EP1812333B1 - Extendable working platform, particularly for a personnel lift - Google Patents
Extendable working platform, particularly for a personnel lift Download PDFInfo
- Publication number
- EP1812333B1 EP1812333B1 EP05810873A EP05810873A EP1812333B1 EP 1812333 B1 EP1812333 B1 EP 1812333B1 EP 05810873 A EP05810873 A EP 05810873A EP 05810873 A EP05810873 A EP 05810873A EP 1812333 B1 EP1812333 B1 EP 1812333B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- platform portion
- profiles
- fixed
- sides
- working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/157—Extensible platforms, e.g. telescopic platforms
Definitions
- the present invention relates to an extendable working platform according to the preamble of claim 1, in particularly for a personnel lift, comprising a frame, which is connected to the lifting mechanism of the personnel lift, said frame being connected to a fixed oblong platform portion, which has rectilinear guides for guiding a moveable platform portion, which can be extended from a retracted, the fixed platform portion overlapping, position to a extended position in which the moveable platform portion projects from the fixed platform portion.
- a personnel lift For performing operations on a facade or on other elevated places usually personnel lifts are used.
- a personnel lift consists of a working platform which can be raised by means of a lifting mechanism, such as a scissor arm arrangement or a suitable telescopic hydraulic lift mechanism, to enable the personnel to perform their jobs.
- a lifting mechanism such as a scissor arm arrangement or a suitable telescopic hydraulic lift mechanism
- In order to enlarge the working surface for the personnel said working platforms are usually extendable in the longitudinal direction. This is especially important for operations over large surfaces within a limited time, such as cleaning windows and painting or cleaning facades.
- the working platforms are extendable in a very limited way. This is due to the fact that in the present known constructions the moveable platform portion is arranged in a guide which is connected to the fixed platform portion. In the fully extended position of the moveable platform portion there must always be a considerable overlapping of both platform portions in order to achieve a sufficient support for the moveable platform portion. So the current extendable working platforms only allow an extension, which is much smaller than the length of the fixed platform portion.
- a platform according to the preamble of claim 1 is known from US 5 301 770 .
- the rectilinear guides are formed by I-profiles which are mounted on the longitudinal sides of the fixed platform portion, the inner sides of said I-profiles carrying an upper moveable platform portion situated above said fixed platform portion, and the outer sides of said I-profiles carrying a lower platform portion situated under said fixed platform portion, both moveable platform portions having almost the same length as the fixed platform portion and said frame being connected to the fixed platform portion via the top sides of the said I-profiles.
- a working platform which has an extendable platform portion both under and above the fixed platform portion, so that an extension can be achieved at both ends of the fixed platform portion, said extension being somewhat smaller than the length of the fixed platform portion.
- this arrangement according to the invention allows an extension which is twice as large. Furthermore a lighter and compacter construction can be achieves because both moveable platform portions are moveable arranged in the same guides.
- the frame consists of one or more substantially C-shaped supports, which extend transversely under the working platform and its free ends are connected to the top sides of the said I-profiles. In this way the working platform can be supported on a lifting mechanism without restricting the moveability of the lower platform portion.
- the working platform consists of a fixed platform portion 1, which in fact is formed by a rectangular oblong floor plate 2, which at the under side is provided with a reinforcement frame 3.
- a reinforcement frame 3 On both longitudinal sides of the floor plate 2 an I-profile 4 is mounted on the floor plate 2.
- a railing 5 is arranged, of which in this figure only a part of an upright is visible.
- an upper moveable platform portion 6 is arranged, which is carried in the inner sides of said I-profiles by means of guiding rollers 7, which are connected to the respective sides of said moveable platform portion.
- the moveable platform portion 6 is situated at a small distance above the fixed platform portion 1, and is also formed by un upper floor plate 8 and an reinforcement frame 9 arranged hereunder, which also supports the guiding rollers 7.
