.In contrast, when the
Um nun Stoßfänger 14a und 14b, die sich in der Einbaulage und in der Sleeperposition auf dem Werkstückträger 54 befinden, wie es in den
Der Werkstückträger 54 wird durch den Einlass 26 in den Behandlungsraum 16 hinein gefördert und befindet sich zunächst in dem Abschnitt 64a des Schienenstranges 64. Die Stoßfänger 14a in der Einbaulage befinden sich dann im Raumquadranten A, sind für den ersten Applikationsroboter 44 zugänglich und werden mit dessen Hilfe von der Seite her lackiert. Die Stoßfänger 14b in der Sleeperposition befinden sich dagegen im Raumquadranten C, sind für den zweiten Applikationsroboter 46 zugänglich und werden mit dessen Hilfe von oben her lackiert.The
Während des Lackierens kann der Werkstückträger 54 dabei durch den Behandlungsraum 16 gefördert werden und sich auf dem Förderweg 70 zum ersten Auslass 30 bewegen.During painting, the
Wenn der Werkstückträger 54 den Behandlungsraum 16 über dessen zweiten Auslass 32 verlassen soll, wird die Weicheneinheit 68 so eingestellt, dass der Schienenstrangabschnitt 64a des Schienenstranges 64 mit dem Abschnitt 66b des Schienenstranges 66 verbunden ist.When the
Der Werkstückträger 54 läuft aus dem Schienenstrangabschnitt 64a in die Weicheneinheit 68 ein und gelangt zu dem Abschnitt 66b des Schienenstranges 66 und darüber zum Auslass 32. Vor dem Erreichen der Weicheneinheit 68 sollte der Lackiervorgang in den Raumquadranten A und C abgeschlossen sein.The
In einer Abwandlung ist das Fördersystem 52 derart eingerichtet, dass die Stoßfänger 14 oder allgemein zu behandelnde Gegenstände ihre Ausrichtung im Behandlungsraum 16 beibehalten, oder anders ausgedrückt ihre Ausrichtung bezogen auf die Förderrichtung 78 ändern, wenn sich die Förderrichtung 78 auf dem gewählten Förderweg ändert.In a modification, the
Wenn der Werkstückträger 54 dann aus dem Schienenstrangabschnitt 64a in den Schienenstrangabschnitt 66b zum Auslass 32 einfährt, bleibt diese Ausrichtung der Stoßfänger 14 dann erhalten, so dass die Stoßfänger 14 im Schienenstrangabschnitt 66b quer zur Förderrichtung 78 angeordnet sind. Entsprechendes kann für die anderen Förderwege gelten, auf denen sich die Förderrichtung 78 ändert.When the
Wenn die Stoßfänger 14a und 14b umgekehrt auf dem Werkstückträger 54 angebracht sind, als es in den
Wenn sich der Werkstückträger 54 dann im Schienenstrangabschnitt 66b befindet, werden die Stoßfänger 14a in der Einbaulage im entsprechenden Bereich der Raumquadranten C und D mittels des zweiten Applikationsroboters 46 lackiert, der sich dabei ebenfalls senkrecht zur Förderrichtung 78 der Stoßfänger 14 bewegen kann.
