DE895737C - Progressive pit construction with a backless coal front - Google Patents

Progressive pit construction with a backless coal front

Info

Publication number
DE895737C
DE895737C DEG1850D DEG0001850D DE895737C DE 895737 C DE895737 C DE 895737C DE G1850 D DEG1850 D DE G1850D DE G0001850 D DEG0001850 D DE G0001850D DE 895737 C DE895737 C DE 895737C
Authority
DE
Germany
Prior art keywords
elements
expansion
extension
pit
backless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG1850D
Other languages
German (de)
Inventor
Walter Dipl-Ing Doehne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gelsenkirchener Bergwerks AG
Original Assignee
Gelsenkirchener Bergwerks AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gelsenkirchener Bergwerks AG filed Critical Gelsenkirchener Bergwerks AG
Priority to DEG1850D priority Critical patent/DE895737C/en
Application granted granted Critical
Publication of DE895737C publication Critical patent/DE895737C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • E21D23/0409Aligning or guiding means for the supports or for the constitutive parts of the supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Manipulator (AREA)

Description

Schreitender Grubenausbau mit rückfreier Kohlenfront Beim Grubenausbau mit rückfreier Kohlenfront, bei ,dem ,das Strebförderm:ittel bei fortschreitendem Abbau als geschlossenes Ganzes an, dien neuen Kohlenstoß herangebracht wird, bedient man sich, bekanntlich zwecks Vermeiidun@g einer Stempelreihe im Bereich der Gewinnunggs@masehne sowie dia Strebfördermi.ttels. des sogenannten schreitenden Ausbaues, eines Ausbaues, bei dem die einzelnen Ausbauelemente frei igelten den Kohlenstoß vorgepfändeit werden. Derartige Ausbaue in ihrer bis,-her bekannten. Ausführung arbeiten in der Weise, daß die Ausbauelexnenrie vor dem Umsetzen um ein geringes Maß @ab-"-es.enlct und in !der abgesenkten Form hängend oder stehend auf dien Kohlenstoß zu vorwärts bewegt werden;. Hierbei ergibt sich, insbesornkre belim Abbau mit Bruchbau, insofern eine große Schwierigkeit, als ,s,i-ch das Hiangende am versatzseitigen Ende des Ausbaues auf das Schaleisen oder Iden Stempel aurfsetzt und dadurch die Vorwärtsbewegung des Aueibawelem@entes hemmt. Außerdem sind bei den bisher bekannten schreitenden Ausbauarten, jeweils nur zwei Ausbauelemenee zu, einer Ausbaueinheit (Gespann) verbunden. Beim sogenannten Schaukelbau müssen mindestens@drei Ausbauelemente miteinander verbunden sein-, gegebenenfalls kann diese Zahl beliebig erhöht werden, soweit es die örtlichen Betriebsverhiäiltni,sse zulassen. Hierdurch wird- erreicht, daß ein seitliches Verschieben der Ausbauteile gegeneinander vermieden_ wird. Um nun beim schreitenden - Ausbau( die vor- erwähnten Schwierigkeiten? zu !beheben, schlägt die vorliegende Erfindung vor, (das Umsetzen ider Aus- bauelemente nicht mehr wie bisher in drei vor-. schiedenen Arbeitsvorgängen (Absenken,, Verschie- ben, und Anheben) auszuführen, wobei, das Ver- schieben in Hängeeii.sen oder in t horizonbalkreis- förm igerBewegung !bei stebeniden.Ausbaubeilen aus- geführt wird, sondern mit vertikallschwenkbaretn Armen in Form auszuführen, wobei die Schwenkarme um so viel länger sind als (der Abstand ;der Baute, so daß sich be@im- Durchschwenken die gewünschte Schrittbreite er- gibt. Durch das Verschieben der einzelnen Ausbau- elemente- in Schaukelbewegung zueinander wird ver- mieden, (daß idas Ausbauelement von dem iseiner Unterstützung beraubten und sich setzenden Ge- birge festgeklemmt wird, da indem Auigenblick, in dem das Aus(banelement seine tiefste Lage erreicht, es bereits im Bereich des Gebirgsteiles liegt, der von den Nachbarbauten getragen wird. Die gelen- kige Veribindning (der einzelnen Ausibaueilemente durch schwenkbare Arme miteinander bat auch noch den Vorteil, daß eine Verbindung zwischen .den Bauen entlang der KohIenfront geschaffen wird, die, verhindert, diaß der Abstand der Blaue sich ändert. Um Idas Vorwärtsarbeiten (der Stempel bei der Schaukelbewegung (dien :aus Schaleisen bestehendem Ausbauelemente zu erleichtern, wind vorgeschlagen, ,die Stempel mit einer angewinkelten Ösiei mit den Schaleisen zu. verbinden, sio daß sich ,die Stempel in der Vorschubrichtun@g entlang dem Schaleisen legen