EP0790364A1 EP96907516A EP96907516A EP0790364A1 EP 0790364 A1 EP0790364 A1 EP 0790364A1 EP 96907516 A EP96907516 A EP 96907516A EP 96907516 A EP96907516 A EP 96907516A EP 0790364 A1 EP0790364 A1 EP 0790364A1
Authority
EP
European Patent Office
Prior art keywords
semi
beams
planking
pillars
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP96907516A
Other languages
German (de)
French (fr)
Inventor
Jaime Enrique Jimenez Sanchez
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0790364A1 publication Critical patent/EP0790364A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/065Light-weight girders, e.g. with precast parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors

Definitions

  • the invention relates to a structural system conceived for reinforced or pre-stressed building structures formed by semi-prefabricated beams and inferior arrangement concrete reinforcements and slabs having an edge thickness in the order of 1 to 5 cm assembled with plates and pillars by means of a planking platform secured to the pillar planking or to the pillar itself.
  • This form of attachment provides an economic solution for any type of structural tie, either straight, angled, non-aligned, or for hanging, edge, or corner beams, or yard, or three or four beams, etc.
  • This structural system is of a universal character in regard to use, serving for houses, commercial galleries, car parking buildings and industrial buildings, with or without a false ceiling and with a plastered, directly painted or visible concrete finish.
  • the currently used systems for building structures are classified in three types:
  • the unidirectional framework or structure is the most extensively used for block buildings or single-family houses, and it is based in the use of girders or slabs to form the framework; since they transmit their loads in one single direction, they are known as unidirectional.
  • the girders transmit their load to the beams, which in turn transmit the whole weight to the pillars and through these to the foundation. At present, this is the least expensive house building system.
  • Reticular frameworks are different from the above in that they transmit their load in two directions, forming a reticule with their load nerves. The loads are finally transmitted to the pillars through this reticule. They are used particularly for office buildings, car parking buildings and commercial centers, and allow for more spacing between the pillars than with girder and slab frameworks. This system is now starting to be competitive in price, in relation to the unidirectional system, as from 7-meter spans between pillars.
  • Prefabricated frameworks are presently used for large commercial centers and car parking buildings. Although they are more economical, they present a drawback in that the grid formed by the pillars must have a very regular shape which does not allow for great architectural design variations.
  • the location of the house pillars are first laid out on the floor, then the planking is put in place and the pillars are filled with concrete.
  • the pillar planking is removed the next day, and the planking of the main load beams is started.
  • the planking consists in placing two wooden or metal beams (crosspieces) parallel to the future beam and separated 80 to 100 cm from each other; panels are then placed on top of these two crosspieces to form the bottom of the beam planking.
  • the crosspieces are suspended in the air by means of metal struts installed in pairs every one meter. In order to avoid movement, the planking is secured to the pillars, and iron rods are then installed in one pillar after the other.
  • the structure is completed by means of girders and slabs which rest on one beam panel and reach out to another beam panel to cover the whole previously empty surface in order to complete the structural plate.
  • the girders must be propped-up every meter and a half or so, since they are not self-supporting.
  • edges of the structural plate require that metal or wooden partitions be placed over the panels which form the bottom of the edge beams, so as to give the structural plate perimeter its shape and serve as an on-site mold for the concrete poured over the plate.
