DE690577C - ng connected hammer drill carrier - Google Patents
ng connected hammer drill carrierInfo
- Publication number
- DE690577C DE690577C DE1938G0098438 DEG0098438D DE690577C DE 690577 C DE690577 C DE 690577C DE 1938G0098438 DE1938G0098438 DE 1938G0098438 DE G0098438 D DEG0098438 D DE G0098438D DE 690577 C DE690577 C DE 690577C
- Authority
- DE
- Germany
- Prior art keywords
- drill
- drilling
- shovel
- loading
- special
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000005553 drilling Methods 0.000 claims description 26
- 239000000969 carrier Substances 0.000 claims description 4
- 239000000428 dust Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 4
- 238000005422 blasting Methods 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 2
- WURBVZBTWMNKQT-UHFFFAOYSA-N 1-(4-chlorophenoxy)-3,3-dimethyl-1-(1,2,4-triazol-1-yl)butan-2-one Chemical compound C1=NC=NN1C(C(=O)C(C)(C)C)OC1=CC=C(Cl)C=C1 WURBVZBTWMNKQT-UHFFFAOYSA-N 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002789 length control Methods 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/126—Loading devices or installations
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Earth Drilling (AREA)
Description
Mit einer maschinell betriebenen Schaufelvorrichtung verbundener Bohrhammerträger Es sind bereits (vgl. die deutsche Patentschrift 36$ 733) Bohrhammerträger in Verbindung mit einer maschinell betriebenen Schaufelvorrichtung zum Verladen von Haufwerk bekannt, deren fahrbares Gestell mit einemAusleger versehen ist, an dem die Bohrsäule derart befestigt ist, daß sie das auf der Sohle liegende Haufwerk überragt, so daß während des Forträumens der abgesprengten Gesteinsmassen gleichzeitig das Einbringen neuer Bohrlöcher erfolgen kann. Es soll damit die Gebundenheit beseitigt werden, die bei den bisher bekannten Bohrhammerträgern oder Bohrsäulen insofern bestand, als immer erst nach erfolgter Absprengung die auf dem Boden liegenden Gesteinsmassen zunächst vollständig fortgeräumt werden mußten, ehe mit -dem Aufstellen der Bohrsäule begonnen werden konnte. Dabei mußten auch in der First des betreffenden Betriebspunktes immer mehrere Bohrlöcher eingebracht werden, die zum Halten der Säule des eigentlichen Bohrhammerträgers dienten: ferner mußten auch diese Bohrsäulen noch mehrmals umgestellt werden, um die Bohrlöcher in die erforderliche gerade,Linie, in Übereinstimmung mit der Richtung des Querschlages, zu bringen.Hammer drill carrier connected to a mechanically operated shovel device There are already (see. German Patent 36 $ 733) hammer drill carriers in connection known with a mechanically operated shovel device for loading debris, whose mobile frame is provided with a boom on which the drilling column is attached that it towers above the pile lying on the sole, so that during the removal of the blasted rock masses at the same time the introduction of new ones Drilled holes can be made. The aim is to remove the bondage that occurs with the previously known hammer drill carriers or drilling columns existed as always only after blasting off the rock masses lying on the ground initially had to be cleared away completely before the erection of the drilling column began could be. They always had to be in the ridge of the relevant operating point several drill holes are drilled to hold the column of the actual Drill hammer carriers served: furthermore, these drill columns had to be repositioned several times to make the drill holes in the required straight, line, in line with the direction of the cross passage.
