DE814603C - Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame - Google Patents

Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame

Info

Publication number
DE814603C
DE814603C DEB604A DEB0000604A DE814603C DE 814603 C DE814603 C DE 814603C DE B604 A DEB604 A DE B604A DE B0000604 A DEB0000604 A DE B0000604A DE 814603 C DE814603 C DE 814603C
Authority
DE
Germany
Prior art keywords
support
arch
support frame
ridge
tunnels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEB604A
Other languages
German (de)
Inventor
Karl Theodor Jasper
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bergbaustahl & Co GmbH
Bergbaustahl GmbH
Original Assignee
Bergbaustahl & Co GmbH
Bergbaustahl GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bergbaustahl & Co GmbH, Bergbaustahl GmbH filed Critical Bergbaustahl & Co GmbH
Priority to DEB604A priority Critical patent/DE814603C/en
Application granted granted Critical
Publication of DE814603C publication Critical patent/DE814603C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/28Longitudinal struts, i.e. longitudinal connections between adjoining arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/183Supporting means for arch members, not provided for in E21D11/22

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

Stützbogen für die Auskleidung von Stollen, Tunnels, Strecken usw. als vorläufiger Stützrahmen Gegenstand der Erfindung bildet ein Stützrahmen, der sowohl in der Höhe und Breite an verschiedene Querschnitte anpaßbar ist und der gleichzeitig die Möglichkeit gibt, als vorläufiger Ausbau sowohl wie als Armierung für solche Stollen, Strecken, Tunnels usw. zu dienen, die nachträglich und zu einem beliebigen Zeitpunkt durch Beton ausgekleidet werden sollen. An solche Stützrahmen werdet eine Reihe von Forderungen gestellt. So handelt es sich insbesondere bei wasserführenden Stollen durch stark hygroskopisches und gebräches Gebirge, wie es z. B. mergeliger Tonschiefer darstellt, darum, auch den Nachfall unter Umständen abfangen zu kö-inea, trotzdem aber den Arbeitsfortschritt beim Vortrieb in keiner Weise zu behindern. Es muß möglich sein, sowohl die vor der Streckenbrust Arbeitenden, also die mit dem eigentlichen Vortrieb und dem Fortschaffen des Abraumes Beschäftigten vor dem Nach- . fall zu schützen, dem Vortrieb rasch zu folgen ohne Zeitverlust, trotzdem aber die bereits erstellte Strecke auch an den Stößen so lange zu halten, bis die zu beliebiger Zeit in Angriff genommene Betonierung der Röhre nachfolgen kann. Gleichzeitig ist aber auch dafür Sorge zu tragen, daß bei klüftigem und mit Einbruch drohendem Gestein au Orten der Klüfte der Ausbau wie eine Verschalung wirkt, die gegebenenfalls den nachfolgenden Beton armiert.Support arches for lining galleries, tunnels, routes, etc. As a preliminary support frame, the invention provides a support frame that both in height and width can be adapted to different cross-sections and the at the same time gives the possibility of temporary expansion as well as reinforcement for such galleries, routes, tunnels, etc. to serve afterwards and to one to be lined with concrete at any point in time. To such support frames a number of demands are made. This is particularly the case with water-bearing tunnels through strongly hygroscopic and used mountains, like it z. B. marly slate represents, therefore, also the fall under certain circumstances to intercept to ko-inea, but nevertheless the work progress in the advance in none Way to hinder. It must be possible for both those who work in front of the front of the track, that is, those who actually drive and move the spoil before the after-. to protect falls, to follow the advance quickly without wasting time, Nevertheless, to keep the already created route at the joints as long as possible, until the concreting of the tube, which has been started at any time, follows can. At the same time, however, care must also be taken to ensure that in the case of cleft and with Impending rock in places of the clefts the expansion acts like a casing, which optionally reinforces the subsequent concrete.