- the floor plate 8 has at its longitudinal sides adjacent to the I-profiles upstanding walls 8a, which provide a stiffening for the floor plate 8 and also serve as support for a railing 10 which is arranged at its inner side and so is adjacent to the railing 5 of the fixed platform portion 1.
- a lower moveable platform portion 11 is arranged, which also consists of a floor plate 12 having a reinforcement frame 13 at its under side.
- the floor plate 12 extends sideward beyond the fixed platform portion 1 and has upstanding side walls 12a which extend until the respective I-profiles 4.
- Near the ends of said upstanding walls guiding rollers are mounted by means of shafts, said rollers running in the outer side of the respective I-profiles 4.
- each upstanding wall 12a is an in inwards directed flange 12b, which is situated in the outer side of the said I-profile 4, which flange 12b serves as a race for guiding rollers 14', which are mounted to the vertical body part of the respective I-profile.
- the lower moveable working platform is in this way guided in the outer side of both I-profiles by means of guiding rollers 14, said guiding rollers 14 being connected to the upstanding wall 12a through shafts, and by means of said guiding rollers 14' being connected to the vertical body part of the concerning I-profiles, the flange portion 12b running over said rollers 14'. In this way a reliable guiding is obtained of the lower moveable working platform 12 in the respective I-profiles 4.
- a railing 15 is arranged, whereof only a part of an upright is visible. Said railing is thus situated at the outer side of the railing 5 of the fixed platform portion 1.
- supports 16, 16' are arranged near both ends of the fixed platform portion.
- Said supports are generally C-shaped and extend substantially under the working platform, while both end of the C each are connected to the upper side of the respective I-profile 4.
- the supports each consist of a beam 16a , which is situated at some distance under the lower platform portion 11 at right angles to its longitudinal direction, said beam at both ends having upstanding beams 16b extending at right angles upwards along the sides of the working platform and these upstanding beams are at theirs ends provided with end beams 16c, extending at right angles to the beams 16b and directed inwards.
- the end beams 16c each rest on the top of the respective I-profile and is connected thereto. In this way the whole working platform is supported by the beams 16a, without restricting the moveability of the platform portions 6 and 11. It is to be understood that the railing 15 of the lower platform portion 11 is constructed in such a way that it will not collide with the said supports.
- Figure 2 shows a side view of the working platform according tot the invention in a totally extended position. As can be seen in said figure, the upper moveable platform portion 6 has been moved to the right and the lower moveable platform portion 11 has been moved to the left.
- the working platform is usually equipped with means for controlling the moveable platform portions. This may be realised electrical or manual.
- the moveable platform portions may be coupled to one another, for example by means of cables which are guided over pulleys, so that both moveable platform portions can be moved simultaneously inward and outward. Further the working platform may be provided with locking means in order to be able to lock said moveable platform portions in any desired position.
- the construction of the platform portion may deviate from the construction as illustrated here.
- the frame consisting of the supports may be arranged in a different way. Essential is that said frame is connected to the top side of the I-profiles and also provide sufficient space to allow the moveability of the lower platform portion.
- the working platform may also be used as suspended from cables, said cables being connected to the top sides of the I-profiles through a suitable connection.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Forklifts And Lifting Vehicles (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Ladders (AREA)
- Rear-View Mirror Devices That Are Mounted On The Exterior Of The Vehicle (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
Description
- The present invention relates to an extendable working platform according to the preamble of
claim 1, in particularly for a personnel lift, comprising a frame, which is connected to the lifting mechanism of the personnel lift, said frame being connected to a fixed oblong platform portion, which has rectilinear guides for guiding a moveable platform portion, which can be extended from a retracted, the fixed platform portion overlapping, position to a extended position in which the moveable platform portion projects from the fixed platform portion. - For performing operations on a facade or on other elevated places usually personnel lifts are used. A personnel lift consists of a working platform which can be raised by means of a lifting mechanism, such as a scissor arm arrangement or a suitable telescopic hydraulic lift mechanism, to enable the personnel to perform their jobs. In order to enlarge the working surface for the personnel said working platforms are usually extendable in the longitudinal direction. This is especially important for operations over large surfaces within a limited time, such as cleaning windows and painting or cleaning facades.
