EP1857727B1 - Method and apparatus for supplying natural gas to gas demand sides in LNG carrier - Google Patents
Method and apparatus for supplying natural gas to gas demand sides in LNG carrier Download PDFInfo
- Publication number
- EP1857727B1 EP1857727B1 EP07104176.8A EP07104176A EP1857727B1 EP 1857727 B1 EP1857727 B1 EP 1857727B1 EP 07104176 A EP07104176 A EP 07104176A EP 1857727 B1 EP1857727 B1 EP 1857727B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- gas
- boil
- natural
- compressor
- forced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000007789 gas Substances 0.000 title claims description 267
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 title claims description 34
- 239000003345 natural gas Substances 0.000 title claims description 17
- 238000000034 method Methods 0.000 title claims description 14
- 239000003949 liquefied natural gas Substances 0.000 claims description 58
- 239000006200 vaporizer Substances 0.000 claims description 30
- 239000000446 fuel Substances 0.000 claims description 16
- 238000011144 upstream manufacturing Methods 0.000 claims description 5
- 230000006835 compression Effects 0.000 claims description 4
- 238000007906 compression Methods 0.000 claims description 4
- 230000008016 vaporization Effects 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 2
- 239000007788 liquid Substances 0.000 description 5
- 238000007796 conventional method Methods 0.000 description 4
- 238000002485 combustion reaction Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000003595 mist Substances 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 238000009834 vaporization Methods 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 238000009835 boiling Methods 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C7/00—Methods or apparatus for discharging liquefied, solidified, or compressed gases from pressure vessels, not covered by another subclass
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/02—Pipe-line systems for gases or vapours
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D1/00—Pipe-line systems
- F17D1/02—Pipe-line systems for gases or vapours
- F17D1/04—Pipe-line systems for gases or vapours for distribution of gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
- F17C2205/01—Mounting arrangements
- F17C2205/0123—Mounting arrangements characterised by number of vessels
- F17C2205/013—Two or more vessels
- F17C2205/0134—Two or more vessels characterised by the presence of fluid connection between vessels
- F17C2205/0142—Two or more vessels characterised by the presence of fluid connection between vessels bundled in parallel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
- F17C2205/01—Mounting arrangements
- F17C2205/0123—Mounting arrangements characterised by number of vessels
- F17C2205/013—Two or more vessels
- F17C2205/0134—Two or more vessels characterised by the presence of fluid connection between vessels
- F17C2205/0146—Two or more vessels characterised by the presence of fluid connection between vessels with details of the manifold
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2205/00—Vessel construction, in particular mounting arrangements, attachments or identifications means
- F17C2205/03—Fluid connections, filters, valves, closure means or other attachments
- F17C2205/0302—Fittings, valves, filters, or components in connection with the gas storage device
- F17C2205/0323—Valves
- F17C2205/0326—Valves electrically actuated
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2221/00—Handled fluid, in particular type of fluid
- F17C2221/03—Mixtures
- F17C2221/032—Hydrocarbons
- F17C2221/033—Methane, e.g. natural gas, CNG, LNG, GNL, GNC, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/01—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
- F17C2223/0146—Two-phase
- F17C2223/0153—Liquefied gas, e.g. LPG, GPL
- F17C2223/0161—Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/03—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the pressure level
- F17C2223/033—Small pressure, e.g. for liquefied gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2223/00—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
- F17C2223/04—Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by other properties of handled fluid before transfer
- F17C2223/042—Localisation of the removal point
- F17C2223/046—Localisation of the removal point in the liquid
- F17C2223/047—Localisation of the removal point in the liquid with a dip tube
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/01—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the phase
- F17C2225/0146—Two-phase
- F17C2225/0153—Liquefied gas, e.g. LPG, GPL
- F17C2225/0161—Liquefied gas, e.g. LPG, GPL cryogenic, e.g. LNG, GNL, PLNG
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2225/00—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel
- F17C2225/03—Handled fluid after transfer, i.e. state of fluid after transfer from the vessel characterised by the pressure level
- F17C2225/033—Small pressure, e.g. for liquefied gas
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0135—Pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0157—Compressors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0171—Arrangement
- F17C2227/0178—Arrangement in the vessel
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2227/00—Transfer of fluids, i.e. method or means for transferring the fluid; Heat exchange with the fluid
- F17C2227/01—Propulsion of the fluid
- F17C2227/0128—Propulsion of the fluid with pumps or compressors
- F17C2227/0171—Arrangement
- F17C2227/0185—Arrangement comprising several pumps or compressors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/03—Treating the boil-off
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/03—Treating the boil-off
- F17C2265/032—Treating the boil-off by recovery
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/03—Treating the boil-off
- F17C2265/032—Treating the boil-off by recovery
- F17C2265/037—Treating the boil-off by recovery with pressurising
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2265/00—Effects achieved by gas storage or gas handling
- F17C2265/06—Fluid distribution
- F17C2265/066—Fluid distribution for feeding engines for propulsion
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C2270/00—Applications
- F17C2270/01—Applications for fluid transport or storage
- F17C2270/0102—Applications for fluid transport or storage on or in the water
- F17C2270/0105—Ships
Definitions
- the present invention relates to a method and apparatus for stable supply of natural gas to gas demand sides in an LNG carrier. More particularly, the present invention relates to a method and apparatus that enables an unstable operation of a natural boil-off gas (NBOG) compressor for fuel supply caused by a low load operation of the NBOG compressor resulting from generation of a low amount of natural boil-off gas during ballast voyage of an LNG carrier to be stabilized via operation of a forcing vaporizer under the situation of the parallel operation of the NBOG compressor and the forcing vaporizer when supplying natural gas to a gas demand side in the LNG carrier, and that can achieve stable release of the pressure at an outlet of the vaporizer with regard to variation in load of the LNG carrier.