Die Forderungen sind bisher mit den bisher üblichen Mitteln in ihrer Gesamtheit nicht erfüllbar gewesen. Der Erfindung blieb es vorbehalten, die gestellten Forderungen restlos zu erfüllen. Es wird eine Anpassung an den im Querschnitt wechselnden Ausbruch erzielt, die Stützrahmen werden in Längs- und Querrichtung an sich und unter sich versteift, an der Vortriebsstelle der Streckenbrust wird ein vollgültiger Schutz der Arbeitenden gegeben, die Arbeitsmöglichkeit bleibt ohne vollständigen Ausbau erhalten, und gleichzeitig wird auch die Möglichkeit geschaffen, sowohl sofort wie nachträglich Einbrüche, Nachfallgefahren usw. zu beseitigen und dem Ausbetonieren Zeit- und Ortfolge freizulassen. Gemäß der Erfindung wird die Lösung dieser Aufgaben vorzugsweise durch ein besonderes Profil in Glockenform erfüllt. Grundsätzlich ist aber die gewählte Ausführungsform des Stützrahmens maßgebend, weil die zur Verwendung gelangenden Bauelemente notfalls auch mit Hilfe anderer Formeisen erstellt werden können. Die Erfindung beruht dabei auf der Gestaltung von im wesentlichen 3teiligen Stützrahmen in Bogenform.The demands are so far with the usual means in their Totality could not be fulfilled. It was reserved to the invention, the provided requirements to be fulfilled completely. There is an adaptation to the outbreak, which changes in cross-section achieved, the support frames are in the longitudinal and transverse directions in and of themselves stiffened, full protection is provided at the point of advance on the face of the route given to workers, the opportunity to work remains without complete expansion received, and at the same time the opportunity is also created, both immediately how subsequently eliminating break-ins, risk of collapse, etc. and concreting To release time and place sequence. According to the invention, these objects are achieved preferably fulfilled by a special profile in the shape of a bell. Basically is but the selected embodiment of the support frame is decisive because the use If necessary, the components that arrive can also be created with the help of other forging tools can. The invention is based on the design of essentially 3-part Arch support frame.

Solche 3teiligen Stützrahmen wurden im Bergbau schon angewandt, waren aber nur für einen Querschnitt anwendbar. Die drei Segmente griffen zwar überlappend ineinander, ergaben aber keine Möglichkeit, sie von vornherein der Höhe oder Breite des Bogens anzupassen, weil die Enden der Segmente gerade und in den Radien ungleich waren. Nach der Erfindung werden die Enden der Segmente dagegen für die Überlappung in den Radien entweder völlig gleich oder aber so aneinander angepaßt, daß die Größe der Überlappung und damit der lichte Querschnitt des Bogens veränderlich gemacht werden kann.Such 3-part support frames have already been used in mining but only applicable for one cross-section. The three segments overlapped into one another, but gave no way of specifying the height or width in advance of the arc because the ends of the segments are straight and unequal in the radii was. According to the invention, however, the ends of the segments are used for the overlap in the radii either completely the same or adapted to one another in such a way that the size the overlap and thus the clear cross-section of the arch is made variable can be.

