EP0419423B1 - A railway car for the transportation of debris - Google Patents

A railway car for the transportation of debris Download PDF

Info

Publication number
EP0419423B1
EP0419423B1 EP90830335A EP90830335A EP0419423B1 EP 0419423 B1 EP0419423 B1 EP 0419423B1 EP 90830335 A EP90830335 A EP 90830335A EP 90830335 A EP90830335 A EP 90830335A EP 0419423 B1 EP0419423 B1 EP 0419423B1
Authority
EP
European Patent Office
Prior art keywords
bin
debris
belt
railway car
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP90830335A
Other languages
German (de)
French (fr)
Other versions
EP0419423A1 (en
Inventor
Erio Casarini
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority to AT90830335T priority Critical patent/ATE102559T1/en
Publication of EP0419423A1 publication Critical patent/EP0419423A1/en
Application granted granted Critical
Publication of EP0419423B1 publication Critical patent/EP0419423B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D7/00Hopper cars
    • B61D7/14Adaptations of hopper elements to railways
    • B61D7/32Means for assisting charge or discharge
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/02Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
    • E01B27/022Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means by devices moving on the track with or without spreading or levelling

Definitions

  • the present invention relates to a railway car for the transportation of debris.
  • Prior art in the design and construction of rolling stock embraces certain types of car by which spoil, rubble and the like can be loaded at an operations site, transported to another location, and dumped.
  • Such vehicles consist generally in two distinct parts, of which a first incorporates the components permitting movement, i.e. pairs of wheels enabling motion along a railway track, and a second consists in a high-sided open topped bin, or skip, resting on a chassis.
  • the bin serves to collect debris dropped in from above by excavating equipment. Naturally enough, there will be a train of such cars lined up at the operations site, and once loaded, the entire train is moved off to a designated dumping ground.
  • a car of the type in question is equipped generally with a number of telescopic arms operated by corresponding pneumatic cylinders mounted between the bin and the chassis; on arrival of the car at the dumping site, the cylinders will be actuated by an operater, whereupon the bin tilts to one side and its contents are discharged onto the ground below.
  • a first drawback is that of the time taken to discharge the debris, and stems from the slow tilt of the bin; in effect, a considerable weight must be handled and it is therefore advisable to proceed with caution, otherwise the balance of the car might be upset, as indeed might the stability of the entire train.
  • a second drawback is concerned with preparation of the ground where the debris is to be deposited; to avoid an accumulation of mounds that would occur if the contents of the bins were to be dumped on level ground, depressions or indeed fully excavated pits are prepared over the entire expanse of the dumping area, serving as a temporary deposit for the material pending its removal and transportation to a permanent site by truck. Such a procedure involves expenditure on personnel and equipment, and considerable loss of time, all of which signifying increased cost to the contractor.
  • a railway car for the transportation of debris is already known from DE-A-24 03 010 and comprises a bin supported on a track by means of two bogies.
  • a horizontal conveyor belt extending longitudinally over the length of the car and serving to receive debris loaded in from outside the car.
  • the conveyor belt is surmounted by a wedge element which is slideably displaceable along the length of the belt and diverts the stream of debris from the conveyor on either side into the bin, thus filling the bin along its length.
  • An endless scraper chain is provided for emptying the bin by conveying the debris to one longitudinal side of the wagon while the chain is moved lengthwise through the bin.
  • the bin has no side wall along the discharge side. This feature requires a very asymmetrical distribution of the debris loaded in the car.
  • the object of the present invention is to overcome the drawbacks outlined above through the provision of a debris transport car equipped with a combination of on-board features designed to enable a rational, speedy and convenient loading and offloading system whereby debris can be dumped successfully even on unprepared ground.
  • the adoption of a chain of conveyor belts ensures swift and rational handling of the debris loaded into the bin; moreover, the third swinging belt permits of dumping material at a distance from the car and thus of dispensing with the need for preparatory excavations.
  • 1 denotes a four-wheel bogie running on railway tracks 21, associated with a horizontal chassis 2 that appears as a platform and supports a bin 3 for the collection of spoil, debris etc., denoted 4 in its entirety.
  • such a car is equipped with a set of features allowing debris 4 to be collected, conveyed and subsequently dumped, consisting essentially in:
  • the bin in which debris 4 is held comprises a fixed structure provided by the upright walls 3, an array of flaps 7, and a floor provided by the horizontal belts denoted 8a and 8b.