- NBOG natural boil-off gas
- a liquefied natural gas (LNG) tanker is typically propelled by one or more steam turbines.
- the tanker is provided with a boiler to generate steam.
- LNG liquefied natural gas
- LNG has such a very low boiling point of about -162°C, although it is a small ratio, continuous evaporation of LNG occurs inevitably within the tanker in spite of thermal insulation of the cargo tank.
- some of the fuel required for the boiler is sufficed by using such natural boil-off gas.
- the remaining fuel is supplied from a stock of heavy hydrocarbon liquid fuel, which is also called "bunker oil.”
- the tanker is additionally provided with a forcing vaporizer, which is a device for supply of natural gas to a burner associated with the boiler. Furthermore, the tanker is provided with a compressor to maintain a constant pressure of the gas supplied to the burner.
- the forced boil-off gas and the natural boil-off gas is mixed upstream of the compressor.
- Korean Utility Model Registration No. 290726 entitled “Boil-off gas supply system” and Korean Utility Model Registration No. 410367 entitled “Apparatus for supplying fuel in LNG carrier” natural boil-off gas within the LNG tank is mixed with forced boil-off gas upstream of the compressor and then supplied into the compressor.
- gas supplied from a cargo tank 210 to a compressor 212 and a power propulsion apparatus 214 is classified into two kinds, as shown in Fig. 1 .
- One kind of gas is natural boil-off gas generated through natural vaporization of liquefied gas within the cargo tank 210, and the other is forced boil-off gas generated through forced vaporization thereof.
- Both the natural boil-off gas and the forced boil-off gas are cooled to a suitable temperature range by a gas cooler 216, and supplied to the compressor 212.
- the suitable temperature range is about -150 to -130 °C.
- the gas is compressed in the compressor 212 and supplied at a suitable discharge pressure to the power propulsion device 214 through a discharge pipe 219.
- Gas pipes 220 are positioned between the cargo tank 210 and the gas cooler 216 to form flow paths of the natural boil-off gas and the forced boil-off gas.
- the gas pipes 220 comprises a natural boil-off gas pipe 220a to deliver the natural boil-off gas from the cargo tank 210 to the gas cooler 216, a gas return pipe 220b to allow liquefied gas to be returned to the cargo tank 210 via the gas cooler 216 after being pumped by a gas pump 211 within the cargo tank 210, and a forced boil-off gas pipe 220c having one end diverged from an initial segment H of the gas return pipe 220b and the other end connected to the natural boil-off gas pipe 220a to deliver the forced boil-off gas from the cargo tank 210 to the gas cooler 216.
- the forced boil-off gas pipe 220c is provided with a vaporizer 224, which forcibly converts liquefied gas into a gaseous state.
- the liquefied gas pumped by the gas pump 211 within the cargo tank 210 is forcibly vaporized through the vaporizer 224, it is mixed with the natural boil-off gas in the natural boil-off gas pipe 220a and flows together into the gas cooler 216.
- the gas pumped by the gas pump 211 is directed from the initial segment H of the gas return pipe 220b not to the vaporizer 224 but directly to the gas cooler 216, the gas is returned back to the cargo tank 210.
- the cargo tank comprises: a gas dome 30 positioned on the top of the cargo tank 20 such that the boil-off gas within the cargo tank 20 is discharged through the gas dome 30; a first low duty compressor 50 connected to the gas dome 30 to raise the pressure of the boil-off gas; a gas heater 60 connected to the first low duty compressor 50 to raise the temperature of the boil-off gas; a check valve 170 disposed between the first low duty compressor 50 and the gas heater 60 to prevent a reverse flow of the boil-off gas; a second low duty compressor 180 for preparation of overhauling and inspection of the first low duty compressor 50; a constant velocity motor 40 to drive both the first and second low duty compressors 50 and 180; a boiler 90 connected to the gas heater 60 to burn the boil-off gas; a main valve 70 disposed between the gas heater 60 and an engine room 80 where the boiler 90 is positioned; a strip spray pump 100 mounted at a lower portion of the cargo tank 20 to supply LNG for supplementing gas shortage during combustion operation of the boiler 90; a flow rate control valve 120 into which a portion of
- NBOG natural boil-off gas
- an object of the present invention is to allow gas to be supplied at a predetermined pressure or more to a gas demand side in an LNG carrier.
- Another object of the present invention is to allow an NBOG compressor used for supply of fuel to the gas demand side in the LNG carrier to be operated at a relatively high load by suitably maintaining the pressure of a cargo tank, stabilizing the operation of the compressor.
- the gas demand side may be any one of a boiler, a double-fuel engine, and a gas turbine.
- the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas is controlled to have the predetermined pressure or more in a variety of ways.
- the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas may have the predetermined pressure or more by the forcing vaporizer.
- the forced boil-off gas may be mixed with the natural boil-off gas before or after compression of the natural boil-off gas.
- the natural boil-off gas is compressed by the compressor, and the forced boil-off gas is vaporized to have the predetermined pressure or more and mixed with the natural boil-off gas compressed by the compressor.
- the pump 320 is preferably a strip pump capable of pumping LNG at the bottom of the cargo tank 310.
- a portion of the forced boil-off gas vaporized by the forcing vaporizer 330 is returned to the cargo tank 310 through a return pipe on which a control valve 332 is disposed.
- the natural boil-off gas 313 is maintained at an absolute pressure of about 1.06 bars in the cargo tank 310 and compressed to have an absolute pressure of about 1.96 bars by the compressor 340.
- LNG transferred from the cargo tank 310 by the pump 320 is vaporized to have an absolute pressure of about 1.96 bars by the vaporizer 330.
