DE9017875U1 - Dust- and/or waterproof connection of two metal panels at the edges of these panels using terminal strips - Google Patents

Dust- and/or waterproof connection of two metal panels at the edges of these panels using terminal strips

Info

Publication number
DE9017875U1
DE9017875U1 DE9017875U DE9017875U DE9017875U1 DE 9017875 U1 DE9017875 U1 DE 9017875U1 DE 9017875 U DE9017875 U DE 9017875U DE 9017875 U DE9017875 U DE 9017875U DE 9017875 U1 DE9017875 U1 DE 9017875U1
Authority
DE
Germany
Prior art keywords
connection according
connection
clamping strip
bend
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE9017875U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K Kessler 6960 Osterburken De GmbH
Original Assignee
K Kessler 6960 Osterburken De GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K Kessler 6960 Osterburken De GmbH filed Critical K Kessler 6960 Osterburken De GmbH
Publication of DE9017875U1 publication Critical patent/DE9017875U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/30Constructions, with or without perforated walls, depending on the use of specified materials mainly of metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D90/00Component parts, details or accessories for large containers
    • B65D90/02Wall construction
    • B65D90/08Interconnections of wall parts; Sealing means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/04Containers for fluids or gases; Supports therefor mainly of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)
  • Cable Accessories (AREA)

Description

: G sä '.- <■ : G sä '.- <■

Anmelderin: K. Kessler GmbH, Osterburken, DE Applicant: K. Kessler GmbH, Osterburken, DE

Staub- und/oder wasserdichte Verbindung von zwei BlechtafelnDust and/or waterproof connection of two metal sheets

Die Neuerung betrifft eine staub- und/oder wasserdichte Verbindung von zwei Blechtafeln mit endseitigen Profilierungen, die von je einer Innen- und AußenkJemmleiste überdeckt sind, wobei die Außenklemmleiste entlang beider Längsseiten mit Schenkeln versehen ist, zur Anwendung für Silos, Behälter und/oder Rohre ab 0,5 bis 1 m Durchmesser.The innovation concerns a dust- and/or watertight connection of two metal panels with profiles on the end, each covered by an inner and outer clamping strip, whereby the outer clamping strip is provided with legs along both long sides, for use in silos, containers and/or pipes with a diameter of 0.5 to 1 m.

Die bekannteste Art, Blechtafeln miteinander zu verbinden, ist die Flanschverbindung. Zu diesem Zweck werden die Bleche endseitig abgewinkelt, so daß sich ein Flansch ergibt, und mit diesen Flansch durchdringenden Schrauben fixiert. Zwischen die Flansche wird ein elastischer Dichtstreifen zur möglichst staubdichten Abdichtung eingelegt. Voraussetzung für eine staubdichte Verbindung ist eine ausreichende Blechstärke und kleine Schraubenabstände. Eine flüssigkeitsdichte Verbindung wird im allgemeinen nur dann erzielt, wenn die Flansche eine wesentlich größere Dicke als die Bleche besitzen, was ein Anschweißen der Flansche erfordert, oder wenn die abgewinkelten Bereiche der Bleche auf andere Weise verstärkt worden sind. Insbesondere dann, wenn die Bleche aus hochwertigem Werkstoff bestehen, sind Silos mit einer derartigen Verbindung kostenaufwendig.The best known way of connecting metal panels is the flange connection. For this purpose, the metal panels are bent at the end to form a flange and fixed with screws that penetrate the flange. An elastic sealing strip is inserted between the flanges to ensure that the seal is as dust-tight as possible. The prerequisite for a dust-tight connection is sufficient metal panel thickness and small screw spacing. A liquid-tight connection is generally only achieved if the flanges are significantly thicker than the metal panels, which requires the flanges to be welded on, or if the bent areas of the metal panels have been reinforced in some other way. Silos with this type of connection are expensive, especially if the metal panels are made of high-quality material.

Eine andere Form der Verbindung von Blechtafeln ist durch die DE 32 45 485 A1 bekanntgeworden. Bei dieser bekannten Bauart wird zunächst die Verbindung und erst dann die Abdichtung durch Auftragen einer Dichtungsmasse hergestellt. Eine solche Verbindung mag bei Silos für Futtermittel den dort verminderten Anforderungen noch genügen; bei Silos für Lebensmittel ist sie jedoch kritisch. In der folgenden Beschreibung der Neuerung wird auf die Unterschiede zu der bekannten Verbindung im einzelnen eingegangen.Another form of joining sheet metal panels has become known through DE 32 45 485 A1. In this known design, the connection is made first and only then the seal is created by applying a sealing compound. Such a connection may still meet the reduced requirements for silos for animal feed; however, it is critical for silos for food. In the following description of the innovation, the differences to the known connection are discussed in detail.