Die 3 Teile des Stützrahmens sollen beliebig vorbaubar und miteinander je nach den örtlichen Bedingungen vereinigbar und auch dem Ausbruch anpaßbar sein. Die Erfindung schlägt demgemäß eine Stützrahmenkonstruktion aus 3teiligen Bogen vor, deren Firstsegment in jedem Fall erhalten bleibt, dessen Abstützung am Stoß und gegen die Sohle aber sowohl durch 2 weitere Bogenteile wie auch durch Senkrechtstützen, die in Höhe und Breite verstellbar zueinander gehalten sind, erfolgen kann. Der 3teilige Bogen wird von vornherein in seiner Einteilung so bestimmt, daß die gewählten Radien eine große Überlappung für den geringsten Querschnitt und eine geringere Überlappung für den erstellbaren größten Querschnitt aufweisen. Beim normalen Vortrieb wird das Firstsegment als Deckenschutz im Sinne des bergmännischen Vorpfändens auf langen Stäbe, die an den bereits aufgestellten Rahmen verankert sind, aufgelegt und gegenüber der Firste verzogen und verpackt. Die Abstützung gegen die Sohle erfolgt dann nach Wegschaffung des Abraumes durch senkrechte 2teilige Stützen auf jeder Seite. Von diesen 2teiligen senkrechten Stützen ist der obere Teil dem Radius des Bogens angepaßt gekrümmt und legt sich am Firstsegment unter Zuhilfenahme geeigneter Spannmittel an, während der untere Teil der Stütze - je nach Höhe des Ausbruchs - wiederum unter Zuhilfenahme von das Gleiten und Verstellen gestattender Spannmittel an dem geraden Ende des oberen Stützrahmens angeschlossen wird. Der Abstand der beiden senkrechten Stützen in der Querrichtung wird so gewählt, daß die beiden Enden des Firstsegments überstehen, um auf diese Weise Platz für die Anlage der Stoßsegmente, entweder sofort oder zu gegebener Zeit zu schaffen.The 3 parts of the support frame should be front-mountable and with one another Depending on the local conditions, it can be combined and also adapted to the outbreak. The invention accordingly proposes a support frame construction made of 3-part arches before, whose ridge segment is retained in any case, its support on the joint and against the sole, however, both by 2 further arch parts and by vertical supports, which are kept adjustable in height and width to each other, can take place. Of the 3-part sheet is determined from the outset in its division so that the selected Radii a large overlap for the smallest cross section and a smaller one Have an overlap for the largest cross-section that can be created. With normal propulsion the ridge segment is used as a ceiling protection in the sense of mining pre-pledging long rods that are anchored to the frame that has already been set up and twisted and packed across from the roof. The support against the sole takes place then after removing the overburden through vertical 2-part supports on each one Page. The upper part of these 2-part vertical supports is the radius of the Curved to match the arch and lays itself on the ridge segment with the help of a suitable one Clamping device on, while the lower part of the support - depending on the height of the breakout - Again with the help of clamping means that allow sliding and adjustment is connected to the straight end of the upper support frame. The distance of the two vertical supports in the transverse direction is chosen so that the two ends of the ridge segment to create space for the installation of the joint segments, either immediately or in due course.

Mit einfachen Mitteln können die Stützrahmen sowohl unter sich wie auch quer gegeneinander verstrebt werden. Die Mittel zu dieser Verstrebung sowie der gesamte Stützrahmen an sich werden an Hand der Zeichnung näher erläutert.With simple means, the support frame can be both under and can also be braced across each other. The means to bracing this as well the entire support frame itself are explained in more detail with reference to the drawing.

In Abb. z ist in Gesamtansicht ein 3teiliger Stützbogen dargestellt, der durch unterschiedliche Überlappung die Bewältigung verschiedener Querschnitte je nach Ausbruch wiedergibt. In Abb. 2 ist gezeigt, wie der Stützrahmen der Erfindung unter Zuhilfenahme von 2teiligen Senkrechtstützen abgefangen wird. Abb.3 zeigt eine beispielsweise Anordnung von Querstreben und Abb.4 eine einfache Längsverstrebung oder Verbolzung, die gegebenenfalls mit dem Vortrieb wandern kann. Abb.5 zeigt eine Situationsskizze für die Folge von Vortrieb, Stützrahmenanordnung und nachfolgender betonierter Rinne. Der 3teilige Bogen gemäß Abb. r besteht aus dem Firstsegment a und den beiden Stoßsegmenten b, deren Radien an den Enden von vornherein so zueinander gewählt werden, daß sie mit größerer Überlappung sowohl an einen kleineren Querschnitt wie mit geringerer Überlappung an einen größeren Querschnitt angepaßt werden können.In Fig.z, a 3-part support arch is shown in an overall view, which, due to the different overlap, enables the mastering of different cross-sections depending on the outbreak. In Fig. 2 it is shown how the support frame of the invention is intercepted with the help of 2-part vertical supports. Fig.3 shows a e.g. arrangement of cross struts and Fig. 4 a simple longitudinal strut or bolting, which can possibly migrate with the advance. Fig.5 shows a Sketch of the situation for the sequence of tunneling, support frame arrangement and the following concrete gutter. The 3-part arch according to Fig. R consists of the ridge segment a and the two joint segments b, whose radii at the ends are from the outset in relation to one another be chosen so that they have a larger overlap and a smaller cross-section how can be adapted to a larger cross-section with less overlap.

