EP1935825A1 - Lift system for a building with at least two floors - Google Patents
Lift system for a building with at least two floors Download PDFInfo
- Publication number
- EP1935825A1 EP1935825A1 EP07122655A EP07122655A EP1935825A1 EP 1935825 A1 EP1935825 A1 EP 1935825A1 EP 07122655 A EP07122655 A EP 07122655A EP 07122655 A EP07122655 A EP 07122655A EP 1935825 A1 EP1935825 A1 EP 1935825A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elevator
- installation according
- car
- elevator installation
- traction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
Definitions
- the invention relates to an elevator installation in a building with at least one transfer floor. This invention is defined in the preamble of the independent claim.
- Modern elevator concepts for buildings with 30 or more floors have transfer floors, which are served by a lift system.
- Such an elevator installation comprises a group of at least two elevators.
- a first elevator directly services the transfer floors from an entrance lobby, i.e. passengers are roughly distributed from the entrance lobby by a high performance lift to the various transfer floors.
- a second elevator performs a fine distribution of the passengers from the transfer floors to their destination floors.
- An elevator usually has an elevator car that can be moved vertically in a shaft and accommodates passengers in order to transport them to a desired floor of a building. To perform this task, the elevator usually has at least the following elevator components: a drive with a motor and a traction sheave, pulleys, traction means, a counterweight, as well as a pair of guide rails for guiding an elevator car and a counterweight.
- the engine generates the power required for the transport of the passengers present in the elevator car.
- an electric motor performs this function.
- This drives directly or indirectly to a traction sheave, which in Frictional contact with a traction means is.
- the traction means may be a belt or a rope. It serves for the suspension and the promotion of the elevator car and the counterweight, which are both suspended so that their gravitational forces act in opposite directions along the traction means. Accordingly, the resulting gravity, which must be overcome by the drive significantly reduced.
- a larger drive torque can be transmitted from the traction sheave to the traction means by the larger Aufliegekraft the traction means on the traction sheave.
- the traction means is guided by deflection rollers.
- EP 1 526 103 shows an elevator system with at least two elevators in a building, which is divided into zones.
- a zone comprises a defined number of floors served by a lift.
- Each elevator is assigned a zone.
- a transfer floor is provided.
- At least one of the elevators has two elevator cars that can be moved vertically one above the other on two car guide rails independently of each other. The arrangement of two feeder or transfer booths should help to avoid unnecessary waiting times in the transfer floors.
- Out EP 1 489 033 is an elevator with at least two elevator cars located one above the other in the same shaft known.
- Each elevator car has its own drive and its own counterweight.
- the drives are arranged close to first and second shaft walls and also the counterweights are each suspended below the associated drive to drive or tethers close to first or second shaft walls.
- the axes of the traction sheaves of the drives are perpendicular to the first and second shaft walls.
- the two independently movable lift cabins ensure a high flow rate.
- the positioning of the drives in the shaft near the first or second walls eliminates the need for a separate machine room and allows a space-saving compact arrangement of the drive elements in the shaft head.
- the object of the present invention is to further increase the delivery rate of an elevator installation for a given shaft cross-section in a building with zoning and at least one transfer floor.
- the elevator installation according to the invention is located in a building with at least two elevators, the building being divided into building zones and each elevator having at least one elevator cage.
- Each elevator car can be moved independently via its own drive in an assigned car zone.
- each cabin zone has at least one transfer deck.
- a first lift has at least three vertically stacked elevator cars in a shaft. At least three of these cabin zones are allocated to a building zone.
- the elevator installation has a significantly higher delivery rate.
- waiting times in transfer floors are further reduced and the emergence of queues largely avoided.
- this at least one elevator car of a second elevator is a multicab with at least two vertically stacked cabins. These two cabins are assigned to the same car zone because they are physically connected and thus can only be moved together.
- the advantage of the elevator installation with double cabin is the doubling of the available cabin volume of an elevator car. Thus, one trip can carry up to twice as many passengers.
- the multi-cab serves at least two superimposed transfer floors.
- the advantage of the elevator system is that, when the transfer floors are doubled, the waiting times on the respective transfer floors can be further reduced.
- the transfer floors have a transfer or a waiting room for the transfer. With a double number of such Umsteigeschreib the changeover is largely conflict-free and if there should be waiting times despite the increased capacity, the passengers have twice the volume waiting room available. A stay in the transfer floors, or transfer or waiting rooms is therefore in any case more pleasant.
- the at least three elevator cars of the first elevator have a central and two adjacent elevator cars.
- the middle elevator car can be moved independently in a central car zone and the two adjacent elevator cars can be moved independently in two adjacent car zones.
- the central car zone overlaps adjacent car zones.
- the advantage of the elevator installation with such overlapping cabin zones is that passengers on any floor lying in the overlapping area of the cabin zones can change from a central cabin zone into an adjacent cabin zone. This allows a more flexible guidance of the passengers.
- floors are served in the overlapping area of the cabin zones of two elevator cars and thus the delivery capacity of the elevator system is increased.
- the at least three drives associated with the elevator cars can be driven over by the elevator cars.
- the elevator system has the advantage that the drives can be arranged space-saving and flexible in the shaft without being in conflict with the elevator cars.
- the at least three drives associated with the elevator cars are positioned on a first shaft wall or second shaft wall opposite.
- the advantage of the elevator system lies in the position of the drives between elevator cars and first and second shaft walls. This allows space in the shaft head or Schachtgrube be saved, where usually the drives are arranged.
- the drive of the middle elevator car is positioned on the first shaft wall and the two drives of the adjacent elevator cars are positioned on the opposite second shaft wall.
- the advantage of the elevator system is the flexible and easy positioning of any number of drives and the associated elevator cars in the same shaft.
- the number of installable drives is limited by the space available in the shaft head.
- a conflict-free management of the tension elements in such a conventional arrangement of the drives in the shaft head narrow limits.
- the shaft is defined by six boundary planes space in which one or more elevator cars are moved along a roadway. Usually, four shaft walls, a ceiling and a floor form these six boundary planes. However, it is also conceivable that an upper or lower road boundary represents a boundary plane. This definition of the shaft can be extended to the effect that a plurality of lanes are also arranged horizontally next to one another in a shaft, along which one or more elevator cars can each be moved.
- the FIG. 1 shows an elevator with at least three elevator cars 7a, 7b, 7c each have their own drive A1, A2, A3 and are movable independently of each other in the vertical direction.
- a middle elevator car 7a is arranged between two adjacent elevator cars 7b, 7c, which are located below respectively above the middle elevator car 7a.
- the associated drives A1, A2, A3 are positioned laterally on first and second shaft walls.
- the first and second shaft walls are those shaft walls opposite each other which have no shaft doors.
- the drive A1 of the middle elevator car 7a is on the first shaft wall and the two drives A2, A3 of the adjacent elevator cars 7b, 7c are positioned on the opposite second shaft wall.
- the drives A1, A2, A3 alternately on opposite shaft walls.
- additional drives other elevator cars are arranged according to the alternating sequence of the drives according to alternately on the first and second shaft walls.
- the drives A1, A2, A3 are in Fig. 1 positioned at three different shaft heights, the drives A2, A3 of adjacent elevator cars 7b, 7c are positioned above or below the drive A1 of the central elevator car 7a.
- the distance in the vertical direction between a central drive A1 and an adjacent drive A2, A3 is at least one cabin height.
- the drive A1 of the middle elevator car 7a on a first shaft wall and the drive A3 of the adjacent upper elevator car 7c on the opposite second shaft wall can be arranged at the same shaft height.
- the advantage of this arrangement lies in the simple maintenance of the two drives A1, A3. They can be maintained from a common platform.
- a drive A1, A2, A3 each have a motor M1, M2, M3 and a traction sheave 1a, 1b, 1c.
- the motor M1, M2, M3 is in operative contact with the traction sheave 1a, 1b, 1c and drives the traction means Z1, Z2, Z3 by means of this traction sheave 1a, 1b, 1c.
- the traction sheave 1a, 1b, 1c is designed so that it is suitable to receive one or more traction means Z1, Z2, Z3.
- the traction means Z1, Z2, Z3 are preferably belts, such as V-ribbed belts with unilateral ribs, which engage in one or more drive-disk-side recesses.
- Belt variants such as smooth belts and single-sided or double-sided toothed belt with corresponding Traction sheaves 1a, 1b, 1c are also usable.
- various types of ropes such as single ropes, double ropes or multiple ropes can be used.
- the traction means Z1, Z2, Z3 have strands of steel wire or aramid or Vectran.
- the at least three elevator cars 7a, 7b, 7c and three counterweights 12a, 12b, 12c are suspended on the traction means Z1, Z2, Z3 as a bottle.
- the elevator cars 7a, 7b, 7c have at least a first and a second deflection roller 2a, 2b, 2c, 3a, 3b, 3c which are fastened in the lower region of the elevator cars 7a, 7b, 7c.
- These deflection rollers 2a, 2b, 2c, 3a, 3b, 3c have on the outer circumference one or more grooves, which are adapted to receive one or more traction means Z1, Z2, Z3.
- the pulleys 2a, 2b, 2c, 3a, 3b, 3c are thus suitable for the guidance of traction means Z1, Z2, Z3 and are brought into contact with the latter.
- An elevator car 7a, 7b, 7c is thus preferably suspended as a bottom block.
- the deflection rollers 2a, 2b, 2c, 3a, 3b, 3c are located in the upper region of the elevator car 7a, 7b, 7c. According to the above description, the elevator car 7a, 7b, 7c is then suspended as a top bottle.
- the counterweight 12a, 12b, 12c is preferably suspended on the third deflection roller 4a, 4b, 4c as a top bottle below the associated drive A1, A2, A3.
- the traction means Z1, Z2, Z3 is moved from a first fixed point 5a, 5b, 5c to a second fixed point 6a, 6b, 6c via first, second and third deflection rollers 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c and the traction sheave 1a, 1b, 1c led from a first shaft wall to the second shaft wall.
- the first fixed point 5a, 5b, 5c is located opposite the associated drive A1, A2, A3 at approximately the same shaft height in the vicinity of a first or second shaft wall.
- the second fixed point 6a, 6b, 6c is located in the vicinity of the assigned drive A1, A2, A3 on an opposite second or first shaft wall.