  • the first belt 5 occupies a central, longitudinal position over the car and is of length greater than the overall length of the bin 3, as may be observed in fig 1a which shows one of the ends of the belt 5 looped around a relative drum 5t and projecting marginally from the corresponding end of the bin.
  • 6 denotes a wedge shaped element slidably mounted over the first belt 5 and serving to distribute the conveyed debris 4, which is rendered capable of movement horizontally along the entire length of the bin 3 by slide means 11.
  • the wedge element 6 consists in a pair of blades 6a and 6b arranged so as to present a chevron profile when seen in plan; the two blades 6a and 6b connect uppermost with a parallelogram linkage 13 that is fixed in turn to the slide means 11, thereby enabling an adjustment in the height of the wedge element 6 between a lowered limit position, close to the belt 5, and a raised limit position, distanced from the belt (phantom line of fig 1).
  • the slide means 11 consist in a pair of arms 11a and 11b (see fig 2) arranged as a frame embracing the wedge element 6 from either side, which are fastened at one end to the parallelogram linkage 13 and provided at the remaining end, in the example illustrated, with respective wheels 14a and 14b that run on a pair of horizontal rails 15 forming part of the framework supporting the first belt 5 and extending the entire length of the bin 3 on either side of the belt; alternatively, the rails could be associated with the top of the bin itself. It will be observed from fig 2 that the plurality of flaps 7 are arranged in opposing pairs, and combine with the bottom of the bin 3 to create a series of hopper-like modular sections in which the debris 4 is accommodated.
  • the flaps 7 are capable of movement between a limit position in which the modular hopper section is closed and the flaps register in flush contact with the bottom of the bin, and a limit position in which the section is open, whereby the flaps 7 are distanced from the bottom of the bin 3 and allow the debris 4 to fall; in the example illustrated, such actuator means 12 consist in a plurality of hydraulic cylinders 16, one to each flap 7, hinged by one end to the inside of the chassis 2 and by the remaining end to the respective flap 7.
  • the second belts 8a and 8b are disposed with their working surfaces occupying a common plane below the array of flaps 7; the combined length of the second belts 8a and 8b will coincide substantially with the length of the bin 3, thereby ensuring that the debris 4 from all of the modular hopper sections is gathered up; more exactly, the two belts 8a and 8b are positioned end to end and driven in opposite directions, Va and Vb, such that the debris 4 is conveyed toward a single dropping point.
  • 19 denotes a chute installed beneath the dropping point and anchored to the chassis 2, which serves to collect the debris 4 falling from the belts 8a and 8b.
  • the third belt 9 is installed remote from the bin 3 with one end below the chute 19, mounted in such a way as to rotate in a lower plane parallel with the chassis 2.
  • Rotation of the belt 9 is produced by drive means 10 that consist in a slewing ring 17 supporting the end of the belt below the chute 19 (see fig 2) and capable of swinging through an arc of 180°; in practice, the belt 9 would be rotated by the ring 17 between a non-operative position, essentially of longitudinal alignment with the chassis 2, and an operative position substantially transverse to the chassis 2, which is adopted in readiness to discharge the debris 4.
  • the third belt 9 and the slewing ring 17 are protected by a frame 18 of cradle embodiment, which envelops the two components entirely with the sole exception, needless to say, of that end of the belt 9 from which the debris 4 ultimately discharges. Operation of the car will now be described.
  • debris 4 is loaded onto the first belt 5 of the first car by such equipment as may be operating on the site, and conveyed along above the bin.
  • the wedge element 6 of this car and those of successive cars down to the penultimate will be raised, by appropriate positioning of the parallelogram 13, in such a way that the debris 4 can pass right along to the final car, whereas the wedge element 6 of the final car will be stationed at the farthest end of the relative bin 3 and set in the lowered position, such that the debris 4 falls into the modular hopper section beneath.
  • the wedge element 6 moves forward in the direction denoted C, against the direction of the belt 5, in such a way as to prevent any further flow of debris 4 into the first modular section and begin filling the next section back along the direction of flow toward the loading station; once this endmost car has been filled completely, the wedge 6 of the penultimate car is lowered, and the process of filling the relative modular sections will proceed in similar fashion.
  • the final discharge or dumping operation might be speeded up still further by addition of a further belt installed at ground level and combining with the third belt 9 to create an unbroken conveyor facility stretching, for example, to a loading point for road haulage vehicles that will carry the debris away to designated disposal sites.
  • Such an expedient would be especially advantageous when emptying the cars at hardcored sites where there is no possibility of effecting preparatory excavations to receive the debris.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • Loading Or Unloading Of Vehicles (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Packaging Of Machine Parts And Wound Products (AREA)
  • Ropes Or Cables (AREA)