- In the known personnel lifts the working platforms are extendable in a very limited way. This is due to the fact that in the present known constructions the moveable platform portion is arranged in a guide which is connected to the fixed platform portion. In the fully extended position of the moveable platform portion there must always be a considerable overlapping of both platform portions in order to achieve a sufficient support for the moveable platform portion. So the current extendable working platforms only allow an extension, which is much smaller than the length of the fixed platform portion.
- A platform according to the preamble of
claim 1 is known fromUS 5 301 770 . - It is an object of the present invention to provide an arrangement for an extendable working platform for a personnel lift, which can be extended over a considerable larger distance.
- This object is achieved according to the invention by the fact that the rectilinear guides are formed by I-profiles which are mounted on the longitudinal sides of the fixed platform portion, the inner sides of said I-profiles carrying an upper moveable platform portion situated above said fixed platform portion, and the outer sides of said I-profiles carrying a lower platform portion situated under said fixed platform portion, both moveable platform portions having almost the same length as the fixed platform portion and said frame being connected to the fixed platform portion via the top sides of the said I-profiles.
- By these measures a working platform is achieved, which has an extendable platform portion both under and above the fixed platform portion, so that an extension can be achieved at both ends of the fixed platform portion, said extension being somewhat smaller than the length of the fixed platform portion. With respect to the known working platforms this arrangement according to the invention allows an extension which is twice as large. Furthermore a lighter and compacter construction can be achieves because both moveable platform portions are moveable arranged in the same guides.
- In a preferred embodiment van the invention the frame consists of one or more substantially C-shaped supports, which extend transversely under the working platform and its free ends are connected to the top sides of the said I-profiles. In this way the working platform can be supported on a lifting mechanism without restricting the moveability of the lower platform portion.
- Further preferred feature and details of the present invention will become apparent from the subclaims 2-8.
- The invention will be explained with reference to the drawings, in which:
- Figure 1
- shows a partial cross section of the working platform according to the present invention.
- Figure 2
- shows a schematic side view of the working platform according to the invention in the totally extended position.
- As can be seen in
figure 1 the working platform according to the invention consists of afixed platform portion 1, which in fact is formed by a rectangularoblong floor plate 2, which at the under side is provided with areinforcement frame 3. On both longitudinal sides of thefloor plate 2 an I-profile 4 is mounted on thefloor plate 2. On top of the I-profiles arailing 5 is arranged, of which in this figure only a part of an upright is visible. - Between said I-
profiles 4 an uppermoveable platform portion 6 is arranged, which is carried in the inner sides of said I-profiles by means of guidingrollers 7, which are connected to the respective sides of said moveable platform portion. Themoveable platform portion 6 is situated at a small distance above thefixed platform portion 1, and is also formed by unupper floor plate 8 and anreinforcement frame 9 arranged hereunder, which also supports the guidingrollers 7. Thefloor plate 8 has at its longitudinal sides adjacent to the I-profilesupstanding walls 8a, which provide a stiffening for thefloor plate 8 and also serve as support for arailing 10 which is arranged at its inner side and so is adjacent to therailing 5 of thefixed platform portion 1. - Under the fixed platform portion 1 a lower
moveable platform portion 11 is arranged, which also consists of afloor plate 12 having areinforcement frame 13 at its under side. Thefloor plate 12 extends sideward beyond thefixed platform portion 1 and hasupstanding side walls 12a which extend until the respective I-profiles 4. Near the ends of said upstanding walls guiding rollers are mounted by means of shafts, said rollers running in the outer side of the respective I-profiles 4. - At the upper side of each
