DE60317779T2 - ARC SYSTEMS - Google Patents

ARC SYSTEMS Download PDF

Info

Publication number
DE60317779T2
DE60317779T2 DE60317779T DE60317779T DE60317779T2 DE 60317779 T2 DE60317779 T2 DE 60317779T2 DE 60317779 T DE60317779 T DE 60317779T DE 60317779 T DE60317779 T DE 60317779T DE 60317779 T2 DE60317779 T2 DE 60317779T2
Authority
DE
Germany
Prior art keywords
arch
foundation
bow
soil
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE60317779T
Other languages
German (de)
Other versions
DE60317779D1 (en
Inventor
Werner Heierli
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEBO ARCH INTERNAT AG
BEBO ARCH INTERNATIONAL AG
Original Assignee
BEBO ARCH INTERNAT AG
BEBO ARCH INTERNATIONAL AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US10/102,921 external-priority patent/US6719492B1/en
Priority claimed from US10/131,526 external-priority patent/US7305798B1/en
Priority claimed from US10/338,906 external-priority patent/US6988337B1/en
Application filed by BEBO ARCH INTERNAT AG, BEBO ARCH INTERNATIONAL AG filed Critical BEBO ARCH INTERNAT AG
Publication of DE60317779D1 publication Critical patent/DE60317779D1/en
Application granted granted Critical
Publication of DE60317779T2 publication Critical patent/DE60317779T2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

Die vorliegende Erfindung bezieht sich auf die allgemeine Kunst des Bauwesens, des Brückenbaus und der Geotechnik sowie auf das besondere Gebiet überschütteter Bogen und im Tagbau erstellter Konstruktionen.The The present invention relates to the general art of Building, of bridge construction and geotechnical engineering as well as the special area overflowed arch and constructions created in the Tagbau.

Oft werden überschüttete Bogenkonstruktionen aus Fertigteilen oder Ortbeton für Brücken verwendet, wobei ein Verkehrsweg über einen zweiten Verkehrsweg, welcher ein Wasserweg, eine Strasse oder Bahn oder im Falle anderer Bauten, ein Lagerraum oder ähnliches sein kann, geführt wird. Die Bezeichnungen „überschütteter Bogen" oder „überschüttete Brücke" werden durch die Darlegungen der vorliegenden Mitteilung erklärt, und im allgemeinen, wie vorliegend, ist eine überschüttete Brücke oder ein überschütteter Bogen eine Brücke aus Bogenelementen, welche auf dem Baugrund oder auf einer Gründung abgestützt ist und auf und neben welcher Boden oder ähnliches Material ruht, mit dem Zweck, das Bauwerk zu stützen und zu stabilisieren, und im Falle einer Brücke, um die Fläche für den ersten Verkehrsweg zu schaffen. Die Form des Bauwerks ist im allgemeinen zylindrisch und meist langgestreckt, aber andere Formen können verwendet werden. Beispiele von überschütteten Brücken sind in den US-Patenten 3,482,406 und 4,458,457 dargestellt.Often, overfilled arched constructions of precast concrete or in-situ concrete are used for bridges, with a traffic route being routed via a second traffic route, which may be a waterway, a road or rail or in the case of other constructions, a storage room or the like. The terms "spilled bow" or "spilled bridge" are explained by the teachings of the present specification, and generally, as presently, a spilled bridge or spill is a bridge of arch members supported on the ground or foundation and on and beside which ground or similar material rests, for the purpose of supporting and stabilizing the structure, and in the case of a bridge, to provide the area for the first traffic route. The shape of the structure is generally cylindrical and usually elongated, but other shapes may be used. Examples of overcrowded bridges are in the U.S. Patents 3,482,406 and 4,458,457 shown.

Bis heute werden überschüttete Stahlbetonbögen entweder in Ortbeton oder mit Fertigelementen erstellt, oder mit einer Kombination beider Ausführungsarten. Diese Bogenbauwerke ruhen auf vorbereiteten Gründungen unten an beiden Seiten des Bogens. Das Schüttmaterial auf beiden Seiten des Bogens (Hinterfüllmaterial) dient dazu, die nach aussen gerichteten Verschiebungen des Bauwerks, bei einer Belastung von oben, zu verringern. Wie hier üblich soll die Bezeichnung „Boden" sich auf normales Bodenmaterial beziehen, wobei dieses Material Hinterfüllmaterial sein kann (z. B. Bodenmaterial, das herangeschafft und an Ort eingebaut wird) oder Material, das bereits an Ort und Stelle ist (z. B. Bodenmaterial an seinem ursprünglichen Ort) und für die Brückenkonstruktion verwendet wird, welches aber sonst einen Bogen nicht ausreichend stützen würde. Die Begriffe „Hinterfüllmaterial" und „an Ort" werden in dem Sinne verwendet, dass sie solchen Boden ebenfalls bezeichnen.To today poured steel concrete arches are either built in in-situ concrete or with prefabricated elements, or with a combination both embodiments. These arch structures rest on prepared foundations below on both sides of the bow. The bulk material on both sides of the bow (backfill material) serves to make the outward shifts of the structure, under load from above, decrease. As is customary here, the term "soil" should refer to normal soil material This material may be backfill material (eg. Soil material, which is brought in and installed in place) or Material that is already in place (eg soil material at its original Place) and for the bridge construction is used, but otherwise a bow is not sufficient support would. The Terms "backfill material" and "in place" are used in the sense used that they also designate such soil.

Solcher Boden eignet sich nicht, um die konzentrierten Lasten an den Enden eines flachen Bogens oder eines herkömmlichen Bogens ohne Lastverteilung durch den Einsatz von Bogengründungen und/oder von bewehrten Gründungsblöcken aufzunehmen.Such Floor is not suited to the concentrated loads at the ends a flat arch or a conventional arch without load distribution through the use of sheet foundations and / or from reinforced foundation blocks.

Boden ist üblicherweise nicht mechanisch stark genug, um Brückenbauwerke, wie sie in dieser Erfindung vorkommen, ausreichend abzustützen. Daher sind Brückenbauwerke, wie sie früherer Baukunst entsprachen, so erstellt worden, dass deren Kräfte über Wände der Bauwerke und/oder auf grosse Betongründungen am Fusse der Wände übertragen wurden. Solche Wände müssen derart erstellt werden, dass sie solche Kräfte übertragen können, und es gelten deshalb besondere Bauanforderungen. Wie weiter unten erörtert werden wird, haben solche Anforderungen Nachteile gegenüber der früheren Baukunst. Bei den Bauwerken früherer Baukunst sind die überschütteten Bögen normalerweise so ausgebildet, dass die Höhenlage der Bogengründung auf der ungefähren Höhenlage der unteren Wegebene oder der Bodenfläche eines unterirdischen Bauwerks, über welche sich der Bogen spannt, liegt. Mit Bezug auf die 1A1C erkennt man, dass Systeme der früheren Baukunst Seiten S1 und S2 oder Seitenwände SW1 und SW2 enthalten, welche Lasten von den oberen Teilen T1 und T2 des Bogens auf die Gründungen F1 und F2 übertragen. Die Seiten der Bogensysteme Slund S2 müssen ausreichend dick sein und ausreichend Bewehrung aufweisen, um diese Lasten und die dabei erzeugten Biegemomente aufzunehmen.Soil is not usually mechanically strong enough to adequately support bridge structures as found in this invention. Therefore, bridge structures, as they corresponded to earlier architecture, have been created so that their forces were transmitted through the walls of the structures and / or large concrete foundations at the foot of the walls. Such walls must be designed so that they can transmit such forces, and there are therefore special construction requirements. As will be discussed below, such requirements have disadvantages over previous designs. In the buildings of earlier architecture, the arches are usually formed so that the altitude of the bow foundation at the approximate altitude of the lower Wegebene or the bottom surface of an underground structure, over which the arc spans. With reference to the 1A - 1C It will be seen that prior art systems include sides S1 and S2 or sidewalls SW1 and SW2 which transfer loads from the upper parts T1 and T2 of the arch to the foundations F1 and F2. The sides of the sheet systems Slund S2 must be sufficiently thick and have sufficient reinforcement to accommodate these loads and the bending moments generated thereby.

Da die Normalkräfte, die Bogenbelastung und die Biegemomente im oberen Teil und in den Seiten herkömmlicher überschütteter Bogensysteme auf ein annehmbares Mass begrenzt werden müssen, ist es im weiteren erforderlich, in der Praxis den Radius des Bogens zu beschränken. Diese Beschränkung des Bogenradius führt zu einer grösseren „Bogenhöhe" R1 und R2 (der vertikale Abstand zwischen der oberen Begrenzung des Lichtraumprofils C1 und C2 der unteren Verkehrsebene (oder Wegebene) LS1 und LS2 und dem Bogenscheitel CR1 und CR2 des Bogens) im Bogenprofil als es oft erwünscht ist, im Hinblick auf die wirtschaftliche und praktische Anordnung der beiden Wegebenen und die Ausbildung der Anlagen in der Nähe des Bogens und über dem Bogen. Dies führt zu einem Höhenverlust LH1 und LH2, welcher in etlichen Fällen erheblich sein kann.There the normal forces, the arc load and the bending moments in the upper part and in the Pages of conventional spilled sheet systems must be limited to an acceptable level, it is further necessary to limit in practice the radius of the bow. This limitation of Arc radius leads to a greater "bow height" R1 and R2 (the vertical Distance between the upper limit of the clearance C1 and C2 of the lower traffic level (or Wegebene) LS1 and LS2 and the Bow-crest CR1 and CR2 of the bow) in the bow profile as often he wishes is, in terms of economic and practical arrangement the two Wegebenen and the training of the plants near the bow and over the bow. this leads to to a loss of height LH1 and LH2, which in some cases can be significant.

Balken oder Platten benötigen zwar grössere Dicken als Bögen, brauchen aber keinen Bogenstich und können deshalb für Brücken mit geringerer Höhe zwischen der Oberseite des Lichtraumprofils der unteren Wegebene und der Oberseite der oberen Wegebene eingesetzt werden. Bögen können deshalb, trotz ihres wirtschaftlichen Vorteils, oft mit Bauwerken aus Balken oder Platten oft nicht konkurrieren, bei grösseren Spannweiten. Die grössere Dicke kann allerdings zu teuren Bauwerken, deren schwere Fertigteile schwierig und unhandlich zur Baustelle zu transportieren sind, führen.bar or plates although larger thicknesses as bows, but do not need an arch engraving and can therefore use for bridges lower height between the top of the gauge of the lower Wegebene and the Top of the upper Wegebene be used. Bows can, therefore, despite their economic advantage, often with structures of beams or Plates often do not compete, with larger spans. The bigger thickness However, too expensive structures, their heavy finished parts difficult and unwieldy to transport to the site are lead.

Im weiteren müssen die Gründungen F1 und F2 der herkömmlichen überschütteten Bogensysteme, wie 1A1C zeigen, von erheblicher Grösse sein, um die Bogenlasten, in 1C als AL bezeichnet, zu tragen, und sie bedürfen zusätzlichen Aushubs an der Bogenbasis (normalerweise unterhalb der vorliegenden Darstellung erkenntlich, können die Kräfte AL als Ringkräfte, die Kräfte AV als vertikale und die Kräfte AH als horizontale Kräfte bezeichnet werden. Die Beanspruchungen des Systems ergeben sich aus der Einwirkung der Kräfte AL und AH.Furthermore, the foundations F1 and F2 of conventional overfilled bow systems, such as 1A - 1C show of considerable Be size to the sheet loads, in 1C referred to as AL, and require additional excavation at the bow base (normally recognizable below the present illustration, the forces AL may be referred to as hoop forces, the forces AV as vertical and the forces AH as horizontal forces from the action of the forces AL and AH.

Zudem müssen die Gründungen der herkömmlichen überschütteten Bogensysteme von erheblicher Grösse sein, um die Bogenlasten zutragen, was zu für die Bauausführung zusätzlichem Aushub an der Bogenbasis (normalerweise unter der unteren Wegebene) führt. Für überschüttete Bögen aus Fertigteilen führt die Berücksichtigung der verlangten Höhe der Seiten oder Seitenwände des Bogens entweder zu hohen Fertigteilen, die schwierig und unhandlich zu transportieren und zu versetzen sind, oder zur Notwendigkeit von Gründungsaufsätzen, wie mit F1a in 1A bezeichnet. Wie oben erörtert, sind der Transport und die Handhabung von Bogenfertigteilen für etliche Bogenkonstruktionen schwierig. Allerdings haben Fertigteile gewisse Vorteile, wie die Fähigkeit, ihr Eigengewicht aufzunehmen sowie alle Vorteile, die sich aus der Vorfertigung solcher Bauteile ergeben. Fertigteile haben aber auch gewisse Nachteile, wie die oben erwähnten Transportschwierigkeiten.In addition, the foundations of conventional overfilled sheet systems must be of considerable size to carry the bow loads, resulting in additional excavation at the bow base (usually below the lower deck) for construction. For overcast prefabricated sheets, the consideration of the required height of the sides or side walls of the sheet will result in either high precast parts which are difficult and unwieldy to transport and relocate, or the need for foundation attachments such as F1a in 1A designated. As discussed above, the transportation and handling of precast sheets is difficult for a number of arch constructions. However, finished parts have certain advantages, such as the ability to take their own weight and all the benefits that result from the prefabrication of such components. However, finished parts also have certain disadvantages, such as the transport difficulties mentioned above.

Deshalb wäre es nützlich, so viele Vorteile der Fertigteile wie möglich beizubehalten und gleichzeitig so viele Nachteile der Vorfabrikation wie möglich auszuschalten – oder wenigstens erheblich zu verringern.Therefore would it be useful, to maintain as many advantages of the finished parts as possible and at the same time to eliminate as many disadvantages of the prefabrication as possible - or at least significantly reduce.