- the forced boil-off gas and compressed natural boil-off gas are supplied to the gas demand side 350 at an absolute pressure of about 1.96 bars.
- the forced boil-off gas returning from the forced vaporizer 330 has the absolute pressure of 1.96 bars and the natural boil-off gas in the cargo tank has the absolute pressure of about 1.06 bars, a pressure difference between the forced boil-off gas and the natural boil-off gas enables returning of the forced boil-off gas from the forcing vaporizer 330 to be easily controlled by opening or closing the control valve 332. With such a control, it is possible to supply the gas having the predetermined pressure or more required for the gas demand side.
- the gas demand side 350 permits only pressure variation in a predetermined range and is changed in quantity of gas demanded, it is possible to supply the gas in a predetermined pressure range by controlling a return amount of the forced boil-off gas from the forcing vaporizer 330 by the opening or closing of the control valve 332.
- the pressure must be strictly controlled to be in an allowable pressure range of ⁇ 0.2 bars.
- the forced boil-off gas supplied from the forcing vaporizer 330 to the return pipe while controlling an open or closed degree of the control valve, it is possible to supply the gas at the pressure in the predetermined range permitted at each gas demand side.
- Such a pressure control can be easily applied or modified by the person skilled in the art with various sensors equipped in the tanks or to various pipes of the LNG carrier.
- the gas returning to the cargo tank 310 is illustrated as being the forced boil-off gas with the pressure increased to the predetermined value or more via the vaporizer 330.
- mixed gas of the forced boil-off gas and the natural boil-off gas which is compressed to have the predetermined pressure or more by the compressor 340 may be returned to the cargo tank.
- the forced boil-off gas and the natural boil-off gas are illustrated as being mixed with each other after having a predetermined pressure or more in Fig. 3
- the natural boil-off gas may be mixed with the forced boil-off gas prior to compression by the compressor 340.
- a mist drum is required to remove liquid droplets from the forced boil-off gas and that the capacity of the compressor 340 increases.
- a separate compressor is provided to the returning pipe with a control valve 332 positioned downstream of the separate compressor.
- the forced boil-off gas from the forcing vaporizer 330 is returned to the cargo tank 310 in the embodiment shown in Fig. 3
- the forced boil-off gas from the forcing vaporizer 330 may be returned to the cargo tank 310 or to a gas header 370 connecting respective cargo tanks to one another other in another embodiment shown in Fig. 4 .
- the forced boil-off gas can be directly supplied to a compressor 340 (for example, LD compressor) connected to the gas header 370 without being returned to the cargo tank 310 such that the allowable gas pressure for the compressor can be maintained.
- the construction of the invention as described above provides various merits.
- the conventional technique in the event where less gas than required for the minimum operation load of the NBOG compressor for fuel supply is induced into the NBOG compressor due to a low amount of natural boil-off gas during ballast voyage of the LNG carrier, and, in the event where variation in load of the gas demand side is great, the stable operation of the NBOG compressor cannot be ensured.
- the NBOG compressor for the fuel supply is operated below the minimum operation load thereof during the ballast voyage of the LNG carrier, the pressure of the cargo tank cannot be maintained efficiently.
- the return pipe and control valve associated with the return of gas to the cargo tank during the ballast voyage are provided to increase the flow rate of gas returning to the cargo tank, so that the NBOG compressor for the fuel supply can be operated at a relatively high load, enabling stable operation of the compressor and thus maintaining a suitable pressure of the cargo tank.
- the pressure of the cargo tank can be properly maintained through an automatic operation via an additional pipe for load adjustment even when the NBOG compressor is operated below the minimum operation load.
- the boil-off gas is returned to the cargo tank, it is possible to smoothly maintain the pressure of the cargo tank by the automatic operation thereof so as not to deteriorate the pressure of the cargo tank. With such merits of the invention, it is possible to achieve automation of a gas management system related to the boiler.
- gas to be supplied to the gas demand side in particular, forced boil-off gas to be supplied from a forcing vaporizer thereto, is bypassed to a return pipe so that natural gas can be supplied at a predetermined pressure or more required by a gas demand side, in particular, at a pressure in a predetermined range permitted by the gas demand side.
- the natural boil-off gas is maintained at the predetermined pressure or more within the cargo tank, enabling the compressor to be operated with a relatively high load, so that the compressor can be operated stably.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
- The present invention relates to a method and apparatus for stable supply of natural gas to gas demand sides in an LNG carrier. More particularly, the present invention relates to a method and apparatus that enables an unstable operation of a natural boil-off gas (NBOG) compressor for fuel supply caused by a low load operation of the NBOG compressor resulting from generation of a low amount of natural boil-off gas during ballast voyage of an LNG carrier to be stabilized via operation of a forcing vaporizer under the situation of the parallel operation of the NBOG compressor and the forcing vaporizer when supplying natural gas to a gas demand side in the LNG carrier, and that can achieve stable release of the pressure at an outlet of the vaporizer with regard to variation in load of the LNG carrier.
- An installation for drawing gas from a tank of liquefied natural gas (LNG) is disclosed by document
JP 2001 056096 - A liquefied natural gas (LNG) tanker is typically propelled by one or more steam turbines. Thus, the tanker is provided with a boiler to generate steam. In laden voyage, about 50% of fuel is natural boil-off gas supplied from an LNG cargo tank of the tanker. Since LNG has such a very low boiling point of about -162°C, although it is a small ratio, continuous evaporation of LNG occurs inevitably within the tanker in spite of thermal insulation of the cargo tank. Conventionally, some of the fuel required for the boiler is sufficed by using such natural boil-off gas. The remaining fuel is supplied from a stock of heavy hydrocarbon liquid fuel, which is also called "bunker oil."
