EP2151030A1 - Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method - Google Patents

Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method

Info

Publication number
EP2151030A1
EP2151030A1 EP08760204A EP08760204A EP2151030A1 EP 2151030 A1 EP2151030 A1 EP 2151030A1 EP 08760204 A EP08760204 A EP 08760204A EP 08760204 A EP08760204 A EP 08760204A EP 2151030 A1 EP2151030 A1 EP 2151030A1
Authority
EP
European Patent Office
Prior art keywords
current
saturation
value
measured values
measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP08760204A
Other languages
German (de)
French (fr)
Inventor
Ludwig Schiel
Waldemar Rebizant
Andrzej Wiszniewski
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of EP2151030A1 publication Critical patent/EP2151030A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/04Arrangements for preventing response to transient abnormal conditions, e.g. to lightning or to short duration over voltage or oscillations; Damping the influence of dc component by short circuits in ac networks
    • H02H1/046Arrangements for preventing response to transient abnormal conditions, e.g. to lightning or to short duration over voltage or oscillations; Damping the influence of dc component by short circuits in ac networks upon detecting saturation of current transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • H02H1/0092Details of emergency protective circuit arrangements concerning the data processing means, e.g. expert systems, neural networks

Definitions

  • the invention relates to a method for correcting a saturation-impaired secondary current profile of a current transformer, in which measured values of the secondary current profile of the current transformer are detected.
  • the sensed readings are checked for saturation interference, and if there is a saturation fault, a start time is determined indicating the onset of saturation.
  • the measured values recorded after the start time are corrected while compensating the disturbance.
  • the invention also relates to an electric field device having a measured value detection device which is set up to detect measured values of a secondary current profile of a current transformer.
  • Electric current transformers are often used in measured value detection in electrical energy supply networks, such as high and medium voltage networks, in order to convert comparatively high alternating electrical currents into lower alternating electrical currents, so that they can be processed by electrical devices, such as electric field devices in the form of protective devices or measuring devices .
  • Conventional electric current transformers in this case comprise a converter core of a magnetizable material (for example iron or steel), which is in magnetic interaction with a primary conductor and a secondary conductor.
  • a core is formed as a so-called ring core, which forms a ring around the Primary conductor forms.
  • the secondary conductor is wound in this case with a certain number of windings around the converter core.
  • the primary conductor is of the comparatively high
  • measured values of the secondary current can serve as current measured values for an electrical differential protection device for monitoring a section of an electrical energy supply network in order to be compared there with current measured values of at least one second differential protection device. The comparison shows that a difference between the respective
  • the invention has for its object to provide a comparatively simple method for correcting a disturbed by saturation secondary current waveform of a current transformer, on the one hand with comparatively low
  • Calculation effort can be performed and on the other hand, without the need of knowledge of a valid for the corresponding current transformer characteristic can be performed.
  • the invention is based on the further object of providing a correspondingly configured field device.
  • This object is achieved with regard to the method according to the invention by a method of the type mentioned in the characteristic values of the secondary current profile are determined in the absence of saturation on the basis of measured values that were detected before the start time and using the specific characteristic parameters, a correct course of calculated after the start time measured values.
  • the method according to the invention advantageously makes use of parameters derived from the unsaturated course of the measured values of the secondary current before the starting time, there is no need to use characteristic curves tailored specifically to the corresponding current transformer. Furthermore, no complicated calculation steps for carrying out the method, since only the corresponding parameters must be determined.
  • DC component of the secondary current waveform can be determined.
  • the effect is advantageously exploited that in many cases, the course of high currents, for example caused by a fault on the primary side of the current transformer, can be represented as a superposition of a fundamental with a DC component.
  • an amplitude and, as characteristic parameters of the DC component, a time constant describing an exponential component of the DC component and / or an initial value of the exponential component are determined as the characteristic parameter of the fundamental component.
  • a further advantageous embodiment of the method according to the invention provides that at least two future values are formed using measured values recorded before the start time, which indicate an expected course of the secondary current after the starting time. In this way, the unsaturated course of the secondary current measured values can be artificially extended into the saturated course by forming the future values.
  • a protection algorithm can work in a protective device which depends on a certain minimum number of correct current transformer measured values for correct functioning.
  • a protective device which depends on a certain minimum number of correct current transformer measured values for correct functioning.
  • the characteristic parameters of the secondary current profile in the absence of saturation on the basis of measured values which were acquired before the start time and the future values.
  • the characteristic parameters of the secondary current profile can be determined even with comparatively few measured values lying in the unsaturated region (ie before the starting time).
  • a first difference value between a current measured value and a predicted value is determined for checking the measured values for the presence of a disturbance due to saturation, the predicted value determining an expected course of the secondary current using at least two indicates a current measured value of immediately preceding measured values, and a first saturation suspected signal is generated if the first difference value corresponds to or exceeds a first current threshold value.
  • a saturation signal indicative of the presence of a perturbation by saturation is generated when the first suspect signal is present.
  • the first difference value between the current measured value and the predicted value is also compared with a second current threshold value, wherein the second current threshold value is selected as a function of a nominal current for which the Current transformer is designed, and a second suspected saturation signal is generated when the first difference value is equal to or exceeds the second current threshold.
  • the saturation signal is generated only when the second suspected saturation signal is present.
  • the saturation signal is only generated if the third suspected saturation signal is present.
  • the predicted value is compared with a third current threshold value and a fourth saturation suspected signal is generated if the magnitude of the predicted value lies above the third current threshold value.
  • the saturation signal is generated only when the fourth suspected saturation signal is present.
  • the difference value between the current measured value and the predicted value is also compared with a fourth current threshold value, wherein the fourth current threshold value is selected as a function of a nominal current for which the current transformer is designed.
  • the prediction value is compared with a fifth current threshold. A saturation return signal is generated when the difference value is equal to fourth current threshold or exceeds and the predicted value is less than the fifth current threshold. The saturation signal is blocked when the saturation return signal is present.
  • a further advantageous embodiment of the method according to the invention also provides that the presence of the saturation signal is monitored to determine the starting time.
  • the start time is when the saturation signal is present for the first time.
  • the start time can also be determined such that for determining the start time, which indicates the beginning of the saturation, a second difference value between the magnitude of the current measurement value and the amount of an estimated value is determined, the estimated value of an expected course of the secondary current using at least indicates three measured values immediately preceding the current measured value. The start time is present when the second difference value exceeds a sixth current threshold. By using at least three preceding measured values, the instant of the current transformer saturation can be determined comparatively accurately. In this context, it can also be provided that the estimated value indicates an expected course of the secondary current using four measured values immediately preceding the current measured value.
  • an end time which indicates the end of saturation is also determined and the correction of the measured values acquired after the start time is terminated with the measured value which coincides with the end time.
  • a defined end time is determined for the correction of the saturation-disturbed measured values; the measured values recorded after that are no longer disturbed by saturation, so that no correction is necessary.
  • a temporal integral over the detected course of the measured values of the secondary current is formed to determine the end time, wherein the integration begins with the measured value at which the starting time has been determined and ends with the current measured value.
  • the end time is when the integral is zero. This makes it possible to set the end time with relatively simple calculation steps.
  • an electric field device of the type mentioned which is a
  • Embodiments is set up.
  • FIG. 1 shows a schematic representation of a toroidal-core current transformer
  • FIG. 2 shows a diagram with the time profile of a secondary current which is disturbed by current transformer saturation
  • Figure 3 is a schematic representation of one with a portion of an electrical
  • FIG. 4 shows a process flow diagram for explaining a first exemplary embodiment of a method for correcting measured values of a secondary flow
  • FIG. 5 shows a further process flow diagram for explaining a second exemplary embodiment of a method for correcting measured values of a secondary current
  • FIG. 6 shows a first logic flow diagram for explaining the detection of a current transformer saturation
  • FIG. 7 shows a second logic flow diagram for explaining the detection of a current transformer saturation
  • Figure 8 is a diagram with a time course through
  • Figure 9 is a diagram with the time course through
  • Figure 10 is a diagram with the time course through
  • Figure 11 is a diagram with the time course through
  • FIG. 1 shows a schematic representation of a current transformer 10 in the form of a toroidal-core current transformer.
  • An electrical primary conductor 11 for example a section of an electrical high-voltage line of an electrical energy supply network, carries a primary current ii (t) in the form of an alternating electrical current.
  • the primary conductor 11 is passed through a formed as a ring current transformer core 12.
  • the current transformer core consists of a magnetizable material, such as iron or steel.
  • electrical windings 13 of a secondary conductor 14 are wound.
  • the secondary conductor 14 is connected via contacts 15 to a measured value detection device 16, through which a secondary current i 2 (t) flows in the form of an alternating current.
  • the magnetic flux in the current transformer core 12 follows the electrical current flow ii (t) through the primary conductor 11 in a proportional manner, which in turn is proportional to the magnetic flux
  • Secondary current i 2 (t) is induced in the secondary conductor 14, which is lower than the primary current ii (t) according to the transformer transmission ratio. Consequently, the secondary current i 2 (t) under normal operating conditions of the current transformer 10 is a proportional mapping of the primary current ii (t).
  • the current transformer core 12 falls into a so-called saturation state.
  • the saturation state of the current transformer core 12 the secondary current i 2 (t) no longer represents a proportional mapping of the primary current ii (t), so that the secondary current profile through the secondary conductor 14 is disturbed by the current transformer saturation.
  • the measured values of the secondary current i 2 (t) recorded with the measured-value acquisition device 16 thus represent correspondingly disturbed or falsified measured values which do not reflect the correct course of the primary current ii (t).
  • electrical devices such as electrical measuring devices or protective devices for monitoring an electrical energy supply network
  • malfunctions are caused in the worst case.
  • an electrical protective device this may for example lead to an unwanted shutdown of a part of the electrical energy supply network.
  • FIG. 2 shows a diagram in which the course of a saturation-impaired secondary current i 2 (t) of a current transformer over the time t is shown in a solid line.
  • the time course of the secondary current i 2 (t) is shown in dashed line in the case that there would be no current transformer saturation. It can be seen at a time tstarti the beginning of a first disturbed by current transformer saturation secondary current waveform , which ends at time t Eride i.
  • the end time of the first current transformer saturation t Eride i is followed by an unsaturated curve of the secondary current i 2 (t) until the time t sta r t 2 a second secondary current waveform disturbed by current transformer saturation begins, which ends at the time t Ende2 .
  • the measured values of the secondary current ⁇ 2 (t) detected during these periods may not be considered in its distorted shape during further processing but must be corrected accordingly.
  • FIG. 3 shows a section 30 of an otherwise not further illustrated electrical energy supply network.
  • An electrical protection device 31 is connected to a measuring input 32 via a current transformer 33 shown in Figure 3 only as a symbol with the portion 30 of the electrical
  • the electrical protection device 31 detects the secondary current ⁇ 2 (t) in analog form.
  • the secondary current ⁇ 2 (t) is sampled with an analog-to-digital converter 34 and converted into digital measured values i (n), wherein the index "n" to
  • the measured values i (n) are fed to a data processing device 35 of the electrical protection device 31, which is determined on the basis of the measured values i (n). (and possibly also other measured values not shown in FIG. 3) makes a decision about the state of the section 30 of the electrical energy supply network.
  • the data processing device 35 If the data processing device 35 detects an error on the section 30 of the electrical energy supply network, the data processing device 35 outputs a trigger signal "TRIP" via a trip output 36 to a power switch 37, which is thereby caused to open its switch contacts and thus the section 30 of the electrical power supply network separated from the rest of the power grid.
  • a trigger signal "TRIP” via a trip output 36 to a power switch 37, which is thereby caused to open its switch contacts and thus the section 30 of the electrical power supply network separated from the rest of the power grid.
  • the data processing device 35 of the electrical protection device 31 In order not to obtain unwanted false tripping of the circuit breaker 37 due to measured values i (n) which are disturbed by current transformer saturation, the data processing device 35 of the electrical protection device 31 also monitors the measured values i (n) for a disturbance due to current transformer saturation. In the event of such a fault, the affected measured values i (n) are correspondingly corrected in order to compensate for the disturbance due to current transformer saturation.
  • an electrical protective device 31 has been referred to by way of example in FIG. 3, another electric power may instead be provided to the section 30 of the electrical power supply network
  • Field device such as a meter or a so-called power quality device for monitoring the
  • Electric power quality of electric power in the section 30, be connected.
  • FIG. 4 shows a process flow diagram for explaining a first exemplary embodiment of a method for correcting a saturation-impaired secondary current profile of a current transformer.
  • a first step 40 is a Secondary current i 2 (t) detected via the current transformer.
  • the detected secondary current i 2 (t) is converted in a second step 41 with an analog / digital converter (for example the analog / digital converter 34 in FIG. 3) into digital measured values i (n).
  • an analog / digital converter for example the analog / digital converter 34 in FIG. 3
  • a further step 42 checks whether there is a disturbance due to current transformer saturation. If this is not the case, then the next following measured value is detected from the secondary current i 2 (t), as indicated by the expression "i (n + 1)" In step 43. This next following measured value is again referred to as current measured value i (n) treated according to step 41 and checked in step 42 for a disturbance by current transformer saturation.
  • step 44 If it is detected in step 42 that there is a disturbance due to current transformer saturation, then in step 44 a starting time t S tart is determined, which indicates the beginning of the current transformer saturation. In a further step 45, characteristic parameters of the secondary current profile are determined in the absence of saturation on the basis of measured values which lie before the starting time ts ta r t ⁇ in the unsaturated region. Using these characteristic parameters, a correction of the current measured value is then carried out in step 46.
  • step 47 it is subsequently checked whether an end of the disturbance by current transformer saturation has already been reached. If this is not the case, then - as indicated by step 48 with the formulation "i (n + l) -- - the next following measured value is detected from the secondary current i 2 (t) and determined using step 45 characteristic parameters of a correction in step 46.
  • step 47 If the check in step 47 shows that an end of the disturbance by saturation has been reached, then a
  • step 49 gives the end of the explained method with respect to the recognized one
  • the method then begins to detect a next disturbance due to CT saturation again at step 41 with the acquisition of the next current measured value i (n).
  • the method illustrated in FIG. 4 for correcting a saturation-impaired secondary current profile can be carried out in real time with a data processing device which has corresponding computing power, since each measured value which is disturbed by current transformer saturation is immediately subjected to a correction.
  • a buffer memory can be used, which temporarily stores the recorded measured values.
  • the second exemplary embodiment of a method for correcting a secondary current profile that is disturbed by current transformer saturation illustrated in the further process flow diagram of FIG. 5 represents a method that is not performed in real time.
  • This exemplary embodiment of the method can also be carried out with data processing devices having a lower computing power, provided that a certain delay in the correction of the measured values can be accepted. This is the case, for example, with power quality Devices of the case, since deviating from a protective device usually no time-critical decision on a safety state of the electrical energy supply network must be made.
  • step 50 After the determination of the characteristic parameters in step 45, according to the exemplary embodiment in FIG. 5, it is first checked in a following step 50 whether the disturbance is terminated by current transformer saturation. If this is not the case, then, as indicated by step 51, the next measured value is recorded and, in turn, then checked in step 50 whether there is an end to the disturbance due to current transformer saturation.
  • step 50 If the end of the fault is detected by current transformer saturation in step 50, the end time t E n de is determined. Only then, in step 52, are all the measured values recorded between the start time tstart and the end time t E subjected to a correction.
  • the exemplary embodiment according to FIG. 5 thus differs from the exemplary embodiment according to FIG. 4 in that first the end time t Eride is awaited and only then in a common correction step are all measured values recorded between the start time and the end time corrected. After the correction made in step 52, the process with respect to the detected fault ends in step 53, and the method begins again on the next measured value in order to be able to recognize the next disturbance due to current transformer saturation.
  • Secondary current waveform ⁇ 2 (t) is checked to see if it is corrupted by a disturbance due to CT saturation.
  • a logic diagram of the procedure for checking for disturbance due to current transformer saturation is shown in FIG.
  • the diagram shown in Figure 8 can be used, in which a disturbed by current transformer saturation secondary current waveform ⁇ 2 (t) over the time t is plotted.
  • the dashed line the (expected) unsaturated course of the secondary flow is shown for comparison, while in a solid line the disturbed by saturation course of the secondary flow is shown.
  • the respectively current measured value i (n) is provided for checking for disturbance due to current transformer saturation.
  • the current measured value i (n) is fed to a first threshold element 61.
  • this threshold member is first a first difference value as an amount of the difference between the current measured value i (n) and a predicted value i e (n), which determines an expected course of the secondary current using at least two measured values i (nl) and i (i) directly preceding the current measured value i (n) n-2).
  • This first difference value is compared with a first threshold value SW 1 such that the condition results according to the following equation (1).
  • the predicted value i e (n) is determined on the assumption that, given a sufficiently small time interval between the samples of the measured values i (n), the slope of the secondary current profile between two sampled values virtually does not change and consequently the first time derivative of the curve is constant.
  • the following equation (2) is used to calculate the predicted value i e (n) under this assumption.
  • the threshold SW 1 used in the threshold 61 may have any predetermined value.
  • the threshold value SW 1 for the evaluation of the current sample value i (n) depends on the height of the sample value i (nl) immediately preceding the current sample value i (n). This ensures that, in cases of very high measured values, a correspondingly high threshold SW 1 is also used.
  • the threshold value SWi the following equation (3) is accordingly proposed
  • Threshold SW 1 is equal to or greater than this, a first suspected saturation signal V 1 is generated and a saturation signal S indicative of saturation is generated in block 62 when the first suspect signal V 1 is present.
  • the current measured value i (n) is first provided in block 70.
  • the first threshold member 71 is already in connection with 6, which leads to the generation of the first suspected saturation signal Vi.
  • this first suspected saturation signal Vi is now supplied to an input of a first AND element 72.
  • the second threshold SW 2 is preferably in
  • a threshold value SW 2 defined as a function of the rated current
  • relatively high deviations of the current measured value i (n) from the predicted value i e (n) can be detected relative to the rated current of the current transformer; at a such a deviation, the probability of CT saturation is comparatively high.
  • Block 74 then emits a third suspected saturation signal V3 at its output if no sign change has taken place, that is, the current measured value i (n) and the immediately preceding measured value i (n-1) have the same sign.
  • the third suspected saturation signal V3 is supplied to a further input of the first AND gate 72.
  • a third threshold module 75 it is possible to check whether the magnitude of the predicted value i e (n) lies above a third threshold value SW 3 , as shown in equation (7) below.
  • a threshold value can be selected according to the following equation (8), so that the third threshold value SW 3 can also be determined as a function of the nominal current I nominal of the current transformer (with respect to the secondary side of the current transformer).
  • the first AND gate 72 then provides an output signal when all tested conditions are fulfilled, ie when all suspected saturation signals V 1 to V 4 are present at the input to the first AND gate 72.
  • the output from the first AND gate 72 output is supplied to a second AND gate 76 on the input side.
  • the first AND gate 72 then provides an output signal when all suspicious signals belonging to the respectively tested conditions are present.
  • a fourth threshold element 77 it is possible to check in a fourth threshold element 77 whether the magnitude of the first difference value
  • the fourth threshold value SW 4 can in this case be selected, for example, according to equation (10).
  • the fourth threshold value is in turn selected as a function of the rated current (secondary side) of the current transformer, whereby here again other factors are conceivable.
  • the condition according to equation (9) is usually fulfilled at the beginning of a primary-side fault. If the condition according to equation (9) is satisfied, then a first saturation return signal Ri is delivered to a third AND gate 78.
  • the fifth threshold value SW 5 in this case can be selected, for example, according to equation (12) as a function of the current measured value i (n).
  • a second saturation return signal R 2 is output to the third AND gate 78. Only in the case that both saturation return signals Ri and R 2 simultaneously present at the input side to the third AND gate 78, a return signal R is generated by the third AND gate 78 and supplied to the second AND gate 76 in an inverted form.
  • the second AND gate 76 therefore outputs an output signal to the block 80 for generating the saturation signal S if and only if all the suspected saturation signals of the tested conditions and at the same time not the return signal R (ie both saturation return signals Ri and R 2 ) are present.
  • the return conditions block the generation of a saturation signal if exactly both return conditions are met.
  • the start time ts ta r t / at which the current transformer saturation begins, and thus the first measured value, which is disturbed by current transformer saturation, can be determined in the simplest case by performing this in step 42 (see FIGS. 4 and 5) Check for CT saturation for the first time has detected a fault. In this case, no additional calculations be performed to determine the start time tstart.
  • a second difference value as an amount of the difference between the current measured value i (n) and an estimated value i s (n), the estimated value i s (n ) indicates an expected course of the secondary current using at least three measured values immediately preceding the current measured value i (n).
  • This relationship is shown graphically in a diagram in FIG. 9, in which the time curve of a secondary current which is disturbed by current transformer saturation ⁇ 2 (t) and in dashed line the (expected) unsaturated course of the secondary current are again shown.
  • the estimated value i s (n) can be calculated according to equation ( 13).
  • i s (n) 3 i (n -1) - 3 i (n -2) + i (n-3) (13)
  • the estimated value i s (n) can be determined with the aid of the three measured values i (nl), i (n-2) and i (n-3) preceding the current measured value.
  • the starting time tstart is then recognized when, according to the following equation (15), the difference between the magnitude of the estimated value i s (n) and the amount of the current one
  • Measured value i (n) is greater than a sixth threshold SW 6 .
  • the sixth threshold value SW 6 can be formed, for example, according to equation (16) as a function of the estimated value i s (n) and a factor F that takes into account the estimation accuracy of the algorithm.
  • the factor F is chosen as a function of the sampling frequency with which the measured values are recorded and the accuracy of the equation used (13 or 14) and can be, for example, between 0.02 and 0.12.
  • FIG. 10 shows a diagram with the time profile of the saturation-impaired secondary current ⁇ 2 (t) in a solid line.
  • the integral between the start time ts ta r t and the current measured value i (n) is formed in each case. If the integral yields the value zero, the end time t E n de is reached. Illustratively, surfaces 101 and 102 in FIG. 10 must assume the same amount for this purpose.
  • R denotes the resistance of the secondary converter circuit.
  • the integral according to equation (17) thus indicates the magnetic flux in the transducer core.
  • the following section explains how to determine the characteristic parameters of the unsaturated current profile needed to correct the measurement values that are disturbed by the saturation of the transducer.
  • the characteristic parameters are formed with the aid of measured values which were recorded before the starting time ts ta r t .
  • To determine the characteristic parameters can advantageously the
  • T a time constant of the DC component
  • Equation (22) can be simplified assuming equation (23).
  • the equations (19) and (20) can be used to determine the amplitude Ii of the fundamental oscillation for a known DC component.
  • One method is the use of the measured values and the first derivative between times (n-2) and (n-3) to give:
  • i p (n-2) i (n-2) - I 0 -e -2 ⁇ (29)
  • the saturation-disturbed measured values can be corrected.
  • phase angle ⁇ for the sample value i p (n-2) is first estimated. This is done with the equation:
  • the measured value is designated at the start time tstart with n S tart.
  • the counter h changes between 0 (for the first measured value of the affected saturation period) and k (for the last measured value of the saturation period).
  • Equation (31) can be performed both in real time and with stored measurements.
  • the correction is always performed up to the current measured value i (n), which in this case corresponds to the measured value i (n s tart + h), until the end time t E nde is recognized as explained above.
  • the range without current transformer saturation can be artificially expanded by forming future values on the basis of the measured values present before the starting time ts ta r t , which provide an expected secondary current ⁇ 2 (t). specify after the start time ts ta r t .
  • at least two future values should be formed to determine the number of times for the calculation of the characteristic values to increase the usable parameters.
  • the characteristic parameters are then formed using the existing measured values from the unsaturated course and the future values calculated from these.
  • the determination of the future values can also be useful if, for example, in an electrical protection device, some measured values following the start time t sta r t are required in the short term in the form of future values in order to carry out a safety-critical protection algorithm in a short time.
  • the protection algorithm can be performed based on the future values. The correction of saturation-disturbed measured values takes place simultaneously. In this case, the protection algorithm does not have to wait until the correction of saturation-impaired measured values has taken place.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