  • the crosspieces and panels may be removed three days later, although the plate struts must be left in place up to 28 days, after which all the material is removed, the plate being ready for masonry work.
  • the innovation of the invention lies in combining a series of known classical elements which determine certain new effects which allow for greater speed in the execution of the structure and savings in planking material, thus reducing the price of the structures and consequently of the house.
  • This structural system for reinforced or pre-stressed concrete building structures is formed by semi-prefabricated beams with reinforcement and concrete slabs that are coupled onto the plates and pillars by means of a planking platform secured to the sheet of the pillar or to the pillar itself.
  • the semi-prefabricated beams rest on a planking platform located in the proximity of the pillars, and absorb all the defects in regard to tolerance and laying out at the work site.
  • the platform around the pillars may be created before removing the planking from the pillars (the concrete may even be poured into the pillars and the framework simultaneously).
  • Said platform anchored to the pillar's planking or to the pillar itself offers different construction solutions, and may be made of wood, plastic, metal plate, etc., to form a classic planking panel.
  • the structure's horizontal movement or bending is completely avoided by means the pillars previously filled with concrete or by the pillar planking duly adjusted, plumb lined and propped-up.
  • the semi-prefabricated beams which rest on the platforms of two adjacent pillars are fitted with spaced struts which support their own weight and that of the framework resting on the slab or inferior sole.
  • the framework may or may not be provided with joists, depending on the type used.
  • the edge beams may have one of its sides fully finished with the same edge as the structure plate, thus avoiding the planking with partition at the work site. Finishing partitions are needed only in the proximity of the pillar and on the framework platform.
  • planking is removed once the concrete has been poured to form the pillars.
  • the pillar planking construction may be used for supporting the prefabricated beams; said planking is not removed until the second or third day after pouring the concrete on the floor.
  • the pillar planking incorporates a height adjustment element to aid in the planking removal and in the adjustment of the floor height.
  • the advantages provided by the invention include time saving in planking operations, and therefore increased execution speed, solutions for all kinds of architectural constructions of the structural plate (angle, hanging, edge and support beams, elevator ducts, yards, projections, slants, etc.), tidiness at the work site, saving in nails and wood, time saving in planking removals in view that no planking panels and beams are involved, longer plank mold life in view that material damages are avoided during planking removals, and safer conditions provided to the planking installator.
  • the invention consisting in a reinforced or pre-stressed concrete semi-prefabricated structure for buildings is composed of a horizontal planking platform (1) positioned over the planking (2) of the pillars or on the sides of the pillars on which concrete has already been poured designed to Support the semi-prefabricated beams (3) and framework (4), said semi-prefabricated beams (3) being formed by steel louvers or joist hangers (5) with a concrete slab or sole (6) on their lower part.
  • the framework (4) which may be of any currently known type and may also serve to support other load beams (7).
  • the semi-prefabricated beams (3) resting on the platforms (1) of two adjacent pillars are supported by struts (8) positioned at a given spacing, designed to withstand their own weight and that of the framework (4) resting on the lower slab or sole (6).
  • the semi-prefabricated beams may be edge beams (3') which show an inferior L-shaped slab (6') positioned in its lower surface and which covers one of the sides.
  • the finishing is performed around the pillars using partitions (9) and wood over the planking platform (1).
  • the pillar plankings incorporate a height adjustment element (10) to aid in the planking removal and the adjustment of the floor height.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

