EP0188890A1 EP85309153A EP85309153A EP0188890A1 EP 0188890 A1 EP0188890 A1 EP 0188890A1 EP 85309153 A EP85309153 A EP 85309153A EP 85309153 A EP85309153 A EP 85309153A EP 0188890 A1 EP0188890 A1 EP 0188890A1
Authority
EP
European Patent Office
Prior art keywords
outer tube
sections
bar
ground anchor
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP85309153A
Other languages
German (de)
English (en)
Other versions
EP0188890B1 (fr
Inventor
Michael John Turner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MICHAEL JOHN TURNER TE STEEPLE, GROOT-BRITTANNIE.
Original Assignee
West's Piling and Construction Co Ltd
WESTS PILING CONSTRUCT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West's Piling and Construction Co Ltd, WESTS PILING CONSTRUCT filed Critical West's Piling and Construction Co Ltd
Priority to AT85309153T priority Critical patent/ATE43147T1/de
Publication of EP0188890A1 publication Critical patent/EP0188890A1/fr
Application granted granted Critical
Publication of EP0188890B1 publication Critical patent/EP0188890B1/fr
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • E02D5/765Anchorings for bulkheads or sections thereof in as much as specially adapted therefor removable
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material

Definitions

  • This invention relates to ground anchors of the kind usually referred to as bar anchors.
  • a bar anchor a bore hole is occupied by an inner bar with a protective outer tube surrounding it. This is normally encased in a grout which may be cement or other settable material and there also may be normally a filling of grout or other suitable material between the inner bar and the protective tube.
  • the bar and tube may be made up of more than one section, the respective sections being joined together. It is a requirement that the inner bar is so joined that tension can be applied between the ends of the whole bar, the loads sometimes being very substantial.
  • outer tube is not necessarily load carrying, it must nevertheless be strong enough to withstand side loads resulting, for example, from soil collapse around the anchor and the same must be true of the coupling between sections of the outer tube.
  • the outer tube coupling must also provide protection to the inner bar at least equal to that afforded by the outer tube sections themselves.
  • the present invention therefore seeks to provide a ground anchor which mitigates against the drawbacks of the prior art.
  • a ground anchor comprising an inner bar and an outer tube surrounding the inner bar, each made up of at least two sections, the sections of inner bar and outer tube being connected together by a coupling comprising a screw threaded sleeve in which correspondingly screw threaded ends of respective bar sections are engaged, and an outer tube connecting assembly, wherein the outer tube connecting assembly comprises two parts which are connected to respective tube sections and which are interconnectible to form a sealed joint between them.
  • the ground anchor may include more than two sections, jointed by respective couplings.
  • connection of two adjacent sections involves connection of the bar sections and the outer tube sections simultaneously.
  • the ground anchor in Figure 1 is shown installed.
  • the inner end is in rock or other hard substance whereas the outer end can be in relatively soft uncompacted material.
  • the anchor may be used to secure a concrete or other structure.
  • the anchors can be used for many civil engineering applications and may have substantial loads applied depending upon operating conditions.
  • the ground in which this anchor is fitted is generally indicated at 10 in Figure 1.
  • the process for installing the anchor is to drill a hole to the required depth removing the soil or rock so as to make provision for entry to the anchor.
  • the anchor is pushed into the hole and a filling of liquid grout indicated at 11 is injected or poured around it. When this sets, the anchor is held firmly in place particularly at the inner end of the hole.
  • a casing may be used to support the surrounding soil particularly in the area of loose soil near the surface. When the casing has been removed secondary grout indicated at 12 is placed into the hole. if required.
  • the anchor as illustrated comprises an inner bar 13 sometimes called the tendon. This is made from high tensile or other steel and may be screw threaded through out the whole of its length.
  • the anchor is sealed at the inner end by an end plug 14 of non-corrodable material and its outer end carries a nut 15 used to retain tension in the bar. Further reference will be made to this later.
  • a tube 16 Surrounding the inner bar is a tube 16 which in this example is a corrugated plastics tube secured at one end to the end plug 14 and at the other end to a sleeve 17 connected to a member 18 which rests on or against the surface to be supported or retained. Sealing material 19 may be used around this member. Further grout is provided between the inner bar 13 and the tube 16.
  • the assembly is pre-assembled on the surface prior to installation.
  • a number of sections are used to make up the complete ground anchor and the sections are connected by couplings to which further reference will be made. In this example, there are two sections but in other cases, several more sections may be used depending upon the length or depth of the hole.
  • Each individual section has a part of the coupling and in the case of the lower or inner section shown in Figure 1 there is a coupling part connected to the end remote from the end plug 14. Similarly, in the case of the upper or outer section of the Figure 1 construction, a coupling part is fitted at one end whereas the other end extends out of the surface and carries the nut 15 as described.
