EP2620405B1 - Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method - Google Patents
Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method Download PDFInfo
- Publication number
- EP2620405B1 EP2620405B1 EP11859735.0A EP11859735A EP2620405B1 EP 2620405 B1 EP2620405 B1 EP 2620405B1 EP 11859735 A EP11859735 A EP 11859735A EP 2620405 B1 EP2620405 B1 EP 2620405B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cylinders
- working oil
- lifting
- reversed
- hydraulic system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
- B66C23/32—Self-hoisting cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
- B66C23/283—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of assembled elements
Definitions
- the present invention relates to the crane domain, in particular to a lifting structure of tower crane, a hydraulic system for the lifting structure, and a lifting method of tower crane.
- a crane having such a structure is disclosed in EP 0516938 A1 .
- the object of the present invention is to provide a lifting structure of tower crane, a hydraulic system of the lifting structure, and a lifting method of tower crane, so as to solve the problem of out-of-sync lifting of tower cranes that employs two or more cylinders in the prior art.
- the present invention provides a hydraulic system for lifting structure of tower crane, used to drive a climbing frame of the tower crane to ascend or descend on the tower body of tower crane, comprising a plurality of cylinders that are connected to lifting beams and upper beams of the tower crane respectively; wherein, each of the cylinders has a forward branch working oil circuit and a reversed branch working oil circuit; the forward branch working oil circuit of each cylinder has a forward speed regulator valve used to regulate the flow rate of hydraulic oil in the forward direction, and the reversed branch working oil circuit of each cylinder has a reversed speed regulator valve used to regulate the flow rate of hydraulic oil in the reversed direction.
- the hydraulic system for lifting structure further comprises balancing valves arranged in each of the forward branch working oil circuits.
- each of the balancing valves comprises an oil inlet, an oil outlet, and a control port, wherein, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with one of the rodless cavity and rod cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and another one of the rodless cavity and rod cavity of the cylinder.
- the hydraulic system further comprises a main working oil circuit communicating with the forward branch working oil circuits and reversed branch working oil circuits respectively, and which has a pilot check valve communicating with the forward branch working oil circuits of the cylinders respectively, the pilot check valve has an opening ratio smaller than the opening ratio of each balancing valve.
- the forward branch working oil circuit and reversed branch working oil circuit of each cylinder have a stop valve respectively.
- the plurality of cylinders are connected in parallel to an oil tank, and the hydraulic system further comprises a main working oil circuit connected between the oil tank and the cylinders, which communicates with the forward branch working oil circuits and reversed branch working oil circuits, and the main working oil circuit has a combined valve comprising a combined reversing valve and a combined overflow valve, which communicate with each other.
- the main working oil circuit has a back pressure valve connected in series to the oil tank, and which communicates with the reversed branch working oil circuits.
- the main working oil circuit has an overflow valve, which communicates with the reversed branch working oil circuits.
- the quantities of cylinders are six
- the tower body has two sides, and one front and one back connected to the two sides, and two cylinders connected between the climbing frame and the lifting beams are arranged on each of the sides and the back of the tower body respectively.
- the present invention further provides a lifting structure of tower crane, which comprises a tower body and a climbing frame arranged on the top of the tower body, wherein, the tower body has a step, the lifting beams are connected at the bottom to the upper beams, and the step support the lifting beams; the lifting structure further comprises a hydraulic system for lifting structure described above.
- the present invention further provides a lifting method of tower crane, which is characterized in:arranging a plurality of cylinders connected between the upper beams and the lifting beams of the tower crane, controlling the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each cylinder and the accuracy of synchronization among the cylinders by means of a forward speed regulator valve and a reversed speed regulator valve on each of the cylinders, and controlling the cylinders to lift synchronously by maintaining the forward and reversed flow rates of hydraulic oil in the branch working oil circuits at the same value among the cylinders and controlling the cylinders to act synchronously.
- two cylinders are arranged on two sides and a back of the climbing frame of tower crane, and each of the cylinders is connected between the upper beams and the lifting beams; the forward and reversed flow rates of hydraulic oil in the branch working oil circuits are maintained at the same value among the cylinders and the cylinders are controlled to act synchronously with the forward speed regulator valve and reversed speed regulator valve on each of the cylinders.
- the weight of the lifting beams is balanced by means of a back pressure valve connected in series to an oil tank.
- the climbing frame is prevented from falling in case of pressure loss in the cylinder by arranging a balancing valve on each of the cylinders to control the rodless cavity of the cylinder.
- arranging a pilot check valve in the main working oil circuit of the hydraulic system and the opening ratio of the pilot check valve is smaller than the opening ratio of each of the balancing valves.
- the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each cylinder and the accuracy of synchronization among the cylinders are controlled by means of the forward speed regulator valve and reversed speed regulator valve on each cylinder, and the cylinders are controlled to lift synchronously by maintaining the flow rates in the branch working oil circuits at the same value among the cylinders; in that way, the problem of out-of-sync lifting of cylinders on tower cranes in the prior art is solved, and the poor efficacy of synchronizing valves on tower cranes in the prior art can be solved.
- hydraulic system of lifting structure drives a climbing frame 31 of tower crane to ascend and descend on the tower body 39 of the tower crane, for example, the climbing frame 31 is supported and driven by the hydraulic system to ascend and descend on the tower body 39 via guide pulleys 32 arranged on the tower body 39.
- the hydraulic system comprises a plurality of cylinders 15; for example, two, three, four, six, or eight cylinders can be used, the cylinders 15 in such a quantity can be arranged more easily.
- the hydraulic system comprises two cylinders 15, the two cylinders 15 can be arranged on one side or both sides of the climbing frame 31.
- each cylinder 15 are connected to lifting beams 35 and upper beams 34 of the tower crane respectively, wherein, the upper beams 34 are fixed to the climbing frame 31, and the lifting beams 35 are fixed to the standard mast sections in a detachable manner, i.e., when the climbing frame 31 climbs, the lifting beams 35 are connected to the topmost standard mast section; when new standard mast section is added, the lifting beams 35 can be disconnected from the original standard mast section and then connected to the added standard mast section.
- a clevis 33 can be utilized to support and locate the climbing frame 31, and thereby the position of the lifting beams 35 can be adjusted.
- a step 37 are arranged on the tower body 39 of the tower crane. At the end of the lifting process, the step 37 will support and stop the lifting beams 35 to prevent the lifting beams 35 from moving again, and thereby ensure the safety of the tower crane.
- the hydraulic system comprises six cylinders 15, which can have the same model and same structure.
- each cylinder has a forward branch working oil circuit and a reversed branch working oil circuit, which are used to control the movement of rodless cavity and rod cavity of the cylinder 15 respectively.
- the hydraulic system further comprises a main working oil circuit 21 that communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively.
- the main working oil circuit 21 comprises a first main working oil circuit communicating with the forward branch working oil circuits and a second main working oil circuit communicating with the reversed branch working oil circuits.
- each forward branch working oil circuit communicates with the rodless cavity of cylinder 15, and another one end of the forward branch working oil circuit communicates with an oil tank 1 of the hydraulic system via the first main working oil circuit;
- one end of each reversed branch working oil circuit communicates with the rod cavity of cylinder 15, and another one end of the reversed branch working oil circuit communicates with the oil tank 1 of the hydraulic system via the second main working oil circuit.
- a speed regulator valve 14 is arranged in the forward branch working oil circuit and reversed branch working oil circuit of each cylinder 15 respectively, wherein, the speed regulator valve 14 arranged in the forward branch working oil circuit is a forward speed regulator valve used to regulate the flow rate in the forward branch working oil circuit; the speed regulator valve 14 arranged in the reversed branch working oil circuit is a reversed speed regulator valve used to regulate the flow rate in the reversed branch working oil circuit.