The invention relates to a method for correcting a secondary current path (i2(t)) of a current converter (10) disturbed by saturation, wherein measurement values (i(n)) of the secondary current path (i2(t)) of the current converter (10) are acquired. The acquired measurement values (i(n)) are checked for a malfunction due to saturation and, if a malfunction due to saturation is present, a starting time (tstart) is determined, indicating the start of the saturation. The measurement values acquired after the starting time (tstart) are corrected by compensating the malfunction. In order to design a method of this kind such that is can be performed with a comparably low computing effort and without the necessity of the characteristic curves for the corresponding current converter, the invention proposes that, using measurement values acquired before the starting time (tstart), characteristic parameters of the secondary current path (i2(t)) when saturation is absent be determined and, using the characteristic parameters thus acquired, a correct path is computed for the measurement values captured after the starting time (tstart). The invention further relates to an accordingly equipped electric field device.

Description

Beschreibungdescription
Verfahren zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes eines Stromwandlers und elektrisches Feldgerät zur Durchführung eines solchen VerfahrensMethod for correcting a saturation-disturbed secondary current profile of a current transformer and electric field device for carrying out such a method
Die Erfindung betrifft ein Verfahren zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes eines Stromwandlers, bei dem Messwerte des Sekundärstromverlaufes des Stromwandlers erfasst werden. Die erfassten Messwerte werden auf Vorliegen einer Störung durch Sättigung überprüft, und bei Vorliegen einer Störung durch Sättigung wird ein Startzeitpunkt bestimmt, der den Beginn der Sättigung angibt. Die nach dem Startzeitpunkt erfassten Messwerte werden unter Kompensation der Störung korrigiert.The invention relates to a method for correcting a saturation-impaired secondary current profile of a current transformer, in which measured values of the secondary current profile of the current transformer are detected. The sensed readings are checked for saturation interference, and if there is a saturation fault, a start time is determined indicating the onset of saturation. The measured values recorded after the start time are corrected while compensating the disturbance.
Die Erfindung betrifft auch ein elektrisches Feldgerät mit einer Messwerterfassungseinrichtung, die zur Erfassung von Messwerten eines Sekundärstromverlaufes eines Stromwandlers eingerichtet ist.The invention also relates to an electric field device having a measured value detection device which is set up to detect measured values of a secondary current profile of a current transformer.
Stromwandler werden häufig bei der Messwerterfassung in elektrischen Energieversorgungsnetzen, wie beispielsweise Hoch- und Mittelspannungsnetzen eingesetzt, um vergleichsweise hohe elektrische Wechselströme in niedrigere elektrische Wechselströme umzusetzen, so dass sie von elektrischen Geräten, wie beispielsweise elektrischen Feldgeräten in Form von Schutzgeräten oder Messgeräten, verarbeitet werden können. Konventionelle elektrische Stromwandler umfassen hierbei einen Wandlerkern aus einem magnetisierbaren Material (beispielsweise Eisen oder Stahl) , der in magnetischer Wechselwirkung mit einem Primärleiter und einem Sekundärleiter steht. Häufig wird ein solcher Kern als sogenannter Ringkern ausgebildet, der einen Ring um den Primärleiter bildet. Der Sekundärleiter ist in diesem Fall mit einer gewissen Anzahl von Wicklungen um den Wandlerkern gewunden .Current transformers are often used in measured value detection in electrical energy supply networks, such as high and medium voltage networks, in order to convert comparatively high alternating electrical currents into lower alternating electrical currents, so that they can be processed by electrical devices, such as electric field devices in the form of protective devices or measuring devices , Conventional electric current transformers in this case comprise a converter core of a magnetizable material (for example iron or steel), which is in magnetic interaction with a primary conductor and a secondary conductor. Frequently, such a core is formed as a so-called ring core, which forms a ring around the Primary conductor forms. The secondary conductor is wound in this case with a certain number of windings around the converter core.
Der Primärleiter wird von dem vergleichsweise hohenThe primary conductor is of the comparatively high
Wechselstrom durchflössen. Dieser induziert ein Magnetfeld in dem Wandlerkern, das wiederum in dem Sekundärleiter einen entsprechend das Wandlerübersetzungsverhältnisses geringeren Wechselstrom induziert, dessen Höhe üblicherweise proportional zur Höhe des Primärstroms ist.AC flowing through. This induces a magnetic field in the transducer core, which in turn induces in the secondary conductor a lower AC current corresponding to the CT ratio, the magnitude of which is usually proportional to the magnitude of the primary current.
Aufgrund der magnetischen Eigenschaften des Wandlerkerns kann jedoch bei primärseitigen hohen Strömen oder starken Gleichstromanteilen im Wechselstrom eine sogenannte Wandlersättigung eintreten, wodurch der Verlauf desDue to the magnetic properties of the converter core, however, a so-called converter saturation may occur in the alternating current in the case of primary-side high currents or strong DC components, as a result of which the course of the
Sekundärstromes nicht mehr proportional zum Verlauf des Primärstromes ist und die auf der Sekundärseite des Stromwandlers erfassten Messwerte somit durch die Stromwandlersättigung gestört sind.Secondary current is no longer proportional to the course of the primary current and thus detected on the secondary side of the current transformer measured values are thus disturbed by the CT saturation.
Durch die solchermaßen gestörten Messwerte können in elektrischen Geräten, die die sekundärseitigen Messwerte als zur Durchführung bestimmter Berechnungen verwenden, Fehlfunktionen hervorgerufen werden. Beispielsweise können Messwerte des Sekundärstroms als Strommesswerte für ein elektrisches Differentialschutzgerät zur Überwachung eines Abschnitts eines elektrischen Energieversorgungsnetzes dienen, um dort mit Strommesswerten zumindest eines zweiten Differentialschutzgerätes verglichen zu werden. Ergibt der Vergleich, dass eine Differenz zwischen den jeweiligenThe thus disturbed measured values can cause malfunctions in electrical devices which use the secondary-side measured values as calculations to carry out certain calculations. By way of example, measured values of the secondary current can serve as current measured values for an electrical differential protection device for monitoring a section of an electrical energy supply network in order to be compared there with current measured values of at least one second differential protection device. The comparison shows that a difference between the respective
Strommesswerten einen von Null signifikant abweichenden Wert ergibt, so wird ein Fehler (z.B. ein Kurzschluss) in dem überwachten Abschnitt des elektrischen Energieversorgungsnetzes erkannt. Ist einer der zur Erfassung der jeweiligen Strommesswerte verwendeten Stromwandler durch Sättigung gestört, so können durch die verfälschten Messwerte bei der Differenzbildung in dem Differentialschutzgerät falsche Ergebnisse erzeugt werden, was zu einer Fehlauslösung des elektrischen Differentialschutzgerätes führen kann.Current readings results in a value significantly different from zero, so an error (eg a short circuit) is detected in the monitored portion of the electrical energy supply network. Is one of the collection If current transformers used in the respective current measurement values are disturbed by saturation, incorrect results can be produced by the corrupted measured values during the subtraction in the differential protection device, which can lead to false tripping of the electrical differential protection device.
Solche Fehlauslösungen sind für Betreiber des elektrischen Energieversorgungsnetzes aufgrund der damit verbundenen Stromausfälle mit hohen Kosten verbunden.Such false alarms are associated with high costs for operators of the electrical energy supply network due to the associated power outages.
Um Fehlfunktionen von elektrischen Geräten zu vermeiden, die eine Weiterverarbeitung der Messwerte vornehmen, werden Verfahren eingesetzt, durch Stromwandlersättigung gestörte Sekundärstromverläufe automatisch zu erkennen und eine entsprechende Korrektur der gestörten Werte vorzunehmen. Ein Verfahren der oben angegebenen Art ist beispielsweise aus der US-Patentschrift US 7,103,485 B2 bekannt. Bei dem bekannten Verfahren werden Messwerte eines Sekundärstromverlaufs eines Stromwandlers erfasst und auf eine möglicherweise vorliegende Sättigung überprüft. Wenn eine Stromwandlersättigung erkannt wird, wird zum Startzeitpunkt der Stromwandlersättigung ein Magnetisierungsstrom berechnet, anhand dessen ein zum Startzeitpunkt vorliegender magnetischer Fluss in dem Wandlerkern bestimmt wird. Unter Verwendung für den speziellen Stromwandler charakteristischer Kennlinien, die einen Zusammenhang zwischen dem magnetischen Fluss und dem Sekundärstrom angeben, werden die durch Sättigung des Stromwandlers gestörten Messwerte nach dem Startzeitpunkt korrigiert, um einen korrekten Verlauf der Messwerte des Sekundärstromes durch Kompensation der Störung durch Stromwandlersättigung zu erhalten. Allerdings sind die benötigten, für den entsprechenden Stromwandler charakteristischen Kennlinien häufig nur schwer verfügbar oder sogar überhaupt nicht vorhanden und müssen erst durch aufwendige Messungen erzeugt werden. Der Erfindung liegt die Aufgabe zugrunde, ein vergleichsweise einfaches Verfahren zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes eines Stromwandlers anzugeben, das einerseits mit vergleichsweise geringemIn order to avoid malfunctions of electrical devices which carry out a further processing of the measured values, methods are used to automatically detect secondary current characteristics which are disturbed by current transformer saturation and to carry out a corresponding correction of the disturbed values. A method of the kind specified above is known, for example, from US Pat. No. 7,103,485 B2. In the known method, measured values of a secondary current profile of a current transformer are detected and checked for possible saturation. When current transformer saturation is detected, a magnetizing current is calculated at the start time of CT saturation, which is used to determine a magnetic flux in the converter core at the time of starting. Using characteristics characteristic of the particular current transformer, which indicate a relationship between the magnetic flux and the secondary current, the measurement values disturbed by saturation of the current transformer are corrected after the start time in order to obtain a correct course of the measured values of the secondary current by compensation of the disturbance due to current transformer saturation , However, the characteristic curves required for the corresponding current transformer are often difficult or even impossible to obtain and must first be produced by complex measurements. The invention has for its object to provide a comparatively simple method for correcting a disturbed by saturation secondary current waveform of a current transformer, on the one hand with comparatively low
Rechenaufwand durchgeführt werden kann und andererseits auch ohne die Notwendigkeit der Kenntnis einer für den entsprechenden Stromwandler gültigen Kennlinie durchgeführt werden kann. Der Erfindung liegt die weitere Aufgabe zugrunde, ein entsprechend eingerichtetes Feldgerät zur Verfügung zu stellen.Calculation effort can be performed and on the other hand, without the need of knowledge of a valid for the corresponding current transformer characteristic can be performed. The invention is based on the further object of providing a correspondingly configured field device.
Diese Aufgabe wird hinsichtlich des Verfahrens erfindungsgemäß durch ein Verfahren der eingangs genannten Art gelöst, bei dem anhand von Messwerten, die vor dem Startzeitpunkt erfasst worden sind, charakteristische Parameter des Sekundärstromverlaufes bei fehlender Sättigung bestimmt werden und unter Verwendung der bestimmten charakteristischen Parameter ein korrekter Verlauf der nach dem Startzeitpunkt aufgenommenen Messwerte berechnet wird.This object is achieved with regard to the method according to the invention by a method of the type mentioned in the characteristic values of the secondary current profile are determined in the absence of saturation on the basis of measured values that were detected before the start time and using the specific characteristic parameters, a correct course of calculated after the start time measured values.
Dadurch, dass bei dem erfindungsgemäßen Verfahren in vorteilhafter Weise auf aus dem vor dem Startzeitpunkt liegenden ungesättigten Verlauf der Messwerte des Sekundärstromes abgeleitete Parameter zurückgegriffen wird, besteht nicht die Notwendigkeit der Verwendung speziell auf den entsprechenden Stromwandler zugeschnittener Kennlinien. Ferner fallen keine aufwendigen Rechenschritte zur Durchführung des Verfahrens an, da lediglich die entsprechenden Parameter bestimmt werden müssen.Because the method according to the invention advantageously makes use of parameters derived from the unsaturated course of the measured values of the secondary current before the starting time, there is no need to use characteristic curves tailored specifically to the corresponding current transformer. Furthermore, no complicated calculation steps for carrying out the method, since only the corresponding parameters must be determined.
Eine vorteilhafte Ausführungsform des erfindungsgemäßen Verfahrens besteht darin, dass anhand der vor dem Startzeitpunkt erfassten Messwerte charakteristische Parameter einer Grundschwingung und einerAn advantageous embodiment of the method according to the invention is that based on the measured values acquired before the start time characteristic Parameters of a fundamental and a
Gleichstromkomponente des Sekundärstromverlaufs bestimmt werden .DC component of the secondary current waveform can be determined.
Hierbei wird vorteilhaft der Effekt ausgenutzt, dass sich in vielen Fällen der Verlauf hoher Ströme, beispielsweise hervorgerufen durch einen Fehler auf der Primärseite des Stromwandlers, als Überlagerung einer Grundschwingung mit einer Gleichstromkomponente darstellen lassen.In this case, the effect is advantageously exploited that in many cases, the course of high currents, for example caused by a fault on the primary side of the current transformer, can be represented as a superposition of a fundamental with a DC component.
Konkret kann in diesem Zusammenhang vorgesehen sein, dass als charakteristischer Parameter der Grundschwingung eine Amplitude und als charakteristische Parameter der Gleichstromkomponente eine einen exponentiellen Anteil der Gleichstromkomponente beschreibende Zeitkonstante und/oder ein Anfangswert des exponentiellen Anteiles bestimmt werden.Specifically, it may be provided in this connection that an amplitude and, as characteristic parameters of the DC component, a time constant describing an exponential component of the DC component and / or an initial value of the exponential component are determined as the characteristic parameter of the fundamental component.
Eine weitere vorteilhafte Ausführungsform des erfindungsgemäßen Verfahrens sieht vor, dass unter Verwendung vor dem Startzeitpunkt aufgenommener Messwerte zumindest zwei Zukunftswerte gebildet werden, die einen erwarteten Verlauf des Sekundärstromes nach dem Startzeitpunkt angeben. Auf diese Weise kann der ungesättigte Verlauf der Sekundärstrommesswerte durch Bildung der Zukunftswerte sozusagen künstlich in den gesättigten Verlauf hinein verlängert werden.A further advantageous embodiment of the method according to the invention provides that at least two future values are formed using measured values recorded before the start time, which indicate an expected course of the secondary current after the starting time. In this way, the unsaturated course of the secondary current measured values can be artificially extended into the saturated course by forming the future values.
