EA201900406A1 - METHOD FOR INSTALLING A HEIGHT ROOF SUPPORT ON A BUILDING ROOF - Google Patents

METHOD FOR INSTALLING A HEIGHT ROOF SUPPORT ON A BUILDING ROOF

Info

Publication number
EA201900406A1
EA201900406A1 EA201900406A EA201900406A EA201900406A1 EA 201900406 A1 EA201900406 A1 EA 201900406A1 EA 201900406 A EA201900406 A EA 201900406A EA 201900406 A EA201900406 A EA 201900406A EA 201900406 A1 EA201900406 A1 EA 201900406A1
Authority
EA
Eurasian Patent Office
Prior art keywords
equipment
roof
building
rise support
height
Prior art date
Application number
EA201900406A
Other languages
Russian (ru)
Other versions
EA035611B1 (en
Inventor
Арна Сериковна ШИЛИКБАЕВА
Улан Серикович ШИЛИКБАЕВ
Серик Кадырович ШИЛИКБАЕВ
Original Assignee
Арна Сериковна ШИЛИКБАЕВА
Улан Серикович ШИЛИКБАЕВ
Серик Кадырович ШИЛИКБАЕВ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Арна Сериковна ШИЛИКБАЕВА, Улан Серикович ШИЛИКБАЕВ, Серик Кадырович ШИЛИКБАЕВ filed Critical Арна Сериковна ШИЛИКБАЕВА
Publication of EA201900406A1 publication Critical patent/EA201900406A1/en
Publication of EA035611B1 publication Critical patent/EA035611B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/08Means for collapsing antennas or parts thereof
    • H01Q1/10Telescopic elements
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01QANTENNAS, i.e. RADIO AERIALS
    • H01Q1/00Details of, or arrangements associated with, antennas
    • H01Q1/12Supports; Mounting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/30Wind power

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Support Of Aerials (AREA)

Abstract

Способ предназначен для монтажа высотной опоры, вдоль которой во время сборки в горизонтальном положении размещают излучающее и принимающее электромагнитные волны оборудование. Обеспечивают осуществление сборки на крыше здания в стесненных условиях площадки, а также повороты основного обода и высотной опоры отдельно друг от друга, с дальнейшим увеличением высоты размещения оборудования после приведения их в вертикальные положения. Обеспечение доступа к оборудованию при помощи выдвижной стремянки на базе вспомогательного обода с возможностью регулирования геометрических размеров конструкции из не пропускающих электромагнитные волны материалов позволяет увеличить производительность оборудования за счет повышения его допустимой мощности и ослабить электромагнитное поле до полного его исключения в заданной области крыши здания. Способ позволяет повысить эффективность использования оборудования на высотной опоре, поворачиваемой и удерживаемой с использованием двух ободьев.The method is intended for mounting a high-rise support, along which, during assembly, equipment emitting and receiving electromagnetic waves is placed in a horizontal position. They provide the implementation of the assembly on the roof of the building in the cramped conditions of the site, as well as the turns of the main rim and the high-rise support separately from each other, with a further increase in the height of the equipment placement after bringing them into vertical positions. Providing access to the equipment using a retractable ladder based on an auxiliary rim with the possibility of adjusting the geometric dimensions of the structure made of materials that do not transmit electromagnetic waves, allows increasing the performance of the equipment by increasing its permissible power and weakening the electromagnetic field until it is completely eliminated in a given area of the building roof. The method makes it possible to increase the efficiency of using the equipment on a high-rise support, which is rotated and held using two rims.