- the speed regulator valve 14 has precise scale, so as to control the flow rate of hydraulic oil in the working oil circuits accurately. It is understood that the forward branch working oil circuit will communicate with the rod cavity and the reversed branch working oil circuit will communicate with the rodless cavity when the piston rod of cylinder 15 is connected to the head beam 34 and the cylinder body is connected to the lifting beam 35.
- the hydraulic system further comprises an oil pump 6 and a motor 7 driving the oil pump 6, wherein, the oil pump 6 is arranged in the main working oil circuit 21, one end of the oil pump 6 communicates with the oil tank 1, and anther end of the oil pump 6 communicates with both the forward branch working oil circuit and the reversed branch working oil circuit simultaneously.
- the forward speed regulator valves on the six cylinders 15 are A11, A12, A13, A14, A15, and A16 respectively; the reversed speed regulator valves on the six cylinders 15 are B11, B12, B 13, B 14, B 15, and B16 respectively.
- the extending and retracting speeds of each cylinder and the synchronization accuracy of the cylinders can be controlled respectively by controlling the opening of the speed regulator valve 14 in each branch to the same scale.
- the forward branch working oil circuit of each cylinder 15 meets the first main working oil circuit of the main working oil circuit 21 at point A
- the reversed branch working oil circuit of each cylinder 15 meets the second main working oil circuit of the main working oil circuit 21 at point B.
- the speed regulator valve 14 has high speed rigidity, i.e., the flow rate is essentially immune to the impact of the load and the pressure fluctuation in the pump station once it is regulated to a specified value, the controlled flow rate will have no fluctuation essentially, and thereby the accuracy of synchronization among the cylinders 15 will be increased highly.
- the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each cylinder 15 and the accuracy of synchronization among the cylinders 15 are controlled by means of the forward speed regulator valve and reversed speed regulator valve on each cylinder 15, and the cylinders 15 are controlled to lift synchronously by maintaining the synchronization of the working oil in eachbranch working oil circuits.
- the problem of out-of-sync lifting of cylinders on tower cranes in the prior art is solved, and the poor efficacy of utilization of synchronizing valves in the prior art can be solved.
- each cylinder 15 Owing to the fact that the ascending speed of the cylinders is different to the descending speed of the cylinders, a bridge rectifier synchronization circuit composed of a speed regulator valve and four check valves is not used; instead, each cylinder 15 employs two speed regulator valves to control the ascending speed and descending speed thereof respectively, so as to achieve the synchronization, i.e., six cylinders 15 employ 12 speed regulator valves altogether to achieve speed regulation and synchronization control.
- the accumulative synchronous error during synchronous operation of the cylinders 15 can be eliminated by that the piston rods of the cylinders reach to the target positions.
- the hydraulic system further comprises balancing valves 13 arranged in the forward branch working oil circuits.
- Each of the balancing valves 13 comprises an oil inlet, an oil outlet, and a control port, wherein, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with one of the rodless cavity and rod cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and another one of the rodless cavity and rod cavity of the cylinder.
- the oil inlet communicates with the forward branch working oil circuit
- the oil outlet communicates with the rodless cavity of the cylinder
- the control port communicates with the reversed branch working oil circuit and a rod control port in the rod cavity correspondingly.
- the rod control port is arranged in the rod cavity of cylinder, and controls the pressure in the rodless cavity by means of the communication with the balancing valve 13, so as to reduce the idle work.
- the six balancing valves 13 are arranged.
- the balancing valve 13 will be closed, and thereby keep the cylinders at its position, so as to ensure safe operation of the tower crane.
- the control port of balancing valve 13 communicates with the rod control port in the rod cavity, so as to regulate the working pressure in the rod cavity and reduce energy consumption.
- a plurality of cylinders 15 are connection in parallel to one oil tank 1; in that way, the space can be save, and the weight of the tower crane can be reduced.
- a back pressure valve 11 connected in series to the cylinders 15 is arranged in the second main working oil circuit of the main working oil circuit 21 of the hydraulic system, and the back pressure valve 11 communicates with each of the reversed branch working oil circuits and an oil pump 6 as well.
- the back pressure valve 11 is mainly used to balance the weight of the lifting beams 35 on the end of the piston rods of the cylinders. Since the lifting beams 35 are connected on the piston rods of the cylinders 15, the heavy lifting beams 35 will tend to drive the piston rods to descend further due to inertia effect, and therefore have impact on the position accuracy of the pistons when the piston rods descend to a position and try to stop thereon. In this case, the system weight can be balanced, owing to the existence of the back pressure valve 11.
- the hydraulic system further comprises a main working oil circuit 21, which communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and the main working oil circuit 21 has a combined valve 9 comprising a combined reversing valve and a combined overflow valve which communicate with each other.
- the oil inlet of the combined valve 9 communicates with the oil pump 6, and the oil outlet of the combined valve 9 communicates with the forward branch working oil circuits and the reversed branch working oil circuits.
- the hydraulic system further comprises an oil return circuit, through which the oil outlet of the combined valve 9, the forward branch working oil circuits and the reversed branch working oil circuits may communicate with the oil tank 1 directly.
- the combined valve 9 is a group valve that integrates a plurality of valves.
- the combined valve 9 is used to control the flow, reversal, and overflow of hydraulic oil in the main working oil circuit 21.
- the combined reversing valve comprises check valves and reversing valves
- the combined overflow valve comprises overflow valves.
- the combined valve can be an off-the-shelf product, or can be assembled from check valves, reversing valves and overflow valves or other valves in the field. An off-the-shelf combined valve is preferred, so as to save installation time, furthermore, it is widely available in the market.
- the hydraulic system further comprises a main working oil circuit 21, which communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and the main working oil has a pilot check valve 12 communicating with the forward branch working oil circuit of each cylinder 15 respectively, and which has an opening ratio smaller than the opening ratio of each balancing valve 13.
- the pilot check valve 12 arranged in the first main working oil circuit communicating with the forward branch working oil circuit of each cylinder 15, thus, the hydraulic oil can only flow into the forward branch working oil circuits, but can't flow back when the tower crane lifts.
- the opening ratio of the pilot check valve 12 is smaller than the opening ratio of each balancing valve 13, which is to say, the balancing valves 13 will open prior to the pilot check valve 12; thus, the startup error of the cylinders 15 can be reduced.
- the pilot check valve 12 is arranged between the combined valve 9 and the forward branch working oil circuits.
- pilot check valve 12 and balancing valves 13 another purpose of the pilot check valve 12 and balancing valves 13 is to force the oil to fill up all the pipelines extending from the pump station to the cylinders 15 (i.e., from the back pressure valve 11, pilot check valve 12, to the cylinders 15), so as to avoid air entrapment in the pipelines and thereby ensure stable and synchronous operation of the cylinders.
- the forward branch working oil circuit and the reversed branch working oil circuit of each cylinder have a stop valve 16 respectively.
- 12 stop valves 16 are arranged in the oil circuits of six cylinders 15.
- the individual cylinders can be controlled to act separately, or several cylinders among the cylinders can be controlled in any combination to act in a coordinated manner.
- the stop valves 16 can be closed, so that there will be no leakage in the working pipelines in that state.
- the main working oil circuit 21 has an overflow valve, which communicates with the reversed branch working oil circuits and the oil tank 1.
- the overflow valve 10 communicates with the rod cavity 15 of each cylinder 15 through the reversed branch working oil circuit, so as to reduce the pressure in the rod cavity of each cylinder 15, thus, the idle work and improve the energy efficiency of the entire system can be reduced.