Wie Abb. 2 zeigt, bildet dieser Stützrahmen a, b zwar die Regel, jedoch ist bei den wechselnden Verhältnissen auch damit zu rechnen, daß der Ausbruch ohne schwierige Nacharbeit nicht immer gleichmäßig erfolgt. Um hier in keiner Weise behindert zu sein, wird gemäß der Erfindung das Firstsegment a nach dem Vorpfänden zunächst durch senkrechte 2teilige Stützen abgefangen. Diese senkrechten Stützen bestehen aus einem geraden Unterstück c und einem am oberen Ende gekrümmten Stück d. Die Krümmung des oberen Stützstückes d ist dem Radius des Firstsegmentes a angepaßt und wird an diesem mit geeigneten Spannmitteln h, die nicht Gegenstand der Erfindung sind, angeschlossen oder verspannt. Die Verbindung der beiden Stützteile c und d erfolgt ebenfalls durch geeignete Spannmittel h, die die Anpassung durch Verstellung der beiden Stützstücke c und d gegeneinander zulassen. Firstsegmente werden in üblicher Weise nach der Art und Größe des Ausbruchs über Vorpfändeisen c gehängt, die an den bereits stehenden Stützrahmen verankert sind. Zur Verankerung können sowohl bekannte wie sonst irgendwie geeignete Spannmittel verwendet werden. Für die Verstrebung in Richtung des Stollens, also die Verbindung der Stützrahmen unter sich, können einfache Winkeleisen f dienen, deren einer Flansch der Form der verwendeten Profileisen angepaßt ausgeklinkt ist und die mittels Keilen f an dem jeweiligen Ort festgelegt werden. Diese Spannbolzen dienen gleichzeitig als Abstandhalter, Zuganker und Schießverbolzung. Der Abstand der beiden Senkrechtstützen c, d in Querrichtung wird in einfacher Weise, wie aus Abb. 3 ersichtlich ist, z. B. durch U-Eisen g bewirkt, an deren Enden der Steg teilweise der Form der verwendeten Stützprofile angepaßt ist, während die stehengebliebenen Flansche zu seitlichen Befestigungslappen für das Verspannen mittels Hakenschellen i abgewinkelt werden.As Fig. 2 shows, this support frame a, b forms the rule, but with the changing conditions it is to be expected that the breakout will not always be uniform without difficult reworking. In order not to be hindered here in any way, according to the invention the ridge segment a is initially intercepted by vertical 2-part supports after the pre-pledge. These vertical supports consist of a straight lower section c and a curved section d at the upper end. The curvature of the upper support piece d is adapted to the radius of the ridge segment a and is connected or clamped to this with suitable clamping means h, which are not the subject of the invention. The connection of the two support parts c and d is also carried out by suitable tensioning means h, which allow adjustment by adjusting the two support parts c and d relative to one another. Ridge segments are hung in the usual way according to the type and size of the breakout over pre-pawn irons c, which are anchored to the already standing support frame. Both known and otherwise suitable tensioning devices can be used for anchoring. For the bracing in the direction of the cleat, that is, the connection of the support frames among themselves, simple angle irons f can be used, one flange of which is notched to match the shape of the profile iron used and which are fixed by means of wedges f at the respective location. These clamping bolts also serve as spacers, tie rods and locking bolts. The distance between the two vertical supports c, d in the transverse direction is determined in a simple manner, as can be seen from FIG. B. caused by U-iron g, at the ends of which the web is partially adapted to the shape of the support profiles used, while the remaining flanges are angled to lateral fastening tabs for bracing by means of hook clamps i.