EA201900406A 2019-03-27 2019-08-16 Method for mounting a tower support on a building roof EA035611B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KZ20190219 2019-03-27

Publications (2)

Publication Number Publication Date
EA201900406A1 true EA201900406A1 (en) 2020-05-29
EA035611B1 EA035611B1 (en) 2020-07-15

Family

ID=70847651

Family Applications (1)

Application Number Title Priority Date Filing Date
EA201900406A EA035611B1 (en) 2019-03-27 2019-08-16 Method for mounting a tower support on a building roof

Country Status (2)

Country Link
EA (1) EA035611B1 (en)
WO (1) WO2020197371A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908979A (en) * 2022-06-19 2022-08-16 重庆建工第二建设有限公司 Construction and installation method of special-shaped component of super high-rise building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107253B (en) * 2021-04-08 2023-03-31 云南电网有限责任公司电力科学研究院 Device for adjusting inclination angle of transmission tower

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1339082A (en) * 1918-09-12 1920-05-04 J A Greene Pole-setting device
EA200300174A1 (en) * 2003-02-20 2004-08-26 Открытое Акционерное Общество "Оборонительные Системы" METHOD OF LIFT-FOLDING OF ANTEN-MAST SYSTEM AND HYDROMECHANICAL DEVICE FOR ITS IMPLEMENTATION
FR2912450B1 (en) * 2007-02-12 2011-09-16 Richard Lavaur WIND TURBINE WITH FOLDING MAT AND METHOD OF USING SUCH A WINDMILL.
FR2918420B1 (en) * 2007-07-02 2017-07-07 Serameca WIND TURBINE WITH FOLDING MAT
RU2451145C1 (en) * 2010-09-13 2012-05-20 Общество с ограниченной ответственностью "Строительно-Монтажная Компания Сибирь" (ООО "СМК Сибирь") Method to install tower support
EA030853B1 (en) * 2014-11-12 2018-10-31 Серик Кадырович ШИЛИКБАЕВ Method for erection of high-tower support

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908979A (en) * 2022-06-19 2022-08-16 重庆建工第二建设有限公司 Construction and installation method of special-shaped component of super high-rise building
CN114908979B (en) * 2022-06-19 2023-08-11 重庆建工第二建设有限公司 Construction and installation method of super high-rise building special-shaped component

Also Published As

Publication number Publication date
WO2020197371A1 (en) 2020-10-01
EA035611B1 (en) 2020-07-15

Similar Documents

Publication Publication Date Title
EA201900406A1 (en) METHOD FOR INSTALLING A HEIGHT ROOF SUPPORT ON A BUILDING ROOF
MX353748B (en) Tower erection system and method.
WO2011118937A3 (en) Bird repeller
MX2015017387A (en) Wind turbine with concrete tower and assembly process of wind turbine with concrete tower.
WO2019204895A3 (en) Offshore wind turbines and methods for deploying and installing same
EA202091299A1 (en) RETAINING PLATFORM ASSEMBLY
CL2013002638A1 (en) Method for assembling a concentrated solar light tower assembly for a solar power plant, which comprises building a foundation, installing a sliding arrangement, building a hollow tower structure, building a steam generator receiver, placing an elevator system, and sliding and raise the solar steam generator receiver; concentrated solar light tower set.
PH12018500779A1 (en) A system and method for raising and lowering a component of a wind turbine
FI3301064T3 (en) Apparatus for lifting heavy loads and method for assembling or disassembling an apparatus for lifting heavy loads
UY32233A (en) MULTI CIRCUITED ELECTRIC CEILING GRILLE
CN105360106A (en) Stretchable anti-bird needle plate
RU167281U1 (en) ELECTRIC TRANSMISSION SUPPORT TRAILER
EA201500456A1 (en) METHOD OF INSTALLATION OF HIGH-HEIGHT SUPPORT
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
JP5868471B1 (en) Solar power generation device installation method, solar power generation device, solar power generation panel mounting base, solar power generation panel mounting base
RU130336U1 (en) ANTENNA SUPPORT OF THE TOWER TYPE
CN103306533B (en) Steel column band base construction system and disposable installing and fixing method thereof
RU108069U1 (en) ANTENNA MAST
FR2964960B1 (en) LIFTING ASSEMBLY
CN204782186U (en) Illumination formula communication tower
CN204571798U (en) The special installation ladder of a kind of dynamometer instrument case
CN109668087A (en) A kind of reinforcing twin-stage street lamp
ES1303652Y (en) East/west aerial photovoltaic solar installation
CN106703233A (en) Novel sound-proof wall support

Legal Events

Date Code Title Description
MM4A Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s)

Designated state(s): AM KZ TM