Abstract

The car comprises a bin (3), and features a first horizontal belt (5) in receipt of excavated debris (4), occupying a central and longitudinal position over the bin and surmounted by a mobile wedge (6) traversed along the length of the bin and serving to distribute the incoming debris, also a plurality of flaps (7) arranged in opposing pairs along the bottom of the bin (3) and combining therewith to create a series of modular hopper sections, which are capable of movement between limit positions whereby the hopper sections are opened and closed; two further horizontal belts (8a, 8b) are installed end to end beneath the flaps (7), positioned to collect the falling contents of the hopper sections when opened up and direct them through a single dropping point onto one end of a third horizontal belt (9), remote from the bin and positioned below the second belts (8a, 8b), which is rotated by a slewing ring (10) between a non-operative inboard position and an operative position substantially transverse to the bin, adopted for the purpose of offloading.

Description

  • The present invention relates to a railway car for the transportation of debris.
  • Prior art in the design and construction of rolling stock embraces certain types of car by which spoil, rubble and the like can be loaded at an operations site, transported to another location, and dumped. Such vehicles consist generally in two distinct parts, of which a first incorporates the components permitting movement, i.e. pairs of wheels enabling motion along a railway track, and a second consists in a high-sided open topped bin, or skip, resting on a chassis.
  • The bin serves to collect debris dropped in from above by excavating equipment. Naturally enough, there will be a train of such cars lined up at the operations site, and once loaded, the entire train is moved off to a designated dumping ground.
  • For dumping purposes, a car of the type in question is equipped generally with a number of telescopic arms operated by corresponding pneumatic cylinders mounted between the bin and the chassis; on arrival of the car at the dumping site, the cylinders will be actuated by an operater, whereupon the bin tilts to one side and its contents are discharged onto the ground below.
  • It is at this stage that one encounters certain drawbacks, attributable mainly to the structure of the car. A first drawback is that of the time taken to discharge the debris, and stems from the slow tilt of the bin; in effect, a considerable weight must be handled and it is therefore advisable to proceed with caution, otherwise the balance of the car might be upset, as indeed might the stability of the entire train. A second drawback is concerned with preparation of the ground where the debris is to be deposited; to avoid an accumulation of mounds that would occur if the contents of the bins were to be dumped on level ground, depressions or indeed fully excavated pits are prepared over the entire expanse of the dumping area, serving as a temporary deposit for the material pending its removal and transportation to a permanent site by truck. Such a procedure involves expenditure on personnel and equipment, and considerable loss of time, all of which signifying increased cost to the contractor.
  • A railway car for the transportation of debris is already known from DE-A-24 03 010 and comprises a bin supported on a track by means of two bogies. Mounted above the bin is a horizontal conveyor belt extending longitudinally over the length of the car and serving to receive debris loaded in from outside the car. The conveyor belt is surmounted by a wedge element which is slideably displaceable along the length of the belt and diverts the stream of debris from the conveyor on either side into the bin, thus filling the bin along its length. An endless scraper chain is provided for emptying the bin by conveying the debris to one longitudinal side of the wagon while the chain is moved lengthwise through the bin. To facilitate the unloading of the debris, the bin has no side wall along the discharge side. This feature requires a very asymmetrical distribution of the debris loaded in the car.