It is based on the addition of a concrete sole (6) to trussed or prestressed beams (3) and inclusively wings with the complete pre-cast height for edge beams. The floor slab (4) will bear on to the concrete sole (6) of the beams. The beams (3) will bear on a form platform created around the pillars.

Description

    OBJECT OF THE INVENTION
  • The invention relates to a structural system conceived for reinforced or pre-stressed building structures formed by semi-prefabricated beams and inferior arrangement concrete reinforcements and slabs having an edge thickness in the order of 1 to 5 cm assembled with plates and pillars by means of a planking platform secured to the pillar planking or to the pillar itself.
  • This form of attachment provides an economic solution for any type of structural tie, either straight, angled, non-aligned, or for hanging, edge, or corner beams, or yard, or three or four beams, etc.
  • This structural system is of a universal character in regard to use, serving for houses, commercial galleries, car parking buildings and industrial buildings, with or without a false ceiling and with a plastered, directly painted or visible concrete finish.
  • BACKGROUND OF THE INVENTION
  • The currently used systems for building structures are classified in three types:
    • unidirectional,
    • reticular and
    • prefabricated.
  • The unidirectional framework or structure is the most extensively used for block buildings or single-family houses, and it is based in the use of girders or slabs to form the framework; since they transmit their loads in one single direction, they are known as unidirectional. The girders transmit their load to the beams, which in turn transmit the whole weight to the pillars and through these to the foundation. At present, this is the least expensive house building system.
  • Reticular frameworks are different from the above in that they transmit their load in two directions, forming a reticule with their load nerves. The loads are finally transmitted to the pillars through this reticule. They are used particularly for office buildings, car parking buildings and commercial centers, and allow for more spacing between the pillars than with girder and slab frameworks. This system is now starting to be competitive in price, in relation to the unidirectional system, as from 7-meter spans between pillars.
  • Prefabricated frameworks are presently used for large commercial centers and car parking buildings. Although they are more economical, they present a drawback in that the grid formed by the pillars must have a very regular shape which does not allow for great architectural design variations.
  • In order to perform a girder and slab unidirectional structure, which is the least expensive and most adaptable to architectural requirements involving 4 to 6 meter spans, the location of the house pillars are first laid out on the floor, then the planking is put in place and the pillars are filled with concrete.
  • The pillar planking is removed the next day, and the planking of the main load beams is started. The planking consists in placing two wooden or metal beams (crosspieces) parallel to the future beam and separated 80 to 100 cm from each other; panels are then placed on top of these two crosspieces to form the bottom of the beam planking. The crosspieces are suspended in the air by means of metal struts installed in pairs every one meter. In order to avoid movement, the planking is secured to the pillars, and iron rods are then installed in one pillar after the other.
  • The structure is completed by means of girders and slabs which rest on one beam panel and reach out to another beam panel to cover the whole previously empty surface in order to complete the structural plate. The girders must be propped-up every meter and a half or so, since they are not self-supporting.
  • The edges of the structural plate require that metal or wooden partitions be placed over the panels which form the bottom of the edge beams, so as to give the structural plate perimeter its shape and serve as an on-site mold for the concrete poured over the plate.
  • Before pouring on the concrete, steel members for supporting the structure's negative flexion moment and a mesh are installed in order to join the whole plate together. The pouring of the concrete completes the execution of a floor structure.
  • The crosspieces and panels may be removed three days later, although the plate struts must be left in place up to 28 days, after which all the material is removed, the plate being ready for masonry work.
  • The applicant is not aware that a system similar to the one proposed is in use, at least on the basis of the inventor's five year experience in structure design and calculations and from data obtained from documentation used in companies engaged in building structures.
  • DESCRIPTION OF THE INVENTION
  • The innovation of the invention lies in combining a series of known classical elements which determine certain new effects which allow for greater speed in the execution of the structure and savings in planking material, thus reducing the price of the structures and consequently of the house.
  • This structural system for reinforced or pre-stressed concrete building structures is formed by semi-prefabricated beams with reinforcement and concrete slabs that are coupled onto the plates and pillars by means of a planking platform secured to the sheet of the pillar or to the pillar itself.
  • The semi-prefabricated beams rest on a planking platform located in the proximity of the pillars, and absorb all the defects in regard to tolerance and laying out at the work site.
  • The framework and even other load beams rest on the slab or sole of the semi-prefabricated beam; the framework may be formed by a slab with nerves or by the pre-stressed type provided with a ceramic, concrete, porexpan, etc., slab.
  • The platform around the pillars may be created before removing the planking from the pillars (the concrete may even be poured into the pillars and the framework simultaneously).