Bei der Abwandlung, bei der sich der Werkstückträger 54 im Weichenbereich verdrehen kann, könnte als Förderweg auch der vierte Förderweg 76 ins Auge gefasst werden. In diesem Fall könnte der zweite Applikationsroboter 46 die Stoßfänger 14a in Einbaulage von der Seite her lackieren, wenn sich der Werkstückträger 54 im Schienenstrangabschnitt 64a des Schienenstranges 64 befindet.When the
In the modification in which the
In den
Bei den Lackierkabinen 80, 82, 84 bzw. 86 sind Komponenten, die den Komponenten der Lackierkabine 10 nach den
Bei der Lackierkabine 80 nach
Bei der Lackierkabine 82 nach
Bei der Lackierkabine 84 nach
Die Führungsschiene 92 für den ersten Applikationsroboter 44 umfasst einen ersten geradlinigen Abschnitt 92a an der ersten Seitenwand 18 der Lackierkabine 10 mit dem Einlass 26, einen zweiten geradlinigen Abschnitt 92b an der zweiten Seitenwand 20 der Lackierkabine 10 und einen die beiden geradlinigen Abschnitte 92a, 92b verbindenden und entsprechend gekrümmten Abschnitt 92c. In entsprechender Weise umfasst eine bereichsweise gekrümmte Führungsschiene 94 für den zweiten Applikationsroboter 46 einen ersten geradlinigen Abschnitt 94a an der dritten Seitenwand 22 der Lackierkabine 10 mit dem Auslass 30, einen zweiten geradlinigen Abschnitt 94b an der vierten Seitenwand 24 der Lackierkabine 10 und einen entsprechend gekrümmten Abschnitt 94c, welche die beiden geradlinigen Abschnitte 94a, 94b verbindet.The
Somit können die Applikationsroboter 44, 46 jeweils senkrecht zur Förderrichtung 78 der Stoßfänger 14 bewegt werden, wenn sie sich auf ihren Schienenabschnitten 92a bzw. 94a der Führungsschienen 92 bzw. 94 befinden. Entsprechend können die Applikationsroboter 44, 46 dagegen jeweils parallel zur Förderrichtung 78 der Stoßfänger 14 bewegt werden, wenn sie sich auf ihren Schienenabschnitten 92b bzw. 94b befinden. Bei der Lackierkabine 82 muss weder bei den Stoßfängern 14a in Einbaulage noch bei den Stoßfängern 14b in der Sleeperposition darauf geachtet werden, wie deren Längsrichtung zur Förderrichtung 78 ausgerichtet ist.Thus, the
Bei der Lackierkabine 86 gemäß
Von den Schienensträngen 64 und 66 sind jeweils die Schienenstrangabschnitte 64a und 66a vorhanden, die über eine abgewandelte Weicheneinheit 68 wahlweise mit einem Schienenstrang 100 verbunden werden können, der sich von der Weicheneinheit 68 im Raumquadranten D zum Auslass 98 erstreckt und mit den Schienenstrangabschnitten 64a und 66a jeweils einen Winkel von 135° einschließt.Of the rail tracks 64 and 66 respectively the
Somit sind zwei Förderwege 102 und 104 gegeben, auf welchen die Stoßfänger 14 durch die Behandlungskabine 16 der Lackierkabine 86 gefördert werden können. Der Förderweg 102 führt vom ersten Einlass 26 zum Auslass 98 und der Förderweg 104 vom zweiten Einlass 28 zum Auslass 98.Thus, there are two
Wenn sich der Werkstückträger 54 im Schienenstrangabschnitt 64a der Lackierkabine 86 befindet, können beide Applikationsroboter 44, 46 parallel zur Förderrichtung 78 der Stoßfänger 14 bewegt werden und Stoßfänger 14 lackieren, die im Raumquadranten A bzw. C positioniert und die parallel zur Förderrichtung 78 ausgerichtet sind. Wenn sich der Werkstückträger 54 dagegen im Schienenstrangabschnitt 66a der Lackierkabine 86 befindet, kann der erste Applikationsroboter 44 senkrecht zur Förderrichtung 78 der Stoßfänger 14 bewegt werden. Dies ist für Stoßfänger 14 relevant, die quer zur Förderrichtung 78 auf dem Werkstückträger 54 befestigt sind. Diese können dann wieder von dem ersten Applikationsroboter 44 in dem jeweiligen Bereich der Raumquadranten A und B der Lackierkabine 86 lackiert werden, in den die Stoßfänger 14 hineinragen.When the
Wenn sich der Werkstückträger im Bereich des Schienenstranges 100 befindet, sind die Stoßfänger 14 für den zweiten Applikationsroboter 46 im Raumquadranten D der Lackierkabine 86 zugänglich und können dort lackiert werden.When the workpiece carrier is in the region of the rail track 100, the bumpers 14 for the
Bei allen oben erläuterten Ausführungsbeispielen in Form der Lackierkabinen 10, 80, 82, 84 und 86 hängt es jeweils von der Bestückung des Werkstückträgers 54 und dem Verlauf der Längsrichtung der Stoßfänger 14 bezogen auf die Förderrichtung 78 ab, über welchen vorhandenen Einlass 26, 28 die Stoßfänger 14 in den Behandlungsraum 16 hinein, entlang welchem der möglichen Förderwege 70, 72, 74, 76, 102 und 104 die Stoßfänger 14 durch den Behandlungsraum 16 hindurch und über welchen vorhandenen Auslass 30, 32, 98 die Stoßfänger 14 wieder aus dem Behandlungsraum 16 hinaus gefördert werden.In all the above-described embodiments in the form of