Die bekannte Verbindung eignet sich nicht für eine Verbindung von Blechtafeln, die hinsichtlich der Festigkeit gegenüber einer herkömmlichen Flanschverbindung bis 10-mal größer ist. Für derartige Festigkeitsanforderungen sind mehrere Voraussetzungen erforderlich. So müssen bsp. die Klemmleisten eine entsprechende Biegesteifigkeit aufweisen. Sie sollten deshalb eine mehr als 2-fache Stärke im Vergleich zur 'Stärke der Blechtafeln haben. Aus der Zeichnung derThe known connection is not suitable for a connection of metal panels, which is up to 10 times stronger than a conventional flange connection. Several requirements are necessary for such strength requirements. For example, the terminal strips must have a corresponding bending stiffness. They should therefore be more than twice as thick as the metal panels. From the drawing of the

DE 32 45 485 Al ist jedoch nur etwa die gleiche Stärke für die Klemmleisten und für die Blechtafeln zu ersehen.DE 32 45 485 Al, however, only approximately the same thickness can be seen for the terminal strips and for the metal panels.

Aber auch dann, wenn die Klemmleisten stark genug dimensioniert wären, könnte nur ein Bruchteil der möglichen Zugfestigkeit erreicht werden, weil die InnenkJemmleiste einen Abstand zu der Blechabkantung aufweist. Dieser Abstand sollte annähernd Null sein, wie das bsp. in den voranstehenden Schutzanspruch en 8 und 9 in Verbindung mit Fig. 5 dargestellt ist. Durch Zugversuche ist nachgewiesen worden, daß die Blechtafeln aus der Klemmverbindung herausrutschen, wenn die Abkantung sich infolge des vorerwähnten Abstands aufbiegen kann. Daß die bekannte Verbindung nicht die erforderliche Festigkeit hat, ist anscheinend bereits damals erkannt worden, da man diesem Mangel durch Anbringung zusätzlicher Bänder um das Silo herum mit verringertem Abstand bei zunehmendem Seitendruck Rechnung getragen hat. Darüber hinaus ist erkannt worden, daß das Einlegen einer Dichtung zwischen den Klemmleisten die vorerwähnte negative Wirkung noch verstärkt hätte, und zwar einerseits deshalb, weil durch die Dichtung der Reibungskoeffizient zwischen den Metallteilen stark reduziert wird, andererseits jedoch deshalb, weil sich durch die Dichtung ein zweiter Spalt ergibt, wodurch die nachteilige Wirkung des vorerwähnten Abstands noch wesentlich verstärkt wird. In Erkenntnis dieser Situation ist bei der bekannten Verbindung die Abdichtung nachträglich hergestellt worden. Das ist in sehr vielen Fällen allerdings recht nachteilig, weil die Dichtungsmasse mit dem Schüttgut in Berührung kommt und durch dieses Schüttgut allmählich abgerieben wird.But even if the clamping strips were dimensioned strong enough, only a fraction of the possible tensile strength could be achieved because the inner clamping strip is at a distance from the sheet metal bend. This distance should be almost zero, as shown, for example, in the preceding claims 8 and 9 in connection with Fig. 5. Tensile tests have shown that the sheet metal panels slip out of the clamping connection if the bend can bend as a result of the aforementioned distance. It appears that the fact that the known connection does not have the required strength was already recognized at that time, since this deficiency was taken into account by attaching additional bands around the silo with a reduced distance and increasing lateral pressure. In addition, it was recognized that inserting a seal between the terminal strips would have increased the negative effect mentioned above, on the one hand because the seal greatly reduces the coefficient of friction between the metal parts, but on the other hand because the seal creates a second gap, which significantly increases the detrimental effect of the aforementioned distance. In recognition of this situation, the seal was subsequently created in the known connection. In many cases, however, this is very disadvantageous because the sealing compound comes into contact with the bulk material and is gradually rubbed off by this bulk material.

Nur durch eine Ausgestaltung gemäß den Ansprüchen 8 und 9 in Verbindung mit Fig. 5 ist es möglich, eine Dichtung im Bereich zwischen den Klemmleisten vorzusehen, ohne daß dadurch die Zugfestigkeit der Verbindung wesentlich beeinträchtigt wird.Only by means of a design according to claims 8 and 9 in conjunction with Fig. 5 is it possible to provide a seal in the area between the terminal strips without the tensile strength of the connection being significantly impaired.