können. Zur der Ums(etzbaarkeiit ist die Möglichkeit gegeben; die Ausbauelemente in. ider Längsirichtung -so voneinander zu trennen, daß das Umsetzen während (der Kohlengewinnung unab- hängig vom Umsetzen bei der Versetzbarkeiit durch- geführt wird, indem die vonderen, (den elgen(tlichen Abbauraum unterstützenden Ausbaue von Iden hin- teren versatzseitigen Ausibauen getrennt werden. Um dabei. zu verhindern; daß bei diesem getrennten Voranschreitendes vorderen und hintewen Ausbaues das dazwischenliegende Gebimge seinen Halt ver- liert, wird vorgeschlagen, zwischen den vorderen. und hinteren Teilen des Ausbaues Drahtseile anzubrin- gen, die :beim Vo.rwäirtsschreiten (dieis vorderem Aus- hauteiles sich spannen und so das Gebirge tragen und ,die ,sich nach, dem Heranrücken (dies hinteren Ausbauteiles, (der eich (dann an. den vorderen. Aus- bauteil anlegt, sichl,aufernförmig,du.rcihh:ängen. In :der Zeichnung ist der Erfindungsvorschlag in einem Ausführunigsiheispiel ischematisc h veranschau- licht, wobei idie einzelnen Abbi:l@dungen Einzelheiten ,darstellen. Nach Abb. i ider Zeichnung (besteht der Ausbau aus drei versichiedenen Teilen. Der Vorpfändibau a hat die Aufgabe, das Hangende im stempelfreien Ab- bauraum zu unterstützen:. Er beisteht aus einer be- liebig lanigen Stahlkappe mit einem oder mehreren Stempeln, deren Anordnung unter !dem Schaleisen ebenfalls beliebig gewählt wenden kann. Das Schal- eisen d wird- mit zwei: Bolzen b versehen, die es !be!im Umsetzen ;dies Baues an. !den Schaukelarmen c haltern. Der Brechbau d unterstützt Idas Hangende bis zur Bruchkante. Auch hier können die Brechschiene und-' der Stempelt in beliebn(gerAnordnung und Länge gewählt werden, da der Bau. ebenfalls mit Bolzen b in den Schäauliuelarmen. c aufgehängt ist. Ein Drahtseil e überbrückt (den ausbaufreien Raum zwischen: idem vorglescbolbeneni Voirpfärnd- bau a und dem zurückggbliefbenen: Brechbau, d. Das Drahtset a spannt sich selbsttätig mit dem Vor- schieben- des Vorpf.ändibauesunter Idas, Hangende- Die Zugkraft (des Drahtseiles- c, wirkt sich bei der gespreizten Stellung der Schlaukelarme c in einten Druck .auf die Stempel aus, so daß die Baue hier- durch nicht unigeschoben werden können. Bei zu- siammengezogen!em Bauen: hängt dias Drahtseil c schlaufenförmi,g zwischen dem Vorderbau und Hinteriba;w idurch. Abb. 2 zeigt (die. Befestigung ider Sch,aukellarme: 2 an (den oben beschriebenen Ausbauen. Die Schaukeil- arme 2 -sind in den Bolzenm drehbar aufgehängt. Die S tahl(leappe ist an ,dieser S telde mit einem Futter- stück 3 verseben, das zur Befestigung der Bolzten i und gleichzeitig zur Führung der 2 idient. Die Läge 4,dier Schaukelarme ,2(lin streichen- der Richtung antsprichtderhaliben. Schritt@veüse des Ausbaues, während idie Breite 5 der Schaukelarme a gleich dom Abstandd ier Blaue iis!t. Abb. 3 zeigt idiie Befestiigung dler Stempelgabel i mit einer winkligen Öse 2 und einem Bolzen 3 an der Stahlkappe q,, so,- daß der Stempel bei der Schaukelbewegung (dies Ausbauelementes, iYis in die waagerechte Lage an dito Stahlkappe q. anlgelegt werden kann. Die Ar'beitsweii,se der Schaukelbaue ist arn (dem Beispiel gemäß A`bb. q. erläutert: Der Vonderib,au besteht .aufs einer Stahlkappe i von i6oo mm Länge, die mit zwei Bolzen 2 und 3 versehern ist. Die Bol- zen 2 und 3 haben einen Durchmesser von 2o mm und sind: nach der angegebenen Weiset an der S t#ah!l- kappe i befestigt. Die Stempel ¢ werden je nach der Größe (des stempelfreiem Raumes auf roo!o( bis i2oo mm vom dem voirderen Staihlkappenenide ent- fernt in Balzen. aufgehängt. Der Bau ist mit vier Schaukelarmen 5 zwischen Iden benachbarten Bauen, gehalten und schwingt ibeim Umsetzen ides Baues :durch: seine Schwerkraft in den Schaukelarmen nach vorn bis .in dlie untere Tofage. Von( hier muß der Bau gehaben werden, wodurch gleichzeitig ein weiteres Vorschieben ides Baues bewirkt wird. Die ganze Stahlkappe kann von einem Arbeitsmann ge- hoben werden, geschieht, jedboh: praktischerweise .mittels, einfies Druckzylinders, dein (gleichzeitig dem Bau einen sichreren: Stand zum Setzern ides Stempels gibt. Durch: (das Verschieben ideir StaiWlcappe i wird das ungefähr ieoi mim lange Drahtseil.stück straff gespannt und dient jetzt -als vorläufige Ik'appe