Beispielsweise kann auf Grundlage eines solchermaßen verlängerten ungesättigten Messwertverlaufes ein Schutzalgorithmus in einem Schutzgerät arbeiten, der zur korrekten Funktion auf eine gewisse Mindestanzahl von korrekten Stromwandlermesswerten angewiesen ist. In diesem Zusammenhang kann aber auch vorteilhaft vorgesehen sein, dass die charakteristischen Parameter des Sekundärstromverlaufes bei fehlender Sättigung anhand von Messwerten, die vor dem Startzeitpunkt erfasst worden sind, und den Zukunftswerten bestimmt werden.For example, on the basis of such a prolonged unsaturated measured value curve, a protection algorithm can work in a protective device which depends on a certain minimum number of correct current transformer measured values for correct functioning. In this context, however, it can also be advantageously provided that the characteristic parameters of the secondary current profile in the absence of saturation, on the basis of measured values which were acquired before the start time and the future values.
Auf diese Weise können die charakteristischen Parameter des Sekundärstromverlaufes auch bei vergleichsweise wenigen in dem ungesättigten Bereich (also vor dem Startzeitpunkt) liegenden Messwerten ermittelt werden.In this way, the characteristic parameters of the secondary current profile can be determined even with comparatively few measured values lying in the unsaturated region (ie before the starting time).
Gemäß einer weiteren vorteilhaften Ausführungsform des erfindungsgemäßen Verfahrens kann ferner vorgesehen sein, dass zum Überprüfen der Messwerte auf Vorliegen einer Störung durch Sättigung ein erster Differenzwert zwischen einem aktuellen Messwert und einem Vorhersagewert bestimmt wird, wobei der Vorhersagewert einen erwarteten Verlauf des Sekundärstromes unter Verwendung zumindest zweier dem aktuellen Messwert unmittelbar vorangehender Messwerte angibt, und ein erstes Sättigungsverdachtssignal erzeugt wird, wenn der erste Differenzwert einem ersten Stromschwellenwert entspricht oder diesen überschreitet. Ein das Vorliegen einer Störung durch Sättigung angebendes Sättigungssignal wird erzeugt, wenn das erste Sättigungsverdachtssignal vorliegt. Hierdurch kann vergleichsweise einfach eine Überprüfung des Messwertverlaufes auf Sättigung vorgenommen werden.According to a further advantageous embodiment of the method according to the invention, it can further be provided that a first difference value between a current measured value and a predicted value is determined for checking the measured values for the presence of a disturbance due to saturation, the predicted value determining an expected course of the secondary current using at least two indicates a current measured value of immediately preceding measured values, and a first saturation suspected signal is generated if the first difference value corresponds to or exceeds a first current threshold value. A saturation signal indicative of the presence of a perturbation by saturation is generated when the first suspect signal is present. As a result, it is comparatively easy to check the measured value profile for saturation.
Um die Zuverlässigkeit der Überprüfung weiter zu erhöhen, können weitere Bedingungen geprüft werden:In order to further increase the reliability of the check, further conditions can be checked:
So kann beispielsweise vorgesehen sein, dass der erste Differenzwert zwischen dem aktuellen Messwert und dem Vorhersagewert auch mit einem zweiten Stromschwellenwert verglichen wird, wobei der zweite Stromschwellenwert in Abhängigkeit von einem Nennstrom gewählt wird, für den der Stromwandler ausgelegt ist, und ein zweites Sättigungsverdachtssignal erzeugt wird, wenn der erste Differenzwert dem zweiten Stromschwellenwert entspricht oder diesen überschreitet. Das Sättigungssignal wird nur dann erzeugt, wenn auch das zweite Sättigungsverdachtssignal vorliegt .For example, it may be provided that the first difference value between the current measured value and the predicted value is also compared with a second current threshold value, wherein the second current threshold value is selected as a function of a nominal current for which the Current transformer is designed, and a second suspected saturation signal is generated when the first difference value is equal to or exceeds the second current threshold. The saturation signal is generated only when the second suspected saturation signal is present.
In diesem Zusammenhang kann auch vorgesehen sein, dass überprüft wird, ob zwischen dem aktuellen Messwert und demjenigen Messwert, der unmittelbar davor erfasst worden ist, ein Vorzeichenwechsel stattgefunden hat, und ein drittes Sättigungsverdachtssignal erzeugt wird, wenn kein Vorzeichenwechsel stattgefunden hat. Das Sättigungssignal wird nur dann erzeugt, wenn auch das dritte Sättigungsverdachtssignal vorliegt.In this context, it can also be provided that it is checked whether a sign change has taken place between the current measured value and the measured value which was detected immediately before, and a third saturation suspected signal is generated if no sign change has taken place. The saturation signal is only generated if the third suspected saturation signal is present.
Außerdem kann hierbei vorgesehen sein, dass der Vorhersagewert mit einem dritten Stromschwellenwert verglichen wird und ein viertes Sättigungsverdachtssignal erzeugt wird, wenn der Betrag des Vorhersagewertes oberhalb des dritten Stromschwellenwertes liegt. Das Sättigungssignal wird nur dann erzeugt, wenn auch das vierte Sättigungsverdachtssignal vorliegt .In addition, it can be provided here that the predicted value is compared with a third current threshold value and a fourth saturation suspected signal is generated if the magnitude of the predicted value lies above the third current threshold value. The saturation signal is generated only when the fourth suspected saturation signal is present.
Um die Zuverlässigkeit der Überprüfung aufTo the reliability of the review
Stromwandlersättigung schließlich noch weiter zu erhöhen, kann zudem vorgesehen sein, dass der Differenzwert zwischen dem aktuellen Messwert und dem Vorhersagewert auch mit einem vierten Stromschwellenwert verglichen wird, wobei der vierte Stromschwellenwert in Abhängigkeit von einem Nennstrom gewählt wird, für den der Stromwandler ausgelegt ist. Außerdem wird der Vorhersagewert mit einem fünften Stromschwellenwert verglichen. Es wird ein Sättigungsrücknahmesignal erzeugt, wenn der Differenzwert dem vierten Stromschwellenwert entspricht oder diesen überschreitet und der Vorhersagewert kleiner als der fünfte Stromschwellenwert ist. Das Sättigungssignal wird blockiert, wenn das Sättigungsrücknahmesignal vorliegt.Finally, to further increase current transformer saturation, it may also be provided that the difference value between the current measured value and the predicted value is also compared with a fourth current threshold value, wherein the fourth current threshold value is selected as a function of a nominal current for which the current transformer is designed. In addition, the prediction value is compared with a fifth current threshold. A saturation return signal is generated when the difference value is equal to fourth current threshold or exceeds and the predicted value is less than the fifth current threshold. The saturation signal is blocked when the saturation return signal is present.
Um vergleichsweise einfach einen Startzeitpunkt des Sättigungsverlaufes bereits bei der Überprüfung auf Stromwandlersättigung festlegen zu können, sieht eine weitere vorteilhafte Ausführungsform des erfindungsgemäßen Verfahrens außerdem vor, dass zur Bestimmung des Startzeitpunktes das Vorliegen des Sättigungssignals überwacht wird. Der Startzeitpunkt liegt dann vor, wenn das Sättigungssignal erstmalig vorliegt.In order to be able to set a start time of the saturation course already comparatively easy when checking for current transformer saturation, a further advantageous embodiment of the method according to the invention also provides that the presence of the saturation signal is monitored to determine the starting time. The start time is when the saturation signal is present for the first time.
Alternativ kann der Startzeitpunkt auch derart bestimmt werden, dass zur Bestimmung des Startzeitpunktes, der den Beginn der Sättigung angibt, ein zweiter Differenzwert zwischen dem Betrag des aktuellen Messwertes und dem Betrag eines Schätzwertes bestimmt wird, wobei der Schätzwert einen erwarteten Verlauf des Sekundärstromes unter Verwendung zumindest dreier dem aktuellen Messwert unmittelbar vorangehender Messwerte angibt. Der Startzeitpunkt dann vorliegt, wenn der zweite Differenzwert einen sechsten Stromschwellenwert überschreitet. Durch die Verwendung zumindest dreier vorangehender Messwerte kann der Zeitpunkt der Stromwandlersättigung vergleichsweise genau festgestellt werden. In diesem Zusammenhang kann außerdem vorgesehen sein, dass der Schätzwert einen erwarteten Verlauf des Sekundärstromes unter Verwendung von vier dem aktuellen Messwert unmittelbar vorangehenden Messwerten angibt.Alternatively, the start time can also be determined such that for determining the start time, which indicates the beginning of the saturation, a second difference value between the magnitude of the current measurement value and the amount of an estimated value is determined, the estimated value of an expected course of the secondary current using at least indicates three measured values immediately preceding the current measured value. The start time is present when the second difference value exceeds a sixth current threshold. By using at least three preceding measured values, the instant of the current transformer saturation can be determined comparatively accurately. In this context, it can also be provided that the estimated value indicates an expected course of the secondary current using four measured values immediately preceding the current measured value.
Gemäß einer weiteren vorteilhaften Ausführungsform des erfindungsgemäßen Verfahrens ist vorgesehen, dass auch ein Endzeitpunkt, der das Ende der Sättigung angibt, bestimmt wird, und die Korrektur der nach dem Startzeitpunkt erfassten Messwerte mit dem Messwert beendet wird, der mit dem Endzeitpunkt zusammenfällt. Hierdurch wird für die Korrektur der durch Sättigung gestörte Messwerte ein definierter Endzeitpunkt festgelegt; die danach aufgenommenen Messwerte sind nicht mehr durch Sättigung gestört, so dass keine Korrektur erforderlich ist.According to a further advantageous embodiment of the method according to the invention, it is provided that an end time which indicates the end of saturation is also determined and the correction of the measured values acquired after the start time is terminated with the measured value which coincides with the end time. As a result, a defined end time is determined for the correction of the saturation-disturbed measured values; the measured values recorded after that are no longer disturbed by saturation, so that no correction is necessary.
In diesem Zusammenhang kann vorteilhafterweise vorgesehen sein, dass zur Bestimmung des Endzeitpunktes ein zeitliches Integral über den erfassten Verlauf der Messwerte des Sekundärstromes gebildet wird, wobei die Integration mit dem Messwert beginnt, bei dem der Startzeitpunkt festgestellt worden ist, und mit dem aktuellen Messwert endet. Der Endzeitpunkt liegt dann vor, wenn das Integral den Wert Null ergibt. Hierdurch lässt sich mit relativ einfaches Rechenschritten der Endzeitpunkt festlegen.In this context, it may be advantageously provided that a temporal integral over the detected course of the measured values of the secondary current is formed to determine the end time, wherein the integration begins with the measured value at which the starting time has been determined and ends with the current measured value. The end time is when the integral is zero. This makes it possible to set the end time with relatively simple calculation steps.
Hinsichtlich des elektrischen Feldgerätes wird die oben genannte Aufgabe durch ein elektrisches Feldgerät der eingangs genannten Art gelöst, das eineWith regard to the electric field device, the above object is achieved by an electric field device of the type mentioned, which is a
Datenverarbeitungseinrichtung aufweist, die zur Durchführung eines Verfahrens nach einer der vorstehend genanntenData processing device for carrying out a method according to one of the above
Ausführungsformen eingerichtet ist.Embodiments is set up.
Die Erfindung soll im Folgenden anhand vonThe invention will be described below with reference to
Ausführungsbeispielen näher erläutert werden. Hierzu zeigenEmbodiments will be explained in more detail. Show this
Figur 1 eine schematische Darstellung eines Ringkernstromwandlers,FIG. 1 shows a schematic representation of a toroidal-core current transformer,
Figur 2 ein Diagramm mit dem zeitlichen Verlauf eines durch Stromwandlersättigung gestörten Sekundärstromes, Figur 3 eine schematische Darstellung eines mit einem Abschnitt eines elektrischenFIG. 2 shows a diagram with the time profile of a secondary current which is disturbed by current transformer saturation, Figure 3 is a schematic representation of one with a portion of an electrical
Energieversorgungsnetzes verbundenen elektrischen Schutzgerätes,Power supply network connected electrical protective device,
Figur 4 ein Verfahrensfließbild zur Erläuterung eines ersten Ausführungsbeispiels eines Verfahrens zum Korrigieren von Messwerten eines Sekundärstromes,4 shows a process flow diagram for explaining a first exemplary embodiment of a method for correcting measured values of a secondary flow, FIG.
Figur 5 ein weiteres Verfahrensfließbild zur Erläuterung eines zweiten Ausführungsbeispiels eines Verfahrens zum Korrigieren von Messwerten eines SekundärStromes,FIG. 5 shows a further process flow diagram for explaining a second exemplary embodiment of a method for correcting measured values of a secondary current,
Figur 6 ein erstes logisches Ablaufschema zur Erläuterung der Erkennung einer Stromwandlersättigung,FIG. 6 shows a first logic flow diagram for explaining the detection of a current transformer saturation,
Figur 7 ein zweites logisches Ablaufschema zur Erläuterung der Erkennung einer Stromwandlersättigung,FIG. 7 shows a second logic flow diagram for explaining the detection of a current transformer saturation,
Figur 8 ein Diagramm mit einem zeitlichen Verlauf durchFigure 8 is a diagram with a time course through
Sättigung gestörter Messwerte eines Sekundärstromes zur Erläuterung der Erkennung einer StromwandlerSättigung,Saturation of disturbed measured values of a secondary current to explain the detection of a current transformer saturation,
Figur 9 ein Diagramm mit dem zeitlichen Verlauf durchFigure 9 is a diagram with the time course through
Sättigung gestörter Messwerte eines Sekundärstromes zur Erläuterung der Festlegung des StartZeitpunktes,Saturation of disturbed measured values of a secondary current to explain the determination of the start time,
Figur 10 ein Diagramm mit dem zeitlichen Verlauf durchFigure 10 is a diagram with the time course through
Sättigung gestörter Messwerte eines Sekundärstromes zur Erläuterung der Festlegung des Endzeitpunktes, und Figur 11 ein Diagramm mit dem zeitlichen Verlauf durchSaturation of disturbed measured values of a secondary current to explain the definition of the end time, and Figure 11 is a diagram with the time course through
Sättigung gestörter Messwerte eines Sekundärstromes zur Erläuterung der Bildung von Zukunftswerten.Saturation of faulty measured values of a secondary current to explain the formation of future values.
