EP2513418A1 - System, method and assembly for wellbore maintenance operations - Google Patents

System, method and assembly for wellbore maintenance operations

Info

Publication number
EP2513418A1
EP2513418A1 EP10842544A EP10842544A EP2513418A1 EP 2513418 A1 EP2513418 A1 EP 2513418A1 EP 10842544 A EP10842544 A EP 10842544A EP 10842544 A EP10842544 A EP 10842544A EP 2513418 A1 EP2513418 A1 EP 2513418A1
Authority
EP
European Patent Office
Prior art keywords
wellbore
production
drainage
fluid
wellbores
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP10842544A
Other languages
German (de)
French (fr)
Inventor
Mark D. Looney
Robert S. Lestz
Stephen David Cassidy
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chevron USA Inc
Original Assignee
Chevron USA Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron USA Inc filed Critical Chevron USA Inc
Publication of EP2513418A1 publication Critical patent/EP2513418A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Definitions

  • This invention relates to oil field production apparatus and techniques, and more particularly, to such apparatus and techniques, including wellbore maintenance operations, for use in the production of low pressure wells.
  • Rod pumps can be used to assist in lifting the production fluids, which are typically oil and water, to the surface. Pumps for artificial lift extend the field life by reducing the bottomhole pressure and thereby recovering more oil economically.
  • the bottom of the rod pumping string is placed above the producing interval in order to allow fluid separation and minimize the possibility of the string becoming stuck. Fluid levels should be above the pumping string intake to avoid “pounding the pump” which increases wear and reduces the life of the equipment. This in turn results in an increase of backpressure being placed on the reservoir due to the hydrostatic head. Minimizing this hydrostatic head would increase production rates and extend field life and reserves.
  • killing a well involves injecting a high density, typically water based, fluid into the production well to provide sufficient hydrostatic pressure to keep the well from flowing. Oftentimes this fluid is displaced into the reservoir.
  • rod pumps are used to keep water out of the reservoir as much as possible. If significant concentrations of water get into the reservoir, the pressure in the reservoir may not be high enough to move it back out. This often results in a significant effort to get these wells back producing. Sometimes the wells are never successfully returned to production.
  • a method of performing a wellbore maintenance operation includes providing a drainage wellbore and a production wellbore.
  • the drainage wellbore is perforated such that the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir.
  • the production wellbore is in fluid communication with the drainage wellbore, such as through a drainage string, so that the reservoir fluids received by the drainage wellbore flow to the production wellbore. Fluid is injected into the production wellbore until the flow of the reservoir fluids from the drainage wellbore to the production wellbore is stopped. Maintenance is then performed on the production wellbore.
  • fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. In one or more embodiments, fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
  • At least two drainage wellbores are provided and fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores. In one or more embodiments, fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
  • gas is injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore.
  • the reservoir fluids can then be produced from the production wellbore.
  • a method of performing a wellbore maintenance operation includes providing a system of wellbores including a drainage wellbore, a drainage string, and a production wellbore for producing reservoir fluids.
  • the drainage wellbore includes a perforation such that the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir.
  • the drainage string extends between the drainage wellbore and the production wellbore. Reservoir fluids received by the drainage wellbore flow through the drainage string to the production wellbore for production. A fluid is injected into the production wellbore until the hydrostatic pressure in the production wellbore is sufficient to stop the flow of the reservoir fluids received by the drainage wellbore from flowing to the production wellbore. Maintenance is then performed on the production wellbore.
  • fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. In one or more embodiments, fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
  • At least two drainage wellbores are provided and fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores. In one or more embodiments, fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
  • gas is injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore.
  • the reservoir fluids can then be produced from the production wellbore.
  • a method of performing a wellbore maintenance operation includes providing a drainage wellbore and a production wellbore.
  • the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir.
  • the production wellbore is in fluid communication with the drainage wellbore such that the reservoir fluids received by the drainage wellbore flow to the production wellbore.
  • a fluid is injected into the production wellbore until the hydrostatic pressure in the production wellbore is sufficient to stop the flow of the reservoir fluids received by the drainage wellbore from flowing to the production wellbore.
  • Maintenance is then performed on the production wellbore. Gas is then injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore.
  • the reservoir fluids are then produced from the production wellbore.
  • the drainage wellbore is in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. [0015] In one or more embodiments, the drainage wellbore is in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
  • At least two drainage wellbores are provided, each drainage wellbore being in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores.
  • At least two drainage wellbores are provided, each drainage wellbore being in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
  • Figure 1 is a schematic, sectional view of a prior art arrangement of production wells extending into a reservoir having hydrocarbons.
  • Figure 2 is a schematic, sectional view of an arrangement of wells extending into a reservoir having hydrocarbons according to an aspect of the present invention.
  • Figure 3 is a schematic, sectional view of the arrangement of Figure 2 for workover operations.
  • a plurality of production wells 11 are spaced for producing hydrocarbons from a reservoir 13.
  • Production wells are spaced in a typical five-spot producing pattern, as shown in Figure 1, for production of hydrocarbons from reservoir 13.
  • Each well 11 operates independently in the five-spot pattern shown in Figure 1.
  • Each well 11 typically comprises a plurality of casing strings inserted into the well after being drilled and then cemented into place.
  • the plurality of casing strings collectively define the outer boundary or outer casing 15 of well 11.