Einen anderen Weg, die Zugfestigkeit der Verbindung durch eine Dichtung nicht zu beeinträchtigen, zeigen gemäß dieser Neuerungsbeschreibung die Fig. 1 - 4 und 6 14. Die Ausgestaltung und Wirkungsweise der neuerungsgemäßen, mit einer Dichtung versehenen Verbindung werden bei der Beschreibung dieser Figuren aufgezeigt.According to this description of the innovation, Figs. 1 - 4 and 6 14 show another way of not impairing the tensile strength of the connection by a seal. The design and mode of operation of the connection provided with a seal according to the innovation are shown in the description of these figures.

-6-Im einzelnen bedeuten:-6-In detail:

1 = Blechtafel 10 = erste 90°-Abkantung1 = sheet metal 10 = first 90° bend

2 = 180°-Abkantung 11 = zweite 90° Abkantung2 = 180° bend 11 = second 90° bend

3 = Schenkel der Außenklemmleisten 12 = Spalt3 = Legs of the external terminal blocks 12 = Gap

4 = Dichtung 13 = Deckleiste4 = Seal 13 = Cover strip

5 = Innenklemmleiste 20 = Verbindung zweier Blechtafeln5 = Internal terminal block 20 = Connection between two metal panels

6 = Außenklemmleiste 21 = Verbindungsanker6 = External terminal block 21 = Connecting anchor

7 = Verschraubung 22 = Zwischenwand7 = Screw connection 22 = Partition wall

8 = Blechtafelende 23 = Biegebelastung8 = Sheet metal end 23 = Bending load

9 = zweite 180°-Abkantung 24 = Verbindung dreier Tafeln9 = second 180° bend 24 = connection of three panels

Fig. 1 zeigt eine neuerungsgemäße Verbindung in einfachster und wirkungsvollster Form. Bei Zugbelastung dieser Verbindung wird das Blechtafelende 8 gegen den Schenkel 3 der Außenklemmleiste 6 gezogen und von diesem festgehalten. Sind die Innenklemmleiste 5 und die Außenklemmleiste 6 ausreichend biegesteif, so kann diese Verbindung sich nur durch Abreißen der Blechtafel vorzugsweise an der 180°-Abkantung 2 lösen. Die Verbindung hat somit eine Festigkeit, die in der Nähe der Reißfestigkeit der Blechtafel 1 liegt. Geben die Klemmleisten 5, 6 um ein ganz geringes Maß nach, so wölbt sich das umgekantete Teil der Blechtafel 1 etwas in Richtung der Außenklemmleiste 6. Dadurch wird die Dichtung 4 zusätzlich gegen die Außenklemmleiste 6 gedrückt und dadurch - soweit überhaupt möglich - noch wirksamer. Nimmt in solchen Fällen die Zugkraft weiter zu, so reißt die Blechtafel 1 wie vorstehend bereits beschrieben. Ein Nachteil dieser Verbindung ist jedoch die etwas schwierige Montage.Fig. 1 shows an innovative connection in the simplest and most effective form. When this connection is subjected to tensile stress, the end 8 of the sheet metal panel is pulled against the leg 3 of the outer terminal strip 6 and held in place by it. If the inner terminal strip 5 and the outer terminal strip 6 are sufficiently rigid, this connection can only be released by tearing off the sheet metal panel, preferably at the 180° bend 2. The connection therefore has a strength that is close to the tear strength of the sheet metal panel 1. If the terminal strips 5, 6 give way by a very small amount, the folded part of the sheet metal panel 1 bends slightly in the direction of the outer terminal strip 6. This additionally presses the seal 4 against the outer terminal strip 6 and thus - as far as possible - becomes even more effective. If the tensile force increases further in such cases, the sheet metal panel 1 tears as already described above. A disadvantage of this connection, however, is that it is somewhat difficult to install.

Fig. 2 zeigt eine Ausführungsform der Neuerung, bei der die Montage aufgrund einer 2-fachen 180°-Abkantung 9 der Blechtafel 1 erleichtert ist. Die zweite 180°- Abkantung kann auch im umgekehrten Uhrzeigersinn vorgesehen werden.Fig. 2 shows an embodiment of the innovation in which assembly is made easier due to a double 180° bend 9 of the sheet metal panel 1. The second 180° bend can also be provided in the reverse clockwise direction.