Figur 1 zeigte eine schematische Darstellung eines Stromwandlers 10 in Form eines Ringkernstromwandlers. Ein elektrischer Primärleiter 11, beispielsweise ein Abschnitt einer elektrischen Hochspannungsleitung eines elektrischen Energieversorgungsnetzes, führt einen Primärstrom ii (t) in Form eines elektrischen Wechselstromes. Der Primärleiter 11 ist durch einen als Ring ausgebildeten Stromwandlerkern 12 hindurchgeführt. Der Stromwandlerkern besteht aus einem magnetisierbaren Material, beispielsweise Eisen oder Stahl. Um den Stromwandlerkern 12 sind elektrische Wicklungen 13 eines Sekundärleiters 14 gewunden. Der Sekundärleiter 14 ist über Kontakte 15 mit einer Messwerterfassungseinrichtung 16 verbunden, durch die ein Sekundärstrom i2 (t) in Form eines Wechselstromes fließt.FIG. 1 shows a schematic representation of a current transformer 10 in the form of a toroidal-core current transformer. An electrical primary conductor 11, for example a section of an electrical high-voltage line of an electrical energy supply network, carries a primary current ii (t) in the form of an alternating electrical current. The primary conductor 11 is passed through a formed as a ring current transformer core 12. The current transformer core consists of a magnetizable material, such as iron or steel. Around the current transformer core 12, electrical windings 13 of a secondary conductor 14 are wound. The secondary conductor 14 is connected via contacts 15 to a measured value detection device 16, through which a secondary current i 2 (t) flows in the form of an alternating current.
Durch den Primärstrom ii (t) wird um den Primärleiter 11 ein Magnetfeld aufgebaut, dessen Intensität durch den magnetisierbaren Stromwandlerkern 12 weiter verstärkt wird. Das sich aufgrund des Wechselstromverhaltens des Primärstromes ii (t) ständig ändernde Magnetfeld in demBy the primary current ii (t) is built around the primary conductor 11, a magnetic field whose intensity is further enhanced by the magnetizable current transformer core 12. The constantly changing due to the AC behavior of the primary current ii (t) magnetic field in the
Stromwandlerkern 12 induziert wiederum einen sekundärseitigen Wechselstrom in den Wicklungen 13 des Sekundärleiters 14, der als Sekundärstrom i2 (t) mit der Messwerterfassungseinrichtung 16 erfasst werden kann.Current transformer core 12 in turn induces a secondary alternating current in the windings 13 of the secondary conductor 14, which can be detected as a secondary current i 2 (t) with the measured value detection device 16.
Unter Normalbedingungen folgt der magnetische Fluss im Stromwandlerkern 12 dem elektrischen Stromfluss ii (t) durch den Primärleiter 11 in proportionaler Weise, wodurch ein wiederum zu dem magnetischen Fluss proportionaler Sekundärstrom i2 (t) im Sekundärleiter 14 induziert wird, der entsprechend des Wandlerübersetzungsverhältnisses geringer ist als der Primärstrom ii (t) . Folglich ist der Sekundärstrom i2 (t) unter normalen Betriebsbedingungen des Stromwandlers 10 eine proportionale Abbildung des Primärstromes ii (t) .Under normal conditions, the magnetic flux in the current transformer core 12 follows the electrical current flow ii (t) through the primary conductor 11 in a proportional manner, which in turn is proportional to the magnetic flux Secondary current i 2 (t) is induced in the secondary conductor 14, which is lower than the primary current ii (t) according to the transformer transmission ratio. Consequently, the secondary current i 2 (t) under normal operating conditions of the current transformer 10 is a proportional mapping of the primary current ii (t).
Im Falle sehr hoher durch den Primärleiter 11 fließender Ströme oder eines signifikanten Gleichstromanteils in dem Primärstrom ii (t) besteht jedoch eine hohe Wahrscheinlichkeit, dass der Stromwandlerkern 12 in einen sogenannten Sättigungszustand fällt. Im Sättigungszustand des Stromwandlerkernes 12 stellt der Sekundärstrom i2 (t) keine proportionale Abbildung des Primärstromes ii (t) mehr dar, so dass der Sekundärstromverlauf durch den Sekundärleiter 14 durch die Stromwandlersättigung gestört ist.In the case of very high currents flowing through the primary conductor 11 or a significant DC component in the primary current ii (t), however, there is a high probability that the current transformer core 12 falls into a so-called saturation state. In the saturation state of the current transformer core 12, the secondary current i 2 (t) no longer represents a proportional mapping of the primary current ii (t), so that the secondary current profile through the secondary conductor 14 is disturbed by the current transformer saturation.
Die mit der Messwerterfassungseinrichtung 16 aufgenommenen Messwerte des Sekundärstromes i2 (t) stellen damit entsprechend gestörte bzw. verfälschte Messwerte dar, die nicht den korrekten Verlauf des Primärstromes ii (t) wiedergeben. Hierdurch werden bei der Weiterverarbeitung der Messwerte des Sekundärstromes i2 (t) in elektrischen Geräten, wie beispielsweise elektrischen Messgeräten oder Schutzgeräten zur Überwachung eines elektrischen Energieversorgungsnetzes, im schlimmsten Fall Fehlfunktionen hervorgerufen. Im Falle eines elektrischen Schutzgerätes kann es hierdurch beispielsweise zu einer ungewollten Abschaltung eines Teils des elektrischen Energieversorgungsnetzes kommen.The measured values of the secondary current i 2 (t) recorded with the measured-value acquisition device 16 thus represent correspondingly disturbed or falsified measured values which do not reflect the correct course of the primary current ii (t). As a result, in the case of further processing of the measured values of the secondary current i 2 (t) in electrical devices, such as electrical measuring devices or protective devices for monitoring an electrical energy supply network, malfunctions are caused in the worst case. In the case of an electrical protective device, this may for example lead to an unwanted shutdown of a part of the electrical energy supply network.
Figur 2 zeigt ein Diagramm, in dem in durchgezogener Linie der Verlauf eines durch Sättigung gestörten Sekundärstromes i2 (t) eines Stromwandlers über der Zeit t dargestellt ist. Zum Vergleich ist in gestrichelter Line der zeitliche Verlauf des Sekundärstromes i2 (t) für den Fall dargestellt, dass keine Stromwandlersättigung vorliegen würde. Man erkennt zu einem Zeitpunkt tstarti den Beginn eines ersten durch Stromwandlersättigung gestörten Sekundärstromverlaufes, der zum Zeitpunkt tEridei endet. Dem Endzeitpunkt der ersten Stromwandlersättigung tEridei folgt ein ungesättigter Verlauf des Sekundärstromes i2 (t) bis zum Zeitpunkt tstart2 ein zweiter durch Stromwandlersättigung gestörter Sekundärstromverlauf beginnt, der zum Zeitpunkt tEnde2 endet. Zwischen den Zeitpunkten tstarti und tEridei sowie tstart2 und tEnde2 ist folglich der Sekundärstromverlauf durch die Stromwandlersättigung gestört, die in diesen Zeiträumen erfassten Messwerte des Sekundärstromes ±2 (t) dürfen bei der weiteren Verarbeitung nicht in ihrer gestörten Form berücksichtigt werden, sondern müssen entsprechend korrigiert werden.FIG. 2 shows a diagram in which the course of a saturation-impaired secondary current i 2 (t) of a current transformer over the time t is shown in a solid line. For comparison, the time course of the secondary current i 2 (t) is shown in dashed line in the case that there would be no current transformer saturation. It can be seen at a time tstarti the beginning of a first disturbed by current transformer saturation secondary current waveform , which ends at time t Eride i. The end time of the first current transformer saturation t Eride i is followed by an unsaturated curve of the secondary current i 2 (t) until the time t sta r t 2 a second secondary current waveform disturbed by current transformer saturation begins, which ends at the time t Ende2 . Between times t sta RTI un dt eRIDE i and t star t2 and t End2 the secondary current flow is consequently disturbed by the current transformer saturation, the measured values of the secondary current ± 2 (t) detected during these periods may not be considered in its distorted shape during further processing but must be corrected accordingly.
Figur 3 zeigt einen Abschnitt 30 eines im Übrigen nicht näher dargestellten elektrischen Energieversorgungsnetzes. Ein elektrisches Schutzgerät 31 ist mit einem Messeingang 32 über einen in Figur 3 lediglich als Symbol dargestellten Stromwandler 33 mit dem Abschnitt 30 des elektrischenFIG. 3 shows a section 30 of an otherwise not further illustrated electrical energy supply network. An electrical protection device 31 is connected to a measuring input 32 via a current transformer 33 shown in Figure 3 only as a symbol with the portion 30 of the electrical
Energieversorgungsnetzes verbunden. Über den Messeingang 32 erfasst das elektrische Schutzgerät 31 den Sekundärstrom ±2 (t) in analoger Form. Der Sekundärstrom ±2 (t) wird mit einem Analog/Digital-Wandler 34 abgetastet und in digitale Messwerte i (n) umgesetzt, wobei der Index ,,n" zurEnergy supply network connected. Via the measuring input 32, the electrical protection device 31 detects the secondary current ± 2 (t) in analog form. The secondary current ± 2 (t) is sampled with an analog-to-digital converter 34 and converted into digital measured values i (n), wherein the index "n" to
Nummerierung des jeweiligen Abtastzeitpunktes dient.Numbering of the respective sampling time is used.
In nicht gezeigter Weise können auch weitere Vorverarbeitungsschritte hinsichtlich des Sekundärstromes ±2 (t) oder der Messwerte i (n) vorgenommen werden, wie beispielsweise eine analoge oder digitale Filterung. Schließlich werden die Messwerte i (n) einer Datenverarbeitungseinrichtung 35 des elektrischen Schutzgerätes 31 zugeführt, die anhand der Messwerte i (n) (und ggf. auch anderer in Figur 3 nicht dargestellter Messwerte) eine Entscheidung über den Zustand des Abschnittes 30 des elektrischen Energieversorgungsnetzes trifft. Erkennt die Datenverarbeitungseinrichtung 35 einen Fehler auf dem Abschnitt 30 des elektrischen Energieversorgungsnetzes, so gibt die Datenverarbeitungseinrichtung 35 über einen Auslöseausgang 36 ein Auslösesignal „TRIP" an einen Leistungsschalter 37 ab, der hierdurch zum Öffnen seiner Schaltkontakte veranlasst wird und somit den Abschnitt 30 des elektrischen Energieversorgungsnetzes vom restlichen Energieversorgungsnetz abtrennt.In a manner not shown, further preprocessing steps can be performed with regard to the secondary current ± 2 (t) or the measured values i (n), such as analog or digital filtering. Finally, the measured values i (n) are fed to a data processing device 35 of the electrical protection device 31, which is determined on the basis of the measured values i (n). (and possibly also other measured values not shown in FIG. 3) makes a decision about the state of the section 30 of the electrical energy supply network. If the data processing device 35 detects an error on the section 30 of the electrical energy supply network, the data processing device 35 outputs a trigger signal "TRIP" via a trip output 36 to a power switch 37, which is thereby caused to open its switch contacts and thus the section 30 of the electrical power supply network separated from the rest of the power grid.
Um keine ungewollte Fehlauslösung des Leistungsschalters 37 aufgrund durch Stromwandlersättigung gestörter Messwerte i (n) zu erhalten, wird in der Datenverarbeitungseinrichtung 35 des elektrischen Schutzgerätes 31 auch eine Überwachung der Messwerte i (n) auf eine Störung durch Stromwandlersättigung durchgeführt. Im Falle einer solchen Störung werden die betroffenen Messwerte i (n) entsprechend korrigiert, um die Störung durch Stromwandlersättigung zu kompensieren.In order not to obtain unwanted false tripping of the circuit breaker 37 due to measured values i (n) which are disturbed by current transformer saturation, the data processing device 35 of the electrical protection device 31 also monitors the measured values i (n) for a disturbance due to current transformer saturation. In the event of such a fault, the affected measured values i (n) are correspondingly corrected in order to compensate for the disturbance due to current transformer saturation.
Obwohl in Figur 3 beispielhaft auf ein elektrisches Schutzgerät 31 Bezug genommen worden ist, kann stattdessen mit dem Abschnitt 30 des elektrischen Energieversorgungsnetzes auch ein anderes elektrischesAlthough an electrical protective device 31 has been referred to by way of example in FIG. 3, another electric power may instead be provided to the section 30 of the electrical power supply network
Feldgerät, beispielsweise ein Messgerät oder ein sogenanntes Power-Quality-Gerät zur Überwachung derField device, such as a meter or a so-called power quality device for monitoring the
Elektroenergiequalität des elektrischen Stromes in dem Abschnitt 30, verbunden sein.Electric power quality of electric power in the section 30, be connected.
Figur 4 zeigt ein Verfahrensfließbild zur Erläuterung eines ersten Ausführungsbeispiels eines Verfahrens zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes eines Stromwandlers. In einem ersten Schritt 40 wird ein Sekundärstrom i2 (t) über den Stromwandler erfasst. Der erfasste Sekundärstrom i2 (t) wird in einem zweiten Schritt 41 mit einem Analog/Digital-Wandler (beispielsweise dem Analog/Digital-Wandler 34 in Figur 3) in digitale Messwerte i (n) umgesetzt .FIG. 4 shows a process flow diagram for explaining a first exemplary embodiment of a method for correcting a saturation-impaired secondary current profile of a current transformer. In a first step 40 is a Secondary current i 2 (t) detected via the current transformer. The detected secondary current i 2 (t) is converted in a second step 41 with an analog / digital converter (for example the analog / digital converter 34 in FIG. 3) into digital measured values i (n).
Bezüglich des aktuellen Messwertes i (n) wird in einem weiteren Schritt 42 abgeprüft, ob eine Störung durch Stromwandlersättigung vorliegt. Ist dies nicht der Fall, so wird der nächstfolgende Messwert aus dem Sekundärstrom i2 (t) erfasst, wie dies durch den Ausdruck ,,i(n+l) ..." in Schritt 43 angedeutet ist. Dieser nächstfolgende Messwert wird wiederum als aktueller Messwert i (n) gemäß Schritt 41 behandelt und im Schritt 42 auf eine Störung durch Stromwandlersättigung überprüft.With respect to the current measured value i (n), a further step 42 checks whether there is a disturbance due to current transformer saturation. If this is not the case, then the next following measured value is detected from the secondary current i 2 (t), as indicated by the expression "i (n + 1)..." In step 43. This next following measured value is again referred to as current measured value i (n) treated according to step 41 and checked in step 42 for a disturbance by current transformer saturation.
Wird in Schritt 42 erkannt, dass eine Störung durch Stromwandlersättigung vorliegt, so wird in Schritt 44 ein Startzeitpunkt tStart festgelegt, der den Beginn der Stromwandlersättigung angibt. In einem weiteren Schritt 45 werden anhand von Messwerten, die vor dem Startzeitpunkt tstart ~ also im ungesättigten Bereich - liegen, charakteristische Parameter des Sekundärstromverlaufes bei fehlender Sättigung bestimmt. Unter Verwendung dieser charakteristischen Parameter wird dann in Schritt 46 eine Korrektur des aktuellen Messwertes vorgenommen.If it is detected in step 42 that there is a disturbance due to current transformer saturation, then in step 44 a starting time t S tart is determined, which indicates the beginning of the current transformer saturation. In a further step 45, characteristic parameters of the secondary current profile are determined in the absence of saturation on the basis of measured values which lie before the starting time ts ta r t ~ in the unsaturated region. Using these characteristic parameters, a correction of the current measured value is then carried out in step 46.
In einem weiteren Schritt 47 wird nachfolgend überprüft, ob bereits ein Ende der Störung durch Stromwandlersättigung erreicht ist. Ist dies nicht der Fall, so wird - wie durch Schritt 48 mit der Formulierung ,,i(n+l) ..." angedeutet - der nächstfolgende Messwert aus dem Sekundärstrom i2 (t) erfasst und unter Verwendung der im Schritt 45 ermittelten charakteristischen Parameter einer Korrektur in Schritt 46 unterzogen .In a further step 47, it is subsequently checked whether an end of the disturbance by current transformer saturation has already been reached. If this is not the case, then - as indicated by step 48 with the formulation "i (n + l)..." - the next following measured value is detected from the secondary current i 2 (t) and determined using step 45 characteristic parameters of a correction in step 46.