- the tower body has two sides, and one front and one back connected with the two sides, i.e., the tower body 39 has left side 391, right side 392, front introduction face 393, and back face 394; two cylinders 15 connected between the climbing frame 31 and the lifting beams 35 are arranged on each sides and the back face, but no cylinder 15 is arranged on the front introduction face 393 of the tower body, so that a preparation work for lifting can be done on the front introduction face 393 of the tower body; for example, some parts required for the lifting work can be introduced through the front introduction face 393.
- Such arrangement is a three-face and six-cylinder lifting structure of tower crane.
- such lifting structure comprises three lifting beams 35, six lifting cylinders 15, one hydraulic pump station 50, and hydraulic rubber tubes 17, etc.
- Each two lifting cylinders 15 are connected to one lifting beam 35 and climbing frame 31 via pins, and each lifting cylinder 15 is connected to the hydraulic pump station 50 by hydraulic rubber tubes 17.
- the three lifting beams 35 are arranged on the opposite face and sides face of the standard mast section introduction face respectively.
- the cylinders 15 Under the control of the lifting hydraulic system, the cylinders 15 will operate synchronously and bear the same pressure in the lifting process of the tower crane, and operate stably, safely, and reliably in the mast section addition process for lifting and the mast section subtraction process for descending; moreover, every two cylinders 15 share a lifting beam 35, and the lifting force required in the lifting process is provided by six cylinders 15 respectively, which is to say, each lifting cylinder 15 only has to provide very low lifting force; thus, a common small-size lifting cylinders can be used, and therefore the cost and space can be reduced.
- the present invention is not limited to the three-face and six-cylinder arrangement; for example, two cylinders or four cylinders can be arranged on the two sides, or three cylinders can be arranged on three sides.
- the six cylinders 15 are controlled to ascend synchronously and bear the same pressure under the control of the hydraulic system.
- the reversing lever When the cylinders lift synchronously to the target position, the reversing lever is switched to the right position of the combined valve 9, the hydraulic oil will flow freely through the back pressure valve 11, and be regulated by the speed regulator valves 14, and then flow into the respective rod cavities; at the same time, the control oil from the second main working oil circuit will open the pilot check valve 12 arranged in the first main working oil circuit; thus, the cylinders will support the climbing frame 31 to descend; in this process, the weight of the upper part of the tower crane is balanced by regulating the balancing valves 13, so that the climbing frame 31 will descend smoothly and steadily; after the clevis 33 are fit, the weight of the upper part of the tower crane will be supported by the clevis 33. Then, the piston rods of cylinders 15 will retract and carry the lifting beams 35 to release from the step on the tower body synchronously; then, the lifting beams 35 will ascend.
- a vacant position for a standard mast section will occur between the lower support of the tower crane and the top of the standard mast sections, and the upper revolving part will be supported completely by the climbing frame 31.
- a new standard mast section can be added between the top of the standard mast sections and the lower support, with the upper part of the added standard mast section connected to the lower support, and the lower part of the added standard mast section connected to the existing standard mast sections. The above procedure can be executed in the reversed sequence to reduce the mast height of the tower crane.
- the hydraulic oil will be filtered by filter 2 and then transferred by high pressure pump 6 to the combined valve; after the control lever is switched to the left position, the hydraulic oil will flow freely through the check valve 12 and balancing valves 13 into the rodless cavities of the cylinders 15, and therefore the piston rods of the cylinders will extend and set the lifting beams connected to the top of the piston rods of cylinders synchronously into the step for the lower mast section of tower body; after the cylinders lift synchronously to the target position and the standard mast section subtraction operation is completed, the reversing lever is switched to the right position of the combined valve 9, and the hydraulic oil will flow freely through the back pressure valve 11, and be regulated by the speed regulator valves 14 synchronously, and then flow into the respective rod cavities; at the same time, the control oil from the right oil circuit will open the check valve 12 in the left oil circuit, and the cylinders will carry the climbing frame 31 to descend smoothly and steadily; then
- the outlet pressure of the oil pump 50 is regulated by the combined valve 9, and is usually set to 1.15 times of the actual lifting pressure.
- the working pressure of rod cavities of the cylinders is regulated by the overflow valve 10, which is lower than the set value of outlet pressure of the pump, so as to reduce energy consumption.
- the present invention can maintain synchronization for multi-cylinders essentially.
- the accuracy of synchronization for multi-cylinders mainly depends on the control accuracy of the speed regulator valves, and which is essentially immune to the impact of the balancing valves.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- Fluid-Pressure Circuits (AREA)
Description
- The present invention relates to the crane domain, in particular to a lifting structure of tower crane, a hydraulic system for the lifting structure, and a lifting method of tower crane. A crane having such a structure is disclosed in
EP 0516938 A1 . - At present, most self-lifting tower cranes employ a single-cylinder lifting hydraulic system, but some large-tonnage self-lifting tower cranes employ a double-cylinder lifting hydraulic system, in which balancing valves or hydraulic locks are rigidly connected to the cylinder bodies to attain the explosion-proof purpose and ensure safety. However, if such an arrangement is employed on super-large-tonnage self-lifting tower cranes, the lifting cylinders will be huge and be difficult to install and service.
- For multi-cylinder large-tonnage self-lifting tower cranes which employ two or more cylinders, there will be the following problems if balancing valves or hydraulic locks still are rigidly connected to the cylinder bodies simply:
- 1. The cylinders may not operate synchronously, because the balancing valves or the hydraulic locks for the cylinders may not be opened synchronously during the cylinder startup process, even synchronous control arrangement (e.g., synchronizing valves) are taken. The accuracy of synchronization depends on the control accuracy of the synchronizing valves when the cylinders ascend or the piston rods extend; whereas, the accuracy of synchronization not only depends on the control accuracy of the synchronizing valves but also is subjected to the control of the balancing valves when the cylinders descend or the piston rods retract; that problem is seen in double-cylinder lifting tower cranes of the prior art.
- 2. As for lifting cylinders that employ hydraulic locks, since the rodless cavities of the cylinders are locked by the respective hydraulic locks, in case one of hydraulic lock is not opened timely, the weight of the entire climbing frame and the back-tension force of other cylinders will act on this cylinder, and thereby may cause over-pressure on said cylinder, resulting in severe damage to said cylinder and severe safety hazard.
- The object of the present invention is to provide a lifting structure of tower crane, a hydraulic system of the lifting structure, and a lifting method of tower crane, so as to solve the problem of out-of-sync lifting of tower cranes that employs two or more cylinders in the prior art.
- To attain the object described above, in an aspect, the present invention provides a hydraulic system for lifting structure of tower crane, used to drive a climbing frame of the tower crane to ascend or descend on the tower body of tower crane, comprising a plurality of cylinders that are connected to lifting beams and upper beams of the tower crane respectively; wherein, each of the cylinders has a forward branch working oil circuit and a reversed branch working oil circuit; the forward branch working oil circuit of each cylinder has a forward speed regulator valve used to regulate the flow rate of hydraulic oil in the forward direction, and the reversed branch working oil circuit of each cylinder has a reversed speed regulator valve used to regulate the flow rate of hydraulic oil in the reversed direction.
- Moreover, the hydraulic system for lifting structure further comprises balancing valves arranged in each of the forward branch working oil circuits.
- Moreover, each of the balancing valves comprises an oil inlet, an oil outlet, and a control port, wherein, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with one of the rodless cavity and rod cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and another one of the rodless cavity and rod cavity of the cylinder.