  • the plurality of casing strings of outer casing 15 are represented in Figure 1 as a single string of casing.
  • the outer casing is perforated. Forming perforations 17 allows fluid communication between oil sands 19 of reservoir 13 and the interior of well 11.
  • Each well 11 typically includes a string of production casing or tubing 21 that is carried within outer casing 15.
  • Tubing 21 has an opening for receiving production fluids (typically oil, water, and gas) at its lower end.
  • Packer seals 23 are positioned between production tubing 21 and casing 15 to force production fluids from reservoir 13 to flow through production tubing 21.
  • Pump assemblies 25 which have a rod pumping string positioned within production tubing 21, are used for communicating production fluids to the surface.
  • pump assemblies 25 can be used when the pressure associated with reservoir 13 is low and produced fluids do not flow to the surface. Pump assemblies 25 help to extend the life of wells 11.
  • the bottom of the rod pumping string of pump assembly 25 is positioned above "the producing interval" in order to allow initial fluid separation between the gas and liquid phases of the production fluids, and to minimize the possibility of the string becoming stuck. It is preferable that the fluid levels of the liquids in the production fluids remain above the pumping string intake to avoid “pounding the pump” which increases wear and reduces the life of the equipment. Maintaining the liquid levels of the production fluids above the intake of pump assembly 25 increases the hydrostatic head within production tubing 21 which in turn results in backpressure being placed on reservoir 13. Reducing this hydrostatic head can further increase production rates and extend field life associated with reservoir 13.
  • a plurality of drainage wellbores 27 extend to production depths within reservoir 13. Drainage wellbores 27 are spaced apart similar to the outer production wells 11 in the five-spot producing pattern of Figure 1. Drainage wellbores 27 have perforations 29 formed in the respective outer casings 31 for receiving production fluids from reservoir 13. Perforation 29 associated with one drainage wellbore 27 can be at a different reservoir depth from perforation 29 of another drainage wellbore 27 for optimal hydrocarbon production. Each drainage wellbore 27 also includes packer seal 32 positioned within casing 31 above perforation 29.
  • Production well 11 ' extends into reservoir 13 adjacent drainage wellbores 27.
  • Production well 11 ' is drilled and completed with substantially the same components as wells 11 in Figure 1, except that production well 11 ' extends deeper into reservoir 13 than drainage wellbores 27.
  • a plurality of drainage strings 33 extend between a lower end portion of production well 11 ' and drainage wellbores 27 so that production well 11 ' is in fluid communication with drainage wellbores 27. Because lower end portion of production well 11 ' is deeper than drainage wellbores 27, gravity helps production fluids from drainage wellbores 27 to collect within production well 11 ' for collection with pump assembly 25'.
  • Drainage strings 33 can be formed with directional drilling techniques when first drilling drainage wellbores 27 and production well 11 ', or with directional drilling between existing wells in an older field. Drainage strings 33 preferably comprise a string of casing or tubing that is installed after drilling.
  • pump assembly 25' is disposed within production well 11 '. Drainage wellbores 27 do not include pump assemblies 25'. This inherently reduces the amount of maintenance associated with the wells of the five-spot pattern shown in Figure 2. Moreover, this also helps to reduce the cost and maintenance associated with pump assemblies 25 (Figure 1) by only having a single pump assembly 25' ( Figure 2).
  • production well 11 ' is positioned in the center of drainage wellbores 27. However, production well 11 ' can be any of the positions in the five-spot pattern. Furthermore, drainage wells 27 and production well 11 ' can be in other production patterns.
  • packer seals 32 can be cheaper packer seals since there is not a string of production tubing being sealed between outer casing 31. This also provides for additional cost savings and reduction of maintenance.
  • production well 11 ' can be without any perforations 17 such that production well 11 ' is merely used for collecting and delivering production fluids from drainage wellbores 27.
  • Not having any perforations within production well 1 1 ' advantageously allows the rod pumping string of pump assembly 25' to be set below the perforations in all of the other connecting drainage wellbores 27. This achieves the lowest possible bottom-hole pressure in the connecting wells by having a fluid level below the perforations while still maintaining fluid level over the rod string entry. In such a system, higher production rates can be achieved and additional reserves can be realized.
  • FIG. 3 illustrates how the assembly of the present invention is advantageous during workover operations.
  • the pump rod string of pump assembly 25 ' is often removed. Additionally, pump rod string of pump assembly 25 ' can be removed for maintenance and repair of pump assembly 25', which is fairly routine.
  • Reducing backflow of water into reservoir 13 is important because if significant concentrations of water enter into reservoir 13, the pressure in reservoir 13 may not be high enough to move the water-based injected fluid back out. When the water-based injection fluid does flow into reservoir 13, this often results in a significant effort to get production well 11 producing again— sometimes production wells 11 are never successfully returned to production.
  • fluidly connected production well 11 ' and drainage wellbores 27 act as the closed end of a manometer.
  • fluid can be injected into the bore of production well 11 '.
  • the fluid compresses the separated gas above it in drainage wellbores 27.
  • fluid can be injected into production well 11 ' until the fluid level within production well 11 ' is at least above perforations 29 in all of drainage wellbores 27.
  • the hydrostatic pressure in production well 11 ' is balanced by the hydrostatic pressure of the fluid in drainage wellbores 27 plus the pressure of the compressed gas phase in drainage wellbores 27.
  • the fluid level in drainage wellbores 27 is lower than in production well 11 ', and the fluid can be kept below perforations 29.
  • the risk of the fluids flowing into reservoir 13 is significantly reduced. Therefore, maintenance and repairs can be performed while production well 11 ' is "killed," while reducing the difficulties with returning production well 11 ' to production.
  • returning production well 11 ' after maintenance is performed is simplified as gas can be injected into drainage wellbores 27 to push the fluid back up through production wellbore 11 '. Accordingly, this reduces the likelihood of the "kill" fluid from entering perforations 29 and allows the reservoir fluids received by drainage wellbore 29 to resume flowing to production wellbore 11 '. Accordingly, the reservoir fluids can then be produced again from the production wellbore.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Lubricants (AREA)
  • Prostheses (AREA)