Ergibt die Überprüfung in Schritt 47, dass ein Ende der Störung durch Sättigung erreicht ist, so wird einIf the check in step 47 shows that an end of the disturbance by saturation has been reached, then a
Endzeitpunkt tEride festgesetzt. Die nach diesem Endzeitpunkt tEnde aufgenommenen Messwerte i (n) werden keiner Korrektur mehr unterzogen, da sie nicht durch Stromwandlersättigung gestört sind. Folglich gibt Schritt 49 das Ende des erläuterten Verfahrens bezüglich der erkannten End time t Eride fixed. The measured values i (n) recorded after this end time t end are no longer subjected to correction since they are not disturbed by current transformer saturation. Thus, step 49 gives the end of the explained method with respect to the recognized one
Stromwandlersättigung an. Das Verfahren beginnt danach zur Erkennung einer nächsten Störung durch Stromwandlersättigung wieder bei Schritt 41 mit der Erfassung des nächsten aktuellen Messwertes i (n) .Current transformer saturation on. The method then begins to detect a next disturbance due to CT saturation again at step 41 with the acquisition of the next current measured value i (n).
Das in Figur 4 dargestellte Verfahren zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes kann mit einer Datenverarbeitungseinrichtung, die über entsprechende Rechenleistung verfügt, in Echtzeit durchgeführt werden, da jeder durch Stromwandlersättigung gestörte Messwert unverzüglich einer Korrektur unterzogen wird. Um kleinere Verzögerungen in der Berechnung auszugleichen, kann ein Pufferspeicher verwendet werden, der die aufgenommenen Messwerte zwischenspeichert.The method illustrated in FIG. 4 for correcting a saturation-impaired secondary current profile can be carried out in real time with a data processing device which has corresponding computing power, since each measured value which is disturbed by current transformer saturation is immediately subjected to a correction. To compensate for smaller delays in the calculation, a buffer memory can be used, which temporarily stores the recorded measured values.
Hingegen stellt das in dem weiteren Verfahrensfließbild gemäß Figur 5 dargestellte zweite Ausführungsbeispiel eines Verfahrens zum Korrigieren eines durch Stromwandlersättigung gestörten Sekundärstromverlaufes ein Verfahren dar, das nicht in Echtzeit durchgeführt wird. Dieses Ausführungsbeispiel des Verfahrens kann auch mit Datenverarbeitungseinrichtungen mit geringerer Rechenleistung durchgeführt werden, sofern eine gewisse Verzögerung der Korrektur der Messwerte hingenommen werden kann. Dies ist beispielsweise bei Power-Quality- Geräten der Fall, da hier abweichend zu einem Schutzgerät üblicherweise keine zeitkritische Entscheidung über einen Sicherheitszustand des elektrischen Energieversorgungsnetzes getroffen werden muss.On the other hand, the second exemplary embodiment of a method for correcting a secondary current profile that is disturbed by current transformer saturation illustrated in the further process flow diagram of FIG. 5 represents a method that is not performed in real time. This exemplary embodiment of the method can also be carried out with data processing devices having a lower computing power, provided that a certain delay in the correction of the measured values can be accepted. This is the case, for example, with power quality Devices of the case, since deviating from a protective device usually no time-critical decision on a safety state of the electrical energy supply network must be made.
Da das Verfahren gemäß Figur 5 in der Mehrzahl seiner Schritte dem Verfahren gemäß Figur 4 entspricht, sind die sich entsprechenden Verfahrensschritte durch dieselben Bezugszeichen gekennzeichnet. Die Abfolge der Verfahrensschritte 40 bis 45 ist dieselbe wie bei dem in Figur 4 behandelten Ausführungsbeispiel.Since the method according to FIG. 5 corresponds in the majority of its steps to the method according to FIG. 4, the corresponding method steps are identified by the same reference symbols. The sequence of method steps 40 to 45 is the same as in the embodiment discussed in FIG.
Nach der Bestimmung der charakteristischen Parameter in Schritt 45 wird gemäß dem Ausführungsbeispiel in Figur 5 zunächst in einem folgenden Schritt 50 überprüft, ob die Störung durch Stromwandlersättigung beendet ist. Ist dies nicht der Fall, so wird, wie durch Schritt 51 angedeutet, der nächste Messwert aufgenommen und wiederum in Schritt 50 daraufhin überprüft, ob ein Ende der Störung durch Stromwandlersättigung vorliegt.After the determination of the characteristic parameters in step 45, according to the exemplary embodiment in FIG. 5, it is first checked in a following step 50 whether the disturbance is terminated by current transformer saturation. If this is not the case, then, as indicated by step 51, the next measured value is recorded and, in turn, then checked in step 50 whether there is an end to the disturbance due to current transformer saturation.
Wird in Schritt 50 das Ende der Störung durch Stromwandlersättigung erkannt, wird der Endzeitpunkt tEnde festgelegt. Erst anschließend werden im Schritt 52 alle zwischen dem Startzeitpunkt tstart und dem Endzeitpunkt tEnde aufgenommenen Messwerte einer Korrektur unterzogen.If the end of the fault is detected by current transformer saturation in step 50, the end time t E n de is determined. Only then, in step 52, are all the measured values recorded between the start time tstart and the end time t E subjected to a correction.
Das Ausführungsbeispiel gemäß Figur 5 unterscheidet sich folglich von dem Ausführungsbeispiel gemäß Figur 4 dadurch, dass zunächst der Endzeitpunkt tEride abgewartet wird und erst dann in einem gemeinsamen Korrekturschritt alle zwischen dem Startzeitpunkt und dem Endzeitpunkt aufgenommenen Messwerte korrigiert werden. Nach der in Schritt 52 vorgenommenen Korrektur endet in Schritt 53 das Verfahren bezüglich der erkannten Störung und es beginnt wiederum beim nächsten Messwert das Verfahren erneut, um die nächste Störung durch Stromwandlersättigung erkennen zu können.The exemplary embodiment according to FIG. 5 thus differs from the exemplary embodiment according to FIG. 4 in that first the end time t Eride is awaited and only then in a common correction step are all measured values recorded between the start time and the end time corrected. After the correction made in step 52, the process with respect to the detected fault ends in step 53, and the method begins again on the next measured value in order to be able to recognize the next disturbance due to current transformer saturation.
Im Folgenden sollen ausgewählte wesentlicheThe following are selected essential
Verfahrensschritte der Ausführungsbeispiele gemäß Figur 4 und Figur 5 näher erläutert werden.Steps of the embodiments according to Figure 4 and Figure 5 are explained in more detail.
I. Erkennung einer Störung durch Sättigung (Schritt 41 in Figuren 4 und 5)I. Detection of disturbance by saturation (step 41 in FIGS. 4 and 5)
Jeder aktuelle aufgenommene Messwert i (n) desEach current measured value i (n) of the
Sekundärstromverlaufes ±2 (t) wird daraufhin überprüft, ob er durch eine Störung aufgrund Stromwandlersättigung verfälscht ist. Ein Logik-Diagramm der Vorgehensweise zur Überprüfung auf Störung durch Stromwandlersättigung ist in Figur 6 dargestellt. Zum besseren Verständnis der Vorgehensweise kann das in Figur 8 dargestellte Diagramm herangezogen werden, in dem ein durch Stromwandlersättigung gestörter Sekundärstromverlauf ±2 (t) über der Zeit t aufgetragen ist. In gestrichelter Linie ist zum Vergleich der (erwartete) ungesättigte Verlauf des Sekundärstromes dargestellt, während in durchgezogener Linie der durch Sättigung gestörte Verlauf des Sekundärstromes dargestellt ist.Secondary current waveform ± 2 (t) is checked to see if it is corrupted by a disturbance due to CT saturation. A logic diagram of the procedure for checking for disturbance due to current transformer saturation is shown in FIG. For a better understanding of the procedure, the diagram shown in Figure 8 can be used, in which a disturbed by current transformer saturation secondary current waveform ± 2 (t) over the time t is plotted. In a dashed line, the (expected) unsaturated course of the secondary flow is shown for comparison, while in a solid line the disturbed by saturation course of the secondary flow is shown.
In einem Block 60 wird der jeweils aktuelle Messwert i (n) zur Überprüfung auf Störung durch Stromwandlersättigung bereitgestellt. Zur Überprüfung, ob der aktuelle Messwert i (n) durch Stromwandlersättigung gestört ist, wird der aktuelle Messwert i (n) einem ersten Schwellenwertglied 61 zugeführt. In diesem Schwellenwertglied wird zunächst ein erster Differenzwert als Betrag der Differenz zwischen dem aktuellen Messwert i (n) und einem Vorhersagewert ie (n) , der einen erwarteten Verlauf des Sekundärstromes unter Verwendung zumindest zweier dem aktuellen Messwert i (n) unmittelbar vorangehender Messwerte i(n-l) und i(n-2) angibt, gebildet. Dieser erste Differenzwert wird mit einem ersten Schwellenwert SW1 derart verglichen, dass sich die Bedingung gemäß folgender Gleichung (1) ergibt.In a block 60, the respectively current measured value i (n) is provided for checking for disturbance due to current transformer saturation. To check whether the current measured value i (n) is disturbed by current transformer saturation, the current measured value i (n) is fed to a first threshold element 61. In this threshold member is first a first difference value as an amount of the difference between the current measured value i (n) and a predicted value i e (n), which determines an expected course of the secondary current using at least two measured values i (nl) and i (i) directly preceding the current measured value i (n) n-2). This first difference value is compared with a first threshold value SW 1 such that the condition results according to the following equation (1).
|/e(n)-/(n)|>^ (D| / e (n) - / (n) |> ^ (D
Der Vorhersagewert ie (n) wird unter der Annahme bestimmt, dass sich bei genügend kleinem zeitlichem Abstand der Abtastungen der Messwerte i (n) die Steigung des Sekundärstromverlaufes zwischen zwei Abtastwerten quasi nicht verändert und folglich die erste zeitliche Ableitung des Verlaufes konstant ist. Bei Verwendung der dem aktuellen Messwert i (n) unmittelbar vorangehenden beiden Messwerte i (n- 1) und i(n-2) ergibt sich unter dieser Annahme zur Berechnung des Vorhersagewertes ie (n) die folgende Gleichung (2)The predicted value i e (n) is determined on the assumption that, given a sufficiently small time interval between the samples of the measured values i (n), the slope of the secondary current profile between two sampled values virtually does not change and consequently the first time derivative of the curve is constant. When using the two measured values i (n-1) and i (n-2) immediately preceding the current measured value i (n), the following equation (2) is used to calculate the predicted value i e (n) under this assumption.
ie(n) = 2i(n-l)-i(n-2) (2)i e (n) = 2i (nl) -i (n-2) (2)
Der in dem Schwellenwertglied 61 verwendete Schwellenwert SW1 kann beispielsweise einen beliebigen fest vorgegebenen Wert besitzen. Als besonders vorteilhaft wird es jedoch angesehen, wenn der Schwellenwert SW1 zur Beurteilung des aktuellen Abtastwertes i (n) von der Höhe des dem aktuellen Abtastwert i (n) unmittelbar vorangehenden Abtastwertes i(n-l) abhängt. Hierdurch wird nämlich gewährleistet, dass in Fällen sehr hoher Messwerte auch ein entsprechend hoher Schwellenwert SW1 verwendet wird. So wird für die Entscheidung, ob eine Störung durch Stromwandlersättigung vorliegt, eine ausreichende Toleranz gewährleistet. Zur Bildung des Schwellenwertes SWi wird demgemäß folgende Gleichung (3) vorgeschlagenFor example, the threshold SW 1 used in the threshold 61 may have any predetermined value. However, it is considered particularly advantageous if the threshold value SW 1 for the evaluation of the current sample value i (n) depends on the height of the sample value i (nl) immediately preceding the current sample value i (n). This ensures that, in cases of very high measured values, a correspondingly high threshold SW 1 is also used. Thus, for the decision whether there is a disturbance due to current transformer saturation, a sufficient Tolerance guaranteed. In order to form the threshold value SWi, the following equation (3) is accordingly proposed
SW1 = 0,2i(n - 1) ( 3 ) ,SW 1 = 0,2i (n - 1) (3),
wobei anstelle des Wertes 0,2 auch andere Faktoren eingesetzt werden können.whereby other factors can be used instead of the value 0.2.
Ergibt die Überprüfung in dem Schwellenwertglied 61, dass der erste Differenzwert gemäß Gleichung (1) dem erstenIf the check in the threshold element 61 shows that the first difference value according to equation (1) corresponds to the first
Schwellenwert SW1 entspricht oder diesen überschreitet, so wird ein erstes Sättigungsverdachtssignal V1 erzeugt, und es wird ein eine Störung durch Sättigung angebendes Sättigungssignal S in Block 62 erzeugt, wenn das erste Sättigungsverdachtssignal V1 vorliegt.Threshold SW 1 is equal to or greater than this, a first suspected saturation signal V 1 is generated and a saturation signal S indicative of saturation is generated in block 62 when the first suspect signal V 1 is present.
Wenn das Sättigungssignal S durch Block 62 erzeugt worden ist, wird in den Schritten 42 gemäß Figuren 4 und 5 eine Stromwandlersättigung erkannt, so dass die folgenden Schritte zur Korrektur der gestörten Messwerte eingeleitet werden können .If the saturation signal S has been generated by block 62, a current transformer saturation is detected in steps 42 according to FIGS. 4 and 5, so that the following steps for correcting the disturbed measured values can be initiated.
Um das in Figur 6 dargestellte vergleichsweise einfache Verfahren zu Erkennung einer Stromwandlersättigung noch zuverlässiger auszubilden, können bezüglich des aktuellen Messwertes weitere Bedingungen geprüft werden. Dies ist in Figur 7 dargestellt. Die in Figur 7 hinzukommenden Bedingungen können optional einzeln oder gemeinsam eingesetzt werden .In order to make the comparatively simple method for detecting a current transformer saturation shown in FIG. 6 even more reliable, further conditions can be checked with regard to the current measured value. This is shown in FIG. The conditions added in FIG. 7 can optionally be used individually or together.
Wie bereits zu Figur 6 erläutert, wird zunächst der aktuelle Messwert i (n) in Block 70 bereitgestellt. Im ersten Schwellenwertglied 71 findet die bereits im Zusammenhang mit Figur 6 besprochene Prüfung statt, die zur Erzeugung des ersten Sättigungsverdachtssignals Vi führt. Gemäß Figur 7 wird dieses erste Sättigungsverdachtssignal Vi nunmehr einem Eingang eines ersten UND-Gliedes 72 zugeführt.As already explained with reference to FIG. 6, the current measured value i (n) is first provided in block 70. In the first threshold member 71 is already in connection with 6, which leads to the generation of the first suspected saturation signal Vi. According to FIG. 7, this first suspected saturation signal Vi is now supplied to an input of a first AND element 72.
Um die Zuverlässigkeit der Überprüfung, ob eine Stromwandlersättigung vorliegt oder nicht, weiter zu erhöhen, kann in einem zweiten Schwellenwertglied 73 geprüft werden, ob der Betrag des ersten Differenzwertes | ie (n) -i (n) | einem zweiten Schwellenwert SW2 entspricht oder diesen überschreitet, wie in folgender Gleichung (4) dargestellt ist . In order to further increase the reliability of checking whether or not there is a current transformer saturation, it is possible to check in a second threshold element 73 whether the magnitude of the first difference value | i e (n) -i (n) | corresponds to or exceeds a second threshold value SW 2 , as shown in equation (4) below.
Ist die Bedingung gemäß Gleichung (4) erfüllt, so wird ein zweites Sättigungsverdachtssignal V2 erzeugt und einem weiteren Eingang des ersten UND-Gliedes 72 zugeführt.If the condition according to equation (4) is satisfied, a second saturation suspected signal V 2 is generated and fed to a further input of the first AND gate 72.
Der zweite Schwellenwert SW2 wird vorzugsweise inThe second threshold SW 2 is preferably in
Abhängigkeit eines sekundärseitigen Nennstromes INenn festgelegt, für den der Stromwandler im normalen Betrieb ausgelegt ist, so dass beispielsweise Gleichung (5) verwendet werden kann.Dependent on a secondary-side rated current I rated set for which the current transformer is designed in normal operation, so that, for example, equation (5) can be used.