zwi- schen id!en beiden. Blauen, Ibis dLer Brechbau ebenfalls unigesetzt ist. Der Brechbau besteht aus einem 210:o bis 300 mm langen Stahlkappen@stück 6, das durch eine Querkappe noch, besondeirs als Brechkappe aus- b-ebi.lidet wenden kann. Der Brechbau, 6 ist in gleicher Weise: wie -der Vorderbau i, jedoch nur mit zwei Schaukelarmen 5, zwischen den benachbarten Bauen aufgehängt. Beim Los,schlegen des Brechstempels q. wird dieser ebenfalls durch sein Gewicht nach vorn gezogen. Auch bei sofortigem Nachbrechen -des Hangenden wird, der Bau selbsttätig in den gescherten Strebraum hineingezogen, so idaß ein Absichern, des Bruches bis, zum Umsetzen des Brechbaues unnötig ist. Das, Wiederaufstellen des Brechbaues b staket sich sehr einfach, da es von einem Mann, leicht durchgeführt werden kann. Das vorher gespannte Drahtseil hängt jetzt wieder in einer Sohlawfe zwischen, Iden Bauen durch.Progressive mine expansion with a reverse-free coal front In the case of mine expansion with a reverse-free coal front, in which the face conveyor is brought up as a closed whole as mining progresses, a row of punches is used, as is well known, for the purpose of avoiding it in the area of the extraction and dia Strebfördermi.ttels. the so-called progressive expansion, an expansion in which the individual expansion elements are freely locked the coal pile. Such expansions in their previously known. Execution work in such a way that the expansion elexnenrie are moved forward by a small amount @ab - "- es.enlct and in! The lowered form hanging or standing on the coal face before moving Quarry construction, insofar as, s, i-ch, the hanging end at the offset end of the extension attaches to the shell iron or die and thereby inhibits the forward movement of the Aueibawelem @ duck. In addition, with the previously known stepping extension types, there are only two each In the so-called swing construction, at least three extension elements must be connected to one another - if necessary, this number can be increased as required, as far as the local operating conditions permit Expansion parts against each other is avoided. In order to continue with the progressive - expansion (the mentioned difficulties? to! fix, the present invention, (the implementation of the components are no longer in three pre-. different work processes (lowering, different practice, and lifting), whereby, the slide in hanging eggs or in the horizontal circle shaped movement! with stebeniden. is guided, but with vertikallschwenkbaretn Poor in To execute form, the swivel arms being so much longer are as (the distance; the building, so that be @ im- Swivel through the desired step width gives. By moving the individual expansion elements - in a rocking motion to each other is avoided, (that i is the extension element of its Support deprived and settled laws birge is stuck, because by Auigenblick, in where the out (banelement reaches its lowest position, it is already in the area of the mountain part that is borne by the neighboring buildings. The gel- kige Veribindning (of the individual extension elements by swiveling arms with each other also begged nor the advantage of having a connection between .the building along the coal front is created, which, prevents the distance from the blue changes. To get Ida's forward work (the stamp on the Rocking movement (serve: made of shell iron To facilitate expansion elements, wind proposed who have favourited Stamp with an angled Ösiei with the Shell iron too. connect, sio that, the stamp in the feed direction along the cup iron can. To the the conversion (availability is the Possibility given; the finishing elements in. ider Longitudinal direction - to be separated from each other in such a way that the Transfer during (the coal production independent depending on the implementation with the relocatability through- is guided by the Expansion of ides to support mining be separated on the offset side. To do it. to prevent; that at this separated Advancing front and rear expansion the mountains in between lose their hold liert, it is suggested between the front. and attach wire ropes to the rear of the extension genes, which: when walking in front of the skin parts stretch and so carry the mountains