Abstract

Methods for performing a wellbore maintenance operation on a system of wellbores used for improved oil recovery are disclosed. A plurality of wellbores are drilled and perforated to receive production fluids from a reservoir. The wellbores are fluidly connected to a production well that is drilled to a depth below the perforations of the wellbores. The production fluids drain and collect in the production well for delivery to the surface. A pump can be used for delivering the production fluids from the production well. During repair and maintenance operations, a fluid is injected into the production well for safely removing the pump components. The fluid is counterbalanced by the pressures in the connected wellbores such that the fluid does not rise above the perforations in the connected wellbores.

Description

SYSTEM, METHOD AND ASSEMBLY FOR
WELLBORE MAINTENANCE OPERATIONS
CROSS-REFERENCE TO A RELATED APPLICATION
[0001] The present application for patent claims the benefit of United States Provisional Application bearing Serial No. 61/286,520, filed on December 15, 2009, which is incorporated by reference in its entirety.
TECHNICAL FIELD
[0002] This invention relates to oil field production apparatus and techniques, and more particularly, to such apparatus and techniques, including wellbore maintenance operations, for use in the production of low pressure wells.
BACKGROUND
[0003] In a typical five-spot producing pattern, four production wells are spaced around a production well that is centrally located. Each well operates independently. Rod pumps can be used to assist in lifting the production fluids, which are typically oil and water, to the surface. Pumps for artificial lift extend the field life by reducing the bottomhole pressure and thereby recovering more oil economically. Typically the bottom of the rod pumping string is placed above the producing interval in order to allow fluid separation and minimize the possibility of the string becoming stuck. Fluid levels should be above the pumping string intake to avoid "pounding the pump" which increases wear and reduces the life of the equipment. This in turn results in an increase of backpressure being placed on the reservoir due to the hydrostatic head. Minimizing this hydrostatic head would increase production rates and extend field life and reserves.
[0004] During fairly routine well maintenance operations, wells are often "killed" in order to safely remove and repair the rod strings. Killing a well involves injecting a high density, typically water based, fluid into the production well to provide sufficient hydrostatic pressure to keep the well from flowing. Oftentimes this fluid is displaced into the reservoir. In low pressure gas wells, rod pumps are used to keep water out of the reservoir as much as possible. If significant concentrations of water get into the reservoir, the pressure in the reservoir may not be high enough to move it back out. This often results in a significant effort to get these wells back producing. Sometimes the wells are never successfully returned to production.
SUMMARY
[0005] According to an aspect of the present invention, a method of performing a wellbore maintenance operation is disclosed. The method includes providing a drainage wellbore and a production wellbore. The drainage wellbore is perforated such that the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir. The production wellbore is in fluid communication with the drainage wellbore, such as through a drainage string, so that the reservoir fluids received by the drainage wellbore flow to the production wellbore. Fluid is injected into the production wellbore until the flow of the reservoir fluids from the drainage wellbore to the production wellbore is stopped. Maintenance is then performed on the production wellbore.
[0006] In one or more embodiments, fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. In one or more embodiments, fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
[0007] In one or more embodiments, at least two drainage wellbores are provided and fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores. In one or more embodiments, fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
[0008] In one or more embodiments, gas is injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore. The reservoir fluids can then be produced from the production wellbore.
[0009] According to another aspect of the present invention, a method of performing a wellbore maintenance operation is disclosed. The method includes providing a system of wellbores including a drainage wellbore, a drainage string, and a production wellbore for producing reservoir fluids. The drainage wellbore includes a perforation such that the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir. The drainage string extends between the drainage wellbore and the production wellbore. Reservoir fluids received by the drainage wellbore flow through the drainage string to the production wellbore for production. A fluid is injected into the production wellbore until the hydrostatic pressure in the production wellbore is sufficient to stop the flow of the reservoir fluids received by the drainage wellbore from flowing to the production wellbore. Maintenance is then performed on the production wellbore.
[0010] In one or more embodiments, fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. In one or more embodiments, fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
[0011] In one or more embodiments, at least two drainage wellbores are provided and fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores. In one or more embodiments, fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
[0012] In one or more embodiments, gas is injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore. The reservoir fluids can then be produced from the production wellbore.