Die Anwendung eines solchen mit einer maschinell betriebenen Schaufelvorrichtung verbundenen Bohrhammerträgers sollte sich folgendermaßen vollziehen: Nachdem die Bohrlöcher eingebracht waren, wurde die VerUdevo:rrichtung mit dem an ihr angebrachten' ausziehbaren Ausleger und somit auch der Bohrhammerträger ahne weiteres so weit in die Strecke zurückgefahren, daß ein Beschädigen durch das Absprengen des Gesteins ausgeschlossen war. Nachdem das Absprengen erledigt war, wurde die Verladevorrichtung wiederum mit Ausleger und Hammerträger so weit in Richtung des Ortsstoßes vorgefahren, daß die Schaufel das jetzt daliegende Haufwerk erfassen konnte. Der Ausleger wurde nun so weit über das Haufwerk hinweg ausgezogen, als nötig war, um den Ortsstoß erreichen zu können. Nunmehr konnte sofort mit dem Einbringen der neuen Bohrlöcher begonnen werden; gleichzeitig hiermit fing die Verladevorrichtung mit dem Forträumen des Haufwerks an. Beim Vorrücken der Verladevorrichtung und der Verminderung des Haufwerks wurde dabei natur= gemäß immer mehr Platz für das Einbringexi der neuen Bohrlöcher frei. Da sich bei d'.vn: fortschreitenden Forträumen des Haufwerksa der Abstand zwischen Ortsstoß und Verladevorrichtung in dem Maße verringerte, als die Menge des Haüfwerks abnahm, so bestand der die Bohrsäule tragende Ausleger aus zwei auseinanderschiebbaren Teilen, von denen der eine mit einem ge@vichtsbelasteten Seil verbunden war, durch das beim Vorfahren des Gestells eine selbsttätige Längenregelung des Auslegers bewirkt wurde.The use of such a machine operated shovel device connected hammer drill carrier should take place as follows: After the Holes were drilled, the VerUdevo: rrichtung with the attached to it ' extendable boom and thus also the hammer drill carrier so far pulled back into the track that damage from the blasting off of the rock was excluded. After the blasting was done, the loading device became again advanced with boom and hammer carrier so far in the direction of the local joint, so that the shovel could grasp what was now lying there. The boom was now pulled out over the heap as far as was necessary to get around the local thrust to be able to achieve. It was now possible to start drilling the new boreholes immediately to be started; simultaneously this started the loading device with the removal of the debris. When advancing the loading device and the Reduction of the pile became naturally = more and more space for the bringing-in the new drill holes free. Since with d'.vn: progressive evacuation of the Haufwerksa the distance between the junction and the loading device decreased to the extent that As the amount of mainworks decreased, the boom supporting the drilling column consisted of two parts that can be pushed apart, one of which has a weight load Rope was connected, through which an automatic length control when the frame is advanced of the boom was effected.
Eine derartige Einrichtung ist aber bisher nicht lebensfähig geworden, weil, ganz abgesehen von der Unzulänglichkeit der Ladevorrichtung als solcher, auch die Abstützung des Bohrhammerträgers gegen die Maschine in der gedachten Weise unzulänglich war, besonders wenn gleichzeitig mehrere Bohrhämmer zur Verwendung kommen sollten. Die fernrohrartige Ausziehbarkeit des Auslegers in Verbindung mit dem Seilvorschub erscheint in keiner Weise für die Abstützung des Gewichts und der Bohrerrückdrücke geeignet, die auftretenden Kräfte aufzunehmen, während die hilfsweise vorgesehene Abstützung des Auslegers durch eine auf der Sohle laufende Rolle schon infolge der Unregelmäßigkeit dieser praktisch ausscheidet.However, such a facility has not yet become viable, because, quite apart from the inadequacy of the loading device as such, too the support of the hammer drill carrier against the machine in the imaginary way is inadequate especially if several rotary hammers are to be used at the same time. The telescope-like extension of the boom in connection with the cable feed does not appear in any way to support the weight and drill back pressures suitable to absorb the forces that occur, while the auxiliary provided Support of the boom by a roller running on the sole as a result of the Irregularity practically ruled out.
