EP1435413A1 - Improved anchorage sockets for the "novel technique for stay cable system" - Google Patents

Improved anchorage sockets for the "novel technique for stay cable system" Download PDF

Info

Publication number
EP1435413A1
EP1435413A1 EP02029058A EP02029058A EP1435413A1 EP 1435413 A1 EP1435413 A1 EP 1435413A1 EP 02029058 A EP02029058 A EP 02029058A EP 02029058 A EP02029058 A EP 02029058A EP 1435413 A1 EP1435413 A1 EP 1435413A1
Authority
EP
European Patent Office
Prior art keywords
anchorage
web
bolts
heads
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP02029058A
Other languages
German (de)
French (fr)
Inventor
Yincheng Hou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hou Yincheng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to EP02029058A priority Critical patent/EP1435413A1/en
Priority to CNU2003201237346U priority patent/CN2712990Y/en
Publication of EP1435413A1 publication Critical patent/EP1435413A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Definitions

  • the invention relates to the field of stay cable anchorage sockets for cable-stayed bridges.
  • the aim of this invention is to fulfil these two requirements while keeping all the advantages of the original system.
  • a pair of half-cylindrical main anchorage sockets M are arranged just above the steel bottom flange G1/B1, on both sides of the steel web G2/B2 and supported by the main anchorage plates G4/B4.
  • a pair of half-cylindrical auxiliary anchorage sockets A are arranged on both sides of the steel web G2/B2 and supported by the auxiliary anchorage plates G5/B5.
  • a steel anchoring box Bs which consists of bottom flange B1, web B2, stiffening plates B3, main anchorage plates B4, auxiliary anchorage plates B5, studs B6, cable pipe B7 and isolating cover plates B8.
  • B1 - B7 are cast into the concrete girder Gc and connects the reinforcements of Gc.
  • Fig. 2 and 3 illustrate the structure of the socket, which consists the following parts:
  • Fig. 4, 5, 6 and 7 illustrated the eventual individual strand replacement, which is carried out with the following procedure:
  • Fig. 8 illustrates the structure of the main anchorage socket, which consists of the following parts:

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

Main features of the auxiliary anchorage socket are:
  • 1) A pair of half-cylindrical auxiliary anchorage heads A1 are fixed together to the web G2/B2 of steel I-girder, tie beam, anchoring bed or anchoring box by transverse bolts A2 and supported by the auxiliary anchorage plates G5/B5.
  • 2) Inside each A1 there is a half-coned hole, in which the half number of strands S of a cable are bonded together by epoxy resin and/or other grouting material A15.
  • 3) When eventual individual strand replacement comes, the A1 can be removed, so that the A15 with half-coned form appears under visible and touchable condition. According to the requirement of individual strand replacement, a part of or all of the A15 is removed by high-pressure water jetting T7 or similar measures, which don't injure the strands during epoxy removed.
  • The principle of a pair of half-cylindrical anchorage heads fixed together by transverse bolts can be extension to the main anchorage socket, which therefore becomes hidden inside the outline of girders, to fulfil the special aesthetic requirements while keeping the original main advantages of the novel stay cable system.
    Figure 00000001