[0013] According to another aspect of the present invention, a method of performing a wellbore maintenance operation is disclosed. The method includes providing a drainage wellbore and a production wellbore. The drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir. The production wellbore is in fluid communication with the drainage wellbore such that the reservoir fluids received by the drainage wellbore flow to the production wellbore. A fluid is injected into the production wellbore until the hydrostatic pressure in the production wellbore is sufficient to stop the flow of the reservoir fluids received by the drainage wellbore from flowing to the production wellbore. Maintenance is then performed on the production wellbore. Gas is then injected into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore. The reservoir fluids are then produced from the production wellbore.
[0014] In one or more embodiments, the drainage wellbore is in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the elevation of the perforations in the drainage wellbore. [0015] In one or more embodiments, the drainage wellbore is in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid injection is stopped prior to the fluid reaching the perforations in the drainage wellbore.
[0016] In one or more embodiments, at least two drainage wellbores are provided, each drainage wellbore being in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid is injected into the production wellbore until the fluid level within the production wellbore is at an elevation above the perforations in the two drainage wellbores.
[0017] In one or more embodiments, at least two drainage wellbores are provided, each drainage wellbore being in fluid communication with the producing zone of the reservoir through a perforation in the drainage wellbore. Fluid injection is stopped prior to the fluid reaching any of the perforations in the two drainage wellbores.
BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is a schematic, sectional view of a prior art arrangement of production wells extending into a reservoir having hydrocarbons.
[0019] Figure 2 is a schematic, sectional view of an arrangement of wells extending into a reservoir having hydrocarbons according to an aspect of the present invention.
[0020] Figure 3 is a schematic, sectional view of the arrangement of Figure 2 for workover operations.
DETAILED DESCRIPTION
[0021] Referring to prior art Figure 1, a plurality of production wells 11 are spaced for producing hydrocarbons from a reservoir 13. Production wells are spaced in a typical five-spot producing pattern, as shown in Figure 1, for production of hydrocarbons from reservoir 13. Each well 11 operates independently in the five-spot pattern shown in Figure 1. Each well 11 typically comprises a plurality of casing strings inserted into the well after being drilled and then cemented into place. The plurality of casing strings collectively define the outer boundary or outer casing 15 of well 11. For ease of illustration, the plurality of casing strings of outer casing 15 are represented in Figure 1 as a single string of casing. After reaching the desired depth in reservoir 13, such that well 11 extends to oil sands 19 — a portion of a reservoir having hydrocarbons, the outer casing is perforated. Forming perforations 17 allows fluid communication between oil sands 19 of reservoir 13 and the interior of well 11.
[0022] Each well 11 typically includes a string of production casing or tubing 21 that is carried within outer casing 15. Tubing 21 has an opening for receiving production fluids (typically oil, water, and gas) at its lower end. Packer seals 23 are positioned between production tubing 21 and casing 15 to force production fluids from reservoir 13 to flow through production tubing 21.
[0023] Pump assemblies 25, which have a rod pumping string positioned within production tubing 21, are used for communicating production fluids to the surface. For example, pump assemblies 25 can be used when the pressure associated with reservoir 13 is low and produced fluids do not flow to the surface. Pump assemblies 25 help to extend the life of wells 11.
[0024] Typically the bottom of the rod pumping string of pump assembly 25 is positioned above "the producing interval" in order to allow initial fluid separation between the gas and liquid phases of the production fluids, and to minimize the possibility of the string becoming stuck. It is preferable that the fluid levels of the liquids in the production fluids remain above the pumping string intake to avoid "pounding the pump" which increases wear and reduces the life of the equipment. Maintaining the liquid levels of the production fluids above the intake of pump assembly 25 increases the hydrostatic head within production tubing 21 which in turn results in backpressure being placed on reservoir 13. Reducing this hydrostatic head can further increase production rates and extend field life associated with reservoir 13.
[0025] Referring to Figure 2, a plurality of drainage wellbores 27 extend to production depths within reservoir 13. Drainage wellbores 27 are spaced apart similar to the outer production wells 11 in the five-spot producing pattern of Figure 1. Drainage wellbores 27 have perforations 29 formed in the respective outer casings 31 for receiving production fluids from reservoir 13. Perforation 29 associated with one drainage wellbore 27 can be at a different reservoir depth from perforation 29 of another drainage wellbore 27 for optimal hydrocarbon production. Each drainage wellbore 27 also includes packer seal 32 positioned within casing 31 above perforation 29.
