GB0900348D0
(en)
*
|
2009-01-09 |
2009-02-11 |
Sensor Developments As |
Pressure management system for well casing annuli
|
GB0900446D0
(en)
*
|
2009-01-12 |
2009-02-11 |
Sensor Developments As |
Method and apparatus for in-situ wellbore measurements
|
GB2475910A
(en)
*
|
2009-12-04 |
2011-06-08 |
Sensor Developments As |
Wellbore measurement and control with inductive connectivity
|
GB201012175D0
(en)
|
2010-07-20 |
2010-09-01 |
Metrol Tech Ltd |
Procedure and mechanisms
|
GB201012176D0
(en)
*
|
2010-07-20 |
2010-09-01 |
Metrol Tech Ltd |
Well
|
US9274038B2
(en)
|
2012-02-23 |
2016-03-01 |
Halliburton Energy Services, Inc. |
Apparatus and method for constant shear rate and oscillatory rheology measurements
|
WO2013142484A2
(en)
*
|
2012-03-19 |
2013-09-26 |
Battelle Memorial Institute |
Apparatus and method for remotely determining the structural intergrity of a well or similar structure
|
NO333359B1
(no)
*
|
2012-03-20 |
2013-05-13 |
Sensor Developments As |
Fremgangsmåte og system for å rette inn en brønnkomplettering
|
US10175385B2
(en)
|
2012-05-23 |
2019-01-08 |
Halliburton Energy Services, Inc. |
Optimization visualization using normalized achievement variables
|
EP4033069A1
(en)
*
|
2012-09-26 |
2022-07-27 |
Halliburton Energy Services, Inc. |
Method of placing distributed pressure gauges across screens
|
US9249657B2
(en)
*
|
2012-10-31 |
2016-02-02 |
General Electric Company |
System and method for monitoring a subsea well
|
US10100635B2
(en)
|
2012-12-19 |
2018-10-16 |
Exxonmobil Upstream Research Company |
Wired and wireless downhole telemetry using a logging tool
|
US9631485B2
(en)
|
2012-12-19 |
2017-04-25 |
Exxonmobil Upstream Research Company |
Electro-acoustic transmission of data along a wellbore
|
US9816373B2
(en)
|
2012-12-19 |
2017-11-14 |
Exxonmobil Upstream Research Company |
Apparatus and method for relieving annular pressure in a wellbore using a wireless sensor network
|
US9557434B2
(en)
|
2012-12-19 |
2017-01-31 |
Exxonmobil Upstream Research Company |
Apparatus and method for detecting fracture geometry using acoustic telemetry
|
WO2014100262A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Telemetry for wireless electro-acoustical transmission of data along a wellbore
|
WO2014100272A1
(en)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Apparatus and method for monitoring fluid flow in a wellbore using acoustic signals
|
CN105229258A
(zh)
|
2013-01-04 |
2016-01-06 |
卡博陶粒有限公司 |
电气地导电的支撑剂以及用于检测、定位和特征化该电气地导电的支撑剂的方法
|
US11008505B2
(en)
|
2013-01-04 |
2021-05-18 |
Carbo Ceramics Inc. |
Electrically conductive proppant
|
NO340917B1
(no)
|
2013-07-08 |
2017-07-10 |
Sensor Developments As |
System og fremgangsmåte for in-situ bestemmelse av et brønnformasjonstrykk gjennom et sementlag
|
US11554969B2
(en)
|
2013-08-09 |
2023-01-17 |
Aquablok Ltd. |
Reactive treatment cell and systems for environmental remediation
|
MX362289B
(es)
|
2013-11-08 |
2019-01-10 |
Schlumberger Technology Bv |
Sistema de acoplador inductivo deslizante.
|
US10132149B2
(en)
|
2013-11-26 |
2018-11-20 |
Exxonmobil Upstream Research Company |
Remotely actuated screenout relief valves and systems and methods including the same
|
US9593574B2
(en)
|
2014-03-14 |
2017-03-14 |
Saudi Arabian Oil Company |
Well completion sliding sleeve valve based sampling system and method
|
MX2016011863A
(es)
|
2014-04-10 |
2016-12-02 |
Halliburton Energy Services Inc |
Monitoreo de multiples sartas usando herramienta de deteccion de corrosion electromagnetica (em).