    Description

    • The invention relates to the field of stay cable anchorage sockets for cable-stayed bridges.
    • A "Novel technique for stay cable system" ("original system" is abbreviated in the following discretion) has been created [European Patent, Application No. / Patent No.: 98119471.5-2303 / 1001089] by the same inventor as this patent, two of the features of which are:
    • 1) Anchoring holes in anchorage sockets are divided into two symmetrical groups, so that main anchorage socket can reliably be arranged at bottom part of any kind of girders holding cable axis coincided with girder web and double half-cylindrical auxiliary anchorage sockets can be arranged on both sides of the web in steel I-girder, in anchoring tie beam or in steel anchoring bed.
    • 2) Based on the help of auxiliary anchorage sockets, in which parallel strands are anchored or bonded individually, ordinary jaws can reliably be used in main anchorage socket while individual strand replacement is allowable.
    • As time goes on, two new requirements raise to the original system:
    • 1) Individual strand replacement in both the anchored and bonded auxiliary anchorage sockets of the original system is carried out under indirectly visible and touchable condition. It is ideal if the individual strand replacement in auxiliary anchorage socket of the system becomes directly visible and touchable.
    • 2) There is a special aesthetic requirement on some cable-stayed bridges that all the anchorage sockets should be hidden inside the outline of girders and the anchorage socket needn't to be tensioned at the girder site.
    • The aim of this invention is to fulfil these two requirements while keeping all the advantages of the original system.
    • 1. Supplement general layout of the anchorage sockets at girder site
    • General layout of the anchorage sockets is no change from the original system at pylon site in any cases, or, at girder site without the special aesthetic requirement of anchorage sockets hidden inside the outline of girders. Supplement general layout occurs only at girder site if there is the above special aesthetic requirement.
    • When isolating cover plats G8/B8 are taken off, as illustrated in Fig. 1, for the cable attaching structure at steel I-girder Gs or steel anchoring box Bs for concrete girder, a pair of half-cylindrical main anchorage sockets M are arranged just above the steel bottom flange G1/B1, on both sides of the steel web G2/B2 and supported by the main anchorage plates G4/B4. As the original system, above the main anchorage sockets M a pair of half-cylindrical auxiliary anchorage sockets A are arranged on both sides of the steel web G2/B2 and supported by the auxiliary anchorage plates G5/B5.
    • In order to reliably transmit cable force to and withstand internal forces in the concrete girder Gc, a steel anchoring box Bs, which consists of bottom flange B1, web B2, stiffening plates B3, main anchorage plates B4, auxiliary anchorage plates B5, studs B6, cable pipe B7 and isolating cover plates B8. B1 - B7 are cast into the concrete girder Gc and connects the reinforcements of Gc.
    • 2. Improved auxiliary anchorage socket at girder site and pylon site 2.1 Structure of the improved auxiliary anchorage socket
    • Fig. 2 and 3 illustrate the structure of the socket, which consists the following parts:
    • 1) A pair of half-cylindrical auxiliary anchorage heads A1 are fixed together to the web G2/B2 of steel I-girder, tie beam or anchoring bed of the original system or anchoring box Bs by transverse bolts A2 and supported by the auxiliary anchorage plates G5/B5. On the web G2/B2 boltholes are drilled for the passing through of transverse bolts A2.
    • 2) Inside each half-cylindrical auxiliary anchorage head A1 there is a half-coned room to contain the half number of strands S of a cable.
    • 3) A pair of cover plates A3 are fixed together to the web G2/B2 by transverse bolts A5. On the web G2/B2 boltholes are drilled for the passing through of transverse bolts A5.
    • 4) The half-cylindrical auxiliary anchorage head A1 and cover plates A3 are fixed together to the auxiliary anchorage plate G5/B5, on which strand holes and boltholes are drilled for strands individually passing through and for deferent bolts passing through or fixed respectively, by longitudinal bolts A4.
    • 5) On the outer site of cover plate A3 a isolating cover A6 made of HDPE or hard rubber is fixed to the cover plate A3 and the web G2/B2 by steel plate A7, steel bar A8, bolts A9, A10 and A11.