upstanding wall 12a is an in inwards directedflange 12b, which is situated in the outer side of the said I-profile 4, whichflange 12b serves as a race for guiding rollers 14', which are mounted to the vertical body part of the respective I-profile. The lower moveable working platform is in this way guided in the outer side of both I-profiles by means of guidingrollers 14, said guidingrollers 14 being connected to theupstanding wall 12a through shafts, and by means of said guiding rollers 14' being connected to the vertical body part of the concerning I-profiles, theflange portion 12b running over said rollers 14'. In this way a reliable guiding is obtained of the lowermoveable working platform 12 in the respective I-profiles 4. - At the outer sides of the
upstanding walls 12a arailing 15 is arranged, whereof only a part of an upright is visible. Said railing is thus situated at the outer side of therailing 5 of thefixed platform portion 1. - In order to be able to connect the whole working platform, consisting of the three interconnected platform portions, to a lifting mechanism (not shown in the drawings) of a personnel lift, supports 16, 16' are arranged near both ends of the fixed platform portion. Said supports are generally C-shaped and extend substantially under the working platform, while both end of the C each are connected to the upper side of the respective I-
profile 4. In fact the supports each consist of abeam 16a , which is situated at some distance under thelower platform portion 11 at right angles to its longitudinal direction, said beam at both ends havingupstanding beams 16b extending at right angles upwards along the sides of the working platform and these upstanding beams are at theirs ends provided with end beams 16c, extending at right angles to thebeams 16b and directed inwards. The end beams 16c each rest on the top of the respective I-profile and is connected thereto. In this way the whole working platform is supported by thebeams 16a, without restricting the moveability of theplatform portions railing 15 of thelower platform portion 11 is constructed in such a way that it will not collide with the said supports. -
Figure 2 shows a side view of the working platform according tot the invention in a totally extended position. As can be seen in said figure, the uppermoveable platform portion 6 has been moved to the right and the lowermoveable platform portion 11 has been moved to the left. - The working platform is usually equipped with means for controlling the moveable platform portions. This may be realised electrical or manual. The moveable platform portions may be coupled to one another, for example by means of cables which are guided over pulleys, so that both moveable platform portions can be moved simultaneously inward and outward. Further the working platform may be provided with locking means in order to be able to lock said moveable platform portions in any desired position.
- It will be clear that the invention is not limited to the embodiment described and illustrated here, but that numerous variants and modifications are possible for a person skilled in the art without departing from the scope of the appended claims. The construction of the platform portion may deviate from the construction as illustrated here. The frame consisting of the supports may be arranged in a different way. Essential is that said frame is connected to the top side of the I-profiles and also provide sufficient space to allow the moveability of the lower platform portion. Alternatively the working platform may also be used as suspended from cables, said cables being connected to the top sides of the I-profiles through a suitable connection.
Claims (8)
- Extendable working platform, particularly for a personnel lift, comprising a frame, which is connectable to the lift mechanism of a personnel lift, said frame being connected to a fixed oblong platform portion (1), having rectilinear guides (4) for guiding an upper and a lower moveable platform portion (6,11), which can be extended from a retracted position, overlapping the fixed platform portion, to an extended position, in which the moveable platform portion projects from the fixed platform portion, both moveable platform portions having almost the same length as the fixed platform portion
characterised in that the rectilinear guides are formed by I-profiles (4) which are mounted on the longitudinal sides of the fixed platform portion (1), the inner sides of said I-profiles carrying an upper moveable platform portion (6) situated above said fixed platform portion, and the outer sides of said I-profiles carrying a lower moveable platform portion (11) situated under the fixed platform portion, and said frame (16, 16') being connected to the fixed platform portion via the top sides of the said I-profiles. - Working platform according to claim 1, characterised in that said frame consists of one or more substantially C-shaped supports (16, 16'), extending beneath said working platform, the free ends of said supports being connected to the top sides of the respective I-profiles (4).
- Working platform according to claim 1 or 2, characterised in that each platform portion consists of a floor plate (2, 8, 12) having a reinforcement frame at its under side.