Wie aus Abb. 5 beispielsweise hervorgeht, sind die Vorpfändeisen e an den letzten Stützrahmen a, d mittels geeigneter Spannmittel verankert. Die beiden Firstsegmente a werden an diesen Vorpfändeisen e durch die gleichen Spannmittel in ihrer Stellung gehalten und festgelegt. Damit wird die Firste des Stollens zunächst so stark abgefangen, daß sie in üblicher Weise verzogen und verpackt werden kann und die an der Streckenbrust Arbeitenden von oben her gegen Nachfall usw. geschützt sind. Soweit nun die örtlichen Verhältnisse es erfordern, können neben den Senkreehtstützen c, d auch gleich die Stoßschenkel b an dem Firstsegment a angelegt und festgespannt werden. Eine solche Anordnung muß insbesondere dort Platz greifen, wo zu befürchten ist, daß das Gebirge die seitlichen Stöße des Stollens in Bewegung bringt, so daß diese gegen die Stollenmitte zii drücken. Diese Anordnung muß vor allem überall dort vorgesehen werden, wo entweder stark hygroskopisches oder zum Nachfall neigendes Gebirge vorhanden ist, daß unter allen Umständen abgefangen werden muß. Aber auch dort, wo z. B. an sich festes Gebirge des Urgesteins vorliegt, entstehen Klüfte oder sind solche vorhanden, die bei Eintreten tektonischer Einwirkung sehr leicht Verschiebungen mit sich bringen und wiederum nicht nur die Stützrahmen beeinflussen, sondern vor allem auch an diesen Stellen die nachträglich eingebrachte Betonröhre beschädigen. In diesem Falle ist es notwendig, daß die Stöße von vornherein hinter einer Art Verschalung gehalten werden, die notfalls nach Abnahme der 'Senkrechtstützen c, d als bleibende Verschalung und Armierung hinter den blassen der Betonröhre verbleibt. In solchen Fällen ist es notwendig, daß die Klüfte w durch Polster aus Kleinschlag, Schotter, Bruchbergen usw. x ausgefüllt und diese Polster durch die Rahmen zunächst gehalten werden. Bei einsetzenden Schiebungen des Gebirges muß das Gebirge zunächst auf das Polster wirken und dieses stützt sich dann auf die zweckmäßig in etwa beliebig starr oder beliebig nachgiebig einstellbaren Stützrahmen ab. Auf diese Weise kann mit der nachfolgenden Betonröhre y ort- und zeitfolgemäßig beliebig gearbeitet werden, d. h. je nachdem die örtlichen Bedingungen dies erfordern und der Transport es mit sich bringt, kann sowohl an verschiedenen Orten gleichzeitig mit der Aufstellung der Betonröhre begonnen werden, die Fertigstellung des Gesamtstollens wird damit lediglich zu einer Frage der Organisation.As can be seen from Fig. 5, for example, the pre-pawn irons e are anchored to the last support frame a, d by means of suitable clamping means. The two ridge segments a are held and fixed in their position by the same clamping means on this pre-locking iron e. In this way, the roof of the tunnel is initially so strongly intercepted that it can be warped and packaged in the usual way and those working on the front of the track are protected from falling, etc. from above. Insofar as the local conditions require it, in addition to the vertical supports c, d , the joint legs b can also be placed on the ridge segment a and tightened. Such an arrangement must especially take place where it is to be feared that the mountains will bring the lateral joints of the tunnel in motion, so that these press against the center of the tunnel. Above all, this arrangement must be provided wherever there is either a strongly hygroscopic rock or a rock which has a tendency to fall behind and which must be intercepted under all circumstances. But also where z. B. solid rock of the primary rock is present, fissures arise or are present that very easily bring about displacements when tectonic influences occur and in turn not only affect the support frame, but also damage the subsequently introduced concrete pipe at these points. In this case it is necessary that the joints are held from the outset behind a kind of casing, which, if necessary, remains behind the pale concrete pipes after removing the 'vertical supports c, d as permanent casing and reinforcement. In such cases it is necessary that the fissures w are filled with cushions made of small pitch, gravel, rubble, etc. x and that these cushions are initially held by the frame. When the mountain range begins to slide, the mountain range must first act on the cushion and the cushion is then supported on the support frame, which can be appropriately adjusted to be approximately rigid or flexible. In this way, you can work with the subsequent concrete pipe at any place and time, i.e. depending on the local conditions and the transport, the erection of the concrete pipe can be started at different locations at the same time, the completion of the The overall tunnel is therefore only a question of organization.