  • Accordingly, the object of the present invention is to overcome the drawbacks outlined above through the provision of a debris transport car equipped with a combination of on-board features designed to enable a rational, speedy and convenient loading and offloading system whereby debris can be dumped successfully even on unprepared ground.
  • The stated object is realized in a transportation car as characterized in the appended claims.
  • Among the advantages afforded by the invention, the adoption of a chain of conveyor belts ensures swift and rational handling of the debris loaded into the bin; moreover, the third swinging belt permits of dumping material at a distance from the car and thus of dispensing with the need for preparatory excavations.
  • The invention will now be described in detail, by way of example, with the aid of the accompanying drawings, in which:
    • figs 1 and 1a together show a side elevation of the railway car according to the invention, with certain parts omitted better to reveal others;
    • fig 2 is a front elevation of the car of fig 1-1a, in which certain parts are omitted better to reveal others.
  • Referring to the drawings, 1 denotes a four-wheel bogie running on railway tracks 21, associated with a horizontal chassis 2 that appears as a platform and supports a bin 3 for the collection of spoil, debris etc., denoted 4 in its entirety.
  • According to the present invention, such a car is equipped with a set of features allowing debris 4 to be collected, conveyed and subsequently dumped, consisting essentially in:
    • a first horizontal conveyor belt 5 by which the debris 4 is collected externally and transferred to the bin 3;
    • a plurality of flaps 7 serving to open and shut the bottom of the bin 3;
    • a pair of second horizontal conveyor belts 8a and 8b, positioned below and serving to collect and transfer debris dropping through the flaps 7;
    • a third horizontal belt 9 positioned remote from the bin below the pair of second belts 8a and 8b and capable of slewing, by which the debris 4 is ultimately conveyed to a dumping site.
  • For practical purposes, the bin in which debris 4 is held comprises a fixed structure provided by the upright walls 3, an array of flaps 7, and a floor provided by the horizontal belts denoted 8a and 8b.
  • The first belt 5 occupies a central, longitudinal position over the car and is of length greater than the overall length of the bin 3, as may be observed in fig 1a which shows one of the ends of the belt 5 looped around a relative drum 5t and projecting marginally from the corresponding end of the bin. 6 denotes a wedge shaped element slidably mounted over the first belt 5 and serving to distribute the conveyed debris 4, which is rendered capable of movement horizontally along the entire length of the bin 3 by slide means 11. The wedge element 6 consists in a pair of blades 6a and 6b arranged so as to present a chevron profile when seen in plan; the two blades 6a and 6b connect uppermost with a parallelogram linkage 13 that is fixed in turn to the slide means 11, thereby enabling an adjustment in the height of the wedge element 6 between a lowered limit position, close to the belt 5, and a raised limit position, distanced from the belt (phantom line of fig 1).
  • The slide means 11 consist in a pair of arms 11a and 11b (see fig 2) arranged as a frame embracing the wedge element 6 from either side, which are fastened at one end to the parallelogram linkage 13 and provided at the remaining end, in the example illustrated, with respective wheels 14a and 14b that run on a pair of horizontal rails 15 forming part of the framework supporting the first belt 5 and extending the entire length of the bin 3 on either side of the belt; alternatively, the rails could be associated with the top of the bin itself. It will be observed from fig 2 that the plurality of flaps 7 are arranged in opposing pairs, and combine with the bottom of the bin 3 to create a series of hopper-like modular sections in which the debris 4 is accommodated. Through the agency of relative actuator means 12, the flaps 7 are capable of movement between a limit position in which the modular hopper section is closed and the flaps register in flush contact with the bottom of the bin, and a limit position in which the section is open, whereby the flaps 7 are distanced from the bottom of the bin 3 and allow the debris 4 to fall; in the example illustrated, such actuator means 12 consist in a plurality of hydraulic cylinders 16, one to each flap 7, hinged by one end to the inside of the chassis 2 and by the remaining end to the respective flap 7.
