EP2067541A1 - Method for continuously manufacturing cold-rolled steel - Google Patents

Method for continuously manufacturing cold-rolled steel Download PDF

Info

Publication number
EP2067541A1
EP2067541A1 EP07254712A EP07254712A EP2067541A1 EP 2067541 A1 EP2067541 A1 EP 2067541A1 EP 07254712 A EP07254712 A EP 07254712A EP 07254712 A EP07254712 A EP 07254712A EP 2067541 A1 EP2067541 A1 EP 2067541A1
Authority
EP
European Patent Office
Prior art keywords
cold
steel
rolled steel
annealing
rolled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP07254712A
Other languages
German (de)
French (fr)
Other versions
EP2067541B1 (en
Inventor
I-Shou Lin
Wen-Chein Hsu
Chen-hui HUANG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yieh United Steel Corp
Original Assignee
Yieh United Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=39111880&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2067541(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Yieh United Steel Corp filed Critical Yieh United Steel Corp
Priority to EP07254712A priority Critical patent/EP2067541B1/en
Priority to PL07254712T priority patent/PL2067541T3/en
Priority to AT07254712T priority patent/ATE551131T1/en
Priority to ES07254712T priority patent/ES2384734T3/en
Priority to SI200730946T priority patent/SI2067541T1/en
Publication of EP2067541A1 publication Critical patent/EP2067541A1/en
Application granted granted Critical
Publication of EP2067541B1 publication Critical patent/EP2067541B1/en
Revoked legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • B21B1/24Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
    • B21B1/28Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by cold-rolling, e.g. Steckel cold mill
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0205Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23GCLEANING OR DE-GREASING OF METALLIC MATERIAL BY CHEMICAL METHODS OTHER THAN ELECTROLYSIS
    • C23G3/00Apparatus for cleaning or pickling metallic material
    • C23G3/02Apparatus for cleaning or pickling metallic material for cleaning wires, strips, filaments continuously
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/22Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0085Joining ends of material to continuous strip, bar or sheet
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B15/0007Cutting or shearing the product
    • B21B2015/0014Cutting or shearing the product transversely to the rolling direction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B15/00Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B2015/0064Uncoiling the rolled product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B3/00Rolling materials of special alloys so far as the composition of the alloy requires or permits special rolling methods or sequences ; Rolling of aluminium, copper, zinc or other non-ferrous metals
    • B21B3/02Rolling special iron alloys, e.g. stainless steel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B39/02Feeding or supporting work; Braking or tensioning arrangements, e.g. threading arrangements
    • B21B39/08Braking or tensioning arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0269Cleaning