5^=0,5-/^ (5)5 ^ = 0.5 - / ^ (5)
Anstelle des Faktors 0,5 können auch andere geeignete Faktoren verwendet werden. Durch die Verwendung eines in Abhängigkeit vom Nennstrom festgelegten Schwellenwertes SW2 können bezogen auf den Nennstrom des Stromwandlers vergleichsweise hohe Abweichungen des aktuellen Messwertes i (n) von dem Vorhersagewert ie (n) erkannt werden; bei einer solchen Abweichung ist die Wahrscheinlichkeit einer Stromwandlersättigung vergleichsweise hoch.Instead of the factor 0.5, other suitable factors may be used. By using a threshold value SW 2 defined as a function of the rated current, relatively high deviations of the current measured value i (n) from the predicted value i e (n) can be detected relative to the rated current of the current transformer; at a such a deviation, the probability of CT saturation is comparatively high.
Gemäß einer weiteren Bedingung zur Prüfung auf Stromwandlersättigung kann in Block 74 überprüft werden, ob zwischen dem aktuellen Strommesswert i (n) und einem unmittelbar davor aufgenommenen Messwert i(n-l) ein Nulldurchgang stattgefunden hat, d. h. ob einAccording to a further condition for testing for current transformer saturation, it can be checked in block 74 whether a zero crossing has taken place between the current current measurement value i (n) and a measurement value i (n-1) recorded immediately before it, ie. H. if a
Vorzeichenwechsel eingetreten ist. Dies wird gemäß folgender Gleichung (6) geprüft, wobei die Funktion „Sign" zurSign change occurred. This is tested according to the following equation (6), wherein the function "Sign" for
Ermittlung des Vorzeichens des jeweiligen Messwertes dient.Determination of the sign of the respective measured value is used.
Sign(i(n))=Sign(i(n-l)) (6)Sign (i (n)) = Sign (i (n-1)) (6)
Block 74 gibt dann ein drittes Sättigungsverdachtssignal V3 an seinem Ausgang ab, wenn kein Vorzeichenwechsel stattgefunden hat, also der aktuelle Messwert i (n) und der unmittelbar vorangehende Messwert i(n-l) dasselbe Vorzeichen aufweisen. Das dritte Sättigungsverdachtssignal V3 wird einem weiteren Eingang des ersten UND-Gliedes 72 zugeführt.Block 74 then emits a third suspected saturation signal V3 at its output if no sign change has taken place, that is, the current measured value i (n) and the immediately preceding measured value i (n-1) have the same sign. The third suspected saturation signal V3 is supplied to a further input of the first AND gate 72.
In einem dritten Schwellenwertbaustein 75 kann schließlich geprüft werden, ob der Betrag des Vorhersagewertes ie (n) oberhalb eines dritten Schwellenwertes SW3 liegt, wie in folgender Gleichung (7) dargestellt ist. Finally, in a third threshold module 75, it is possible to check whether the magnitude of the predicted value i e (n) lies above a third threshold value SW 3 , as shown in equation (7) below.
Hierdurch wird berücksichtigt, dass die Wahrscheinlichkeit einer Stromwandlersättigung bei sehr hohen Strömen vergleichsweise hoch ist. Ist die Bedingung gemäß Gleichung (7) erfüllt, wird ein viertes Sättigungsverdachtssignal V4 erzeugt und einem weiteren Eingang des ersten UND-Gliedes 72 zugeführt .This takes into account that the probability of a current transformer saturation at very high currents is comparatively high. If the condition according to equation (7) is satisfied, a fourth suspected saturation signal V 4 generated and a further input of the first AND gate 72 is supplied.
Beispielsweise kann als dritter Schwellenwert SW3 ein Schwellenwert gemäß folgender Gleichung (8) gewählt werden, so dass auch der dritte Schwellenwert SW3 in Abhängigkeit von dem (bezüglich der Sekundärseite des Stromwandlers) vorgesehenen Nennstrom INenn des Stromwandlers festgelegt sein kann .For example, as the third threshold value SW 3, a threshold value can be selected according to the following equation (8), so that the third threshold value SW 3 can also be determined as a function of the nominal current I nominal of the current transformer (with respect to the secondary side of the current transformer).
SW3=I- INenn (8)SW 3 = I- I nominal (8)
Anstelle des Faktors 2 kann auch in diesem Fall ein geeigneter anderer Faktor verwendet werden.Instead of the factor 2, a suitable other factor can also be used in this case.
Das erste UND-Glied 72 liefert dann ein Ausgangssignal, wenn alle abgeprüften Bedingungen erfüllt sind, d. h. wenn alle Sättigungsverdachtssignale V1 bis V4 eingangsseitig an dem ersten UND-Glied 72 anstehen. Das von dem ersten UND-Glied 72 abgegebene Ausgangssignal wird einem zweiten UND-Glied 76 eingangsseitig zugeführt.The first AND gate 72 then provides an output signal when all tested conditions are fulfilled, ie when all suspected saturation signals V 1 to V 4 are present at the input to the first AND gate 72. The output from the first AND gate 72 output is supplied to a second AND gate 76 on the input side.
Wie bereits erwähnt, ist es auch möglich, zusätzlich zu der in Schwellenwertglied 71 formulierten Bedingung nur einen Teil der übrigen Bedingungen zur Prüfung vorzusehen. In diesem Fall liefert das erste UND-Glied 72 dann ein Ausgangssignal, wenn alle zu den jeweils abgeprüften Bedingungen gehörenden Verdachtssignale anstehen.As already mentioned, it is also possible, in addition to the condition formulated in threshold element 71, to provide only part of the remaining conditions for testing. In this case, the first AND gate 72 then provides an output signal when all suspicious signals belonging to the respectively tested conditions are present.
Um die Zuverlässigkeit der Überprüfung aufTo the reliability of the review
Stromwandlersättigung noch weiter zu erhöhen, kann in einem vierten Schwellenwertglied 77 überprüft werden, ob der Betrag des ersten Differenzwertes | ie (n) -i (n) | gemäß Gleichung (9) einem vierten Schwellenwert SW4 entspricht oder diesen übersteigt . To further increase current transformer saturation, it is possible to check in a fourth threshold element 77 whether the magnitude of the first difference value | i e (n) -i (n) | according to equation (9) corresponds to or exceeds a fourth threshold SW 4 .
Der vierte Schwellenwert SW4 kann in diesem Fall beispielsweise gemäß Gleichung (10) gewählt werden. The fourth threshold value SW 4 can in this case be selected, for example, according to equation (10).
Der vierte Schwellenwert ist wiederum in Abhängigkeit des (sekundärseitigen) Nennstromes des Stromwandlers gewählt, wobei auch hier wiederum andere Faktoren denkbar sind. Die Bedingung gemäß Gleichung (9) ist üblicherweise zu Beginn eines primärseitig aufgetretenen Fehlers erfüllt. Ist die Bedingung gemäß Gleichung (9) erfüllt, so wird ein erstes Sättigungsrücknahmesignal Ri an ein drittes UND-Glied 78 abgegeben .The fourth threshold value is in turn selected as a function of the rated current (secondary side) of the current transformer, whereby here again other factors are conceivable. The condition according to equation (9) is usually fulfilled at the beginning of a primary-side fault. If the condition according to equation (9) is satisfied, then a first saturation return signal Ri is delivered to a third AND gate 78.
Außerdem wird in einem fünften Schwellenwertglied 79 überprüft, ob der Verdachtswert ie (n) gemäß Gleichung (11) unterhalb eines fünften Schwellenwertes SW5 liegt. In addition, it is checked in a fifth threshold element 79 whether the suspected value i e (n) according to equation (11) is below a fifth threshold value SW 5 .
Der fünfte Schwellenwert SW5 kann in diesem Fall beispielsweise gemäß Gleichung (12) in Abhängigkeit von dem aktuellen Messwert i (n) gewählt werden.The fifth threshold value SW 5 in this case can be selected, for example, according to equation (12) as a function of the current measured value i (n).
SW5= 0,8-|/(^ (12) Die Bedingung gemäß Gleichung (11) ist beispielsweise bei einer Laständerung auf der Primärseite des Stromwandlers erfüllt.SW 5 = 0.8 | / (^ ( 12 ) The condition according to equation (11) is fulfilled, for example, with a load change on the primary side of the current transformer.
Ist auch die Bedingung gemäß Gleichung (11) erfüllt, wird ein zweites Sättigungsrücknahmesignal R2 an das dritte UND-Glied 78 abgegeben. Nur in dem Fall, dass beide Sättigungsrücknahmesignale Ri und R2 gleichzeitig eingangsseitig an dem dritten UND-Glied 78 anstehen, wird ein Rücknahmesignal R von dem dritten UND-Glied 78 erzeugt und in invertierter Form dem zweiten UND-Glied 76 zugeführt.If the condition according to equation (11) is also satisfied, a second saturation return signal R 2 is output to the third AND gate 78. Only in the case that both saturation return signals Ri and R 2 simultaneously present at the input side to the third AND gate 78, a return signal R is generated by the third AND gate 78 and supplied to the second AND gate 76 in an inverted form.
Das zweite UND-Glied 76 gibt daher genau dann ein Ausgangssignal an den Block 80 zur Erzeugung des Sättigungssignals S ab, wenn alle Sättigungsverdachtssignale der abgeprüften Bedingungen und gleichzeitig nicht das Rücknahmesignal R (also beide Sättigungsrücknahmesignale Ri und R2) vorliegen. Mit anderen Worten wird durch die Rücknahmebedingungen die Erzeugung eines Sättigungssignals dann blockiert, wenn genau beide Rücknahmebedingungen erfüllt sind.The second AND gate 76 therefore outputs an output signal to the block 80 for generating the saturation signal S if and only if all the suspected saturation signals of the tested conditions and at the same time not the return signal R (ie both saturation return signals Ri and R 2 ) are present. In other words, the return conditions block the generation of a saturation signal if exactly both return conditions are met.
II. Bestimmung des Startzeitpunktes (Schritt 44 in Figuren 4 und 5)II. Determining the Start Time (Step 44 in FIGS. 4 and 5)
Der Startzeitpunkt tstart/ zu dem die Stromwandlersättigung beginnt, und damit der erste Messwert, der durch Stromwandlersättigung gestört ist, kann im einfachsten Fall dadurch festgelegt werden, dass bei diesem Messwert die im Schritt 42 (vgl. Figuren 4 und 5) durchgeführte Überprüfung auf Stromwandlersättigung zum ersten Mal eine Störung erkannt hat. In diesem Fall müssen keine zusätzlichen Berechnungen zur Bestimmung des Startzeitpunktes tstart durchgeführt werden .The start time ts ta r t / at which the current transformer saturation begins, and thus the first measured value, which is disturbed by current transformer saturation, can be determined in the simplest case by performing this in step 42 (see FIGS. 4 and 5) Check for CT saturation for the first time has detected a fault. In this case, no additional calculations be performed to determine the start time tstart.
Um den Startzeitpunkt tstart noch genauer bestimmen zu können, besteht jedoch auch die Möglichkeit, einen zweiten Differenzwert als Betrag der Differenz zwischen dem aktuellen Messwert i (n) und einem Schätzwert is (n) zu bilden, wobei der Schätzwert is (n) einen erwarteten Verlauf des Sekundärstromes unter Verwendung zumindest dreier dem aktuellen Messwert i (n) unmittelbar vorangehender Messwerte angibt. Dieser Zusammenhang ist grafisch in einem Diagramm in Figur 9 dargestellt, in dem wiederum in durchgezogener Linie der zeitliche Verlauf eines durch Stromwandlersättigung gestörten Sekundärstromes ±2 (t) und in gestrichelter Linie der (erwartete) ungesättigte Verlauf des Sekundärstromes dargestellt ist.However, in order to be able to determine the start time t start even more precisely, it is also possible to form a second difference value as an amount of the difference between the current measured value i (n) and an estimated value i s (n), the estimated value i s (n ) indicates an expected course of the secondary current using at least three measured values immediately preceding the current measured value i (n). This relationship is shown graphically in a diagram in FIG. 9, in which the time curve of a secondary current which is disturbed by current transformer saturation ± 2 (t) and in dashed line the (expected) unsaturated course of the secondary current are again shown.
Unter der Annahme, dass zwischen den Messwerten i (n) , i(n-l) sowie i(n-l) und i(n-2) die zweite zeitliche Ableitung des Sekundärstromverlaufes konstant bleibt, lässt sich der Schätzwert is (n) gemäß Gleichung (13) berechnen.Assuming that the second time derivative of the secondary current profile remains constant between the measured values i (n), i (nl) and i (nl) and i (n-2), the estimated value i s (n) can be calculated according to equation ( 13).
is(n) = 3i(n -1) - 3i(n -2) + i(n-3) (13)i s (n) = 3 i (n -1) - 3 i (n -2) + i (n-3) (13)
Somit lässt sich der Schätzwert is (n) unter Zuhilfenahme der dem aktuellen Messwert vorhergehenden drei Messwerte i(n-l), i(n-2) und i (n-3) bestimmen.Thus, the estimated value i s (n) can be determined with the aid of the three measured values i (nl), i (n-2) and i (n-3) preceding the current measured value.
Die Genauigkeit lässt sich noch weiter erhöhen, wenn man annimmt, dass auch die dritte zeitliche Ableitung des Sekundärstromverlaufes konstant bleibt, so dass in diesem Fall für den Schätzwert is (n) Gleichung (14) gilt is (n) = 4i(n - 1) -6i(n - 2) +4i(n - 3) - i(n - 4) ( 14 ) ,The accuracy can be further increased if it is assumed that the third time derivative of the secondary current profile remains constant, so that applies in this case for the estimated value i s (n) equation (14) i s ( n ) = 4i (n-1) -6i (n-2) + 4i (n-3) -i (n-4) (14)
so dass der Schätzwert is (n) unter Zuhilfenahme der vier unmittelbar vor dem aktuellen Messwert liegenden Messwerte bestimmt wird.so that the estimated value i s (n) is determined with the aid of the four measured values lying immediately before the current measured value.
Der Startzeitpunkt tstart wird dann erkannt, wenn gemäß folgender Gleichung (15) die Differenz zwischen dem Betrag des Schätzwertes is (n) und dem Betrag des aktuellenThe starting time tstart is then recognized when, according to the following equation (15), the difference between the magnitude of the estimated value i s (n) and the amount of the current one
Messwertes i (n) größer ist als ein sechster Schwellenwert SW6.Measured value i (n) is greater than a sixth threshold SW 6 .
is(n)\-\i(n)\ >SW6 (15)i s (n) \ - \ i (n) \> SW 6 (15)
Hierbei kann der sechste Schwellenwert SW6 beispielsweise gemäß Gleichung (16) in Abhängigkeit des Schätzwertes is (n) und einem Faktor F gebildet werden, der die Schätzgenauigkeit des Algorithmus berücksichtigt. Der Faktor F wird in Abhängigkeit der Abtastfrequenz, mit der die Messwerte aufgenommen werden, und der Genauigkeit der verwendeten Gleichung (13 oder 14) gewählt und kann beispielsweise zwischen 0,02 und 0,12 liegen. In this case, the sixth threshold value SW 6 can be formed, for example, according to equation (16) as a function of the estimated value i s (n) and a factor F that takes into account the estimation accuracy of the algorithm. The factor F is chosen as a function of the sampling frequency with which the measured values are recorded and the accuracy of the equation used (13 or 14) and can be, for example, between 0.02 and 0.12.
Derjenige Messwert, der mit dem Startzeitpunkt tstart zusammenfällt, erhält eine entsprechende Markierung; ab diesem Messwert muss im Folgenden eine Korrektur der Messwerte vorgenommen werden (vgl. Figuren 4 und 5) . III. Bestimmung des Endzeitpunktes (Schritt 47 in Figur 4, Schritt 50 in Figur 5)The measured value which coincides with the starting time t sta r t receives a corresponding marking; From this measured value, a correction of the measured values must be made in the following (see Figures 4 and 5). III. Determination of the end time (step 47 in FIG. 4, step 50 in FIG. 5)
Zum Festlegen des Endzeitpunktes tEride, der das Ende der Stromwandlersättigung markiert, wird die Tatsache ausgenutzt, dass beim Durchlaufen einer kompletten Sättigungsphase der magnetische Fluss im Stromwandlerkern und somit auch das Integral über den Sekundärstrom den Wert Null annimmt. Dies ist anhand von Figur 10 näher dargestellt, die ein Diagramm mit dem zeitlichen Verlauf des durch Sättigung gestörten Sekundärstromes ±2 (t) in durchgezogener Linie zeigt.To set the end time t Eride , which marks the end of the current transformer saturation, the fact is exploited that assumes the passage of a complete saturation phase , the magnetic flux in the current transformer core and thus the integral via the secondary current value zero. This is illustrated in greater detail with reference to FIG. 10, which shows a diagram with the time profile of the saturation-impaired secondary current ± 2 (t) in a solid line.