[0026] Production well 11 ' extends into reservoir 13 adjacent drainage wellbores 27. Production well 11 ' is drilled and completed with substantially the same components as wells 11 in Figure 1, except that production well 11 ' extends deeper into reservoir 13 than drainage wellbores 27. A plurality of drainage strings 33 extend between a lower end portion of production well 11 ' and drainage wellbores 27 so that production well 11 ' is in fluid communication with drainage wellbores 27. Because lower end portion of production well 11 ' is deeper than drainage wellbores 27, gravity helps production fluids from drainage wellbores 27 to collect within production well 11 ' for collection with pump assembly 25'. Drainage strings 33 can be formed with directional drilling techniques when first drilling drainage wellbores 27 and production well 11 ', or with directional drilling between existing wells in an older field. Drainage strings 33 preferably comprise a string of casing or tubing that is installed after drilling.
[0027] As shown in Figure 2, pump assembly 25' is disposed within production well 11 '. Drainage wellbores 27 do not include pump assemblies 25'. This inherently reduces the amount of maintenance associated with the wells of the five-spot pattern shown in Figure 2. Moreover, this also helps to reduce the cost and maintenance associated with pump assemblies 25 (Figure 1) by only having a single pump assembly 25' (Figure 2). In Figure 2, production well 11 ' is positioned in the center of drainage wellbores 27. However, production well 11 ' can be any of the positions in the five-spot pattern. Furthermore, drainage wells 27 and production well 11 ' can be in other production patterns. In the system of Figure 2, packer seals 32 can be cheaper packer seals since there is not a string of production tubing being sealed between outer casing 31. This also provides for additional cost savings and reduction of maintenance.
[0028] As shown in Figure 2, production well 11 ' can be without any perforations 17 such that production well 11 ' is merely used for collecting and delivering production fluids from drainage wellbores 27. Not having any perforations within production well 1 1 ' advantageously allows the rod pumping string of pump assembly 25' to be set below the perforations in all of the other connecting drainage wellbores 27. This achieves the lowest possible bottom-hole pressure in the connecting wells by having a fluid level below the perforations while still maintaining fluid level over the rod string entry. In such a system, higher production rates can be achieved and additional reserves can be realized.
[0029] Figure 3 illustrates how the assembly of the present invention is advantageous during workover operations. During workover operations on the well, the pump rod string of pump assembly 25 ' is often removed. Additionally, pump rod string of pump assembly 25 ' can be removed for maintenance and repair of pump assembly 25', which is fairly routine.
[0030] As previously described, to perform such operations in conventional well arrangements, such as production wells 11 shown in Figure 1, wells are often "killed" in order to safely pull the rod pumping string of pump assembly. "Killing" production well 11 (Figure 1), typically involves injecting a high density, typically water-based, fluid into production well 11. This provides sufficient hydrostatic pressure to keep production well 11 from flowing (i.e., cease flow of production fluids into production well 11 through perforations 17). It is common for the injected fluid used for "killing" well 11 to get displaced into reservoir 13. In low pressure gas wells, such as production wells 11 shown in Figure 1 and production well 11 ' shown in Figure 2, pump assemblies 25,25' are used to keep water out of reservoir 13 as much as possible. Reducing backflow of water into reservoir 13 is important because if significant concentrations of water enter into reservoir 13, the pressure in reservoir 13 may not be high enough to move the water-based injected fluid back out. When the water-based injection fluid does flow into reservoir 13, this often results in a significant effort to get production well 11 producing again— sometimes production wells 11 are never successfully returned to production.
[0031] According to a method of the present invention, fluidly connected production well 11 ' and drainage wellbores 27 act as the closed end of a manometer. In order to "kill" production well 11 ' and drainage wellbores 27, fluid can be injected into the bore of production well 11 '. As the fluid level of the injected fluid and the produced fluid collecting in production well 11 ', drainage wellbores 27, and drainage strings 33 rises, the fluid compresses the separated gas above it in drainage wellbores 27. As seen in Figure 3, fluid can be injected into production well 11 ' until the fluid level within production well 11 ' is at least above perforations 29 in all of drainage wellbores 27. The hydrostatic pressure in production well 11 ' is balanced by the hydrostatic pressure of the fluid in drainage wellbores 27 plus the pressure of the compressed gas phase in drainage wellbores 27. As a result, the fluid level in drainage wellbores 27 is lower than in production well 11 ', and the fluid can be kept below perforations 29. With the fluid (produced fluid and the water-based injected fluid) being below perforations 29, the risk of the fluids flowing into reservoir 13 is significantly reduced. Therefore, maintenance and repairs can be performed while production well 11 ' is "killed," while reducing the difficulties with returning production well 11 ' to production.
[0032] Moreover, returning production well 11 ' after maintenance is performed is simplified as gas can be injected into drainage wellbores 27 to push the fluid back up through production wellbore 11 '. Accordingly, this reduces the likelihood of the "kill" fluid from entering perforations 29 and allows the reservoir fluids received by drainage wellbore 29 to resume flowing to production wellbore 11 '. Accordingly, the reservoir fluids can then be produced again from the production wellbore.
[0033] While the invention has been shown in only some of its forms, it should be apparent to those skilled in the art that it is not so limited, but susceptible to various changes without departing from the scope of the invention.