    • 6) On the other side of the auxiliary anchorage plate G5/B5 a isolating cover A12 made of HDPE or hard rubber is fixed to the auxiliary anchorage plate G5/B5 and the web G2/B2 by steel plate A13 and bolts A14.
    • 7) In the room between anchorage head A1, cover plates A3, auxiliary anchorage plate G5/B5 and web G2/B2, epoxy resin and/or other grouting material A15 is injected by the grout hole A16 and vent-hole A17 to bond the stands S together with A1, A3, G5/B5 and G2/B2.
    • 8) Diameter of strand holes on steel plate A7 and A13, auxiliary anchorage plate G5/B5 and cover plate A3 is bigger enough than the diameter of strand, while diameter of strand holes on isolating cover A6 and A13 is little smaller than that of stand to ensure strands touching only the soft material in the auxiliary anchorage socket.
    • 9) In order to facilitate the eventual individual strand replacement, release agent is smeared on all the inside surfaces of anchorage head A1 and cover plates A3 as well as thread holes A18 and A19 are arranged on the auxiliary anchorage plate G5/B5 and anchorage head A1 respectively.
    • 2.2 Construction procedure of auxiliary anchorage socket
    • Construction of the auxiliary anchorage socket is carried out with the following procedure:
    • 1) Isolating cover A12 is fixed to the auxiliary anchorage plate G5/B5 and the web G2/B2 by steel plate A13 and bolts A14.
    • 2) Isolating cover A6 is fixed to cover plate A3 by steel plate A7 and bolts A9.
    • 3) Isolating cover A6 with cover plate A3 and steel plate A7 are erected and initially fixed to the web G2/B2 by transverse bolts A5, steel bar A8 and bolts A10.
    • 4) Strands S are erected, tensioned and anchored in main anchorage socket M.
    • 5) When the final cable force adjustment has been done, the anchorage head A1 , transverse bolts A2 and longitudinal bolts A4 are erected, and then all the bolts A2, A4, A5, A 10 and A11 are tightened up.
    • 6) Epoxy resin and/or other grouting material A15 is injected into anchorage head A1 at grout hole A16 until the epoxy resin jets out from vent hole A17.
    • 2.3 Procedure of eventual individual strand replacement of auxiliary anchorage socket
    • Fig. 4, 5, 6 and 7 illustrated the eventual individual strand replacement, which is carried out with the following procedure:
    • 1) Bolts A11 and A 10 are removed and released respectively.
    • 2) Bolts A5 are removed.
    • 3) Tool beam T1, tool bolts T2 and Teflon washers T3 are erected.
    • 4) Cover plate A3 is pushed out of epoxy resin and/or other grouting material A15 and anchorage head A1 by screwing the nuts of bolts A4.
    • 5) Bolts A4 are removed.
    • 6) Tool beam T4, tool bolts T5 and Teflon washers T6 are erected.
    • 7) Anchorage head A1 are drawn out of epoxy resin and/or other grouting material A15 and web G2/B2 by screwing the nuts of tool bolt T5.
    • 8) The anchorage head A1 is removed and a half-coned epoxy resin and/or other grouting material A15 appears under directly visible and touchable condition. The removed anchorage head A1 is cleaned and release agent is smeared on its inside surface again.
    • 9) According to the requirement of individual strand replacement, a part of or all of the half-coned epoxy resin and/or other grouting material A15 is removed by high-pressure water jetting T7 or similar measures, which don't injure the strands during epoxy removed.
    • 10) A single strand jack in pylon releases and removes the strand, which should be replaced.
    • 11) A new strand is erected, stressed and anchored on main anchor head by a single strand jack in pylon.
    • 12) The anchorage head A1, transverse bolts A2, longitudinal bolts A4 and bolts A11 are erected back, then all the bolts A2, A4, A5, A10 and A11 are tightened up.
    • 13) New epoxy resin and/or other grouting material A15 is injected into anchorage head A1 at grout hole A16 until the epoxy resin jets out from vent hole A17.
    • 3. Main anchorage socket at the girder site
    • The principle of a pair of half-cylindrical auxiliary anchorage heads fixed together to the web G2/B2 of steel I-girder Gs or anchoring box Bs, by transverse bolts can be extension to the main anchorage socket. Fig. 8 illustrates the structure of the main anchorage socket, which consists of the following parts:
    • 1) A pair of half-cylindrical anchorage heads M1 are arranged on both side of the web G2/B2 and supported by the main anchorage plates G4/B4 just above the steel bottom flange G1/B1.
    • 2) The anchorage heads M1 are fixed together to the web G2/B2, on which boltholes are drilled, by transverse bolts M2.
    • 3) Anchoring holes M3 are arranged in the anchorage heads M1 to individually anchor the stands by jaws.