Zum Bestimmen des Endzeitpunktes tEnde wird jeweils das Integral zwischen dem Startzeitpunkt tstart und dem aktuellen Messwert i (n) gebildet. Ergibt das Integral den Wert Null, so ist der Endzeitpunkt tEnde erreicht. Anschaulich gesehen müssen hierzu die Flächen 101 und 102 in Figur 10 denselben Betrag annehmen.In order to determine the end time t E n de , the integral between the start time ts ta r t and the current measured value i (n) is formed in each case. If the integral yields the value zero, the end time t E n de is reached. Illustratively, surfaces 101 and 102 in FIG. 10 must assume the same amount for this purpose.
Fällt der aktuelle Messwert i (n) beispielsweise auf den in Figur 10 dargestellten Zeitpunkt tm, so ist der Bestandteil 102a der Fläche 102 hinsichtlich seines Betrages kleiner als die Fläche 101. Der Endzeitpunkt ist zu diesem Zeitpunkt tm folglich noch nicht erreicht. Zum in Figur 10 markierten Zeitpunkt tEnde entsprechen sich die Beträge der Flächen 101 und 102, so dass das Integral den Wert Null annimmt. Somit gilt für den Endzeitpunkt tEride die Gleichung (17) .If the current measured value i (n) falls, for example, to the instant t m shown in FIG. 10, the component 102a of the surface 102 is smaller than the surface 101 in terms of its magnitude. The end time is therefore not yet reached at this time t m . At the time t E n de marked in FIG. 10, the amounts of the areas 101 and 102 correspond, so that the integral assumes the value zero. Thus, equation (17) applies to the end time t Eride .
) tStart Hierbei ist mit R der Widerstand des sekundären Wandlerkreises bezeichnet. Das Integral gemäß Gleichung (17) gibt somit den magnetischen Fluss im Wandlerkern an.) tStart Here, R denotes the resistance of the secondary converter circuit. The integral according to equation (17) thus indicates the magnetic flux in the transducer core.
Der Messwert, der mit dem Endzeitpunkt zusammenfällt, wird wiederum markiert. An dieser Stelle muss die Korrektur der Messwerte beendet werden, da danach ein ungesättigter Sekundärstromverlauf beginnt.The measured value which coincides with the end time is marked again. At this point, the correction of the measured values must be terminated, since then an unsaturated secondary current course begins.
IV. Bestimmung der Parameter des ungesättigten Sekundärstromverlaufes (Schritt 45 in Figuren 4 und 5)IV. Determination of the Parameters of the Unsaturated Secondary Current Course (Step 45 in FIGS. 4 and 5)
Im Folgenden wird erläutert, wie die zur Korrektur der durch Wandlersättigung gestörten Messwerte benötigten charakteristischen Parameter des ungesättigten Stromverlaufes bestimmt werden. Die charakteristischen Parameter werden unter Zuhilfenahme von Messwerten gebildet, die vor dem Startzeitpunkt tstart aufgenommen worden sind. Zur Bestimmung der charakteristischen Parameter kann vorteilhaft dieThe following section explains how to determine the characteristic parameters of the unsaturated current profile needed to correct the measurement values that are disturbed by the saturation of the transducer. The characteristic parameters are formed with the aid of measured values which were recorded before the starting time ts ta r t . To determine the characteristic parameters can advantageously the
Tatsache ausgenutzt werden, dass sich Stromverläufe, die beispielsweise aufgrund von Fehlern in dem elektrischen Energieversorgungsnetz entstehen, mit guter Näherung durch Überlagerung einer Grundschwingung mit einer Gleichstromkomponente darstellen lassen. Folglich müssen als charakteristische Parameter des ungesättigten Sekundärstromverlaufes einerseits eine Amplitude Ii der Grundschwingung und andererseits ein Anfangswert Io und eine Zeitkonstante Ta des Gleichstromanteils, bei dem es sich üblicherweise um einen exponentiell abnehmenden Gleichstromanteil handelt, bestimmt werden.It can be exploited that current waveforms that arise, for example, due to faults in the electrical energy supply network, can be represented with good approximation by superimposing a fundamental oscillation with a DC component. Consequently, as characteristic parameters of the unsaturated secondary current profile on the one hand an amplitude Ii of the fundamental and on the other hand an initial value Io and a time constant T a of the DC component, which is usually an exponentially decreasing DC component, are determined.
Nachfolgend wird beschrieben, wie die charakteristischen Parameter der Grundschwingung und der Gleichstromkomponente des ungesättigten Stromverlaufes aus wenigen vor dem Startzeitpunkt tstart liegenden Messwerten bestimmt werden. Hierzu wird davon ausgegangen, dass vier Messwerte aus dem ungesättigten Verlauf zur Verfügung stehen. Dies sind i(n-l), i (n-2) , i (n-3) und i (n-4) . Für den Messwert i (n-4) gilt Gleichung (18) :The following describes how the characteristic parameters of the fundamental and the DC components of the unsaturated current profile from a few before the start time ts ta r t lying measured values are determined. For this purpose, it is assumed that four measured values from the unsaturated course are available. These are i (nl), i (n-2), i (n-3) and i (n-4). For the measured value i (n-4), equation (18) applies:
i{n- A)=I0 -I1 -cos(ω-t + φ-ε) (18)i {n-A) = I 0 -I 1 -cos (ω-t + φ-ε) (18)
Für die übrigen Messwerte i (n-3) , i(n-2) und i(n-l) gelten entsprechend Gleichungen (19) bis (21)For the other measured values i (n-3), i (n-2) and i (n-1), equations (19) to (21) apply correspondingly
i(n - 3) =/0 • e - I1 cos(ω -t + φ) (19) i(n -I)=I0- e~2τ - I1 cos(<» -t + φ + ε) (20) i(n-l)=/0-e~3r -Ii -cos(ω-t + φ + 2ε) (21)i (n - 3) = / 0 • e ~ τ - I 1 cos (ω -t + φ) (19) i (n -I) = I 0 - e ~ 2τ - I 1 cos (<»- t + φ + ε) (20) i (nl) = / 0 -e ~ 3r -Ii-cos (ω-t + φ + 2ε) (21)
Für die Gleichungen mit (18) bis (21) wurden folgende Formelzeichen verwendet:For equations (18) to (21), the following symbols were used:
Ii : Amplitude der GrundschwingungIi: amplitude of the fundamental
Io : Anfangswert der GleichstromkomponenteIo: initial value of the DC component
Ts: AbtastzeitT s : sampling time
Ta: Zeitkonstante der Gleichstromkomponente φ: Phasenverschiebung τ = Ts/Ta ε = TsT a : time constant of the DC component φ: phase shift τ = T s / T a ε = T s * ω
Ordnet man die Gleichungen (18) bis (21) in eine Gleichung ein, erhält man:Assigning equations (18) through (21) to an equation yields:
i(n - 1) + i(n - 4) = I0[(l+ e~2τ)- 2e~τ ■ cos(ε)] + 2i(n -3) cos(ε) (22) Für kleine Werte von τ kann die Gleichung (22) vereinfacht werden, wobei die Annahme gemäß Gleichung (23) gilt.i (n-1) + i (n-4) = I 0 [(l + e ) -2e ~ τ ■ cos (ε)] + 2i (n -3) cos (ε) (22) For small values of τ, equation (22) can be simplified assuming equation (23).
l + e~2τ~2-e (23)l + e ~ 2τ ~ 2-e ~ τ (23)
Setzt man die Gleichung (23) in (22) ein, kann man den Wert der Gleichstromkomponente berechnen, der dem Messwert zum Zeitpunkt (n-3) entspricht.Substituting equation (23) into (22), one can calculate the value of the DC component corresponding to the measurement at time (n-3).
ι __τ ^ i(n -2) - 2i(n -3) • cos(ε) + i(n -4) °'e ~ 2-(l-cos(f))ι __ τ ^ i (n -2) - 2i (n -3) • cos (ε) + i (n -4) ° 'e ~ 2- (l-cos (f))
Entsprechend kann man schreiben:Accordingly one can write:
_2r i(n -1) - 2i(n - X) cos(ε) +i(n -3) h e ~ (25)_ 2r i (n -1) - 2 i (n - X) cos (ε) + i (n -3) h ~ e (25)
2-(l-cos(s))2- (l-cos (s))
Daraus ergibt sich der expotentielle Anteil der Gleichstromkomponente zu:This results in the exponential component of the DC component to:
c-T „ i(n ~1) ~ 2i(n -2) cosjε) +i(n -3) i(n - 2) - 2i(n -3) • cos(ε) + i(n -4)c- T " i (n ~ 1) ~ 2i (n -2) cosjε) + i (n -3) i (n - 2) - 2i (n -3) • cos (ε) + i (n - 4)
Hieraus ergibt sich τ und mit der Bedingung τ = Ts/Ta auch der Wert der Zeitkonstante Ta der Gleichstromkomponente. Setzt man Gleichung (26) in Gleichung (25) ein, lässt sich der Anfangswert Io der Gleichstromkomponente berechnen.This results in τ and with the condition τ = T s / T a also the value of the time constant T a of the DC component. Substituting equation (26) into equation (25), the initial value Io of the DC component can be calculated.
Mit beispielsweise den Messwerten i(n-2) und i (n-3) kann unter Verwendung der Gleichungen (19) und (20) bei bekannter Gleichstromkomponente die Amplitude Ii der Grundschwingung bestimmt werden. Eine Methode ist die Nutzung der Messwerte und der ersten Ableitung zwischen den Zeitpunkten (n-2) und (n-3) , so dass sich ergibt:With, for example, the measured values i (n-2) and i (n-3), the equations (19) and (20) can be used to determine the amplitude Ii of the fundamental oscillation for a known DC component. One method is the use of the measured values and the first derivative between times (n-2) and (n-3) to give:
Wobei die Stromwerte ip(n-2) und ip(n-3) mit folgenden aus (19) und (20) resultierenden Gleichungen bestimmt werden:. ip(n-3)=i (n-3) - I0 -e~ (28)Wherein the current values ip (n-2) and ip (n-3) are determined with the following equations (19) and (20): i p (n-3) = i (n-3) - I 0 -e ~ (28)
ip(n-2)=i (n-2) - I0 -e -2τ (29)i p (n-2) = i (n-2) - I 0 -e -2τ (29)
Auf diese Weise sind die benötigten charakteristischen Parameter, nämlich die Amplitude Ii der Grundschwingung und der Anfangswert Io sowie die Zeitkonstante Ta der Gleichstromkomponente bestimmt worden.In this way, the required characteristic parameters, namely the amplitude Ii of the fundamental and the initial value Io and the time constant T a of the DC component have been determined.
V. Korrektur der durch Sättigung gestörten Messwerte (Schritt 46 in Figur 4, Schritt 52 in Figur 5)V. Correction of Measurements Disturbed by Saturation (Step 46 in FIG. 4, Step 52 in FIG. 5)
Mit den auf die beschriebene Weise bestimmten charakteristischen Parametern können die durch Sättigung gestörten Messwerte korrigiert werden.With the characteristic parameters determined in the manner described, the saturation-disturbed measured values can be corrected.
Zur Korrektur der gestörten Messwerte wird zunächst der Phasenwinkel γ für den Abtastwert ip(n-2) geschätzt. Dies erfolgt mit der Gleichung:To correct the disturbed measured values, the phase angle γ for the sample value i p (n-2) is first estimated. This is done with the equation:
Y - (ω * t + φ + ε ) = sign[ip {n - 2) - ip (n - arccos : 30 ) Damit ergeben sich die korrigierten Messwerte ic zwischen dem Startzeitpunkt tstart und dem Endzeitpunkt tEnde zuY - (ω * t + φ + ε) = sign [i p {n - 2) - i p (n - arccos: 30) This results in the corrected measured values i c between the start time tstart and the end time t En de
Λnstart+h) = (I0 e ) e ^'^-I, - cos (χ+(h+2) - ε) ( 31 )Λn start + h) = (I 0 e ) e ^ '^ - I, - cos (χ + (h + 2) - ε) (31)
Hierbei ist mit nStart der Messwert zum Startzeitpunkt tstart bezeichnet. Der Zähler h ändert sich zwischen 0 (für den ersten Messwert der betroffenen Sättigungsperiode) und k (für den letzten Messwert der Sättigungsperiode) .In this case, the measured value is designated at the start time tstart with n S tart. The counter h changes between 0 (for the first measured value of the affected saturation period) and k (for the last measured value of the saturation period).
Gleichung (31) kann sowohl in Echtzeit als auch mit gespeicherten Messwerten durchgeführt werden. Bei Durchführung in Echtzeit wird die Korrektur immer bis zum aktuellen Messwert i (n) durchgeführt, der in diesem Fall dem Messwert i (nStart+h) entspricht, bis der Endzeitpunkt tEnde wie oben erläutert erkannt wird.Equation (31) can be performed both in real time and with stored measurements. When performed in real time, the correction is always performed up to the current measured value i (n), which in this case corresponds to the measured value i (n s tart + h), until the end time t E nde is recognized as explained above.
VI. „Künstliche Verlängerung" des ungesättigten SekundärstromverlaufesVI. "Artificial extension" of the unsaturated secondary current profile
Um eine möglichst zuverlässige Bestimmung der charakteristischen Parameter des ungesättigten Sekundärstromverlaufes vornehmen zu können, sollten möglichst viele Messwerte aus dem ungesättigten Bereich desIn order to be able to determine the characteristic parameters of the unsaturated secondary current profile as reliably as possible, as many measurements as possible from the unsaturated region of the
Stromwandlers vorliegen. Sind zu wenige Messwerte in dem ungesättigten Bereich aufgenommen worden, so lässt sich der Bereich ohne Stromwandlersättigung künstlich erweitern, indem auf der Basis der vor dem Startzeitpunkt tstart vorhandenen Messwerte Zukunftswerte gebildet werden, die einen erwarteten Verlauf des Sekundärstromes ±2 (t) nach dem Startzeitpunkt tstart angeben. Hierbei sollten mindestens zwei Zukunftswerte gebildet werden, um die Anzahl der für die Berechnung der charakteristischen Parameter verwendbaren Messwerte zu erhöhen. Die künstliche Erweiterung des ungesättigten Verlaufes kann anhand von Figur 11 näher erläutert werden.Current transformer present. If too few measured values have been recorded in the unsaturated region, then the range without current transformer saturation can be artificially expanded by forming future values on the basis of the measured values present before the starting time ts ta r t , which provide an expected secondary current ± 2 (t). specify after the start time ts ta r t . In this case, at least two future values should be formed to determine the number of times for the calculation of the characteristic values to increase the usable parameters. The artificial extension of the unsaturated course can be explained in more detail with reference to FIG. 11.
Die Vorhersage dreier Zukunftswerte, also der auf denThe prediction of three future values, ie the on the
Startzeitpunkt tstart folgenden Messwerte iF(n), iF(n+l) und iF(n+2) ohne Sättigungseinfluss wird mit folgenden Gleichungen (32) bis (34) durchgeführt. Auf diese folgende Zukunftswerte werden entsprechend abgeleitet.Start time t sta r t following measurements i F (n), i F (n + l) and i F (n + 2) without saturation influence is performed with the following equations (32) to (34). The following future values are derived accordingly.
iF{n)*2i{n-\)-{n-2) (32)i F {n) * 2i {n - \) - {n-2) (32)
iF(n +l)χ4iF(n)-6i(n-l) + 4i(n-2)-i(n-3) (33)i F (n + l) χ 4i F (n) -6i (nl) + 4i (n-2) -i (n-3) (33)
iF(n + 2)χ4iF(n +l)-6iF(n) + 4i(n-l)-i(n-2) (34)i F (n + 2) χ 4i F (n + 1) -6i F (n) + 4i (nl) -i (n-2) (34)
Die charakteristischen Parameter werden dann unter Verwendung der vorhandenen Messwerte aus dem ungesättigten Verlauf sowie der aus diesen berechneten Zukunftswerte gebildet.The characteristic parameters are then formed using the existing measured values from the unsaturated course and the future values calculated from these.
Die Bestimmung der Zukunftswerte kann auch dann sinnvoll sein, wenn beispielsweise in einem elektrischen Schutzgerät einige auf den Startzeitpunkt tstart folgende Messwerte in Form von Zukunftswerten kurzfristig benötigt werden, um einen sicherheitskritischen Schutzalgorithmus in kurzer Zeit durchzuführen. In diesem Fall kann der Schutzalgorithmus auf Grundlage der Zukunftswerte durchgeführt werden. Die Korrektur der durch Sättigung gestörten Messwerte erfolgt gleichzeitig. Der Schutzalgorithmus muss in diesem Fall daher nicht abwarten, bis die Korrektur der durch Sättigung gestörten Messwerte erfolgt ist. The determination of the future values can also be useful if, for example, in an electrical protection device, some measured values following the start time t sta r t are required in the short term in the form of future values in order to carry out a safety-critical protection algorithm in a short time. In this case, the protection algorithm can be performed based on the future values. The correction of saturation-disturbed measured values takes place simultaneously. In this case, the protection algorithm does not have to wait until the correction of saturation-impaired measured values has taken place.