Definitions

  • the invention relates to a method for continuously manufacturing cold-rolled steel, more particularly to a method for continuously manufacturing cold-rolled steel from white steel.
  • a conventional process for making stainless steel essentially includes casting, hot rolling, and cold rolling.
  • a steel slab obtained from casting is hot rolled to obtain a black steel coil, which is then annealed and pickled to obtain a white steel coil.
  • the white steel coil can be further processed by cold rolling, annealing, pickling, temper rolling, tension leveling, etc., to obtain a steel coil product.
  • the product obtained by cold rolling, annealing, and pickling is known as a 2D steel coil
  • the product obtained by further temper rolling and tension leveling the 2D steel coil is known as a 2B steel coil.
  • a conventional process for manufacturing cold-rolled steel is conducted using a multi-stage production line including a steel coil preparation installation 11, a cold rolling installation 12, an annealing-pickling installation 13, a temper rolling installation 14, and a tension leveling installation 15, which are separate from one another.
  • the steel coil preparation installation 11 is used for uncoiling a white steel coil 100 into a white steel strip 400, which is welded with guide portions each having a length of 8-10 meters at two ends thereof and is then coiled into a steel coil 200.
  • the steel coil 200 is transported to the cold rolling installation 12.
  • the steel coil 200 is uncoiled into a steel strip 400, which passes through the cold rolling installation 12.
  • the cold rolling installation 12 is a 20-high cold rolling mill, and is used for cold rolling the steel strip 400 to have a predetermined thickness.
  • the steel strip 400 after cold rolling is coiled into a steel coil 200, which is transported to the annealing-pickling installation 13.
  • the steel coil 200 is uncoiled into a steel strip 400, which passes through the annealing-pickling installation 13, in which the steel strip 400 is annealed, and is then pickled to remove scale from the steel strip 400.
  • the steel strip 400 after pickling is coiled into a steel coil 200, which is the 2D steel coil.
  • the 2D steel coil 200 can be further transported to the temper rolling installation 14.
  • the steel coil 200 is uncoiled into a steel strip 400, which passes through the temper rolling installation 14.
  • the temper rolling installation 14 is used for imposing gloss on the steel strip 400.
  • the steel strip 400 after temper' rolling is coiled into a steel coil 200, which is transported to the tension leveling installation 15.
  • the steel coil 200 is uncoiled into a steel strip 400, which passes through the tension leveling installation 15, in which the steel strip 400 is tension leveled, and is then trimmed and coiled to obtain a steel coil product 300 (i.e., the 2B steel coil).
  • U.S. Patent No. 6,478,899 discloses a method and an installation for making a cold-rolled stainless steel strip, and consists of continuously executing on a single production line all the process steps for fabricating a cold-rolled stainless strip from a thin strip cast directly from liquid metal, i.e., from the casting step through finishing steps to packaging the strip in the form of a coil.
  • the method and installation disclosed therein start from casting a stainless steel strip directly from liquid metal, the operating units and steps involved are relatively complicated. Therefore, the technique disclosed therein is impractical for use in the industry.
  • U.S. Patent No. 6,546,771 discloses a method for manufacturing strips of stainless steel, which comprises rolling in cold condition of strips which in a foregoing process have been manufactured through strip casting and/or have been hot rolled. According to various specific wants of the final product, the stainless steel shall pass once or twice through a rolling mill line. Additionally, the rolling mill line or parts of it also can be used for processes which are aimed at manufacturing strips with various specific features that are of significant importance for some applications. Since parts of the rolling mill line should be stopped in view of the specific requirements for the final product, the utilization rate of the rolling mill line is relatively low.
  • the object of the present invention is to provide a method for continuously manufacturing cold-rolled steel to overcome the aforementioned shortcomings of the prior art.
  • the method for continuously manufacturing cold-rolled steel of this invention includes the steps of:
  • the preferred embodiment of a method for continuously manufacturing cold-rolled steel according to this invention includes the steps of:

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Metal Rolling (AREA)
  • Heat Treatment Of Steel (AREA)
  • Cleaning And De-Greasing Of Metallic Materials By Chemical Methods (AREA)

Abstract

A method for continuously manufacturing cold-rolled steel includes the steps of: providing coils (100) of white steel (400) that are manufactured by hot rolling a cast steel followed by annealing and pickling the cast steel; subjecting the coil (100) of white steel (400) to uncoiling and welding in an uncoiling-welding installation (21); passing the flattened and welded white steel (400) through a first strip accumulator (22) and a cold rolling device (23) for cold rolling the white steel (400) to result in a cold-rolled steel with a predetermined thickness; and processing the cold-rolled steel in sequence using a degreasing device (24), a second strip accumulator (25), an annealing-pickling installation (26), a third strip accumulator (27), a temper rolling device (28), a tension leveling device (29), a fourth strip accumulator (31), and a trimming-recoiling installation (32).