Die Erfindung beruht auf der Erkenntnis, daß eine dem Patent 668 794 entsprechende Lademaschine ganz ausgezeichnete Bedingungen für die Verbindung mit einem solchen Bohrhammerträger aufweist. Es handelt sich hierbei um eine mittels Seiles oder Kette sich selbst vorwärtsziehende Lademaschine mit vorn angeordneter, über die Breite der Förderwagen hinaus breit ausgebildeter Druck-Schaufel und anschließend ansteigend über den zu beladenden Wagen geführtem Förderer, bei der der Angriff des Zugorgans derart erfolgt, daß ein Aufbäumen der Maschine auch unter den gewaltigen Kräften, die zu ihrer Voranbewegung unter das Haufwerk erforderlich sind, ausgeschlossen wird, d. h. also ihre völlige Standfestigkeit verbürgt ist: 1i Dabei muß naturgemäß die Schaufel selbst als vorkragender und am stärksten beanspruchter Teil so widerstandsfähig ausgebildet werden, daß sie als Ausleger für die Aufnahme des Bohrmaschinenträgers herangezogen werden kann, indem die Säulen des Bohrgestells damit unmittelbar verbunden und lediglich hilfsweise durch Streben gegen das Maschinengestell abgestützt werden. Die Säulen des Bohrgestells werden in der NTähe der seitliehen Begrenzungsflanschen der Schaufel festgelegt und untereinander ebenfalls abgestützt. Mit dieser so auch für das BohrgerÜst gegebenen Standfestigkeit in Verbin-,:.dung mit dem zum Aufnehmen weit größerer :-:Kräfte bestimmten Seilzug für das Voranbewegen der Lademaschine ist dann die Ab-Stützung der Bohrmaschinen unter verläßlichem Abfangen der Bohrerrückdrücke gegeben.The invention is based on the knowledge that one of the patent 668 794 corresponding loading machine quite excellent conditions for connection with having such a hammer drill carrier. It is a means of Rope or chain self-pulling loading machine with front-mounted, wide pressure shovel and then beyond the width of the trolley Increasing conveyor guided over the wagon to be loaded, in which the attack of the pulling organ takes place in such a way that the machine rears up even under the mighty Forces that are required to move them under the pile are excluded will, d. H. So their complete stability is guaranteed: 1i It must of course the shovel itself as a protruding and most heavily stressed part is so resistant be designed that they are used as a boom for receiving the drill support can be used by the pillars of the drilling rig directly connected to it and only alternatively be supported by struts against the machine frame. The pillars of the drilling rig are in the vicinity of the lateral limiting flanges the shovel fixed and also supported among each other. With this one too The stability given for the drill rig in connection with the for picking up far greater: -: Forces determined cable pull for moving the loading machine forward is then the support of the drilling machines with reliable interception of the drill back pressures given.
Da nun die Leistungsfähigkeit der Lademaschine als solcher außerordentlich groß ist, so wird sie durch diese Heranziehung zu der Bohrarbeit insgesamt besser ausgenutzt, während sie sonst immer für eine große Zeit stilliegen würde. In diesem Zusammenhang ist es nun von größter Bedeutung, daß der jeweilige Ein- und Ausbau der Bohreinrichtung so schnell wie möglich erfolgt, um einen möglichst unmittelbaren Wechsel zwischen Bohr-bzw. Schießarbeit und Verladearbeit herbeiführen zu können. Demgemäß ist die Gesamteinrichtung im engeren nach diesem Leitgedanken durchgebildet, wie sie an Hand des in den Zeichnungen dargestellten Ausführungsbeispiels beschrieben werden soll. In diesen stellt Abb. i einen Aufriß des Kopfes der Gesamtmaschine dar, während Abb. ä die Anordnung für das Bohren der Sohlenschüsse erkennen läßt: Abb.3 zeigt das Streckenprofil gegen den Ortsstoß gesehen, und Abb. q. läßt den entsprechenden Grundriß dazu erkennen.Since the performance of the loading machine as such is extraordinary is large, it becomes better as a whole by this attraction to the drilling work exploited, while otherwise it would always be idle for a long time. In this Context, it is now of the utmost importance that the respective installation and removal the drilling equipment is done as quickly as possible, in order to be as immediate as possible Change between drilling or To be able to bring about shooting work and loading work. Accordingly, the entire facility is designed in more detail according to this guiding principle, as described with reference to the embodiment shown in the drawings shall be. In these Fig. I shows an elevation of the head of the entire machine while Fig. ä shows the arrangement for drilling the sole sections: Fig.3 shows the route profile seen against the junction, and Fig. Q. lets the recognize the corresponding floor plan.