- Moreover, the hydraulic system further comprises a main working oil circuit communicating with the forward branch working oil circuits and reversed branch working oil circuits respectively, and which has a pilot check valve communicating with the forward branch working oil circuits of the cylinders respectively, the pilot check valve has an opening ratio smaller than the opening ratio of each balancing valve.
- Moreover, the forward branch working oil circuit and reversed branch working oil circuit of each cylinder have a stop valve respectively.
- Moreover, the plurality of cylinders are connected in parallel to an oil tank, and the hydraulic system further comprises a main working oil circuit connected between the oil tank and the cylinders, which communicates with the forward branch working oil circuits and reversed branch working oil circuits, and the main working oil circuit has a combined valve comprising a combined reversing valve and a combined overflow valve, which communicate with each other.
- Moreover, the main working oil circuit has a back pressure valve connected in series to the oil tank, and which communicates with the reversed branch working oil circuits.
- Moreover, the main working oil circuit has an overflow valve, which communicates with the reversed branch working oil circuits.
- Moreover, the quantities of cylinders are six, the tower body has two sides, and one front and one back connected to the two sides, and two cylinders connected between the climbing frame and the lifting beams are arranged on each of the sides and the back of the tower body respectively.
- The present invention further provides a lifting structure of tower crane, which comprises a tower body and a climbing frame arranged on the top of the tower body, wherein, the tower body has a step, the lifting beams are connected at the bottom to the upper beams, and the step support the lifting beams; the lifting structure further comprises a hydraulic system for lifting structure described above.
- The present invention further provides a lifting method of tower crane, which is characterized in:arranging a plurality of cylinders connected between the upper beams and the lifting beams of the tower crane, controlling the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each cylinder and the accuracy of synchronization among the cylinders by means of a forward speed regulator valve and a reversed speed regulator valve on each of the cylinders, and controlling the cylinders to lift synchronously by maintaining the forward and reversed flow rates of hydraulic oil in the branch working oil circuits at the same value among the cylinders and controlling the cylinders to act synchronously.
- Moreover, two cylinders are arranged on two sides and a back of the climbing frame of tower crane, and each of the cylinders is connected between the upper beams and the lifting beams; the forward and reversed flow rates of hydraulic oil in the branch working oil circuits are maintained at the same value among the cylinders and the cylinders are controlled to act synchronously with the forward speed regulator valve and reversed speed regulator valve on each of the cylinders.
- Furthermore, the weight of the lifting beams is balanced by means of a back pressure valve connected in series to an oil tank.
- Moreover, the climbing frame is prevented from falling in case of pressure loss in the cylinder by arranging a balancing valve on each of the cylinders to control the rodless cavity of the cylinder.
- Moreover, arranging a pilot check valve in the main working oil circuit of the hydraulic system, and the opening ratio of the pilot check valve is smaller than the opening ratio of each of the balancing valves.
- In the solution of the present invention, the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each cylinder and the accuracy of synchronization among the cylinders are controlled by means of the forward speed regulator valve and reversed speed regulator valve on each cylinder, and the cylinders are controlled to lift synchronously by maintaining the flow rates in the branch working oil circuits at the same value among the cylinders; in that way, the problem of out-of-sync lifting of cylinders on tower cranes in the prior art is solved, and the poor efficacy of synchronizing valves on tower cranes in the prior art can be solved.
- As a part of the patent application, the accompanying drawings are provided to further illustrate the present invention; the embodiments and the description thereof in the present invention are provided to illustrate the present invention, but not be deemed as any undue limitation to the present invention. Among the drawings:
-
Figure 1 shows the working principle of the lifting structure of tower crane in the embodiments of the present invention; -
Figure 2 shows the structure of the hydraulic system for lifting structure of tower crane in the embodiments of the present invention; -
Figure 3 shows the structure on the back of the lifting structure of tower crane in the embodiments of the present invention; -
Figure 4 shows the structure on the side of the lifting structure of tower crane in the embodiments of the present invention; -
Figure 5 shows the structure on the front of the lifting structure of tower crane in the embodiments of the present invention; and -
Figure 6 shows the structure of the lifting beams of tower crane in the embodiments of the present invention. - It is noted that the embodiments and the features in the embodiments can be combined freely, in the case of there is no confliction between them. Hereunder the present invention will be detailed in the embodiments, with reference to the accompanying drawings.
- As shown in
Figure 1 , in the tower crane in the embodiments of the present invention, hydraulic system of lifting structure drives aclimbing frame 31 of tower crane to ascend and descend on thetower body 39 of the tower crane, for example, theclimbing frame 31 is supported and driven by the hydraulic system to ascend and descend on thetower body 39 viaguide pulleys 32 arranged on thetower body 39. The hydraulic system comprises a plurality ofcylinders 15; for example, two, three, four, six, or eight cylinders can be used, thecylinders 15 in such a quantity can be arranged more easily. For example, if the hydraulic system comprises twocylinders 15, the twocylinders 15 can be arranged on one side or both sides of theclimbing frame 31. The piston rod and cylinder body of eachcylinder 15 are connected tolifting beams 35 andupper beams 34 of the tower crane respectively, wherein, theupper beams 34 are fixed to theclimbing frame 31, and thelifting beams 35 are fixed to the standard mast sections in a detachable manner, i.e., when theclimbing frame 31 climbs, thelifting beams 35 are connected to the topmost standard mast section; when new standard mast section is added, thelifting beams 35 can be disconnected from the original standard mast section and then connected to the added standard mast section. In the process theclimbing frame 31 climbs, aclevis 33 can be utilized to support and locate theclimbing frame 31, and thereby the position of thelifting beams 35 can be adjusted. Astep 37 are arranged on thetower body 39 of the tower crane. At the end of the lifting process, thestep 37 will support and stop thelifting beams 35 to prevent thelifting beams 35 from moving again, and thereby ensure the safety of the tower crane. - As shown in
Figure 2 , in one embodiment of the present invention, the hydraulic system comprises sixcylinders 15, which can have the same model and same structure. Among thecylinders 15, each cylinder has a forward branch working oil circuit and a reversed branch working oil circuit, which are used to control the movement of rodless cavity and rod cavity of thecylinder 15 respectively. The hydraulic system further comprises a main workingoil circuit 21 that communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively. In this embodiment, the main workingoil circuit 21 comprises a first main working oil circuit communicating with the forward branch working oil circuits and a second main working oil circuit communicating with the reversed branch working oil circuits. Wherein, one end of each forward branch working oil circuit communicates with the rodless cavity ofcylinder 15, and another one end of the forward branch working oil circuit communicates with anoil tank 1 of the hydraulic system via the first main working oil circuit; one end of each reversed branch working oil circuit communicates with the rod cavity ofcylinder 15, and another one end of the reversed branch working oil circuit communicates with theoil tank 1 of the hydraulic system via the second main working oil circuit. Aspeed regulator valve 14 is arranged in the forward branch working oil circuit and reversed branch working oil circuit of eachcylinder 15 respectively, wherein, thespeed regulator valve 14 arranged in the forward branch working oil circuit is a forward speed regulator valve used to regulate the flow rate in the forward branch working oil circuit; thespeed regulator valve 14 arranged in the reversed branch working oil circuit is a reversed speed regulator valve used to regulate the flow rate in the reversed branch working oil circuit. Thespeed regulator valve 14 has precise scale, so as to control the flow rate of hydraulic oil in the working oil circuits accurately. It is understood that the forward branch working oil circuit will communicate with the rod cavity and the reversed branch working oil circuit will communicate with the rodless cavity when the piston rod ofcylinder 15 is connected to thehead beam 34 and the cylinder body is connected to thelifting beam 35. - Please see
Figure 2 again. The hydraulic system further comprises an oil pump 6 and amotor 7 driving the oil pump 6, wherein, the oil pump 6 is arranged in the main workingoil circuit 21, one end of the oil pump 6 communicates with theoil tank 1, and anther end of the oil pump 6 communicates with both the forward branch working oil circuit and the reversed branch working oil circuit simultaneously. - Specifically, as shown in
Figure 2 , the forward speed regulator valves on the sixcylinders 15 are A11, A12, A13, A14, A15, and A16 respectively; the reversed speed regulator valves on the sixcylinders 15 are B11, B12,B 13,B 14,B 15, and B16 respectively. The extending and retracting speeds of each cylinder and the synchronization accuracy of the cylinders can be controlled respectively by controlling the opening of thespeed regulator valve 14 in each branch to the same scale. The forward branch working oil circuit of eachcylinder 15 meets the first main working oil circuit of the main workingoil circuit 21 at point A, and the reversed branch working oil circuit of eachcylinder 15 meets the second main working oil circuit of the main workingoil circuit 21 at point B. Owing to the fact that thespeed regulator valve 14 has high speed rigidity, i.e., the flow rate is essentially immune to the impact of the load and the pressure fluctuation in the pump station once it is regulated to a specified value, the controlled flow rate will have no fluctuation essentially, and thereby the accuracy of synchronization among thecylinders 15 will be increased highly. - In the hydraulic system provided in the present invention, the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each