- the traction means Z1, Z2, Z3 runs along a first or second shaft wall down to the second deflection roller 3a, 3b, 3c wraps around from outside to inside at an angle of approximately 90 ° and leads to the first deflection roller 2a, 2b, 2c.
- the traction means Z1, Z2, Z3 wraps around this first deflection roller 2a, 2b, 2c from inside to outside again by approximately 90 ° and is then guided along the elevator cage 7a, 7b, 7c up to the traction sheave 1a, 1b, 1c and wraps around it from inside to outside about 150 °.
- the wrap angle can be set in a range of 90 to 180 °. Thereafter, the traction means Z1, Z2, Z3 along a second or first shaft wall down to the third guide roller 4a, 4b, 4c, wraps around this from outside to inside by about 180 ° and is again along a second or first shaft wall up to the second Fixed point 6a, 6b, 6c out.
- an adjusting disc 13a, 13b, 13c is an optional component of the drive A1, A2, A3.
- the wrap angle can be set the traction means Z1, Z2, Z3 on the traction sheave 1a, 1b, 1c, or enlarge or reduce the desired traction forces of the traction sheave 1a, 1b, 1c on the traction means A1, A2, A3 to transfer.
- the distance of the adjusting disc 13a, 13b, 13c to the traction sheave 1a, 1b, 1c can also be the distance of the traction means Z1, Z2, Z3 to the drive A1, A2, A3, the counterweight 12a, 12b, 12c or the elevator car 7a, 7b , 7c. This ensures a conflict-free guidance of the traction means Z1, Z2, Z3 in the shaft between the traction sheave 1a, 1b, 1c and the first deflection roller 2a, 2b, 2c.
- the adjacent lower elevator unit with the elevator car 7b and an adjacent upper elevator unit with elevator car 7c are each arranged mirror-inverted to the middle.
- the drives A1, A2, A3 of the elevator units are thus located on opposite first or second shaft walls and also the associated traction sheaves 1a, 1b, 1c, deflection rollers 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c, adjusting discs 13a , 13b, 13c, counterweights 12a, 12b, 12c, traction means Z1, Z2, Z3 and fixed points 5a, 5b, 5c, 6a, 6b, 6c of adjacent elevator cars 7a, 7b, 7c are arranged in mirror image.
- This rule of mirror image arrangement middle and adjacent elevator units applies to any number of elevator units installed in a shaft.
- the associated drives A1, A2, A3 and first fixed points 5a, 5b, 5c are positioned at approximately the same height on opposite first and second shaft walls.
- the shaft height predetermined by the fixed points 5a, 5b, 5c and drives A1, A2, A3 is at the same time also the highest point which can reach an associated elevator car 7a, 7b, 7b, since in the embodiment shown the traction means comprise a suspension point of an elevator car 7a, 7b, 7c can not lift above the height of the traction sheave 1a, 1b, 1c.
- the positioning of the drives A1, A2, A3 and first fixed points 5a, 5b, 5c of the middle and adjacent elevator cars 7a, 7b, 7c is generally carried out at different shaft heights.
- the elevator cars 7a, 7b, 7c can thus only reach different maximum shaft heights. Accordingly, the middle and the neighboring elevator cars 7a, 7b, 7c are assigned different car zones in which the elevator cars 7a, 7b, 7c are movable.
- Fig. 1 the cabin zones K1, K2, K3 assigned to the elevator cars 7a, 7b, 7c can be seen.
- the shaft height of a drive A1, A2, A3 in the configuration described above specifies the maximum shaft height of such a car zone K1, K2, K3.
- the minimum shaft height of a car zone K1, K2, K3 is defined by the drive A1, A2, A3 of the next-to-last elevator unit below.
- the counterweight 12c of the adjacent upper elevator car is located 7c and the drive A2 of the next but one underlying adjacent lower elevator car 7b by the mirror-image construction of middle and adjacent elevator units on the same first or second shaft wall.
- the lowest height achievable by the counterweight 12c is thus limited by the drive A2 lying underneath on the same shaft wall.
- the travel range of the counterweight 12c between the drive A2 and the drive A3 thus defines, with a simultaneous 2: 1 suspension of the associated elevator car 7c and the counterweight 12c, the car zone K3 of the elevator car 7c.
- the elevator cars 7a, 7b, 7c are guided by two car guide rails 10.1, 10.2.
- the two car guide rails 10.1, 10.2 form a connection plane V, which extends approximately ever through the center of gravity S of the two elevator cars 7a, 7b, 7c.
- the elevator cars 7a, 7b, 7c are suspended eccentrically. Only the arrangement of two elevator units arranged directly above one another is shown here. However, it is clear to the person skilled in the art that the arrangement for further pairs of elevator units arranged directly above one another takes place analogously.
- the traction means Z1, Z2, Z3 and the associated guide means such as deflection rollers 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c and traction sheaves 1a, 1b, 1c lie in this suspension arrangement on one side of the connecting plane V, wherein the deflection rollers 4a, 4b, 4c for clarity in Fig. 2 are not shown. That is, all the aforementioned components associated with an elevator car 7a, 7b, 7c are either between third shaft walls and the connection plane V or between fourth shaft walls and the connection plane V.
- Third or fourth shaft walls designate shaft walls which have at least one shaft door 9 and opposite shaft walls.
- the distance y of the traction means Z1, Z2, Z3 and the connection plane V is approximately equal.
- the traction means Z1, Z2, Z3 of an elevator car 7a, 7b, 7c lie alternately on one or on the other side of the connecting plane V.
- the moments which are generated by the eccentric suspension of the elevator cars 7a, 7b, 7c are opposite.
- the moments acting on the guide rails 10.1, 10.2 essentially cancel each other out.
- the counterweights 12a, 12b, 12c are guided by two counterweight guide rails 11a.1, 11a.2, 11b.1, 11b.2.
- the counterweights 12a, 12b, 12c are positioned on opposite shaft walls between the car guide rails 10.1, 10.2 and first or second shaft walls.
- the counterweights 12a, 12b, 12c are suspended in their center of gravity on the traction means Z1, Z2, Z3. Since the elevator cars 7a, 7b, 7c are suspended eccentrically, the counterweights 12a, 12b, 12c are laterally offset in the vicinity of third and fourth shaft walls.
- the axes of rotation of the traction sheaves 1a, 1b, 1c and the pulleys 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c are parallel to first or second shaft walls.
- the aforementioned components are of the shape that they can take four parallel traction means Z1, Z2, Z3, this lead or drive in the case of the traction sheave 1a, 1b, 1c also.
- the deflection rollers 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c and traction sheaves 1a, 1b, 1c have four specially designed contact surfaces, which in the case of cables, for example as grooves or in the case of belts eg are designed as cambered surfaces or teeth or are provided with a flat trained contact surface with guide shoulders. These four contact surfaces can be applied either on a common cylindrical base body or on four individual rollers with a common axis of rotation.
- each roller can accommodate one to four or, if required, more pulling means Z1, Z2, Z3.
- the elevator cars 7a, 7b, 7c are placed flush with the floor at a floor stop and the car doors 8 are opened together with the landing doors 9 to allow transfer of passengers from the floor to the elevator car 7a, 7b, 7c and vice versa.
- Fig. 3 shows an alternative suspension arrangement with centrally suspended elevator cars 7a, 7b, 7c. It will be here only the arrangement of two directly superposed elevator units shown. However, it is clear to the person skilled in the art that the arrangement for further pairs of elevator units arranged directly above one another takes place analogously.
- the traction means Z1, Z2, Z3 are guided on both sides of the connecting plane V by the deflection rollers and traction sheaves 1a, 1b, 1c.
- the suspension is arranged symmetrically with respect to the connection plane V. Since in this case the suspension center of gravity substantially coincides with the center of gravity S of the elevator car 7a, 7b, 7c, no additional moments act on the car guide rails 10.1, 10.2.
- the associated deflection rollers 2a.1, 2a.2, 2b.1, 2b.2, 3a.1, 3a.2, 3b.1, 3b.2 and traction sheaves 1a exist.
- 1, 1a.2, 1b.1, 1b.2 at least two rollers, which are arranged on the left and right of the connecting plane V.
- the deflection rollers 4a, 4b, 4c of the counterweights 12a, 12b, 12c also consist of two rollers, which are arranged on the left and right of the connecting plane V, but are not in the interests of clarity Figure 3 shown.
- the deflection rollers 2a.1, 2a.2, 3a.1, 3a.2 and the traction sheave 1a.1, 1a.2 assigned to the middle elevator cage 7a lie at a first distance x from the connection plane V and those of the adjacent lower elevator cage 7b associated deflection rollers 2b.1, 2b.2, 3b.1, 3b.2 and the traction sheave 1b at a second distance X to the connection plane V, wherein the first distance x is smaller than the second distance X.
- the first distance x is smaller than the second distance X.
- the counterweights 12a, 12b, 12c are advantageously suspended in their center of gravity S to the traction means Z1, Z2, Z3 between the car guide rails 10.1, 10.2 and first or second shaft walls. Since the elevator cars 7a, 7b, 7c are now centrally suspended, the counterweights 12a, 12b, 12c are also located in a middle region of the first and second shaft walls. Thanks to this central position of the counterweights 12a, 12b, 12c, the clearance between the lateral ends of the counterweights 12a, 12b, 12c and third and fourth shaft walls increases. This gives room for maneuver for the counterweights 12a, 12b, 12c. Thus, e.g.
- a narrower and wider counterweight 12a, 12b, 12c can be used to make better use of the space.
- the elevator car 7a, 7b, 7c gains width or, given a cabin size, the shaft cross-section can be reduced.
- FIGS. 2 and 3 The centric and eccentric suspension variants used in the FIGS. 2 and 3 , are shown with any of the following examples Fig. 5 and 6 combined.
- the drive A1 has a motor M1, preferably an electric motor, a traction sheave 1a and optionally an adjusting disc 13a with which the wrap angle of the traction means Z1 to the traction sheave 1a and the horizontal distance of the traction means Z1 to the drive A1 to the elevator car 7a or the counterweight 12a can be adjusted.
- a motor M1 preferably an electric motor
- a traction sheave 1a and optionally an adjusting disc 13a with which the wrap angle of the traction means Z1 to the traction sheave 1a and the horizontal distance of the traction means Z1 to the drive A1 to the elevator car 7a or the counterweight 12a can be adjusted.