Wie aus der obigen Beschreibung hervorgeht, können die Stoßfänger 14 auf dem Werkstückträger 54 sowohl in Einbaulage als auch in der Sleeperposition entweder parallel oder senkrecht zur Förderrichtung 78 angeordnet werden. Je nachdem, ob die Stoßfänger 14 in einer Einbaulage oder einer Sleeperposition auf dem Werkstückträger 54 angeordnet sind und abhängig davon, ob die Stoßfänger 14 parallel oder senkrecht zur Förderrichtung 78 angeordnet sind, müssen sich die Applikationsroboter 44 und 46 parallel oder senkrecht zur jeweiligen Förderrichtung 78 der Stoßfänger 14 bewegen können. Dies wird durch eine entsprechende Zuordnung des Einlasses und des Auslasses und des dazwischen zurückzulegenden Förderweges und ergänzend gegebenenfalls durch eine Weicheneinheit 68, die eine Drehung des Werkstückträgers 54 verursacht, erreicht, wie es oben beschrieben wurde.As can be seen from the above description, the bumpers 14 can be arranged on the
Bei einer weiteren Abwandlung kann auch jeweils nur ein einziger Applikationsroboter in dem Behandlungsraum 16 der Lackierkabinen 10, 80, 82, 84 oder 86 angeordnet sein. In diesem Fall ist der Werkstückträger 54 vorzugsweise so aufgebaut, dass er Stoßfänger 14 in der Einbaulage nur auf der Seite trägt, die dem Applikationsroboter zugewandt ist, wenn der Werkstückträger 54 und der Applikationsroboter parallel zueinander bewegt werden.In a further modification, in each case only a single application robot can be arranged in the
Anstelle der Weicheneinheit 68 kann auch jeweils ein Drehteller oder dergleichen vorgesehen sein, so dass der Werkstückträger 54 in analoger Weise von einem Schienenstrangabschnitt auf einen anderen auffahren kann. Gegebenenfalls kann auch auf die Weicheneinheit 68 verzichtet werden. Bei der Lackierkabine 10 z.B. ist dann der erste Einlass 26 über den Förderweg 70 mit dem ersten Auslass 30 und der zweite Einlass 28 über den Förderweg 74 mit dem zweiten Auslass 32 verbunden, ohne das eine Richtungsänderung der Stoßfänger 14 möglich ist, während diese durch den Behandlungsraum 16 gefördert werden. In diesem Fall müssen die Stoßfänger 14 abhängig von ihrer Applikationslage über einen bestimmten Einlass 26 oder 28 in den Behandlungsraum 16 hinein gefördert werden.Instead of the
Darüber hinaus kann auch auf die Seitenwände verzichtet werden und der Luftzuführraum 36 z.B. mit einer Rahmenstruktur gestützt werden. So sind modulartige Einheiten gebildet, von denen nach Bedarf mehrere zusammenarbeiten können.In addition, the sidewalls can also be dispensed with and the
Claims (11)
- A treatment unit for surface treatment, in particular for painting, of articles, in particular of vehicle body parts, havinga) at least one treatment chamber (16);b) a conveying system (52) by means of which articles (14) to be treated can be conveyed into the treatment chamber (16), through the treatment chamber (16) along a conveying path (70, 72, 74, 76, 102, 104), and out of the treatment chamber (16) again, wherein a direction of conveying (78) that is tangential to the conveying path (70, 72, 74, 76, 102, 104) can be determined by each article (14) at any position on the conveying path (70, 72, 74, 76, 102, 104);c) an application system (42) which comprises at least one multiple-axis application robot (44, 46) which carries along an application means and can be moved along a robot movement path (60, 62, 88, 90).characterized in thatd) the conveying system (52) and the application system (42) are arranged in such a way that the at least one application robot (44, 46) can be moved in relation to the direction of conveying (78) of an article (14), optionally withda) a movement component parallel to the direction of conveying (78) of the article (14)
and/ordb) a movement component perpendicular to the direction of conveying (78) of the article (14);e) the conveying system (52) comprises a conveying rail system (58) on which workpiece holders (54) holding the articles (14) to be treated can be moved;f) the conveying rail system (58) comprises a track switch unit (68) by means of which portions (64a, 64b, 66a, 66b) of the conveying rail system (58) that run in the same direction or at an angle to one another can be connected to one another, such that different conveying paths (70, 72, 74, 76, 102, 104) for the articles (14) can be determined optionally. - A treatment unit according to Claim 1, characterized in that the at least one application robot (44, 46) is mounted such that it can be moved on a guide rail (48, 50, 92, 94) which determines the path of movement (60, 62, 88, 90) of the robot and is arranged at a height level above the articles (14) to be treated that are being conveyed through the treatment chamber (16).