In analoger Weise haben auch Ortbetonbauteile viele Vorteile, eingeschlossen die Möglichkeit, sie den Bedürfnissen auf der Baustelle anzupassen, sowie die Ausschaltung der Transportprobleme bei der Fertigteilbauweise. Aber Ortbetonbauteile haben auch gewisse Nachteile, so die Notwendigkeit von Schalungen und Lehrgerüsten. Deshalb wäre es zielführend, so viele Vorteile der Ortbetonbauteile wie möglich beizubehalten und gleichzeitig soviel Nachteile wie möglich auszuschalten oder wenigstens erheblich zu verringern.In In the same way, in-situ concrete components have many advantages, including the possibility of her the needs on the construction site, as well as the elimination of transport problems in the precast construction. But cast-in-place components also have certain Disadvantages, so the need for formwork and scaffolding. Therefore would it be purposeful, to maintain as many advantages of in-situ concrete components as possible and at the same time as many disadvantages as possible eliminate or at least significantly reduce.

AT-B-395894 zeigt ein Bogensystem mit Seitenwänden und vorgefertigten Längsauflagern, mit einem Bogenelement, welches auf den Längsauflagem aufliegt. Die vorliegende Erfindung ist in den unabhängigen Ansprüchen dargestellt, und optionale Möglichkeiten sind in den abhängigen Ansprüchen erwähnt. AT-B-395894 shows a sheet system with side walls and prefabricated longitudinal supports, with a curved element, which rests on the Längsauflagem. The present invention is set forth in the independent claims, and optional possibilities are mentioned in the dependent claims.

Ein Aspekt der eben erwähnten Erfindung (1 bis 14) erläutert eine Methode zur Herstellung eines Bogensystems, welches die Probleme mit dem mechanischen (statischen) Ungenügen normalen Bodens zur Auflagerung von Brücken und anderen Bauwerken, die in jener und dieser Erfindung von Interesse sind, überwindet. Die Vorteile dieser Methode sind erheblich. Es wäre deshalb wertvoll, diese Erläuterungen in einer Art zu verwenden, welche auch die Vorteile zu verwirklichen gestattet, die mit der Erhaltung der Vorzüge sowohl der Fertigteil- wie auch der Ortbetonbauweise überschütteter Bogenbauwerke verbunden sind, unter gleichzeitiger Verringerung, oder wenn möglich Ausschaltung, vieler Nachteile solcher Fertigteil- und Ortbetonbauwerke.One aspect of the invention just mentioned ( 1 to 14 ) discusses a method of making a bow system which overcomes the problems with mechanical (static) normal ground failure for supporting bridges and other structures of interest in that and this invention. The benefits of this method are significant. It would therefore be valuable to use these explanations in a manner which also allows to realize the advantages associated with preserving the benefits of both the precast and cast-in-place arch structures, while reducing, or perhaps eliminating, many Disadvantages of prefabricated and in-situ concrete structures.

Währenddem die Vorteile, die mit dieser Methode der Erfindung verbunden sind, erheblich sind, wäre es doch äusserst nützlich, weitere Vorteile der Abstützung zu verwirklichen. Biegemomente in überschütteten Brückenbauwerken werden durch die Überschüttung und Lasten, so wie Verkehrslasten, die die Brücke zu tragen hat, erzeugt. Diese Biegemomente müssen durch das Brückenbauwerk aufgenommen werden. Bisher erstellte überschüttete Bogenbauwerke tragen diesen Biegemomenten Rechnung, und zwar durch eine Vergrösserung der Bauwerksdicke, durch eine grössere Stahlbewehrung und/oder durch eine Vergrösserung und eine Erhöhung der Steifigkeit der Bogenauflager. Diese Massnahmen können aufwendig sein, und namentlich nicht so effizient wie es möglich wäre. Es besteht daher die Notwendigkeit einer Massnahme, die effizient zur Verminderung der Biegemomente in einem überschütteten Bogenbauwerk führt.During the the advantages associated with this method of the invention, would be significant it is extremely useful, further advantages of the support to realize. Bending moments in overcrowded bridge structures are through the overburden and Loads, such as traffic loads that the bridge has to bear generated. These bending moments must through the bridge structure be recorded. Previously created overwhelmed arch structures wear these bending moments, by an enlargement the building thickness, by a larger Steel reinforcement and / or by an enlargement and an increase of Stiffness of the bow supports. These measures can be costly and not as efficiently as possible. There is therefore the need a measure that is effective for reducing bending moments in a lavish bow building leads.

Die Technologie des ersten Aspekts der Erfindung (114) verbessert die Effizienz eines überschütteten Brückenbauwerks erheblich durch die Art der Lastaufnahme, gegenüber herkömmlichen Bogenbauwerken. Allerdings wäre es hilfreich, wenn diese Vorzüge der Effizienz der Lastaufnahme weiter verbessert werden könnten. Überschüttete Bogenbauwerke, insbesondere flache überschüttete Bögen, sind empfindlich auf Auswärtsbewegungen der Bogenenden. Die Auswärtsbewegungen führen zu grösseren Biegemomenten im Bogen. Herkömmliche überschüttete Bauwerke setzen diesen Biegemomenten eine grössere Bauteildicke, grössere Stahlbewehrungen und/oder grössere und steifere Bogenauflager entgegen. Diese Massnahmen können aufwendig und nicht so effizient sein, wie es möglich wäre.The technology of the first aspect of the invention ( 1 - 14 ) significantly improves the efficiency of a spilled bridge structure by the type of load bearing, compared to conventional arch structures. However, it would be helpful if these benefits of load handling efficiency could be further improved. Overfilled arch structures, especially shallow overflowed arches, are sensitive to outward movements of the bow ends. The outward movements lead to larger bending moments in the bow. Conventional overcrowded structures set these bending moments a greater component thickness, larger steel reinforcements and / or larger and stiffer Bogenauflager contrary. These measures can be costly and not as efficient as it would be possible.

Deshalb besteht die Notwendigkeit einer Massnahme, mit der die Auswärtsbewegungen und besonders die Empfindlichkeit eines überschütteten Bogens auf Auswärtsbewegungen der Bogengründungen effizient reduziert werden können.Therefore there is a need for a measure with which the outward movements and especially the sensitivity of a showered bow to outward movements the sheet foundations can be reduced efficiently.

Die in 114 dargestellte Technologie erhöht die Effizienz einer überschütteten Bogenkonstruktion bei der Vermeidung solcher Auswärtsbewegungen der Bogengründungen, gegenüber bisherigen Bogenbauwerken. Allerdings wäre es hilfreich, wenn der Widerstand gegen Auswärtsbewegungen der Bogengründungen weiter verbessert werden könnte.In the 1 - 14 The technology shown increases the efficiency of a spilled bow construction in avoiding such outward movements of the sheet foundations, compared to previous arch structures. However, it would be helpful if the resistance to outward movements of the sheet foundations could be further improved.

Das neuartige System, dargestellt in den 114 der vorliegenden Anmeldung, löst eine Anzahl der obigen Probleme dadurch, dass Gründungsblöcke hinter oder in der Nähe der Seitenwände erstellt werden, auf die sich der Bogen abstützt. Der Bogen gibt alle oder wenigstens den grössten Teil der Auflagerkräfte in die Gründungsblöcke ab.The novel system, presented in the 1 - 14 of the present application solves a number of the above problems by providing foundation blocks behind or near the sidewalls upon which the arch is supported. The sheet gives all or at least most of the support forces into the foundation blocks.

Dies ist ein äusserst wirksames System, und es erfüllt eine ganze Anzahl der erwähnten Ziele. Die Wirksamkeit dieser Struktur kann noch weiter erhöht werden durch die Verbesserung der Baumethoden. Es ergibt sich daher die Notwendigkeit einer Methode zur Erstellung der Bauwerke gemäss 114. Während die Ortbetonbauweise für Bogenbauwerke wegen ihrer Wirtschaftlichkeit und Schnelligkeit in vielen Situationen geeignet ist, gibt es gewisse kommerzielle und technische (örtliche) Bedingungen, bei welchen eine vollständig vorgefertigte Konstruktion vorzuziehen ist.This is an extremely effective system, and it fulfills a number of the mentioned goals. The effectiveness of this structure can be further increased by improving the construction methods. There is therefore the need for a method for creating the structures according to 1 - 14 , While the cast-in-situ method of arch construction is suitable in many situations for its economy and speed, there are certain commercial and technical (local) conditions in which a completely prefabricated construction is preferable.

Einige dieser Bedingungen sind:

  • – zeitliche Beschränkungen für die Erstellung auf der Baustelle;
  • – Wetter, besonders tiefe Temperaturen;
  • – Nichtvorhandensein von Lehrgerüsten und von Bauteams mit Ortbetonerfahrung;
  • – Notwendigkeit, die Aufgaben des Spezialunternehmers auf die Lieferung (und, eventuell, auf die Montage) der Fertigteile zu beschränken, im Gegensatz zur Ausführung des Bauwerks durch einen Totalunternehmer (mit entsprechender Verantwortung);
  • – Begrenzter zur Verfügung stehender Raum, welcher den Einbau eines Lehrgerüsts nicht erlaubt (wie z. B. bei Bahnbetrieb auf der unteren Wegebene);
  • – Besondere Anforderungen (Ästhetik, etc.)
Some of these conditions are:
  • - time restrictions for the construction on the construction site;
  • - weather, especially low temperatures;
  • - Absence of scaffolding and construction teams with in-situ concrete experience;
  • - the need to limit the tasks of the special contractor to the supply (and, possibly, to the assembly) of the finished parts, as opposed to the execution of the works by a general contractor (with due responsibility);
  • - Limited available space, which does not allow the installation of a scaffold (as in the case of railway operations on the lower road);
  • - special requirements (aesthetics, etc.)

Deshalb besteht eine Notwendigkeit für Methoden zur Errichtung vollständig vorgefertigter überschütteter flacher Bogenbauwerke.Therefore there is a need for Methods of construction completely prefabricated lavender shallow Arch structures.

Die Fertigteile vieler herkömmlicher Systeme werden stehend (auf ihrer Seite) betoniert. Dies erfordert Schalungen, welche Seitenwände aufweisen und welche auf besondere Art gehandhabt werden müssen, damit die Fertigteile geeignet ausgebildet werden. Weiter werden die Fertigteile normalerweise in stehender Lage transportiert. Sie werden dann abgeladen und in der Luft gedreht, damit sie sich in der definitiven Lage befinden (definitive Lage bedeutet hier eine Lage wie in 32 oder so wie in den 1A bis 1C, und eine stehende Lage benötigt eine Drehung um 90° gegenüber der Lage, die in diesen Figuren gezeigt ist). Eine Herstellung und ein Transport in stehender Lage hat verschiedene Nachteile: komplizierte Schalung, besondere Transportprobleme, Hebe-Probleme wegen des Anheben und Drehens solcher Fertigteile.The precast parts of many conventional systems are concreted upright (on their side). This requires formwork, which have side walls and which must be handled in a special way, so that the finished parts are suitably formed. Next, the finished parts are usually transported in a vertical position. They are then unloaded and turned in the air so that they are in the definitive position (definitive position here means a position as in 32 or like in the 1A to 1C and a standing position requires a 90 ° turn from the position shown in these figures). Production and transport in a standing position has various disadvantages: complicated formwork, special transport problems, lifting problems due to the lifting and turning of such finished parts.

Deshalb besteht eine Notwendigkeit für ein Verfahren für die Herstellung und den Transport von Fertigteilen.Therefore there is a need for a procedure for the manufacture and transport of finished parts.

Im Falle verhältnismässig grosser Überschüttung wird keine Verbindung zwischen benachbarten Bogenfertigteilen benötigt, weil die Überschüttung die Last auf der Oberfläche verteilt, sodass keine unterschiedlichen Verschiebungen zwischen benachbarten Fertigteilen auftreten. Solche Verschiebungen können zu sogenannten Verschiebungsrissen führen (Rissen, welche sich von der Oberfläche des Fertigteils bis zur Belagsoberfläche fortpflanzen). Solche Verschiebungen sollten vermieden werden.in the Case of relatively large overburden no connection between adjacent precast sheets needed because the overfill the Load on the surface distributed, so no different shifts between neighboring finished parts occur. Such shifts can too so-called displacement cracks lead (cracks, which differ from the surface of the Finished part up to the surface of the covering procreate). Such shifts should be avoided.

Beim Einsatz von flachen Bögen sind wenig mächtige Überschüttungen häufiger als mächtige, da der flache Bogen vorzugsweise dort verwendet wird, wo die verlorene Höhe minimal gehalten werden muss. In einem solchen Falle, mit nur 0.30m bis 0.60m oder nur 0.10m bis 0.20m oder fast Null Überschüttung (in einigen Fällen) können Verkehrslasten auf einzelne Fertigteile wirken, bevor sie auf die nächsten übertragen werden, so dass Relativ-Vertikalverschiebungen auftreten, die zum Reissen des Belags führen.At the Use of flat arches are little powerful overburdens frequently as powerful, because the flat arch is preferably used where the lost one Height minimal must be kept. In such a case, with only 0.30m to 0.60m or just 0.10m to 0.20m or almost zero overburden (in some cases) may increase traffic loads individual finished parts act before they are transferred to the next, allowing relative vertical displacements occur, which lead to the tearing of the surface.

Deshalb besteht ein Bedarf nach einer Baumassnahme für Bogenbauwerke, welche unterschiedliche Verschiebungen zwischen benachbarten Fertigteilen des Systems vermeidet. Weiter besteht ein Bedarf nach Bauverfahren für Bögen, welche unterschiedliche Verschiebungen zwischen benachbarten Fertigteilen des Systems sogar bei sehr geringer, oder gar verschwindender, Überschüttung vermeidet.Therefore There is a need for a construction work for arch structures, which are different Avoiding shifts between adjacent finished parts of the system. Further, there is a need for construction methods for sheets which are different Shifts between adjacent finished parts of the system even at very low, or even vanishing, overflow avoids.