and, which, after, the approaching (this rear Expansion part, (the calibration (then to. The front. component attaches, sichl, umern-shaped, du.rcihh: angen. In: the drawing is the inventive proposal in a detailed ischemical example light, where i the individual figures: l @ dings details ,represent. According to Fig. I in the drawing (the expansion from three different parts. The Vorpfändibau a has the task of creating the hanging wall in a stamp-free support installation space :. He is supported by a lovely long steel cap with one or more Stamps, their arrangement under! The cup iron can also turn arbitrarily chosen. The scarf iron d is provided with two: bolts b, which it! be! im Implement; this build on. ! hold the rocking arms c. The crushed building d supports Ida's hanging wall up to to the breakline. Here, too, you can use the breaker bar and- 'the stamps in any (small arrangement and length be chosen as the construction. also with bolts b in the Schäauliuelarms. c is suspended. A wire rope bridged over (the expansion-free Space between: idem vorglescbolbeneni Voirpfärnd- construction a and the leftover one: crushed construction, d. That Wire set a is automatically tensioned with the sliding front pillar under Idas, hanging wall The tensile force (of the wire rope - c, affects the spread position of the lugar arms c in one Pressure on the stamps so that the buildings cannot be pushed through. In to- pulled together! em building: hang the wire rope c loop-shaped, g between the front structure and Hinteriba; w idurch. Fig. 2 shows (the. Attachment of the Sch, aukellarme: 2 (the removal described above. arms 2 -are suspended in the bolts so that they can rotate. The S tahl (leappe is on, this S telde with a fodder piece 3, which is used to fasten the bolts i and at the same time to guide the 2 idient. The length 4, the swing arms, 2 (line lin- the direction responds accordingly. Step @ veüse des Expansion, while the width 5 of the swing arms a equal to the distance between the blue ones. Fig. 3 shows the fastening of the punch fork i with an angled eyelet 2 and a bolt 3 the steel cap q ,, so, - that the punch at the Rocking movement (this expansion element, iYis in the horizontal position on ditto steel cap q. created can be. The working method of the swing construction is arn (dem Example according to A`b b . q. explained: The Vonderib, au consists of a steel cap i 600 mm long, which is versehern with two bolts 2 an d. 3 The Bol zen 2 and 3 have a diameter of 20 mm and are: according to the given way at the S t # ah! l- cap i attached. The stamps ¢ are changed depending on the Size (of the stamp-free space on roo! O (up to i2oo mm from the voirderen steel cap end far away in courtship. hung up. The construction is with four Swing arms 5 between the neighboring buildings, held and swayed when moving the building : by: its gravity in the swing arms forward to the lower tofage. From (here must the construction to be had, making one at the same time further advancement of the building is effected. the whole steel cap can be done by one worker be lifted, happens, but: practical .by means of a single impression cylinder, your (at the same time the Build a safer one: stand to set the stamp gives. By: (moving ideir StaiWlcappe i becomes the roughly ieoi mim long piece of wire rope is taut excited and now serves as a provisional Ik'appe between between the two. Blauen, Ibis dLer Brechbau too is not set. The crushing structure consists of a 210: o up to 300 mm long steel caps @ piece 6 that through a cross-cap, especially as a break-off cap. b-ebi.lidet can turn. The crushing structure, 6 is in the same way: like -the front structure i, but only with two swing arms 5, suspended between the neighboring structures. At the start, hit the breaker q. this is also pulled forward by its weight. Even if the hanging wall is broken up immediately, the structure is automatically drawn into the sheared face so that it is unnecessary to secure the break before moving the structure. The re-erection of the crushing structure is very simple, since it can easily be carried out by one man. The wire rope that was previously tensioned is now hanging again in a slippery slip between Iden Bauen.