- the motor M1 is vertically above the traction sheave 1a. Thanks to this arrangement, the drive can be positioned in the light projection of the counterweights 12a between the elevator cars 7a and first and second shaft walls. As a result, the drives A1 can be driven over by the elevator cars 7a and can thus be mounted in a space not otherwise required by the shaft. In comparison with conventional machine-room-less elevators, you gain the space in the shaft head and / or in the shaft pit.
- the drive A1 is fixed on a cross member 19, which is attached to a car guide rail 10.1 and / or the counterweight guide rails 11a.1, 11a.2.
- the third guide roller 4a on which the counterweight 12a is suspended and in the background, the elevator car 7a.
- the example shown here is in comparison with the arrangement Fig. 2 with respect to the connection plane V mirrored.
- the drives A1 can also be fixed directly on the shaft walls and it saves the cross member 19th
- Fig. 5 shows an elevator system for a zoned building.
- a building zone G1, G2 is composed of several vertically superposed floors of the building. At least one of these floors of a building zone G1, G2 is a so-called transfer floor U1, U2.
- this feeder elevator is designed as a high-performance lift.
- the number of remaining floors allocated to a building zone G1, G2 is defined by those floors serviced by a walker lift 14.1, 14.2.
- This Wegbringer elevator 14.1, 14.2 takes the fine distribution of passengers from the transfer floors U1, U2 before their destination floors.
- the building is divided into two building zones G1, G2.
- Each of these building zones G1, G2 is assigned a group of three 14.1, 14.2, which operates exclusively floors of the allocated building zone G1, G2.
- the elevator system has three elevators, which are arranged in two shafts 15.1, 15.2.
- In the first shaft 15.1 are two superimposed groups of three 14.1, 14.2 with six elevator units, six elevator cars and the associated car zones K1.1, K1.2, K1.3, K2.1, K2.2, K2.3.
- a change from the first building zone G1 into the second building zone G2 is thus necessarily via the elevator of the second shaft 15.2 and only from the transfer floors U1.1, U1.2 of the building zone G1 to the transfer floors U2.1, U2.2 of the building zone G2 ,
- the two groups of three 14.1, 14.2 are responsible for the transport of passengers from the transfer floors U2.1, U2.2 to a floor of the corresponding building zone G1, G2 and between any two floors within a building zone G1, G2. This allows more efficient channeled transport of passengers within the building.
- the first shaft 15.1 can optionally be subdivided into two separate individual shafts, each with one elevator.
- the shaft height of these individual shafts depends largely on the height of the corresponding building zone G1, G2.
- the advantage of such separate shafts is the absence of the chimney effect and therefore the absence of unwanted strong shaft winds, as they can occur in tall shafts.
- a high-performance lift is operated, which operates only transfer floors U1.2, U1.1, U2.1, U2.2.
- This high performance lift is in Example shown a Doppeldeckerlift with two firmly connected cabins, which are arranged vertically one above the other and can be moved together in the shaft 15.2. These biplane cabins serve two directly superimposed transfer floors U1.2, U1.1, U2.1, U2.2.
- Each car zone K1.1, K1.2, K1.3, K2.1, K2.2, K2.3. and each building zone G1, G2 has at least one transfer floor U1.2, U1.1, U2.1, U2.2.
- the transfer floors U2.1, U2.2 of the double-decker lift lie in a central area of the building zone G2
- the lower transfer floor U2.2 is from the lower cabin of the double-decker cabin and the middle and lower adjacent elevator car of the triad 14.1 operated
- the upper transfer floor U2.1 is operated accordingly from the upper cabin of the double-decker cabin and the middle and the upper adjacent elevator car of the group of three 14.2.
- the passengers whose destination floor is located in the central car zone K1.2 always two elevator cars of the group of three 14.2 for the onward journey are available.
- the central car zone K1.2 preferably has two floors less than the number of floors allocated to the building zone G2. Because the middle elevator car can serve all middle floors of the building zone G2 except the two border floors. Because of the vertical stacking of the elevator cars of a group of three 14.2, the middle elevator car can not pass the upper or lower adjacent cars, which occupy at least one perimeter storey of the building zone G2.
- this includes the two transfer floors U2.1, U2.2.
- the middle elevator car of the triple group 14.2 for the building zone G2 assumes the function of an escalator 16 by transporting passengers from the upper transfer floor U2.1 to the lower transfer floor U2.2 and vice versa.
- the two transfer floors U2.1, U2.2 are then the only floors of the building zone G2, which are each served by two elevator cars of the group of three 14.2.
- the two peripheral floors of the building zone G2 remain the only floors served only by the adjacent lower or upper elevator car of the triple group 14.2. All other floors are served by two elevator cars at maximum extension of the central cabin zone K1.2.
- the arrangement of the car zones K1.1, K2.1, K3.1, the associated elevator units and the transfer floors U1.1, U1.2 in the building zone G1 essentially corresponds to the arrangement of said elements of the building zone G2.
- An important additional aspect concerns the transfer floors U1.1, U1.2 of the lower building zone G1.
- the two transfer floors U1.1, U1.2 of the lower building zone G1 are connected by an escalator 16.
- the escalators are often used on building lobbies.
- the building lobbies are floors in which the passengers enter and leave the building and are therefore frequented by numerous passengers. If, for example, the lower transfer floor U1.2 is now a building lobby, then the incoming passengers arrive as needed thanks to the high capacity of the escalator 16 quickly to the upper transfer floors U1.1 or get when leaving the building quickly from this back to the building lobby.
- the building lobby may in principle be located on any floor of the building.
- the building lobby is usually operated at least by the high-performance lift of the second shaft 15.2.
- Fig. 6 shows a building with two additional building zones G3, G4 and associated triplets 14.3, 14.4 with the cabin zones K1.3, K2.3, K3.3, K1.4, K2.4, K3.4 and the associated transfer floors U3.1, U3.2, U4.1, U4.2. It can be any number of triads 14 arranged vertically above each other.
- the invention is not limited only to the embodiments shown. With knowledge of the invention it is obvious for the expert to optimize different parameters for concrete building forms. Instead of a double-decker cabin, it is also possible for a plurality of individual single cabins or multi-cabins, which have more than two interconnected cabins, to be moved in a second shaft 15.2.
- the number of floors allocated to a building zone G is also freely selectable.
- the building zones G need not have an equal number of floors, but may vary from building zone to building zone. It also does not always have to be assigned only triads 14 a building zone G. Thus, groups of four, five or six, etc. can be assigned to the building zones G.
- the cabin zones for example, need not be symmetrical within a group of three.
- these car zones K are free to the specific building conditions customizable.
- the transfer floors U are also freely arrangeable with respect to number and position in a building zone G as a function of car zones K or number of cabins of a multicabine.
- each elevator car has a conveyor coefficient of 1/9 weighted by the number of floors to be served, which measures the output of the elevator car on a certain floor.
- the adjacent car zones K2.2 and K3.2 each serve five upper and five lower floors and the central car zone K1.2 eight floors.
- the result for the area of overlapping cabin zones is a coefficient of promotion of 1/5 plus 1/8 or 13/40 and for the peripheral floors a coefficient of promotion of 1/5.
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Description
Die Erfindung betrifft eine Aufzugsanlage in einem Gebäude mit mindestens einem Umsteigestockwerk. Diese Erfindung wird im Oberbegriff des unabhängigen Patentanspruchs definiert.The invention relates to an elevator installation in a building with at least one transfer floor. This invention is defined in the preamble of the independent claim.
Moderne Aufzugskonzepte für Gebäude mit 30 und mehr Stockwerken verfügen über Umsteigestockwerke, die von einer Aufzugsanlage bedient werden. Eine solche Aufzugsanlage umfasst eine Gruppe von mindestens zwei Aufzügen. Ein erster Aufzug bedient direkt die Umsteigestockwerke von einer Eingangslobby aus, d.h., dass Passagiere relativ rasch von der Eingangslobby durch einen Hochleistungslift auf die verschiedenen Umsteigestockwerke grobverteilt werden. Ein zweiter Aufzug führt eine Feinverteilung der Passagiere von den Umsteigestockwerken zu deren Zielstockwerken durch.Modern elevator concepts for buildings with 30 or more floors have transfer floors, which are served by a lift system. Such an elevator installation comprises a group of at least two elevators. A first elevator directly services the transfer floors from an entrance lobby, i.e. passengers are roughly distributed from the entrance lobby by a high performance lift to the various transfer floors. A second elevator performs a fine distribution of the passengers from the transfer floors to their destination floors.
Ein Aufzug weist in der Regel eine Aufzugskabine auf, die vertikal in einem Schacht verfahrbar ist und Passagiere aufnimmt, um diese auf ein gewünschtes Stockwerk eines Gebäudes zu transportieren. Um diese Aufgabe wahrnehmen zu können, verfügt der Aufzug in der Regel mindestens über folgende Aufzugskomponenten: einen Antrieb mit einem Motor und einer Treibscheibe, Umlenkrollen, Zugmittel, ein Gegengewicht, sowie über je ein Paar Führungsschienen zur Führung einer Aufzugskabine und eines Gegengewichts.An elevator usually has an elevator car that can be moved vertically in a shaft and accommodates passengers in order to transport them to a desired floor of a building. To perform this task, the elevator usually has at least the following elevator components: a drive with a motor and a traction sheave, pulleys, traction means, a counterweight, as well as a pair of guide rails for guiding an elevator car and a counterweight.
Dabei erzeugt der Motor die für den Transport der in der Aufzugskabine anwesenden Passagiere benötigte Leistung. In der Regel nimmt ein Elektromotor diese Funktion wahr. Dieser treibt direkt oder indirekt eine Treibscheibe an, die in Reibkontakt mit einem Zugmittel steht. Das Zugmittel kann ein Riemen oder ein Seil sein. Es dient der Aufhängung sowie der Förderung der Aufzugskabine und des Gegengewichts, welche beide dermassen aufgehängt sind, dass deren Schwerkräfte in entgegengesetzter Richtung entlang des Zugmittels wirken. Dementsprechend reduziert sich die resultierende Schwerkraft, welche durch den Antrieb überwunden werden muss erheblich. Zudem kann durch die grössere Aufliegekraft des Zugmittels auf der Treibscheibe ein grösseres Antriebsmoment von der Treibscheibe auf das Zugmittel übertragen werden. Das Zugmittel wird durch Umlenkrollen geführt.In this case, the engine generates the power required for the transport of the passengers present in the elevator car. As a rule, an electric motor performs this function. This drives directly or indirectly to a traction sheave, which in Frictional contact with a traction means is. The traction means may be a belt or a rope. It serves for the suspension and the promotion of the elevator car and the counterweight, which are both suspended so that their gravitational forces act in opposite directions along the traction means. Accordingly, the resulting gravity, which must be overcome by the drive significantly reduced. In addition, a larger drive torque can be transmitted from the traction sheave to the traction means by the larger Aufliegekraft the traction means on the traction sheave. The traction means is guided by deflection rollers.