- A treatment unit according to one of Claims 1 or 2, characterized in that the robot movement path (60, 62) runs rectilinearly.
- A treatment unit according to one of Claims 1 or 2, characterized in that the robot movement path (88, 90) has a curved course, at least in certain areas.
- A treatment unit according to one of Claims 1 to 5, characterized in that the treatment chamber (16) has at least one inlet (26, 28) and at least one outlet (30, 32, 98) which are connected to one another via a conveying path (70, 72, 74, 76, 102, 104).
- A treatment unit according to Claim 5, characterized in that the treatment chamber (16) has an inlet (26, 28) or a first inlet (26) and a second inlet (28), wherein each inlet (26, 28) present is connected to an outlet (30, 32) or a first outlet (30) and a second outlet (32) via a conveying path (70, 72, 74, 76, 102, 104).
- An installation for the surface treatment, in particular for painting, of articles, in particular of vehicle body parts, characterized by at least one treatment unit (10) according to one of Claims 1 to 6.
- A method for the surface treatment, in particular painting, of articles, in particular of vehicle body parts, in a treatment chamber (16), in whicha) the articles (14) are conveyed into the treatment chamber (16), through the treatment chamber (16) along a conveying path (70, 72, 74, 76, 102, 104), and out of the treatment chamber (16) again, during which they determine a direction of conveying (78) that is tangential to the conveying path (70, 72, 74, 76, 102, 104) at any position on the conveying path (70, 72, 74, 76, 102, 104);b) at least one multiple-axis application robot (44, 46) which carries along an application means is moved along a robot movement path (60, 62, 88, 90),characterized in thatc) the at least one application robot (44, 46) is moved in a relation to the direction of conveying (78) of an article (14), optionally withca) a movement component parallel to the direction of conveying (78) of the article (14)
and/orcb) a movement component perpendicular to the direction of conveying (78) of the article (14);d) workpiece holders (54) which hold the articles (14) to be treated are moved on a conveying rail system (58);e) different conveying paths (70, 72, 74, 76, 102, 104) for the articles (14) can be determined. - A method according to Claim 8, characterized in that the at least one application robot (44, 46) is moved on a guide rail (48, 50, 92, 94) which determines the path of movement (60, 62, 88, 90) of the robot and is arranged at a height level above the articles (14) to be treated that are being conveyed through the treatment chamber (16).
- A method according to one of Claims 8 or 9, characterized in that the at least one application robot (44, 46) is moved on a rectilinear robot movement path (60, 62).