cylinder 15 and the accuracy of synchronization among thecylinders 15 are controlled by means of the forward speed regulator valve and reversed speed regulator valve on eachcylinder 15, and thecylinders 15 are controlled to lift synchronously by maintaining the synchronization of the working oil in eachbranch working oil circuits. In this way, the problem of out-of-sync lifting of cylinders on tower cranes in the prior art is solved, and the poor efficacy of utilization of synchronizing valves in the prior art can be solved. Owing to the fact that the ascending speed of the cylinders is different to the descending speed of the cylinders, a bridge rectifier synchronization circuit composed of a speed regulator valve and four check valves is not used; instead, eachcylinder 15 employs two speed regulator valves to control the ascending speed and descending speed thereof respectively, so as to achieve the synchronization, i.e., sixcylinders 15 employ 12 speed regulator valves altogether to achieve speed regulation and synchronization control. The accumulative synchronous error during synchronous operation of thecylinders 15 can be eliminated by that the piston rods of the cylinders reach to the target positions. - Preferably, as shown in
Figure 2 , the hydraulic system further comprises balancingvalves 13 arranged in the forward branch working oil circuits. Each of the balancingvalves 13 comprises an oil inlet, an oil outlet, and a control port, wherein, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with one of the rodless cavity and rod cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and another one of the rodless cavity and rod cavity of the cylinder. - In an embodiment of the present invention, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with the rodless cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and a rod control port in the rod cavity correspondingly. Wherein, the rod control port is arranged in the rod cavity of cylinder, and controls the pressure in the rodless cavity by means of the communication with the balancing
valve 13, so as to reduce the idle work. In a hydraulic system with sixcylinders 15, the six balancingvalves 13 are arranged. In case that a rubber tube connected to the rodless cavity of a cylinder ruptures in the mast section addition process for lifting of the tower crane, and therefore the cylinders tend to drop rapidly with the climbing frame on the upper part of the tower crane due to sudden pressure loss in the rodless cavity, the balancingvalve 13 will be closed, and thereby keep the cylinders at its position, so as to ensure safe operation of the tower crane. In addition, as shown inFigure 2 , the control port of balancingvalve 13 communicates with the rod control port in the rod cavity, so as to regulate the working pressure in the rod cavity and reduce energy consumption. - Preferably, as shown in
Figure 2 , a plurality ofcylinders 15 are connection in parallel to oneoil tank 1; in that way, the space can be save, and the weight of the tower crane can be reduced. Aback pressure valve 11 connected in series to thecylinders 15 is arranged in the second main working oil circuit of the main workingoil circuit 21 of the hydraulic system, and theback pressure valve 11 communicates with each of the reversed branch working oil circuits and an oil pump 6 as well. - The
back pressure valve 11 is mainly used to balance the weight of the lifting beams 35 on the end of the piston rods of the cylinders. Since the lifting beams 35 are connected on the piston rods of thecylinders 15, the heavy lifting beams 35 will tend to drive the piston rods to descend further due to inertia effect, and therefore have impact on the position accuracy of the pistons when the piston rods descend to a position and try to stop thereon. In this case, the system weight can be balanced, owing to the existence of theback pressure valve 11. - Preferably, as shown in
Figure 2 , the hydraulic system further comprises a main workingoil circuit 21, which communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and the main workingoil circuit 21 has a combinedvalve 9 comprising a combined reversing valve and a combined overflow valve which communicate with each other. The oil inlet of the combinedvalve 9 communicates with the oil pump 6, and the oil outlet of the combinedvalve 9 communicates with the forward branch working oil circuits and the reversed branch working oil circuits. The hydraulic system further comprises an oil return circuit, through which the oil outlet of the combinedvalve 9, the forward branch working oil circuits and the reversed branch working oil circuits may communicate with theoil tank 1 directly. - The combined
valve 9 is a group valve that integrates a plurality of valves. In this embodiment, the combinedvalve 9 is used to control the flow, reversal, and overflow of hydraulic oil in the main workingoil circuit 21. Wherein, the combined reversing valve comprises check valves and reversing valves, while the combined overflow valve comprises overflow valves. The combined valve can be an off-the-shelf product, or can be assembled from check valves, reversing valves and overflow valves or other valves in the field. An off-the-shelf combined valve is preferred, so as to save installation time, furthermore, it is widely available in the market. - Preferably, as shown in
Figure 2 , the hydraulic system further comprises a main workingoil circuit 21, which communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and the main working oil has apilot check valve 12 communicating with the forward branch working oil circuit of eachcylinder 15 respectively, and which has an opening ratio smaller than the opening ratio of each balancingvalve 13. Thepilot check valve 12 arranged in the first main working oil circuit communicating with the forward branch working oil circuit of eachcylinder 15, thus, the hydraulic oil can only flow into the forward branch working oil circuits, but can't flow back when the tower crane lifts. The opening ratio of thepilot check valve 12 is smaller than the opening ratio of each balancingvalve 13, which is to say, the balancingvalves 13 will open prior to thepilot check valve 12; thus, the startup error of thecylinders 15 can be reduced. Moreover, thepilot check valve 12 is arranged between the combinedvalve 9 and the forward branch working oil circuits. - In addition, another purpose of the
pilot check valve 12 and balancingvalves 13 is to force the oil to fill up all the pipelines extending from the pump station to the cylinders 15 (i.e., from theback pressure valve 11,pilot check valve 12, to the cylinders 15), so as to avoid air entrapment in the pipelines and thereby ensure stable and synchronous operation of the cylinders. - Preferably, as shown in
Figure 2 , the forward branch working oil circuit and the reversed branch working oil circuit of each cylinder have a stop valve 16 respectively. Altogether 12 stop valves 16 are arranged in the oil circuits of sixcylinders 15. Thus, the individual cylinders can be controlled to act separately, or several cylinders among the cylinders can be controlled in any combination to act in a coordinated manner. Furthermore, when the cylinders are to be held at a position for long, the stop valves 16 can be closed, so that there will be no leakage in the working pipelines in that state. - Preferably, the main working
oil circuit 21 has an overflow valve, which communicates with the reversed branch working oil circuits and theoil tank 1. Theoverflow valve 10 communicates with therod cavity 15 of eachcylinder 15 through the reversed branch working oil circuit, so as to reduce the pressure in the rod cavity of eachcylinder 15, thus, the idle work and improve the energy efficiency of the entire system can be reduced. - The quantities of cylinders are six. Preferably, as shown in
Figures 3-5 , the tower body has two sides, and one front and one back connected with the two sides, i.e., thetower body 39 has leftside 391,right side 392,front introduction face 393, and back face 394; twocylinders 15 connected between theclimbing frame 31 and the lifting beams 35 are arranged on each sides and the back face, but nocylinder 15 is arranged on thefront introduction face 393 of the tower body, so that a preparation work for lifting can be done on thefront introduction face 393 of the tower body; for example, some parts required for the lifting work can be introduced through thefront introduction face 393. - Such arrangement is a three-face and six-cylinder lifting structure of tower crane. As shown in
Figures 2-6 , such lifting structure comprises three liftingbeams 35, six liftingcylinders 15, onehydraulic pump station 50, andhydraulic rubber tubes 17, etc. Each two liftingcylinders 15 are connected to onelifting beam 35 andclimbing frame 31 via pins, and each liftingcylinder 15 is connected to thehydraulic pump station 50 byhydraulic rubber tubes 17. The threelifting beams 35 are arranged on the opposite face and sides face of the standard mast section introduction face respectively. Under the control of the lifting hydraulic system, thecylinders 15 will operate synchronously and bear the same pressure in the lifting process of the tower crane, and operate stably, safely, and reliably in the mast section addition process for lifting and the mast section subtraction process for descending; moreover, every twocylinders 15 share alifting beam 35, and the lifting force required in the lifting process is provided by sixcylinders 15 respectively, which is to say, each liftingcylinder 15 only has to provide very low lifting force; thus, a common small-size lifting cylinders can be used, and therefore the cost and space can be reduced. Especially, for large-size or extra-large tower cranes, such as D5200-240 self-lifting extra-large tower cranes, which can bear heavy lifting load up to more than 800 tons and whose lifting beams 35 has weight of more than 4 tons, the lifting work can be done easily with said three-face and six-cylinder lifting structure; in contrast, in the prior art, to implement such an efficacy, a complex approach has to be used, and there is a risk of over-pressure on cylinder. - Moreover, the present invention is not limited to the three-face and six-cylinder arrangement; for example, two cylinders or four cylinders can be arranged on the two sides, or three cylinders can be arranged on three sides.
