DE947077C - Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure - Google Patents

Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure

Info

Publication number
DE947077C
DE947077C DEP55041A DEP0055041A DE947077C DE 947077 C DE947077 C DE 947077C DE P55041 A DEP55041 A DE P55041A DE P0055041 A DEP0055041 A DE P0055041A DE 947077 C DE947077 C DE 947077C
Authority
DE
Germany
Prior art keywords
concrete
steel girders
steel
girders
composite structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP55041A
Other languages
German (de)
Inventor
Dipl-Ing Arthur Kramer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Original Assignee
Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie filed Critical Aktiengesellschaft fuer Unternehmungen der Eisen und Stahlindustrie
Priority to DEP55041A priority Critical patent/DE947077C/en
Application granted granted Critical
Publication of DE947077C publication Critical patent/DE947077C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/02Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

Es ist bekannt, bei Stahlbrücken mit über den Stahlträgern liegender Betonfahrbahn die Betonfahrbahn so fest mit dem Stahlträger zu verbinden, daß beide Teile ein einheitliches Verbundtragwerk bilden. Bei auf zwei Stützen ruhenden Brückenträgern dieser Art wird die Betonfahrbahn nur auf Druck durch die Verkehrslast beansprucht.It is known that in steel bridges with overlying the steel girders Concrete roadway to connect the concrete roadway so firmly with the steel girder that both Parts form a uniform composite structure. With bridge girders resting on two supports In this way, the concrete pavement is only subjected to pressure from the traffic load.

Jedoch z. B. bei Brückenträgern auf drei Stützen wird der Beton im Bereich der Mittelstütze durch die Verkehrslast auf Zug beansprucht. Auch durch das Schwinden des Betons beim Erhärten und nachfolgendes Kriechen des Beton entstehen Zugbeanspruchungen in der Betondecke. Diese Zugbeanspruchungen führen, wenn sie das zulässige Maß überschreiten, zur Bildung von Rissen in der Betondecke.However, e.g. B. with bridge girders on three supports, the concrete is in The area of the central support is subject to tensile stress due to the traffic load. Also through the shrinkage of the concrete when it hardens and the subsequent creeping of the concrete Tensile stresses in the concrete ceiling. These tensile loads result when they exceed the permissible level, to the formation of cracks in the concrete ceiling.

Um derartige Rißbildungen zu vermeiden, hat man bereits dafür Sorge getragen, daß die Betondecke mit dem Stahlträger so verbunden wird, daß nach dem Erhärten des Betons in seinem auf Zug beanspruchten Bereich eine Druckvorspannung vorhanden ist. Dies hat man in der Weise erzielt, daß man bereits dafür Sorge getragen, daß die Beton-Betonfahrbahn durch eine Zwangsbiegung eine solche Vorspannung gegeben hat, daß nach Erhärten des Betons und Aufhebung der Zwangsbiegung der Stahlträger im Beton eine Druckspannung entstand.In order to avoid such cracks, one has already taken care of it worn that the concrete ceiling is connected to the steel beam that after If the concrete hardens in its tensile stressed area, a compressive prestress is available. This has been achieved in such a way that care has already been taken to that the concrete-concrete roadway is given such a bias by a forced bending has that after the concrete has hardened and the forced bending of the steel girders is lifted a compressive stress developed in the concrete.

Den Gegenstand der Erfindung bildet ein Verfahren zum Herstellen von mit Betonauflage versehenen und mit dieser zu einem Verbundtragwerk starr verbundenen Stahlträgern, die gegen unzulässige Zugspannungen in der Betonschicht dadurch gesichert sind, daß auf die Stahlträger Schubsicherungen, z. B. Blechwinkel, aufgesetzt werden, die Betondecke im Bereich dieser Schubsicherungen mit Aussparungen hergestellt und auf Druck vorgespannt wird, und daß hierauf die Aussparungen mit den Schubsicherungen der Stahlträger vergossen werden. Das Verfahren nach der Erfindung ist in einfacher Weise und mit geringen Kosten durchführbar.The subject of the invention is a method for producing provided with a concrete layer and rigidly connected to this to form a composite structure Steel girders that are secured against impermissible tensile stresses in the concrete layer are that on the steel girders thrust locks, z. B. sheet metal angles, are placed, the concrete ceiling in the area of this shear protection is made with recesses and is biased on pressure, and that then the recesses with the thrust locks the steel girders are cast. The method according to the invention is simpler Wise and feasible at low cost.