- A method according to one of Claims 8 or 9, characterized in that the at least one application robot (44, 46) is moved on a robot movement path (88, 90) which is curved at least in certain areas.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102011017347A DE102011017347A1 (en) | 2011-04-16 | 2011-04-16 | Treatment unit, installation and process for the surface treatment of objects |
PCT/EP2012/001508 WO2012143093A1 (en) | 2011-04-16 | 2012-04-05 | Treatment unit, installation and method for the surface treatment of articles |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2699359A1 EP2699359A1 (en) | 2014-02-26 |
EP2699359B1 true EP2699359B1 (en) | 2018-10-03 |
Family
ID=45992162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12715589.3A Not-in-force EP2699359B1 (en) | 2011-04-16 | 2012-04-05 | Treatment unit, installation and method for the surface treatment of articles |
Country Status (7)
Country | Link |
---|---|
US (1) | US9623432B2 (en) |
EP (1) | EP2699359B1 (en) |
CN (1) | CN103476512B (en) |
BR (1) | BR112013018273A2 (en) |
DE (1) | DE102011017347A1 (en) |
RU (1) | RU2607204C2 (en) |
WO (1) | WO2012143093A1 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
USD732590S1 (en) * | 2013-04-19 | 2015-06-23 | Cefla Societa' Cooperativa | Paint spray booth |
DE102014008052A1 (en) * | 2014-05-28 | 2015-12-17 | Eisenmann Ag | Plant and method for treating objects |
CN104267730B (en) * | 2014-10-21 | 2017-07-28 | 山东鲁能智能技术有限公司 | indoor track type intelligent inspection robot system |
DE102014015962B4 (en) | 2014-10-31 | 2016-10-13 | Guder Strahltechnik GmbH | Apparatus for blasting railway edge sets with a hermetic sealed chamber. |
DE102015002090A1 (en) * | 2015-02-23 | 2016-08-25 | Eisenmann Se | Device for treating objects |
US10507486B2 (en) * | 2017-03-28 | 2019-12-17 | Compagnie Plastic Omnium | Support apparatus for part in painting process |
EP3381568B1 (en) * | 2017-03-28 | 2021-09-08 | Compagnie Plastic Omnium | Method for painting parts using a device for supporting said parts |
PT3459642T (en) * | 2017-09-26 | 2020-11-05 | Wagner Int Ag | Powder coating assembly for coating a workpiece with coating powder |
ES1243504Y (en) * | 2020-02-13 | 2020-09-01 | Sosa Gonzalez S L | Autonomous painting robot |
CN111515068B (en) * | 2020-04-22 | 2021-07-16 | 杭州叉车门架有限公司 | Paint spraying equipment for forklift overhead guard |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3240835A1 (en) * | 1982-11-05 | 1984-05-10 | Dürr Anlagenbau GmbH, 7000 Stuttgart | DEVICE FOR THE SURFACE TREATMENT OF MOTOR VEHICLE BODIES |
GB2190312B (en) * | 1986-04-01 | 1990-12-19 | Honda Motor Co Ltd | Method and apparatus for painting object |
US4930213A (en) * | 1987-04-24 | 1990-06-05 | Mazda Motor Corporation | System for transferring vehicle body from a coating station to an assembly line and an overhead conveyor |
CA2013067A1 (en) * | 1989-03-27 | 1990-09-27 | Hiroshi Arai | Method of assembling automotive body and body panels, apparatus for removing and installing body panels, and feed jig feeding body panels |
EP0455371A3 (en) * | 1990-04-24 | 1992-04-22 | Engineering Incorporated | Robotic carrier mechanism for aircraft maintenance |
JPH05200333A (en) * | 1992-01-27 | 1993-08-10 | Toyota Motor Corp | Automatic coating machine |
RU2128088C1 (en) * | 1995-03-07 | 1999-03-27 | Блинов Александр Вячеславович | Installation for car painting |
DE19945291B4 (en) * | 1999-09-22 | 2006-07-20 | Eisenmann Maschinenbau Gmbh & Co. Kg | Painting plant for painting plastic objects |
US6350491B1 (en) | 2000-04-24 | 2002-02-26 | Adac Plasitis, Inc | Painting apparatus and method |
WO2004085081A1 (en) * | 2003-03-27 | 2004-10-07 | Honda Motor Co., Ltd. | Method of applying protective layer forming material |
SE0300983D0 (en) * | 2003-04-04 | 2003-04-04 | Mevein Holding Ag | Method and apparatus for information transfer in coating work |
DE102004056493A1 (en) * | 2004-06-25 | 2006-01-12 | Dürr Systems GmbH | Paint-spray line for painting motor vehicle body parts, has two linear guides moveable along application and handling robots, where each of two linear guides is provided to guide one of application robots and one of handling robots |
DE102004030858B3 (en) | 2004-06-25 | 2005-11-03 | Dürr Systems GmbH | Coating system and associated operating method |
US20060068109A1 (en) | 2004-09-15 | 2006-03-30 | Airbus Deutschland Gmbh | Painting device, painting arrangement, method for painting a curved surface of an object, and use of an inkjet device for painting an aircraft |
DE102004044655B4 (en) * | 2004-09-15 | 2009-06-10 | Airbus Deutschland Gmbh | Painting device, painting arrangement, method for painting a curved surface of an aircraft and use of an inkjet device for painting an aircraft |
DE102005013014A1 (en) * | 2005-03-21 | 2006-10-05 | Dürr Systems GmbH | Coating plant and associated method |
DE102005013708B4 (en) * | 2005-03-24 | 2017-06-01 | Dürr Systems Ag | Apparatus for separating wet paint overspray |
DE102005048580A1 (en) * | 2005-10-05 | 2007-04-19 | Dürr Systems GmbH | Apparatus and method for separating wet paint overspray |