Es ist das hauptsächlichste Ziel der vorliegenden Erfindung, eine wirtschaftliche und rasch erstellte überschüttete Bogenkonstruktion und eine Methode für deren Herstellung bereitzustellen.It is the main one Aim of the present invention, an economical and rapid created overfilled arch construction and a method for to provide their production.

Es ist eine weiteres Ziel der vorliegenden Erfindung ist es, ein Bogensystem und eine Herstellungsmethode dafür bereitzustellen, bei welchen die Bogenkräfte nicht direkt auf die Wände des Bogenbauwerks übertragen werden und bei welchen die Wände nicht benötigt werden, um wesentliche Anteile dieser Kräfte aufzunehmen.It Another object of the present invention is to provide a sheet system and a manufacturing method for it in which the sheet forces are not applied directly to the walls of the Arched structure and where are the walls not required to absorb substantial portions of these forces.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke oder ein anderes Bauwerk sowie eine Baumethode dafür bereitzustellen, welches die Anwendung einer minimalen Bogenkrümmung erlaubt.It is a further object of the present invention to provide a spilled arch bridge or a to provide another structure as well as a construction method allowing for the application of a minimum arch curvature.

Es ist ein weiteres Ziel der vorliegenden Erfindung, den Bogenstich zu minimieren und dadurch den Anwendungsbereich des Bogens auszudehnen, ohne dabei die strukturelle Bogenwirkung des überschütteten Bauwerks aufzugeben.It Another object of the present invention is the sheet stitch to minimize and thereby extend the scope of the bow, without while giving up the structural arch effect of the overcrowded structure.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk und eine Baumethode dafür bereitzustellen, welche es ermöglicht, die Seiten/Seitenwände der überschütteten Bauwerks leichter und deshalb wirtschaftlicher zu gestalten und rascher zu errichten als bisher.It is another object of the present invention, a spilled arch bridge construction and a construction method for it which makes it possible the sides / side walls the overcrowded structure easier and therefore more economical and faster build as before.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk bereitzustellen, welche es ermöglicht, ein solches Bauwerk mit schlechtem Hinterfüllmaterial zu erstellen.It is another object of the present invention to provide a spilled arch bridge structure, which makes it possible To create such a structure with bad backfill material.

Es ist ein weiters Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk und eine Baumethode dafür bereitzustellen, welche gestatten, die Gründungen an der Basis der überschütteten Bauwerks kleiner zu gestalten als bisher.It It is a further object of the present invention to provide a spilled arch bridge structure and a construction method for it which allow the foundations at the base of the overfilled building smaller than before.

Es ist ein weiters Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk und eine Baumethode dafür bereitzustellen, welche gestatten, die Gründung an der Basis des überschütteten Bauwerks wegzulassen.It It is a further object of the present invention to provide a spilled arch bridge structure and a construction method for it to provide, which allow the foundation at the base of the overcrowded structure omit.

Es ist ein weiters Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk und eine Baumethode dafür bereitzustellen, welche gestatten, die Gründungen an der Basis des überschütteten Bauwerks auf so kleine Dimensionen zu reduzieren, dass sie nur zur Montage der Seitenwände dienen müssen.It It is a further object of the present invention to provide a spilled arch bridge structure and a construction method for it which allow the foundations at the base of the submerged structure to reduce to such small dimensions that they are only for assembly serve the side walls have to.

Es ist ein weiters Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbrückenbauwerk und eine Baumethode dafür bereitzustellen, welche die Abhängigkeit vom Transport grosser und unhandlicher Fertigteile und von schweren Montagekränen gegenüber bisher reduziert. Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche rasch produziert werden kann.It It is a further object of the present invention to provide a spilled arch bridge structure and a construction method for it to provide the dependence from the transport of large and unwieldy finished parts and heavy ones Assembly cranes compared to date reduced. It is another object of the present invention to provide a spilled arch bridge, which can be produced quickly.

Es ist ein weiteres Hauptziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche einfacher zu handhaben und zu transportieren ist als gegenwärtig vorhandene Bogenbauwerke.It is another main object of the present invention to provide a spilled arch bridge, which is easier to handle and transport than currently available Arch structures.

Es ist ein weiteres Ziel der Erfindung, Fertigteile überschütteter Bogenbrücken bereitzustellen, welche einfacher zu handhaben und zu transportieren sind als gegenwärtig zur Verfügung stehende Bogenfertigteile, welche aber so tragfähige und stabile Bauwerke ergeben wie heute vorhandene Bogenbauwerke.It It is a further object of the invention to provide finished parts of overfilled arched bridges which easier to handle and transport than at present disposal standing arched finished parts, which but so viable and stable structures like today existing arch structures.

Es ist eine besonderes Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbauwerk bereitzustellen, welches eine Komposit-Konstruktion Fertigteil-Ortbeton umfasst. Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche eine Massnahme für die effiziente Aufnahme von im Bogen vorhandenen Biegemomenten einschliesst.It It is a particular object of the present invention to provide a lavish arched structure to provide a composite construction precast in situ concrete includes. It is another object of the present invention to provide a spilled arch bridge, which is a measure for the efficient inclusion of bowing moments present in the bow.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche eine Massnahme für die effiziente Reduktion der Empfindlichkeit eines überschütteten Bogens auf Auswärtsbewegungen der Bogengründungen ermöglicht.It it is another object of the present invention to provide a spilled arch bridge, which is a measure for the efficient reduction of the sensitivity of a spilled bow on outward movements the sheet foundations allows.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche vorgespannt wird, um darin Momente zu erzeugen, welche den durch die Überschüttung und die Lasten auf dem Bogenbauwerk erzeugten Momenten entgegenwirken.It it is another object of the present invention to provide a spilled arch bridge, which is biased to create moments in it, which the through the overflow and the loads on the bow building counteract generated moments.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche ein Bogenende aufweist, welches fallweise so gestaltet werden kann, dass es Exzentrizitäten zwischen der Bogenauflagerkraft und der Bogenachse erzeugt. Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche zu eine verringerten Empfindlichkeit auf Auswärtsverschiebungen der Bogengründungen gegenüber bisherigen Bögen führt.It it is another object of the present invention to provide a spilled arch bridge, which has a bow end, which are designed case by case can it be eccentricities generated between the sheet support force and the bow axis. It is another object of the present invention to provide a spilled arch bridge, which results in a reduced sensitivity to outward shifts the sheet foundations across from previous bows leads.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche behandelten Boden zur Schaffung einer Gründung für den Bogen verwenden.It it is another object of the present invention to provide a spilled arch bridge, which treated floor to create a foundation for the bow use.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche eine Fertigteil-Ortbeton Konposit-Konstruktion enthalten und bei welchen Bodenmaterial für die Schaffung einer Bogengründung verwendet wird, eine Bogengründung, welche nicht nur die (vertikalen) Setzungen zu verringern gestattet, sondern auch die (horizontalen) Verschiebungen.It it is another object of the present invention to provide a spilled arch bridge, which contain a prefabricated in-situ concrete conposit construction and with which soil material for the creation of a bow foundation is used, a sheet foundation, which not only allows to reduce the (vertical) subsidence, but also the (horizontal) shifts.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine überschüttete Bogenbrücke bereitzustellen, welche aus einer Komposit-Konstruktion Fertigteil-Ortbeton besteht und die Technologie, dargestellt in 114, verwendet.It is a further object of the present invention to provide an overfilled arched bridge consisting of a composite construction precast in situ concrete and the technology puts in 1 - 14 , used.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbauwerk bereitzustellen, welches eine Auflagergeometrie verwendet, die automatisch den Momenten aus Aufschüttung und Bogenbelastung entgegenwirkt und die Technologie der 114 verwendet.It is a further object of the present invention to provide an overfilled arched structure which utilizes a support geometry which automatically counteracts the moments of bedding and sheet loading and the technology of 1 - 14 used.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbauwerk bereitzustellen, welches Vorspannung verwendet, um automatisch den Momenten aus Überschüttung und Bogenbelastung entgegenzuwirken und welches die Technologie von 114 verwendet.It is a further object of the present invention to provide an overfilled arch structure which utilizes preload to automatically counteract the overhead of padding and bow loading and which incorporates the technology of 1 - 14 used.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbauwerk bereitzustellen, welches viele der Vorzüge der überschütteten Fertigteil-Bogenbrücken verwendet und dabei viele der Nachteile von überschütteten Bogenbrücken ausschaltet oder verringert.It is another object of the present invention, a spilled sheet structure which utilizes many of the benefits of overfilled precast arch bridges while eliminating many of the disadvantages of over-arched arch bridges or decreased.

Es ist ein weiteres Ziel der vorliegenden Erfindung, ein überschüttetes Bogenbauwerk bereitzustellen, welches viele der Vorteile überschütteter Ortbeton-Bogenbrücken beibehält, aber viele der Nachteile von Ortbeton-Brückenbauwerken eliminiert oder wenigstens erheblich reduziert.It is another object of the present invention, a spilled sheet structure however, which retains many of the benefits of overburden in-situ arched bridges eliminates many of the disadvantages of in-situ concrete bridge structures or at least considerably reduced.

Es ist ein weiteres Ziel der vorliegenden Erfindung, die Vorteile, die durch die im Aspekt der 114 dargestellte Technologie ermöglicht werden, weiter zu verbessern. Es ist ein weiteres Ziel der vorliegenden Erfindung, Mittel und Methoden für die Erstellung von Gebäuden bereitzusdtellen.It is a further object of the present invention to provide the advantages provided by in the aspect of 1 - 14 enabled technology to further improve. It is another object of the present invention to provide means and methods for building construction.

Es ist ein weiteres Ziel der vorliegenden Erfindung eine Methode für die Erstellung vollständig vorgefertigter flacher überschütteter Bogenkonstruktionen, wie in 1-14 dargestellt, bereitzustellen.It is a further object of the present invention to provide a method for the creation of fully prefabricated shallow, overfilled arch constructions as in 1 - 14 shown to provide.

Es ist ein weiteres Ziel der vorliegenden Erfindung eine Methode für die Fabrikation, Lagerhaltung und Transport eines bogenförmigen Fertigteils in definitiver Lage gemäss 114 bereitzustellen.It is a further object of the present invention, a method for the fabrication, warehousing and transport of a curved precast element in a definitive position according to 1 - 14 provide.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine Methode für die Erstellung eines Bogensystems gemäss 114 derart bereitzustellen, dass unterschiedliche Verschiebungen zwischen benachbarten Bogenelementen vermieden werden.It is another object of the present invention to provide a method for creating a bow system according to 1 - 14 such that different displacements between adjacent arch members are avoided.

Es ist ein weiteres Ziel der vorliegenden Erfindung, eine Methode für die Erstellung eines Bogensystems gemäss 114 bereitzustellen, bei welcher unterschiedliche Verschiebungen zwischen benachbarten Fertigteilen des Systems selbst im Falle von geringer oder sogar verschwindender Überschüttung vermieden werden.It is another object of the present invention to provide a method for creating a bow system according to 1 - 14 to provide for different shifts between adjacent finished parts of the system even in the case of low or even vanishing overflow avoided.

Verschiedene Arten des Beschriebs der Aspekte der Erfindung sind in den unabhängigen Ansprüchen dargestellt. Verschiedene weitere mögliche Aspekte werden in den abhängigen Ansprüchen erwähnt. Einige der obenerwähnten Ziele werden durch eine bogenförmige Überschüttung und/oder eine Hinterfüllkonstruktion, bei welcher ein flacher Bogen einen leeren Raum überspannt, erreicht. Die Seiten des leeren Raumes werden durch gekrümmte oder ebene Wände gebildet. Verfestigte Zonen von Hinterfüllmaterial oder schon vorher örtlich vorhandenem Baugrund im Kontakt mit den Bogengründungen bei den „Kämpfern", auch als Bogenenden beizeichnet, des Bogens und/oder hinter den Wänden, bilden Gründungsblöcke, welche in unmittelbarem Kontakt mit den Gründungen an den Bogenkämpfern und/oder mit dem oberen Teil der Wände stehen, dergestalt, dass der Bogen seine ganze oder wenigstens den grössten Teil der ganzen Auflagerkraft auf die obenerwähnten Gründungsblöcke einleitet, wodurch die Normalkräfte, Querkräfte und Biegemomente in der Wand und in den Wandgründungen drastisch reduziert werden. Das Bogenbauwerk berührt die Gründungsblöcke dergestalt, dass die Auflagerkräfte des Bogens auf die Gründungsblöcke (statt auf die Seitenwände) des Systems übertragen werden. Die sich daraus ergebenden Vorteile der Abgabe der Auflagerkräfte auf die Gründungsblöcke statt auf die Seitenwände werden in der vorliegenden Darstellung erkannt werden.Various Manners of describing aspects of the invention are set forth in the independent claims. Various other possible aspects become dependent claims mentioned. Some of the above mentioned Goals are made by an arcuate cover and / or a Hinterfüllkonstruktion, in which a flat arc spans an empty space, reached. The pages of empty space are formed by curved or flat walls. Solidified zones of backfill material or already locally existing subsoil in contact with the foundations of the "Fighters", also as bow ends signs, of the arch and / or behind the walls, forming foundation blocks, which in direct contact with the foundations at the bowmen and / or with the upper part of the walls stand, in such a way that the bow its all or at least the biggest Part of the whole bearing force on the above-mentioned foundation blocks initiates, causing the Normal forces, transverse forces and drastically reduces bending moments in the wall and wall foundations become. The arched structure touches the foundation blocks, that the support forces of the Arch on the foundation blocks (instead on the side walls) of the system become. The consequent benefits of delivering the support forces the founding blocks take place on the side walls will be recognized in the present presentation.