Fig. 3 zeigt eine Ausführungsform der Neuerung, bei der die Montage wesentlich erleichtert ist. Allerdings muß in Kauf genommen werden, daß die Innenklemmleiste 5 aus einem Sonderprofil besteht und in das Innere des Behälters vorsteht, was insbesondere bei axialer Verbindung von Rohren störend sein kann.Fig. 3 shows an embodiment of the innovation in which assembly is made significantly easier. However, it must be accepted that the inner clamping strip 5 consists of a special profile and protrudes into the interior of the container, which can be particularly disruptive when connecting pipes axially.

Fig. 4 zeigt eine weitere Ausführungsform der Neuerung mit Rücksicht auf leichtere Montage. Die Blechtafel 1 ist 3-mal abgekantet. Der Spalt 12 zwischen Innertklemmleiste'5 und Blechtafel 1 ist zur Aufnahme einer weiteren Dichtung 4Fig. 4 shows a further embodiment of the innovation with regard to easier assembly. The metal sheet 1 is bent three times. The gap 12 between the inner terminal strip 5 and the metal sheet 1 is designed to accommodate a further seal 4

vorgesehen. Damit diese weitere Dichtung 4 nicht mit dem Lagergut in Berührung kommt und darüber hinaus gut festgehalten wird, ist eine Deckleiste 13 vorgesehen, die insbesondere dann, wenn die Blechtafel 1 aus einem hochwertigen Werkstoff besteht, ebenfalls aus diesem Werkstoff sein kann, während die Klemmleisten 5, 6 aus einem preiswerteren, ggf. festeren Werkstoff bestehen.provided. So that this additional seal 4 does not come into contact with the stored goods and is also held firmly in place, a cover strip 13 is provided, which can also be made of a high-quality material, particularly if the metal panel 1 is made of this material, while the clamping strips 5, 6 are made of a cheaper, possibly stronger material.

Fig. 5 zeigt eine Abwandlung der Ausführungsform gemäß Fig. 4. Dabei ist aus Kostengründen die 180°-Abkantung weggelassen worden. Allerdings müssen hier die Flanken der Innenklemmleiste 5 das Blech gegen die Schenkel 3 der Außenklemmleiste 6 drücken, zumindest jedoch möglichst spaltfrei anliegen. Bei einer Ausbildung wie in Fig. 4 mit Spalt 12 würden sich bei Zugbeanspruchung dieser Verbindung die Abkantungen aufbiegen. Das Blechende könnte dann aus der Klemmung zwischen Innenklemmleiste 5 und Außenklemmleiste 6 bereits bei einem Bruchteil der Reißfestigkeit der Blechtafel 1 herausrutschen. Durch Weglassen der Dichtung 4 in Fig. 5 wird der Reibungskoeffizient zwar wesentlich erhöht, doch würde die tatsächliche Zugfestigkeit dieser Verbindung bei Ausführung mit einem Spalt 12 nur zu einem Teil genutzt.Fig. 5 shows a modification of the embodiment according to Fig. 4. For cost reasons, the 180° bend has been omitted. However, here the flanks of the inner clamping strip 5 must press the sheet against the legs 3 of the outer clamping strip 6, or at least lie against it with as little gap as possible. In a design as in Fig. 4 with a gap 12, the bends would bend open when this connection was subjected to tensile stress. The end of the sheet could then slip out of the clamp between the inner clamping strip 5 and the outer clamping strip 6 at a fraction of the tear strength of the sheet metal panel 1. By omitting the seal 4 in Fig. 5, the coefficient of friction is increased considerably, but the actual tensile strength of this connection would only be partially used if it were designed with a gap 12.

Fig. 6, 7 und 8 zeigen Abwandlungen der neuerungsgemäßen Verbindung nach Fig. 4 mit anderen Dichtungssystemen, jedoch mit dem gleichen Verhalten bei Zugbeanspruchung.Fig. 6, 7 and 8 show modifications of the innovative connection according to Fig. 4 with other sealing systems, but with the same behaviour under tensile stress.

Fig. 9, 10, 11, 13 und 14 zeigen Abwandlungen der neuerungsgemäßen Verbindung nach Fig. 5 mit einer anderen Ausbildung der Dichtung 4. Auch dabei soll eine Beeinträchtigung der Reibung durch die Dichtung 4 verringert bzw. ausgeschaltet werden.Fig. 9, 10, 11, 13 and 14 show modifications of the innovative connection according to Fig. 5 with a different design of the seal 4. Here too, any impairment of friction by the seal 4 should be reduced or eliminated.