Im Aufzugsbau gewinnt die optimale Nutzung des Schachtvolumens immer mehr an Bedeutung. Gerade in Hochhäusern mit einem hohen Nutzungsgrad des Gebäudes ist bei einem gegebenen Schachtvolumen ein möglichst effizientes Bewältigen des Passagieraufkommens anzustreben. Dieses Ziel kann erstens durch eine optimale platzsparende Anordnung der Aufzugskomponenten, was Raum für grössere Aufzugskabinen schafft, und zweitens durch Aufzugskonzepte, die das vertikale Verfahren mehrerer unabhängiger Aufzugskabinen in einem Schacht ermöglicht, erreicht werden.In elevator construction, the optimum utilization of the shaft volume is becoming increasingly important. Especially in high-rise buildings with a high degree of utilization of the building, it is desirable to manage the passenger volume as efficiently as possible for a given shaft volume. This goal can be achieved, first, by an optimal space-saving arrangement of the elevator components, which creates space for larger elevator cars, and secondly by elevator concepts, which allows the vertical movement of several independent elevator cars in a shaft.
Aus
Die Aufgabe der vorliegenden Erfindung ist es die Förderleistung einer Aufzugsanlage für einen gegebenen Schachtquerschnitt in einem Gebäude mit Zonenaufteilung und mindestens einem Umsteigestockwerk weiter zu erhöhen.The object of the present invention is to further increase the delivery rate of an elevator installation for a given shaft cross-section in a building with zoning and at least one transfer floor.
Die oben erwähnte Aufgabe wird durch die Erfindung gemäss der Definition des unabhängigen Patentanspruchs gelöst.The above-mentioned object is achieved by the invention according to the definition of the independent patent claim.
Die erfindungsgemässe Aufzugsanlage liegt in einem Gebäude mit mindestens zwei Aufzügen, wobei das Gebäude in Gebäudezonen aufgeteilt ist und jeder Aufzug über mindestens eine Aufzugskabine verfügt. Jede Aufzugskabine ist über einen eigenen Antrieb in einer zugeordneten Kabinenzone unabhängig verfahrbar. Zudem verfügt jede Kabinenzone über mindestens ein Umsteigestockwerk. Ein erster Aufzug verfügt über mindestens drei senkrecht übereinander angeordnete Aufzugskabinen in einem Schacht. Mindestens drei dieser Kabinenzonen sind einer Gebäudezone zugeteilt.The elevator installation according to the invention is located in a building with at least two elevators, the building being divided into building zones and each elevator having at least one elevator cage. Each elevator car can be moved independently via its own drive in an assigned car zone. In addition, each cabin zone has at least one transfer deck. A first lift has at least three vertically stacked elevator cars in a shaft. At least three of these cabin zones are allocated to a building zone.
Dank der mindestens drei übereinander unabhängig verfahrbaren Aufzugskabinen eines Aufzugs besitzt die Aufzugsanlage eine deutlich höhere Förderleistung. Somit werden Wartezeiten in Umsteigestockwerken weiter reduziert und das Entstehen von Warteschlangen weitgehend vermieden.Thanks to the at least three elevator cars of an elevator which can be moved independently of one another, the elevator installation has a significantly higher delivery rate. Thus, waiting times in transfer floors are further reduced and the emergence of queues largely avoided.
Vorteilhafterweise ist diese mindestens eine Aufzugskabine eines zweiten Aufzugs eine Multikabine mit mindestens zwei senkrecht übereinander angeordneten Kabinen. Diese beiden Kabinen sind derselben Kabinenzone zugeordnet, da sie physisch verbunden sind und somit nur gemeinsam verfahren werden können.Advantageously, this at least one elevator car of a second elevator is a multicab with at least two vertically stacked cabins. These two cabins are assigned to the same car zone because they are physically connected and thus can only be moved together.
Der Vorteil der Aufzugsanlage mit Doppelkabine liegt in der Verdoppelung des verfügbaren Kabinenvolumens einer Aufzugskabine. Somit lassen sich durch eine Fahrt bis zu doppelt so viele Passagiere befördern.The advantage of the elevator installation with double cabin is the doubling of the available cabin volume of an elevator car. Thus, one trip can carry up to twice as many passengers.
Vorteilhafterweise bedient die Multikabine mindestens zwei übereinanderliegende Umsteigestockwerke.Advantageously, the multi-cab serves at least two superimposed transfer floors.
Der Vorteil der Aufzugsanlage ist, dass sich bei einer Verdoppelung der Umsteigestockwerke die Wartezeiten auf den jeweiligen Umsteigestockwerken weiter reduzieren lassen. Die Umsteigestockwerke besitzen für das Umsteigen einen Umsteige- bzw. einen Warteraum. Bei einer doppelten Anzahl solcher Umsteigeräume gestaltet sich das Umsteigen weitgehend Konfliktfrei und falls es trotz der erhöhten Förderleistung dennoch zu Wartezeiten kommen sollte, steht den Passagieren das doppelte Volumen Warteraum zur Verfügung. Ein Aufenthalt in den Umsteigestockwerken, bzw. Umsteige- oder Warteräume wird also in jedem Fall angenehmer.The advantage of the elevator system is that, when the transfer floors are doubled, the waiting times on the respective transfer floors can be further reduced. The transfer floors have a transfer or a waiting room for the transfer. With a double number of such Umsteigeräume the changeover is largely conflict-free and if there should be waiting times despite the increased capacity, the passengers have twice the volume waiting room available. A stay in the transfer floors, or transfer or waiting rooms is therefore in any case more pleasant.
Vorteilhafterweise verfügen die mindestens drei Aufzugskabinen des ersten Aufzugs über eine mittlere und zwei benachbarte Aufzugskabinen. Die mittlere Aufzugskabine ist dabei in einer mittleren Kabinenzone unabhängig verfahrbar und die zwei benachbarten Aufzugskabinen sind in zwei benachbarten Kabinenzonen unabhängig verfahrbar. Weiters vorteilhaft überlappt die mittlere Kabinenzone benachbarte Kabinenzonen.Advantageously, the at least three elevator cars of the first elevator have a central and two adjacent elevator cars. The middle elevator car can be moved independently in a central car zone and the two adjacent elevator cars can be moved independently in two adjacent car zones. Further advantageously, the central car zone overlaps adjacent car zones.
Der Vorteil der Aufzugsanlage mit solch überlappenden Kabinenzonen ist, dass Passagiere auf jedem beliebigen Stockwerk, das im Überlappungsbereich der Kabinenzonen liegt, von einer mittleren Kabinenzone in eine benachbarte Kabinenzone umsteigen können. Dies ermöglicht eine flexiblere Führung der Passagiere. Zudem werden Stockwerke im Überlappungsbereich der Kabinenzonen von zwei Aufzugskabinen bedient und somit wird die Förderleistung der Aufzugsanlage erhöht.The advantage of the elevator installation with such overlapping cabin zones is that passengers on any floor lying in the overlapping area of the cabin zones can change from a central cabin zone into an adjacent cabin zone. This allows a more flexible guidance of the passengers. In addition, floors are served in the overlapping area of the cabin zones of two elevator cars and thus the delivery capacity of the elevator system is increased.
Vorteilhafterweise sind die mindestens drei den Aufzugskabinen zugeordneten Antriebe von den Aufzugskabinen überfahrbar.Advantageously, the at least three drives associated with the elevator cars can be driven over by the elevator cars.
Die Aufzugsanlage hat den Vorteil, dass die Antriebe platzsparend und flexibel im Schacht anordbar sind ohne mit den Aufzugskabinen in Konflikt zu geraten.The elevator system has the advantage that the drives can be arranged space-saving and flexible in the shaft without being in conflict with the elevator cars.
Vorteilhafterweise sind die mindestens drei den Aufzugskabinen zugeordneten Antriebe an einer ersten Schachtwand oder zweiten gegenüberliegenden Schachtwand positioniert.Advantageously, the at least three drives associated with the elevator cars are positioned on a first shaft wall or second shaft wall opposite.
Der Vorteil der Aufzugsanlage liegt in der Position der Antriebe zwischen Aufzugskabinen und ersten und zweiten Schachtwänden. Dadurch kann Platz im Schachtkopf oder Schachtgrube eingespart werden, wo üblicherweise die Antriebe angeordnet sind.The advantage of the elevator system lies in the position of the drives between elevator cars and first and second shaft walls. This allows space in the shaft head or Schachtgrube be saved, where usually the drives are arranged.
Vorteilhafterweise ist der Antrieb der mittleren Aufzugskabine an der ersten Schachtwand positioniert und sind die beiden Antriebe der benachbarten Aufzugskabinen an der gegenüberliegenden zweiten Schachtwand positioniert.Advantageously, the drive of the middle elevator car is positioned on the first shaft wall and the two drives of the adjacent elevator cars are positioned on the opposite second shaft wall.
Der Vorteil der Aufzugsanlage liegt in der flexiblen und einfachen Positionierung beliebig vieler Antriebe und der zugeordneten Aufzugskabinen im selben Schacht. Bei einer konventionellen Anordnung der Antriebe im Schachtkopf hingegen ist die Anzahl installierbarer Antriebe durch den im Schachtkopf verfügbaren Raum begrenzt. Ebenso sind einer konfliktfreien Führung der Zugelemente bei einer solch konventionellen Anordnung der Antriebe im Schachtkopf enge Grenzen gesetzt.The advantage of the elevator system is the flexible and easy positioning of any number of drives and the associated elevator cars in the same shaft. In a conventional arrangement of the drives in the shaft head, however, the number of installable drives is limited by the space available in the shaft head. Likewise, a conflict-free management of the tension elements in such a conventional arrangement of the drives in the shaft head narrow limits.