  • The second belts 8a and 8b are disposed with their working surfaces occupying a common plane below the array of flaps 7; the combined length of the second belts 8a and 8b will coincide substantially with the length of the bin 3, thereby ensuring that the debris 4 from all of the modular hopper sections is gathered up; more exactly, the two belts 8a and 8b are positioned end to end and driven in opposite directions, Va and Vb, such that the debris 4 is conveyed toward a single dropping point. 19 denotes a chute installed beneath the dropping point and anchored to the chassis 2, which serves to collect the debris 4 falling from the belts 8a and 8b.
  • The third belt 9 is installed remote from the bin 3 with one end below the chute 19, mounted in such a way as to rotate in a lower plane parallel with the chassis 2. Rotation of the belt 9 is produced by drive means 10 that consist in a slewing ring 17 supporting the end of the belt below the chute 19 (see fig 2) and capable of swinging through an arc of 180°; in practice, the belt 9 would be rotated by the ring 17 between a non-operative position, essentially of longitudinal alignment with the chassis 2, and an operative position substantially transverse to the chassis 2, which is adopted in readiness to discharge the debris 4. Being located externally of the car body structure, the third belt 9 and the slewing ring 17 are protected by a frame 18 of cradle embodiment, which envelops the two components entirely with the sole exception, needless to say, of that end of the belt 9 from which the debris 4 ultimately discharges. Operation of the car will now be described.
  • Assuming a train of empty cars to be stationed in readiness at a given site, debris 4 is loaded onto the first belt 5 of the first car by such equipment as may be operating on the site, and conveyed along above the bin. The wedge element 6 of this car and those of successive cars down to the penultimate will be raised, by appropriate positioning of the parallelogram 13, in such a way that the debris 4 can pass right along to the final car, whereas the wedge element 6 of the final car will be stationed at the farthest end of the relative bin 3 and set in the lowered position, such that the debris 4 falls into the modular hopper section beneath.
  • Once this first section has been filled, the wedge element 6 moves forward in the direction denoted C, against the direction of the belt 5, in such a way as to prevent any further flow of debris 4 into the first modular section and begin filling the next section back along the direction of flow toward the loading station; once this endmost car has been filled completely, the wedge 6 of the penultimate car is lowered, and the process of filling the relative modular sections will proceed in similar fashion.
  • When all cars are filled, the train is shunted off to the designated dumping ground, on arrival at which the third belt 9 of each car will be swung out through 90° or thereabouts on the side of the track where the debris is to be deposited. At this juncture, the flaps 7 are opened in succession by operating the relative cylinders 16, whereupon the debris 4 falls onto the second belts 8a and 8b and is carried by these to the single dropping point over the chute 19. The material now falls through the chute onto the third belt 9 beneath, and is conveyed out to the final dumping location.
  • It will be appreciated from the foregoing that the entire transportation and offloading procedure is particularly speedy, and can be repeated several times within a notably brief period.
  • The final discharge or dumping operation might be speeded up still further by addition of a further belt installed at ground level and combining with the third belt 9 to create an unbroken conveyor facility stretching, for example, to a loading point for road haulage vehicles that will carry the debris away to designated disposal sites. Such an expedient would be especially advantageous when emptying the cars at hardcored sites where there is no possibility of effecting preparatory excavations to receive the debris.