  • each intermediate section carries at one end the coupling part fitted to the lower or inner section shown in Figure 1 and at its other end a coupling part as fitted to the upper or outer sections shown in Figure 1.
  • Such intermediate sections are preformed prior to installation including the internal grout and the coupling parts are fixed to the sections of inner bar and outer tube.
  • Figures 2 and 3 show the components of the coupling for the outer tube. These comprise a flanged collar 20 secured in one end of a cylindrical sleeve 21, such as by welding. The outer end of the collar is formed with grooves 22 which engage in and are securable with the interior of the adjacent section of tube 16. The collar 20 is secured within the tube 16 so as to be sealed against ingress of corrosive materials and is also secured against rotation relatively to the tube 16.
  • a component 23 which is slideably engageable with the end of the sleeve 21.
  • This component 23 comprises a hollow stepped generally cylindrical member with a flange 24 which may abut against the end of the sleeve 21.
  • An end portion which slideably engages in the sleeve 21 has at least one but preferably a plurality of grooves 25 to accept sealing rings.
  • the component 23 has a grooved portion 26 engageable over the outer tube 16 of the adjacent section. This can be secured in a manner similar to the securement of the portion 22 both against ingress of corrosive materials and also against relative rotation.
  • a pair of flats 28 are provided for engagement by a clamp or support device or spanner.
  • a coupling sleeve 29 for the inner bar sections As previously described, the sections are screw threaded with relatively coarse threads throughout their lengths. Grout which fills the space between the inner bar and the outer tube, however, leaves the bar end exposed and it is on to this bar end that the sleeve 29 is screwed. Prior to installation of an individual section, the sleeve 29 is fitted to the bar end of the lower or inner section, i.e. the bar end not situated within the sleeve 21.
  • the arrangement is such that the sleeve 29 will not screw further onto the bar end of the lower bar section than the position shown in Figure 1 in which the bar end is approximately half way along the length of the sleeve 29. This can be achieved by providing a dead spot in the thread of the sleeve 29 midway between its ends so that the threads on the bar end and sleeve will not mate beyond the position shown in Figure 1.
  • the section carrying the component 23 and coupling sleeve 29 is introduced into the hole but its upper end remains above the surface for the time being. It is held by means of a clamp which supports the weight of the section as well as preventing its rotation.
  • the section is gripped below the component 23 around the outer tube 16.
  • forks of a support device may be engaged on the flats 28 of the component 23.
  • the next section which carries the sleeve 21 is now introduced over the supported section.
  • the sleeve 21 is pre-packed with corrosion resistant grease or other material (and. if necessary, taped over to prevent dirt entering the grease or other material during transportation) so as substantially to fill the space within the coupling but allows movement of the coupled tendon during tensioning.
  • the two sections are engaged together by screwing the upper section. This results in engagement of the bar end of the upper section in the sleeve 29 and at the same time engaging the sleeve 21 over the component 23.
  • a coupling is completely secure when the inner bar ends of the adjacent section engage one another and this will coincide with a position in which the sleeve end 21 will abut against the flange 24 or will be within a defined distance from the flange 24 of a component 23.
  • coupling of the inner bar as well as the outer tube takes place simultaneously and reliably.
  • the coupling can be completed in a matter of a minute or two.
  • the clamp or support can then be released and the anchor lowered or driven further into the hole which has been prepared for it. Any appropriate number of sections can be added. It is to be understood that the anchor can be fitted in any orientation and therefore references to lowering the anchor into the hole may be inappropriate where the anchor is fitted horizontally or upwardly.
  • tension can be applied to the inner bar in conventional manner. It is usual to grip the outer end of the bar and apply appropriate force to it and then to turn the nut 15 so as to engage on the member 18 to retain the bar in tension. A cover 30 is finally fitted to enclose the bar end and nut.
  • the inner bar is normally coated with a release agent over parts of its length between the couplings, so as to allow for elongation when tension is applied.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Piles And Underground Anchors (AREA)
EP85309153A 1984-12-15 1985-12-16 Tirant d'ancrage dans le sol Expired EP0188890B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT85309153T ATE43147T1 (de) 1984-12-15 1985-12-16 Zuganker im erdreich.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8431715 1984-12-15
GB848431715A GB8431715D0 (en) 1984-12-15 1984-12-15 Ground anchors

Publications (2)

Publication Number Publication Date
EP0188890A1 true EP0188890A1 (fr) 1986-07-30
EP0188890B1 EP0188890B1 (fr) 1989-05-17

Family

ID=10571254

Family Applications (1)

Application Number Title Priority Date Filing Date
EP85309153A Expired EP0188890B1 (fr) 1984-12-15 1985-12-16 Tirant d'ancrage dans le sol

Country Status (4)

Country Link
EP (1) EP0188890B1 (fr)
AT (1) ATE43147T1 (fr)
DE (1) DE3570256D1 (fr)
GB (2) GB8431715D0 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2674555A1 (fr) * 1991-03-29 1992-10-02 Bouygues Sa Dispositif d'ancrage.
KR100436662B1 (ko) * 1996-10-21 2004-08-25 (주) 코리아에스이 어스앵커