- With the three-face and six-cylinder lifting structure, the procedures of mast section addition process for lifting or mast section subtraction process for descending of tower crane are as follows:
- 1. Start up the
hydraulic pump station 50, extend thecylinders 15 and hang the three liftingbeams 35 to the nearest set of step, and insert safety pins; - 2. Verify the above work, and then start up the hydraulic system to extend the piston rods and lift the
climbing frame 31 and the part thereabove. - In the lifting process, the six
cylinders 15 are controlled to ascend synchronously and bear the same pressure under the control of the hydraulic system. - The main working process with a three-face and six-cylinder lifting structure is described as follows:
- For the lifting operation of the tower crane, after the
drive motor 7 is started, the hydraulic oil will be filtered by a filter 2 and then transferred by a high pressure pump 6 to the combinedvalve 9; after the control lever is switched to the left position, the hydraulic oil will flow freely through thepilot check valve 12 and balancingvalves 13 into the rodless cavities of thecylinders 15, and firstly, set the lifting beams 35 connected to the top of the piston rods of the cylinders into the step on the tower body, wherein the six cylinders can lift synchronously. The accuracy of synchronization is preset by thespeed regulator valves 14. - When the cylinders lift synchronously to the target position, the reversing lever is switched to the right position of the combined
valve 9, the hydraulic oil will flow freely through theback pressure valve 11, and be regulated by thespeed regulator valves 14, and then flow into the respective rod cavities; at the same time, the control oil from the second main working oil circuit will open thepilot check valve 12 arranged in the first main working oil circuit; thus, the cylinders will support theclimbing frame 31 to descend; in this process, the weight of the upper part of the tower crane is balanced by regulating the balancingvalves 13, so that theclimbing frame 31 will descend smoothly and steadily; after theclevis 33 are fit, the weight of the upper part of the tower crane will be supported by theclevis 33. Then, the piston rods ofcylinders 15 will retract and carry the lifting beams 35 to release from the step on the tower body synchronously; then, the lifting beams 35 will ascend. - When the lifting process is completed, a vacant position for a standard mast section will occur between the lower support of the tower crane and the top of the standard mast sections, and the upper revolving part will be supported completely by the
climbing frame 31. To increase the mast height of the tower crane, a new standard mast section can be added between the top of the standard mast sections and the lower support, with the upper part of the added standard mast section connected to the lower support, and the lower part of the added standard mast section connected to the existing standard mast sections. The above procedure can be executed in the reversed sequence to reduce the mast height of the tower crane. - When the piston rods of cylinders carrying the lifting beams 35 is retracted to the position above the step for the upper standard mast section, the reversing lever is switched to the left position, the piston rods of cylinders will extend and carry the lifting beams 35 to descend synchronously into the groove of the step. The weight of the lifting beams 35 is balanced by regulating the
back pressure valve 11; then, the lever of the combinedvalve 9 can be switched to the left position, and the above procedure can be repeated to start another lifting cycle. - For the mast section subtraction operation for descending of the tower crane, after the
drive motor 7 is started, the hydraulic oil will be filtered by filter 2 and then transferred by high pressure pump 6 to the combined valve; after the control lever is switched to the left position, the hydraulic oil will flow freely through thecheck valve 12 and balancingvalves 13 into the rodless cavities of thecylinders 15, and therefore the piston rods of the cylinders will extend and set the lifting beams connected to the top of the piston rods of cylinders synchronously into the step for the lower mast section of tower body; after the cylinders lift synchronously to the target position and the standard mast section subtraction operation is completed, the reversing lever is switched to the right position of the combinedvalve 9, and the hydraulic oil will flow freely through theback pressure valve 11, and be regulated by thespeed regulator valves 14 synchronously, and then flow into the respective rod cavities; at the same time, the control oil from the right oil circuit will open thecheck valve 12 in the left oil circuit, and the cylinders will carry theclimbing frame 31 to descend smoothly and steadily; then, after the clevis are fit, the piston rods will carry the lifting beams to release from the step synchronously. Next, after the reversing lever is switched to left position, the piston rods of the cylinders will extend, and carry the lifting beams 35 to fall into the groove of step for the lower mast section. Then, the lever of the combinedvalve 9 can be switch to the left position and above procedure can be repeat to start another mast section subtraction cycle. - In the mast section addition process for lifting of the tower crane, in case a rubber tube connecting the rodless cavity of a
cylinder 15 ruptures, thecylinder 15 will tend to carry theclimbing frame 31 to fall rapidly due to sudden loss of pressure in the rodless cavity; in this case, the balancingvalve 13 will be closed so as to keep thecylinder 15 at its position, so that the safe operation of the tower crane can be ensure. - In the hydraulic system, the outlet pressure of the
oil pump 50 is regulated by the combinedvalve 9, and is usually set to 1.15 times of the actual lifting pressure. The working pressure of rod cavities of the cylinders is regulated by theoverflow valve 10, which is lower than the set value of outlet pressure of the pump, so as to reduce energy consumption. - It is seen from the above description that the embodiments of the present invention can attain the following technical efficacies:
- For a tower crane with two or more cylinders for lifting operation, the present invention can achieve stable, safe, and reliable during the mast section addition operation for lifting and the mast section subtraction operation for descending, and the over-pressured of cylinder can be avoided.
- The present invention can maintain synchronization for multi-cylinders essentially. The accuracy of synchronization for multi-cylinders mainly depends on the control accuracy of the speed regulator valves, and which is essentially immune to the impact of the balancing valves.