Die auf den Rädern 61, 62 verfahrbare Lademaschine ist mit dem Seil 15 an einem Festpunkt in der Sohle verankert, das über eine Umlenktrommel i9 zur Windetrommel 18 läuft, die mittels des Klinkwerks 21,:22 von dem Motor 2o aus angetrieben wird; da- i bei arbeitet sich die Schneide 16 der Schaufel 16" unter das Haufwerk, um dieses mit Hilfe des nicht gezeichneten Förderbandes verladen zu können. Im vorderen Teil der um ein Vielfaches breiter als die Förderwagen ausgebildeten Schaufel 6' sind nun in der Nähe der seitlichen Begrenzungsflächen 16" (Abb. 3) die konischen Hülsen 9o angeschweißt, in die die Zapfen der Bohrsäulen 9i, 9i eingepaßt sind, die mittels des Keiles 92 angezogen und mittels des Keiles 93 umgekehrt wieder gelüftet werden können. Die beiden Säulen 9i, 9i werden durch eine Verstrebung 96 miteinander verbunden, so daß sie praktisch mit der breiten Druckschaufel ein starres Ganzes bilden: Es ist auch vorgesehen, die Säulen 9i, 9i noch rückwärts durch Streben 9:4 gegen die eigentliche Lademaschine abzustützen, ohne daß dies aber unbedingt notwendig wäre. Sowohl an den Stützsäulen 9i als auch an der Lademaschine sindTräger vorgesehen, die zur Bildung einer Bohr- oder Baubühne dienen. Als Auflage der die Bühne bildenden Bretter können aber auch die rückwärtigen Stützen 94 der Säulen 9i benutzt werden.The loading machine, which can be moved on the wheels 61, 62, is anchored with the rope 15 at a fixed point in the sole, which runs via a deflection drum i9 to the winch drum 18, which is driven by the motor 2o by means of the ratchet mechanism 21,: 22; The cutting edge 16 of the shovel 16 ″ works its way under the pile in order to be able to load it with the aid of the conveyor belt (not shown) Lateral boundary surfaces 16 " (Fig. 3) welded the conical sleeves 9o into which the pegs of the drilling columns 9i, 9i are fitted, which can be tightened by means of the wedge 92 and, conversely, released again by means of the wedge 93. The two columns 9i, 9i are connected to one another by a strut 96 so that they practically form a rigid whole with the wide pressure shovel: It is also provided that the columns 9i, 9i are supported backwards by struts 9: 4 against the actual loading machine, but without this being absolutely necessary. Supports are provided on both the support columns 9i and the loading machine, which are used to form a drilling or construction platform. The rear supports 94 of the columns 9i can also be used to support the boards forming the stage.
Die die Stützsäulen 9i untereinander verbindende Strebe 96 wird als Rohr ausgebildet und dient gleichzeitig als Preßluftverteiler für die einzelnen Bohrmaschinen 97, die auf verkröpften Armen 98 angebracht sind. Die Tragarme 98 sind gegen die Stützsäulen 9i verstellbar ausgebildet, so daß, gegebenenfalls unter gleichzeitiger Drehung der verkröpften Tragarme 98, die Bohrmaschinen in jeder gewünschten Höhe und Schräglage eingestellt werden können. Die Stützsäulen 9i sind nach oben mit Verlängerungen 99 versehen, die von Hand oder durch Preßluft bis unter die beim Schießen freigelegte Firste verschoben werden können. Diese Verlängerungsstücke 99 haben dabei die Aufgabe, gleichzeitig die Tragarme zur Aufnahme der zum Bohren der Firstschüsse notwendigen Bohrmaschine zu halten; ihre Verbindung mit den Stützsäulen 9i ist so ausgebildet, daß sie in kürzester Zeit nach unten weggezogen werden können, damit die Lademaschine mit den noch in ihrer Schaufel aufgebauten Stützsäulen in den schon fertig ausgebauten, also niedrigeren Teil der Strecke zurückgezogen werden kann.The brace 96 connecting the support columns 9i to one another is called Tube formed and also serves as a compressed air distributor for the individual Drills 97 mounted on cranked arms 98. The support arms 98 are designed to be adjustable against the support columns 9i, so that, if necessary, under simultaneous rotation of the cranked support arms 98, the drills in any desired Height and inclination can be adjusted. The support columns 9i are up provided with extensions 99, by hand or by compressed air to under the Shooting exposed ridges can be moved. These extension pieces 99 have the task, at the same time, the support arms for receiving the drilling to keep the ridge shots necessary drill; their connection with the supporting columns 9i is designed in such a way that it can be pulled downwards in a very short time, so that the loading machine with the support columns still built in its shovel in the already completed, i.e. lower part of the route will be withdrawn can.
