EA020732B1 - Method to erect pile foundation - Google Patents
Method to erect pile foundation Download PDFInfo
- Publication number
- EA020732B1 EA020732B1 EA201101511A EA201101511A EA020732B1 EA 020732 B1 EA020732 B1 EA 020732B1 EA 201101511 A EA201101511 A EA 201101511A EA 201101511 A EA201101511 A EA 201101511A EA 020732 B1 EA020732 B1 EA 020732B1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- pile
- soil
- solution
- strengthening
- piles
- Prior art date
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
Description
Изобретение относится к области строительства, а именно к способам возведения свайных фундаментов зданий и сооружений преимущественно на просадочных грунтах.The invention relates to the field of construction, and in particular to methods of construction of pile foundations of buildings and structures mainly on subsiding soils.
Известен способ возведения свайного фундамента на просадочных грунтах, включающий образование скважин на всю глубину просадочного грунта с заглублением в подстилающий непросадочный грунт, заполнение скважин дренирующим материалом, обваловывание территории по периметру сооружения, замачивание путем заливки воды на обвалованную территорию с выдерживанием в течение 15-30 дней и погружение свай в скважины (а. с. СССР № 885446, дата приоритета 19.03.1980, дата публикации 30.11.1981, авторы Руденко Л.К. и др.).There is a method of constructing a pile foundation on subsidence soils, including the formation of wells to the entire depth of subsidence soil with deepening in the underlying non-subsidence soil, filling wells with drainage material, bunding the area around the perimeter of the structure, soaking by pouring water into the bunded area with holding for 15-30 days and immersion of piles into wells (a. from the USSR No. 885446, priority date 03/19/1980, publication date 11/30/1981, authors Rudenko L.K. et al.).
Недостатком известного способа является ограниченная область применения в связи с возможностью его эффективной реализации только при положительных температурах.The disadvantage of this method is the limited scope in connection with the possibility of its effective implementation only at positive temperatures.
Известен способ возведения свайного фундамента, принятый в качестве прототипа, в котором осуществляют установку свай с последующим их укреплением путем подачи в грунт в два этапа твердеющего раствора под давлением, причем сначала подачу твердеющего раствора осуществляют по периферии укрепляемых свай, а после затвердения раствора по периферийному контуру осуществляют подачу твердеющего раствора в зону, ограниченную периферийным контуром, в том числе и межсвайное пространство, при этом на обоих этапах введение в грунт укрепляющего раствора осуществляют либо с помощью инъекторов, которые забивают в грунт на глубину уплотнения, либо предварительно по периферии группы укрепляемых свай и внутри межсвайного пространства бурят скважины, в которые подают твердеющий раствор под давлением (патент РФ № 2379419, дата приоритета 27.11.2007, дата публикации 10.06.2009, авторы Лубягин А.В. и др., прототип).A known method of construction of a pile foundation, adopted as a prototype, in which the installation of piles is carried out, followed by their strengthening by feeding into the soil in two stages of a hardening mortar under pressure, and first, the supply of a hardening mortar is carried out on the periphery of the reinforced piles, and after hardening the solution along the peripheral contour hardening mortar is supplied into the zone limited by the peripheral contour, including the inter-pile space, at the same time, at both stages, the introduction of a strengthening solution into the soil thieves are carried out either with the help of injectors that are driven into the ground to a depth of compaction, or wells are first drilled around the periphery of the group of reinforced piles and inside the inter-pile space, into which hardening solution is supplied under pressure (RF patent No. 2379419, priority date 11.27.2007, publication date 06/10/2009, authors A. Lubyagin et al., Prototype).
Недостатком прототипа является неоднородное укрепление грунта вокруг сваи, обусловленное тем, что при гидроразрыве под действием подаваемого в грунт под давлением твердеющего раствора за счет изменения напряженного состояния траектория трещины при подходе к зоне уплотнения вокруг сваи будет искривляться и огибать это препятствие, находя более слабые участки в межсвайном пространстве, к тому же способ может оказаться экономически невыгодным из-за большого расхода неэффективно используемого твердеющего раствора и трудозатрат по осуществлению его введения в грунт.The disadvantage of the prototype is the heterogeneous strengthening of the soil around the pile, due to the fact that during hydraulic fracturing under the action of a hardening solution supplied to the soil under pressure due to a change in the stress state, the crack path will bend and bend around this obstacle, finding weaker sections in inter-pile space, moreover, the method may be economically disadvantageous due to the high consumption of inefficiently hardening mortar and labor costs its introduction into the ground.