Claims

WHAT IS CLAIMED IS:
1. A method of performing a wellbore maintenance operation, the method comprising:
(a) providing a drainage wellbore that is perforated with a perforation such that the drainage wellbore receives reservoir fluids from a producing zone of a subterranean reservoir;
(b) providing a production wellbore in fluid communication with the drainage wellbore such that the reservoir fluids received by the drainage wellbore flow to the production wellbore;
(c) injecting fluid into the production wellbore until the flow of the reservoir fluids from the drainage wellbore to the production wellbore is stopped; and
(d) performing maintenance on the production wellbore.
2. The method of claim 1, wherein the production wellbore is in fluid communication with the drainage wellbore through a drainage string that extends between the lower portions of the drainage wellbore and the production wellbore.
3. The method of claim 1, wherein the fluid is injected into the production wellbore in step (b) until the fluid level within the production wellbore is at an elevation above the elevation of the perforation in the drainage wellbore.
4. The method of claim 1, wherein the injecting of the fluid into the production wellbore in step (b) is stopped prior to the fluid level reaching the perforation in the drainage wellbore.
5. The method of claim 1, wherein:
at least two drainage wellbores are provided in step (a); and the fluid is injected into the production wellbore in step (b) until the fluid level within the production wellbore is at an elevation above the perforations in the at least two drainage wellbores.
6. The method of claim 1, wherein:
at least two drainage wellbores are provided in step (a); and
the injecting of the fluid into the production wellbore in step (b) is stopped prior to the fluid level reaching any of the perforations in the at least two drainage wellbores.
7. The method of claim 1, further comprising:
(e) injecting a gas into the drainage wellbore to force the fluid back up through production wellbore and allow the reservoir fluids received by the drainage wellbore to flow to the production wellbore; and
(f) producing the reservoir fluids from the production wellbore.
8. The method of claim 1, wherein the fluid is injected into the production wellbore in step (b) until the hydrostatic pressure in the production wellbore is sufficient to stop the flow of the reservoir fluids from the drainage wellbore to the production wellbore.
EP10842544A 2009-12-15 2010-12-15 System, method and assembly for wellbore maintenance operations Withdrawn EP2513418A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US28652009P 2009-12-15 2009-12-15
PCT/US2010/060541 WO2011084497A1 (en) 2009-12-15 2010-12-15 System, method and assembly for wellbore maintenance operations

Publications (1)

Publication Number Publication Date
EP2513418A1 true EP2513418A1 (en) 2012-10-24

Family

ID=44305708

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10842544A Withdrawn EP2513418A1 (en) 2009-12-15 2010-12-15 System, method and assembly for wellbore maintenance operations

Country Status (6)

Country Link
US (1) US20110203792A1 (en)
EP (1) EP2513418A1 (en)
CN (1) CN102741500A (en)
CA (1) CA2784496A1 (en)
EA (1) EA201290503A1 (en)
WO (1) WO2011084497A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016019427A1 (en) * 2014-08-04 2016-02-11 Leap Energy Australia Pty Ltd A well system
US11629576B2 (en) 2020-02-10 2023-04-18 Chevron U.S.A. Inc. Multi-lateral well heel to toe development optimization
US11156073B2 (en) 2020-02-28 2021-10-26 Saudi Arabian Oil Company Drilling wellbores in a multilayered reservoir

