EP0045658A1 - Gas inlet orifice monitoring - Google Patents

Gas inlet orifice monitoring Download PDF

Info

Publication number
EP0045658A1
EP0045658A1 EP81303556A EP81303556A EP0045658A1 EP 0045658 A1 EP0045658 A1 EP 0045658A1 EP 81303556 A EP81303556 A EP 81303556A EP 81303556 A EP81303556 A EP 81303556A EP 0045658 A1 EP0045658 A1 EP 0045658A1
Authority
EP
European Patent Office
Prior art keywords
orifice
pressure
gas
monitoring
formation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP81303556A
Other languages
German (de)
French (fr)
Inventor
Patrick Collins
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Steel Corp
Original Assignee
British Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Steel Corp filed Critical British Steel Corp
Publication of EP0045658A1 publication Critical patent/EP0045658A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/34Blowing through the bath

Definitions

  • This invention relates to gas inlet orifice monitoring and more particularly to a method of and apparatus for monitoring or controlling the operation of a gas inlet orifice below the surface of a liquid such as molten metal in a metallurgical vessel.
  • a method of monitoring the operation of a gas inlet orifice below the surface of a liquid under the action of positive gas pressure and with the formation of bubbles at the orifice comprising the steps of collecting signals indicative of the pressure of the gas flowing through the orifice; removing from such signals the components thereof indicative of the mean pressure of said gas; and monitoring from the remaining components of such signals the pressure fluctuations thereby detected and caused by the formation of gas bubbles at the orifice.
  • the invention is based upon the recognition that except in certain unusual and identifiable circumstances gases blown into a liquid via an orifice produce bubbles of gas; and that such bubble production causes gas pressure fluctuations, which are usually small but detectable; and that these pressure fluctuations constitute a uniquely recognisable "signature" of a particular orifice operating under specific conditions, which can be monitored for changes brought about by variations in gas flow rate, orifice obstruction, and liquid density changes for example so that operation of that nozzle can likewise be monitored.
  • the invention includes the steps of connecting the gas flowing through the orifice to a pressure transducer via two separate paths, in one of said paths filtering out pressure fluctuations caused by the formation of gas bubbles at the orifice, mutually opposing said two separate paths at said pressure transducer and monitoring the pressure fluctuations detected thereby.
  • the filtering in said one path may be achieved by forming that path from pipework having a length and cross-section determined from known criteria to damp and remove fluctuations of the frequency and magnitude which are determined to be related to the relevant bubble formation.
  • removal from the signals indicative of the gas flowing through the orifice of the components indicative of the mean pressure may be accomplished by means of an arrangement incorporating a piezo-electric transducer.
  • an electrical circuit, incorporating a filter network to eliminate signals indicative of the mean pressure may be connected to a piezo-electric interface device.
  • Such an arrangement can have high sensitivity even at high mean gas pressures such as might arise when the orifice is small and/or gas flow rates very high.
  • the method of monitoring provided by the invention is of especial applicability in relation to metallurgical process, in particular the production of iron and steel.
  • the operation of gas supplying tuyeres for metal treatment vessels are monitored as hereinabove defined. Operation of the tuyeres can be controlled in dependence on monitored changes in fluctuations, particularly frequency and magnitude changes.
  • a system of two or more concentric pipes might be used, usually with an oxidising or exothermic gas passing through an inner pipe or annulus and an indothermic gas passing through the outermost annulus.
  • Transducers would be fitted in the gas supply lines to detect the "signatures".
  • gases with perhaps only two gases involved, such as air and nitrogen, air would be supplied to the centre pipe with nitrogen passing through the annulus.
  • the pressure "signatures" for the core would be obtained with a clear tuyere for a range of flow rates i.e. datum "signatures".
  • the tuyere During subsequent operation, the tuyere would be operated by adjusting the flow of the coolant (nitrogen) to obtain a dynamic thermal and hydrostatic balance at the tuyere exit so that a slight build up of metal occurred at the exit.
  • This build up should be considered to be a sacrificial deposit which can be further eroded or built up depending on small thermal inequilibria.
  • the "signatures" of the core for this level of build up would also be determined and these would be the aim "signatures". In this way the aim and minimum level (datum) "signatures" for given core flow rates are established.
  • the coolant flow will be adjusted to ensure that the desired core "signature” is obtained, e.g. a "signature” denoting a reduction in orifice area will initiate a reduction in coolant flow to restore the signature to the aim. Similarly, a move from the aim "signature” towards the datum “signature” will initiate an increased coolant flow.