Im Folgenden wird die Erfindung durch Ausführungsbeispiele und Zeichnungen verdeutlicht und weiter im Detail beschrieben. Es zeigen:
- Fig.1
- Schematische Seitenansicht einer Anordnung eines Aufzugs einer Aufzugsanlage mit drei Aufzugskabinen, drei Antrieben, drei Treibscheiben, drei Zugmitteln und mehreren Umlenkrollen;
- Fig.2
- Schematische Draufsicht einer Anordnung des Aufzugs einer Aufzugsanlage gemäss
Fig. 1 ; - Fig.3
- Schematische Draufsicht einer optionalen Anordnung eines Aufzugs einer Aufzugsanlage gemäss
Fig. 1 ; - Fig.4
- Seitenansicht einer Anordnung der Antriebe auf Querträgern;
- Fig.5
- Schematische Seitenansicht einer Aufzugsanlage in einem Gebäude mit zwei Gebäudezonen; und
- Fig.6
- Schematische Seitenansicht einer Aufzugsanlage in einem Gebäude mit vier Gebäudezonen.
- Fig.1
- Schematic side view of an arrangement of an elevator of an elevator system with three elevator cars, three drives, three traction sheaves, three traction means and a plurality of pulleys;
- Fig.2
- Schematic plan view of an arrangement of the elevator of an elevator system according to
Fig. 1 ; - Figure 3
- Schematic plan view of an optional arrangement of an elevator of an elevator system according to
Fig. 1 ; - Figure 4
- Side view of an arrangement of the drives on cross members;
- Figure 5
- Schematic side view of an elevator installation in a building with two building zones; and
- Figure 6
- Schematic side view of an elevator installation in a building with four building zones.
Der Schacht ist ein von sechs Begrenzungsebenen definierter Raum, in welchem eine oder mehrere Aufzugskabinen entlang einer Fahrbahn verfahren werden. Üblicherweise bilden vier Schachtwände, eine Decke und ein Boden diese sechs Begrenzungsebenen. Es ist aber durchaus auch denkbar, dass eine obere oder untere Fahrbahnbegrenzung eine Begrenzungsebene darstellt. Diese Definition des Schachts kann dahingehend ausgeweitet werden, dass in einem Schacht auch mehrere Fahrbahnen horizontal nebeneinander angeordnet sind, entlang welcher je eine oder mehrere Aufzugskabinen verfahrbar sind.The shaft is defined by six boundary planes space in which one or more elevator cars are moved along a roadway. Usually, four shaft walls, a ceiling and a floor form these six boundary planes. However, it is also conceivable that an upper or lower road boundary represents a boundary plane. This definition of the shaft can be extended to the effect that a plurality of lanes are also arranged horizontally next to one another in a shaft, along which one or more elevator cars can each be moved.
Die
Die zugeordneten Antriebe A1, A2, A3 sind seitlich an ersten und zweiten Schachtwänden positioniert. Die ersten und zweiten Schachtwände sind diejenigen sich gegenüberliegenden Schachtwände, die keine Schachttüren aufweisen. Der Antrieb A1 der mittleren Aufzugskabine 7a ist an der ersten Schachtwand und die beiden Antriebe A2, A3 der benachbarten Aufzugskabinen 7b, 7c sind an der gegenüberliegenden zweiten Schachtwand positioniert. Dabei befinden sich die Antriebe A1, A2, A3 alternierend auf gegenüberliegenden Schachtwänden. Nicht gezeigte zusätzliche Antriebe weiterer Aufzugskabinen sind der alternierenden Reihung der Antriebe entsprechend abwechselnd an ersten und zweiten Schachtwänden angeordnet.The associated drives A1, A2, A3 are positioned laterally on first and second shaft walls. The first and second shaft walls are those shaft walls opposite each other which have no shaft doors. The drive A1 of the
Die Antriebe A1, A2, A3 sind in
Es ist aber auch möglich zwei Antriebe auf gleicher Schachthöhe zu positionieren. Zum Beispiel kann der Antrieb A1 der mittleren Aufzugskabine 7a auf einer ersten Schachtwand und der Antrieb A3 der benachbarten oberen Aufzugskabine 7c auf der gegenüberliegenden zweiten Schachtwand auf gleicher Schachthöhe angeordnet sein. Der Vorteil dieser Anordnung liegt in der einfachen Wartung der beiden Antriebe A1, A3. Diese können nämlich von einer gemeinsamen Plattform aus gewartet werden.But it is also possible to position two drives at the same shaft height. For example, the drive A1 of the
Ein Antrieb A1, A2, A3 verfügt jeweils über einen Motor M1, M2, M3 und über eine Treibscheibe 1a, 1b, 1c. Der Motor M1, M2, M3 steht in Wirkkontakt mit der Treibscheibe 1a, 1b, 1c und treibt mittels dieser Treibscheibe 1a, 1b, 1c das Zugmittel Z1, Z2, Z3 an. Die Treibscheibe 1a, 1b, 1c ist so gestaltet, dass sie geeignet ist ein oder mehrere Zugmittel Z1, Z2, Z3 aufzunehmen. Die Zugmittel Z1, Z2, Z3 sind vorzugsweise Riemen, wie Keilrippenriemen mit einseitigen Rippen, die in eine oder mehrere treibscheibenseitige Vertiefungen eingreifen. Riemenvarianten wie glatte Riemen und einseitig oder beidseitig verzahnte Riemen mit entsprechenden Treibscheiben 1a, 1b, 1c sind ebenfalls verwendbar. Zudem sind auch verschiedene Arten von Seilen wie Einzelseile, Doppelseile oder Mehrfachseile einsetzbar. Die Zugmittel Z1, Z2, Z3 weisen Stränge aus Stahldraht bzw. Aramid oder Vectran auf.A drive A1, A2, A3 each have a motor M1, M2, M3 and a
Die mindestens drei Aufzugskabinen 7a, 7b, 7c und drei Gegengewichte 12a, 12b, 12c sind an den Zugmitteln Z1, Z2, Z3 als Flasche aufgehängt. Dabei besitzen die Aufzugskabinen 7a, 7b, 7c mindestens eine erste und eine zweite Umlenkrolle 2a, 2b, 2c, 3a, 3b, 3c, die im unteren Bereich der Aufzugskabinen 7a, 7b, 7c befestigt sind. Diese Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c haben am äusseren Umfang eine oder mehrere Rillen, die so beschaffen sind, dass sie ein oder mehrere Zugmittel Z1, Z2, Z3 aufnehmen können. Die Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c sind also geeignet für die Führung von Zugmitteln Z1, Z2, Z3 und werden mit letzteren in Kontakt gebracht. Eine Aufzugskabine 7a, 7b, 7c wird so vorzugsweise als Unterflasche aufgehängt.The at least three
In einer optionalen Ausführungsform befinden sich die Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c im oberen Bereich der Aufzugskabine 7a, 7b, 7c. Entsprechend der obigen Beschreibung wird die Aufzugskabine 7a, 7b, 7c dann als Oberflasche aufgehängt.In an optional embodiment, the
Im oberen Bereich der Gegengewichte 12a, 12b, 12c befindet sich eine dritte Umlenkrolle 4a, 4b, 4c, die ebenfalls geeignet ist analog zu den Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c ein oder mehrere Zugmittel Z1, Z2, Z3 aufzunehmen. Dementsprechend wird das Gegengewicht 12a, 12b, 12c vorzugsweise an der dritten Umlenkrolle 4a, 4b, 4c als Oberflasche unterhalb des zugeordneten Antriebs A1, A2, A3 aufgehängt.In the upper region of the
Das Zugmittel Z1, Z2, Z3 wird von einem ersten Fixpunkt 5a, 5b, 5c zu einem zweiten Fixpunkt 6a, 6b, 6c via erste, zweite und dritte Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c und der Treibscheibe 1a, 1b, 1c von einer ersten Schachtwand zur zweiten Schachtwand geführt. Der erste Fixpunkt 5a, 5b, 5c befindet sich dabei gegenüber des zugeordneten Antriebs A1, A2, A3 auf etwa derselben Schachthöhe in der Nähe einer ersten oder zweiten Schachtwand. Der zweite Fixpunkt 6a, 6b, 6c befindet sich in der Nähe des zugeordneten Antriebs A1, A2, A3 auf einer gegenüberliegenden zweiten oder ersten Schachtwand.The traction means Z1, Z2, Z3 is moved from a first
Vom ersten Fixpunkt 5a, 5b, 5c verläuft das Zugmittel Z1, Z2, Z3 entlang einer ersten oder zweiten Schachtwand hinunter zur zweiten Umlenkrolle 3a, 3b, 3c umschlingt diese von Aussen nach Innen in einem Winkel von ca. 90° und führt zur ersten Umlenkrolle 2a, 2b, 2c. Das Zugmittel Z1, Z2, Z3 umschlingt diese erste Umlenkrolle 2a, 2b, 2c von Innen nach Aussen wiederum um ca. 90° und wird danach entlang der Aufzugskabine 7a, 7b, 7c nach oben zur Treibscheibe 1a, 1b, 1c geführt und umschlingt diese von Innen nach Aussen um ca. 150°. Je nach Einstellung der optionalen Stellscheibe 13a, 13b, 13c kann der Umschlingungswinkel in einem Bereich von 90 bis 180° eingestellt werden. Danach wird das Zugmittel Z1, Z2, Z3 entlang einer zweiten oder ersten Schachtwand hinunter zur dritten Umlenkrolle 4a, 4b, 4c geführt, umschlingt diese von Aussen nach Innen um ca. 180° und wird wieder entlang einer zweiten oder ersten Schachtwand nach oben zum zweiten Fixpunkt 6a, 6b, 6c geführt.From the first
Wie oben erwähnt ist eine Stellscheibe 13a, 13b, 13c optionaler Bestandteil des Antriebs A1, A2, A3. Mit dieser Stellscheibe 13a, 13b, 13c lässt sich der Umschlingungswinkel des Zugmittels Z1, Z2, Z3 an der Treibscheibe 1a, 1b, 1c einstellen, bzw. vergrössern oder verkleinern um die gewünschten Traktionskräfte von der Treibscheibe 1a, 1b, 1c auf das Zugmittel A1, A2, A3 zu übertragen. Je nach Abstand der Stellscheibe 13a, 13b, 13c zur Treibscheibe 1a, 1b, 1c lässt sich zudem der Abstand des Zugmittels Z1, Z2, Z3 zum Antrieb A1, A2, A3, zum Gegengewicht 12a, 12b, 12c oder zur Aufzugskabine 7a, 7b, 7c einstellen. Damit wird eine konfliktfreie Führung der Zugmittel Z1, Z2, Z3 im Schacht zwischen der Treibscheibe 1a, 1b, 1c und der ersten Umlenkrolle 2a, 2b, 2c gewährleistet.As mentioned above, an
Eine Aufzugskabine 7a, 7b, 7c, sowie die jeweils zugeordneten Antriebe A1, A2, A3, Treibscheiben 1a, 1b, 1c, Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c, optionalen Stellscheiben 13a, 13b, 13c, Gegengewichte 12a, 12b, 12c, Zugmittel Z1, Z2, Z3 und Fixpunkte 5a, 5b, 5c, 6a, 6b, 6c bilden eine Aufzugseinheit. Folglich zeigt
Ausgehend von der mittleren Aufzugseinheit mit der Aufzugskabine 7a, sind die benachbarte untere Aufzugseinheit mit der Aufzugskabine 7b und eine benachbarte obere Aufzugseinheit mit Aufzugskabine 7c je spiegelbildlich zur mittleren angeordnet. Die Antriebe A1, A2, A3 der Aufzugseinheiten liegen also auf sich gegenüberliegenden ersten oder zweiten Schachtwänden und auch die zugeordneten Treibscheiben 1a, 1b, 1c, Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c, Stellscheiben 13a, 13b, 13c, Gegengewichte 12a, 12b, 12c, Zugmittel Z1, Z2, Z3 und Fixpunkte 5a, 5b, 5c, 6a, 6b, 6c benachbarter Aufzugskabinen 7a, 7b, 7c sind spiegelbildlich angeordnet. Diese Regel der spiegelbildlichen Anordnung mittlerer und benachbarter Aufzugseinheiten gilt für eine beliebige Anzahl von Aufzugseinheiten, die in einem Schacht installiert sind.Starting from the central elevator unit with the