|
BR112016025597B1
(pt)
|
2014-05-01 |
2022-05-10 |
Halliburton Energy Services, Inc |
Segmento de tubo de revestimento
|
SG11201608940TA
(en)
|
2014-05-01 |
2016-11-29 |
Halliburton Energy Services Inc |
Guided drilling methods and systems employing a casing segment with at least one transmission crossover arrangement
|
AU2015253515B2
(en)
|
2014-05-01 |
2017-06-15 |
Halliburton Energy Services, Inc. |
Multilateral production control methods and systems employing a casing segment with at least one transmission crossover arrangement
|
CA2946743C
(en)
|
2014-05-01 |
2020-09-15 |
Halliburton Energy Services, Inc. |
Interwell tomography methods and systems employing a casing segment with at least one transmission crossover arrangement
|
FR3021992B1
(fr)
*
|
2014-06-04 |
2019-08-16 |
Gdf Suez |
Procede et systeme d'exploitation et de surveillance d'un puits d'extraction ou de stockage de fluide
|
US10323468B2
(en)
|
2014-06-05 |
2019-06-18 |
Schlumberger Technology Corporation |
Well integrity monitoring system with wireless coupler
|
US20150361757A1
(en)
*
|
2014-06-17 |
2015-12-17 |
Baker Hughes Incoporated |
Borehole shut-in system with pressure interrogation for non-penetrated borehole barriers
|
CA2955381C
(en)
|
2014-09-12 |
2022-03-22 |
Exxonmobil Upstream Research Company |
Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
|
US10400536B2
(en)
|
2014-09-18 |
2019-09-03 |
Halliburton Energy Services, Inc. |
Model-based pump-down of wireline tools
|
EP3198115A1
(en)
|
2014-09-26 |
2017-08-02 |
Exxonmobil Upstream Research Company |
Systems and methods for monitoring a condition of a tubular configured to convey a hydrocarbon fluid
|
GB2546209B
(en)
|
2014-10-28 |
2020-11-25 |
Halliburton Energy Services Inc |
Downhole state-machine-based monitoring of vibration
|
US9970286B2
(en)
|
2015-01-08 |
2018-05-15 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
WO2016111629A1
(en)
*
|
2015-01-08 |
2016-07-14 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
NO343193B1
(en)
*
|
2015-01-08 |
2018-11-26 |
Sensor Developments As |
Method and apparatus for permanent measurement of wellbore formation pressure from an in-situ cemented location
|
US9863222B2
(en)
|
2015-01-19 |
2018-01-09 |
Exxonmobil Upstream Research Company |
System and method for monitoring fluid flow in a wellbore using acoustic telemetry
|
US10408047B2
(en)
|
2015-01-26 |
2019-09-10 |
Exxonmobil Upstream Research Company |
Real-time well surveillance using a wireless network and an in-wellbore tool
|
NO343542B1
(en)
*
|
2015-03-27 |
2019-04-01 |
Sensor Developments As |
Borehole stress meter system and method for determining wellbore formation instability
|
US10053980B2
(en)
|
2015-03-27 |
2018-08-21 |
Halliburton As |
Borehole stress meter system and method for determining wellbore formation instability
|
WO2016159776A1
(en)
|
2015-03-27 |
2016-10-06 |
Sensor Developments As |
Borehole stress meter system and method for determining wellbore formation instability
|
RU2601347C2
(ru)
*
|
2015-04-01 |
2016-11-10 |
Общество с ограниченной ответственностью "Научно-производственная фирма Завод "Измерон" |
Интеграционная конструкция для скважинного датчика
|
NO341832B1
(en)
*
|
2015-06-05 |
2018-01-29 |
Probe Holdings |
A thermal conductivity quartz transducer with waste-heat management system
|
NO342722B1
(en)
*
|
2015-06-05 |
2018-07-30 |
Sensor Developments As |
Wellbore wireless thermal conductivity quartz transducer with waste-heat management system
|
US9708905B2
(en)
|
2015-06-05 |
2017-07-18 |
Sensor Developments As |
Wellbore wireless thermal conductivity quartz transducer with waste-heat management system
|
US10132164B2
(en)
*
|
2015-12-18 |
2018-11-20 |
Schlumberger Technology Corporation |
Systems and methods for in-situ measurements of mixed formation fluids
|
US11105198B2
(en)
|
2016-03-31 |
2021-08-31 |
Schlumberger Technology Corporation |
Methods for in-situ multi-temperature measurements using downhole acquisition tool
|
US10344583B2
(en)
*
|
2016-08-30 |
2019-07-09 |
Exxonmobil Upstream Research Company |
Acoustic housing for tubulars
|
US10415376B2
(en)
|
2016-08-30 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Dual transducer communications node for downhole acoustic wireless networks and method employing same
|
AU2017321141B2
(en)
*
|
2016-08-30 |
2020-04-02 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10526888B2
(en)
|
2016-08-30 |
2020-01-07 |
Exxonmobil Upstream Research Company |
Downhole multiphase flow sensing methods
|
US10487647B2
(en)
|
2016-08-30 |
2019-11-26 |
Exxonmobil Upstream Research Company |
Hybrid downhole acoustic wireless network
|
US10697287B2
(en)
|
2016-08-30 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Plunger lift monitoring via a downhole wireless network field
|
US10167716B2
(en)
|
2016-08-30 |
2019-01-01 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10465505B2
(en)
|
2016-08-30 |
2019-11-05 |
Exxonmobil Upstream Research Company |
Reservoir formation characterization using a downhole wireless network
|
US10190410B2
(en)
|
2016-08-30 |
2019-01-29 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10364669B2
(en)
|
2016-08-30 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10590759B2
(en)
|
2016-08-30 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
|
US10837276B2
(en)
|
2017-10-13 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along a drilling string
|
CN111201454B
(zh)
|
2017-10-13 |
2022-09-09 |
埃克森美孚上游研究公司 |
用于利用通信执行操作的方法和***
|
WO2019074657A1
(en)
|
2017-10-13 |
2019-04-18 |
Exxonmobil Upstream Research Company |
METHOD AND SYSTEM FOR REALIZING OPERATIONS USING COMMUNICATIONS
|
MX2020003296A
(es)
|
2017-10-13 |
2020-07-28 |
Exxonmobil Upstream Res Co |
Metodo y sistema para realizar operaciones de hidrocarburo con redes de comunicacion mixta.