Задачей изобретения является повышение эффективности укрепления грунта вокруг сваи при снижении трудозатрат и сокращении расхода твердеющего материала.The objective of the invention is to increase the effectiveness of strengthening the soil around the pile while reducing labor costs and reducing the consumption of hardening material.
Для решения поставленной задачи в способе возведения свайного фундамента, включающем установку свай и укрепление околосвайного грунта путем армирования его раствором твердеющего материала, согласно изобретению перед установкой сваи бурят скважину диаметром не более 1/3 диаметра сваи, заполняют скважину закрепляющим раствором, погружают сваю в заполненную закрепляющим раствором скважину с образованием под пятой и вокруг ствола сваи закрепленной и уплотненной зон в форме полусферы снизу и усеченного конуса над ней, причем к свае примыкает закрепленная зона, армированная закрепляющим раствором и расположенная в объеме уплотненной зоны.To solve the problem in a method of constructing a pile foundation, including installing piles and strengthening the near-pile soil by reinforcing it with a solution of hardening material, according to the invention, before installing the piles, they drill a well with a diameter of not more than 1/3 of the diameter of the pile, fill the well with a fixing solution, immerse the pile in a filled fixing well solution with the formation under the fifth and around the trunk piles of fixed and compacted zones in the form of a hemisphere below and a truncated cone above it, and adjacent to the pile There is a fixed zone reinforced with a fixing solution and located in the volume of the compacted zone.
Согласно изобретению при погружении сваи может быть использована устанавливаемая по месту забивки сваи направляющая шайба.According to the invention, when immersing the piles, a guide washer installed at the place of driving the piles can be used.
Согласно изобретению в качестве закрепляющего раствора используют жидкое стекло.According to the invention, liquid glass is used as the fixing solution.
Способ поясняется чертежами, на которых показана схема уплотнения грунта вокруг сваи: на фиг. 1 - продольный разрез сваи; на фиг. 2 - поперечный разрез А-А на фиг. 1.The method is illustrated by drawings, in which a diagram of soil compaction around a pile is shown: in FIG. 1 is a longitudinal section of a pile; in FIG. 2 is a transverse section aa in FIG. one.
Способ возведения свайного фундамента осуществляют следующим образом. По месту установки каждой сваи 1 в грунте бурят скважину диаметром не более 1/3 диаметра сваи (условно не показано). В пробуренную скважину нагнетают закрепляющий раствор, обладающий сцепляемостью с грунтом, в качестве которого используют, например, жидкое стекло (силикат натрия). В заполненную жидким стеклом скважину погружают вдавливанием или забивкой сваю 1. При этом в результате воздействия на сваю соответственно статической или динамической нагрузки под пятой и вокруг ствола сваи образуются две зоны в форме полусферы под сваей снизу и усеченного конуса над полусферой сверху, а именно примыкающая к стволу сваи закрепленная зона 2, армированная жидким стеклом, и уплотненная зона 3. Объемы закрепленной 2 и уплотненной 3 зон определяются расчетным путем и зависят в основном от пористости грунта, его реологических свойств и других технологических параметров процесса. Примыкающая к стволу сваи закрепленная зона 2, образованная в результате заполнения пор под давлением жидким стеклом и схватывания его с грунтом, характеризуется тем, что радиус ее полусферы не будет превышать радиуса уплотненной зоны 3, охватывающей укрепленную зону 2, и будет зависеть от величины заполнения пор закрепляющим раствором, которая в основном зависит от пористости грунта и других факторов. Одним из них является, например, использование направляющей шайбы 4 при погружении свай для центрирования нагрузки и предотвращения вытекания закрепляющего раствора из скважины. Особенно актуально использование направляющей шайбы 4 при погружении свай забивкой, т.