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2077119A5 (fr) * 1970-01-28 1971-10-15 Moll Leonhard Kg
DE2019166A1 (de) * 1970-04-21 1971-11-11 Moll Kg Leonhard Injektionszuganker
FR2122094A5 (fr) * 1971-01-12 1972-08-25 Bauer Karlheinz

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2141436B1 (fr) * 1971-06-02 1973-06-29 Sif Entreprise Bachy

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2077119A5 (fr) * 1970-01-28 1971-10-15 Moll Leonhard Kg
DE2019166A1 (de) * 1970-04-21 1971-11-11 Moll Kg Leonhard Injektionszuganker
FR2122094A5 (fr) * 1971-01-12 1972-08-25 Bauer Karlheinz

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2674555A1 (fr) * 1991-03-29 1992-10-02 Bouygues Sa Dispositif d'ancrage.
KR100436662B1 (ko) * 1996-10-21 2004-08-25 (주) 코리아에스이 어스앵커

Also Published As

Publication number Publication date
EP0188890B1 (fr) 1989-05-17
DE3570256D1 (en) 1989-06-22
GB8529727D0 (en) 1986-01-08
GB8431715D0 (en) 1985-01-30
GB2169936B (en) 1988-05-25
ATE43147T1 (de) 1989-06-15
GB2169936A (en) 1986-07-23

Similar Documents

Publication Publication Date Title
EP0960266B1 (fr) Boulon serre-cable
US4239419A (en) Precast concrete threaded pilings
US7073296B2 (en) Preconstruction anchoring system and method for buildings
US4360292A (en) Grouted strand anchor and method of making same
US4124983A (en) Corrosion protected earth tieback
US4069677A (en) Anchor and method for constructing same
US3999391A (en) Tie-back anchor components and method for a shoring system
EP2609258B1 (fr) Système d'ancrage d'une charge
EP0060863B1 (fr) Procede et assemblage tendon de renforcement isole electriquement
GB2208533A (en) Anchoring device such as a rock anchor
US7975519B1 (en) Wind turbine installation comprising an apparatus for protection of anchor bolts and method
US4228627A (en) Reinforced foundation structure
US4112637A (en) Removable press anchor with destructible anchor body
US4081992A (en) Apparatus for load testing foundation shafts
US4132498A (en) Earth anchor and method of setting and removing same
GB1595432A (en) Precast concrete piling
KR100896963B1 (ko) 락볼트
EP0188890A1 (fr) Tirant d'ancrage dans le sol
DE19882104C1 (de) Verankerungsvorrichtung für einen Spann- und/oder Festanker
US9963849B1 (en) Tieback assembly with removable tendon threaded element
JPH0771034A (ja) 地盤アンカー構造
JPH0324665Y2 (fr)
US5286142A (en) Reduced moment anchor hub
EP1154077A1 (fr) Ancrage injecté récupérable
JPH0452318A (ja) 永久地盤アンカーの防食処理構造

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE FR GB IT LI LU NL SE

17P Request for examination filed

Effective date: 19870130

17Q First examination report despatched

Effective date: 19880316

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE FR IT LI LU NL SE

REF Corresponds to:

Ref document number: 43147

Country of ref document: AT

Date of ref document: 19890615

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3570256

Country of ref document: DE

Date of ref document: 19890622

ET Fr: translation filed
ITF It: translation for a ep patent filed

Owner name: BUGNION S.P.A.

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19891231

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 19901214

Year of fee payment: 6

Ref country code: AT

Payment date: 19901214

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 19901221

Year of fee payment: 6

ITTA It: last paid annual fee
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19901231

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19910115

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19910121

Year of fee payment: 6

EPTA Lu: last paid annual fee
REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: MICHAEL JOHN TURNER

Ref country code: CH

Ref legal event code: PFA

Free format text: WESTPILE LTD

NLT1 Nl: modifications of names registered in virtue of documents presented to the patent office pursuant to art. 16 a, paragraph 1

Owner name: WESTPILE LIMITED TE UXBRIDGE, GROOT-BRITTANNIE.

NLS Nl: assignments of ep-patents

Owner name: MICHAEL JOHN TURNER TE STEEPLE, GROOT-BRITTANNIE.

REG Reference to a national code

Ref country code: FR

Ref legal event code: TP

Ref country code: FR

Ref legal event code: CD

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19911216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Effective date: 19911217

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19911224

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19911231

Ref country code: CH

Effective date: 19911231

Ref country code: BE

Effective date: 19911231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19920131

Year of fee payment: 7

BERE Be: lapsed

Owner name: TIRNER MICHAEL JOHN

Effective date: 19911231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Effective date: 19920701

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19930831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19930901

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

EUG Se: european patent has lapsed

Ref document number: 85309153.6

Effective date: 19920704