Eine weitere Charakteristik der Anordnung der Aufzugseinheiten ist, dass die zugeordneten Antriebe A1, A2, A3 und ersten Fixpunkte 5a, 5b, 5c in etwa auf gleicher Höhe an gegenüberliegenden ersten und zweiten Schachtwänden positioniert sind. Die durch die Fixpunkte 5a, 5b, 5c und Antriebe A1, A2, A3 vorgegebene Schachthöhe ist gleichzeitig auch der Höchste Punkt, der eine zugeordnete Aufzugskabine 7a, 7b, 7b erreichen kann, da das Zugmittel in der gezeigten Ausführungsform einen Aufhängepunkt einer Aufzugskabine 7a, 7b, 7c nicht über die Höhe der Treibscheibe 1a, 1b, 1c heben kann. Die Positionierung der Antriebe A1, A2, A3 und erster Fixpunkte 5a, 5b, 5c der mittleren und der benachbarten Aufzugskabinen 7a, 7b, 7c erfolgt in der Regel auf unterschiedlichen Schachthöhen. Die Aufzugskabinen 7a, 7b, 7c können also nur unterschiedliche maximale Schachthöhen erreichen. Dementsprechend sind der mittleren und den benachbarten Aufzugskabinen 7a, 7b, 7c unterschiedliche Kabinenzonen zugewiesen, in welchen die Aufzugskabinen 7a, 7b, 7c verfahrbar sind.Another characteristic of the arrangement of the elevator units is that the associated drives A1, A2, A3 and first
In
Wendet man diese Lehre auf die Dreiergruppe 14 an, ergeben sich teilweise überlappende Kabinenzonen K1, K2, K3, wobei sich nur mittlere und benachbarte Kabinenzonen K1, K2, K3 überlappen. Bei einem Hochhaus mit mehreren übereinander angeordneten Dreiergruppen 14 werden also alle Stockwerke, die sich in einer mittleren Kabinenzone K1 befinden, von zwei Aufzugskabinen bedient.Applying this doctrine to the
Gemäss
Die Zugmittel Z1, Z2, Z3 und die zugeordneten Führungsmittel, wie Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c und Treibscheiben 1a, 1b, 1c liegen in dieser Aufhängungsanordnung einseitig der Verbindungsebene V, wobei die Umlenkrollen 4a, 4b, 4c übersichtlichkeitshalber in
Die Gegengewichte 12a, 12b, 12c sind durch zwei Gegengewichtsführungsschienen 11a.1, 11a.2, 11b.1, 11b.2 geführt. Die Gegengewichte 12a, 12b, 12c sind an gegenüberliegenden Schachtwänden zwischen den Kabinenführungsschienen 10.1, 10.2 und ersten oder zweiten Schachtwänden positioniert. Vorteilhafterweise sind die Gegengewichte 12a, 12b, 12c in ihrem Schwerpunkt an den Zugmitteln Z1, Z2, Z3 aufgehängt. Da die Aufzugskabinen 7a, 7b, 7c exzentrisch aufgehängt sind, liegen die Gegengewichte 12a, 12b, 12c seitlich versetzt in der Nähe von dritten und vierten Schachtwänden.The
Die Drehachsen der Treibscheiben 1a, 1b, 1c und der Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c liegen parallel zu ersten oder zweiten Schachtwänden. In der gezeigten Ausführung sind die vorhergenannten Komponenten der Gestalt, dass sie vier parallel verlaufende Zugmittel Z1, Z2, Z3 aufnehmen können, diese führen oder im Fall der Treibscheibe 1a, 1b, 1c auch antreiben. Um die Zugmittel Z1, Z2, Z3 aufnehmen zu können besitzen die Umlenkrollen 2a, 2b, 2c, 3a, 3b, 3c, 4a, 4b, 4c und Treibscheiben 1a, 1b, 1c vier speziell ausgebildete Kontaktflächen, die im Fall von Seilen zum Beispiel als Rillen oder im Fall von Riemen z.B. auch als bombierte Flächen oder Verzahnung ausgelegt sind oder bei einer flach ausgebildeten Kontaktfläche mit Führungsschultern versehen sind. Diese vier Kontaktflächen können entweder auf einem gemeinsamen walzenförmigen Grundkörper oder je auf vier einzelne Rollen mit gemeinsamer Drehachse aufgebracht sein.The axes of rotation of the traction sheaves 1a, 1b, 1c and the
Bei Kenntnis dieser Ausführungsform stehen dem Fachmann je nach Aufgabenstellung zahlreiche Variationsmöglichkeiten offen. So kann dieser ein bis vier oder mehr einzelne Rollen mit oder ohne Abstand zueinander auf einer Drehachse anordnen. Dabei kann jede Rolle je nach Auslegung ein bis vier oder bei Bedarf auch mehr Zugmittel Z1, Z2, Z3 aufnahmen.With knowledge of this embodiment, the person skilled in the art, depending on the task numerous variations available. So this can arrange one to four or more individual roles with or without distance to each other on a rotation axis. Depending on the design, each roller can accommodate one to four or, if required, more pulling means Z1, Z2, Z3.
Im Normalbetrieb des Aufzugs werden die Aufzugskabinen 7a, 7b, 7c bei einem Stockwerkshalt bündig zum Stockwerk platziert und die Kabinentüren 8 zusammen mit den Schachttüren 9 geöffnet, um den Transfer von Passagieren vom Stockwerk zur Aufzugskabine 7a, 7b, 7c und umgekehrt zu ermöglichen.In normal operation of the elevator, the
Dabei werden die Zugmittel Z1, Z2, Z3 von den Umlenkrollen und Treibscheiben 1a, 1b, 1c beidseitig der Verbindungsebene V geführt. Vorteilhafterweise ist dabei die Aufhängung bezüglich der Verbindungsebene V symmetrisch angeordnet. Da in diesem Fall der Aufhängeschwerpunkt im Wesentlichen mit dem Schwerpunkt S der Aufzugskabine 7a, 7b, 7c zusammenfällt wirken keine zusätzlichen Momente auf die Kabinenführungsschienen 10.1, 10.2.The traction means Z1, Z2, Z3 are guided on both sides of the connecting plane V by the deflection rollers and
Bei dieser zentrischen Aufhängung der Aufzugskabinen 7a, 7b, 7c bestehen die zugeordneten Umlenkrollen 2a.1, 2a.2, 2b.1, 2b.2, 3a.1, 3a.2, 3b.1, 3b.2 und Treibscheiben 1a.1, 1a.2, 1b.1, 1b.2 mindestens aus zwei Rollen, die links und rechts der Verbindungsebene V angeordnet sind. Die Umlenkrollen 4a, 4b, 4c der Gegengewichte 12a, 12b, 12c bestehen ebenfalls aus zwei Rollen, die links und rechts der Verbindungsebene V angeordnet sind, sind aber übersichtshalber nicht in
Auch hier sind die Gegengewichte 12a, 12b, 12c vorteilhafterweise in ihrem Schwerpunkt S an den Zugmitteln Z1, Z2, Z3 zwischen den Kabinenführungsschienen 10.1, 10.2 und ersten oder zweiten Schachtwänden aufgehängt. Da die Aufzugskabinen 7a, 7b, 7c nun zentrisch aufgehängt sind, liegen auch die Gegengewichte 12a, 12b, 12c in einem mittleren Bereich der ersten und zweiten Schachtwände. Dank dieser mittigen Position der Gegengewichte 12a, 12b, 12c erhöht sich der Freiraum zwischen den seitlichen Enden der Gegengewichte 12a, 12b, 12c und dritten und vierten Schachtwänden. Dadurch gewinnt man Gestaltungsspielraum für die Gegengewichte 12a, 12b, 12c. So kann z.B. ein schmaleres und breiteres Gegengewicht 12a, 12b, 12c verwendet werden, um den Platz besser auszunützen. Bei gegebenem Schachtquerschnitt gewinnt die Aufzugskabine 7a, 7b, 7c an Breite oder bei gegebener Kabinengrösse kann der Schachtquerschnitt verkleinert werden.Again, the
Die zentrischen und exzentrischen Aufhängevarianten, die in den
Wie in
Der Motor M1 liegt vertikal über der Treibscheibe 1a. Dank dieser Anordnung lässt sich der Antrieb in der Lichtprojektion der Gegengewichte 12a zwischen den Aufzugskabinen 7a und ersten und zweiten Schachtwänden positionieren. Dadurch sind die Antriebe A1 von den Aufzugskabinen 7a überfahrbar und können somit in einem andersweit nicht benötigten Raum des Schachtes angebracht werden. Im Vergleich mit herkömmlichen maschinenraumlosen Aufzügen gewinnt man dadurch den Raum im Schachtkopf und/oder in der Schachtgrube.The motor M1 is vertically above the
Gemäss
Optional können die Antriebe A1 auch direkt auf den Schachtwänden fixiert werden und man erspart sich dabei die Querträger 19.Optionally, the drives A1 can also be fixed directly on the shaft walls and it saves the cross member 19th
Das Gebäude ist hier in zwei Gebäudezonen G1, G2 eingeteilt. Jeder dieser Gebäudezonen G1, G2 ist eine Dreiergruppe 14.1, 14.2 zugeteilt, die ausschliesslich Stockwerke der zugeteilten Gebäudezone G1, G2 bedient. Die Aufzugsanlage verfügt über drei Aufzüge, die in zwei Schächten 15.1, 15.2 angeordnet sind. Im ersten Schacht 15.1 befinden sich zwei übereinander angeordnete Dreiergruppen 14.1, 14.2 mit sechs Aufzugseinheiten, sechs Aufzugskabinen und den zugeordneten Kabinenzonen K1.1, K1.2, K1.3, K2.1, K2.2, K2.3. Ein Wechsel von der ersten Gebäudezone G1 in die zweite Gebäudezone G2 erfolgt somit zwingend über den Aufzug des zweiten Schachts 15.2 und nur von den Umsteigestockwerken U1.1, U1.2 der Gebäudezone G1 zu den Umsteigestockwerken U2.1, U2.2 der Gebäudezone G2. Die beiden Dreiergruppen 14.1, 14.2 sind für den Transport der Passagiere von den Umsteigestockwerken U2.1, U2.2 zu einem Stockwerk der entsprechenden Gebäudezone G1, G2 und zwischen zwei beliebigen Stockwerken innerhalb einer Gebäudezone G1, G2 zuständig. Damit lässt sich ein effizienter kanalisierter Transport von Passagieren innerhalb des Gebäudes erzielen.The building is divided into two building zones G1, G2. Each of these building zones G1, G2 is assigned a group of three 14.1, 14.2, which operates exclusively floors of the allocated building zone G1, G2. The elevator system has three elevators, which are arranged in two shafts 15.1, 15.2. In the first shaft 15.1 are two superimposed groups of three 14.1, 14.2 with six elevator units, six elevator cars and the associated car zones K1.1, K1.2, K1.3, K2.1, K2.2, K2.3. A change from the first building zone G1 into the second building zone G2 is thus necessarily via the elevator of the second shaft 15.2 and only from the transfer floors U1.1, U1.2 of the building zone G1 to the transfer floors U2.1, U2.2 of the building zone G2 , The two groups of three 14.1, 14.2 are responsible for the transport of passengers from the transfer floors U2.1, U2.2 to a floor of the corresponding building zone G1, G2 and between any two floors within a building zone G1, G2. This allows more efficient channeled transport of passengers within the building.