    Claims (9)

    1. A pair of improved half-cylindrical auxiliary anchorage heads A1 are fixed together to the web G2/B2 of steel I-girder, tie beam, anchoring bed or anchoring box by transverse bolts A2 and supported by auxiliary anchorage plates G5/B5. On the web G2/B2 boltholes are drilled for the passing through of transverse bolts A2.
    2. A pair of improved half-cylindrical auxiliary anchorage heads A1 as claimed in Claim 1, characterised in that inside each half-cylindrical auxiliary anchorage head A1 there is a half-coned hole to contain the half number of strands S of a cable. On all the inside surfaces of auxiliary anchorage heads A1 release agent is smeared,
    3. A pair of improved half-cylindrical auxiliary anchorage heads A1 as claimed in Claim 1, characterised in that on the side of auxiliary anchorage heads A1 with biggest diameter of coned hole, a pair of cover plates A3 are fixed together to the web G2/B2 by transverse bolts A5. On the web G2/B2 boltholes are drilled for the passing through of transverse bolts A5. On all the inside surfaces of cover plate A3 release agent is smeared.
    4. A pair of improved half-cylindrical auxiliary anchorage heads A1 and a pair of cover plates A3 as claimed in Claim 2 and Claim 3, characterised in that in the room between anchorage head A1, cover plates A3, auxiliary anchorage plate G5/B5 and web G2/B2, an epoxy resin and/or other grouting material A15 with half-coned form is injected by the grout hole A16 and vent-hole A17 to bond the half number of stands S of a cable together with A1, A3, G5/B5 and G2/B2.
    5. An epoxy resin and/or other grouting material A15 with half-coned form as claimed in Claim 4, characterised in that in order to ensure the jetting quality of the epoxy resin A15, on the outer site of cover plate A3 a isolating cover A6 made of HDPE or hard rubber is fixed to the cover plate A3 and the web G2/B2 by steel plate A7, steel bar A8, bolts A9, A10 and A11 as well as on the other side of the auxiliary anchorage plate G5/B5 a isolating cover A12 made of HDPE or hard rubber is fixed to the auxiliary anchorage plate G5/B5 and the web G2/B2 by steel plate A13 and bolts A14.
    6. A pair of cover plates A3 as claimed in Claim 3, characterised in that when eventual individual strand replacement comes, the cover plate A3 can be pushed out of epoxy resin and/or other grouting material A15 and anchorage head A1 by screwing the nuts of bolts A4, reaction force on which transmits through Teflon washers T3, Tool beam T1, tool bolts T2 and thread holes A18 to the auxiliary anchorage plates G5/B5.
    7. A pair of improved half-cylindrical auxiliary anchorage heads A1 as claimed in Claim 2, characterised in that when eventual individual strand replacement comes, the auxiliary anchorage heads A1 can be drawn out of epoxy resin A15 and web G2/B2 by removing the bolts A4 and the nuts of bolts A2 and by screwing the nuts of tool bolts T5, which connect the thread holes A19 of auxiliary anchorage heads A1 and reaction force on which transmits through Teflon washers T6, Tool beam T4 to the stiffening plates G3/B3.
    8. An epoxy resin released cover plate A3 and a removed half-cylindrical auxiliary anchorage heads A1 as claimed in Claim 5 and Claim 6, characterised in that a half-coned epoxy resin and/or other grouting material A15 appears under visible and touchable condition. According to the requirement of individual strand replacement, a part of or all of the half-coned epoxy resin and/or other grouting material A15 is then removed by high-pressure water jetting T7 or similar measures, which don't injure the strands during epoxy removed.
    9. A pair of improved half-cylindrical auxiliary anchorage heads A1 are fixed together to the web G2/B2 of steel I-girder Gs or anchoring box Bs by transverse bolts A2 and supported by auxiliary anchorage plates G5/B5 as claimed in Claim 1, characterised in that this principle can be extension to the main anchorage socket, which consists of the following parts: 1) A pair of half-cylindrical anchorage heads M1 are arranged on both side of the web G2/B2 and supported by the main anchorage plates G4/B4 just above the steel bottom flange G1 / B1. 2) The anchorage heads M1 are fixed together to the web G2/B2, on which boltholes are drilled, by transverse bolts M2. 3) Anchoring holes M3 are arranged in the anchorage heads M1 to individually anchor the stands by jaws.
    EP02029058A 2002-12-30 2002-12-30 Improved anchorage sockets for the "novel technique for stay cable system" Withdrawn EP1435413A1 (en)

    Priority Applications (2)

    Application Number Priority Date Filing Date Title
    EP02029058A EP1435413A1 (en) 2002-12-30 2002-12-30 Improved anchorage sockets for the "novel technique for stay cable system"
    CNU2003201237346U CN2712990Y (en) 2002-12-30 2003-11-27 Improved backup anchor for bridge drag rope structure

    Applications Claiming Priority (1)

    Application Number Priority Date Filing Date Title
    EP02029058A EP1435413A1 (en) 2002-12-30 2002-12-30 Improved anchorage sockets for the "novel technique for stay cable system"

    Publications (1)

    Publication Number Publication Date
    EP1435413A1 true EP1435413A1 (en) 2004-07-07

    Family

    ID=32479728

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP02029058A Withdrawn EP1435413A1 (en) 2002-12-30 2002-12-30 Improved anchorage sockets for the "novel technique for stay cable system"

    Country Status (2)

    Country Link
    EP (1) EP1435413A1 (en)
    CN (1) CN2712990Y (en)