е. при динамическом погружении. При этом над скважиной после ее заполнения жидким стеклом по месту забивки сваи устанавливают в качестве направляющей шайбы съемную металлическую обойму с отверстием для сваи. Далее предварительно изготовленную и замоченную 1%-ным раствором соляной кислоты железобетонную сваю погружают забивкой, вдавливанием или вибропогружением на заданную глубину, образуя под ееThe method of construction of the pile foundation is as follows. At the location of each pile 1 in the soil, a well is drilled with a diameter of not more than 1/3 of the diameter of the pile (not shown conditionally). Fixing solution having adhesion to the soil is injected into the drilled well, for example, using liquid glass (sodium silicate). Pile 1 is immersed in the well filled with liquid glass by indentation or driving. As a result of exposure to the pile, respectively, of a static or dynamic load under the fifth and around the trunk of the pile, two zones are formed in the form of a hemisphere under the pile below and a truncated cone above the hemisphere above, namely, adjacent to the pile shaft, fixed zone 2, reinforced with liquid glass, and compacted zone 3. The volumes of fixed 2 and compacted 3 zones are determined by calculation and depend mainly on the porosity of the soil, its rheological properties and other technological process parameters. The fixed zone 2 adjacent to the pile shaft, formed as a result of filling pores under pressure with liquid glass and setting it with soil, is characterized by the fact that the radius of its hemisphere will not exceed the radius of the compacted zone 3, covering the fortified zone 2, and will depend on the amount of pore filling fixing solution, which mainly depends on the porosity of the soil and other factors. One of them is, for example, the use of a guide washer 4 when immersing piles to center the load and prevent the outflow of fixing solution from the well. The use of the guide washer 4 is especially important when diving piles by driving, i.e. with dynamic immersion. At the same time, above the well after filling it with liquid glass at the place of pile driving, a removable metal clip with a hole for the pile is installed as a guide washer. Next, a reinforced concrete pile prefabricated and soaked with a 1% hydrochloric acid solution is immersed by driving, indenting or vibration dipping to a predetermined depth, forming under it
- 1 020732 пятой уплотненную полусферическую зону радиусом, составляющим не менее 2,75 диаметра сваи, и уплотненную зону вокруг ствола сваи в виде усеченного конуса с диаметрами оснований, равными соответственно в нижней части двум радиусам полусферы, а в верхней части - диаметру сваи. При этом уплотненная зона армируется непосредственно под пятой и вокруг ствола сваи жидким стеклом и тем самым закрепляется, образуя внутри примыкающую к свае закрепленную зону 2.- 1,020,732 the fifth sealed hemispherical zone with a radius of at least 2.75 of the diameter of the pile, and the sealed zone around the pile shaft in the form of a truncated cone with base diameters equal respectively to the two hemisphere radii in the lower part and the pile diameter in the upper part. In this case, the sealed zone is reinforced directly under the fifth and around the pile shaft with liquid glass and is thereby fixed, forming inside the adjacent zone 2 adjacent to the pile.
Преимуществом предлагаемого способа возведения свайного фундамента является высокая его эффективность, обусловленная высокой несущей способностью свай, снижением трудозатрат и сокращением расхода твердеющего материала, за счет более технологичного армирования твердеющим материалом, обеспечивающего однородность закрепляемого грунта вокруг сваи в объеме уплотненного грунта, а также снижение трудозатрат и сокращение расхода твердеющего материала в связи с исключением операций укрепления грунта по периферии группы укрепляемых свай и внутри межсвайного пространства.The advantage of the proposed method of construction of the pile foundation is its high efficiency, due to the high bearing capacity of the piles, reduced labor costs and reduced consumption of hardening material, due to more technological reinforcement with hardening material, ensuring uniformity of the fixed soil around the pile in the volume of compacted soil, as well as reducing labor costs and reducing consumption of hardening material due to the exclusion of soil strengthening operations along the periphery of the group of reinforced piles and inside the interspace.