Description

  • The invention relates to a method for continuously manufacturing cold-rolled steel, more particularly to a method for continuously manufacturing cold-rolled steel from white steel.
  • A conventional process for making stainless steel essentially includes casting, hot rolling, and cold rolling. A steel slab obtained from casting is hot rolled to obtain a black steel coil, which is then annealed and pickled to obtain a white steel coil. The white steel coil can be further processed by cold rolling, annealing, pickling, temper rolling, tension leveling, etc., to obtain a steel coil product. The product obtained by cold rolling, annealing, and pickling is known as a 2D steel coil, and the product obtained by further temper rolling and tension leveling the 2D steel coil is known as a 2B steel coil.
  • Referring to Figure 1, a conventional process for manufacturing cold-rolled steel is conducted using a multi-stage production line including a steel coil preparation installation 11, a cold rolling installation 12, an annealing-pickling installation 13, a temper rolling installation 14, and a tension leveling installation 15, which are separate from one another.
  • The steel coil preparation installation 11 is used for uncoiling a white steel coil 100 into a white steel strip 400, which is welded with guide portions each having a length of 8-10 meters at two ends thereof and is then coiled into a steel coil 200. The steel coil 200 is transported to the cold rolling installation 12.
  • The steel coil 200 is uncoiled into a steel strip 400, which passes through the cold rolling installation 12. The cold rolling installation 12 is a 20-high cold rolling mill, and is used for cold rolling the steel strip 400 to have a predetermined thickness. The steel strip 400 after cold rolling is coiled into a steel coil 200, which is transported to the annealing-pickling installation 13.
  • The steel coil 200 is uncoiled into a steel strip 400, which passes through the annealing-pickling installation 13, in which the steel strip 400 is annealed, and is then pickled to remove scale from the steel strip 400. The steel strip 400 after pickling is coiled into a steel coil 200, which is the 2D steel coil.
  • The 2D steel coil 200 can be further transported to the temper rolling installation 14. The steel coil 200 is uncoiled into a steel strip 400, which passes through the temper rolling installation 14. The temper rolling installation 14 is used for imposing gloss on the steel strip 400. The steel strip 400 after temper' rolling is coiled into a steel coil 200, which is transported to the tension leveling installation 15.
  • The steel coil 200 is uncoiled into a steel strip 400, which passes through the tension leveling installation 15, in which the steel strip 400 is tension leveled, and is then trimmed and coiled to obtain a steel coil product 300 (i.e., the 2B steel coil).
  • Since the installations 11, 12, 13, 14, 15 for performing the conventional process for manufacturing a cold-rolled steel are separate from one another, multiple packaging operations, such as intermediate coiling operations, and transfer of coils from one installation to another are required. Furthermore, it is also costly in terms of energy consumption because of multiple operations of transporting intermediate product (coils) between installations. Additionally, storage of intermediate product takes up space.
  • In order to overcome the aforesaid shortcomings encountered in the conventional multi-stage production line, it is desirable in the art to develop a continuous production line for manufacturing cold-rolled steel.
  • U.S. Patent No. 6,478,899 discloses a method and an installation for making a cold-rolled stainless steel strip, and consists of continuously executing on a single production line all the process steps for fabricating a cold-rolled stainless strip from a thin strip cast directly from liquid metal, i.e., from the casting step through finishing steps to packaging the strip in the form of a coil. However, since the method and installation disclosed therein start from casting a stainless steel strip directly from liquid metal, the operating units and steps involved are relatively complicated. Therefore, the technique disclosed therein is impractical for use in the industry.
  • U.S. Patent No. 6,546,771 discloses a method for manufacturing strips of stainless steel, which comprises rolling in cold condition of strips which in a foregoing process have been manufactured through strip casting and/or have been hot rolled. According to various specific wants of the final product, the stainless steel shall pass once or twice through a rolling mill line. Additionally, the rolling mill line or parts of it also can be used for processes which are aimed at manufacturing strips with various specific features that are of significant importance for some applications. Since parts of the rolling mill line should be stopped in view of the specific requirements for the final product, the utilization rate of the rolling mill line is relatively low.