  • exit dimensions are variable up to the limit of the maximum of the pipe dimensions and this exit orifice size is controlled by adjusting the proportion of exothermic and endothermic fluids.
  • An undue increase in the endothermic fluid will result in local overcooling of the tuyere exit with subsequent chilling of the liquid phase above the tuyere on to the tuyere. This growth can continue until the tuyere exit dimension is reduced to the extent that the tuyere is blocked.
  • the exit size can therefore be controlled by adjusting the proportions of endothermic and exothermic fluids to achieve a satisfactory thermal balance in order to produce an orifice with acceptable fluid dynamic characteristics. These fluid dynamic characteristics would be related to gas dispersion patterns and the preventions of liquid ingress into the tuyere.
  • the method of monitoring herein defined can be used to detect the junction level between two liquids of different densities. In metallurgical processes this may comprise the detection of the metal/slag interface in vessels.
  • the method of monitoring can be used in a blast furnace by detecting the level of liquid metal in the hearth and by selecting the position of the orifice using this to optimise the slag tapping operation. If the orifice is located just below the slag tapping notch, then when the liquid iron signature is detected at that point, slag tapping would commence resulting in only a minimum of slag being carried down on top of the metal to the lower metal notch. A similar orifice could be located at the metal notch level to detect the absence of metal and by inference, prevent tapping any slag at all through the notch.
  • the method of monitoring can be used in a BOS vessel by detecting the level of steel above the tap hole entrance to minimise slag carry over. If the sensor is located beside the tap hole, then the gas flow rate can be adjusted so that at some I predetermined value, penetration of the gas through the liquid steel into the overlying slag without any formation of bubbles will be achieved recognised by a total loss of "signature", giving time to rotate the vessel before slag is carried over.
  • FIG. 1 it will be seen that there is illustrated a tuyere 1 having a consumable end 2 terminating in a nozzle 3 intended for connection into a metallurgical vessel below the molten metal surface therein.
  • a flush mounting diaphragm pressure transducer 4 is connected into the tuyere 1, the pressure diaphragm being connected in the tuyere flush to the gas stream at 5. By this means pipework resonance is avoided.
  • the negative pressure tapping of the transducer is connected via low volume filter pipework 6 to the tuyere at 7.
  • the filter pipework was selected by known criteria for filtering the relevant pressure fluctuations.
  • Signals from the transducer 4 are fed to a converter 8 which controls an oscillograph 9 providing a "signature" trace.
  • a typical "signature” trace is shown in Figure 2 at 10. As will be seen the amplitude of the "signature” is within a range of 100 mbar, when the gas pressure in the tuyere can be up to 7 bar. The time scale of the "signature” is indicated at 11.
  • FIG 3 is shown schematically a possible control arrangement for a tuyere arrangement for metal processing comprising two concentric pipes, the inner or core pipe carrying an exothermic gas and the outer or annular pipe carrying an endothermic or coolant gas.
  • the desired processing gas flow through the core pipe is measured at 12 and the base "signature" of the core, in particular the frequency of such "signature", at optimum operation is determined at 13. Thereafter during operation the "signature", particularly its frequency, is monitored at 14.
  • coolant gas flow to the outer pipe is maintained constant, or reduced if the frequency decreases (indicating an increase in solid metal build up at the tuyere nozzle), or increased if the frequency increases (indicating a decrease in solid metal build up at the tuyere nozzle).
  • the arrangement of Figure 1 can also be regarded as illustrative of an arrangement for monitoring the level of the junction between the liquid metal in the hearth of a blast furnace and the overlying slag layer.
  • 1 will represent a pipe with an orifice 3 which may be arranged to be located just below the slag tapping notch. As the slag is tapped and the metal level approaches the slag tapping notch, the bubble signal at the orifice 3 will charge to indicate the transition from slag to metal and slag tapping can be terminated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

The invention provides a method of monitoring the operation of a gas inlet orifice below the surface of a liquid under the action of positive gas pressure and with the formation of bubbles at the orifice, comprising the steps of collecting signals indicative of the pressure of the gas flowing through the orifice; removing from such signals the components thereof indicative of the mean pressure of said gas; and monitoring from the remaining components of such signals the pressure fluctuations thereby detected and caused by the formation of gas bubbles at the orifice.