Claims (3)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2011106080/03A RU2456408C1 (en) | 2011-02-17 | 2011-02-17 | Method to erect pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
EA201101511A1 EA201101511A1 (en) | 2012-08-30 |
EA020732B1 true EA020732B1 (en) | 2015-01-30 |
Family
ID=46827020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201101511A EA020732B1 (en) | 2011-02-17 | 2011-11-16 | Method to erect pile foundation |
Country Status (2)
Country | Link |
---|---|
EA (1) | EA020732B1 (en) |
RU (1) | RU2456408C1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2535556C1 (en) * | 2013-08-20 | 2014-12-20 | Михаил Борисович Пермяков | Pile and its erection method |
RU2640059C1 (en) * | 2016-12-28 | 2017-12-26 | Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) | Method of manufacturing drill-driven pile |
RU2678251C2 (en) * | 2017-07-17 | 2019-01-24 | Государственное автономное образовательное учреждение Астраханской области высшего образования Астраханский Государственный Архитектурно-Строительный Университет | Method of creating broadening at end of screw pile |
RU2753295C1 (en) * | 2020-11-10 | 2021-08-12 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Method for pile construction in macro-porous soils |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3842608A (en) * | 1972-11-28 | 1974-10-22 | L Turzillo | Method and means for installing load bearing piles in situ |
SU489846A1 (en) * | 1973-05-08 | 1975-10-30 | Одесский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" | Zabivna sva |
SU1481331A1 (en) * | 1986-09-09 | 1989-05-23 | Ростовский государственный университет им.М.А.Суслова | Method of setting a pile in loess soil |
RU2150549C1 (en) * | 1997-01-06 | 2000-06-10 | Новосибирская государственная академия строительства | Method and device for moulding of cast-in- place pile in ground |
RU2379419C2 (en) * | 2007-11-27 | 2010-01-20 | Общество с ограниченной ответственностью промышленно-строительная компания "Фундамент" | Method of increasing bearing strength of piling |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU730935A1 (en) * | 1977-06-13 | 1980-04-30 | Строительное Управление N28 Тираспольского Стройтреста | Method of erecting pile foundation |
SU885446A1 (en) * | 1980-03-19 | 1981-11-30 | Трест "Николаевсельстрой" | Method of constructing pile foundation on sagging soil |
RU2163281C1 (en) * | 2000-05-22 | 2001-02-20 | Дубина Михаил Михайлович | Pile-slab foundation and method of its construction |
-
2011
- 2011-02-17 RU RU2011106080/03A patent/RU2456408C1/en not_active IP Right Cessation
- 2011-11-16 EA EA201101511A patent/EA020732B1/en not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3842608A (en) * | 1972-11-28 | 1974-10-22 | L Turzillo | Method and means for installing load bearing piles in situ |
SU489846A1 (en) * | 1973-05-08 | 1975-10-30 | Одесский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" | Zabivna sva |
SU1481331A1 (en) * | 1986-09-09 | 1989-05-23 | Ростовский государственный университет им.М.А.Суслова | Method of setting a pile in loess soil |
RU2150549C1 (en) * | 1997-01-06 | 2000-06-10 | Новосибирская государственная академия строительства | Method and device for moulding of cast-in- place pile in ground |
RU2379419C2 (en) * | 2007-11-27 | 2010-01-20 | Общество с ограниченной ответственностью промышленно-строительная компания "Фундамент" | Method of increasing bearing strength of piling |
Also Published As
Publication number | Publication date |
---|---|
RU2456408C1 (en) | 2012-07-20 |
EA201101511A1 (en) | 2012-08-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105951880A (en) | Assembled underground structure of precast concrete planks and construction method thereof | |
RU2456408C1 (en) | Method to erect pile foundation | |
CN110397057B (en) | Self-sinking type steel open caisson supporting system and method for soft soil area | |
CN106013171A (en) | Semi-rigid and semi-flexible support structure and method for deep foundation pit side wall | |
KR100651671B1 (en) | Construction method using caisson | |
CN102220764B (en) | Construction method of deep foundation pit bracing system | |
RU2556588C1 (en) | Pile foundation for arrangement of supports of overhead power transmission line | |
CN112482367A (en) | Foundation pit support pile for replacing cast-in-place pile rock-socketed with steel pipe pile | |
CN106245641A (en) | PHC pile tube post grouting construction technique and PHC pile tube composite pile | |
RU2492294C1 (en) | Pipe concrete pile with reinforced base and method of its erection | |
RU2275470C1 (en) | Method of floating pile load-bearing capacity increase | |
RU2441115C1 (en) | Pile with increased resistance to swelling | |
RU2491387C1 (en) | Method to erect recessed structures and underground structures of buildings | |
RU2089706C1 (en) | Pile frozen into permafrost and method of erection of pile frozen into permafrost | |
CN221442184U (en) | Building wall reinforcing structure without entering home | |
RU2619964C1 (en) | Method for increasing bearing capacity of pile pier | |
RU2321703C1 (en) | Method for pile-and-mat foundation erection | |
RU2753295C1 (en) | Method for pile construction in macro-porous soils | |
CN115305977B (en) | Foundation reinforcement method for cliff building | |
RU2819680C1 (en) | Method of increasing bearing capacity and durability of piles | |
RU2807350C1 (en) | Constructive and technological solution for foundation of intermediate support of high pile work type constructed in temporary enclosing structure | |
RU2325483C1 (en) | Technique for erecting solid core foundation slab | |
CN118207884B (en) | Existing building dismantling and newly-built building foundation pit supporting cross comprehensive construction method | |
CN207919586U (en) | A kind of large span arch bridge basis | |
RU100529U1 (en) | PILED BRACKET WITH INCREASED RESISTANCE TO TURNS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s) |
Designated state(s): AM AZ BY KZ KG MD TJ TM RU |