  • It is still desirable in the art to provide an improved method for continuously manufacturing cold-rolled steel.
  • Therefore, the object of the present invention is to provide a method for continuously manufacturing cold-rolled steel to overcome the aforementioned shortcomings of the prior art.
  • Accordingly, the method for continuously manufacturing cold-rolled steel of this invention includes the steps of:
    • providing coils of white steel that are manufactured by hot rolling a cast steel followed by annealing and pickling the cast steel;
    • subjecting the coils of white steel to uncoiling and welding in an uncoiling-welding installation where the coils of white steel are flattened in an uncoiling device and are welded in a welding device;
    • passing the flattened and welded white steel through a set of tension rollers provided in a first strip accumulator;
    • moving the white steel from the first strip accumulator to a cold rolling device for cold rolling the white steel to result in a cold-rolled steel with a predetermined thickness;
    • moving the cold-rolled steel from the cold rolling device to a degreasing device for removing grease from the cold-rolled white steel;
    • moving the cold-rolled steel from the degreasing device to a second strip accumulator having a set of tension rollers;
    • moving the cold-rolled steel from the second strip accumulator to an annealing-pickling installation for annealing the cold-rolled steel and for electrolyzing and acid-washing the cold-rolled steel after annealing so as to remove scale from the cold-rolled steel;
    • moving the cold-rolled steel from the annealing-pickling installation to a third strip accumulator having a set of tension rollers;
    • moving the cold-rolled steel from the third strip accumulator to a temper rolling device for imposing gloss on the cold-rolled steel;
    • moving the cold-rolled steel from the temper rolling device to a tension leveling device for leveling the cold-rolled steel;
    • moving the cold-rolled steel from the tension leveling device to a fourth strip accumulator having a set of tension rollers; and
    • moving the cold-rolled steel from the fourth strip accumulator to a trimming-recoiling installation for trimming and recoiling the cold-rolled steel.
  • Other features and advantages of the present invention will become apparent in the following detailed description of the preferred embodiment with reference to the accompanying drawings, of which:
    • Figure 1 is a schematic diagram of a conventional process for manufacturing cold-rolled steel conducted using a multi-stage production line;
    • Figure 2 is a schematic diagram of a preferred embodiment of a method for continuously manufacturing cold-rolled steel according to this invention; and
    • Figure 3 is a bar chart demonstrating a production efficiency comparison of the preferred embodiment to the prior art of Figure 1.
  • Referring to Figure 2, the preferred embodiment of a method for continuously manufacturing cold-rolled steel according to this invention includes the steps of:
    1. 1) providing coils of white steel:
      • Coils 100 of white steel 400 are provided, which are manufactured by hot rolling a cast steel followed by annealing and pickling the cast steel.
    2. 2) uncoiling and welding:
      • The white steel is subjected to uncoiling and welding in an uncoiling-welding installation 21 where the coils 100 of white steel 400 are flattened in an uncoiling device 211 and are welded in a welding device 212. The uncoiling device 211 includes two overhang-mandrel type of uncoilers. The welding device 212 includes a first arc welder for welding a steel strip having a thickness more than 1.5 mm, preferably 1.5-6 mm, and a second arc welder for welding a steel strip having a thickness less than 1.5 mm.
    3. 3) passing through a first strip accumulator:
      • The flattened and welded white steel 400 is passed through a set of tension rollers 221 provided in a first strip accumulator 22.
    4. 4) cold rolling:
      • The white steel 400 is moved from the first strip accumulator 22 to a cold rolling device 23 for cold rolling the white steel 400 to result in a cold-rolled steel with a predetermined thickness. The cold rolling device 23 includes three cold rolling mills 231 arranged in series. The white steel 400 is cold rolled in a rolling ratio ranging from 50 to 70% and to a thickness of about 0.3 mm. The thickness of the white steel 400 as it enters the cold rolling device 23 is measured. The thickness and the shape of the white steel 400 as it exits the cold rolling device 23 are also measured and transmitted to an automatic gauge control and a shape control system so as to monitor the conditions of the cold rolling device 23 and the properties of the white steel 400 after cold rolling.
    5. 5) degreasing:
      • The cold-rolled steel from the cold rolling device 23 is moved to a degreasing device 24 for removing grease from the cold-rolled white steel. The degreasing device 24 includes a base solution spraying region 241 for spraying a base solution on the cold-rolled steel, a water-washing region 242 for washing the cold-rolled steel using water, and a drying region 243 for drying the cold-rolled steel after washing.