Die Baue. der oben beschriebenen Art @slinid paarweise uim Soo mm gegeneinander vers!atzt, so daß jeweils jeder zweite Bau umgesetzt wenden kann. Der gesamte Strebausbau ist durch die Schaukelarme fest verbunden, idie somit die Lage dies. Umzusetzenden Baues bestimmen.The build. of the kind described above @slinid in pairs uim Soo mm offset against each other so that every second building can turn around. The entire longwall structure is firmly connected by the swing arms, thus the Location this. Determine the building to be implemented.

Die vier Phasen eines Arbeitsspieles mit den Bauen ist aus der Abib. 5 ersichtlich.The four phases of a work game with building is from the Abib. 5 can be seen.

Die Diarstellung I zeigt die Ausgangsstellung zweior :benachbauter Baue. In Darstellung II d(st der Bau z@ vorgeschoben und dies Drahtseil 3 gespannt. In Darstellung III sind die Baue i und z vorgeschoben und das Drahtseil q. gespannt. In Darstellung IV wind ,der Brechbau 5 herangeholt. Das Arbei.ts:spdel beginnt jetzt wieder mit der Darstellung I, indem der Brechbau 6 herangeholt wird.Diagram I shows the starting position two or more: adjacent Build. In illustration II d (the construction z @ is pushed forward and wire rope 3 is tensioned. In illustration III the structures i and z are advanced and the wire rope q. tense. In illustration IV wind, the crushing structure 5 is brought up. The work: spdel starts now again with illustration I, in that the crushing structure 6 is brought up.

Claims (1)

PATENTANSPRÜCHE: i. Schreitender Grulbenausibau. mit rückfreier Kohlleinfront, dadurch gekennzeichnet, idaß die einzelnen Ausbauelemente in Schaukelbewegung gegeneinander vorwärts bewegt wieirden, zu welchem Zwecke,das Aushnuelement an d en be- nac'hlbarten Elementen gelenkig aufgehängt ist. a. Grix.be,nauo-bau: nach Ansprucah i, dadurch ,gekennzeichnet, daß die gelenkige Aufhängung ider einzelnen Ausbauelemente aneinander mittels schwenkbarer Arme erfolgt. 3. Grubenausbau nach Anspruch i unid a, da- durch gekennzeichnet, d@aß die Länge der Schaukelarme in streichender Richtung der hal- iben Schrittseite des Awslbaues entspricht, wäh- rend ihre Breite gleich ,dem, Abstand der ei,n- zeJnen Ausbauelemente voneiniander ist. q.. Grulbenausibau nach Anspruch:i, bis 3, da.- ,durch -gekennzeichnet, @daß @diegelenkige Ver- bindung ider Schaukelarme mit ,dien zweckmäßig aus Schaleisen bestehenden Ausbauielementen ,durch Drehbolzen erfolgt, wobei diie Schaleisen an den Verbinduugsstellen mit Futterstücken versehen sind. -5;. Grubenfausbau nach Anspruch i ibi,s. q., Idia- ,durc!h -gekennzeichnet, idaß die :die Ausbau- elementea tragenden Stempel mittels einer ge- winkelten Öse mit den die Ausbauelemente bil- ,deinden Schaleisen verbunden sind. 6. Gruibenansbau nach Anspruch i, bis 5, da- durch gekennzeichnet, idaß die: Ausibaueleimente in der Längsrichtung voneiniander getrennt sind. 7. Gruöenausbau nach Anspruch i :bis 6, da- durch,geleennzeidhnet, @daß bei in Längsrichtung getrennten Ausfbauelementen letztere mittels Drahtseilen miteinanider verbuniden sind.
Angezogene Druckschriften: Berichte über idie »Arbei,tssitzu@ng der Hauptaussahüsise für Forschungswesen des Bergb-au@Vereins« am a5. 6. 1943, Glückauf-Verlag, S. 36, Abb. 12, und letzter Absatz der linken Spalte.
PATENT CLAIMS: i. Stepping pit construction. with a backless cabbage front, characterized in that the individual extension elements are moved forward in a rocking motion against each other what the purpose of the exclusion is hinged to adjacent elements. a. Grix.be, nauo-bau: according to claims i, thereby , characterized in that the articulated suspension ider individual expansion elements together takes place by means of pivoting arms. 3. Pit lining according to claim i unid a, that characterized by, d @ ate the length of the Swing arms in the stroking direction of the half on the crotch side of the Awslbau, while- rend their width is equal to the, distance of the egg, n- The two finishing elements are separated from each other. q .. Grulbenausibau according to claim: i, to 3, da.- , marked by, @ that @diegelenkige verb binding ider swing arms with, serve purposefully finishing elements consisting of shell iron , is done by pivot bolts, the cup iron at the connection points with pieces of food are provided. -5 ;. Pit support according to claim i ibi, sq, Idia- , marked by the: the expansion elementea bearing stamp by means of a angled eyelet with which the extension elements form , which are connected to the shell irons. 6. Gruibenansbau according to claim i, to 5, there- characterized by, i that the: Ausibaueleimente are separated from each other in the longitudinal direction. 7. Green extension according to claim i: up to 6, there- through, gelennzeidhnet, @ that at in the longitudinal direction separate extension elements by means of the latter Wire ropes are connected to each other.
Attached pamphlets: reports on the »work, tssitzu @ ng of the main committee for research of the mining association« on a5. 6. 1943, Glückauf-Verlag, p. 36, Fig. 12, and the last paragraph in the left column.
DEG1850D 1944-05-27 1944-05-27 Progressive pit construction with a backless coal front Expired DE895737C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG1850D DE895737C (en) 1944-05-27 1944-05-27 Progressive pit construction with a backless coal front