Description

  • This invention relates to gas inlet orifice monitoring and more particularly to a method of and apparatus for monitoring or controlling the operation of a gas inlet orifice below the surface of a liquid such as molten metal in a metallurgical vessel.
  • According to the invention there is provided a method of monitoring the operation of a gas inlet orifice below the surface of a liquid under the action of positive gas pressure and with the formation of bubbles at the orifice, comprising the steps of collecting signals indicative of the pressure of the gas flowing through the orifice; removing from such signals the components thereof indicative of the mean pressure of said gas; and monitoring from the remaining components of such signals the pressure fluctuations thereby detected and caused by the formation of gas bubbles at the orifice.
  • The invention is based upon the recognition that except in certain unusual and identifiable circumstances gases blown into a liquid via an orifice produce bubbles of gas; and that such bubble production causes gas pressure fluctuations, which are usually small but detectable; and that these pressure fluctuations constitute a uniquely recognisable "signature" of a particular orifice operating under specific conditions, which can be monitored for changes brought about by variations in gas flow rate, orifice obstruction, and liquid density changes for example so that operation of that nozzle can likewise be monitored. f
  • In one embodiment the invention includes the steps of connecting the gas flowing through the orifice to a pressure transducer via two separate paths, in one of said paths filtering out pressure fluctuations caused by the formation of gas bubbles at the orifice, mutually opposing said two separate paths at said pressure transducer and monitoring the pressure fluctuations detected thereby.
  • The filtering in said one path may be achieved by forming that path from pipework having a length and cross-section determined from known criteria to damp and remove fluctuations of the frequency and magnitude which are determined to be related to the relevant bubble formation.
  • In an alternative embodiment of the invention removal from the signals indicative of the gas flowing through the orifice of the components indicative of the mean pressure may be accomplished by means of an arrangement incorporating a piezo-electric transducer. Thus an electrical circuit, incorporating a filter network to eliminate signals indicative of the mean pressure, may be connected to a piezo-electric interface device. Such an arrangement can have high sensitivity even at high mean gas pressures such as might arise when the orifice is small and/or gas flow rates very high.
  • The method of monitoring provided by the invention is of especial applicability in relation to metallurgical process, in particular the production of iron and steel.
  • Thus in one embodiment of the invention the operation of gas supplying tuyeres for metal treatment vessels are monitored as hereinabove defined. Operation of the tuyeres can be controlled in dependence on monitored changes in fluctuations, particularly frequency and magnitude changes.
  • In a typical production plant installation, a system of two or more concentric pipes might be used, usually with an oxidising or exothermic gas passing through an inner pipe or annulus and an indothermic gas passing through the outermost annulus. Transducers would be fitted in the gas supply lines to detect the "signatures". In the case say, of a process in steel production in which agitation and stirring of the melt is carried out by below-melt injection of gases with perhaps only two gases involved, such as air and nitrogen, air would be supplied to the centre pipe with nitrogen passing through the annulus. The pressure "signatures" for the core would be obtained with a clear tuyere for a range of flow rates i.e. datum "signatures". During subsequent operation, the tuyere would be operated by adjusting the flow of the coolant (nitrogen) to obtain a dynamic thermal and hydrostatic balance at the tuyere exit so that a slight build up of metal occurred at the exit. This build up should be considered to be a sacrificial deposit which can be further eroded or built up depending on small thermal inequilibria. 'The "signatures" of the core for this level of build up would also be determined and these would be the aim "signatures". In this way the aim and minimum level (datum) "signatures" for given core flow rates are established.
  • During the normal course of a processing cycle, the coolant flow will be adjusted to ensure that the desired core "signature" is obtained, e.g. a "signature" denoting a reduction in orifice area will initiate a reduction in coolant flow to restore the signature to the aim. Similarly, a move from the aim "signature" towards the datum "signature" will initiate an increased coolant flow.