Das Bogenbauwerk-System, hergestellt mit Fertigteilen oder Ortbeton oder einer Kombination beider Methoden, umfasst:
Entweder einen unbewehrten oder bewehrten Betonbogen, abgestützt auf Bogengründungen, welche ihrerseits auf Gründungsblöcken aufliegen, wobei letztere verfestigter Teil der Hinterfüllung oder von gewachsenem Bodenmaterial, ausserhalb der Seitenwand unter beiden Seiten des Betonbogens, sind. Der Betonbogen kann aus Fertigteilen, Ortbeton oder einer Kombination bestehen. Die Wände können mit bewehrter Erde oder irgend einer anderen Art von Stützwand hergestellt sein, eingeschlossen Spundwände, Bohrpfehle, Schlitzwände oder eine ausgegrabene Ortbeton-, Fertigteil- oder Spritzbeton-Wand mit oder ohne Nägeln/Anker; Oder einen durchgehenden, monolithischen Rahmen aus einem Stück, wobei der obere Teil des Rahmens einen Bogen umfasst und die Seiten des Rahmens aus gekrümmten oder ebenen Wänden bestehen, wobei die Enden des Bogens und die oberen Enden der Seitenwände so gestaltet sind, dass die Bogenlasten in die Gründungsblöcke eingeleitet werden, mit Gründungsblöcken, die verfestigte Zonen des Hinterfüllmaterials oder gewachsenen Bodenmaterials ausserhalb der Rahmenwände sind.
The sheet metal construction system, manufactured with precast concrete or in-situ concrete or a combination of both, comprises:
Either an unreinforced or reinforced concrete arch, supported on bow foundations, which in turn rest on foundation blocks, the latter being consolidated part of the backfill or of grown soil material, outside the sidewall below both sides of the concrete arch. The concrete arch can consist of precast concrete, in-situ concrete or a combination. The walls may be made of reinforced earth or any other type of retaining wall, including sheet piles, bored cutters, diaphragm walls or an excavated in-situ concrete, precast or shotcrete wall with or without nails / anchors; Or a one-piece monolithic, continuous frame, the upper part of the frame comprising an arc and the sides of the frame being curved or flat walls, the ends of the sheet and the upper ends of the side walls being shaped so that the sheet loads in the foundation blocks are introduced, with foundation blocks, the solidified zones of the backfill material or grown soil material outside the Frame walls are.

Wo Fertigteile eingesetzt werden, können benachbarte Fertigteilbögen baulich entlang der ganzen Abwicklung oder eines Teil derselben verbunden sein.Where Prefabricated parts can be used adjacent Precast arches structurally along the whole settlement or part of it be connected.

Die Gründungsblöcke der vorliegenden Erfindung umfassen ein Material mit ausreichender Steifigkeit und Festigkeit derart, dass die Bogenauflagerkräfte über die Bogengründungen durch den Gründungsblock zum anschliessenden Bodenmaterial so verteilt werden können, dass die Verschiebungen der Bogenenden innerhalb annehmbarer Grenzen bleiben. Flache Bögen (wie in der vorliegenden Erfindung) sind besonders empfindlich auf horizontale Auswärtsbewegungen ihrer Bogenenden. Die Bauweise der vorliegenden Erfindung stellt sicher, dass solide Gründungen, welche für einen solchen Bogen wesentlich sind, wirtschaftlich hergestellt werden können.The Foundation blocks of the present invention include a material with sufficient rigidity and strength such that the sheet support forces over the sheet foundations through the foundation block can be distributed to the subsequent soil material so that the shifts of the bow ends within acceptable limits stay. Flat arches (as in the present invention) are particularly sensitive to horizontal outward movements her bow ends. The construction of the present invention provides sure that solid foundations, which for Such a bow are essential, economically produced can be.

Dadurch, dass der Übergang der Bogenlasten von den Bogenenden über die Bogengründungen auf die Gründungsblöcke ermöglicht wird, brauchen die Bogenauflagekräfte nicht in die Seitenwände des überschütteten Bogensystems eingeleitet zu werden. Dieses System-Merkmal der vorliegenden Erfindung macht es möglich, das Hinterfüllen der Seitenwände mit der Erstellung der Gründungsblöcke zu kombinieren, weil die ganze Hinterfüllung der Seitenwände oder ein Teil davon oder das an Ort verfestigte Bodenmaterial direkt die Gründungsblöcke bildet. Dies gestattet auch ein wirtschaftlicheres Vorgehen für den Bau der Seitenwände, welcher erheblich leichter ist als bei herkömmlichen Systemen.Thereby, that the transition the sheet loads from the bow ends over the sheet foundations the foundation blocks is made possible need the bow support forces not in the side walls of the showered bow system to be initiated. This system feature of the present invention makes it is possible the backfilling the side walls with to combine the creation of foundation blocks, because the whole backfill the side walls or a portion of it or the soil material solidified in place directly forms the foundation blocks. This also allows for a more economical approach to construction the side walls, which is considerably lighter than conventional systems.

Zudem ist es möglich, durch direkte Einleitung der Bogenauflagerkräfte in die Gründungsblöcke im Bereich der oberen Enden der Seitenwände, die Bögen flacher auszubilden als herkömmlich. Dies rührt daher, dass die Lasten und Biegemomente, die bei einem herkömmlichen überschütteten Bogen beträchtlich grösser sind bei einem flacheren Bogen als bei einem höheren (weniger flachen) Bogen. Ein flacherer Bogen (geringer Bogenstich) hat den Vorteil, dass bei einer vorgegebenen lichten Höhe unter dem Seitenbereich des Bogens, die verlorene Höhe (vgl. verlorene Höhe LH1 und LH2 in 1A und 1B) reduziert und dadurch der Anwendungsbereich der Bogenkonstruktion erweitert werden kann. Damit wird die verlorene Höhe LH1 oder LH2 beträchtlich gegenüber den Werten, die in den 1A und 1B angegeben sind, reduziert.In addition, it is possible to form the sheets flatter by direct initiation of Bogenauflagerkräfte in the foundation blocks in the region of the upper ends of the side walls, as conventional. This is because the loads and bending moments that are significantly greater in a conventional overfilled bow are significantly greater with a shallower bow than with a higher (less flat) bow. A shallower bow (lower bow stitch) has the advantage that at a given clear height below the side portion of the bow, the lost height (compare lost height LH1 and LH2 in FIG 1A and 1B ) and thereby the scope of application of the arch construction can be extended. Thus, the lost height LH1 or LH2 will be considerably higher than the values given in the 1A and 1B are reduced.

Die vorliegende Erfindung umfasst auch eine Deckelbauweise eines solchen Systems. Obwohl hier ein Brückensystem dargestellt wird, kann die vorliegende Erfindung selbstverständlich auch auf andere Systeme angewendet werden, ohne dass dabei von der vorliegende Erfindung und deren Darstellung abgewichen wird. So liegt z. B. irgend eine Art von unterirdischen Raum (eingeschlossen Schutzräume, Lager, Hallen, Lagerräume, hinterfüllt und überschüttet oder nur hinterfüllt oder in vorhandenen Boden eingebaut) innerhalb des Bereichs der vorliegenden Erfindung und Darstellung, und die vorliegende Erfindung, so wie sie durch diese Beschreibungen und die Ansprüche definiert ist, soll solche Bauwerke auch umfassen.The The present invention also includes a lid construction of such System. Although here is a bridge system Of course, the present invention may also be illustrated be applied to other systems without being affected by the present Deviated from the invention and its representation. So is z. B. some kind of underground space (including shelters, camps, Halls, storage rooms, backfilled and showered or just backfilled or installed in existing soil) within the range of present invention and illustration, and the present invention, as defined by these descriptions and claims is to include such structures also.

Weitere Zwecke können durch eine überschüttete Bogenbrücke in Fertigteilen und Ortbeton erreicht werden. Die überschüttete Bogenbrücke kann auf wirtschaftliche und wirksame Weise vorgespannt werden, oder die Bogenenden so angeordnet werden, dass die Biegemomente infolge Belastung wirtschaftlich und wirksam aufgenommen werden und die Empfindlichkeit des Bogens auf Auswärtsbewegungen verringert wird.Further Purposes can through a spilled arch bridge in prefabricated parts and in-situ concrete can be achieved. The overcrowded arch bridge can be energetically and effectively biased, or the bow ends are arranged so that the bending moments due to Burden be absorbed economically and effectively and the Sensitivity of the bow is reduced to outward movements.

Die in den 1531 enthaltene Art überschütteter Bogenbrücken kann in Verbindung mit der in den 114 dargestellten und erläuterten Technologie verwendet werden, damit zusätzliche Vorteile jeder der beiden Technologien verwirklicht werden können.The in the 15 - 31 Type of sprayed arch bridges can be used in conjunction with in the 1 - 14 used and illustrated technology can be used to additional benefits of each of the two technologies can be realized.

Die überschüttete Komposit-Bogenkonstruktion, enthalten in den 1531 der vorliegenden Erfindung, verwirklicht dergestalt Vorteile sowohl der Fertigteilbauweise wie auch der Ortbetonbauweise und verringert – oder eliminiert sogar – viele Nachteile reiner Fertigteil- oder Ortbetonbauweisen. Zusätzliche Vorteile ergeben sich wegen der Komposit-Konstruktion der vorliegenden Erfindung, eingeschlossen die Möglichkeit, das Bauwerk effizient abzudichten und mit Fugenabdichtungen zu versehen.The showered composite arch construction, contained in the 15 - 31 In accordance with the present invention, advantages of both precast and in-situ constructions are realized, and many of the disadvantages of pure precast or in-situ constructions are reduced or even eliminated. Additional advantages arise because of the composite construction of the present invention, including the ability to efficiently seal and seal the structure.

Die überschüttete Brücke und Teile davon, dargestellt in den 1531 der vorliegenden Erfindung, machen solche Bauwerke einfach für den Transport, die Handhabung und die Montage und gleichzeitig stabil und wasserdicht.The overgrown bridge and parts thereof, shown in the 15 - 31 In accordance with the present invention, such structures make them easy to transport, handle and assemble while being stable and waterproof.

Weitere Ziele werden durch Methoden (vgl. 3251) für die Ausbildung eines Bogensystems (dargestellt in 114) dadurch erreicht, dass die Bogenfertigteile in ihrer definitiven Stellung (d.h. wie im Bauwerk) vollständig vorgefertigt gelagert und transportiert werden. Dabei bedeutet „vollständig vorgefertigt", dass, mit Ausnahme des Einsatzes von Ortbeton in den Bogengründungen und fallweise in den Scheitelfugen, das ganze Bogenteil vorgefertigt wird. Die Bogenfertigteile werden auf den Gründungsblöcken derart aufgelagert, dass die Bogenauflagerkräfte durch die Gründungsböcke so verteilt werden, wie dies in den Darstellungen der 114 erläutert wird.Further goals are achieved by methods (cf. 32 - 51 ) for the formation of an arch system (shown in 1 - 14 ) achieved in that the curved panels in their final position (ie as in the building) are stored and transported completely prefabricated. In this case, "fully prefabricated" means that, with the exception of the use of in-situ concrete in the sheet foundations and occasionally in the crest joints, the entire arched part is prefabricated on the foundation blocks such that the sheet support forces are distributed by the foundation blocks as this in the representations of 1 - 14 is explained.

Die Schalung ist sehr einfach, und es sind normalerweise keine Konterschalungen erforderlich. Zudem fällt das Drehen der Fertigteile in der Luft am Kran weg.The Formwork is very simple, and it is usually not counter-formwork required. In addition, falls turning the precast parts in the air at the crane.

Die Bogenfertigteile können vorgespannt werden, durch Vorverformung entweder während des Transports vom Wagen bis zum Einbauort, oder anderswie. Die Vorspannung gleicht den Einfluss möglicher Auswärtsverschiebungen der Widerlager (Gründungsblöcke) ganz oder teilweise aus. Die Fertigteile werden in ihrer vorverformten Gestalt verlegt und erreichen die Sollage, wenn sie überschüttet sind.The Bow finished parts can be preloaded by pre-deformation either during transport from the car to the installation site, or otherwise. The bias is equal the influence of possible Away shifts the abutment (foundation blocks) whole or partially off. The finished parts are in their pre-formed Misplaced and reach the desired position when they are showered.

Die Breite der Bogenfertigteile mag durch geometrische Transport-Einschränkungen und das Gewicht begrenzt sein. Die liegende oder definitive Lage/Stellung der Elemente hat verschiedene Vorteile gegenüber der stehender Lage (oder Seitenlage), eingeschlossen die Vorteile verbunden mit längeren Elementen. Für flache Bögen gemäss vorliegender Erfindung können längere Elemente (sogar mit angebauter Bogengründung) transportiert werden als mit anderen Bogengeometrien.The Width of the curved panels may be due to geometric transport restrictions and the weight will be limited. The horizontal or definite position The elements have various advantages over the standing position (or Lateral position), including the advantages associated with longer elements. For flat Bows according to the present invention can longer Elements (even with attached bow foundation) are transported as with other arc geometries.

Es wird hier vermerkt, dass die hier dargestellten Methoden (z. B. 3251) auf schiefe Bogenbauwerke und auch auf Spannweiten, die keine Lösungen mit nur einem Fertigteil gestatten, sondern für die Verbindung beider Hälften einer Scheitelfuge bedürfen, anwendbar sind.It is noted here that the methods presented here (eg. 32 - 51 ) on inclined arch structures and on spans, which do not allow solutions with only one precast, but for the connection of both halves of a vertex require.

Die Erfindung kann in verschiedener Art und Weise eingesetzt werden, und eine Anzahl bevorzugter Beispiele von Realisierungen wird nun mit Bezug auf die beiliegenden Figuren beschrieben – Figuren, in welchen:The Invention can be used in various ways, and a number of preferred examples of implementations will now be with reference to the accompanying figures - Figures, in which:

1A und 1B Querschnitte herkömmlicher Systeme darstellen. 1A and 1B Represent cross sections of conventional systems.

1C die bei überschütteten Bögen, wie sie herkömmlichen Systemen eigen sind, auftretenden Kräfte darstellt. 1C which represents overflowed arches, as they are common to conventional systems occurring forces.