    6. 6) moving the cold-rolled steel to a second strip accumulator:
      • The cold-rolled steel is moved from the degreasing device 24 to a second strip accumulator 25. The second strip accumulator 25 is similar to the first strip accumulator 22 in structure, and has a set of tension rollers 251.
    7. 7) annealing and pickling:
      • The cold-rolled steel is moved from the second strip accumulator 25 to an annealing-pickling installation 26 for annealing the cold-rolled steel and for electrolyzing and acid-washing the cold-rolled steel after annealing so as to remove scale from the cold-rolled steel. The annealing-pickling installation 26 includes an annealing device 261 and a pickling device 262. The annealing device 261 includes a heating region 263 operating at a temperature ranging from 1000 °C to 1200 °C, a preheating region 264 which is disposed upstream of the heating region 263 and in which the cold-rolled steel is preheated by radiation heat generated by the heating region 263, and a cooling region 265 which is disposed downstream of the heating region 263 and in which the cold-rolled steel is cooled to a temperature not higher than 80 °C. The pickling device 262 includes an electrolyzing tank 266 containing a sodium sulfate solution for removing iron oxide scale from the cold-rolled steel, an acid-washing tank 267 containing nitric acid and hydrofluoric acid for removing Fe-Cr-Ni oxide scale from the cold-rolled steel, and a water-washing region 268 for washing the cold-rolled steel. The water-washing region 268 is conducted in five stages so as to ensure that the acid solutions are washed out of the cold-rolled steel completely.
    8. 8) moving the cold-rolled steel to a third strip accumulator:
      • The cold-rolled steel is moved from the annealing-pickling installation 26 to a third strip accumulator27. The third strip accumulator 27 is similar to the first strip accumulator 22 in structure, and has a set of tension rollers 271.
    9. 9) temper rolling:
      • The cold-rolled steel is moved from the third strip accumulator 27 to a temper rolling device 28 for imposing gloss on the cold-rolled steel. The temper rolling device 28 includes a set of work rolls 281 for imposing the gloss on the cold-rolled steel via transfer printing.
    10. 10) tension leveling:
      • The cold-rolled steel is moved from the temper rolling device 28 to a tension leveling device 29 for leveling the cold-rolled steel. The tension leveling device 29 includes a leveling unit 291 for leveling the cold-rolled steel, and a washing-drying device 292 for washing and drying the cold-rolled steel after leveling. The leveling unit 291 includes a set of bending rolls 293 and a set of reverse-bending rolls 294. Additionally, the cold-rolled steel is sprayed with water or lubricant by the washing-drying device 292 before it enters into the leveling unit 291.
    11. 11) moving the cold-rolled steel to a fourth strip accumulator:
      • The cold-rolled steel is moved from the tension leveling device 29 to a fourth strip accumulator 31. The fourth strip accumulator 31 is similar to the first strip accumulator 22 in structure, and has a set of tension rollers 311.
      • It should be noted that each of the first, second, third, and fourth strip accumulators 22, 25, 27, 31 adjusts the tension of the steel, and enables the speeds at which the steel moves through two adjacent devices to be independent of each other.
    12. 12) moving the cold-rolled steel to a trimming-recoiling installation:
      • The cold-rolled steel is moved from the fourth strip accumulator 31to a trimming-recoiling installation 32, which includes a trimming device 321 for trimming the cold-rolled steel, and a recoiling device 322 for recoiling the cold-rolled steel to obtain a cold-rolled steel product 300 (i.e., 2B steel coil).
      • Additionally, when 2D steel coil is intended to be produced, it can be obtained merely by shutting down the temper rolling device 28. Therefore, the utilization rate of the production line to perform the method of the present invention can be improved over the prior art.
      • Referring to Figure 3, a comparison of the cold-rolled steel product made by the method of the present invention to the cold-rolled steel product made by the conventional multi-stage process shown in Figure 1 is made in terms of equipment cost, personnel cost, operating rate, throughput, productivity, and overall production cost. As shown in Figure 3, the personnel cost, the throughput, and the productivity of the method of the present invention are improved over those of the conventional multi-stage process even though the equipment cost of the method of the present invention is relatively high and the operating rate of the method of the present invention is relatively low. Totally, the overall production cost of the method of the present invention is merely 78% of that of the conventional multi-state process.