  • By way of further explanation of this just mentioned arrangement it is to be noted that in the commercial operation of a tuyere the exit dimensions are variable up to the limit of the maximum of the pipe dimensions and this exit orifice size is controlled by adjusting the proportion of exothermic and endothermic fluids. An undue increase in the endothermic fluid will result in local overcooling of the tuyere exit with subsequent chilling of the liquid phase above the tuyere on to the tuyere. This growth can continue until the tuyere exit dimension is reduced to the extent that the tuyere is blocked. The exit size can therefore be controlled by adjusting the proportions of endothermic and exothermic fluids to achieve a satisfactory thermal balance in order to produce an orifice with acceptable fluid dynamic characteristics. These fluid dynamic characteristics would be related to gas dispersion patterns and the preventions of liquid ingress into the tuyere.
  • In another embodiment of the invention the method of monitoring herein defined can be used to detect the junction level between two liquids of different densities. In metallurgical processes this may comprise the detection of the metal/slag interface in vessels.
  • Thus in one application of this embodiment the method of monitoring can be used in a blast furnace by detecting the level of liquid metal in the hearth and by selecting the position of the orifice using this to optimise the slag tapping operation. If the orifice is located just below the slag tapping notch, then when the liquid iron signature is detected at that point, slag tapping would commence resulting in only a minimum of slag being carried down on top of the metal to the lower metal notch. A similar orifice could be located at the metal notch level to detect the absence of metal and by inference, prevent tapping any slag at all through the notch.
  • In another application of this embodiment, the method of monitoring can be used in a BOS vessel by detecting the level of steel above the tap hole entrance to minimise slag carry over. If the sensor is located beside the tap hole, then the gas flow rate can be adjusted so that at some I predetermined value, penetration of the gas through the liquid steel into the overlying slag without any formation of bubbles will be achieved recognised by a total loss of "signature", giving time to rotate the vessel before slag is carried over.
  • In order that the invention may be more readily understood embodiments thereof will now be described by way of example with reference to the accompanying drawings in which:-
    • Figure 1 is a schematic view of apparatus for monitoring the operation of a tuyere;
    • Figure 2 is a typical "signature" produced by the apparatus of Figure 1; and
    • Figure 3 is a control diagram for a double tuyere.
  • Referring to Figure 1 it will be seen that there is illustrated a tuyere 1 having a consumable end 2 terminating in a nozzle 3 intended for connection into a metallurgical vessel below the molten metal surface therein.
  • A flush mounting diaphragm pressure transducer 4 is connected into the tuyere 1, the pressure diaphragm being connected in the tuyere flush to the gas stream at 5. By this means pipework resonance is avoided. The negative pressure tapping of the transducer is connected via low volume filter pipework 6 to the tuyere at 7. The filter pipework was selected by known criteria for filtering the relevant pressure fluctuations.
  • By connecting the transducer in this manner the operation is independent of overall pressure which is always balanced on each side of the pressure diaphragm, only signals representative of pressure fluctuations or bubble "signature" being transmitted.
  • One result of this is that the risk of damage to the transducer caused by dramatic changes in pressure is greatly reduced.
  • Signals from the transducer 4 are fed to a converter 8 which controls an oscillograph 9 providing a "signature" trace.
  • A typical "signature" trace is shown in Figure 2 at 10. As will be seen the amplitude of the "signature" is within a range of 100 mbar, when the gas pressure in the tuyere can be up to 7 bar. The time scale of the "signature" is indicated at 11.
  • In Figure 3 is shown schematically a possible control arrangement for a tuyere arrangement for metal processing comprising two concentric pipes, the inner or core pipe carrying an exothermic gas and the outer or annular pipe carrying an endothermic or coolant gas. At optimum operation a slight build up of solid metal at the tuyere nozzle will exist. The desired processing gas flow through the core pipe is measured at 12 and the base "signature" of the core, in particular the frequency of such "signature", at optimum operation is determined at 13. Thereafter during operation the "signature", particularly its frequency, is monitored at 14. At 15 dependent on any frequency changes, coolant gas flow to the outer pipe is maintained constant, or reduced if the frequency decreases (indicating an increase in solid metal build up at the tuyere nozzle), or increased if the frequency increases (indicating a decrease in solid metal build up at the tuyere nozzle). By this means positive operational control of the tuyere function is achieved.
  • The arrangement of Figure 1 can also be regarded as illustrative of an arrangement for monitoring the level of the junction between the liquid metal in the hearth of a blast furnace and the overlying slag layer. In this case, for example, 1 will represent a pipe with an orifice 3 which may be arranged to be located just below the slag tapping notch. As the slag is tapped and the metal level approaches the slag tapping notch, the bubble signal at the orifice 3 will charge to indicate the transition from slag to metal and slag tapping can be terminated.