- Working platform according to claim 3, characterised in that the floor plate (12) of the lower moveable platform portion (11) at its longitudinal sides has upstanding walls (12a), each of said walls extending along the respective outer sides of the fixed platform portion (1) and carrying one or more guiding rollers (14), running in the outer sides of the respective I-profile.
- Working platform according to claim 4, characterised in that the upstanding walls of the lower moveable platform portion each have an end flange (12b) directed to the inner side, which forms a race for guiding rollers (14'), which are rotatably connected to the vertical body of said I-profiles
- Working platform according to one or more of the preceding claims 3-5, characterised in that the upper moveable platform portion (6) has upstanding walls (8a) at its longitudinal sides, a railing (10) being arranged at the inner side of said walls.
- Working platform according one or more of the preceding claims, characterised in that the fixed platform portion has a railing (5), which is connected to the top sides of the said I-profiles.
- Working platform according one or more of the preceding claims, characterised in that the lower moveable platform portion has a railing (15), which is connected to the outer sides of the upstanding walls (12a).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1027507A NL1027507C2 (en) | 2004-11-15 | 2004-11-15 | Extendable work platform, in particular for a platform. |
PCT/NL2005/000795 WO2006052131A1 (en) | 2004-11-15 | 2005-11-14 | Extendable working platform, particularly for a personnel lift |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1812333A1 EP1812333A1 (en) | 2007-08-01 |
EP1812333B1 true EP1812333B1 (en) | 2011-03-02 |
Family
ID=35056948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05810873A Not-in-force EP1812333B1 (en) | 2004-11-15 | 2005-11-14 | Extendable working platform, particularly for a personnel lift |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1812333B1 (en) |
AT (1) | ATE500192T1 (en) |
DE (1) | DE602005026687D1 (en) |
NL (1) | NL1027507C2 (en) |
WO (1) | WO2006052131A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015085419A1 (en) * | 2013-12-09 | 2015-06-18 | Haessler Inc. | Vertically elevating mobile work platform |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202007005306U1 (en) * | 2007-04-11 | 2008-08-21 | Weiss, Franz-Joachim | platform |
DE102007037976A1 (en) * | 2007-08-10 | 2009-02-12 | Alpine Bau Deutschland Ag | Variable-length work platform, in particular for climbing equipment |
FR2944041B1 (en) * | 2009-04-07 | 2015-05-15 | Outinord St Amand | PLATFORM ENCORBELLEMENT EQUIPPED WITH AN EXTENSION DEVICE. |
KR101042528B1 (en) * | 2010-10-14 | 2011-06-20 | 주식회사 콘솔에스더블유씨 | The construction works cage which has a expanded function |
GB2489667B (en) * | 2011-03-24 | 2013-02-13 | Harsco Infrastructure Services Ltd | An extending platform |
PL236729B1 (en) * | 2017-12-21 | 2021-02-08 | Akademia Gorniczo Hutnicza Im Stanislawa Staszica W Krakowie | Mobile platform unit |
EP4108625A1 (en) * | 2021-06-21 | 2022-12-28 | Bertolotti Rail S.r.l. | Platform, particularly for maintenance operations |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB759187A (en) * | 1954-01-20 | 1956-10-17 | Access Equipment Ltd | Improvements in or relating to mobile working platforms |
FR2583450A1 (en) * | 1985-06-17 | 1986-12-19 | Hyvon Raoul | Movable and dismantleable lifting scaffolding, device and use |
SU1296706A1 (en) * | 1985-10-14 | 1987-03-15 | Государственный Ремонтно-Строительный Специализированный Трест "Укрцветметремонт" | Expandable hoisted scaffold for repairs of flues |
US5301770A (en) * | 1992-07-06 | 1994-04-12 | Regan Timothy J | Adjustable work platform assembly |
IT1308404B1 (en) * | 1999-03-03 | 2001-12-17 | Treemme Tecnology Srl | EXTENDABLE AERIAL PLATFORM |
GB0112746D0 (en) * | 2001-05-25 | 2001-07-18 | Dorman Long Access Systems Ltd | Rolling Platform |
-
2004
- 2004-11-15 NL NL1027507A patent/NL1027507C2/en not_active IP Right Cessation
-
2005
- 2005-11-14 EP EP05810873A patent/EP1812333B1/en not_active Not-in-force
- 2005-11-14 WO PCT/NL2005/000795 patent/WO2006052131A1/en active Application Filing
- 2005-11-14 DE DE602005026687T patent/DE602005026687D1/en active Active