Fig. 6, 7, 8, 13 und 14 zeigen Abwandlungen zu Fig. 4 bezüglich der Abdeckung der Dichtung 4 durch eine Deckleiste 13.Fig. 6, 7, 8, 13 and 14 show modifications to Fig. 4 with regard to the covering of the seal 4 by a cover strip 13.

Die neuerungsgemäßen Verbindungen nach Fig. 7, 8, 14 und 20 eignen sich besonders gut zur axialen Verbindung von gerundeten Blechtafeln 1 zwecks Herstellung rohrförmiger Körper.The innovative connections according to Fig. 7, 8, 14 and 20 are particularly suitable for the axial connection of rounded metal sheets 1 for the purpose of producing tubular bodies.

Fig. 15 zeigt eine Abwandlung der neuerungsgemäßen Verbindung nach Fig. 5 mit der Aufgabe, die Festigkeit einer Verbindung zu maximieren. Die optimale Festigkeit bei dieser Ausführungsform wird jedoch nur erreicht, wenn die Schenkellänge des zwischen den Klemmleisten 5, 6 erfaßten Blechbereichs, dieFig. 15 shows a modification of the innovative connection according to Fig. 5 with the task of maximizing the strength of a connection. However, the optimal strength in this embodiment is only achieved if the leg length of the sheet metal area gripped between the clamping strips 5, 6, the

ihrerseits von der Schenkellänge der Außenklemmleiste 6 abhängen, ausreichend groß bemessen ist. Bei kleinen Behältern mit geringer Zugbelastung, bei denen die Blechstärken aus Produktionsgründen überdimensioniert sind, genügt bei der Ausführungsform nach Fig. 4 eine Schenkellänge von etwa dem 3- bis 5-fachen der Blechstärke. Die Nutzung der maximalen Festigkeit der Verbindung ist dadurch jedoch erheblich eingeschränkt. Wird dagegen die Schenkellänge auf etwa das 8-bis 10-fache der Blechstärke erhöht, wie in Fig. 15 dargestellt, ergibt das einen wesentlich höheren Widerstand gegen Aufbiegen der Abkantung auch dann, wenn eine Dichtung 4 eingebaut ist. Ein Herausrutschen der Blechtafel 1 wird erschwert bzw. gänzlich unmöglich gemacht.which in turn depend on the leg length of the external terminal strip 6, is sufficiently large. For small containers with low tensile loads, where the sheet thicknesses are oversized for production reasons, a leg length of about 3 to 5 times the sheet thickness is sufficient in the embodiment according to Fig. 4. However, the use of the maximum strength of the connection is significantly limited as a result. If, on the other hand, the leg length is increased to about 8 to 10 times the sheet thickness, as shown in Fig. 15, this results in a significantly higher resistance to bending of the fold, even if a seal 4 is installed. Slipping out of the sheet metal panel 1 is made more difficult or even impossible.

Fig. 16 zeigt die Verbindung von vier Blechtafeln 1 zu einem runden Behälter.Fig. 16 shows the connection of four metal sheets 1 to form a round container.

Fig. 17 zeigt die Verbindung von vier Blechtafeln 1 zu einem Viereckbehälter. Falls dabei z.B. eine Verbindung nach Fig. 5 vorgesehen wird, so wird die erste 90°-Abkantung auf 45° verringert.Fig. 17 shows the connection of four metal sheets 1 to form a square container. If, for example, a connection according to Fig. 5 is provided, the first 90° bend is reduced to 45°.

Fig. 18 zeigt zwei Behälter in Viereckbauweise, die miteinander verbunden, jedoch durch eine Zwischenwand 22 geteilt sind. Bei großen Breiten des Behälters wird die erforderliche Breite der Blechtafel 1 durch eine Verbindung 20 hergestellt.Fig. 18 shows two containers in a square design that are connected to each other but divided by an intermediate wall 22. If the container is very wide, the required width of the metal sheet 1 is created by a connection 20.

Zur Verbindung dieser Blechtafeln 1 können alle gezeigten Ausführungsformen Verwendung finden. Nachdem jedoch die Verbindung nicht nur auf Zug belastet wird, sondern auch noch zusätzlich auf Biegung (s. Pfeil 23), ist eine Verbindung nach Fig. 15 am besten geeignet. Sie hat ein Vielfaches an Biegewiderstand im Vergleich zu einer Flanschverbindung.All the embodiments shown can be used to connect these metal sheets 1. However, since the connection is not only subjected to tensile stress but also to bending (see arrow 23), a connection according to Fig. 15 is the most suitable. It has a multiple of the bending resistance compared to a flange connection.