Claims (7)

  1. A railway car for the transportation of debris, consisting in at least two bogies (1) rolling on tracks (21) and interconnected by a chassis (2) supporting an open topped bin (3), and comprising a first horizontal conveyor belt (5) in receipt of debris (4) loaded in from externally of the car, occupying a substantially central and longitudinal position over the bin (3) and surmounted coaxially by a wedge element (6) traversing along the entire longitudinal length of the bin through the agency of slide means (11), by which incoming debris conveyed along the first belt (5) is distributed uniformly on either side into the bin (3), characterized in that it comprises:
    - a plurality of flaps (7) arranged in opposing pairs along the bottom of the bin (3) and combining with the bin to create a series of modular hopper sections for temporary storage of the debris, which are operated by actuator means (12) and capable of movement between a limit position of flush contact with the bin, in which the modular hopper section is closed, and a limit position distanced from the bin, in which the modular hopper section is open and the debris can discharge from the bin;
    - a pair of second horizontal conveyor belts (8a, 8b) located beneath the flaps (7), positioned end to end and disposed with conveying surfaces in a common plane in such a way as to establish the floor of the bin and take up the debris discharged from the modular hopper sections, and turning in opposite directions so as to direct the debris convergently to a single dropping point;
    - a third horizontal belt (9), remote from the bin and positioned below the pair of second belts (8a, 8b) with one end beneath the single dropping point, which is rotatable about a vertical axis through the agency of drive means (10) between a non-operative position, essentially of longitudinal alignment with the bin, and an operative offloading position substantially transverse to the bin.
  2. A railway car as in claim 1, wherein the wedge element (6) consists in a pair of blades (6a, 6b) disposed in chevron formation when seen in plan and connected uppermost to a parallelogram linkage (13) fastened in its turn to the slide means (11), which serves to vary the height of the wedge element (6) between a lowered limit position, with the blades close to the first belt (5), and a raised limit position in which the blades are distanced from the first belt.
  3. A railway car as in claim 1, wherein the slide means (11) consist in a pair of arms (11a, 11b) fastened at one end to a parallelogram linkage (13) and furnished at the remaining end with respective wheels (14a, 14b) running on a pair of horizontal rails (15) afforded by the top of the bin (3) and disposed on either side of the first belt (5).
  4. A railway car as in claim 1, wherein the flaps (7) are operated by actuator means (12) consisting in corresponding hydraulic cylinders (16) of which the opposite ends are hinged to the inside of the chassis (2) and to the relative flap, respectively.
  5. A railway car as in claim 1, wherein drive means (10) consist in a slewing ring (17) by which the third belt (9) is supported at the end beneath the single dropping point.
  6. A railway car as in claim 1, wherein the third belt (9) is accommodated by a frame (18) of cradle embodiment completely encompassing the belt and the relative drive means (10).
  7. A railway car as in claim 1, further comprising a chute (19) located between the pair of second belts (8a, 8b) and the third belt (9) at the single dropping point.
EP90830335A 1989-09-22 1990-07-19 A railway car for the transportation of debris Expired - Lifetime EP0419423B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT90830335T ATE102559T1 (en) 1989-09-22 1990-07-19 RAILWAY CARRIAGE FOR TRANSPORTATION OF DEBRIS.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT8903629A IT1235604B (en) 1989-09-22 1989-09-22 RAILWAY WAGON FOR DEPARTMENTS TRANSPORT
IT362989 1989-09-22

Publications (2)

Publication Number Publication Date
EP0419423A1 EP0419423A1 (en) 1991-03-27
EP0419423B1 true EP0419423B1 (en) 1994-03-09

Family

ID=11110886

Family Applications (1)

Application Number Title Priority Date Filing Date
EP90830335A Expired - Lifetime EP0419423B1 (en) 1989-09-22 1990-07-19 A railway car for the transportation of debris

Country Status (5)

Country Link
EP (1) EP0419423B1 (en)
AT (1) ATE102559T1 (en)
DE (1) DE69007216T2 (en)
ES (1) ES2049966T3 (en)
IT (1) IT1235604B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR112013020831B1 (en) 2011-02-15 2020-11-24 Metso Minerals, Inc MOBILE PROCESSING DEVICE
FR2988361B1 (en) * 2012-03-26 2015-05-22 Gtf ASSEMBLY FOR LOADING THE RESIDUES FOR REMOVING A RAILWAY
FR2988737B1 (en) * 2012-03-29 2018-11-16 Etf DOUBLE FLOW BALLASTAGE TRAIN.
US9702093B2 (en) 2013-09-02 2017-07-11 Sersa Maschineller Gleisbau Ag Material transport carriage
FR3014066B1 (en) * 2013-12-02 2017-10-27 Gtf WAGON LOADER OF BULK PRODUCTS WITH UNLOADING MEANS
US11014583B2 (en) * 2017-06-02 2021-05-25 Trinity Rail Group, Llc Hopper car discharge gates
CN113718324B (en) * 2021-08-31 2022-09-20 江西中鼎金属工艺有限公司 Metal handicraft surface coating device installed on conveying line