- 2005-11-14 AT AT05810873T patent/ATE500192T1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015085419A1 (en) * | 2013-12-09 | 2015-06-18 | Haessler Inc. | Vertically elevating mobile work platform |
GB2535416A (en) * | 2013-12-09 | 2016-08-17 | Haessler Inc | Vertically elevating mobile work platform |
CN106029549A (en) * | 2013-12-09 | 2016-10-12 | 黑斯勒有限公司 | Vertically elevating mobile work platform |
US10060142B2 (en) | 2013-12-09 | 2018-08-28 | Haessler Inc. | Vertically elevating mobile work platform |
Also Published As
Publication number | Publication date |
---|---|
NL1027507C2 (en) | 2006-05-16 |
DE602005026687D1 (en) | 2011-04-14 |
ATE500192T1 (en) | 2011-03-15 |
EP1812333A1 (en) | 2007-08-01 |
WO2006052131A1 (en) | 2006-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1812333B1 (en) | Extendable working platform, particularly for a personnel lift | |
US10023448B2 (en) | Lift truck with mast | |
AU2016349938B2 (en) | Loading platform | |
US8287212B2 (en) | Cantilever system and method of use | |
GB2422141A (en) | Elevating working platform for clamping to the framework of a building as the building is constructed | |
US5645395A (en) | Building crane apparatus climbable on building walls | |
KR100989822B1 (en) | High-place worktable for agriculture | |
US7661372B2 (en) | Mason's adjustable chimney-platform arrangement | |
CA2701102A1 (en) | Automated system for positioning and supporting the work platform of a mobile workover and well-servicing rig | |
KR20140003277U (en) | A lift for a high place work | |
US9114967B2 (en) | Mason's adjustable chimney-platform arrangement | |
EP3296251B1 (en) | A height accessible working platform with horizontally displaceable cradle | |
US4930599A (en) | Ladder and carriage combination | |
US20190277043A1 (en) | Work platform comprising a crane device | |
US7849637B2 (en) | Fold-up scaffold for semi-trailer shop | |
JPH1067493A (en) | Working base device for high place working vehicle | |
CN220224960U (en) | Construction platform | |
KR101252098B1 (en) | high-place worktable for agriculture | |
KR20100057569A (en) | Lifting apparatus for height work | |
FI89401B (en) | Arrangement for carrying out operations such as bricklaying or the like on ordinary scaffolding on building walls | |
JP2008180016A (en) | Self-climbing type overhead crane | |
EP3423390B1 (en) | A foldable platform lift | |
GB2390110A (en) | Width variable access apparatus | |
SU1281658A1 (en) | Self-hoisting scaffold | |
JPS60156862A (en) | Scaffold apparatus for working building outer wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20070515 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602005026687 Country of ref document: DE Date of ref document: 20110414 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602005026687 Country of ref document: DE Effective date: 20110414 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110613 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110603 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20110302 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110602 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110704 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110702 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20111205 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602005026687 Country of ref document: DE Effective date: 20111205 |
|
BERE | Be: lapsed |
Owner name: WEENINK, TED Effective date: 20111130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: V1 Effective date: 20120601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120601 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111130 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111130 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111114 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20111114 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110302 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20141201 Year of fee payment: 10 Ref country code: DE Payment date: 20141127 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20141127 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602005026687 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20151114 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20160729 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160601 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151114 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151130 |