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG1850D DE895737C (en) 1944-05-27 1944-05-27 Progressive pit construction with a backless coal front

Publications (1)

Publication Number Publication Date
DE895737C true DE895737C (en) 1953-11-05

Family

ID=7116452

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG1850D Expired DE895737C (en) 1944-05-27 1944-05-27 Progressive pit construction with a backless coal front

Country Status (1)

Country Link
DE (1) DE895737C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1019265B (en) * 1954-03-02 1957-11-14 Kloeckner Bergbau Victor Icker Wandering longwall mining, preferably for mining in steep floezen
DE1103268B (en) * 1959-10-31 1961-03-30 Bwg Bergwerks Und Walzwerk Mas Wandering support frame for the expansion of pit rooms
DE1202238B (en) * 1961-06-03 1965-10-07 Konrad Grebe Wandering longwall construction made of support frames combined to form teams

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1019265B (en) * 1954-03-02 1957-11-14 Kloeckner Bergbau Victor Icker Wandering longwall mining, preferably for mining in steep floezen
DE1103268B (en) * 1959-10-31 1961-03-30 Bwg Bergwerks Und Walzwerk Mas Wandering support frame for the expansion of pit rooms
DE1202238B (en) * 1961-06-03 1965-10-07 Konrad Grebe Wandering longwall construction made of support frames combined to form teams

Similar Documents

Publication Publication Date Title
DE910770C (en) Procedure for moving a longwall construction (migrating longwall construction)
DE895737C (en) Progressive pit construction with a backless coal front
DE970540C (en) Framework for progressive expansion in brown coal longwall mining
DE1009136B (en) Extension frame for traveling longwall mining
DE849537C (en) Longwall mining
DE2646496C3 (en) Facility for the continuous expansion of a line with a door frame expansion
DE858089C (en) Drag chain conveyor in which the working and return sections are separate from each other
DE2001358C3 (en) Device for the automatic production of spatial lattice girders
DE911961C (en) Method and device for the moving expansion of mining struts
DE817738C (en) Device for mechanically moving the expansion parts during coal mining with a backless coal front
DE902963C (en) Pit stamp with Vorpfaendeinrichtung
DE6752880U (en) DEVICE FOR ALIGNING AND SETTING UP BODIES, ESPECIALLY HOLLOW BODIES OD. DGL.
DE973605C (en) Mine support
DE1758939B1 (en) Moving hydraulic support frame for underground mine gear
DE1257721C2 (en) HYDRAULIC STAMP REMOVAL UNDER LOAD
DE958644C (en) Procedure for free pre-paving in longwall mining and expansion to carry out the procedure
DE803535C (en) Method and device for free pre-paving in moving longwall mining with shell iron
DE970192C (en) Method and device for mobile longwall mining
DE802931C (en) Self-locking hook for the pit construction
DE875639C (en) Offset wire support
DE974859C (en) Gradual expansion in steep storage
DE1215633B (en) Hiking pillar extension for strut in inclined storage
AT313833B (en) Expansion frame
DE1882507U (en) HIKING STREAM CONSTRUCTION.
DE1076604B (en) Progressive longwall mining