2 den typischen Querschnitt für die grundlegende Realisierungsart der vorliegenden Erfindung, die Verwendung eines flachen, auf Gründungsblöcken aufliegenden Bogens, darstellt. 2 the typical cross-section for the basic implementation of the present invention, the use of a flat, resting on foundation blocks bow represents.

3 den typischen Querschnitt für die grundlegende Realisierungsart der vorliegenden Erfindung durch Verwendung eines durchgehenden, auf Gründungsblöcken abgestützten Rahmens darstellt, wobei der Bogen und die Seitenwände aus ein und dem selben Stück bestehen und durchgehend sind, darstellt. Dabei zeigt das Beispiel eine abgetreppte äussere Bogenfläche. 3 FIG. 12 illustrates the typical cross-section for the basic implementation of the present invention through the use of a continuous frame supported on foundation blocks, where the arch and sidewalls consist of one and the same piece and are continuous. The example shows a stepped outer arch surface.

4 den typischen Querschnitt für die grundlegende Realisierungsart der vorliegenden Erfindung durch Verwendung eines durchgehenden, auf Gründungsblöcke abgestützten Rahmens, in welchem der Bogen und die Seitenwände aus ein und dem selben Stück bestehen und durchgehend sind, darstellt. Dabei zeigt das Beispiel eine vorspringende Ecke. 4 the typical cross section for the basic realization of the present invention by using a continuous, supported on foundation blocks frame in which the arc and the side walls consist of one and the same piece and are continuous. The example shows a protruding corner.

5 ein Flussdiagramm für eine Deckelbauweise der vorliegenden Erfindung darstellt. 5 FIG. 3 illustrates a flow chart for a lid construction of the present invention. FIG.

6 ein System, hergestellt mit der Deckelbauweise, zeigt. 6 a system made with the lid construction shows.

7 ein Flussdiagramm des gesamten Ablaufs der Herstellung eines Bogensystems gemäss vorliegender Erfindung zeigt. 7 a flow chart of the entire process of manufacturing an arch system according to the present invention shows.

8 eine Draufsicht einer anderen Art der vorliegenden Erfindung ist, wo das ganze System einen Dom mit einer (im Grundriss) gebogenen Seitenwand darstellt. 8th Fig. 10 is a plan view of another type of the present invention where the whole system represents a dome with a side wall bent (in plan).

9 eine Mehrfachbogen-Ausführung der vorliegenden Erfindung zeigt. 9 shows a multiple arc embodiment of the present invention.

10 die Anwendung vorliegender Erfindung bei einer schiefen Brücke zeigt. 10 shows the application of the present invention in a leaning bridge.

11 die vorliegende Erfindung mit einem schräg abgeschnittenen Bauwerksende im Einklang mit einer Dammböschung darstellt. 11 the present invention with an obliquely cut building end in accordance with a dam embankment represents.

12 eine Methode gemäss vorliegender Erfindung für die Vorspannung des Bogenbauwerks zeigt. 12 shows a method according to the present invention for the bias of the arch structure.

13 eine Methode zur Herstellung verschiedener unterschiedlicher Spannweiten durch Abschalen innerhalb derselben Schalung zeigt. 13 shows a method for producing various different spans by peeling within the same formwork.

14 eine Methode zur Herstellung verschiedener unterschiedlicher Bogenspannweiten mit der gleichen Schalung durch Anfügen von Verlängerungen an die Schalung zeigt. 14 shows a method for producing different different span spans with the same formwork by adding extensions to the formwork.

15 ein überschüttetes Bogenbauwerk wie in den 114 zeigt. 15 a larded bow building as in the 1 - 14 shows.

16 einen Vertikalschnitt einer überschütteten Komposit-Bogenkonstruktion gemäss vorliegender Erfindung darstellt. 16 a vertical section of a showered composite arch construction according to the present invention.

17 ein Detail eines Längschnitts A-A aus 16 zeigt. 17 a detail of a longitudinal section AA 16 shows.

18 ein Detail B von 17 zeigt. 18 a detail B of 17 shows.

19 einen Vertikalschnitt eines überschütteten Bogenbauwerks mit den Bogengründungen zeigt. 19 a vertical section of an over Pouring bow building with the bow foundations pointing.

20 eine Ausbildung des Auflagers des Bogens auf die Bogengründung im Detail zeigt. 20 an education of the support of the bow on the sheet foundation in detail shows.

21 die herkömmliche Art der Bogenauflagerung zeigt. 21 the conventional type of Bogenauflagerung shows.

22 die Momentenverteilung mit einem herkömmlichen Bogenauflager gemäss 21 zeigt. 22 the torque distribution with a conventional Bogenauflager according 21 shows.

23 die exzentrische Bogenauflagerung gemäss Erläuterung der vorliegenden Erfindung darstellt. 23 the eccentric Bogenauflagerung according to explanation of the present invention represents.

24 das durch die Exzentrizität des Bogenauflagerung bewirkte Moment zeigt. 24 shows the moment caused by the eccentricity of Bogenauflagerung.

25 eine Darstellung der resultierenden Momentenverteilung für eine bestimmte Bogenend-Ausbildung (wie in 23) zeigt. 25 a representation of the resulting torque distribution for a particular Bogenend training (as in 23 ) shows.

26 ein Diagramm der Momenten-Optimierung durch das Vorspannen des Bogens zeigt. 26 shows a diagram of the moment optimization by biasing the bow.

27 ein Diagramm der Momentenverteilung bei einen Bogen mit herkömmlicher Auflagerung zeigt. 27 shows a diagram of the torque distribution in a bow with conventional Auflagerung.

28 ein Diagramm mit der Einwirkung einer Vorspannung des Bogens zeigt. 28 shows a diagram with the action of a bias of the bow.

29 die resultierende Momentenverteilung für einen vorgespannten Bogen zeigt. 29 shows the resulting moment distribution for a prestressed arc.

30 ein Detail aus 19 mit Lagern zwischen dem Bogenende und der Bogengründung, durch welche der Bogen vorgespannt wird, zeigt. 30 a detail from 19 with bearings between the end of the sheet and the sheet foundation through which the sheet is biased shows.

31 die Darstellung eines Zugbandes zur Vorspannung des Bogens zeigt. 31 the representation of a tension band for biasing the sheet shows.

32 einen Schnitt durch ein fertiggestelltes Bogenbauwerk gemäss 1 bis 14, so wie in der vorliegenden Darstellung erläutert, zeigt. 32 a section through a finished arch structure according 1 to 14 , as explained in the present description, shows.

33a einen Grundriss eines schiefen Systems zeigt, wie es gemäss der Erläuterung in vorliegender Darstellung ausgebildet werden kann. 33a shows a plan of a lean system, as it can be formed according to the explanation in the present presentation.

33b einen Grundriss eines Systems mit einem gekrümmten Verlauf, wie er gemäss vorliegender Erläuterung erstellt werden kann, darstellt. 33b a plan of a system with a curved course, as it can be created according to the present explanation represents.

33c einen Grundriss eines Systems mit einem unregelmässigen Verlauf, wie er gemäss vorliegender Erläuterung erstellt werden kann, darstellt. 33c a plan of a system with an irregular course, as it can be created according to the present explanation represents.

34a einen Grundriss mit einem gekrümmten Verlauf, gezeigt mit den aneinander liegenden Bogenfertigteilen, wie er gemäss vorliegender Erläuterung erstellt werden kann, darstellt. 34a a floor plan with a curved course, shown with the adjacent curved precast elements, as it can be created according to the present explanation represents.

34b einen Grundriss eines schiefen Systems, wie er gemäss vorliegender Erläuterung erstellt werden kann, darstellt. 34b a plan of a leaning system, as it can be created according to the present explanation represents.

34c einen Grundriss eines herkömmlichen Systems, mit aneinanderliegenden Bogenfertigteilen, wie er gemäss vorliegender Erläuterung erstellt werden kann, darstellt. 34c a floor plan of a conventional system, with adjacent curved precast elements, as it can be created according to the present explanation represents.

35 einen Grundriss einer Schalung, in welcher Bogenfertigteile in der definierten Lage, gemäss den Erläuterungen der vorliegenden Darstellung, hergestellt werden können, zeigt. 35 a floor plan of a formwork in which curved panels can be made in the defined position, according to the explanations of the present presentation, shows.

36 einen Vertikalschnitt der Schalung von 35 darstellt. 36 a vertical section of the formwork of 35 represents.

37a ein Bogenfertigteil, hergestellt in definitiver Lage, während des Einbauvorgangs zeigt. 37a a prefabricated sheet, produced in a definite position, during the installation process shows.

37b eine Draufsicht auf das Bogenelement während des Einbauvorgangs zeigt. 37b a top view of the sheet member during the installation process shows.

38 ein Bogenfertigteil mit einem Vorspannmittel zeigt. 38 shows a curved precast with a biasing means.

39 einen Vertikalschnitt durch ein Bogenfertigteil zeigt, in welchem Löcher angeordnet sind, um Verbindungselemente wie Dübel oder ähnliches einzuführen. 39 shows a vertical section through a precast part in which holes are arranged to introduce fasteners such as dowels or the like.

40 und 40a ein Verbindungselement in einem Loch eines Betonfertigteils zeigen. 40 and 40a show a fastener in a hole of a precast concrete part.

41 eine Draufsicht auf eine Anzahl von nebeneinander liegenden Bogenfertigteilen zeigt. 41 a plan view of a number of adjacent curved panels shows.

42 ein Verbindungselement zwischen benachbarten Bogenfertigteilen zeigt. 42 shows a connecting element between adjacent curved panels.

43 einen Längsschnitt durch ein fertiggestelltes Bogensystem zeigt, in welchen die Bogenfertigteile miteinander verbunden sind, gemäss den vorliegenden Erläuterungen. 43 a longitudinal section through a finished sheet system shows, in which the curved panels are connected to each other, according to the present explanations.

44 ein Detail einer Verbindung zwischen zwei benachbarten Bogenfertigteilen eines fertiggestellten Bogensystems zeigt, gemäss den vorliegenden Erläuterungen. 44 shows a detail of a connection between two adjacent precast sheets of a finished sheet system, according to the present explanation.

45 ein Detail einer anderen Ausbildung der Verbindung zwischen zwei benachbarten Bogenfertigteilen zeigt, gemäss den vorliegenden Erläuterungen. 45 shows a detail of another embodiment of the connection between two adjacent curved panels, according to the present explanations.

46 einen Vertikalschnitt (Querschnitt) eines Bogensystems zeigt, und zwar während der Montage des Systems, gemäss den vorliegenden Erläuterungen. 46 a vertical section (cross section) egg A bow system shows, during assembly of the system, according to the present explanations.

47 ein Detail eines Bogenendes und einen Teil eines Gründungsblocks zeigt, und zwar während der Montage des Systems, gemäss den vorliegenden Erläuterungen. 47 shows a detail of an arc end and a part of a foundation block, during assembly of the system, according to the present explanations.

48 ein Detail eines Bogenendes und einen Teil eines Gründungsblocks zeigt, und zwar während der Montage des Systems, gemäss den vorliegenden Erläuterungen. 48 shows a detail of an arc end and a part of a foundation block, during assembly of the system, according to the present explanations.

49 ein Detail der Ausbildung eines Bogenfertigteils und dessen Bogengründung zeigt, wie es die Darstellung der vorliegenden Erfindung enthält. 49 shows a detail of the formation of a curved component and its arc foundation, as it contains the representation of the present invention.

50 ein weiteres Detail der Ausbildung eines Bogenfertigteils und dessen Bogengründung zeigt, wie es die Darstellung der vorliegenden Erfindung enthält. 50 shows a further detail of the formation of a curved precast and its arc foundation, as it contains the representation of the present invention.

51 ein weiteres Detail der Ausbildung eines Bogenfertigteils und dessen Bogengründung zeigt, wie es die Darstellung der vorliegenden Erfindung enthält. 51 shows a further detail of the formation of a curved precast and its arc foundation, as it contains the representation of the present invention.

Weitere Ziele, Charakteristika und Vorzüge der Erfindung werden ersichtlich aus dem Studium der nachfolgenden detaillierten Beschreibung und der beiliegenden Figuren.Further Objectives, characteristics and advantages of the The invention will be apparent from the study of the following detailed Description and attached figures.