Wenn in der Zeichnung auch das vorgenannte Glockenprofil als bestgeeignetes Profil für den besagten Zweck an die Spitze gestellt ist, so ist der gleiche Rahmen bzw. der gleiche Aufbau und auch das daraus folgende Arbeitsverfahren ohne weiteres auch mit anderen Rinnenprofilen oder Formeisen zu bewältigen. Beispielsweise ist man in der Lage, das Firstsegrnent a auch aus einem normalen I-Profil, die beiden Stoßschenkel b aus einem U-Profil zu bilden. Bei den Stützen c und d wird dann zweckmäßig die obere Stütze d aus einem U-Eisen, die Fußstütze aus I-Profil gebildet. Die Verspannung der einzelnen Teile untereinander, die Querstreben und die Längsbolzen sind entweder die gleichen oder den dargestellten Mitteln gleichartige Mittel, ist ohne weiteres möglich. Es ist auch denkbar, mittels handelsüblicher Spannelemente, wie quergelegten Flacheisen und gewöhnlichen Handelsschrauben, die erforderlichen Verspannungen zu bilden und die Einzelteile des Stützrahmens untereinander verstell- und anpaßbar zu vereinigen.If the above-mentioned bell profile is also the most suitable one in the drawing Profile is put at the top for the said purpose, so is the same frame or the same structure and also the subsequent working method without further ado can also be mastered with other channel profiles or shaped irons. For example is one is able to get the first segment a also from a normal I-profile, the two Form joint leg b from a U-profile. In the case of supports c and d, it is then appropriate the upper support d is made of a U-iron, the footrest is made of an I-profile. The tension of the individual parts with each other, the cross struts and the longitudinal bolts are either the same or similar means to the means shown, is without further ado possible. It is also conceivable by means of commercially available tensioning elements, such as transverse ones Flat iron and ordinary commercial screws, the necessary tension form and the individual parts of the support frame are adjustable and adaptable to one another to unite.

Gemäß der Erfindung ist man also in der Lage, dem Arbeitsfortschritt und dem Vortrieb in schnellster und einfachster Weise zu folgen, kann den wechselnden Ausbruch in Höhe und Breite mit ein und derselben Stützeinrichtung vornehmen und kann gleichzeitig gegen Druck geschützt Nachfall, Einbrüche usw. abfangen und eine bleibende Verschalung oder Armierung bilden. Andererseits ergibt der Aufbau gemäß der Erfindung die Möglichkeit der Immerwiederverwendung, . so daß die Stützrahmen von Baustelle zu Baustelle ständig wieder zu verwenden sind. Die Anpassung besonderer Art, weil diese Profile selbst in verschiedenen Gewichtsklassen durcheinander verwendet werden können und jeweils durch die Verspannung der überlappenden Enden mit ihren stärksten Querschnittsteilen gegeneinander anliegen und zu höchster Lastaufnahme geeignet sind.According to the invention, one is thus able to monitor the progress of the work and to follow the advance in the fastest and easiest way can change Carry out excavation in height and width with one and the same support device and can simultaneously protect against pressure and intercept relapses, break-ins, etc. and a Form permanent cladding or reinforcement. On the other hand, the structure according to FIG the invention the possibility of reuse over and over again,. so that the support frame are to be used again and again from construction site to construction site. Customizing special Kind because these profiles are used mixed up even in different weight classes can be and each by bracing the overlapping ends with their the strongest cross-sectional parts are in contact with each other and with the highest load bearing capacity are suitable.