Family Cites Families (58)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2584605A (en) * 1948-04-14 1952-02-05 Edmund S Merriam Thermal drive method for recovery of oil
US2670802A (en) * 1949-12-16 1954-03-02 Thermactor Company Reviving or increasing the production of clogged or congested oil wells
US2777679A (en) * 1952-03-07 1957-01-15 Svenska Skifferolje Ab Recovering sub-surface bituminous deposits by creating a frozen barrier and heating in situ
US3513913A (en) * 1966-04-19 1970-05-26 Shell Oil Co Oil recovery from oil shales by transverse combustion
US3513914A (en) * 1968-09-30 1970-05-26 Shell Oil Co Method for producing shale oil from an oil shale formation
US3537529A (en) * 1968-11-04 1970-11-03 Shell Oil Co Method of interconnecting a pair of wells extending into a subterranean oil shale formation
US3888307A (en) * 1974-08-29 1975-06-10 Shell Oil Co Heating through fractures to expand a shale oil pyrolyzing cavern
US3957116A (en) * 1975-05-19 1976-05-18 Cities Service Company Fluid flow control in waterflood
US4147211A (en) * 1976-07-15 1979-04-03 Union Oil Company Of California Enhanced oil recovery process utilizing a plurality of wells
US4113314A (en) * 1977-06-24 1978-09-12 The United States Of America As Represented By The Secretary Of The Interior Well perforating method for solution well mining
US4445574A (en) * 1980-03-24 1984-05-01 Geo Vann, Inc. Continuous borehole formed horizontally through a hydrocarbon producing formation
US4334580A (en) * 1980-03-24 1982-06-15 Geo Vann, Inc. Continuous borehole formed horizontally through a hydrocarbon producing formation
US4390067A (en) * 1981-04-06 1983-06-28 Exxon Production Research Co. Method of treating reservoirs containing very viscous crude oil or bitumen
US4399866A (en) * 1981-04-10 1983-08-23 Atlantic Richfield Company Method for controlling the flow of subterranean water into a selected zone in a permeable subterranean carbonaceous deposit
US4448252A (en) * 1981-06-15 1984-05-15 In Situ Technology, Inc. Minimizing subsidence effects during production of coal in situ
US4422505A (en) * 1982-01-07 1983-12-27 Atlantic Richfield Company Method for gasifying subterranean coal deposits
US4545435A (en) * 1983-04-29 1985-10-08 Iit Research Institute Conduction heating of hydrocarbonaceous formations
EP0251881B1 (en) * 1986-06-26 1992-04-29 Institut Français du Pétrole Enhanced recovery method to continually produce a fluid contained in a geological formation
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5054551A (en) * 1990-08-03 1991-10-08 Chevron Research And Technology Company In-situ heated annulus refining process
US5450902A (en) * 1993-05-14 1995-09-19 Matthews; Cameron M. Method and apparatus for producing and drilling a well
US5709505A (en) * 1994-04-29 1998-01-20 Xerox Corporation Vertical isolation system for two-phase vacuum extraction of soil and groundwater contaminants
US5669444A (en) * 1996-01-31 1997-09-23 Vastar Resources, Inc. Chemically induced stimulation of coal cleat formation
US6729394B1 (en) * 1997-05-01 2004-05-04 Bp Corporation North America Inc. Method of producing a communicating horizontal well network
US6280000B1 (en) * 1998-11-20 2001-08-28 Joseph A. Zupanick Method for production of gas from a coal seam using intersecting well bores
US6681855B2 (en) * 2001-10-19 2004-01-27 Cdx Gas, L.L.C. Method and system for management of by-products from subterranean zones
US6425448B1 (en) * 2001-01-30 2002-07-30 Cdx Gas, L.L.P. Method and system for accessing subterranean zones from a limited surface area
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US7073595B2 (en) * 2002-09-12 2006-07-11 Cdx Gas, Llc Method and system for controlling pressure in a dual well system
US7048049B2 (en) * 2001-10-30 2006-05-23 Cdx Gas, Llc Slant entry well system and method
US6679322B1 (en) * 1998-11-20 2004-01-20 Cdx Gas, Llc Method and system for accessing subterranean deposits from the surface
US6598686B1 (en) * 1998-11-20 2003-07-29 Cdx Gas, Llc Method and system for enhanced access to a subterranean zone
US6662870B1 (en) * 2001-01-30 2003-12-16 Cdx Gas, L.L.C. Method and system for accessing subterranean deposits from a limited surface area
CA2277528C (en) * 1999-07-16 2007-09-11 Roman Bilak Enhanced oil recovery methods
AU2002257221B2 (en) * 2001-04-24 2008-12-18 Shell Internationale Research Maatschappij B.V. In situ recovery from a oil shale formation
US6550542B2 (en) * 2001-07-17 2003-04-22 Conocophillips Company Fluid profile control in enhanced oil recovery
US7165615B2 (en) * 2001-10-24 2007-01-23 Shell Oil Company In situ recovery from a hydrocarbon containing formation using conductor-in-conduit heat sources with an electrically conductive material in the overburden
US7360595B2 (en) * 2002-05-08 2008-04-22 Cdx Gas, Llc Method and system for underground treatment of materials
US6725922B2 (en) * 2002-07-12 2004-04-27 Cdx Gas, Llc Ramping well bores
US7025137B2 (en) * 2002-09-12 2006-04-11 Cdx Gas, Llc Three-dimensional well system for accessing subterranean zones
US8333245B2 (en) * 2002-09-17 2012-12-18 Vitruvian Exploration, Llc Accelerated production of gas from a subterranean zone
US7264048B2 (en) * 2003-04-21 2007-09-04 Cdx Gas, Llc Slot cavity
US7073577B2 (en) * 2003-08-29 2006-07-11 Applied Geotech, Inc. Array of wells with connected permeable zones for hydrocarbon recovery
US20050045336A1 (en) * 2003-08-29 2005-03-03 Kirby Hayes Propellant treatment and continuous foam removal of well debris
US7100687B2 (en) * 2003-11-17 2006-09-05 Cdx Gas, Llc Multi-purpose well bores and method for accessing a subterranean zone from the surface
US7222670B2 (en) * 2004-02-27 2007-05-29 Cdx Gas, Llc System and method for multiple wells from a common surface location
US20050051326A1 (en) * 2004-09-29 2005-03-10 Toothman Richard L. Method for making wells for removing fluid from a desired subterranean
CN101099024B (en) * 2004-11-19 2012-05-30 哈利伯顿能源服务公司 Methods and apparatus for drilling, completing and configuring u-tube boreholes
MX2007008515A (en) * 2005-01-14 2007-11-09 Halliburton Energy Serv Inc System and method for producing fluids from a subterranean formation.
US7493951B1 (en) * 2005-11-14 2009-02-24 Target Drilling, Inc. Under-balanced directional drilling system
US7540324B2 (en) * 2006-10-20 2009-06-02 Shell Oil Company Heating hydrocarbon containing formations in a checkerboard pattern staged process
WO2008115359A1 (en) * 2007-03-22 2008-09-25 Exxonmobil Upstream Research Company Granular electrical connections for in situ formation heating
US7631706B2 (en) * 2007-07-17 2009-12-15 Schlumberger Technology Corporation Methods, systems and apparatus for production of hydrocarbons from a subterranean formation
RU2475632C2 (en) * 2007-10-31 2013-02-20 Шелл Интернэшнл Рисерч Маатсхаппий Б.В. Oil and/or gas extraction method and system (versions)
US20090211757A1 (en) * 2008-02-21 2009-08-27 William Riley Utilization of geothermal energy
US8171999B2 (en) * 2008-05-13 2012-05-08 Baker Huges Incorporated Downhole flow control device and method
US20100170672A1 (en) * 2008-07-14 2010-07-08 Schwoebel Jeffrey J Method of and system for hydrocarbon recovery
CN102428252B (en) * 2009-05-15 2015-07-15 美国页岩油有限责任公司 In situ method and system for extraction of oil from shale