Erster AspektFirst aspect

Mit Bezug auf einen ersten Aspekt der Erfindung, der hier im Hinblick auf die 1 bis 14 diskutiert wird, und im Sinne der Erläuterung der vorliegenden Darstellung, enthält die vorliegende Erfindung statt einer einzigen Bogengründung (welche in Stahlbeton ausgeführt sein mag) zur Verteilung der horizontalen und vertikalen Auflagerkräfte eine schmale Bogengründung am Bogenende plus einen grossen Gründungsblock, auf dem die (schmale) Bogengründung aufliegt. Dadurch werden die Auflagerkräfte zweistufig verteilt, was wirksamer und weniger aufwendig ist als bei herkömmlichen Systemen. Der Gründungsblock der vorliegenden Erfindung weist zwar ein grösseres Volumen auf, ist aber dennoch relativ billig, weil die Bauwerkshinterfüllung ohnehin verdichtet werden muss und weil bei der vorliegenden Erfindung lediglich verfestigende Zusätze beigefügt werden müssen. Die vorliegende Erfindung kann schlechtes Bodenmaterial – das sonst für die Hinterfüllung einer normalen Brücke ungeeignet wäre – deshalb verwenden, weil es durch verfestigenden Zusätze zu einem soliden Gründungsblock gemacht wird. Der Bogen des vorliegenden Systems berührt diesen Gründungsblock über die Bogengründungen, dergestalt, dass alle oder mindestens der grösste Teil der Bogenauflagerkräfte auf den Gründungsblock übertragen werden. In der praktischen Anwendung werden dadurch die Kräfte auf die Seitenwand und deren Gründung verringert oder eliminiert, wodurch entsprechende Vorteile entstehen. In den meisten Fällen sind die Seitenwände mit den Gründungsblöcken verbunden und dadurch durch diese gehalten. Die grossen Abmessungen des Gründungsblocks im Verein mit dessen Gewicht gestaltet eine so vorteilhafte Kraftverteilung, dass die (horizontalen) Auswärtsverschiebungen der Bogenenden minimiert werden, und zwar auch dann auf wirtschaftliche Art und Weise, wenn unter dem Gründungsblock relativ weiches Material vorhanden ist. Dieses Merkmal der Erfindung bietet besondere Vorteile bei einem relativ flachen Bogen. Flache Bögen werden im Zusammenhang mit breiten Lichtraumprofilen, bei einem Minimum an verlorener Höhe (1A und 1B sowie 2), verwendet.With reference to a first aspect of the invention, which is here in view of 1 to 14 and for purposes of explanation of the present disclosure, instead of a single sheet foundation (which may be in reinforced concrete) for distributing the horizontal and vertical support forces, the present invention includes a narrow sheet foundation at the sheet end plus a large foundation block on which the (narrow ) Sheet foundation rests. As a result, the bearing forces are distributed in two stages, which is more effective and less expensive than conventional systems. Although the foundation block of the present invention has a larger volume, but is still relatively cheap, because the building backfilling must be compressed anyway and because in the present invention only solidifying additives must be added. The present invention can use poor soil material - which would otherwise be unsuitable for the backfill of a normal bridge - because it is made solidifying additions to a solid foundation block. The arch of the present system contacts this foundation block via the sheet foundations, such that all or at least most of the sheet support forces are transferred to the foundation block. In practice, this reduces or eliminates the forces on the sidewall and its foundation, thereby providing benefits. In most cases, the side walls are connected to and thus held by the foundation blocks. The large dimensions of the foundation block combined with its weight make such an advantageous distribution of force that the (horizontal) outward displacements of the ends of the arches are minimized, even economically, if relatively soft material is present under the foundation block. This feature of the invention offers particular advantages in a relatively flat arc. Flat arches are used in conjunction with wide clearances, with a minimum of lost height ( 1A and 1B such as 2 ).

Mit Bezug auf 2 ist ersichtlich, dass das gesamte überschüttete Bogenbauwerk 10 (welches auch einfach als Bogenbauwerk bezeichnet wird) und die Bauweise der vorliegenden Erfindung einen Bogen 12 (welcher auch als Bogenelement bezeichnet wird) umfasst, welcher das Dach eines Hohlraums 14 innerhalb eines mit Boden aufgefüllten Raumes bildet. Unter dem Bogen 12 halten die Wände 16 und 18 (welche auch als Seitenwände oder Stützwände bezeichnet werden) die Bodenhinterfüllung 20 oder die Aushubränder 22 und 24 des anstehenden Bodens, auf beiden Seiten des Hohlraums 14 zurück. Der Bogen und die Stützwände können miteinander baulich verbunden sein oder nicht. Die Anwendung vorliegender Erfindung gestattet es, den Bogen und die Wände unabhängig voneinander, in verschiedenen Bauphasen, zu erstellen, Der Zweck und die Gestalt des Bogens, der Stützwände und der Gründung dieser beiden Schlüsselelemente des überschütteten Bauwerks wird aus der Erläuterung der vorliegenden Darstellung ersichtlich. Bauwerk 10 kann sich zwischen der ersten ausgewählten Ebene 30 (welche der Boden eines Hohlraums oder die tiefer liegende Wegebene sein kann und welche auch die Ebene 32 umfassen kann) und einer zweiten ausgewählten Ebene 34 (welche das Dach eines Hohlraums oder eine obere Wegebene sein kann) befinden.Regarding 2 it can be seen that the entire overgrown arched structure 10 (which is also referred to simply as a sheet structure) and the construction of the present invention a bow 12 (which is also referred to as an arch element) comprising the roof of a cavity 14 forms within a floor filled space. Under the arch 12 keep the walls 16 and 18 (which are also referred to as side walls or retaining walls) the bottom backfill 20 or the excavation edges 22 and 24 of the pending floor, on both sides of the cavity 14 back. The bow and the supporting walls may be structurally connected to each other or not. The purpose of the present invention is to make the arch and walls independent of each other at different stages of construction. The purpose and shape of the arch, the supporting walls and the foundation of these two key elements of the overburden will be apparent from the discussion of the present disclosure. building 10 can be between the first selected level 30 (which may be the floor of a cavity or the lower level of the floor, and which may be the level 32 may include) and a second selected level 34 (which may be the roof of a cavity or upper deck).

Der Bogen besteht aus Stahlbeton oder unbewehrtem Beton und kann als Bogenfertigteil oder in Ortbeton hergestellt werden.Of the Arch is made of reinforced concrete or unreinforced concrete and can as Precast sheet or in-situ concrete.

Der Bogen ist über Bogengründungen (48, 50) und Gründungsblöcke 40 und 42 auf der Hinterfüllung 20 oder auf gewachsenem Boden (die Oberfläche des vorhandenen Baugrundes, ausgehoben bis dorthin) gegründet. Die Gründungsblöcke 40 und 42 werden beide hinter den entsprechenden Seitenwänden 16 und 18 des überschütteten Bogenbauwerks erstellt. Die Bogengründungen 48 und 50, hergestellt in Beton oder Stahlbeton, liegen zwischen den Enden des Bogens 12 und den Gründungsblöcken, damit die Auflagerkräfte, wie durch die Pfeile 54 angegeben, über eine breite Fläche verteilt werden, wodurch die Festigkeits- und Steifigkeits-Anforderungen an das verfestigte Material reduziert werden. Wie aus den Figuren, besonders 2, ersichtlich, sind die Kräfte 54 der Bogenenden radial gerichtet. Wie aus 2 ersichtlich, ist der Kontakt zwischen den Bogenenden des Bogen 12 und den Gründungsblöcken so angeordnet, dass die Auflagerkräfte an den Bogenenden über die Bogengründungen auf die Gründungsblöcke übertragen werden. Demgemäss stützen die Seitenwände das Bogenbauwerk in keiner erhebliche Weise, mindestens nicht in horizontaler Richtung. Tatsächlich, wie 2 zeigt, darf man feststellen, dass die Enden des Bogens 12 von den oberen Enden 55 der Seitenwände einen Abstand aufweisen, dass alle oder wenigstens der grösste Teil der Bogenend-Kräfte auf die Gründungsblöcke übertragen werden. Die Gründungsblöcke enthalten verfestigtes Bodenmaterial mit genügender Steifigkeit und Festigkeit, dass die Bogenauflagerkräfte durch den Gründungsblock auf das anliegende Bodenmaterial übertragen werden. Damit ermöglicht das System gemäss vorliegender Erfindung die Erfüllung dieser Zwecke mit einem Bauteil, weil die Gründungsblöcke sowohl die Seitenwände des Bauwerks halten wie auch die Gründung des Bogenbauwerks darstellen und zudem die ganze Hinterfüllung oder einen Teil davon ausmachen.The arch is about bow foundations ( 48 . 50 ) and foundation blocks 40 and 42 on the backfill 20 or based on grown soil (the surface of existing subsoil, excavated up to there). The foundation blocks 40 and 42 Both are behind the appropriate pages walls 16 and 18 created the overgrown arch building. The sheet foundations 48 and 50 , made in concrete or reinforced concrete, lie between the ends of the arch 12 and the foundation blocks, so that the bearing forces, as indicated by the arrows 54 be distributed over a wide area, whereby the strength and stiffness requirements are reduced to the solidified material. As from the figures, especially 2 , obviously, are the forces 54 the bow ends directed radially. How out 2 As can be seen, the contact between the bow ends of the bow 12 and the foundation blocks are arranged so that the support forces are transmitted at the sheet ends on the arc foundations on the foundation blocks. Accordingly, the side walls do not support the arch structure in any significant way, at least not in the horizontal direction. Actually, how 2 shows, one may notice that the ends of the bow 12 from the upper ends 55 the side walls have a distance that all or at least most of the Bogenend forces are transmitted to the foundation blocks. The foundation blocks contain consolidated soil material with sufficient rigidity and rigidity that the sheet support forces are transmitted through the foundation block to the adjacent soil material. Thus, the system according to the present invention enables the fulfillment of these purposes with a component, because the foundation blocks both hold the side walls of the structure as well as constitute the founding of the arch structure and also make up the whole backfill or a part thereof.

Wie mit Pfeilen 56 in 2 angegeben, verteilen die Gründungsblöcke die konzentrierten Auflagerkräfte an den Bogenenden auf eine genügend grosse Hinterfüll-Fläche, sodass die Bodenpressungen auf den Baugrund (auf welchen die Bogenlasten abgetragen werden) keine unannehmbaren Verschiebungen, besonders in horizontaler Richtung, verursachen. Als Materialien, die für die Schaffung der Gründungsblöcke 40 und 42 eingesetzt werden können, kommen zementverfestigtes Bodenmaterial, erhärtetes Flüssig-Füllmaterial, Flüssigfüllmaterial mit geringem Raumgewicht, durch Hochdruck an Ort injizierter Boden oder andere dergestalt hergestellte oder behandelte Materialien in Frage.As with arrows 56 in 2 As stated, the foundation blocks distribute the concentrated bearing forces at the ends of the sheet to a sufficiently large backfill area so that the soil pressures on the ground (on which the sheet loads are removed) will not cause unacceptable shifts, especially in the horizontal direction. As materials necessary for the creation of foundation blocks 40 and 42 can be used, come cement-hardened soil material, hardened liquid filling material, liquid filling material with low density, by high-pressure in-situ injected soil or other materials prepared or treated in this way in question.

Diese Materialien haben eine Festigkeit und Steifigkeit, die höher als diejenige normalen Bodens, aber beträchtlich tiefer als diejenige normalen Betons ist. Deshalb können die Gründungsblöcke 40 und 42 wesentlich kostengünstiger als in normalem Beton hergestellt werden. Oft kann Bodenmaterial, das sich für Brückenhinterfüllungen nicht eignet, für die Herstellung von Gründungsblöcken verwendet werden, weil es mit Zement, Kalk oder anderen Zusätzen behandelt wird. Zudem kann Material, welches aus Umweltgründen in besonderen Deponien gelagert werden müsste, verwendet werden, weil es wegen seiner Behandlung mit Zement nicht mehr umweltkritisch oder -gefährlich ist.These materials have a strength and rigidity higher than that of normal soil but considerably lower than that of normal concrete. Therefore, the foundation blocks 40 and 42 much cheaper than being produced in normal concrete. Often, soil material that is not suitable for bridge backfill can be used to make foundation blocks because it is treated with cement, lime or other additives. In addition, material that would have to be stored for environmental reasons in special landfills can be used because it is no longer environmentally critical or dangerous because of its treatment with cement.

Die Wände 16 und 18 können unabhängig von und vor dem Bogen 12 erstellt und primär für den Zweck, die Hinterfüllung an der Aussenseite des Bauwerks abzustützen, ausgelegt werden; oder als Fortsetzung des Betonbogens in Einheit mit demselben, wie angedeutet mit dem System 10' in 3 oder System 10'' in 4.The walls 16 and 18 can be independent of and in front of the bow 12 designed and designed primarily for the purpose of supporting the backfill on the outside of the structure; or as a continuation of the concrete arc in unit with it, as indicated by the system 10 ' in 3 or system 10 '' in 4 ,

Unabhängig erstellte Seitenwände können bewehrte Erdwände mit Fertigteilen oder irgend eine andere Art von Stützwand, eingeschlossen Spundwände, Bohrpfähle oder eine im Aushub erstellte, vorgefertigte oder Spritzbetonwand, mit oder ohne Nägel/Anker, sein. Da die ganze oder der grösste Teil der Bogenstützkraft auf die Gründungsblöcke gerichtet ist, können die Wandgründungen 57 und 58 sehr schmal dimensioniert werden, verglichen mit den Wandgründungen F1 und F2, oder sie können komplett weggelassen werden.Independently made sidewalls may be precast earthwork or any other type of retaining wall, including sheet piles, bored piles or excavated, prefabricated or shotcrete walls, with or without nails / anchors. Since all or most of the arch support force is directed to the foundation blocks, the wall foundations 57 and 58 can be dimensioned very narrow, compared with the wall foundations F1 and F2, or they can be completely omitted.

Wie aus dem Vergleich der 1C und 2C ersichtlich, hat das System der vorliegenden Erfindung verschiedene Vorteile über herkömmliche Systeme. Dadurch, dass die Gründungsblöcke hinter der Wand oder den Wänden platziert werden, ergeben sich eine Anzahl von Vorteilen mit dem System der vorliegenden Erfindung. Normale Gründungen hinter den Wänden, welche üblicherweise bedeutsame Aushöbe im Baugrund erfordern und welche aufwendig und umweltmässig nachteilig sein können, speziell im Fall von Flussbetten (entsprechende Gesetze verbieten zum Teil das Arbeiten in Flussbetten), oder wenn umweltschädliches Material zuerst beseitigt werden muss für den Bau der Gründung, können in wesentlichen Masse verringert werden.As from the comparison of 1C and 2C As can be seen, the system of the present invention has several advantages over conventional systems. By placing the foundation blocks behind the wall or walls, there are a number of advantages with the system of the present invention. Normal foundations behind the walls, which usually require significant excavations in the subsoil and which can be costly and environmentally disadvantageous, especially in the case of riverbeds (laws prohibit partly working in riverbeds), or if environmentally harmful material must first be disposed of for construction the founding, can be substantially reduced.