Claims (8)

  1. A method for continuously manufacturing cold-rolled steel, characterized by the steps of:
    providing coils (100) of white steel (400) that are manufactured by hot rolling a cast steel followed by annealing and pickling the cast steel;
    subjecting the coils (100) of white steel (400) to uncoiling and welding in an uncoiling-welding installation (21) where the coils (100) of the white steel (400) are flattened in an uncoiling device (211) and are welded in a welding device (212);
    passing the flattened and welded white steel (400) through a set of tension rollers (221) provided in a first strip accumulator (22);
    moving the white steel (400) from the first strip accumulator (22) to a cold rolling device (23) for cold rolling the white steel (400) to result in a cold-rolled steel with a predetermined thickness;
    moving the cold-rolled steel from the cold rolling device (23) to a degreasing device (24) for removing grease from the cold-rolled white steel;
    moving the cold-rolled steel from the degreasing device (24) to a second strip accumulator (25) having a set of tension rollers (251);
    moving the cold-rolled steel from the second strip accumulator (25) to an annealing-pickling installation (26) for annealing the cold-rolled steel and for electrolyzing and acid-washing the cold-rolled steel after annealing so as to remove scale from the cold-rolled steel;
    moving the cold-rolled steel from the annealing-pickling installation (26) to a third strip accumulator (27) having a set of tension rollers (271) ;
    moving the cold-rolled steel from the third strip accumulator (27) to a temper rolling device (28) for imposing gloss on the cold-rolled steel;
    moving the cold-rolled steel from the temper rolling device (28) to a tension leveling device (29) for leveling the cold-rolled steel;
    moving the cold-rolled steel from the tension leveling device (29) to a fourth strip accumulator (31) having a set of tension rollers (311); and
    moving the cold-rolled steel from the fourth strip accumulator (31)to a trimming-recoiling installation (32) for trimming and recoiling the cold-rolled steel.
  2. The method as claimed in Claim 1, characterized in that the white steel (400) is cold rolled in a rolling ratio ranging from 50 to 70% and to a thickness of about 0.3 mm.
  3. The method as claimed in Claim 1, characterized in that the degreasing device (24) includes a base solution spraying region (241) for spraying a base solution on the cold-rolled steel, a water-washing region (242) for washing the cold-rolled steel using water, and a drying region (243) for drying the cold-rolled steel after washing.
  4. The method as claimed in Claim 1, characterized in that the annealing-pickling installation (26) includes an annealing device (261) having a heating region (263) operating at a temperature ranging from 1000 °C to 1200 °C, a preheating region (264) which is disposed upstream of the heating region (263) and in which the cold-rolled steel is preheated by radiation heat generated by the heating region (263), and a cooling region (265) which is disposed downstream of the heating region (263) and in which the cold-rolled steel is cooled to a temperature not higher than 80 °C.
  5. The method as claimed in Claim 1, characterized in that the uncoiling device (211) includes two overhang-mandrel type of uncoilers.
  6. The method as claimed in Claim 1, characterized in that the welding device (212) includes a first arc welder for welding a steel strip having a thickness more than 1. 5 mm, and a second arc welder for welding a steel strip having a thickness less than 1.5 mm.
  7. The method as claimed in Claim 1, characterized in that the annealing-pickling installation (26) includes a pickling device (262) having an electrolyzing tank (266) containing a sodium sulfate solution for removing iron oxide scale from the cold-rolled steel, an acid-washing tank (267) containing nitric acid and hydrofluoric acid for removing Fe-Cr-Ni oxide scale from the cold-rolled steel, and a water-washing region (268) for washing the cold-rolled steel.
  8. The method as claimed in Claim 1, characterized in that the tension leveling device (29) includes a washing-drying device (292) for washing and drying the cold-rolled steel after leveling.
EP07254712A 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel Revoked EP2067541B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP07254712A EP2067541B1 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel
PL07254712T PL2067541T3 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel
AT07254712T ATE551131T1 (en) 2007-12-05 2007-12-05 METHOD FOR CONTINUOUS PRODUCTION OF COLD ROLLED STEEL
ES07254712T ES2384734T3 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold rolled steel
SI200730946T SI2067541T1 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP07254712A EP2067541B1 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel

Publications (2)

Publication Number Publication Date
EP2067541A1 true EP2067541A1 (en) 2009-06-10
EP2067541B1 EP2067541B1 (en) 2012-03-28

Family

ID=39111880

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07254712A Revoked EP2067541B1 (en) 2007-12-05 2007-12-05 Method for continuously manufacturing cold-rolled steel

Country Status (5)