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1605016A1 (en) * 1967-08-25 1971-03-04 Siemens Ag Equipment of trolleys for the transport of bulk goods
DE2303984A1 (en) * 1973-01-27 1974-08-01 Gerhard Muesch UNLOADING CONVEYOR BELT
DE2403010A1 (en) * 1974-01-23 1975-07-31 Wieger Maschbau Viscous material loading and unloading machine - has lengthwise conveyor with transverse conveyor below, sliding in lengthwise direction
GB2098169A (en) * 1981-02-26 1982-11-17 Procor Uk Ltd Railway wagon and apparatus for unloading the wagon

Also Published As

Publication number Publication date
DE69007216D1 (en) 1994-04-14
IT1235604B (en) 1992-09-11
EP0419423A1 (en) 1991-03-27
ES2049966T3 (en) 1994-05-01
IT8903629A0 (en) 1989-09-22
DE69007216T2 (en) 1994-06-23
ATE102559T1 (en) 1994-03-15

Similar Documents

Publication Publication Date Title
CA2102007C (en) A loading wagon for the transport of bulk material
US4923355A (en) System to feed and discharge materials continuously in operations to rehabilitate railway road beds and the like
US6835041B1 (en) High capacity bulk material transportation and discharge method and system
CA2090398C (en) Transport wagon comprising a wagon frame supported on on-track undercarriages
NL1003464C2 (en) Storage wagon for storing bulk goods.
AU635111B2 (en) Bulk goods waggon
CA1202592A (en) Freight train
EP0419423B1 (en) A railway car for the transportation of debris
US3167193A (en) Loading car with conveyor
NL8200039A (en) MOBILE IMPLEMENT FOR RECORDING, CLEANING AND RE-APPLICATION OF BALLAST OF RAILWAYS.
JPS6137148B2 (en)
EP0571540B1 (en) Continuous gondola car
JPS5836829A (en) Device for treating and collecting bulk material
CA2077367C (en) Machine arrangement for picking up, storing and distributing the ballast of a track
RU2668144C2 (en) Trolley for transporting materials
US4556112A (en) Mobile conveyor arrangement
US2251990A (en) Material unloading system
CZ278838B6 (en) Set for catching and transportation of ballast, waste or another loose material
AU2008217284A1 (en) Storage cart
AU621086B2 (en) Freight discharge of railway wagons
US5119738A (en) Hopper construction
CA1128456A (en) Mobile conveyor-flow equalizer
US2725584A (en) Street sweeper
US3500565A (en) Conveyor system having plural unloading stations
US1452080A (en) Loader

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE DE ES FR GB NL

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: FRANZ PLASSER BAHNBAUMASCHINEN- INDUSTRIEGESELLSCH

17P Request for examination filed

Effective date: 19910510

17Q First examination report despatched

Effective date: 19921029

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE DE ES FR GB NL

REF Corresponds to:

Ref document number: 102559

Country of ref document: AT

Date of ref document: 19940315

Kind code of ref document: T

REF Corresponds to:

Ref document number: 69007216

Country of ref document: DE

Date of ref document: 19940414

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2049966

Country of ref document: ES

Kind code of ref document: T3

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20050608

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060719

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20080718

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20080725

Year of fee payment: 19

Ref country code: NL

Payment date: 20080729

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20080627

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20080923

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20080801

Year of fee payment: 19

BERE Be: lapsed

Owner name: *FRANZ PLASSER BAHNBAUMASCHINEN- INDUSTRIEGESELLSC

Effective date: 20090731

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090719

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20100201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20100331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090719

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100202

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090731

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20090720

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090720

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100201