Da die Gründungsblöcke des vorliegenden Systems hinter den Seitenwänden liegen, sind sie durch Kolkprobleme weniger gefährdet als Gründungen von herkömmlichen Systemen. Die Gründungsblöcke der vorliegenden Erfindung sind einfacher, billiger und rascher in der Erstellung als herkömmliche Gründungen. Ein zusätzlicher Vorteil ist, dass normale Aushubgeräte für ihre Erstellung verwendet werden können (statt spezialisierte Geräte für das Betonieren).There the foundation blocks of the are present behind the side walls, they are through Kolkprobleme less endangered as foundations from conventional Systems. The foundation blocks of the present invention are simpler, cheaper and faster in the Creation as conventional foundations. An additional one The advantage is that normal excavators are used for their creation can be (instead of specialized equipment for the Concrete).

Erdmaterial, das sich für die Hinterfüllung herkömmlicher Systeme nicht eignet, kann für das System der vorliegenden Erfindung geeignet gemacht werden, und zwar sogar für die verfestigten Hinterfüllzonen (Gründungsblöcke), dadurch, dass Zement, Kalk oder andere verfestigende Materialien oder Behandlungen verwendet werden.soil material, that stands for the backfill of conventional Systems not suitable for the system of the present invention are made suitable, and even for the solidified backfill zones (Foundation blocks), thereby, that cement, lime or other solidifying materials or treatments be used.

Die Gründungsblöcke sind unbewehrt (mit Ausnahme der allfälligen Verankerungsmatten, hauptsächlich Kunststoffanker in verschiedenen Formen der Erfindung) und deshalb dauerhafter als herkömmliche Systeme. Im Fall von Zement- oder Kalkbehandlungen werden die Gründungsblöcke mit der Zeit sogar härter; sie können nicht schlechter werden.The foundation blocks are unbewehrt (with Exception of any anchoring mats, mainly plastic anchors in various forms of the invention) and therefore more durable than conventional systems. In the case of cement or lime treatments, the foundation blocks become even harder over time; they can not get worse.

Da das System der vorliegenden Erfindung hauptsächlich Erdmaterial vom Ort verwendet, hat das System der vorliegenden Erfindung mehrere ökologische Vorteile, eingeschlossen die Vorteile geringerer Transportdistanzen (weniger Luftverschmutzung) und der geringeren Benützung wertvoller Kiesreserven. Es besteht sogar die Möglichkeit, die Wand mit umweltmässig bedenklichem Material zu hinterfüllen, da dieses in verschiedenen Fällen ungefährlich wird, wenn es mit Zement, Kalk oder anderen Zusätzen vermischt wird.There the system of the present invention mainly earth material from the site used, the system of the present invention has several ecological Benefits, including the benefits of lower transport distances (less air pollution) and less use more valuable Gravel reserves. There is even the possibility of the wall with environmentally questionable To backfill material, because this in different cases harmless when mixed with cement, lime or other additives.

Im weiteren erkennt man durch den Vergleich des Systems, dargestellt in 2, mit dem System, dargestellt in 1B, dass das System der vorliegenden Erfindung die verlorene Höhe LH reduziert und dass damit das gleiche Lichtraumprofil wie bei herkömmlichen Systemen erreicht wird.In the further one one recognizes by the comparison of the system, represented in 2 , with the system, presented in 1B in that the system of the present invention reduces the lost height LH and thus achieves the same clearance gauge profile as in conventional systems.

Es gibt mehrere alternative Arten der vorliegenden Erfindung. Eine Art der Erfindung ist diejenige, wo die obere Wegebene 36 (in 2) mit der Oberfläche des Bogens 12 zusammenfällt, sodass die Erdüberfüllung, welche bei den herkömmlichen Bögen normal ist, wegfällt. Wie oben erwähnt, werden in den 3 und 4 zwei Formen der Erfindung gezeigt, als Systeme 10' und 10''. Dieser flache Bogen der Erfindung kann auf Gründungsblöcken, welche gleichzeitig zur Stützung der Seitenwände dienen, ruhen, oder er kann einen durchgehenden Rahmen enthalten, der seitlich durch Gründungsblöcke, wie in 3 und 4 gezeigt, gestützt wird. 3 zeigt das System 10', welches die Stufen 60 in den oberen Seitenbereichen der Konstruktion 12' enthält, sowie Elemente 62 (Rohre und Ähnliches), welche verwendet werden, um die Kontaktzone zwischen dem Bauwerk selbst und dem Gründungsblock zu vermörteln, wodurch zusätzlich der gute Kontakt und die gute Kraftübertragung von der Bogenkonstruktion 12' des Systems 10' auf die Gründungsblöcke 40' und 42' gesichert wird. Die Kräfte des Bogenbauwerks 12' werden verteilt auf die Gründungsblöcke, wie oben beschrieben und wie dargestellt durch die Pfeile 63. 4 zeigt eine Ausbildung 10'' des flachen Bogens unter Verwendung eines durchgehenden monolithischen Rahmens in einem Stück, wobei die hervorstehende Ecke 64 verwendet wird (statt der abgetreppten Aussenseite des Bogenbauwerks 12'), um die Kraftübertragung vom Bauwerk auf den Gründungsblock sicher zu stellen. Um dafür zu sorgen, dass eine sichere Verbindung zwischen dem Bogenbauwerk 12' und den Gründungsblöcken 40'' und 42'' besteht, kann ein Kanal 65 definiert werden, durch jede hervorstehende Ecke. Zement oder Beton oder Ähnliches kann durch den Kanal 75 oder durch Rohre (wie in anderen Arten der Erfindung) eingeführt werden, um den direkten Kontakt zwischen der hervorstehenden Ecke 74 und den Gründungsblöcken 40'' und 42'' zu garantieren. Wie in den 2 und 3 dargestellt, können die Seitenwände des Systems der vorliegenden Erfindung entweder eben sein und rechtwinklig gegenüber der Ebene 32 (enthalten in der ersten gewählten Ebene 30) oder sie können mit einem schiefen Winkel θ mit Bezug auf die Ebene 32 gestaltet werden, wobei θ ein Winkel < 90° ist, wobei die Seitenwände sich gegeneinander neigen. Zudem, wie dargestellt in 4, können die Seitenwände gekrümmt sein in der Art wie dargestellt im Gebiet 68 mit Bezug auf die Ebene 69, welche stehend ist im Vergleich zur Ebene 32. In verschiedenen Fällen kann die Ebene 69 senkrecht auf der Ebene 32 stehen. In anderen Fällen, wie unten erörtert werden wird, wird die gekrümmte Art der Seitenwand diese Seitenwände zylindrisch machen.There are several alternative types of the present invention. One type of invention is the one where the upper level is 36 (in 2 ) with the surface of the bow 12 coincides, so that the earth trapping, which is normal in the conventional arcs eliminated. As mentioned above, in the 3 and 4 two forms of the invention are shown as systems 10 ' and 10 '' , This flat arch of the invention may rest on foundation blocks which simultaneously serve to support the side walls, or it may include a continuous frame extending laterally through foundation blocks as in Figs 3 and 4 shown is supported. 3 shows the system 10 ' which the stairs 60 in the upper side areas of the construction 12 ' contains, as well as elements 62 (Pipes and the like), which are used to mortar the contact zone between the building itself and the foundation block, which in addition the good contact and the good power transmission from the arch construction 12 ' of the system 10 ' on the foundation blocks 40 ' and 42 ' is secured. The forces of the arched structure 12 ' are distributed to the foundation blocks as described above and as indicated by the arrows 63 , 4 shows an education 10 '' flat arch using a continuous monolithic frame in one piece, with the protruding corner 64 is used (instead of the stepped outside of the arch structure 12 ' ) to ensure the transmission of power from the structure to the foundation block. To ensure that a secure connection between the arch structure 12 ' and the foundation blocks 40 '' and 42 '' there can be a channel 65 be defined by each protruding corner. Cement or concrete or the like can pass through the canal 75 or introduced through pipes (as in other types of the invention) to direct contact between the projecting corner 74 and the foundation blocks 40 '' and 42 '' to guarantee. As in the 2 and 3 As shown, the side walls of the system of the present invention may be either planar and perpendicular to the plane 32 (included in the first selected level 30 ) or they can be at an oblique angle θ with respect to the plane 32 where θ is an angle <90 °, with the sidewalls tilting against each other. In addition, as shown in 4 , the side walls may be curved in the manner as shown in the area 68 with respect to the plane 69 , which is standing compared to the plane 32 , In different cases, the level can be 69 perpendicular to the plane 32 stand. In other cases, as will be discussed below, the curved nature of the sidewall will render these sidewalls cylindrical.

Zudem können einige oder alle der Systeme der vorliegenden Erfindung Bewehrungen RE im Bogen und in den Seitenwänden enthalten, wie dargestellt in 2 und 4. Die Gründungsblöcke als solche sind unbewehrt mit Ausnahme der meistens in Kunststoff ausgebildeten Anker, welche die bewehrten Erdwände in die Hinterfüllung zurückhalten (im Falle, wo diese Art von Wandsystem verwendet wird).In addition, some or all of the systems of the present invention may include reinforcements RE in the arch and sidewalls as shown in FIG 2 and 4 , As such, the foundation blocks are unreinforced with the exception of the mostly plastic anchors which retain the reinforced earth walls in the backfill (in the case where this type of wall system is used).

Das System der vorliegenden Erfindung kann auch im Zusammenhang mit der Deckelbauweise verwendet werden. Wie dargestellt in 5, umfasst eine Deckelbauweise der vorliegenden Erfindung:
die Herstellung von Seitenwänden durch den Einsatz von Spundwänden, Rühlwänden, gerammten oder gebohrten Pfählen, Schlitzwänden oder anderen Materialien in Schritt 70;
die Herstellung der Gründungsblöcke aus Boden in Schritt 72;
die Herstellung der Gründungsblöcke, direkt anschliessend an eine der ausgewählten Ebenen, in Schritt 74;
das Versetzen des Bogenelements in einer Lage, derart dass sie benachbarte Gründungsblöcke überspannt und auf diesen Gründungsblöcken in Schritt 46 aufgelegt wird;
das Überschütten des Bogenelementes mit Bogen in Schritt 68 (wenn eine Bodenüberschüttung verlangt ist); und
die Entfernung des Bodens zwischen den Seitenwänden in Schritt 80.
The system of the present invention may also be used in conjunction with the lid construction. As shown in 5 includes a lid construction of the present invention:
the manufacture of side walls through the use of sheetpiles, skirts, rammed or drilled piles, diaphragm walls or other materials in step 70 ;
the production of foundation blocks from soil in step 72 ;
the production of the foundation blocks, immediately following one of the selected levels, in step 74 ;
placing the sheet member in one layer so as to span adjacent foundation blocks and on said foundation blocks in step 46 is launched;
the overflowing of the arch element with arch in step 68 (if a floor overflow is required); and
the removal of the soil between the sidewalls in step 80 ,

Das Endprodukt dieser Methode wird in 6 als System 90 gezeigt. Das System 90 enthält Seitenwände 92 und 94, welche vorgängig als Spundwände, Rühlwände, gerammte oder gebohrte Pfähle, Schlitzwände usw. erstellt worden sind, anschliessend werden die Fundationsblöcke 96 und 98 durch Verfestigung von ausgehobenem Material oder durch oberflächennahe Bodenverbesserung (wo möglich) oder auch mit anderen Arten der Verfestigung verfestigt;
anschliessend wird ein flacher Bogen 100 montiert oder erstellt, und
im letzten Schritt wird der Bogen bis zur Höhe 104 aufgefüllt und das Bodenmaterial 102 zwischen den Seitenwänden wird entfernt.
The end product of this method is in 6 as a system 90 shown. The system 90 contains side walls 92 and 94 , which were previously created as sheet pile walls, Rühlwände, rammed or drilled piles, slot walls, etc., then the foundation blocks 96 and 98 solidified by solidification of excavated material or by near-surface soil improvement (where possible) or other types of solidification;
then a flat bow is made 100 assembled or created, and
in the last step, the bow is up to the height 104 filled up and the soil material 102 between the side walls is removed.

Wo es möglich ist, wird diese Deckelbauweise ohne, dass zunächst die Seitenwände erstellt werden, angewendet, und zwar, wenn die Aushubwände dadurch gesichert werden können, dass Spritzbeton und/oder Nägel und Anker anschliessend oder laufend während des Aushubes unter dem flachen Bogen eingebaut werden. Die Gründungsblöcke 96 und 98 können erstellt werden durch Aushub und Ersatz mit Material, das mit Zement oder Ähnlichem gemischt ist oder durch einen Verfestigungsvorgang von der Oberfläche aus sowie durch oberflächennahe Bodenmischverfahren oder durch Einpressen von Mörtel oder auf andere Art erfolgt. Zudem können die Seitenwände 92 und 94 als Spundwände, als Rühlwände, als gerammte oder gebohrte Pfähle oder als Schlitzwände oder als Aushub, geschützt mit Spritzbeton und Nägeln/Ankern oder ähnlichen Mitteln der Erstellung einer Stützwand, die geeignet sind für diese Anwendung, ausgeführt werden. Wie in 6 dargestellt, stützen sich die Bogenenden 106 und 108 der Bogen-Spannweite 100 über Bogengründungen auf die Gründungsblöcke ab. Wie dargestellt in 7, umfasst die vorliegende Erfindung eine Methode zur Herstellung eines Bogensystems, welches folgende Schritte umfasst:
Bestimmung einer ersten ausgewählten Ebene in Schritt 120;
Bestimmung einer zweiten ausgewählten Ebene über der ersten ausgewählten Ebene in Schritt 122;
Herstellung zweier Seitenwände (vertikal, aufrechtstehend oder geneigt) zwischen der ersten und der zweiten gewählten Ebene in Schritt 124;
Erstellung von Gründungsblöcken nahe an den Seitenwänden in Schritt 126;
Erstellung eines Bogens über den Seitenwänden in Schritt 128;
Abstützung der Bogenenden gegen die Gründungsblöcke in Schritt 130 (über der Bogengründung); und
Übertragung der Bogenstützkräfte vom Bogen auf die Gründungsblöcke in Schritt 132.
Wherever possible, this lid construction is used without first constructing the sidewalls, namely, when the excavated walls can be secured by incorporating shotcrete and / or nails and anchors subsequently or continuously during excavation under the flat arch , The foundation blocks 96 and 98 may be created by excavating and replacing material that is mixed with cement or the like, or by a solidification process from the surface, or by near-surface soil mixing or by mortar or otherwise. In addition, the side walls 92 and 94 as sheet pile walls, as Rühlwände, as rammed or drilled piles or as diaphragm walls or excavated, protected with shotcrete and nails / anchors or similar means of creating a retaining wall, which are suitable for this application, running. As in 6 represented, the bow ends are supported 106 and 108 the bow span 100 over sheet foundations on the foundation blocks from. As shown in 7 The present invention comprises a method for the production of an arch system comprising the following steps:
Determine a first selected level in step 120 ;
Determining a second selected level above the first selected level in step 122 ;
Fabrication of two sidewalls (vertical, upright or inclined) between the first and second selected planes in step 124 ;
Creation of foundation blocks close to the sidewalls in step 126 ;
Create an arc over the sidewalls in step 128 ;
Supporting the bow ends against the foundation blocks in step 130 (over the sheet foundation); and
Transfer the sheet support forces from the sheet to the foundation blocks in step 132 ,