Claims (7)

1. A method of monitoring the operation of a gas inlet orifice below the surface of a liquid under the action of positive gas pressure and with the formation of bubbles at the orifice, comprising the steps of collecting signals indicative of the pressure of the gas flowing through the orifice; removing from such signals the components thereof indicative of the mean pressure of said gas; and monitoring from the remaining components of such signals the pressure fluctuations thereby detected and caused by the formation of gas bubbles at the orifice.
2. A method according to Claim 1 including the steps of connecting the gas flowing through the orifice to a pressure transducer via two separate paths, in one of said paths filtering out pressure fluctuations caused by the formation of gas bubbles at the orifice, mutually opposing said two separate paths at said pressure transducer and monitoring the pressure fluctuations detected thereby.
3. A method according to Claim 2 wherein the filtering in said one path is achieved by forming that path from pipework having a predetermined length and cross-section such as to remove fluctuations in pressure of frequency and magnitude of the order of the relevant bubble formation.
4. A method according to Claim 1 including the steps of connecting the gas flowing through the orifice to a piego- I electric transducer, and passing the signal produced thereby through an electrical filter network to eliminate signals indicative of the mean gas pressure.
5. A method of monitoring the operation of a gas inlet orifice substantially as hereinbefore described with reference to the accompanying drawings.
6. A method of monitoring the operation of a below-melt tuyere incorporating a method according to any one of the preceding claims.
7. A method of detecting the junction level between two liquids incorporating a method according to any one of Claims 1 to 6.
EP81303556A 1980-08-06 1981-08-04 Gas inlet orifice monitoring Withdrawn EP0045658A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8025717 1980-08-06
GB8025717 1980-08-06

Publications (1)

Publication Number Publication Date
EP0045658A1 true EP0045658A1 (en) 1982-02-10

Family

ID=10515289

Family Applications (1)

Application Number Title Priority Date Filing Date
EP81303556A Withdrawn EP0045658A1 (en) 1980-08-06 1981-08-04 Gas inlet orifice monitoring

Country Status (2)

Country Link
EP (1) EP0045658A1 (en)
GB (1) GB2081911A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989001982A1 (en) * 1987-08-24 1989-03-09 Mannesmann Ag Process and device for minimizing process gas consumption in metallurgical processes
WO2004046390A1 (en) * 2002-11-16 2004-06-03 Sms Demag Aktiengesellschaft Gas supply system for a metallurgical furnace and operating method for said system
CN103658221A (en) * 2013-12-19 2014-03-26 江阴江顺铝型材成套设备制造有限公司 Device for measuring pressure of air inlet of combustion chamber of hot shearing furnace

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1253581A (en) * 1968-02-24 1971-11-17 Maximilianshuette Eisenwerk Improvements in processes and apparatus for making steel
GB1356225A (en) * 1971-08-18 1974-06-12 Allegheny Ludlum Ind Inc Method and apparatus for determining the depth of submerged lances and the like
GB1447642A (en) * 1972-08-01 1976-08-25 Uss Eng & Consult Method and apparatus for controlling the operation of a steel refining converter
JPS5266466A (en) * 1975-11-29 1977-06-01 Nippon Steel Corp Detectin of molten metal levels within molten steel vessel such as mol ds for continous casting
DE2326754B2 (en) * 1973-05-25 1977-08-18 DEVICE FOR THE CONTROLLED SUPPLY OF A FRESH GAS AND A FLUID PROTECTIVE MEDIUM
GB2003591A (en) * 1977-08-26 1979-03-14 British Steel Corp Control system for blowing passages