    Cited By (14)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN102704395A (en) * 2012-06-01 2012-10-03 中铁大桥勘测设计院集团有限公司 Internal inhaul cable and steel anchor box anchoring structure
    US20130186019A1 (en) * 2010-03-26 2013-07-25 Vsl International Ag Sealing arrangement
    CN103437284A (en) * 2012-11-14 2013-12-11 中铁九桥工程有限公司 Positioning technology for anchor box of member with parallelogram section
    CN105421230A (en) * 2015-12-10 2016-03-23 中铁大桥局集团有限公司 Multi-directional adjusting type buckle beam and anchor beam device
    CN106049279A (en) * 2016-07-27 2016-10-26 上海市城市建设设计研究总院 Cable anchor structure in steel box girder
    CN106592427A (en) * 2016-12-14 2017-04-26 中铁第四勘察设计院集团有限公司 Stay cable ground anchor structure
    CN107587426A (en) * 2017-09-05 2018-01-16 安徽金星预应力工程技术有限公司 Bridge external prestressing system auxiliary anchorage
    CN108265614A (en) * 2018-03-15 2018-07-10 中铁第四勘察设计院集团有限公司 The bridge tower anchor structure and anchoring process of a kind of cable-stayed bridge
    CN108842617A (en) * 2018-06-22 2018-11-20 武船重型工程股份有限公司 A kind of Cable Stayed Steel box bridge anchor case and its manufacturing method
    CN109056529A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of steel anchor box suitable for rail iron trusses suspension bridge pin joint formula hoist cable
    CN109056531A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of steel anchor box suitable for rail iron trusses suspension bridge straddle-type hoist cable
    CN109811643A (en) * 2019-03-21 2019-05-28 广东省交通规划设计研究院股份有限公司 Steel anchor beam structure and its installation method
    CN113512932A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
    CN114250715A (en) * 2022-02-15 2022-03-29 中铁二局集团有限公司 Method and device for positioning space special-shaped steel arch bridge inhaul cable

    Families Citing this family (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN101509231B (en) * 2009-03-26 2010-10-20 周孝余 Construction method for quickly assembling and disassembling guy cable of stayed-cable bridge
    CN104878692B (en) * 2015-04-27 2016-08-17 吉林省银河水利水电新技术设计有限公司 Anchor method in the concrete for hydraulic structure of a kind of two-way punched steel plate mounting drag-line

    Citations (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP1001089A1 (en) 1998-10-15 2000-05-17 Yincheng Hou Novel technique for stay cable system

    Patent Citations (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP1001089A1 (en) 1998-10-15 2000-05-17 Yincheng Hou Novel technique for stay cable system

    Cited By (21)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US20130186019A1 (en) * 2010-03-26 2013-07-25 Vsl International Ag Sealing arrangement
    US8869476B2 (en) * 2010-03-26 2014-10-28 Vsl International Ag Sealing arrangement
    CN102704395A (en) * 2012-06-01 2012-10-03 中铁大桥勘测设计院集团有限公司 Internal inhaul cable and steel anchor box anchoring structure
    CN103437284A (en) * 2012-11-14 2013-12-11 中铁九桥工程有限公司 Positioning technology for anchor box of member with parallelogram section
    CN103437284B (en) * 2012-11-14 2016-12-21 中铁九桥工程有限公司 A kind of parallelogram section rod member anchor case localization method
    CN105421230B (en) * 2015-12-10 2017-07-07 中铁大桥局集团有限公司 A kind of multidirectional adjustable type button anchor beam device
    CN105421230A (en) * 2015-12-10 2016-03-23 中铁大桥局集团有限公司 Multi-directional adjusting type buckle beam and anchor beam device
    CN106049279A (en) * 2016-07-27 2016-10-26 上海市城市建设设计研究总院 Cable anchor structure in steel box girder
    CN106592427B (en) * 2016-12-14 2018-04-20 中铁第四勘察设计院集团有限公司 A kind of suspension cable ground anchor structure
    CN106592427A (en) * 2016-12-14 2017-04-26 中铁第四勘察设计院集团有限公司 Stay cable ground anchor structure
    CN107587426A (en) * 2017-09-05 2018-01-16 安徽金星预应力工程技术有限公司 Bridge external prestressing system auxiliary anchorage
    CN108265614A (en) * 2018-03-15 2018-07-10 中铁第四勘察设计院集团有限公司 The bridge tower anchor structure and anchoring process of a kind of cable-stayed bridge
    CN108842617A (en) * 2018-06-22 2018-11-20 武船重型工程股份有限公司 A kind of Cable Stayed Steel box bridge anchor case and its manufacturing method
    CN109056529A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of steel anchor box suitable for rail iron trusses suspension bridge pin joint formula hoist cable
    CN109056531A (en) * 2018-09-25 2018-12-21 中铁二院工程集团有限责任公司 A kind of steel anchor box suitable for rail iron trusses suspension bridge straddle-type hoist cable
    CN109056529B (en) * 2018-09-25 2024-03-08 中铁二院工程集团有限责任公司 Steel anchor box suitable for pin joint type sling of railway steel truss girder suspension bridge
    CN109056531B (en) * 2018-09-25 2024-03-12 中铁二院工程集团有限责任公司 Steel anchor box suitable for riding type sling of railway steel truss girder suspension bridge
    CN109811643A (en) * 2019-03-21 2019-05-28 广东省交通规划设计研究院股份有限公司 Steel anchor beam structure and its installation method
    CN113512932A (en) * 2021-03-19 2021-10-19 宁波市政工程建设集团股份有限公司 Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
    CN114250715A (en) * 2022-02-15 2022-03-29 中铁二局集团有限公司 Method and device for positioning space special-shaped steel arch bridge inhaul cable
    CN114250715B (en) * 2022-02-15 2024-04-26 中铁二局集团有限公司 Positioning method and positioning device for space special-shaped steel arch bridge inhaul cable