In der Zeichnung ist als Ausführungsbeispiel der Erfindung ein Teil eines Stahlträgers einer Brücke mit dem angrenzenden Teil der Spannbetonfahrbahn vor dem Ausbetonieren der Ausschnitte dargestellt.The drawing shows a part as an exemplary embodiment of the invention a steel girder of a bridge with the adjacent part of the prestressed concrete deck shown before concreting the cutouts.

Abb..i zeigt die Verbindung im Längsschnitt, Abb. 2 im Ouerschnitt und Abb. 3 im Grundriß.Fig..i shows the connection in longitudinal section, Fig. 2 in cross section and Fig. 3 in plan.

Auf dem-Stahlträger i liegt die Spannbetonfahrbahn z mit den Spanndrähten 3 und den Bewehrungseisen ¢. Über dem Stahlträger i sind in der Spannbetonfahrbahn 2 in regelmäßigen Abständen Aussparungen 5 vorgesehen, in die mit dem Stahlträger i fest verschweißte oder auf ändere Weise fest verbundene Schubsicherungen 6 hineinragen. Die Herstellung der festen Verbindung zwischen dem Träger i und der Spannbetonfahrbahn 2 erfolgt in der Weise, daß nach dem Erhärten.und Schwinden der Spannbetonfahrbahn die Aussparungen 5 mit Beton ausgefüllt werden und die Betonfahrbahn auf diese Weise mit dem Stahlträger schubfest verbunden wird, so daß bei der Belastung der Brücke die Zugspannungen im Stahlträger auf die Betonfahrbahn übertragen werden, wo sie aber nur die im Beton vorhandenen Druckvorspannungen aufheben, ohne-unzulässige Zugspannungen in Beton hervorzurufen.The prestressed concrete track z with the tensioning wires lies on the steel girder i 3 and the reinforcement bars ¢. Above the steel girder i are in the prestressed concrete roadway 2 recesses 5 provided at regular intervals, in the with the steel beam i firmly welded or otherwise firmly connected thrust locks 6 protrude. Establishing the fixed connection between the girder i and the prestressed concrete roadway 2 takes place in such a way that after the hardening and shrinking of the prestressed concrete roadway the recesses 5 are filled with concrete and the concrete roadway in this way is connected to the steel girder in a shear-proof manner, so that when the bridge is loaded the tensile stresses in the steel girder are transferred to the concrete pavement where they are but only remove the existing compressive stresses in the concrete without impermissible ones Cause tensile stresses in concrete.

Die Stahlträger können vor ihrer starren Verbindung mit der Betondecke in ihrem mit dieser sich berührenden Teil eine Zugvorspannung erhalten, die nach Herstellung der starren Verbindung der Stahlträger mit der Betondecke wieder aufgehoben wird.The steel girders can be rigidly connected to the concrete ceiling receive a tensile prestress in their part that is in contact with this, which according to Establishment of the rigid connection between the steel girders and the concrete ceiling was lifted again will.

Die Berührungsflächen der Stahlträger mit der Betondecke können geglättet und gegebenenfalls mit einem Gleitmittel versehen werden.The contact surfaces of the steel girders with the concrete ceiling can be smoothed and optionally provided with a lubricant.

Die einbetonierten Schubsicherungen 6 sorgen für eine Übertragung der Schubkräfte zwischen Träger i und Fahrbahn 2. Die Schubsicherungen haben im dargestellten Fall T-Form; sie können aber auch eine andere Form haben. Nötigenfalls können zur Sicherung der Schubübertragung Bügel? in die Fahrbahn 2 einbetoniert werden. Die Breite der Aussparungen 5 richtet sich nach den jeweiligen Erfordernissen, sie kann nötigenfalls größer als die Flanschbreite des Trägers i sein.The concreted thrust locks 6 ensure a transmission of the shear forces between girder i and track 2. The shear locks have im illustrated case T-shape; but they can also have a different shape. If necessary can brackets be used to secure the thrust transmission? concreted in the roadway 2 will. The width of the recesses 5 depends on the respective requirements, if necessary, it can be larger than the flange width of the beam i.