Claims

PatentansprüchePatentansprüche Patent Claims Patent claims
1. Verfahren zum Korrigieren eines durch Sättigung gestörten Sekundärstromverlaufes (i2(t)) eines Stromwandlers (10), bei demA method for correcting a saturation-disturbed secondary current waveform (i 2 (t)) of a current transformer (10), wherein
- Messwerte (i (n) ) des Sekundärstromverlaufes (i2(t)) des Stromwandlers (10) erfasst werden; - die erfassten Messwerte (i (n) ) auf Vorliegen einer Störung durch Sättigung überprüft werden;- Measured values (i (n)) of the secondary current waveform (i 2 (t)) of the current transformer (10) are detected; - the acquired measured values (i (n)) are checked for the presence of a disturbance due to saturation;
- bei Vorliegen einer Störung durch Sättigung ein Startzeitpunkt (tstart) t der den Beginn der Sättigung angibt, bestimmt wird; und - die nach dem Startzeitpunkt (tstart) erfassten Messwerte unter Kompensation der Störung korrigiert werden; d a d u r c h g e k e n n z e i c h n e t, dassif a saturation disturbance is present, a start time (tstart) t, which indicates the beginning of saturation, is determined; and - the measured values acquired after the start time (tstart) are corrected while compensating for the disturbance; d a d u r c h e c e n c i n e s that
- anhand von Messwerten, die vor dem Startzeitpunkt (tstart) erfasst worden sind, charakteristische Parameter des Sekundärstromverlaufes (i2(t)) bei fehlender Sättigung bestimmt werden; und- characteristic parameters of the secondary current profile (i 2 (t)) are determined in the absence of saturation on the basis of measured values which were acquired before the start time (tstart); and
- unter Verwendung der bestimmten charakteristischen Parameter ein korrekter Verlauf der nach dem Startzeitpunkt (tstart) aufgenommenen Messwerte berechnet wird.a correct course of the measured values recorded after the start time (tstart) is calculated using the determined characteristic parameters.
2. Verfahren nach Anspruch 1, d a d u r c h g e k e n n z e i c h n e t, dass2. Method according to claim 1, characterized in that
- anhand der vor dem Startzeitpunkt (tstart) erfassten Messwerte charakteristische Parameter einer Grundschwingung und einer Gleichstromkomponente des Sekundärstromverlaufs (i2 (t) ) bestimmt werden.- Characteristic parameters of a fundamental and a DC component of the secondary current profile (i 2 (t)) are determined based on the measured values acquired before the start time (tstart).
3. Verfahren nach Anspruch 2, d a d u r c h g e k e n n z e i c h n e t, dass - als charakteristischer Parameter der Grundschwingung eine Amplitude (Ii) und als charakteristische Parameter der Gleichstromkomponente eine einen exponentiellen Anteil der Gleichstromkomponente beschreibende Zeitkonstante (Ta) und/oder ein Anfangswert (Io) des exponentiellen Anteiles bestimmt werden.3. The method according to claim 2, characterized in that an amplitude (Ii) is determined as the characteristic parameter of the fundamental oscillation, and a time constant (T a ) describing an exponential component of the DC component and / or an initial value (Io) of the exponential component are determined as characteristic parameters of the DC component.
4. Verfahren nach einem der vorangehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t, dass - unter Verwendung vor dem Startzeitpunkt (tstart) aufgenommener Messwerte zumindest zwei Zukunftswerte gebildet werden, die einen erwarteten Verlauf des Sekundärstromes (i2 (t) ) nach dem Startzeitpunkt (tstart) angeben.4. Method according to one of the preceding claims, characterized in that - at least two future values are formed using measured values taken before the start time (tstart), which indicate an expected course of the secondary current (i2 (t)) after the start time (tstart).
5. Verfahren nach Anspruch 4, d a d u r c h g e k e n n z e i c h n e t, dass5. The method of claim 4, wherein a
- die charakteristischen Parameter des Sekundärstromverlaufes (i2 (t) ) bei fehlender Sättigung anhand von Messwerten, die vor dem Startzeitpunkt (tstart) erfasst worden sind, und den Zukunftswerten bestimmt werden.- The characteristic parameters of the secondary current waveform (i2 (t)) are determined in the absence of saturation on the basis of measured values that were detected before the start time (tstart), and the future values.
6. Verfahren nach einem der vorangehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t, dass6. The method according to any one of the preceding claims, d a d u r c h e c e n e c e s in that e
- zum Überprüfen der Messwerte auf Vorliegen einer Störung durch Sättigung ein erster Differenzwert zwischen einem aktuellen Messwert (i (n) ) und einem Vorhersagewert (ie(n)) bestimmt wird, wobei der Vorhersagewert (ie(n)) einen erwarteten Verlauf des Sekundärstromes (i2(t)) unter Verwendung zumindest zweier dem aktuellen Messwert (i (n) ) unmittelbar vorangehender Messwerte angibt, und ein erstes Sättigungsverdachtssignal (V1) erzeugt wird, wenn der erste Differenzwert einem ersten Stromschwellenwert (SW1) entspricht oder diesen überschreitet; und - ein das Vorliegen einer Störung durch Sättigung angebendes Sättigungssignal (S) erzeugt wird, wenn das erste Sättigungsverdachtssignal (Vi) vorliegt.for checking the measured values for the presence of a disturbance due to saturation, a first difference value between a current measured value (i (n)) and a predicted value (i e (n)) is determined, wherein the predicted value (i e (n)) has an expected course of the secondary current (i2 (t)) using at least two measured values immediately preceding the current measured value (i (n)), and a first saturation suspected signal (V 1 ) being generated if the first difference value corresponds to a first current threshold value (SW 1 ) or exceeds this; and - A saturation signal indicating the presence of a saturation saturation signal (S) is generated when the first suspected saturation signal (Vi) is present.
7. Verfahren nach Anspruch 6, d a d u r c h g e k e n n z e i c h n e t, dass7. The method of claim 6, wherein a
- der erste Differenzwert zwischen dem aktuellen Messwert- the first difference value between the current measured value
(i (n) ) und dem Vorhersagewert (ie(n)) auch mit einem zweiten Stromschwellenwert (SW2) verglichen wird, wobei der zweite Stromschwellenwert (SW2) in Abhängigkeit von einem Nennstrom (INenn) gewählt wird, für den der Stromwandler (10) ausgelegt ist, und ein zweites Sättigungsverdachtssignal (V2) erzeugt wird, wenn der erste Differenzwert dem zweiten Stromschwellenwert (SW2) entspricht oder diesen überschreitet; und(i (n)) and the predicted value (i e (n)) is also compared with a second current threshold (SW 2 ), wherein the second current threshold (SW 2 ) is selected as a function of a nominal current (IN e nn) the current transformer (10) is designed, and a second saturation suspected signal (V 2 ) is generated when the first difference value to the second current threshold (SW 2 ) or exceeds; and
- das Sättigungssignal (S) nur dann erzeugt wird, wenn auch das zweite Sättigungsverdachtssignal (V2) vorliegt.- The saturation signal (S) is only generated when the second suspected saturation signal (V 2 ) is present.
8. Verfahren nach Anspruch 6 oder 7, d a d u r c h g e k e n n z e i c h n e t, dass8. A method as claimed in claim 6 or 7, wherein a
- überprüft wird, ob zwischen dem aktuellen Messwert (i (n) ) und demjenigen Messwert, der unmittelbar davor erfasst worden ist, ein Vorzeichenwechsel stattgefunden hat, und ein drittes Sättigungsverdachtssignal (V3) erzeugt wird, wenn kein Vorzeichenwechsel stattgefunden hat; und- it is checked whether a sign change has taken place between the current measured value (i (n)) and the measured value which was detected immediately before, and a third suspected saturation signal (V 3 ) is generated if no sign change has taken place; and
- das Sättigungssignal (S) nur dann erzeugt wird, wenn auch das dritte Sättigungsverdachtssignal (V3) vorliegt.- The saturation signal (S) is only generated when the third suspected saturation signal (V 3 ) is present.
9. Verfahren nach einem der Ansprüche 6 bis 8, d a d u r c h g e k e n n z e i c h n e t, dass9. The method according to any one of claims 6 to 8, d a d u c h e c e n e c i n e that t
- der Vorhersagewert (ie(n)) mit einem dritten Stromschwellenwert (SW3) verglichen wird und ein viertes Sättigungsverdachtssignal (V4) erzeugt wird, wenn der Betrag Jthe predicted value (i e (n)) is compared with a third current threshold (SW 3 ) and a fourth suspected saturation signal (V 4 ) is generated when the magnitude J
des Vorhersagewertes (ie(n)) oberhalb des dritten Stromschwellenwertes (SW3) liegt; undthe predicted value (i e (n)) is above the third current threshold (SW3); and
- das Sättigungssignal (S) nur dann erzeugt wird, wenn auch das vierte Sättigungsverdachtssignal (V4) vorliegt.- The saturation signal (S) is only generated when the fourth suspected saturation signal (V 4 ) is present.
10. Verfahren nach einem der Ansprüche 6 bis 9, d a d u r c h g e k e n n z e i c h n e t, dass10. The method of claim 6, wherein:
- der Differenzwert zwischen dem aktuellen Messwert (i (n) ) und dem Vorhersagewert (ie(n)) auch mit einem vierten Stromschwellenwert (SW4) verglichen wird, wobei der viertethe difference value between the current measured value (i (n)) and the predicted value (i e (n)) is also compared with a fourth current threshold value (SW 4 ), wherein the fourth
Stromschwellenwert (SW4) in Abhängigkeit von einem Nennstrom (INenn) gewählt wird, für den der Stromwandler (10) ausgelegt ist;Current threshold (SW 4 ) is selected in dependence on a rated current (I Ne nn), for which the current transformer (10) is designed;
- der Vorhersagewert (ie(n)) mit einem fünften Stromschwellenwert (SW5) verglichen wird;the predicted value (i e (n)) is compared with a fifth current threshold (SW 5 );
- ein Rücknahmesignal (R) erzeugt wird, wenn der Differenzwert dem vierten Stromschwellenwert (SW4) entspricht oder diesen überschreitet und der Vorhersagewert (ie(n)) kleiner als der fünfte Stromschwellenwert (SW5) ist; und - das Sättigungssignal (S) blockiert wird, wenn das Rücknahmesignal (R) vorliegt.- A return signal (R) is generated when the difference value is equal to or exceeds the fourth current threshold (SW 4 ) and the predicted value (i e (n)) is less than the fifth current threshold (SW 5 ); and - the saturation signal (S) is blocked when the return signal (R) is present.
11. Verfahren nach einem der Ansprüche 6 bis 10, d a d u r c h g e k e n n z e i c h n e t, dass - zur Bestimmung des Startzeitpunktes (tstart) das Vorliegen des Sättigungssignals (S) überwacht wird; und11. Method according to one of claims 6 to 10, characterized in that - to determine the start time (tstart), the presence of the saturation signal (S) is monitored; and
- der Startzeitpunkt dann (tstart) vorliegt, wenn das Sättigungssignal (S) erstmalig ansteht.- The start time then (tstart) is present when the saturation signal (S) is present for the first time.
12. Verfahren nach einem der Ansprüche 1 bis 10, d a d u r c h g e k e n n z e i c h n e t, dass12. The method of claim 1, wherein:
- zur Bestimmung des Startzeitpunktes (tstart) / der den Beginn der Sättigung angibt, ein zweiter Differenzwert zwischen dem Betrag des aktuellen Messwertes (i (n) ) und dem Betrag eines Schätzwertes (is(n)) bestimmt wird, wobei der Schätzwert (is(n)) einen erwarteten Verlauf des Sekundärstromes (i2(t)) unter Verwendung zumindest dreier dem aktuellen Messwert (i (n) ) unmittelbar vorangehender Messwerte angibt; und - der Startzeitpunkt (tstart) dann vorliegt, wenn der zweite Differenzwert einen sechsten Stromschwellenwert (SW6) überschreitet .for determining the start time (t sta r t ) / indicating the beginning of the saturation, a second difference value between the amount of the current measured value (i (n)) and the amount of a Estimated value (i s (n)) is determined, wherein the estimated value (i s (n)) indicates an expected course of the secondary current (i 2 (t)) using at least three measured values immediately preceding the current measured value (i (n)); and - the starting time (t sta r t ) is present when the second difference value exceeds a sixth current threshold (SW 6 ).
13. Verfahren nach Anspruch 12, d a d u r c h g e k e n n z e i c h n e t, dass13. The method of claim 12, wherein a
- der Schätzwert (is(n)) einen erwarteten Verlauf des Sekundärstromes (i2(t)) unter Verwendung von vier dem aktuellen Messwert (i (n) ) unmittelbar vorangehenden Messwerten angibt.- the estimated value (i s (n)) indicates an expected course of the secondary current (i2 (t)) using four measured values immediately preceding the current measured value (i (n)).
14. Verfahren nach Anspruch einem der vorangehenden Ansprüche, d a d u r c h g e k e n n z e i c h n e t, dass14. The method according to claim 1, wherein a
- auch ein Endzeitpunkt (tEnde) t der das Ende der Sättigung angibt, bestimmt wird, und- Also an end time (t E nde) t indicating the end of the saturation is determined, and
- die Korrektur der nach dem Startzeitpunkt (tstart) erfassten Messwerte mit dem Messwert beendet wird, der mit dem Endzeitpunkt (tEnde) zusammenfällt.- the correction of the measured values acquired after the start time (ts ta r t ) is ended with the measured value which coincides with the end time (t E nde).
15. Verfahren nach Anspruch 14, d a d u r c h g e k e n n z e i c h n e t, dass15. The method of claim 14, wherein a
- zur Bestimmung des Endzeitpunktes (tEnde) ein zeitliches Integral über den erfassten Verlauf der Messwerte des Sekundärstromes (i2(t)) gebildet wird, wobei die Integration mit dem Messwert beginnt, bei dem der Startzeitpunkt (tstart) festgestellt worden ist, und mit dem aktuellen Messwert (i (n) ) endet; und- To determine the end time (t E n de ) a time integral over the detected course of the measured values of the secondary current (i2 (t)) is formed, the integration begins with the measured value, in which the starting time (t sta r t ) detected and ends with the current measured value (i (n)); and
- der Endzeitpunkt (tEride) dann vorliegt, wenn das Integral den Wert Null ergibt. - The end time (t Eride ) is present when the integral is zero.
16. Elektrisches Feldgerät (31) mit16. Electrical field device (31) with
- einer Messwerterfassungseinrichtung (34), die zur Erfassung von Messwerten eines Sekundärstromverlaufes (i2(t)) eines Stromwandlers (33) eingerichtet ist, g e k e n n z e i c h n e t d u r c h- A measured value detection device (34), which is adapted to detect measured values of a secondary current waveform (i 2 (t)) of a current transformer (33), characterized by
- eine Datenverarbeitungseinrichtung (35), die zur Durchführung eines Verfahrens nach einem der Ansprüche 1 bis 15 eingerichtet ist. - A data processing device (35), which is adapted to carry out a method according to any one of claims 1 to 15.
EP08760204A 2007-05-31 2008-05-29 Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method Withdrawn EP2151030A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PL382552A PL382552A1 (en) 2007-05-31 2007-05-31 The manner of correction of the course of secondary current interrupted by saturation of current measuring transformer and electric device for execution of this process
PCT/EP2008/056613 WO2008145694A1 (en) 2007-05-31 2008-05-29 Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method

Publications (1)

Publication Number Publication Date
EP2151030A1 true EP2151030A1 (en) 2010-02-10

Family

ID=39874024

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08760204A Withdrawn EP2151030A1 (en) 2007-05-31 2008-05-29 Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method

Country Status (3)

Country Link
EP (1) EP2151030A1 (en)
PL (1) PL382552A1 (en)
WO (1) WO2008145694A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3447870B1 (en) 2017-08-22 2022-11-30 Siemens Aktiengesellschaft Differential protection method, differential protection device and differential protection system
AT525578B1 (en) 2022-04-01 2023-05-15 Sprecher Automation Gmbh Procedure for saturation detection of a current transformer

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19723422C1 (en) * 1997-06-04 1998-12-10 Siemens Ag Method and device for detecting and correcting a saturated current profile of a current transformer
FR2835319B1 (en) * 2002-01-29 2004-03-12 Alstom SATURATION DETECTION METHOD IN A CURRENT TRANSFORMER
US7103485B2 (en) * 2003-04-17 2006-09-05 Myongji University Method for compensating secondary current of current transformers
KR100580428B1 (en) * 2004-10-11 2006-05-15 명지대학교 산학협력단 A compensation method for the distorted secondary current of a current transformer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
None *
See also references of WO2008145694A1 *

Also Published As

Publication number Publication date
PL382552A1 (en) 2008-12-08
WO2008145694A1 (en) 2008-12-04

Similar Documents

Publication Publication Date Title
EP3379273B1 (en) Method, device and system for determining the location a fault on a line of an electrical energy supply network
DE112012001189B4 (en) Methods, systems and devices for the detection of parallel electrical arcing faults
DE102005028881B4 (en) Fault current analyzer for detecting a fault current and device with fault current detection function
DE112010000959B4 (en) Device for detecting insulation degradation
EP3447870B1 (en) Differential protection method, differential protection device and differential protection system
WO2016074742A1 (en) Differential protection method and differential protection device for performing a differential protection method
EP0890111A1 (en) Process for producing fault classification signals
EP3663783B1 (en) Magnetic field measuring device and method for detecting a location current in a branched ac power supply system
DE102016113624B4 (en) Motor drive with a function of detecting circuit abnormalities due to the intrusion of foreign matter before a significant abnormality occurs
EP3108554B1 (en) Differential protection method and differential protection device
EP2392934A1 (en) Method and device for surveillance of a sheath voltage arrester of a cable system
AT402770B (en) METHOD FOR MONITORING A THREE-PHASE NETWORK FOR A CHANGE IN THE TUNING COOLER
DE10251001B3 (en) Earth short-circuit fault signal provision method for multi-phase transmission line monitoring with detection of phase current transducer saturation
WO2008145694A1 (en) Method for correcting a secondary current path of a current converter disturbed by saturations, and electric field device for conducting said method
EP2901534B1 (en) Differential protection method and protective device for carrying out a differential protection method
EP3595114B1 (en) Method and arrangement for detecting a winding defect in a transformer on the basis of corresponding negative sequence current values
EP3080885B1 (en) Method and device for generating a resonance signal indicating the presence of a ferroresonant oscillation in an electrical system
WO2008025309A1 (en) Differential protection method and differential protection unit
DE4418124C2 (en) Device for detecting insulation deterioration on power supply lines
DE10253864B4 (en) Method and arrangement for earth fault monitoring of a stator in star connection
DE102012220474A1 (en) Method and device for monitoring a state of a transformer
EP1001270B1 (en) Method for testing a ground connection
EP3269015B1 (en) Method for determining states and locating faults in installed isolated down conductors in the external lightning protection means
EP3832823B1 (en) Method and devices for generating soil related information
EP3913382B1 (en) Method and device for determining the location of a three-pole assymetrical fault on a line of a three-phase electrical energy supply network

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20091109

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SIEMENS AKTIENGESELLSCHAFT

17Q First examination report despatched

Effective date: 20160923

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SIEMENS AKTIENGESELLSCHAFT

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20190131

RIN1 Information on inventor provided before grant (corrected)

Inventor name: WISZNIEWSKI, ANDRZEJ

Inventor name: SCHIEL, LUDWIG

Inventor name: REBIZANT, WALDEMAR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20190612