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1253581A (en) * 1968-02-24 1971-11-17 Maximilianshuette Eisenwerk Improvements in processes and apparatus for making steel
GB1356225A (en) * 1971-08-18 1974-06-12 Allegheny Ludlum Ind Inc Method and apparatus for determining the depth of submerged lances and the like
GB1447642A (en) * 1972-08-01 1976-08-25 Uss Eng & Consult Method and apparatus for controlling the operation of a steel refining converter
DE2326754B2 (en) * 1973-05-25 1977-08-18 DEVICE FOR THE CONTROLLED SUPPLY OF A FRESH GAS AND A FLUID PROTECTIVE MEDIUM
JPS5266466A (en) * 1975-11-29 1977-06-01 Nippon Steel Corp Detectin of molten metal levels within molten steel vessel such as mol ds for continous casting
GB2003591A (en) * 1977-08-26 1979-03-14 British Steel Corp Control system for blowing passages

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN Vol. 1, No. 132, 31 October 1977, page 5960E77 & JP-A-52 066 466 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1989001982A1 (en) * 1987-08-24 1989-03-09 Mannesmann Ag Process and device for minimizing process gas consumption in metallurgical processes
WO2004046390A1 (en) * 2002-11-16 2004-06-03 Sms Demag Aktiengesellschaft Gas supply system for a metallurgical furnace and operating method for said system
AU2003276022B2 (en) * 2002-11-16 2009-01-22 Sms Demag Aktiengesellschaft Gas supply system for a metallurgical furnace and operating method for said system
US7691320B2 (en) 2002-11-16 2010-04-06 Sms Demag Ag Gas supply system for a metallurgical furnace and operating method for said system
KR101024248B1 (en) * 2002-11-16 2011-03-29 에스엠에스 지마크 악티엔게젤샤프트 Gas supply system for a metallurgical furnace and operating method for said system
US7998400B2 (en) * 2002-11-16 2011-08-16 Sms Siemag Aktiengesellschaft Gas supply system for a metallurgical furnace and method for operating this system
CN103658221A (en) * 2013-12-19 2014-03-26 江阴江顺铝型材成套设备制造有限公司 Device for measuring pressure of air inlet of combustion chamber of hot shearing furnace
CN103658221B (en) * 2013-12-19 2015-12-30 江阴江顺铝型材成套设备制造有限公司 A kind of hot shearing furnace combustion chamber air inlet pressure tester

Also Published As

Publication number Publication date
GB2081911A (en) 1982-02-24

Similar Documents

Publication Publication Date Title
US6737014B2 (en) Slag detector for molten steel transfer operations
CA2195530C (en) Method and apparatus for detecting the condition of the flow of liquid metal in and from a teeming vessel
US4651976A (en) Method for operating a converter used for steel refining
EP0045658A1 (en) Gas inlet orifice monitoring
JP3245423B2 (en) Method and apparatus for adjusting the height of liquid metal in a mold for continuous casting of metal
CN107110605B (en) System and method for collecting and analyzing data relating to operating conditions of a top-submerged lancing injector reactor system
EP1918703B1 (en) Acoustic emission control of slag height in a steelmaking process
US4359211A (en) Method of and apparatus for measuring level and characteristics of a slag layer overlying a metallurgical metal
US5028033A (en) Process for detecting outflow of slag
US4481809A (en) Method and apparatus for monitoring erosion in gas stirring devices in molten metal ladles
CN112157240B (en) Method for detecting blockage of submerged nozzle of crystallizer
JPH09236461A (en) Decision method and device for slug outflow
ISO et al. Development of Bottom-Blowing Nozzle for Combined Blowing Converter
CN219972359U (en) Water-break emergency device for furnace cover of refining furnace
JP2971336B2 (en) Slag cut control method and slag cut device in molten metal refining furnace
Vazquez Tenova’s intelligent i BOF® technology, a modular package for BOF process improvement
JPH1017911A (en) Method for diagnosing breakage of tuyere
JP3082656B2 (en) Detection method of boiling in continuous casting machine mold
CA2040238A1 (en) Method for determining and regulating the level of a bath of molten metal
JPH0217263B2 (en)
JPH0211257A (en) Method for diagnosing inclusion series internal defect in continuously cast slab and continuous casting method by using this method
JPS6182956A (en) Detector for nozzle clogging
RU2113505C1 (en) Method of melt treatment in ladle with varying position of lance
JP2941597B2 (en) Molten metal injection flow measurement method
JP2584382B2 (en) Apparatus and method for monitoring abnormal erosion of triple tube tuyere

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): BE DE NL SE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BRITISH STEEL CORPORATION

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19830116

RIN1 Information on inventor provided before grant (corrected)

Inventor name: COLLINS, PATRICK