Der erste Schacht 15.1 kann optional in zwei abgetrennte Einzelschächte mit je einem Aufzug unterteilt werden. Die Schachthöhe dieser Einzelschächte richtet sich weitgehend nach der Höhe der entsprechenden Gebäudezone G1, G2. Der Vorteil von solch abgetrennten Einzelschächten ist das Ausbleiben des Schornsteineffekts und darum auch das Ausbleiben von unerwünschten starken Schachtwinden, wie sie in hohen Schächten auftreten können.The first shaft 15.1 can optionally be subdivided into two separate individual shafts, each with one elevator. The shaft height of these individual shafts depends largely on the height of the corresponding building zone G1, G2. The advantage of such separate shafts is the absence of the chimney effect and therefore the absence of unwanted strong shaft winds, as they can occur in tall shafts.
Im zweiten Aufzugsschacht 15.2 wird ein Hochleistungslift verfahren, der ausschliesslich Umsteigestockwerke U1.2, U1.1, U2.1, U2.2 bedient. Dieser Hochleistungslift ist im gezeigten Beispiel ein Doppeldeckerlift mit zwei fest verbundenen Kabinen, die vertikal übereinander angeordnet und gemeinsam im Schacht 15.2 verfahrbar sind. Diese Doppeldeckerkabinen bedienen zwei unmittelbar übereinander angeordnete Umsteigestockwerke U1.2, U1.1, U2.1, U2.2.In the second elevator shaft 15.2, a high-performance lift is operated, which operates only transfer floors U1.2, U1.1, U2.1, U2.2. This high performance lift is in Example shown a Doppeldeckerlift with two firmly connected cabins, which are arranged vertically one above the other and can be moved together in the shaft 15.2. These biplane cabins serve two directly superimposed transfer floors U1.2, U1.1, U2.1, U2.2.
Jede Kabinenzone K1.1, K1.2, K1.3, K2.1, K2.2, K2.3. und jede Gebäudezone G1, G2 besitzt mindestens ein Umsteigestockwerk U1.2, U1.1, U2.1, U2.2. In der oberen Gebäudezone G2 ergibt sich beispielsweise folgende Anordnung: die Umsteigestockwerke U2.1, U2.2 des Doppeldeckerlifts liegen in einem mittleren Bereich der Gebäudezone G2, das untere Umsteigestockwerk U2.2 wird von der unteren Kabine der Doppeldeckerkabine und der mittleren und der unteren benachbarten Aufzugskabine der Dreiergruppe 14.1 bedient und das obere Umsteigestockwerk U2.1 wird entsprechend von der oberen Kabine der Doppeldeckerkabine und der mittleren und der oberen benachbarten Aufzugskabine der Dreiergruppe 14.2 bedient. Somit stehen den Passagieren, deren Zielstockwerk in der mittleren Kabinenzone K1.2 liegt, immer zwei Aufzugskabinen der Dreiergruppe 14.2 für die Weiterfahrt zur Verfügung.Each car zone K1.1, K1.2, K1.3, K2.1, K2.2, K2.3. and each building zone G1, G2 has at least one transfer floor U1.2, U1.1, U2.1, U2.2. In the upper building zone G2, the following arrangement results, for example: the transfer floors U2.1, U2.2 of the double-decker lift lie in a central area of the building zone G2, the lower transfer floor U2.2 is from the lower cabin of the double-decker cabin and the middle and lower adjacent elevator car of the triad 14.1 operated and the upper transfer floor U2.1 is operated accordingly from the upper cabin of the double-decker cabin and the middle and the upper adjacent elevator car of the group of three 14.2. Thus, the passengers whose destination floor is located in the central car zone K1.2, always two elevator cars of the group of three 14.2 for the onward journey are available.
Während die benachbarten Kabinenzonen K2.2, K3.2 vorzugsweise je die Hälfte der Stockwerke einer Gebäudezone umfassen, verfügt die mittlere Kabinenzone K1.2 vorzugsweise über zwei Stockwerke weniger als die Anzahl Stockwerke, die der Gebäudezone G2 zugeteilt sind. Denn die mittlere Aufzugskabine kann alle mittleren Stockwerke der Gebäudezone G2 ausser die beiden Randstockwerke bedienen. Die mittlere Aufzugskabine kann wegen der senkrechten Stapelung der Aufzugskabinen einer Dreiergruppe 14.2 nicht an den oberen oder unteren benachbarten Kabinen vorbeifahren, die mindestens je ein Randstockwerk der Gebäudezone G2 besetzt halten.While the adjacent car zones K2.2, K3.2 preferably each comprise half of the floors of a building zone, the central car zone K1.2 preferably has two floors less than the number of floors allocated to the building zone G2. Because the middle elevator car can serve all middle floors of the building zone G2 except the two border floors. Because of the vertical stacking of the elevator cars of a group of three 14.2, the middle elevator car can not pass the upper or lower adjacent cars, which occupy at least one perimeter storey of the building zone G2.
Bei einer minimalen Grösse der mittleren Kabinenzone K1.2 umfasst diese die beiden Umsteigestockwerke U2.1, U2.2. In diesem Fall übernimmt die mittlere Aufzugskabine der Dreiergruppe 14.2 für die Gebäudezone G2 die Funktion einer Rolltreppe 16, indem sie Passagiere vom oberen Umsteigestockwerk U2.1 in das untere Umsteigestockwerk U2.2 und umgekehrt transportiert. Die beiden Umsteigestockwerke U2.1, U2.2 sind dann auch die einzigen Stockwerke der Gebäudezone G2, die je von zwei Aufzugskabinen der Dreiergruppe 14.2 bedient werden.With a minimum size of the central car zone K1.2 this includes the two transfer floors U2.1, U2.2. In this case, the middle elevator car of the triple group 14.2 for the building zone G2 assumes the function of an
In der maximalen Ausdehnung der mittleren Kabinenzone K1.2 hingegen bleiben die beiden Randstockwerke der Gebäudezone G2 die einzigen Stockwerke, die nur von der benachbarten unteren oder oberen Aufzugskabine der Dreiergruppe 14.2 bedient werden. Alle anderen Stockwerke werden bei maximaler Ausdehnung der mittleren Kabinenzone K1.2 von zwei Aufzugskabinen bedient.By contrast, in the maximum extent of the central cabin zone K1.2, the two peripheral floors of the building zone G2 remain the only floors served only by the adjacent lower or upper elevator car of the triple group 14.2. All other floors are served by two elevator cars at maximum extension of the central cabin zone K1.2.
Die Anordnung der Kabinenzonen K1.1, K2.1, K3.1, der zugeordneten Aufzugseinheiten und der Umsteigestockwerke U1.1, U1.2 in der Gebäudezone G1 entspricht im Wesentlichen der Anordnung der genannten Elemente der Gebäudezone G2. Ein wichtiger zusätzlicher Aspekt betrifft die Umsteigestockwerke U1.1, U1.2 der unteren Gebäudezone G1.The arrangement of the car zones K1.1, K2.1, K3.1, the associated elevator units and the transfer floors U1.1, U1.2 in the building zone G1 essentially corresponds to the arrangement of said elements of the building zone G2. An important additional aspect concerns the transfer floors U1.1, U1.2 of the lower building zone G1.