  • Said platform anchored to the pillar's planking or to the pillar itself offers different construction solutions, and may be made of wood, plastic, metal plate, etc., to form a classic planking panel.
  • The structure's horizontal movement or bending is completely avoided by means the pillars previously filled with concrete or by the pillar planking duly adjusted, plumb lined and propped-up.
  • The semi-prefabricated beams which rest on the platforms of two adjacent pillars are fitted with spaced struts which support their own weight and that of the framework resting on the slab or inferior sole. The framework may or may not be provided with joists, depending on the type used.
  • The edge beams may have one of its sides fully finished with the same edge as the structure plate, thus avoiding the planking with partition at the work site. Finishing partitions are needed only in the proximity of the pillar and on the framework platform.
  • In classical beam and summer structural systems and unidirectional frameworks, the planking is removed once the concrete has been poured to form the pillars.
  • With this new system, the pillar planking construction may be used for supporting the prefabricated beams; said planking is not removed until the second or third day after pouring the concrete on the floor.
  • The pillar planking incorporates a height adjustment element to aid in the planking removal and in the adjustment of the floor height.
  • On removal of the planking, no material is damaged after being let down from the ceiling onto the floor, as in the case of classic summer plankings, and also the floors will be much less fouled-up; if semi-prefabricated frameworks are used, no slab pieces, metal strips, plastic pieces or pallets will be found laying around.
  • The greater execution speed, as compared to classic unidirectional summers and frameworks, results in a 30 to 50% reduction in the time currently required (depending on the type of forging used).
  • If the structure is used in a house that requires the beams not to protrude under the framework, a false ceiling must be installed, and this favors the design of facility and air conditioning installation. The cost of false ceilings is Pts. 600.- per m2, comparable to stucco and plaster finishing. The proposed structural system has a cost below Pts. 600.- per m2, so therefore it should be readily acceptable in the market.
  • The advantages provided by the invention include time saving in planking operations, and therefore increased execution speed, solutions for all kinds of architectural constructions of the structural plate (angle, hanging, edge and support beams, elevator ducts, yards, projections, slants, etc.), tidiness at the work site, saving in nails and wood, time saving in planking removals in view that no planking panels and beams are involved, longer plank mold life in view that material damages are avoided during planking removals, and safer conditions provided to the planking installator.
  • DESCRIPTION OF THE DRAWINGS
  • In order to complement the description set forth and to help in providing a better understanding of the characteristics of the invention, a set of drawings is attached to this specification, being an integral part thereof, wherein the following is represented in an illustrative and non-limiting character:
    • Figure 1 is a semi-prefabricated beam comprising a reinforcement, a concrete slab and a slab-type framework with nerves.
    • Figure 2 shows a pillar planking with work platform.
    • Figure 3 shows a semi-prefabricated beam with reinforcement and concrete slab over which rests a load beam.
    • Figure 4 shows a semi-prefabricated beam resting in the two adjacent pillar platforms fitted with struts positioned at a given spacing in order to withstand the weight of the semi-prefabricated beam.
    • Figure 5 shows a meeting point of two beams, the pillar and the framework.
    • Figure 6 shows an edge beam.
    • Figure 7 shows a meeting point of the edge beam, the framework and respective finishing and pillar partitions.
    • Figure 8 shows a meeting point of the beam, the frameworks and the finishing and pillar partitions.
    • Figure 9 shows a meeting point of a hanging beam, another beam of a larger edge and a pillar.
    PREFERRED EMBODIMENT OF THE INVENTION
  • In the light of the figures, it is evident that the invention consisting in a reinforced or pre-stressed concrete semi-prefabricated structure for buildings is composed of a horizontal planking platform (1) positioned over the planking (2) of the pillars or on the sides of the pillars on which concrete has already been poured designed to Support the semi-prefabricated beams (3) and framework (4), said semi-prefabricated beams (3) being formed by steel louvers or joist hangers (5) with a concrete slab or sole (6) on their lower part.
  • Over the concrete slab or sole (6) rests the framework (4), which may be of any currently known type and may also serve to support other load beams (7).
  • The semi-prefabricated beams (3) resting on the platforms (1) of two adjacent pillars are supported by struts (8) positioned at a given spacing, designed to withstand their own weight and that of the framework (4) resting on the lower slab or sole (6).
  • The semi-prefabricated beams may be edge beams (3') which show an inferior L-shaped slab (6') positioned in its lower surface and which covers one of the sides.
  • The finishing is performed around the pillars using partitions (9) and wood over the planking platform (1).
  • The pillar plankings incorporate a height adjustment element (10) to aid in the planking removal and the adjustment of the floor height.
  • This description need not be more extensive for an expert on the subject to understand the scope of the invention and the advantages deriving therefrom.
  • The materials, shape, size an arrangement of the elements are liable to variation provided the essence of the invention is not altered.
  • The terms used in the description of this specification must at all times be taken in an ample and non-limiting sense.