    Also Published As

    Publication number Publication date
    CN2712990Y (en) 2005-07-27

    Similar Documents

    Publication Publication Date Title
    EP1435413A1 (en) Improved anchorage sockets for the "novel technique for stay cable system"
    JP4712612B2 (en) PC tension material intermediate fixing device and intermediate fixing method
    CN103147391A (en) Corrosion-resistant self-centering bridge pier structure easy for seismic rehabilitation
    CN106436583B (en) A kind of interim stretch-draw anchor suspension device of great cantilever bent cap and its construction method
    KR20110111907A (en) Saddle assembly
    EP3808899B1 (en) System and method for destressing stay cables by incorporation of, or substitution by, improved filler material
    CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
    CN104878948A (en) Reinforced concrete frame beam hogging moment region reinforcing method and reinforcing device
    WO2016135512A1 (en) Steel-concrete composite structure
    CN113605771A (en) Prestress assembly type frame structure system
    CN110184948A (en) A kind of Bridge beam construction method
    CN105113781B (en) Device is set up in a kind of overhanging complete pre-buried installation in side of setting a roof beam in place
    JP2007231683A (en) Tension anchoring connection method of connected member by wire
    KR101251118B1 (en) A manufacturing method of a composite steel box girder using prestressed concrete for a positive moment area of a bridge
    JP5716117B1 (en) Hinge reinforcement method and reinforcement structure for existing girder bridge
    CN103306495A (en) Wood structure cutting column reinforcing construction method
    JP2002194704A (en) Method for constructing girder
    CN103993738A (en) Floor penetrating and anchoring type overhanging unloading steel platform
    JP3924192B2 (en) Bridge superstructure and substructure connection structure and its construction method
    JP6969909B2 (en) How to reinforce steel synthetic girders
    KR102304230B1 (en) Demountable shear connector apparatus and bridge structure with the same, and bridge concrete slab construction method using the same
    CN212153150U (en) Whole reinforcing apparatus of bridge
    JP4195795B2 (en) Exposed type column base structure
    KR101546878B1 (en) Strengthening Apparatus for Reinforced Concrete Sturcure And Strengthening Method Using the Same
    CN109235511B (en) Detachable tubular pile connecting device for tubular pile static load test and complete equipment

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SI SK TR

    AX Request for extension of the european patent

    Extension state: AL LT LV MK RO

    17P Request for examination filed

    Effective date: 20040917

    AKX Designation fees paid

    Designated state(s): GB SE

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: 8566

    17Q First examination report despatched

    Effective date: 20070601

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: HOU YINCHENG

    RIN1 Information on inventor provided before grant (corrected)

    Inventor name: HOU YINCHENG

    R17C First examination report despatched (corrected)

    Effective date: 20080409

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

    18D Application deemed to be withdrawn

    Effective date: 20080701