- While the present invention has been illustrated and described with reference to some preferred embodiments, the present invention is not limited to these. Those skilled in the art should recognize that various variations and modifications can be made.
Claims (15)
- A hydraulic system for lifting structure of tower crane, used to drive a climbing frame of the tower crane to ascend or descend on a tower body of the tower crane, characterized in that:the hydraulic system comprises a plurality of cylinders, which are connected to lifting beams and upper beams of the tower crane respectively;wherein, each of the cylinders has a forward branch working oil circuit and a reversed branch working oil circuit, the forward branch working oil circuit of each cylinder has a forward speed regulator valve used to regulate the flow rate of hydraulic oil in the forward direction, and the reversed branch working oil circuit of each cylinder has a reversed speed regulator valve used to regulate the flow rate of hydraulic oil in the reversed direction.
- The hydraulic system for lifting structure according to claim 1, characterized in that, the hydraulic system further comprises balancing valves arranged in each of the forward branch working oil circuits.
- The hydraulic system for lifting structure according to claim 2, characterized in that, the balancing valves comprises an oil inlet, an oil outlet, and a control port, wherein, the oil inlet communicates with the forward branch working oil circuit, the oil outlet communicates with one of the rodless cavity and rod cavity of the cylinder, and the control port communicates with the reversed branch working oil circuit and another one of the rodless cavity and rod cavity of the cylinder.
- The hydraulic system for lifting structure according to claim 3, characterized in that, the hydraulic system further comprises a main working oil circuit communicating with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and which has a pilot check valve communicating with the forward branch working oil circuit of each cylinder respectively, the pilot check valve has an opening ratio smaller than the opening ratio of each balancing valve.
- The hydraulic system for lifting structure according to claim 4, characterized in that, the forward branch working oil circuit and reversed branch working oil circuit of each cylinder have a stop valve respectively.
- The hydraulic system for lifting structure according to claim 1, characterized in that, the plurality of cylinders are connected in parallel to an oil tank, and the hydraulic system further comprises a main working oil circuit connected between the oil tank and the cylinders, which communicates with the forward branch working oil circuits and the reversed branch working oil circuits respectively, and the main working oil circuit has a combined valve comprising a combined reversing valve and a combined overflow valve, which communicate with each other.
- The hydraulic system for lifting structure according to claim 6, characterized in that, the main working oil circuit has a back pressure valve connected in series to the oil tank, and which communicates with the reversed branch working oil circuits.
- The hydraulic system for lifting structure according to claim 6, characterized in that, the main working oil circuit has an overflow valve, which communicates with the reversed branch working oil circuits.
- The hydraulic system for lifting structure according to any of claims 1-8, characterized in that, the quantities of cylinders are six, the tower body has two sides, and one front and one back connected to the two sides, and two cylinders connected between the climbing frame and the lifting beams are arranged on each of the sides and the back of the tower body respectively.
- A lifting structure of tower crane, comprising a tower body and a climbing frame arranged on the top of the tower body, the tower body has a step, the lifting beams are connected at the bottom to upper beams, and the step support the lifting beams, characterized in that, the lifting structure further comprises the hydraulic system for lifting structure as described in any of claims 1-9.
- A lifting method of tower crane, characterized in that, the method comprises:arranging a plurality of cylinders connected between upper beams and lifting beams of the tower crane, controlling the forward and reversed flow rates of hydraulic oil in the branch working oil circuits of each of the cylinders and the accuracy of synchronization among the cylinders by means of a forward speed regulator valve and a reversed speed regulator valve on each of the cylinders, and controlling the cylinders to lift synchronously by maintaining the forward and reversed flow rates of hydraulic oil in the branch working oil circuits at the same value among the cylinders and controlling the cylinders to act synchronously.
- The lifting method according to claim 11, characterized in that, two cylinders are arranged on two sides and a back of the climbing frame of tower crane, and each of the cylinders is connected between the upper beams and the lifting beams; the forward and reversed flow rates of hydraulic oil in the branch working oil circuits are maintained at the same value among the cylinders and the cylinders are controlled to act synchronously with the forward speed regulator valve and reversed speed regulator valve on each of the cylinders.
- The lifting method according to claim 12, characterized in that, the weight of the lifting beams is balanced by arranging a back pressure valve connected in series to the oil tank.
- The lifting method according to claim 11, characterized in that, the climbing frame is prevented to fall due to pressure loss in the cylinders by arranging a balancing valve on each of the cylinders to control the rodless cavity of the cylinder.
- The lifting method according to claim 14, characterized in that, arranging a pilot check valve in the main working oil circuit of the hydraulic system, and the pilot check valve has an opening ratio smaller than the opening ratio of each of the balancing valves.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110050632 CN102173363B (en) | 2011-03-02 | 2011-03-02 | Jacking structure of tower crane, hydraulic system and jacking method thereof |
PCT/CN2011/078540 WO2012116537A1 (en) | 2011-03-02 | 2011-08-17 | Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2620405A1 EP2620405A1 (en) | 2013-07-31 |
EP2620405A4 EP2620405A4 (en) | 2014-04-16 |
EP2620405B1 true EP2620405B1 (en) | 2015-10-14 |
Family
ID=44516674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11859735.0A Not-in-force EP2620405B1 (en) | 2011-03-02 | 2011-08-17 | Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2620405B1 (en) |
CN (1) | CN102173363B (en) |
WO (1) | WO2012116537A1 (en) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102502434B (en) * | 2011-10-21 | 2013-12-11 | 四川宏华石油设备有限公司 | Luffing hydraulic controlling system of joint lift |
CN102505630A (en) * | 2011-11-17 | 2012-06-20 | 廊坊凯博建设机械科技有限公司 | Double-oil cylinder synchronous system for bridge detection operation vehicle |
CN102491186A (en) * | 2011-12-19 | 2012-06-13 | 中联重科股份有限公司 | Tower crane |
CN103303811A (en) * | 2013-06-13 | 2013-09-18 | 山东丰汇设备技术有限公司 | Automatic jacking system of internal climbing tower crane |
CN103626047A (en) * | 2013-09-09 | 2014-03-12 | 胡江 | Telescopic crane for ship |
CN103663183A (en) * | 2013-11-29 | 2014-03-26 | 江苏大通重工有限公司 | Fast self-mounting tower crane |
CN105438989B (en) * | 2014-12-19 | 2018-02-16 | 徐州重型机械有限公司 | Crane is got on or off the bus oil supply system |
CN104528582A (en) * | 2014-12-26 | 2015-04-22 | 柳州欧维姆机械股份有限公司 | Intelligent separate control type hydraulic synchronous jacking system and method for replacing bridge support through same |
CN105129608A (en) * | 2015-06-12 | 2015-12-09 | 焦作大学 | Container crane heightening device |
CN105271014A (en) * | 2015-09-30 | 2016-01-27 | 徐州建机工程机械有限公司 | Detachable sleeve frame structure of tower crane |
CN105174062B (en) * | 2015-10-19 | 2017-04-19 | 中联重科股份有限公司 | Multi-cylinder jacking synchronous control system, method and device and tower crane |
CN105417429A (en) * | 2015-12-22 | 2016-03-23 | 中联重科股份有限公司 | Counter weight lifting device and crane with same |