- To increase the total amount of steam required for propulsion of the tanker, however, it is necessary for the tanker to have the capability of generating sufficient thermal energy through the combustion of the natural gas only. For this purpose, the tanker is additionally provided with a forcing vaporizer, which is a device for supply of natural gas to a burner associated with the boiler. Furthermore, the tanker is provided with a compressor to maintain a constant pressure of the gas supplied to the burner.
- As to supply of the natural boil-off gas and forced boil-off gas by the forcing vaporizer to the burner, there are two well-known methods.
- In one method, the forced boil-off gas and the natural boil-off gas is mixed upstream of the compressor. For example, as set forth in Korean Utility Model Registration No. 290726 entitled "Boil-off gas supply system" and Korean Utility Model Registration No.
410367 - In Korean Utility Model Registration No.
290726 cargo tank 210 to acompressor 212 and apower propulsion apparatus 214 is classified into two kinds, as shown inFig. 1 . One kind of gas is natural boil-off gas generated through natural vaporization of liquefied gas within thecargo tank 210, and the other is forced boil-off gas generated through forced vaporization thereof. Both the natural boil-off gas and the forced boil-off gas are cooled to a suitable temperature range by agas cooler 216, and supplied to thecompressor 212. Here, the suitable temperature range is about -150 to -130 °C. Then, the gas is compressed in thecompressor 212 and supplied at a suitable discharge pressure to thepower propulsion device 214 through adischarge pipe 219. -
Gas pipes 220 are positioned between thecargo tank 210 and thegas cooler 216 to form flow paths of the natural boil-off gas and the forced boil-off gas. Thegas pipes 220 comprises a natural boil-offgas pipe 220a to deliver the natural boil-off gas from thecargo tank 210 to thegas cooler 216, agas return pipe 220b to allow liquefied gas to be returned to thecargo tank 210 via thegas cooler 216 after being pumped by agas pump 211 within thecargo tank 210, and a forced boil-offgas pipe 220c having one end diverged from an initial segment H of thegas return pipe 220b and the other end connected to the natural boil-offgas pipe 220a to deliver the forced boil-off gas from thecargo tank 210 to thegas cooler 216. The forced boil-offgas pipe 220c is provided with avaporizer 224, which forcibly converts liquefied gas into a gaseous state. - The natural boil-off gas within the
cargo tank 210 flows into the natural boil-offgas pipe 220a. Meanwhile, the liquefied gas having been pumped by thegas pump 211 flows into thegas return pipe 220b and the initial segment H of the forced boil-offgas pipe 220c. - Here, when the liquefied gas pumped by the
gas pump 211 within thecargo tank 210 is forcibly vaporized through thevaporizer 224, it is mixed with the natural boil-off gas in the natural boil-offgas pipe 220a and flows together into thegas cooler 216. However, in the event that the gas pumped by thegas pump 211 is directed from the initial segment H of thegas return pipe 220b not to thevaporizer 224 but directly to thegas cooler 216, the gas is returned back to thecargo tank 210. - However, since this method is focused on temperature control of the gas upstream and downstream of the compressor and requires simultaneous compression of the forced boil-off gas and natural boil-off gas, there are shortcomings of large capacities of the compressor and motor, a complicated control method, and requirement for a mist separator (or cooler 216) to prevent liquid particles from entering the compressor.
- In order to solve the problems, techniques are proposed by which the forced boil-off gas and natural boil-off gas are mixed downstream of the compressor. For example, such techniques are disclosed in Korean Patent Laid-open Nos.
2003-0017423 2003-0073975 2003-0073975 gas dome 30 positioned on the top of thecargo tank 20 such that the boil-off gas within thecargo tank 20 is discharged through thegas dome 30; a firstlow duty compressor 50 connected to thegas dome 30 to raise the pressure of the boil-off gas; agas heater 60 connected to the firstlow duty compressor 50 to raise the temperature of the boil-off gas; acheck valve 170 disposed between the firstlow duty compressor 50 and thegas heater 60 to prevent a reverse flow of the boil-off gas; a secondlow duty compressor 180 for preparation of overhauling and inspection of the firstlow duty compressor 50; aconstant velocity motor 40 to drive both the first and secondlow duty compressors boiler 90 connected to thegas heater 60 to burn the boil-off gas; amain valve 70 disposed between thegas heater 60 and anengine room 80 where theboiler 90 is positioned; astrip spray pump 100 mounted at a lower portion of thecargo tank 20 to supply LNG for supplementing gas shortage during combustion operation of theboiler 90; a flowrate control valve 120 into which a portion of LNG discharged by thestrip spray pump 100 is transferred through apressure control valve 110; arecovery line 130 connected to thepressure control valve 110 to recover LNG remaining after being transferred into the flowrate control valve 120 to the cargo tank; atemperature control valve 140 connected to the flowrate control valve 120; avaporizer 150 connected to the flowrate control valve 120 to convert the phase of LNG from a liquid state to a gaseous state; a mixer 160 connected to thevaporizer 150 andtemperature control valve 140 to mix LNG in the liquid state with LNG in the gaseous state within the mixer 160; and aboiler 90 connected to the mixer 160 to burn LNG in the gaseous state. - Details relating to pressure and temperature in the respective flow paths are shown in
Figs. 1 and2 of Korean Patent Laid-open No.2003-0017423 - The inventors of this invention have found that a stable operation of a natural boil-off gas (NBOG) compressor cannot be secured in the event where less gas than required for a minimum load of the NBOG compressor is induced into the NBOG compressor due to generation of a low amount of natural boil-off gas during ballast voyage of an LNG carrier, and, in the event where there is great variation in load at a gas demand side, such as a boiler, in the LNG carrier.
- There is no countermeasure that can solve such problems in the prior art.