Weitere Merkmale der Neuerung können den Schutzansprüchen entnommen werden. Further features of the innovation can be found in the protection claims.

Claims (20)

- 1 Schutzansprüche- 1 Protection claims 1. Staub- und/oder wasserdichte Verbindung von zwei Blechtafeln mit endseitigen Profilierungen, die von je einer Innen- und Außenklemmleiste überdeckt sind, wobei die Außenklemmleiste entlang beider Längsseiten mit Schenkeln versehen ist, zur Anwendung für Silos, Behälter und/oder Rohre ab 0,5 bis 1 m Durchmesser, dadurch gekennzeichnet, daß die Profilierungen als Abkantungen (2, 9, 10, 11) ausgebildet sind und zwischen der Innen- (5) und der Außenklemmleiste (6) eine Dichtung (4) angeordnet ist.1. Dust- and/or watertight connection of two metal panels with end profiles, which are each covered by an inner and outer clamping strip, the outer clamping strip being provided with legs along both long sides, for use for silos, containers and/or pipes from 0.5 to 1 m in diameter, characterized in that the profiles are designed as folds (2, 9, 10, 11) and a seal (4) is arranged between the inner (5) and the outer clamping strip (6). 2. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Abkantung der Blechtafeln (1) eine 180°-Abkantung (2) darstellt (Fig. 1).2. Connection according to claim 1, characterized in that the bend of the metal sheets (1) represents a 180° bend (2) (Fig. 1). 3. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Blechtafeln (1) zwei oder mehr 180°-Abkantungen (9) aufweisen (Fig. 2).3. Connection according to claim 1, characterized in that the metal sheets (1) have two or more 180° bends (9) (Fig. 2). 4. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Blechtafeln (1) mit zwei 90°-Abkantungen versehen sind (Fig. 5).4. Connection according to claim 1, characterized in that the metal sheets (1) are provided with two 90° bends (Fig. 5). 5. Verbindung nach Anspruch 4, dadurch gekennzeichnet, daß die Blechtafeln (1) ergänzend zu den beiden 90°-Abkantungen (10, 11) noch eine 180°-Abkantung aufweisen (Fig. 4).5. Connection according to claim 4, characterized in that the metal sheets (1) have a 180° bend in addition to the two 90° bends (10, 11) (Fig. 4). 6. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Blechtafeln (1) eine 90°-Abkantung (10) und eine 180°-Abkantung aufweisen (Fig. 3).6. Connection according to claim 1, characterized in that the metal sheets (1) have a 90° bend (10) and a 180° bend (Fig. 3). 7. Verbindung nach Anspruch 4, dadurch gekennzeichnet, daß die Schenkelhöhe zwischen den beiden 90c-Abkantungen mehr als das 6-fache der Blechstärke beträgt (Fig. 15).7. Connection according to claim 4, characterized in that the leg height between the two 90 ° bends is more than 6 times the sheet thickness (Fig. 15). 8. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß zwischen den Schenkeln (3) der Außenklemmleiste (6), den Schenkeln der Abkantungen der Blechtafeln (1) und den Flanken der Innenklemmleiste (5) kein bzw. nur ein geringes Spiel vorgesehen ist (Fig. 3, 5, 9 usw.).8. Connection according to claim 1, characterized in that no or only a slight clearance is provided between the legs (3) of the outer clamping strip (6), the legs of the folded edges of the metal panels (1) and the flanks of the inner clamping strip (5) (Fig. 3, 5, 9 etc.). -2--2- 9. Verbindung nach Anspruch 8, dadurch gekennzeichnet, daß die Flanke der InnenkJemmleiste (5) die Abkantung der Blechtafel (1) an die Schenkel (3) der AußenkJemmleiste (6) drückt.9. Connection according to claim 8, characterized in that the flank of the inner clamping strip (5) presses the bevel of the metal panel (1) against the legs (3) of the outer clamping strip (6). 10. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Innenklemmleiste (5) einen Schenkel (Fig. 9, 13, 15) oder eine Einlage (Fig. 10) aufweist.10. Connection according to claim 1, characterized in that the inner clamping strip (5) has a leg (Fig. 9, 13, 15) or an insert (Fig. 10). 11. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Innenklemmleiste (5) einen Mittelsteg und/oder eine Nut zur Aufnahme der Dichtung (4) aufweist (Fig. 3).11. Connection according to claim 1 , characterized in that the inner clamping strip (5) has a central web and/or a groove for receiving the seal (4) (Fig. 3). 12. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß der Schenkel (3) der Außenklemmleiste (6) mit einem Absatz (Fig. 8, 11, 14) oder mit einer Einlage (Fig. 12) versehen ist.12. Connection according to claim 1, characterized in that the leg (3) of the outer terminal block (6) is provided with a shoulder (Fig. 8, 11, 14) or with an insert (Fig. 12). 13. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Innenklemmleiste (5) mit einer Deckleiste (13) versehen ist (Fig. 4, 6, 7, 8, 13, 14).13. Connection according to claim 1, characterized in that the inner terminal strip (5) is provided with a cover strip (13) (Fig. 4, 6, 7, 8, 13, 14). 14. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß die Klemmleisten (5, 6) aus einem anderen Werkstoff als die Blechtafeln (1) bestehen.14. Connection according to claim 1, characterized in that the terminal strips (5, 6) consist of a different material than the metal sheets (1). 15. Verbindung nach Anspruch 13, dadurch gekennzeichnet, daß die Deckleiste (13) aus einem anderen Werkstoff als die Klemmleisten (5, 6) besteht.15. Connection according to claim 13, characterized in that the cover strip (13) consists of a different material than the terminal strips (5, 6). 16. Verbindung nach Anspruch 13, dadurch gekennzeichnet, daß die Deckleiste (13) auch die Schraubenköpfe abdeckt.16. Connection according to claim 13, characterized in that the cover strip (13) also covers the screw heads. 17. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß Mehrfachdichtungen (4) vorgesehen sind (Fig. 3, 7, 8, 13, 14).17. Connection according to claim 1, characterized in that multiple seals (4) are provided (Fig. 3, 7, 8, 13, 14). 18. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß sie außer auf ebenflächige auch für gewölbte (Fig. 16) und abgewinkelte Blechtafeln (1) (Fig. 17, 18) anwendbar ist.18. Connection according to claim 1, characterized in that it can be used not only for flat but also for curved (Fig. 16) and angled sheet metal panels (1) (Fig. 17, 18). 19. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß gleichzeitig drei Blechtafeln (1) durch eine Verbindung miteinander verbunden sind (Fig. 18, 19).19. Connection according to claim 1, characterized in that three metal sheets (1) are simultaneously connected to one another by a connection (Fig. 18, 19). -3--3- 20. Verbindung nach Anspruch 1, dadurch gekennzeichnet, daß der Winkel zwischen den Schenkeln (3) und der Außenklemmleiste (6) > 90° ist (Fig. 20).20. Connection according to claim 1 , characterized in that the angle between the legs (3) and the outer terminal block (6) is > 90° (Fig. 20).
DE9017875U 1990-08-10 1990-08-10 Dust- and/or waterproof connection of two metal panels at the edges of these panels using terminal strips Expired - Lifetime DE9017875U1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19904025490 DE4025490A1 (en) 1990-08-10 1990-08-10 DUST- AND OR WATERPROOF CONNECTION OF TWO SHEET PANELS AT THE BEND OF THESE SHEET PANELS BY means of CLAMPING STRIPS