CN105480876A (en) * | 2016-01-04 | 2016-04-13 | 徐州建机工程机械有限公司 | Inner jacking mechanism of tower crane |
CN106762883B (en) * | 2016-12-30 | 2018-07-13 | 中联重科股份有限公司 | Hydraulic system and tower crane |
CN109368498B (en) * | 2018-08-09 | 2020-06-09 | 青岛理工大学 | Automatic system based on BIM intelligent assembly type node construction and building |
CN110206155B (en) * | 2019-05-31 | 2021-06-15 | 浙江精工钢结构集团有限公司 | Bottom-added hydraulic jacking system and construction method |
CN113264459A (en) * | 2021-05-31 | 2021-08-17 | 湖南三一塔式起重机械有限公司 | Tower crane and jacking and balancing method thereof |
CN113955653A (en) * | 2021-10-11 | 2022-01-21 | 中联重科建筑机械(江苏)有限责任公司 | Self-climbing tower crane and multi-cylinder jacking system thereof |
CN115490164A (en) * | 2022-09-22 | 2022-12-20 | 徐州建机工程机械有限公司 | Anti-falling structure and anti-falling method for climbing process of tower crane and tower crane |
CN115744670A (en) * | 2022-11-30 | 2023-03-07 | 徐州圣淮机械有限公司 | Anti-falling mechanism for jacking cross beam of tower crane |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4274542A (en) * | 1979-02-26 | 1981-06-23 | Fmc Corporation | Method for transfer of crane from tower |
JP2809308B2 (en) * | 1988-05-09 | 1998-10-08 | 越原 良忠 | Jib hoisting speed control device for construction tower crane |
DE4135961A1 (en) * | 1991-06-04 | 1992-12-10 | Liebherr Werk Biberach Gmbh | CLIMBING DEVICE FOR CLIMBING LARGE CLIMBING WEIGHTS IN TURN TURNING CRANES, WORKING PLATFORMS OR THE LIKE. |
JP3504369B2 (en) * | 1995-03-13 | 2004-03-08 | 石川島播磨重工業株式会社 | Tower crane |
CN2333687Y (en) * | 1998-06-03 | 1999-08-18 | 胡建锋 | Climbing mechanism for internal climbing tower crane |
CN2466125Y (en) * | 2001-02-28 | 2001-12-19 | 长沙中联重工科技发展股份有限公司 | Self-lifting internal creeping lifting-up system |
CN2488893Y (en) * | 2001-08-10 | 2002-05-01 | 王震山 | Hydraulic lifting device for tower crane |
CN2679123Y (en) * | 2002-12-19 | 2005-02-16 | 胡建锋 | Internally creeping tower crane |
CN2658453Y (en) * | 2003-11-21 | 2004-11-24 | 谢彬 | Tower crank hydraulic lift pump station |
DE202005009236U1 (en) * | 2005-05-09 | 2006-09-21 | Liebherr-Werk Biberach Gmbh | Rotating tower crane, in tower sections, has a traverse and support shoe with hydraulic piston/cylinder units to raise a section for the insertion of a new section to increase the crane height |
CN201225344Y (en) * | 2008-05-20 | 2009-04-22 | 上海建工(集团)总公司 | Building construction mould climbing jacking synchronous control system |
CN201288033Y (en) * | 2008-08-28 | 2009-08-12 | 中国二十冶建设有限公司 | Hydraulic synchronous lifting apparatus control apparatus |
CN201334318Y (en) * | 2008-12-25 | 2009-10-28 | 张恕铭 | Hoisting gear for tower crane |
CN201495049U (en) * | 2009-09-29 | 2010-06-02 | 四川建设机械(集团)股份有限公司 | Jacking actuating unit for stacker crane |
CN101759106B (en) * | 2009-12-29 | 2012-07-25 | 中联重科股份有限公司 | Connecting structure and connecting method for jacking oil cylinder and upper cross beam of tower crane |
CN202016806U (en) * | 2011-03-02 | 2011-10-26 | 长沙中联重工科技发展股份有限公司 | Jacking structure of tower type crane and hydraulic system thereof |
-
2011
- 2011-03-02 CN CN 201110050632 patent/CN102173363B/en active Active
- 2011-08-17 WO PCT/CN2011/078540 patent/WO2012116537A1/en active Application Filing
- 2011-08-17 EP EP11859735.0A patent/EP2620405B1/en not_active Not-in-force
Also Published As
Publication number | Publication date |
---|---|
EP2620405A4 (en) | 2014-04-16 |
WO2012116537A1 (en) | 2012-09-07 |
CN102173363A (en) | 2011-09-07 |
EP2620405A1 (en) | 2013-07-31 |
CN102173363B (en) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2620405B1 (en) | Lifting structure of tower crane, hydraulic system of lifting structure, and lifting method | |
CA2955713C (en) | A multi-cylinder synchronous energy-saving and efficient hydraulic lift system and method thereof | |
CN204213075U (en) | Maintenance vehicle with workbench hydraulic control system | |
CN102979772B (en) | Oil cylinder locking device, twin-tub hydraulic control system and crane gear | |
CN201269230Y (en) | Integral jacking creeping formwork hydraulic synchronous integrated control system for steel construction platform | |
CN105502234B (en) | Adjustable speed high thrust hydraulic elevator platform | |
CN104528582A (en) | Intelligent separate control type hydraulic synchronous jacking system and method for replacing bridge support through same | |
CN204434182U (en) | Intelligence division control type hydraulic synchronous jacking system | |
US20150014093A1 (en) | Hydraulic Control Valve, Dual-Cylinder Extension System and Aerial Work Engineering Machine | |
CN104925694A (en) | Hydraulic lifting platform system capable of achieving synchronous oil cylinder lifting | |
CN202579384U (en) | Hydraulic synchronous driving system for adjusting eccentric loads based on proportional valve -controlled energy accumulators | |
CN105257614A (en) | Hydraulic oil cylinder high-precision synchronous control complete device of ultralarge heavy equipment | |
KR20130001079A (en) | Hydraulic cylinder tuning apparatus for car lifting | |
CN102030288A (en) | Elevator mechanism of automatic stacking device and control method | |
CN202971368U (en) | Hydro-cylinder locking device, double-cylinder hydraulic control system and lifting device | |
CN202451485U (en) | Hydraulic synchronization independent control device, synchronous hydraulic system and crane | |
CN111255776B (en) | Hydraulic control system and method for whole steel platform formwork of super high-rise building | |
CN102635098A (en) | Hydraulically-driven winching type starting and stopping machine | |
CN205190393U (en) | Hydraulic drive device of super large jumbo | |
CN216430089U (en) | Multi-oil-cylinder synchronous control system based on variable flow and displacement feedback | |
CN102155007B (en) | Hydraulic system for trolley driving mechanism of inclined sliding door hoist | |
RU2662586C1 (en) | Lifting system and lifting system control method | |
CN102588364A (en) | Hydraulic synchronous independent control device, synchronous hydraulic system and crane | |
CN201962652U (en) | Hydraulic system of diagonal tension door type hoist trolley driving mechanism | |
CN210162985U (en) | Hydraulic elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130320 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: ZOOMLION HEAVY INDUSTRY SCIENCE & TECHNOLOGY CO., |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20140318 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B66C 23/32 20060101ALI20140312BHEP Ipc: B66C 23/62 20060101ALI20140312BHEP Ipc: B66C 23/28 20060101ALI20140312BHEP Ipc: B66C 13/20 20060101AFI20140312BHEP |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150107 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150519 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 754952 Country of ref document: AT Kind code of ref document: T Effective date: 20151015 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602011020702 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20151014 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 754952 Country of ref document: AT Kind code of ref document: T Effective date: 20151014 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160214 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160114 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160115 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602011020702 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
26N | No opposition filed |
Effective date: 20160715 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602011020702 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20160817 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160831 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160831 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20170428 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160817 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160831 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160817 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170301 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160817 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110817 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160831 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151014 |