- Therefore, an object of the present invention is to allow gas to be supplied at a predetermined pressure or more to a gas demand side in an LNG carrier. Another object of the present invention is to allow an NBOG compressor used for supply of fuel to the gas demand side in the LNG carrier to be operated at a relatively high load by suitably maintaining the pressure of a cargo tank, stabilizing the operation of the compressor.
- In accordance with one aspect of the present invention, there is provided the method for supplying natural gas at a predetermined pressure or more to a gas demand side in an LNG carrier according to claim 1.
- The gas demand side may be any one of a boiler, a double-fuel engine, and a gas turbine.
- According to one embodiment, it is necessary for the gas returned to the cargo tank to have the predetermined pressure or more, and, for this purpose, the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas is controlled to have the predetermined pressure or more in a variety of ways. For example, the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas may have the predetermined pressure or more by the forcing vaporizer. Alternatively, a separate compressor is used to control the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas to have the predetermined pressure or more while being returned to the cargo tank or the gas header, if the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas does not have the predetermined pressure or more.
- Furthermore, the forced boil-off gas may be mixed with the natural boil-off gas upstream of the compressor. Preferably, the natural boil-off gas is compressed by the compressor, and the forced boil-off gas is vaporized to have the predetermined pressure or more, followed by being mixed with the natural boil-off gas compressed by the compressor.
- According to the invention, since the gas having the predetermined pressure or more is returned to the cargo tank, the natural boil-off gas is maintained at the predetermined pressure or more within the cargo tank, enabling the compressor to be operated at a relatively high load, so that the compressor can be operated stably. The pressure of the gas returned to the cargo tank can be variously changed depending on the pressure range according to the specification of the compressor. In one example described below, the natural boil-off gas has an absolute pressure of about 1.06 bars in the cargo tank and the forced boil-off gas has an absolute pressure of about 1.96 bars.
- In accordance with another aspect of the invention, an apparatus for supplying natural gas to a gas demand source in an LNG carrier is defined by claim 5.
- The gas demand side may be any one of a boiler, a double-fuel engine, and a gas turbine.
- The forced boil-off gas may be mixed with the natural boil-off gas before or after compression of the natural boil-off gas. Preferably, the natural boil-off gas is compressed by the compressor, and the forced boil-off gas is vaporized to have the predetermined pressure or more and mixed with the natural boil-off gas compressed by the compressor.
- A separate or another compressor may be installed on a pipe, through which the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas is returned to the cargo tank or the gas header, to increase the pressure of the forced boil-off gas returned alone or in a state of being mixed with the natural boil-off gas to the cargo tank or the gas header if the pressure of the returning gas is less than or equal to a predetermined value. In the case where the forced boil-off gas is mixed with the natural boil-off gas downstream of the compressor, since the forced boil-off gas has the predetermined pressure or more when being mixed therewith downstream of the compressor, the separate compressor is not necessary.
- The apparatus may further comprise a return pipe connected to downstream of the vaporizer or to downstream of a pipe joined to the return pipe through which the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas is returned to the cargo tank, and a control valve on the return pipe to control returning of the forced boil-off gas or the mixed gas by opening or closing the control valve. Since the forced boil-off gas or the mixed gas returning to the cargo tank or the header has the predetermined pressure or more, it is possible to control a returning amount of the gas only by the opening and closing of the control valve.
- The above and other objects, features and other advantages of the present invention will be more clearly understood from the following detailed description taken in conjunction with the accompanying drawings:
-
Fig. 1 is a schematic view of a natural gas supply apparatus of Korean Utility Model Registration No.290726 -
Fig. 2 is a schematic view of a natural gas supply apparatus of Korean Patent Laid-open No.2003-73975 -
Fig. 3 is a schematic view illustrating an apparatus for supplying natural gas to a gas demand side in an LNG carrier according to one embodiment of the present invention; and -
Fig. 4 is a schematic view illustrating an apparatus for supplying natural gas to a gas demand side in an LNG carrier according to another embodiment of the present invention. - Exemplary embodiments will be described in detail with reference to the accompanying drawings.