Claims (3)

PATENTANSPRÜCHE: i. Verfahren zum Herstellen von mit Betonauflage versehenen und mit dieser zu einem Verbundtragwerk starr verbundenen Stahlträgern, insbesondere von mit Betonfahrbahn verbundenen Brückenträgern, dadurch gekennzeichnet, daß auf die Stahlträger Schubsicherungen aufgesetzt werden, daß die Betondecke im Bereich dieser Schubsicherungen mit Aussparungen hergestellt und auf Druck vorgespannt wird, und daß hierauf die Aussparungen mit den Schubsicherungen der Stahlträger vergossen werden. PATENT CLAIMS: i. Method for producing with a concrete layer steel girders provided and rigidly connected to this to form a composite structure, in particular of bridge girders connected to the concrete roadway, characterized in that, that shear locks are placed on the steel girders, that the concrete ceiling in the The area of these shear locks is made with recesses and preloaded with pressure is, and that on this the recesses with the thrust locks of the steel girders to be shed. 2. Verfahren nach Anspruch i, dadurch gekennzeichnet, daß die Stahlträger vor ihrer starren Verbindung mit der Betondecke in ihrem mit dieser sich berührenden Teil -eine Zugvorspannung erhalten, die nach Herstellung der starren Verbindung der Stahlträger mit der Betondecke wieder aufgehoben wird. 2. The method according to claim i, characterized in that the Steel girders in front of their rigid connection with the concrete ceiling in their with this touching part -a tensile prestress obtained after the production of the rigid Connection of the steel girders with the concrete ceiling is canceled again. 3. Verfahren nach Anspruch i oder 2, dadurch gekennzeichnet, daß die Berührungsflächen zwischen Betondecke und Stahlträgern geglättet und gegebenenfalls mit einem Gleitmittel versehen werden.3. Procedure according to claim i or 2, characterized in that the contact surfaces between Concrete ceiling and steel girders smoothed and, if necessary, provided with a lubricant will.
DEP55041A 1949-09-16 1949-09-16 Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure Expired DE947077C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP55041A DE947077C (en) 1949-09-16 1949-09-16 Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP55041A DE947077C (en) 1949-09-16 1949-09-16 Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure

Publications (1)

Publication Number Publication Date
DE947077C true DE947077C (en) 1956-08-09

Family

ID=7387503

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP55041A Expired DE947077C (en) 1949-09-16 1949-09-16 Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure

Country Status (1)

Country Link
DE (1) DE947077C (en)

Similar Documents

Publication Publication Date Title
DE996795T1 (en) COLUMN CONCRETE PILLAR
DE69622036T2 (en) REINFORCING ELEMENTS
DE2255412A1 (en) REINFORCED CONCRETE COMPONENTS
DE947077C (en) Process for the production of steel girders provided with a concrete layer and rigidly connected to this to form a composite structure
DE2300733C2 (en) Method of making a composite beam
DE1018083B (en) Shear-resistant connection of concrete slab and steel girders in composite girders
DE960360C (en) Process for the production of continuous or frame-like plate structures
DE973407C (en) Process for the production of wide-span bridge structures made of reinforced concrete
DE2936836C2 (en)
DE975280C (en) Steel truss bridge with reinforced concrete deck
DE102006060695B4 (en) Process for the production of two or more field composite steel bridges
DE887517C (en) Process for the production of a composite bridge running over several support points and a bridge produced according to the process
DE839044C (en) Reinforced concrete continuous beam pre-tensioned by hanging work with subsequent connection
DE806727C (en) Method for introducing a compressive prestress into the concrete part of a composite girder
DE924806C (en) Process for the production of structures with combined support members made of steel and reinforced concrete and suspension bridges produced by this process
DE822556C (en) Process for the production of girder bridges from reinforced concrete
DE813891C (en) Process for the production of long-span prestressed concrete structures
DE974961C (en) Method for manufacturing a girder bridge from steel girders and a pre-stressed deck made of reinforced concrete coupled to these
DE1124075B (en) Method for prestressing statically indeterminate composite beams, in particular bridge beams
DE882553C (en) Composite beams, especially for bridges, and method for its manufacture
DE16921C (en) Methods of making hollow columns, shafts, girders, pillars and similar structural parts more resistant
EP2803767B1 (en) Composite system for a helicopter landing pad and method for the production thereof
DE2455993A1 (en) Composite steel and concrete bridge girder prestressing - with steel girder serving as concrete stress member after initial loose connection
DE2124131A1 (en) Prefabricated building element for the production of concrete beams
DE1078154B (en) Steel composite girder with prestressed reinforced concrete slab