Durch ein zweites Verteilerrohr ioo mit entsprechender Anzahl der Anschlüsse wird mittels der ebenfalls kurzen Schläuche ioi dass zuz Verhinderung der Staubbelästigung erforderliche Wasser den Düsen io2 zugeführt. Die Bohrmaschinen 103 für das Bohren der Sohlenschüsse ruhen auf einem schlittenartigen Gestell 104, das für sich mit je einem Stützarm 105 gegen einen gemeinsamen, die beiden Stützsäulen 9i im unteren Teil miteinander verbindenden Querträger io6 festgelegt ist. Die Stütze 105 ist dabei sowohl an dem Führungsschlitten 104 als auch an der Querverbindung io6 so gelenkig angeschlossen, daß eine verläßliche übertragun.g der Bohrerrückdrücke auf die Stützsäulen 9i gewährleistet ist. Der Querverbindung io6 kommt ferner insofern noch eine besondere Bedeutung zu, als sie beim Bohren der Firstlöcher eine äußerst wirksame Versteifung der Stützsäulengi darstellt; jedenfalls kann sie schon beim Bohren der Firstlöcher an die Säulen 9i angeklemmt werden, ohne daß etwa schon die Bohrmaschine 103 angeschlossen werden müßte. Zweckmäßig wird die Querverbindung io6 dann etwas höher angesetzt, als es ihrer übrigen Bestiminung entspricht, wobei sie dann gleichzeitig auch zur besseren Festlegung der Bohr- oder Baubühne 95 dienen kann. Mit der in dieser Weise aufgebauten Baubühne ist man in der Lage, sämtliche zum Schießen erforderlichen Löcher zu bohren, wobei sowohl die Gewichte wie die Bohrerrückdrücke durch die Lademaschine aufgenommen werden, deren Vorschubgetriebe auch die Nachführung der Bohr er übernehmen kann. Der Aufbau bzw. Abbau der gesamten Bohreinrichtung läßt sich dabei in der verhältnismäßig sehr kurzen Zeit von etwa io Minuten durchführen.Through a second distribution pipe ioo with a corresponding number of connections, the water required to prevent dust nuisance is fed to the nozzles io2 by means of the likewise short hoses ioi. The drilling machines 103 for drilling the sole sections rest on a slide-like frame 104 which is fixed with a support arm 105 against a common cross member io6 connecting the two support columns 9i in the lower part. The support 105 is connected in an articulated manner both to the guide carriage 104 and to the cross-connection io6 so that a reliable transfer of the drill back pressures to the support columns 9i is guaranteed. The cross connection io6 is also of particular importance insofar as it represents an extremely effective stiffening of the support column when drilling the ridge holes; in any case, it can be clamped to the pillars 9i while the ridge holes are being drilled, without the drilling machine 103 having to be connected. The cross-connection io6 is then expediently set somewhat higher than it corresponds to its remaining definition, in which case it can also serve at the same time to better fix the drilling or construction platform 95. With the construction platform constructed in this way, one is able to drill all the holes required for shooting, with both the weights and the drill back pressures being absorbed by the loading machine, whose feed gear can also take over the tracking of the drill. The construction or dismantling of the entire drilling device can be carried out in the relatively very short time of about 10 minutes.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1938G0098438 DE690577C (en) | 1938-08-12 | 1938-08-12 | ng connected hammer drill carrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1938G0098438 DE690577C (en) | 1938-08-12 | 1938-08-12 | ng connected hammer drill carrier |
Publications (1)
Publication Number | Publication Date |
---|---|
DE690577C true DE690577C (en) | 1940-04-29 |
Family