Claims (6)

PATENTANSPRÜCHE: i. Stützbogen für die Auskleidung von Stollen, Tunnels, Strecken usw. als vorläufiger Stützrahmen, dadurch gekennzeichnet, daß ein an sich bekannter 3teiliger Bogen den Grundkörper des Stützrahmens bildet, dessen Einzelteile an den Überlappungsstellen übereinstimmende Krümmungsradien besitzen, so daß durch stärkere oder geringere Überlappung Querschnitte verschiedener Größenordnung gebildet werden können. PATENT CLAIMS: i. Support arches for lining tunnels, tunnels, routes, etc. as a preliminary support frame, characterized in that a known 3-part arch forms the base body of the support frame, the individual parts of which have matching radii of curvature at the overlap points, so that more or less overlapping cross-sections of different Order of magnitude can be formed. 2. Stützbogen nach Anspruch i, dadurch gekennzeichnet, daß die Firstsegmente (a) des 3teiligen Bogens auf 2teiligen senkrechten Stützen ruhen, die höhen- und breitenverstellbar sind und die gleichzeitige oder nachträgliche Anordnung der Stoßschenkel (b) des 3teiligen Bogens gestatten. Die Anlage der Senkrechtstützen erfolgt unter Belassung eines überstehenden Endes am Firstsegment. 2. Support arch according to claim i, characterized in that the ridge segments (a) of the 3-part arch rest on 2-part vertical supports, which are height and width adjustable and the simultaneous or subsequent Allow arrangement of the joint legs (b) of the 3-part arch. The installation of the vertical supports takes place leaving a protruding end on the ridge segment. 3. Stützbogen nach Anspruch i und 2, dadurch gekennzeichnet, daß die Senkrechtstützen aus 2 Teilen bestehen, von denen der auf der Sohle aufstehende Teil (c) gerade, der am Firstsegment (a) anliegende Teil (d) am oberen Ende gekrümmt ist und in seiner Krümmung dem Radius des Firstbogens angepaßt ist. 3. Support arch according to claims i and 2, characterized in that the vertical supports consist of 2 parts exist, of which the part (c) standing up on the sole is straight, the part on the ridge segment (a) the adjacent part (d) is curved at the top and the radius in its curvature of the ridge arch is adapted. 4. Stützbogen nach Anspruch i bis 3, dadurch gekennzeichnet, daß die 2teiligen Stützen (c, d) längs- und querverstrebt sind und am Firstsegment (a) und unter sich durch Spannmittel orts- und längenverstellbar sind. 4. Support arch according to claim i to 3, characterized in that the 2-part supports (c, d) are longitudinally and transversely braced and on the ridge segment (a) and below are adjustable in position and length by clamping means. 5. Stützbogen nach Anspruch i bis 4, dadurch gekennzeichnet, daß sämtliche Teile des Stützrahmens aus Profilen glockenförmigen Querschnitts gebildet sind, die gegebenenfalls metergewichtsverschieden sind, aber ineinander passen. 5. Support arch according to claims i to 4, characterized in that all parts of the support frame from profiles of bell-shaped cross-section are formed, which may be are different meters in weight, but fit into each other. 6. Stützbogen nach Anspruch i bis 4, dadurch gekennzeichnet, daB die Teile des Stützrahmens ans Rinnenprofilen verschiedenen Querschnitts gebildet sind, etwa derart, daß die Firstbogen (a) und die Senkrechtstütze (c) aus Profilen I-förrnigen Querschnitts, die übrigen Teile des Stützrahmens aus U-förmigen Rinnenprofilen gebildet werden oder umgekehrt.6. Support arch according to claim i to 4, characterized in that the parts of the support frame attach to the gutter profiles different cross-section are formed, such that the ridge arch (a) and the vertical support (c) made of profiles with an I-shaped cross-section, the remaining parts of the support frame are formed from U-shaped channel profiles or vice versa.
DEB604A 1949-11-10 1949-11-10 Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame Expired DE814603C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEB604A DE814603C (en) 1949-11-10 1949-11-10 Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEB604A DE814603C (en) 1949-11-10 1949-11-10 Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame

Publications (1)

Publication Number Publication Date
DE814603C true DE814603C (en) 1951-09-24

Family

ID=6951933

Family Applications (1)

Application Number Title Priority Date Filing Date
DEB604A Expired DE814603C (en) 1949-11-10 1949-11-10 Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame

Country Status (1)