|
MX2020004982A
(es)
|
2017-10-13 |
2020-11-12 |
Exxonmobil Upstream Res Co |
Metodo y sistema para realizar comunicaciones usando solapamiento.
|
US10697288B2
(en)
|
2017-10-13 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
|
CA3078604C
(en)
|
2017-11-16 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Multiple tubing-side antennas or casing-side antennas for maintaining communication in a wellbore
|
AU2018367388C1
(en)
|
2017-11-17 |
2022-04-14 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along tubular members
|
US10690794B2
(en)
|
2017-11-17 |
2020-06-23 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications for a hydrocarbon system
|
US12000273B2
(en)
|
2017-11-17 |
2024-06-04 |
ExxonMobil Technology and Engineering Company |
Method and system for performing hydrocarbon operations using communications associated with completions
|
US10844708B2
(en)
|
2017-12-20 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Energy efficient method of retrieving wireless networked sensor data
|
BR112020010485B1
(pt)
*
|
2017-12-26 |
2023-04-25 |
Halliburton Energy Services, Inc |
Sistema de antenas e método
|
MX2020005766A
(es)
|
2017-12-29 |
2020-08-20 |
Exxonmobil Upstream Res Co |
Metodos y sistemas para monitorear y optimizar las operaciones de estimulacion de yacimientos.
|
US11156081B2
(en)
|
2017-12-29 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Methods and systems for operating and maintaining a downhole wireless network
|
WO2019156966A1
(en)
|
2018-02-08 |
2019-08-15 |
Exxonmobil Upstream Research Company |
Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods
|
US11268378B2
(en)
|
2018-02-09 |
2022-03-08 |
Exxonmobil Upstream Research Company |
Downhole wireless communication node and sensor/tools interface
|
CN108825218A
(zh)
*
|
2018-04-27 |
2018-11-16 |
中国石油天然气股份有限公司 |
地层温度测试方法及装置
|
CN109142172B
(zh)
*
|
2018-07-16 |
2019-07-02 |
中国海洋大学 |
一种深海底浊流多参数综合监测装置
|
WO2020050815A1
(en)
*
|
2018-09-04 |
2020-03-12 |
Halliburton Energy Services, Inc. |
Position sensing for downhole electronics
|
WO2020052984A1
(en)
|
2018-09-11 |
2020-03-19 |
Abb Schweiz Ag |
Cable conduit with integrated sensors
|
JP2022500983A
(ja)
|
2018-09-11 |
2022-01-04 |
アーベーベー・シュバイツ・アーゲーABB Schweiz AG |
センサが組み込まれたケーブルコンジット
|
RU2694984C1
(ru)
*
|
2018-10-26 |
2019-07-18 |
Акционерное общество "Ижевский радиозавод" |
Способ коммутации блоков датчиков телеметрической системы передачи информации
|
US11293280B2
(en)
|
2018-12-19 |
2022-04-05 |
Exxonmobil Upstream Research Company |
Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
|
US11952886B2
(en)
|
2018-12-19 |
2024-04-09 |
ExxonMobil Technology and Engineering Company |
Method and system for monitoring sand production through acoustic wireless sensor network
|
US11876398B1
(en)
*
|
2019-03-01 |
2024-01-16 |
National Technology & Engineering Solutions Of Sandia, Llc |
Systems, methods and computer program products for charging autonomous wireless sensors in subsurface environments
|
US11781419B2
(en)
*
|
2020-05-26 |
2023-10-10 |
Saudi Arabian Oil Company |
Instrumented mandrel for coiled tubing drilling
|
US11735958B2
(en)
|
2020-12-17 |
2023-08-22 |
Halliburton Energy Services, Inc. |
Multiphase power transfer in inductive couplers
|
US11713676B2
(en)
|
2021-08-06 |
2023-08-01 |
Saudi Arabian Oil Company |
Sensor node device, sensor node system, and method for mapping hydraulic fractures using the same
|
CN114778686B
(zh)
*
|
2022-06-23 |
2022-09-13 |
西安石油大学 |
一种智能完井预埋套管损伤检测***
|
US20240192398A1
(en)
*
|
2022-12-08 |
2024-06-13 |
Halliburton Energy Services, Inc. |
Wirelessly powered and activated electromagnetic transmitters behind casing for reservoir monitoring
|