Country Link
EP (1) EP2067541B1 (en)
AT (1) ATE551131T1 (en)
ES (1) ES2384734T3 (en)
PL (1) PL2067541T3 (en)
SI (1) SI2067541T1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2769779A1 (en) * 2013-02-22 2014-08-27 Siemens VAI Metals Technologies GmbH Facility and method for rolling a metal strip
CN106271665A (en) * 2015-05-28 2017-01-04 佛山市吉力佳机械有限公司 A kind of rustless steel coiled material Compositions of metal-working machines
CN106799596A (en) * 2017-02-17 2017-06-06 佛山市欧艺钢金属制品有限公司 A kind of coiled material production equipment
CN106881352A (en) * 2017-03-22 2017-06-23 山东宏旺实业有限公司 A kind of Band by Hot-rolling technique and its production equipment
CN110306016A (en) * 2019-07-31 2019-10-08 首钢京唐钢铁联合有限责任公司 A kind of method and device of bell-type annealing production Ultra-thin strip
CN114433624A (en) * 2022-01-21 2022-05-06 甘肃酒钢集团宏兴钢铁股份有限公司 Frosted surface stainless steel cold rolling production method
CN116673335A (en) * 2023-05-24 2023-09-01 邢台金逸金属制品有限公司 Cold-rolled coiled sheet production molding system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5820704A (en) * 1995-10-19 1998-10-13 Usinor Sacilor Process for the continuous production of a rolled stainless steel sheet strip and continuous production line for carrying out the process
DE19843382A1 (en) * 1998-09-22 2000-03-23 Schloemann Siemag Ag Continuous mill train for rolling steel strips has uncoiling device and a welding device
US6478899B1 (en) 1998-02-25 2002-11-12 Ugine S.A. Installation for making cold rolled stainless steel bands
US6546771B1 (en) 1998-12-18 2003-04-15 Avestapolarit Ab Method for manufacturing of strips and rolling mill line
DE10209406A1 (en) * 2001-09-21 2003-04-24 Hitachi Ltd Continuous pickling and cold rolling plant and method for operating the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5820704A (en) * 1995-10-19 1998-10-13 Usinor Sacilor Process for the continuous production of a rolled stainless steel sheet strip and continuous production line for carrying out the process
US6478899B1 (en) 1998-02-25 2002-11-12 Ugine S.A. Installation for making cold rolled stainless steel bands
DE19843382A1 (en) * 1998-09-22 2000-03-23 Schloemann Siemag Ag Continuous mill train for rolling steel strips has uncoiling device and a welding device
US6546771B1 (en) 1998-12-18 2003-04-15 Avestapolarit Ab Method for manufacturing of strips and rolling mill line
DE10209406A1 (en) * 2001-09-21 2003-04-24 Hitachi Ltd Continuous pickling and cold rolling plant and method for operating the same

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2769779A1 (en) * 2013-02-22 2014-08-27 Siemens VAI Metals Technologies GmbH Facility and method for rolling a metal strip
WO2014127864A1 (en) * 2013-02-22 2014-08-28 Siemens Vai Metals Technologies Gmbh Installation and method for rolling a metal strip
US9573174B2 (en) 2013-02-22 2017-02-21 Primetals Technologies Austria GmbH Installation and method for rolling a metal strip
CN106271665A (en) * 2015-05-28 2017-01-04 佛山市吉力佳机械有限公司 A kind of rustless steel coiled material Compositions of metal-working machines
CN106799596A (en) * 2017-02-17 2017-06-06 佛山市欧艺钢金属制品有限公司 A kind of coiled material production equipment
CN106799596B (en) * 2017-02-17 2019-03-05 佛山市欧艺钢数控设备有限公司 A kind of coiled material production equipment
CN106881352A (en) * 2017-03-22 2017-06-23 山东宏旺实业有限公司 A kind of Band by Hot-rolling technique and its production equipment
CN110306016A (en) * 2019-07-31 2019-10-08 首钢京唐钢铁联合有限责任公司 A kind of method and device of bell-type annealing production Ultra-thin strip
CN110306016B (en) * 2019-07-31 2021-07-09 首钢京唐钢铁联合有限责任公司 Method and device for producing ultrathin strip steel by hood-type annealing
CN114433624A (en) * 2022-01-21 2022-05-06 甘肃酒钢集团宏兴钢铁股份有限公司 Frosted surface stainless steel cold rolling production method
CN116673335A (en) * 2023-05-24 2023-09-01 邢台金逸金属制品有限公司 Cold-rolled coiled sheet production molding system
CN116673335B (en) * 2023-05-24 2023-11-21 邢台金逸金属制品有限公司 Cold-rolled coiled sheet production molding system

Also Published As

Publication number Publication date
SI2067541T1 (en) 2012-09-28
PL2067541T3 (en) 2012-08-31
ATE551131T1 (en) 2012-04-15
EP2067541B1 (en) 2012-03-28
ES2384734T3 (en) 2012-07-11