ID=7140879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1938G0098438 Expired DE690577C (en) | 1938-08-12 | 1938-08-12 | ng connected hammer drill carrier |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE690577C (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE850282C (en) * | 1941-02-18 | 1952-09-22 | Bergtechnik G M B H | Mobile device for driving routes |
DE853890C (en) * | 1949-10-02 | 1952-10-30 | Gustav Dr-Ing Schaar | Crawler loader with drilling device |
DE864533C (en) * | 1950-11-10 | 1953-01-26 | Fritz Lauster | Drilling jig for drilling rows of holes in rock |
DE875487C (en) * | 1947-08-22 | 1953-05-04 | Tech Pour L Ind Miniere S O T | Device for drilling explosive holes, especially for mining |
-
1938
- 1938-08-12 DE DE1938G0098438 patent/DE690577C/en not_active Expired
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE850282C (en) * | 1941-02-18 | 1952-09-22 | Bergtechnik G M B H | Mobile device for driving routes |
DE875487C (en) * | 1947-08-22 | 1953-05-04 | Tech Pour L Ind Miniere S O T | Device for drilling explosive holes, especially for mining |
DE853890C (en) * | 1949-10-02 | 1952-10-30 | Gustav Dr-Ing Schaar | Crawler loader with drilling device |
DE864533C (en) * | 1950-11-10 | 1953-01-26 | Fritz Lauster | Drilling jig for drilling rows of holes in rock |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE278881C (en) | ||
DE202009003824U1 (en) | Removal machine, in particular Surfac Miner | |
DE2657573C3 (en) | Device for expanding shafts or the like. | |
DE2621674C3 (en) | Process and device for driving and upgrading an underground route as well as upgrading the route to carry out the process | |
DE2815898A1 (en) | DEVICE FOR POSITIONING CEILING SUPPORT IN A TUNNEL | |
DE2307413C2 (en) | Device for the extraction of a floz-like deposit in longwall mining | |
EP2236745A2 (en) | Excavation machine, in particular surface miner and method for fitting and detaching a transport device for a excavation machine | |
DE690577C (en) | ng connected hammer drill carrier | |
DE1185140B (en) | Coal jacking machine, preferably a slicing machine | |
DE4028596A1 (en) | Equipment for sinking shafts - uses widening tool fixed to supporting and guiding tube which is inserted in pilot hole | |
DE3729561C2 (en) | ||
DE2704222C3 (en) | Procedure and multi-purpose platform for the expansion of sections of mining and tunneling that were excavated by blasting | |
CH377300A (en) | Auxiliary support for drifting, especially in underground mining | |
DE888985C (en) | Device for pre-paving when expanding the line, especially in mining operations | |
DE2461251B2 (en) | DEVICE FOR PRE-ASSEMBLY, TRANSPORT AND INSTALLATION OF A TRACK OR TUNNEL EXPANSION | |
DE882083C (en) | Mobile drilling rig for driving routes | |
DE2161291A1 (en) | Movable ceiling support, especially for mining | |
DE440653C (en) | Process for coal extraction by means of a chain of sprockets that can be moved in front of and back against the impact, extending over the entire length of the impact, rotating in one direction of rotation, in which the drive machine is to the side of the impact | |
DE3031646C2 (en) | Tunneling machine | |
DE1483942A1 (en) | Relocatable work platform for the production and expansion of a manhole, in particular blind manhole and method for laying the stage | |
DE1758505C (en) | Drilling driving machine for driving horizontally, inclined or vertically running pits | |
DE1913183C3 (en) | Loading, conveying and drilling equipment for drifting | |
CH423863A (en) | Drilling platform for tunnel construction | |
DE1033616B (en) | Device for covering the offset and for expansion in struts of steeply or semi-steeply supported coal fats | |
DE633516C (en) | Device for driving through loose bulk masses |