Claims (3)

  1. Reinforced or pre-stressed concrete semi-prefabricated building structure, essentially characterized in that it is composed of a horizontal framework platform (1) positioned over the planking (2) of the pillars or on the sides of the pillar on which concrete has already been poured and designed to support the semi-prefabricated beams (3) and framework (4), said semi-prefabricated beams (3) being formed by steel louvers or joist hangers (5) with a concrete slab or sole (6) fitted on the lower part thereof and over which rests the framework (4).
  2. Reinforced or pre-stressed concrete semi-prefabricated building structure according to the previous claim, characterized in that the semi-prefabricated beams may be edge beams (3') provided with an L-shaped lower slab (6') positioned on its lower surface and which covers one of the sides.
  3. Reinforced or pre-stressed concrete semi-prefabricated building structure according to claim 1, characterized in that it comprises finishing pieces around the pillars which consist in partitions (9) located over the horizontal framework platform (1).
EP96907516A 1995-09-05 1996-03-29 Reinforced or prestressed semi-precast concrete structure for building Withdrawn EP0790364A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ES9501731 1995-09-05
ES009501731A ES2133202B1 (en) 1995-09-05 1995-09-05 SEMI-PREFABRICATED STRUCTURE OF REINFORCED OR PRE-STRESSED CONCRETE FOR BUILDING, WHICH USES THE PILLAR AND / OR ITS FORMWORK TO CREATE A WORK PLATFORM AROUND THE PILLAR THAT SUPPORTS FORMWORK AND SUPPORTING SEMI-PREFABRICATED BEAMS.
PCT/ES1996/000069 WO1997009494A1 (en) 1995-09-05 1996-03-29 Reinforced or prestressed semi-precast concrete structure for building

Publications (1)

Publication Number Publication Date
EP0790364A1 true EP0790364A1 (en) 1997-08-20

Family

ID=8291496

Family Applications (1)

Application Number Title Priority Date Filing Date
EP96907516A Withdrawn EP0790364A1 (en) 1995-09-05 1996-03-29 Reinforced or prestressed semi-precast concrete structure for building

Country Status (8)

Country Link
EP (1) EP0790364A1 (en)
CN (1) CN1164881A (en)
AU (1) AU5111196A (en)
ES (1) ES2133202B1 (en)
HU (1) HUP9702115A2 (en)
PL (1) PL319949A1 (en)
TR (1) TR199700346T1 (en)
WO (1) WO1997009494A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2154558A1 (en) * 1998-09-08 2001-04-01 Sanchez Jaime Enrique Jimenez Method of making a side or corner beam, of the reinforced cage type with a concrete base and the semi-prefabricated beam so obtained.
EP1433908A1 (en) * 2002-12-24 2004-06-30 Fimurex Metal wire reinforcement for fixing a prestressed piece
WO2009010366A1 (en) * 2007-07-19 2009-01-22 Leone, Lucio Improved girders for reinforcing concrete and method for connecting them to pillars in order to provide continuity from bay to bay

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2154512B1 (en) * 1997-01-27 2001-10-16 Extremadura 2000 De Estructura ADJUSTABLE FORMWORK PLATFORM AROUND THE PILLAR OR PILLAR FORMWORK, FOR SUPPORT OF PREFABRICATED FIGURES.
ES2147107B1 (en) * 1997-12-02 2001-04-01 Extremadura 2000 De Estructura SEMI-PREFABRICATED MIXED BEAM FOR FLAT ROOFS.
ES2156801B1 (en) * 1998-12-10 2002-02-01 Sanchez Jaime Enrique Jimenez ADJUSTABLE FORMWORK PLATFORM TO PLACE AROUND THE PILLAR THAT SUPPORTS THE PREFABRICATED BEAMS.
ES2297974B1 (en) * 2005-06-28 2009-07-20 Proerai, S.L. CONSTRUCTION ELEMENT FOR BEAMS AND BUILT STRUCTURE.
CN101899878B (en) * 2009-05-19 2012-05-02 柳忠林 Construction method for small draft frame structure of large-span prestressed concrete beam slab
CN104763085B (en) * 2015-04-08 2017-06-30 中国建筑第八工程局有限公司 The double T floor frames structures of assembled integral prestressing force and its construction method
CN107313506B (en) * 2017-08-14 2022-12-23 有利华建筑预制件(深圳)有限公司 Building frame structure with boundary beam and construction method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1940209A1 (en) * 1969-08-07 1971-02-18 Rheinbau Gmbh Floor ceiling for buildings or the like.
DE2309722A1 (en) * 1973-02-27 1974-09-05 Wolfgang Ruemmele PROCESS FOR THE PRODUCTION OF CONCRETE BUILDING CEILINGS
US4081935A (en) * 1976-07-26 1978-04-04 Johns-Manville Corporation Building structure utilizing precast concrete elements
FR2474083A1 (en) * 1980-01-17 1981-07-24 Etude Realisat Elements Ste Gl Pre-fabricated reinforced beam for floors in building renovation - has overlapping vertical stirrups to increase I-section of reinforcing bars
US4443985A (en) * 1981-08-31 1984-04-24 Jaime Moreno Composite building construction comprising a combination of precast and poured-in-place concrete
US4505087A (en) * 1983-03-14 1985-03-19 U.S. Filigree Wideslab, Inc. Method of construction of concrete decks with haunched supporting beams
DE3543174A1 (en) * 1985-08-08 1987-09-10 Otto Dr Becker Support construction, e.g. for bridges, buildings, space shuttles, aircraft, ships, vehicles, in particular for spanning large abutment spacings
AT389556B (en) * 1987-07-28 1989-12-27 Bucher Franz METHOD FOR INSTALLING A CEILING SHEET POOLABLE WITH LOCAL CONCRETE