DE102005048579A1 (en) * | 2005-10-05 | 2007-04-12 | Dürr Systems GmbH | Apparatus and method for separating wet paint overspray |
EP2359939B1 (en) * | 2007-03-08 | 2014-02-26 | Kabushiki Kaisha Yaskawa Denki | Painting system |
DE102008045553A1 (en) | 2008-09-03 | 2010-03-04 | Dürr Systems GmbH | Painting device and associated method |
-
2011
- 2011-04-16 DE DE102011017347A patent/DE102011017347A1/en not_active Withdrawn
-
2012
- 2012-04-05 CN CN201280018738.XA patent/CN103476512B/en active Active
- 2012-04-05 RU RU2013141820A patent/RU2607204C2/en not_active IP Right Cessation
- 2012-04-05 US US14/007,707 patent/US9623432B2/en not_active Expired - Fee Related
- 2012-04-05 EP EP12715589.3A patent/EP2699359B1/en not_active Not-in-force
- 2012-04-05 WO PCT/EP2012/001508 patent/WO2012143093A1/en active Application Filing
- 2012-04-05 BR BR112013018273A patent/BR112013018273A2/en not_active Application Discontinuation
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
BR112013018273A2 (en) | 2016-11-16 |
CN103476512B (en) | 2017-02-22 |
RU2013141820A (en) | 2015-05-27 |
CN103476512A (en) | 2013-12-25 |
US9623432B2 (en) | 2017-04-18 |
US20140030439A1 (en) | 2014-01-30 |
WO2012143093A1 (en) | 2012-10-26 |
EP2699359A1 (en) | 2014-02-26 |
RU2607204C2 (en) | 2017-01-10 |
DE102011017347A1 (en) | 2012-10-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2699359B1 (en) | Treatment unit, installation and method for the surface treatment of articles | |
EP2595761B1 (en) | Modular line for surface treatment | |
EP1931580B1 (en) | Roller conveyor | |
EP1609532A1 (en) | Painting installation and corresponding operating process | |
DE102006032804A1 (en) | Painting plant and associated operating method | |
EP2101926B1 (en) | Coating system and method for the series coating of workpieces | |
DE102016004484A1 (en) | Process and manufacturing plant for the production of vehicles and surface treatment equipment for the surface treatment of vehicle bodies | |
DE102017113343A1 (en) | Process and manufacturing plant for the production of vehicles and surface treatment equipment for the surface treatment of vehicle bodies | |
EP2595760B1 (en) | Treatment unit and assembly for the surface treatment of objects | |
EP1749584B1 (en) | Spray booth and installation having overhead tools | |
EP2520374B1 (en) | Method and device for varnishing | |
EP1784901B2 (en) | Device for coating, in particular for painting objects, in particular vehicle bodies | |
EP2791008B1 (en) | Coating device and corresponding method | |
EP2427279B1 (en) | Cleaning system for motor vehicle body components and operating method | |
EP2683634A1 (en) | Dipping-treatment installation for vehicle bodies, and a method for operating same | |
EP0777534B1 (en) | Workpiece spray-painting device | |
DE10231503A1 (en) | Process for coating, in particular painting objects | |
EP1889666A1 (en) | Device for coating, in particular painting, objects, in particular vehicle bodywork | |
DE202004020728U1 (en) | Coating device used in painting vehicle bodies, has guide chains carrying electrical lines connected to robot arm, in which guide chains have parts forming loop of connection points along sliding direction of robot arm | |
DE19824434A1 (en) | Paint applicator appliance for doors and windows |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130918 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: EISENMANN SE |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20180126 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20180423 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1048046 Country of ref document: AT Kind code of ref document: T Effective date: 20181015 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502012013544 Country of ref document: DE Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190203 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190103 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190104 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190203 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502012013544 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
26N | No opposition filed |
Effective date: 20190704 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190430 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190405 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200420 Year of fee payment: 9 Ref country code: FR Payment date: 20200420 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1048046 Country of ref document: AT Kind code of ref document: T Effective date: 20190405 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20200428 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190405 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20120405 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502012013544 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210430 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211103 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200405 |