-
Fig. 3 is a schematic view illustrating an apparatus for supplying natural gas to a gas demand side in an LNG carrier according to one embodiment of the present invention. The construction and operation of the apparatus will be described hereinafter. - An
LNG cargo tank 310 is filled withLNG 312 at a lower portion and natural boil-offgas 313 at an upper portion. The natural boil-offgas 313 generated in thecargo tank 310 is compressed by anNBOG compressor 340 after passing through an exit (dome) at the top of thecargo tank 310. -
LNG 312 of thestorage tank 310 is transferred to the outside of the tank by thepump 320. Since an amount of LNG is small during ballast voyage of an LNG carrier, thepump 320 is preferably a strip pump capable of pumping LNG at the bottom of thecargo tank 310. - The LNG transferred by the
pump 320 is vaporized by a forcingvaporizer 330. Forced boil-off gas vaporized by the forcingvaporizer 330 is mixed with the natural boil-off gas compressed by thecompressor 340 and is supplied to agas demand side 350, for example, boilers, dual-fuel engines, gas turbines, etc. - Meanwhile, a portion of the forced boil-off gas vaporized by the forcing
vaporizer 330 is returned to thecargo tank 310 through a return pipe on which acontrol valve 332 is disposed. - The natural boil-off
gas 313 is maintained at an absolute pressure of about 1.06 bars in thecargo tank 310 and compressed to have an absolute pressure of about 1.96 bars by thecompressor 340. LNG transferred from thecargo tank 310 by thepump 320 is vaporized to have an absolute pressure of about 1.96 bars by thevaporizer 330. The forced boil-off gas and compressed natural boil-off gas are supplied to thegas demand side 350 at an absolute pressure of about 1.96 bars. - Since the forced boil-off gas returning from the forced
vaporizer 330 has the absolute pressure of 1.96 bars and the natural boil-off gas in the cargo tank has the absolute pressure of about 1.06 bars, a pressure difference between the forced boil-off gas and the natural boil-off gas enables returning of the forced boil-off gas from the forcingvaporizer 330 to be easily controlled by opening or closing thecontrol valve 332. With such a control, it is possible to supply the gas having the predetermined pressure or more required for the gas demand side. Furthermore, even when thegas demand side 350 permits only pressure variation in a predetermined range and is changed in quantity of gas demanded, it is possible to supply the gas in a predetermined pressure range by controlling a return amount of the forced boil-off gas from the forcingvaporizer 330 by the opening or closing of thecontrol valve 332. - For example, for the double-fuel engine among various gas demand sides, the pressure must be strictly controlled to be in an allowable pressure range of ±0.2 bars. In this case, by bypassing the forced boil-off gas supplied from the forcing
vaporizer 330 to the return pipe while controlling an open or closed degree of the control valve, it is possible to supply the gas at the pressure in the predetermined range permitted at each gas demand side. Such a pressure control can be easily applied or modified by the person skilled in the art with various sensors equipped in the tanks or to various pipes of the LNG carrier. - In
Fig. 3 , the gas returning to thecargo tank 310 is illustrated as being the forced boil-off gas with the pressure increased to the predetermined value or more via thevaporizer 330. However, it is needless to say that mixed gas of the forced boil-off gas and the natural boil-off gas which is compressed to have the predetermined pressure or more by thecompressor 340 may be returned to the cargo tank. - Furthermore, although the forced boil-off gas and the natural boil-off gas are illustrated as being mixed with each other after having a predetermined pressure or more in
Fig. 3 , the natural boil-off gas may be mixed with the forced boil-off gas prior to compression by thecompressor 340. However, in this case, there are disadvantages in that a mist drum is required to remove liquid droplets from the forced boil-off gas and that the capacity of thecompressor 340 increases. In order to return the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas having pressure lower than the predetermined degree, a separate compressor is provided to the returning pipe with acontrol valve 332 positioned downstream of the separate compressor. - In addition, although the forced boil-off gas from the forcing
vaporizer 330 is returned to thecargo tank 310 in the embodiment shown inFig. 3 , the forced boil-off gas from the forcingvaporizer 330 may be returned to thecargo tank 310 or to agas header 370 connecting respective cargo tanks to one another other in another embodiment shown inFig. 4 . If the forced boil-off gas is returned to thegas header 370, the forced boil-off gas can be directly supplied to a compressor 340 (for example, LD compressor) connected to thegas header 370 without being returned to thecargo tank 310 such that the allowable gas pressure for the compressor can be maintained. - The construction of the invention as described above provides various merits. For the conventional technique, in the event where less gas than required for the minimum operation load of the NBOG compressor for fuel supply is induced into the NBOG compressor due to a low amount of natural boil-off gas during ballast voyage of the LNG carrier, and, in the event where variation in load of the gas demand side is great, the stable operation of the NBOG compressor cannot be ensured. In addition, for the conventional technique, since the NBOG compressor for the fuel supply is operated below the minimum operation load thereof during the ballast voyage of the LNG carrier, the pressure of the cargo tank cannot be maintained efficiently. Furthermore, according to the conventional technique, in the event where there is a rapid variation in load at the gas demand side while the forcing vaporizer is operated in the ballast voyage or laden voyage of the LNG carrier, it is likely that pressures at the outlet of the forcing vaporizer and the inlet of the boiler will increase rapidly. Moreover, according to the conventional technique, although it is possible to operate the compressor by increasing the flow rate from the NBOG compressor using a surge control valve of the NBOG compressor, there occurs a disadvantage in that, as the gas of high temperatures downstream of the compressor circulates, the temperature of the outlet of the compressor continuously increases, making it difficult to perform the stable operation of the NBOG compressor.
- In this regard, according to the invention, the return pipe and control valve associated with the return of gas to the cargo tank during the ballast voyage are provided to increase the flow rate of gas returning to the cargo tank, so that the NBOG compressor for the fuel supply can be operated at a relatively high load, enabling stable operation of the compressor and thus maintaining a suitable pressure of the cargo tank. In addition, according to the invention, since the forced boil-off gas through the forcing vaporizer is returned to the cargo tank during the ballast voyage, the pressure of the cargo tank can be properly maintained through an automatic operation via an additional pipe for load adjustment even when the NBOG compressor is operated below the minimum operation load. Furthermore, according to the invention, since the boil-off gas is returned to the cargo tank, it is possible to smoothly maintain the pressure of the cargo tank by the automatic operation thereof so as not to deteriorate the pressure of the cargo tank. With such merits of the invention, it is possible to achieve automation of a gas management system related to the boiler.
- As apparent from the above description, according to the invention, gas to be supplied to the gas demand side, in particular, forced boil-off gas to be supplied from a forcing vaporizer thereto, is bypassed to a return pipe so that natural gas can be supplied at a predetermined pressure or more required by a gas demand side, in particular, at a pressure in a predetermined range permitted by the gas demand side. Furthermore, since the gas having the predetermined pressure or more is returned to the cargo tank, the natural boil-off gas is maintained at the predetermined pressure or more within the cargo tank, enabling the compressor to be operated with a relatively high load, so that the compressor can be operated stably.
- It should be understood that the embodiments and the accompanying drawings have been described for illustrative purposes, and the present invention is limited only by the following claims.