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2011084497A1 *

Also Published As

Publication number Publication date
CN102741500A (en) 2012-10-17
EA201290503A1 (en) 2012-12-28
WO2011084497A1 (en) 2011-07-14
US20110203792A1 (en) 2011-08-25
CA2784496A1 (en) 2011-07-14

Similar Documents

Publication Publication Date Title
US8006756B2 (en) Gas assisted downhole pump
US5402851A (en) Horizontal drilling method for hydrocarbon recovery
US6237691B1 (en) Method and apparatus for increasing fluid recovery from a subterranean formation
RU2328590C1 (en) Separate maintenance process for injection or production well and implementation variants
US20030141073A1 (en) Advanced gas injection method and apparatus liquid hydrocarbon recovery complex
RU2007148901A (en) CAVITY DRILLING SYSTEM
US20060169458A1 (en) Pumping system and method for recovering fluid from a well
US20110203792A1 (en) System, method and assembly for wellbore maintenance operations
US11613982B2 (en) Horizontal wellbore separation systems and methods
CA2865786C (en) Subsurface well systems with multiple drain wells extending from a production well and methods for use thereof
RU2738615C1 (en) Method for simultaneous separate production of oil from two formations of one well by production string
RU2232263C2 (en) Method for extracting of high-viscosity oil
US20170191355A1 (en) Two-step artificial lift system and method
RU2680158C1 (en) Method of formation geomechanical impact
RU106649U1 (en) TECHNOLOGICAL LAYOUT FOR WELL DEVELOPMENT
WO2010016767A2 (en) Subsurface reservoir drainage system
CA2911615C (en) Method of enhanced oil recovery from lateral wellbores
CA2125355C (en) Horizontal drilling method for hydrocarbon recovery
CA2847341A1 (en) Artificial lift system
RU2780980C1 (en) Method for developing an oil deposit of a mature field
RU2539060C1 (en) Recovery of self-squeezing gas well with abnormally low seam pressure
US20220298900A1 (en) Gravity Assisted Reservoir Drainage Systems and Methods
RU2054528C1 (en) Method for separated lifting of products of producing wells
RU2097534C1 (en) Method of well reconditioning
Zulkipli et al. Application of Hydraulic Jet Pump Technology in MEL Field

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120709

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20150701

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230522