Publications (1)

Publication Number Publication Date
DE9017875U1 true DE9017875U1 (en) 1992-09-17

Family

ID=6412067

Family Applications (2)

Application Number Title Priority Date Filing Date
DE9017875U Expired - Lifetime DE9017875U1 (en) 1990-08-10 1990-08-10 Dust- and/or waterproof connection of two metal panels at the edges of these panels using terminal strips
DE19904025490 Withdrawn DE4025490A1 (en) 1990-08-10 1990-08-10 DUST- AND OR WATERPROOF CONNECTION OF TWO SHEET PANELS AT THE BEND OF THESE SHEET PANELS BY means of CLAMPING STRIPS

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE19904025490 Withdrawn DE4025490A1 (en) 1990-08-10 1990-08-10 DUST- AND OR WATERPROOF CONNECTION OF TWO SHEET PANELS AT THE BEND OF THESE SHEET PANELS BY means of CLAMPING STRIPS

Country Status (2)

Country Link
EP (1) EP0472038A1 (en)
DE (2) DE9017875U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4228630A1 (en) * 1992-08-28 1994-03-03 Karosseriefabrik Biberach Gmbh Construction kit for rolling transport containers - has end walls and interfitting side walls engaging on castor-mounted baseplate of pallet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2726597B1 (en) * 1994-11-03 1997-01-10 Piscines Desjoyaux Sa POOL WITHOUT ANCHORAGE OR FOUNDATIONS
FR3026395B1 (en) * 2014-09-30 2017-08-04 Sarl Ur-Bain METHOD AND MEMBRANE FOR ASSEMBLING TRUNK TILES, ESPECIALLY FOR PRODUCING SWIMMING POOLS AND SWIMMING POOL PRODUCED THEREBY

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT81130B (en) * 1916-03-28 1920-08-25 Saege Impraegnierungswerke & H Fastening for wall and roof panels in demountable connection for wall and roof panels in demountable buildings. n buildings.
US1378725A (en) * 1919-08-01 1921-05-17 Ryan Thomas Tank
US1631051A (en) * 1925-08-14 1927-05-31 Watt M Nichols Oil tank
DE813221C (en) * 1949-12-01 1951-09-10 Willy Dipl-Ing Rieger Plate connection
US2904144A (en) * 1956-05-04 1959-09-15 Moorex Ind Inc Intersecting joint construction
BE432268A (en) * 1964-05-29
FR1499548A (en) * 1966-10-26 1967-10-27 Improvements to plate assembly
DE1759662A1 (en) * 1968-05-24 1971-06-16 Reinke Fritz Panel connection for solid panels and sandwich panels
FR2054374A5 (en) * 1969-07-16 1971-04-16 Lipp Xaver
US3889836A (en) * 1972-01-07 1975-06-17 Martin Marietta Aluminum Method and means for constructing large tanks
GB2096227A (en) * 1981-04-06 1982-10-13 Dravo Corp Method and apparatus for silo construction
DE3245485A1 (en) * 1982-12-08 1984-06-14 Josef Ing. 4600 Wels Oberösterreich Lesslhumer Silo for fodder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4228630A1 (en) * 1992-08-28 1994-03-03 Karosseriefabrik Biberach Gmbh Construction kit for rolling transport containers - has end walls and interfitting side walls engaging on castor-mounted baseplate of pallet

Also Published As

Publication number Publication date
EP0472038A1 (en) 1992-02-26
DE4025490A1 (en) 1992-02-13

Similar Documents

Publication Publication Date Title
EP0115246A1 (en) Pipe clamp
DE2620148A1 (en) FILTER ELEMENT
DE1957380C3 (en) Curb for roof skylights
DE2820620C3 (en) Elastic sealing and fastening strip for enclosing a pane, in particular a pane in a motor vehicle body
DE9017875U1 (en) Dust- and/or waterproof connection of two metal panels at the edges of these panels using terminal strips
DD139889A1 (en) COMPOSIBLE KOERPER ELEMENT COMPRISED OF INDIVIDUAL WALL ELEMENTS
EP0085355B1 (en) Device for the connection of air-channel elements provided with flange sections at their edges which form openings for corner angles
DE3806091A1 (en) Component composed of two or more profiled strips which are preferably made of metallic material, in particular for use in the construction of vehicles
DE3242614A1 (en) Device for fastening sheets of plastic or the like along their edges
DE9116436U1 (en) Construction of profile bars and truss profiles
EP0143150B1 (en) Flange coupling
DE3031687C2 (en) Device for protecting the end areas of pipes against mechanical damage
EP0951113B1 (en) Rectangular case for electrical or electronic components
EP0352403A2 (en) Seal ring
DE6910884U (en) RETAINING STRIP FOR FASTENING WALL CLADDING PANELS FORMING AN EXTERNAL METAL WALL
DE3332974C1 (en) Profile strip arrangement on the platform of a lifting stage
DE9304677U1 (en) Reinforcement profile for an external mullion reinforcement of a window mullion
EP1335138B1 (en) Profiled bar connection
DE4440430C1 (en) Connector between wire mats
DE2225556C3 (en) Two-part waveguide flange that can be plugged onto a microwave waveguide
WO1993011385A1 (en) Flange section for fitting on the mating edges of air duct components
DE8414028U1 (en) DEVICE FOR CONNECTING TWO PIPES
DE1943224C (en) Pressure vessel, especially for a central heating system
DE1958901A1 (en) Moment of force absorbing, water repellent connection construction
DE3536784A1 (en) Pipe connection