Claims (10)
- A method for supplying natural gas at a predetermined pressure or more to a gas demand side (350) in an LNG carrier during ballast voyage of the LNG carrier, where less gas than required for a minimum load of a compressor (340) is induced into the compressor (340) due to generation of a low amount of natural boil-off gas, the natural gas comprising natural boil-off gas (313) generated in a cargo tank (310) or a plurality of cargo tanks containing LNG (312) and forced boil-off gas generated by vaporizing LNG pumped from the cargo tank or the plurality of cargo tanks,
wherein, in order to supply the natural gas at a predetermined pressure or more, the forced boil-off gas or a mixed gas of the forced boil-off gas and natural boil-off gas (313) having the predetermined pressure or more is returned to the cargo tank (310) or to a gas header (370) connecting the plurality of the cargo tanks to one another. - The method according to claim 1, wherein the gas demand side (350) is any one of a boiler, a double-fuel engine, and a gas turbine.
- The method according to claim 1 or 2, wherein the natural boil-off gas (313) is compressed by the compressor (340), and the forced boil-off gas is vaporized to have the predetermined pressure or more and mixed with the natural boil-off gas compressed by the compressor (340).
- The method according to any one of claims 1 to 3, wherein, when the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas is returned to the cargo tank (310) or the gas header (370), the forced boil-off gas or the mixed gas is compressed by a separate compressor and returned at the predetermined pressure or more to the cargo tank or the gas header.
- An apparatus for supplying natural gas to a gas demand side in an LNG carrier, comprising:a pump (320) suitable for pumping LNG from a cargo tank or a plurality of cargo tanks; anda vaporizer (330) to vaporize the pumped LNG to generate forced boil-off gas; anda compressor (340) to compress natural boil-off gas generated from said cargo tank (310) or said plurality of cargo tanks containing LNG;the apparatus being characterized by being configured so that, when the apparatus is mounted in the LNG carrier with the pump being connected to pump LNG from the cargo tank or from the plurality of cargo tanks of the LNG carrier and less gas than required for a minimum load of the compressor (340) is induced into the compressor (340) due to generation of a low amount of natural boil-off gas during ballast voyage of the LNG carrier, the forced boil-off gas of the vaporizer is mixed with the natural boil-off gas upstream or downstream of the compressor and supplied at a predetermined pressure or more to the gas demand side, and the forced boil-off gas or mixed gas of the forced boil-off gas and natural boil-off gas having the predetermined pressure or more is returned to the cargo tank (310) or a gas header (370) connecting the plurality of the cargo tanks to one another.
- The apparatus according to claim 5, wherein the forced boil-off gas is mixed with the natural boil-off gas before or after compression of the natural boil-off gas (313).
- The apparatus according to claim 5 or 6, further comprising:
another compressor disposed on a pipe through which the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas (313) is returned to the cargo tank (310) or the gas header (370). - The apparatus according to any one of claims 5 to 7, further comprising:a return pipe connected to downstream of the vaporizer or to downstream of a pipe joined to the return pipe through which the forced boil-off gas or the mixed gas of the forced boil-off gas and natural boil-off gas (313) is returned to the cargo tank (310); anda control valve (332) on the return pipe to control returning of the forced boil-off gas or the mixed gas by opening or closing the control valve (332).
- An LNG carrier, comprising an apparatus according to any one of claims 5 to 8, mounted in the LNG carrier.
- An LNG carrier according to claim 9, wherein the gas demand side (350) includes any one of a boiler, a double-fuel engine, and a gas turbine.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060045018A KR100649863B1 (en) | 2006-05-19 | 2006-05-19 | Natural Gas Supplying Method?and Apparatus thereof in LNG Carrier |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1857727A2 EP1857727A2 (en) | 2007-11-21 |
EP1857727A3 EP1857727A3 (en) | 2017-05-10 |
EP1857727B1 true EP1857727B1 (en) | 2019-09-11 |
Family
ID=37159642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07104176.8A Active EP1857727B1 (en) | 2006-05-19 | 2007-03-14 | Method and apparatus for supplying natural gas to gas demand sides in LNG carrier |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1857727B1 (en) |
KR (1) | KR100649863B1 (en) |
CN (1) | CN101074760B (en) |
DK (1) | DK1857727T3 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2008099977A1 (en) * | 2007-02-13 | 2008-08-21 | Daewoo Shipbuilding & Marine Engineering Co., Ltd. | Lng cargo tank of lng carrier and method for treating boil-off gas using the same |
KR100839771B1 (en) * | 2007-05-31 | 2008-06-20 | 대우조선해양 주식회사 | Apparatus for producing nitrogen equipped in a marine structure and method for producing nitrogen using the apparatus |
KR100868847B1 (en) * | 2007-07-19 | 2008-11-14 | 현대중공업 주식회사 | Lng vaporizer for unloading lng in lng carrier |
DE102007042158A1 (en) * | 2007-09-05 | 2009-03-12 | Man Diesel Se | Gas supply system for a gas-fueled internal combustion engine |
KR100952669B1 (en) * | 2007-10-09 | 2010-04-13 | 대우조선해양 주식회사 | Pressure regulating apparatus and lng carrier with the pressure regulating apparatus |
US8783041B2 (en) | 2010-06-09 | 2014-07-22 | Chevron U.S.A. Inc. | LNG transport vessel and method for storing and managing excess boil off gas thereon |
CN102269327B (en) * | 2011-07-28 | 2013-02-13 | 中国寰球工程公司 | Recovery system and recovery method for vapor in storage tank |
CN103225739B (en) * | 2013-04-22 | 2015-09-09 | 中国海洋石油总公司 | A kind of LNG receiving station boil-off gas energy-efficient treatment system |
CN103225740B (en) * | 2013-04-22 | 2015-09-09 | 中国海洋石油总公司 | A kind of LNG receiving station utilizes the BOG processing system of pressure energy |
CA2819721C (en) * | 2013-06-27 | 2014-07-08 | Westport Power Inc. | Engine control apparatus |