Die beiden Umsteigestockwerke U1.1, U1.2 der unteren Gebäudezone G1 sind durch eine Rolltreppe 16 verbunden. Die Rolltreppen werden oft auf Gebäude-Lobbys eingesetzt. Die Gebäude-Lobbys sind Stockwerke, in welchen die Passagiere das Gebäude betreten und auch wieder verlassen und sind darum von zahlreichen Passagieren frequentiert. Ist nun beispielsweise das untere Umsteigestockwerk U1.2 eine Gebäude-Lobby, gelangen nun die hereinströmenden Passagiere bei Bedarf dank der hohen Förderleistung der Rolltreppe 16 schnell zum oberen Umsteigestockwerke U1.1 oder gelangen beim Verlassen des Gebäudes schnell von diesem wieder auf die Gebäude-Lobby. Je nach Art und Lage des Gebäudes kann die Gebäude-Lobby prinzipiell auf irgendeinem Stockwerk des Gebäudes liegen. Die Gebäude-Lobby wird dabei in der Regel mindestens vom Hochleistungslift des zweiten Schachts 15.2 bedient.The two transfer floors U1.1, U1.2 of the lower building zone G1 are connected by an
Die Erfindung ist nicht nur auf die gezeigten Ausführungsformen beschränkt. Bei Kenntnis der Erfindung ist es für den Fachmann naheliegend unterschiedliche Parameter für konkrete Gebäudeformen zu optimieren. Anstatt einer Doppeldeckerkabine können auch mehrere oder einzelne Einzelkabinen oder Multikabinen, die über mehr als zwei miteinander verbundene Kabinen besitzen, in einem zweiten Schacht 15.2 verfahren werden. Auch die Anzahl Stockwerke, die einer Gebäudezone G zugeteilt sind, ist frei wählbar. Die Gebäudezonen G brauchen auch nicht eine gleiche Anzahl Stockwerke zu besitzen, sondern können von Gebäudezone zu Gebäudezone variieren. Es müssen auch nicht immer nur Dreiergruppen 14 einer Gebäudezone G zugeordnet sein. So lassen sich auch Vierer-, Fünfer- oder Sechsergruppen, usw. den Gebäudezonen G zuteilen. Die Kabinenzonen brauchen z.B. innerhalb einer Dreiergruppe nicht symmetrisch aufgebaut zu sein. In Abhängigkeit der Position der Antriebe und der Umsteigestockwerke U sind diese Kabinenzonen K frei den spezifischen Gebäudegegebenheiten anpassbar. Schliesslich sind auch die Umsteigestockwerke U bezüglich Anzahl und Position in einer Gebäudezone G in Abhängigkeit von Kabinenzonen K oder Anzahl Kabinen einer Multikabine frei anordbar.The invention is not limited only to the embodiments shown. With knowledge of the invention it is obvious for the expert to optimize different parameters for concrete building forms. Instead of a double-decker cabin, it is also possible for a plurality of individual single cabins or multi-cabins, which have more than two interconnected cabins, to be moved in a second shaft 15.2. The number of floors allocated to a building zone G is also freely selectable. The building zones G need not have an equal number of floors, but may vary from building zone to building zone. It also does not always have to be assigned only triads 14 a building zone G. Thus, groups of four, five or six, etc. can be assigned to the building zones G. The cabin zones, for example, need not be symmetrical within a group of three. Depending on the position of the drives and the transfer floors U, these car zones K are free to the specific building conditions customizable. Finally, the transfer floors U are also freely arrangeable with respect to number and position in a building zone G as a function of car zones K or number of cabins of a multicabine.
Folgende einfache Rechnung zeigt, dass sich dank der Erfindung eine deutliche Steigerung der Förderleistung erzielen lässt. Für eine Gebäudezone G2 mit beispielsweise zehn Stockwerken bedienen gemäss Stand der Technik zwei Aufzugskabinen je neun Stockwerke, d.h., dass jede Aufzugskabine pro Stockwerk einen durch die Anzahl der zu bedienenden Stockwerke gewichteten Förderkoeffizienten von 1/9 besitzt, der ein Mass für die Förderleistung der Aufzugskabine in einem bestimmten Stockwerk darstellt. Dies ergibt für die beiden Randstockwerke, die jeweils nur von einer Aufzugskabine bedient werden einen Förderkoeffizienten von je 1/9 und für einen mittleren Bereich von acht Stockwerken, wo sich die beiden Kabinenzonen überlappen, einen Förderkoeffizienten von 2/9.The following simple calculation shows that thanks to the invention a significant increase in the delivery rate can be achieved. According to the state of the art, for a building zone G2 having, for example, ten storeys, two elevator cars each serve nine floors, ie each elevator car has a conveyor coefficient of 1/9 weighted by the number of floors to be served, which measures the output of the elevator car on a certain floor. This results in a conveying coefficient of 1/9 for each of the two marginal storeys, which are each served by only one elevator car, and a conveying coefficient of 2/9 for a central area of eight storeys, where the two car zones overlap.
Erfindungsgemäss bedienen die benachbarten Kabinenzonen K2.2 und K3.2 je fünf obere und fünf untere Stockwerke und die mittlere Kabinenzone K1.2 acht Stockwerke. Daraus ergibt sich für den Bereich überlappender Kabinenzonen ein Förderkoeffizient von 1/5 plus 1/8 oder 13/40 und für die Randstockwerke ein Förderkoeffizient von 1/5.According to the invention, the adjacent car zones K2.2 and K3.2 each serve five upper and five lower floors and the central car zone K1.2 eight floors. The result for the area of overlapping cabin zones is a coefficient of promotion of 1/5 plus 1/8 or 13/40 and for the peripheral floors a coefficient of promotion of 1/5.
Dieses einfache Rechenbeispiel zeigt, dass sich eine deutlich erhöhte Förderleistung für alle Stockwerke der Gebäudezone G2 ergibt. Die Steigerung der Förderleistung für die beiden Randstockwerke ist sogar überproportional gross. Zudem ist es leicht zu erkennen, dass diese Steigerung der Förderleistung auch für eine von 10 abweichende Anzahl von Stockwerken in einer Gebäudezone gilt.This simple calculation example shows that there is a significantly increased delivery rate for all floors of building zone G2. The increase in output for the two peripheral floors is even disproportionately large. In addition, it is easy to see that this increase in capacity is also valid for a non-10 number of floors in a building zone.
Claims (39)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP07122655A EP1935825A1 (en) | 2006-12-22 | 2007-12-07 | Lift system for a building with at least two floors |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06127132 | 2006-12-22 | ||
EP07122655A EP1935825A1 (en) | 2006-12-22 | 2007-12-07 | Lift system for a building with at least two floors |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1935825A1 true EP1935825A1 (en) | 2008-06-25 |
Family
ID=39420637
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07122655A Withdrawn EP1935825A1 (en) | 2006-12-22 | 2007-12-07 | Lift system for a building with at least two floors |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP1935825A1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0820953A2 (en) * | 1996-07-25 | 1998-01-28 | Otis Elevator Company | Elevator shuttle with auxiliary elevators at terminals |
GB2320013A (en) * | 1996-12-03 | 1998-06-10 | Otis Elevator Co | Elevator shuttle system |
EP1489033A1 (en) | 2003-06-18 | 2004-12-22 | Inventio Ag | Elevator with two cars arranged one above the other in the same hoistway |
US20050077115A1 (en) * | 2003-09-11 | 2005-04-14 | Otis Elevator Company | Elevator device for a multi-sky-lobby system |
EP1526103A1 (en) | 2003-10-09 | 2005-04-27 | Inventio Ag | Multiple deck elevator system for group elevators |
-
2007
- 2007-12-07 EP EP07122655A patent/EP1935825A1/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0820953A2 (en) * | 1996-07-25 | 1998-01-28 | Otis Elevator Company | Elevator shuttle with auxiliary elevators at terminals |
GB2320013A (en) * | 1996-12-03 | 1998-06-10 | Otis Elevator Co | Elevator shuttle system |
EP1489033A1 (en) | 2003-06-18 | 2004-12-22 | Inventio Ag | Elevator with two cars arranged one above the other in the same hoistway |
US20050077115A1 (en) * | 2003-09-11 | 2005-04-14 | Otis Elevator Company | Elevator device for a multi-sky-lobby system |
EP1526103A1 (en) | 2003-10-09 | 2005-04-27 | Inventio Ag | Multiple deck elevator system for group elevators |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1326797B1 (en) | Elevator with drive unit mounted in a superior lateral section of the elevator hoistway | |
EP1935829A1 (en) | Elevator comprising two elevator cars in a shaft | |
DE60214219T2 (en) | LIFT SYSTEM | |
EP1149795B1 (en) | Arrangement of the driving unit for an elevator | |
DE69918218T2 (en) | Drawn elevator | |
DE69630081T2 (en) | Traction sheave elevator | |
EP1619157B2 (en) | Elevator system with independently movable elevator cars and method for controlling its movement | |
EP1768923B1 (en) | Lift and pulley assembly for use in a lift | |
EP1640308B1 (en) | Positioning of a driving machine for elevators | |
EP1588977B1 (en) | Device for the leveling of the cars of a multi-deck elevator | |
EP1056678B1 (en) | Preassembled elevator shaft | |
EP3807205B1 (en) | Method for operating a lift facility | |
EP2534083A1 (en) | Elevator system and method for operating such an elevator system | |
EP1693331A1 (en) | Elevator system with several shafts and with elevator cars that can be coupled and uncoupled from the selected drive system. | |
EP1489033B2 (en) | Elevator with two cars arranged one above the other in the same hoistway | |
EP1526103A1 (en) | Multiple deck elevator system for group elevators | |
DE19718626C1 (en) | Rope driven elevator | |
EP1918238B1 (en) | Elevator with two superimposed cars in one shaft | |
WO2019192846A1 (en) | Method for operating a lift system | |
EP1935828B1 (en) | Lift system for a building with at least two floors | |
EP1935825A1 (en) | Lift system for a building with at least two floors | |
AT410784B (en) | LIFT | |
DE10319731A1 (en) | elevator | |
WO2019154704A2 (en) | Passenger conveying device with a predefined direction of travel | |
EP2468674A1 (en) | Lift facility with double decker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
17P | Request for examination filed |
Effective date: 20081212 |
|
17Q | First examination report despatched |
Effective date: 20090122 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1122782 Country of ref document: HK |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
18W | Application withdrawn |
Effective date: 20121212 |
|
REG | Reference to a national code |