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9709494A1 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2154558A1 (en) * 1998-09-08 2001-04-01 Sanchez Jaime Enrique Jimenez Method of making a side or corner beam, of the reinforced cage type with a concrete base and the semi-prefabricated beam so obtained.
EP1433908A1 (en) * 2002-12-24 2004-06-30 Fimurex Metal wire reinforcement for fixing a prestressed piece
WO2009010366A1 (en) * 2007-07-19 2009-01-22 Leone, Lucio Improved girders for reinforcing concrete and method for connecting them to pillars in order to provide continuity from bay to bay

Also Published As

Publication number Publication date
ES2133202A1 (en) 1999-09-01
CN1164881A (en) 1997-11-12
TR199700346T1 (en) 1997-08-21
WO1997009494A1 (en) 1997-03-13
ES2133202B1 (en) 2000-04-16
HUP9702115A2 (en) 1998-04-28
MX9703000A (en) 1997-07-31
AU5111196A (en) 1997-03-27
PL319949A1 (en) 1997-09-01

Similar Documents

Publication Publication Date Title
US2497887A (en) Paneled building construction
US3818660A (en) Building formed of cast vertical and horizontal members
US5930965A (en) Insulated deck structure
US3678638A (en) Building construction of modular units with settable material therebetween
US20090151298A1 (en) Method of Making Monolithic Concrete Structures
WO2011021151A1 (en) Method and system for in-situ construction of civil structures
EP0790364A1 (en) Reinforced or prestressed semi-precast concrete structure for building
JP2023514035A (en) MODULAR COMPOSITE ACTION PANEL AND STRUCTURAL SYSTEM USING THE SAME
US3733762A (en) Binary precast concrete triangulated building system
WO2002066757A1 (en) A load bearing building panel
AU2020264333B2 (en) A Construction System and Method of Use Thereof
US4294052A (en) Prefabricated load bearing structure
CN111677281A (en) Construction method of floor system with triangular truss easy to install
US20040250482A1 (en) Construction method and appartaus
US7700024B1 (en) Corrugated concrete wall panel form and method of construction thereof
RU124274U1 (en) MONOLITHIC CONSTRUCTION DESIGN OF THE BUILDING OR STRUCTURE "GENESIS-RUS" - "VEFT"
US4660349A (en) Method of erecting a building using preconstructed modular units
CA2639339A1 (en) Method of constructing a multi-storey building using prefabricated modular panels
RU2130106C1 (en) Methods for embodying structural system of fully prefabricated civic building
RU2820548C1 (en) Method of reconstruction of buildings and structures
US2296863A (en) Reinforced concrete floor construction
WO1989009314A1 (en) Process for the construction of buildings
MXPA97003000A (en) Semi-prefabricated structure of armed concrete pretensed for edificac
WO2023195868A1 (en) Method of erecting a building and prefabricated wall element
JPS6215368Y2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FI GB GR IT LI NL PT

17P Request for examination filed

Effective date: 19970804

17Q First examination report despatched

Effective date: 20001215

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Withdrawal date: 20010720