KR101479486B1 (en) | 2013-06-29 | 2015-01-08 | 대우조선해양 주식회사 | Lng regasification real-time operating system and operating method |
CN104315341B (en) * | 2014-11-13 | 2017-02-01 | 南通中远川崎船舶工程有限公司 | Ventilating device of ship gas pipeline control master valve room of dual-fuel propelled ship |
KR102189756B1 (en) * | 2015-03-19 | 2020-12-14 | 삼성중공업 주식회사 | Fuel gas supply system |
FR3071276B1 (en) * | 2017-09-20 | 2021-01-01 | Gaztransport Et Technigaz | DEVICE AND PROCESS FOR SUPPLYING GAS WITH A METHANE RATING OPTIMIZED AT LEAST ONE THERMAL ENGINE, IN PARTICULAR OF A LIQUEFIED GAS TRANSPORT VESSEL |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5687776A (en) * | 1992-12-07 | 1997-11-18 | Chicago Bridge & Iron Technical Services Company | Method and apparatus for fueling vehicles with liquefied cryogenic fuel |
US6112528A (en) * | 1998-12-18 | 2000-09-05 | Exxonmobil Upstream Research Company | Process for unloading pressurized liquefied natural gas from containers |
JP2001056096A (en) * | 1999-08-12 | 2001-02-27 | Ishikawajima Harima Heavy Ind Co Ltd | Prevention method and device against forming liquid in lng tank into heavy gravity |
CN1332327A (en) * | 2001-07-18 | 2002-01-23 | 青岛化工设计院 | Liquefied natural gas gasifying supplier |
FI118680B (en) * | 2003-12-18 | 2008-02-15 | Waertsilae Finland Oy | A gas supply arrangement in a craft and a method for controlling gas pressure in a craft gas supply arrangement |
JP4425090B2 (en) * | 2004-08-25 | 2010-03-03 | 株式会社川崎造船 | Fuel gas supply system to LNG carrier engine |
MX2007002937A (en) * | 2004-09-13 | 2008-03-05 | Argent Marine Operations Inc | System and process for transporting lng by non-self-propelled marine lng carrier. |
-
2006
- 2006-05-19 KR KR1020060045018A patent/KR100649863B1/en active IP Right Grant
-
2007
- 2007-03-14 EP EP07104176.8A patent/EP1857727B1/en active Active
- 2007-03-14 DK DK07104176T patent/DK1857727T3/en active
- 2007-03-15 CN CN2007100882011A patent/CN101074760B/en active Active
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
EP1857727A3 (en) | 2017-05-10 |
EP1857727A2 (en) | 2007-11-21 |
DK1857727T3 (en) | 2019-12-09 |
CN101074760B (en) | 2011-01-12 |
KR100649863B1 (en) | 2006-11-28 |
KR20060063845A (en) | 2006-06-12 |
CN101074760A (en) | 2007-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1857727B1 (en) | Method and apparatus for supplying natural gas to gas demand sides in LNG carrier | |
KR102159859B1 (en) | Gas Treatment System | |
KR100681094B1 (en) | Natural gas supply apparatus | |
JP5538234B2 (en) | Natural gas supply method and apparatus | |
JP4073445B2 (en) | Evaporative gas supply system for liquefied natural gas carrier | |
US9206776B2 (en) | Fuel feeding system and method of operating a fuel feeding system | |
EP2939918B1 (en) | Natural gas fuel evaporator, natural gas fuel supply device, and method for supplying natural gas fuel to ships and motors | |
KR101814439B1 (en) | System for supplying fuel gas | |
KR20150092771A (en) | A Treatment System Of Liquefied Gas | |
KR20180082107A (en) | Treatment system of gas and ship having the same | |
KR102436050B1 (en) | Gas treatment system and ship having the same | |
KR20180051955A (en) | Treatment system of gas and ship having the same | |
KR20180041923A (en) | Treatment system of gas and ship having the same | |
KR102348832B1 (en) | gas treatment system and ship having the same | |
KR20180041927A (en) | Treatment system of gas and ship having the same | |
KR20180041920A (en) | Treatment system of gas and ship having the same | |
KR20180051946A (en) | Treatment system of gas and ship having the same | |
KR101941356B1 (en) | Gas Treatment System and Vessel having the same | |
KR20220137217A (en) | gas treatment system and ship having the same | |
KR20180103372A (en) | Treatment system of gas and ship having the same | |
KR20180071574A (en) | Treatment system of gas and ship having the same | |
KR20190123455A (en) | gas treatment system and offshore plant having the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F17C 7/00 20060101AFI20170403BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20171110 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AXX | Extension fees paid |
Extension state: MK Extension state: BA Extension state: AL Extension state: RS Extension state: HR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180222 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20190326 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1178882 Country of ref document: AT Kind code of ref document: T Effective date: 20190915 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007059189 Country of ref document: DE Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20191203 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190911 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191212 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1178882 Country of ref document: AT Kind code of ref document: T Effective date: 20190911 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200113 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200224 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007059189 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG2D | Information on lapse in contracting state deleted |
Ref country code: IS |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200112 |
|
26N | No opposition filed |
Effective date: 20200615 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200314 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200314 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190911 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602007059189 Country of ref document: DE Representative=s name: CBDL PATENTANWAELTE GBR, DE |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602007059189 Country of ref document: DE Owner name: HANWHA OCEAN CO., LTD., GEOJE-SI, KR Free format text: FORMER OWNER: DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD, SEOUL, KR |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240307 Year of fee payment: 18 Ref country code: GB Payment date: 20240325 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240227 Year of fee payment: 18 Ref country code: DK Payment date: 20240326 Year of fee payment: 18 |