Country Link
DE (1) DE814603C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1048849B (en) * 1955-06-30 1959-01-22 Droege & Koch Kommanditgesells Channel profile bolting
DE971847C (en) * 1955-05-25 1959-04-09 Bergbaustahl G M B H Bolting for expansion arches
DE975087C (en) * 1951-05-18 1961-08-10 Bochumer Eisen Heintzmann Plain bend, especially for route expansion
DE1164956B (en) * 1952-08-13 1964-03-12 Hueser & Weber K G Holding device for spacer bolts on track expansion profiles
DE1167292B (en) * 1956-06-20 1964-04-09 Bochumer Eisen Heintzmann Delay element for the tensile and pressure-resistant connection of expansion frames arranged one behind the other in the direction of the route
DE1296591B (en) * 1965-10-19 1969-06-04 Dipl Berging Kurt Heinz Stamp head for supporting a ridge arch in multi-part arch construction in a mining section

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE975087C (en) * 1951-05-18 1961-08-10 Bochumer Eisen Heintzmann Plain bend, especially for route expansion
DE1164956B (en) * 1952-08-13 1964-03-12 Hueser & Weber K G Holding device for spacer bolts on track expansion profiles
DE971847C (en) * 1955-05-25 1959-04-09 Bergbaustahl G M B H Bolting for expansion arches
DE1048849B (en) * 1955-06-30 1959-01-22 Droege & Koch Kommanditgesells Channel profile bolting
DE1167292B (en) * 1956-06-20 1964-04-09 Bochumer Eisen Heintzmann Delay element for the tensile and pressure-resistant connection of expansion frames arranged one behind the other in the direction of the route
DE1296591B (en) * 1965-10-19 1969-06-04 Dipl Berging Kurt Heinz Stamp head for supporting a ridge arch in multi-part arch construction in a mining section

Similar Documents

Publication Publication Date Title
DE2021734C3 (en) Hiking support scaffolding for excavating tunnels or tunnels
DE814603C (en) Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame
DE3820700A1 (en) Compound anchor support system
DE2905919C3 (en) Method for intercepting the slope layers and securing the seams in the stretches of underground mining
DE902188C (en) Sliding circuit for concrete structures
EP3580429B1 (en) Reinforcement system for the concrete lining of the inner shell of a tunnel construction
DE3027661C2 (en) Extension of the line to intercept the layers of the slope and to secure the line edge in the stretches of underground mining
DE810151C (en) Movable folding formwork for concreting mine tunnels
DE2216643C3 (en) Method and device for assembling roadworks, in particular for machine heading with roadheaders in mining
DE2453281C3 (en) Movable formwork scaffolding
DE102017125624B3 (en) Reinforcement system for the concrete lining of the inner shell of a tunnel building
DE2159486C3 (en) Process and devices for the production of underground structures in hydraulic jacking
DE2461251A1 (en) METHOD AND DEVICE FOR INTRODUCING AND SETTING UPPER FRAMES IN TUNNEL-LIKE ROUTES OF LARGE SECTIONS
DE2408038C3 (en) Process to reduce subsidence in the expansion of multi-part underground cavities
EP3486428B1 (en) Device for extending a tunnel
DE2915588A1 (en) Mine or tunnel gallery lattice girder support lining - has peripherally aligned sheathing plates supported on girder linked holders
DE660012C (en) Process for mining tunnels and similar underground structures in individual partial cross-sections, especially for subways
DE4019280A1 (en) Construction of underground roadways - uses mat reinforcement with arch supports and distribution bars pneumatically concreted in
DE2254947B2 (en) Process for the mining of several cavities
DE1000419B (en) Closed protective hood for the creation of galleries and tunnels
DE1271745B (en) Process for the section-wise implementation of an armor construction for the production of concrete ceilings in tunnels as well as armaments construction for the implementation of this process
AT71946B (en) Method for building tunnels for subways or the like. Under traffic routes.
CH377758A (en) Auxiliary support for drifting, especially in underground mining
AT165573B (en) Process for the construction of underground cavities, in particular tunnels
CH201557A (en) Procedure for the creation of a reinforced concrete structure.