Similar Documents

Publication Publication Date Title
EP2067541B1 (en) Method for continuously manufacturing cold-rolled steel
RU2746876C1 (en) System and method for continuous production of cold-rolled stainless steel sheets
JP3888396B2 (en) Continuous production method of rolled stainless steel sheet and production line for carrying out it
AU2009202178B2 (en) Method for descaling a metal strip
CN108906888A (en) Stainless-steel cold-rolling strip production equipment
CN106244967B (en) Cold-rolling of steel plate coating integration produces unit and its production technology
AT516956A4 (en) DEVICE AND METHOD FOR PRODUCING A ZINCED STEEL STRIP
KR100983762B1 (en) Method for continuously manufacturing cold-rolled steel
CN109622619B (en) Method for producing high-grade non-oriented electrical steel by cold continuous rolling and product thereof
CN110756585A (en) Method for producing nickel-based alloy by twenty-high reversing mill
KR100207835B1 (en) Method and plant for the manufacture of special steel blanks
CN110883086B (en) Collinear production method of titanium and titanium alloy section and section steel
CN108607896A (en) A kind of the continuously dip coat unit and hot plating technology of the preceding smooth function of band plating
CN102921728B (en) Method for producing titanium coils by employing single-frame twenty-roller reversing cold mill unit
CN113302006A (en) Method for producing stainless steel strip
CN105149348A (en) Method of producing TA10 alloy rolls through twenty-roller cold rolling unit
KR100990865B1 (en) Method and device for the continuous production of metallic strips
CN113846291A (en) Cleaning, coating and plating combined unit for galvanized steel sheet/coil and production method thereof
JP2011189394A (en) Method for manufacturing hot rolled steel sheet having excellent surface property
CN110883092A (en) Method for controlling thickness fluctuation of silicon steel
CN114525391B (en) Production process of high-carbon tool steel cold-rolled sheet
JP2014180677A (en) Production device and production method for different thickness steel plate having plate thickness difference in plate width direction
KR20100060877A (en) Big size wire rod using warm rolling method
Kubińska-Jabcoń et al. Analysis of the Economical, Ecological and Quality Advantages Consequent Resulting from Initiation of Technology Integrated in Metallurgy
JPH0824904A (en) Manufacture of metallic strip

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20071220

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

AKX Designation fees paid
RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20100127

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 551131

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007021589

Country of ref document: DE

Effective date: 20120524

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2384734

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20120711

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20120328

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20120328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120629

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 551131

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120728

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120730

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

26 Opposition filed

Opponent name: SIEMENS VAI METALS TECHNOLOGIES SAS

Effective date: 20121221

26 Opposition filed

Opponent name: SMS SIEMAG AG

Effective date: 20121228

Opponent name: FIVES DMS

Effective date: 20121228

Opponent name: SIEMENS VAI METALS TECHNOLOGIES SAS

Effective date: 20121221

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 602007021589

Country of ref document: DE

Effective date: 20121221

PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

Free format text: ORIGINAL CODE: EPIDOSCOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121231

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120628

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121231

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121205

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121205

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20071205

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20140919

Year of fee payment: 8

PLAB Opposition data, opponent's data or that of the opponent's representative modified

Free format text: ORIGINAL CODE: 0009299OPPO

PLAB Opposition data, opponent's data or that of the opponent's representative modified

Free format text: ORIGINAL CODE: 0009299OPPO

R26 Opposition filed (corrected)

Opponent name: SIEMENS VAI METALS TECHNOLOGIES SAS

Effective date: 20121221

R26 Opposition filed (corrected)

Opponent name: SIEMENS VAI METALS TECHNOLOGIES SAS

Effective date: 20121221

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20141218

Year of fee payment: 8

Ref country code: TR

Payment date: 20141110

Year of fee payment: 8

Ref country code: FR

Payment date: 20140930

Year of fee payment: 8

Ref country code: DE

Payment date: 20140926

Year of fee payment: 8

Ref country code: GB

Payment date: 20141001

Year of fee payment: 8

Ref country code: RO

Payment date: 20141124

Year of fee payment: 8

Ref country code: CZ

Payment date: 20141201

Year of fee payment: 8

REG Reference to a national code

Ref country code: DE

Ref legal event code: R064

Ref document number: 602007021589

Country of ref document: DE

Ref country code: DE

Ref legal event code: R103

Ref document number: 602007021589

Country of ref document: DE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SI

Payment date: 20141114

Year of fee payment: 8

Ref country code: PL

Payment date: 20141104

Year of fee payment: 8

RDAF Communication despatched that patent is revoked

Free format text: ORIGINAL CODE: EPIDOSNREV1

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20141218

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20150127

Year of fee payment: 8

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: YIEH UNITED STEEL CORP.

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20141230

Year of fee payment: 8

RDAG Patent revoked

Free format text: ORIGINAL CODE: 0009271

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT REVOKED

27W Patent revoked

Effective date: 20150224

GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state

Effective date: 20150224

REG Reference to a national code

Ref country code: DE

Ref legal event code: R107

Ref document number: 602007021589

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: ECNC

REG Reference to a national code

Ref country code: SI

Ref legal event code: KO00

Effective date: 20160829