Die Methode kann zudem einen Schritt 134 umfassen, in dem der Bogen eine Spannweite grösser als den Abstand der Seitenwände überspannt. Die Methode kann weiter einen Schritt 136 umfassen, in welchem das Bodenmaterial direkt hinter den Seitenwänden zu Gründungsblöcken verfestigt wird. Die Verfestigung des Bodenmaterials kann auch in Schritt 138 erfolgen. Die Methode kann im weiteren umfassen, dass die Seitenwände gegeneinander geneigt werden (in einem Schritt 140) und sie kann auch einschliessen, dass die Kräfte, die vom Bogenbauwerk auf die Gründungsblöcke übertragen werden, auf eine grössere Fläche als die Enden des Bogens in Schritt 142 verteilt werden. Wie dargestellt in Schritt 144 kann der Schritt der Herstellung der beiden Seitenwände auch umfassen, dass diese an Ort und Stelle betoniert werden, oder, wie in Schritt 146 dargestellt, den Schritt, dass der Bogen selbst an Ort und Stelle betoniert wird. Der Schritt der Erstellung der beide Seitenwände kann die Vorfabrikation der Seitenwände in Schritt 148 und den Schritt der Erstellung des Bogens als Fertigteil in Schritt 150 umfassen. Die hier definierte Methode kann zudem umfassen, dass der Bogen in Schritt 152 und die Seitenwände in Schritt 154 bewehrt werden.The method can also be a step 134 include, in which the arc spans a span greater than the distance of the side walls. The method can go one step further 136 in which the soil material is solidified directly behind the sidewalls into foundation blocks. The solidification of the soil material can also be in step 138 respectively. The method may further include that the side walls are inclined towards each other (in one step 140 ) and it may also include that the forces transmitted from the arch structure to the foundation blocks are on a larger area than the ends of the arch in step 142 be distributed. As shown in step 144 For example, the step of making the two sidewalls may also include concreting them in place or, as in step 146 represented, the step that the sheet itself is concreted in place. The step of creating the both sidewalls may be the prefabrication of the sidewalls in step 148 and the step of creating the sheet as a finished part in step 150 include. The method defined here can also include that of the bow in step 152 and the side walls in step 154 be reinforced.

Die bisherige Darstellung bezieht sich auf ein gerades Brückenbauwerk; aber die oben erwähnten Methoden können auch auf im Grundriss gekrümmte oder im Grundriss oder im Längsschnitt eckig verlaufende Bauwerke angewendet werden, ohne dass dadurch von der vorliegenden Darstellung abgewichen würde.The previous illustration refers to a straight bridge structure; but the methods mentioned above can also curved in on the floor plan or in plan or in longitudinal section angular structures can be applied without this deviated from the present presentation.

Wie oben dargestellt, kann die vorliegende Erfindung auch für ein Dom-Bauwerk verwendet werden. Wie im Grundriss in 8 dargestellt, umfasst ein System 10''' einen Dom 160, welcher einem Bogen 12 entspricht und welcher dadurch einen leeren Raum überspannt. Eine im Grundriss gekrümmte Seitenwand, welche kreisförmig oder elliptisch im Grundriss sein kann (zylindrisch), oder ähnlich, dargestellt als Seitenwand 161, befindet sich unterhalb des Doms 160. Eine Domgründung und ein Gründungsblock 162 befinden sich direkt anschliessend an die Domenden 164 des Domes 160 in der Art wie oben beschrieben. Da der einige Unterschied zwischen dem System 10''' und dem System 10 die Domform des Systems 10''' ist, wird das System 10''' nicht weiter erörtert. Währenddem eine kugelförmige Domform erörtert wurde, ist es für Fachleute klar, dass eine gebogene Form der vorliegenden Erfindung auch andere gebogene Formen, eingeschlossen die elliptische oder andere Bogenformen, umfassen kann. Solche Bogenformen sollen im Umfang der vorliegenden Darstellung auch enthalten sein.As stated above, the present invention can also be used for a dome structure. As in the floor plan in 8th shown comprises a system 10 ''' a Cathedral 160 which is a bow 12 corresponds and which thereby spans an empty space. A curved in plan floor side wall, which may be circular or elliptical in plan (cylindrical), or similar, shown as a side wall 161 , located below the cathedral 160 , A dome foundation and a foundation block 162 are located directly after the cathedral ends 164 of the cathedral 160 in the way described above. Because of some difference between the system 10 ''' and the system 10 the dome of the system 10 ''' is, the system becomes 10 ''' not discussed further. While a spherical mandrel has been discussed, it will be appreciated by those skilled in the art that a curved shape of the present invention may include other curved shapes, including elliptical or other arcuate shapes. Such arch forms should also be included within the scope of the present disclosure.

Die Ausbildung der vorliegenden Erfindung als Dom hat den Vorteil, dass die verfestigte Hinterfüllung (Gründungsblock) die Notwendigkeit von umlaufenden Spannkabeln am Bogenende des Doms wegen der Steifigkeit des Gründungsblocks ausschliesst.The Forming the present invention as a dome has the advantage that the solidified backfill (Foundation block) the need for circumferential tension cables at the bow end of the cathedral because of the rigidity of the foundation block excludes.

Die vorliegende Darstellung umfasst nicht nur Brücken mit Wegebenen über und unter ihnen, sondern auch jegliche Art von unterirdischem Raum, mit einem oder mehreren Öffnungen für den Zugang und den Ausgang etc.The present presentation does not cover only bridges with walkways above and below them, but also any kind of underground space, with one or more openings for access and exit etc.

Weiter kann das System der vorliegenden Erfindung verwendet werden im Zusammenhang mit anderen Arten von Brücken sowie einem Mehrfach-Bogenbauwerk 200, dargestellt in 9, einem schiefen Bogenbauwerk 300, wie dargestellt in 10 und in der US Patent-Anmeldung mit der laufenden Nr. 09/520636 , welche am 03/07/2000 durch den gleichen Erfinder angemeldet wurde und welche als überschüttete schiefe Fertigteil-Brücke, publiziert als US-B-6434892 , bezeichnet wurde. Ein Bogenbauwerk 400 gemäss 11 mit abgeschrägten Enden, wobei die Enden des Bogenbauwerks in der gleichen Ebene geneigt sind wie die Böschungen des Dammes, durch welchen das Bogenbauwerk hindurchfährt. Es wird darauf hingewiesen, dass die Systeme 200, 300 und 400 alle mit Bögen ausgestattet sind, so wie die Bögen 202, 302 und 402, welche sich auf die Gründungsblöcke 204, 304 und 404 in der oben beschriebenen Art abstützen. Im Falle eines Mehrfachbogen-Systems können Gründungsblöcke die Seitenwände ersetzen, welche sonst zwischen benachbarten Bogenabschnitten eingesetzt würden, so wie dargestellt durch die Gründungsblöcke 206. Die Gründungsblöcke 304 und 404 können sich bis ausserhalb der Längen der Bogenelemente 302 und 402 erstrecken. Wie in 10 dargestellt, hat die schiefe Brücke 300 einen schiefen Winkel α, wobei α kleiner als 90° ist. Die Methoden der vorliegenden Erfindung können abgeändert werden, sodass sie auch die oben dargestellten Bogenarten umfassen. Diese Änderungen werden in 7 dargestellt durch die Definition eines schiefen Bogensystems in Schritt 700 und eines Systems mit abgeschrägten Enden in Schritt 800. Es wird hier auf die Darstellung dieser Schritte verwiesen.Further, the system of the present invention may be used in conjunction with other types of bridges as well as a multiple arch structure 200 represented in 9 , a leaning arch construction 300 , as shown in 10 and in the US Patent Application Serial No. 09 / 520,636 which on the 03/07/2000 was filed by the same inventor and which as a larded oblique prefabricated bridge, published as US-B-6434892 , was designated. A bow building 400 according to 11 with bevelled ends, the ends of the arch structure being inclined in the same plane as the embankments of the dam through which the arch structure passes. It should be noted that the systems 200 . 300 and 400 all are equipped with bows, as are the bows 202 . 302 and 402 , which are based on the foundation blocks 204 . 304 and 404 support in the manner described above. In the case of a multiple arc system, foundation blocks may replace the sidewalls that would otherwise be inserted between adjacent arcuate sections as illustrated by the foundation blocks 206 , The foundation blocks 304 and 404 can be up to outside the lengths of the arch elements 302 and 402 extend. As in 10 portrayed, has the crooked bridge 300 an oblique angle α, where α is smaller than 90 °. The methods of the present invention may be modified to include the types of sheets illustrated above. These changes will be made in 7 represented by the definition of a slanted arc system in step 700 and a bevelled end system in step 800 , Reference is made here to the representation of these steps.

Der Kontakt zwischen den Bogenkonstruktionen und den Gründungsblöcken in den Systemen 200, 300 und 400 ist identisch mit dem Kontakt zwischen den Bogenbauwerken und den Gründungsblöcken, wie oben erörtert. Dementsprechend wird dieser Kontakt nicht näher erörtert, sondern es wird auf die obigen Darstellungen verwiesen.The contact between the arch structures and the foundation blocks in the systems 200 . 300 and 400 is identical to the contact between the arch structures and the foundation blocks, as discussed above. Accordingly, this contact is not discussed in detail, but reference is made to the above representations.

Weiterhin, wie in 12 dargestellt, sind flache (mit kleinem Bogenstich ausgestattete) Bögen 12A empfindlich auf Auswärtsverschiebungen 12A' ihrer Enden/Gründungen. Deshalb wird in der vorliegenden Erfindung die Vorspannung des Bogens durch das Pressen des Bogens auf einer Seite berücksichtigt, wodurch das Gegenteil von dem, was bei einer Auswärtsverschiebung erfolgen würde, hervorgerufen wird. Dieses Pressen (Vorspannen) wird in 12 durch einen Pfeil 12A'' gezeigt. Die Empfindlichkeit auf Auswärtsbewegungen wird dadurch erheblich verringert. Dementsprechend wird festgestellt, dass die vorliegende Erfindung auch einen Schritt 900 enthalten kann, bei welchem das Bogenbauwerk vorgespannt wird.Continue, as in 12 shown are flat (with a small curve stitched) arches 12A sensitive to outward shifts 12A ' their ends / foundations. Therefore, in the present invention, the bias of the sheet is taken into account by pressing the sheet on one side, thereby causing the opposite of what would happen in an outward displacement. This pressing (pretensioning) is in 12 through an arrow 12A '' shown. The sensitivity to outward movements is thereby significantly reduced. Accordingly, it is noted that the present invention also includes a step 900 may contain, in which the arched structure is biased.

Wie dargestellt in den 13 und 14, besteht eine der Möglichkeiten der vorliegenden Erfindung darin, dass der Bogen 12D kreisförmig (konstanter Krümmungsradius) sein kann. Diese Ausbildung hat verschiedene Vorteile, eingeschlossen die Möglichkeit, dass bei der Fertigteilproduktion eine einzige Schalung für die Herstellung von Bögen mit grosser Spannweite und, durch Abschalen, von Bögen mit kleinerer Spannweite, wie in 13 gezeigt (12B), möglich wird; oder im Falle von Ortbeton, in welchem die Schalung 12F, dargestellt mit 12FE, dass eine kreisförmige Bogenform (vgl. 14) durch eine Verlängerung 12FE der Schalung 12F erweitert wird. Die Methode der vorliegenden Erfindung kann verändert werden, sodass sie diesen Schritt ebenfalls einschliesst, und dies ist die 7 durch den Schritt 950 dargestellt, wobei eine einzige Schalung verwendet wird, um mehr als eine Form des Bogens zu erzeugen.As shown in the 13 and 14 , One of the possibilities of the present invention is that the bow 12D can be circular (constant radius of curvature). This design has several advantages, including the possibility that in prefabrication a single formwork for the production of large span bows and, by scaling, smaller span bends as in 13 shown ( 12B ) becomes possible; or in the case of in-situ concrete, in which the formwork 12F represented by 12Fe in that a circular arc shape (cf. 14 ) by an extension 12Fe the formwork 12F is extended. The method of the present invention can be changed to include this step as well, and this is the 7 through the step 950 wherein a single form is used to create more than one shape of the arch.

ZWEITER ASPEKTSECOND ASPECT

Bei der generellen Behandlung eines Zweiten Aspekts der Erfindung, die mit Bezug auf die 1531 erörtert wird (wobei diese Figuren ihre eigenen Bezugsnummern haben, welche sich mit den Bezugsnummern der 114 überdecken) können das Bogenbauwerk und dessen Elemente der vorliegenden Erfindung unabhängig oder in Verbindung mit der überschütteten in 114 dargestellten Brücke verwendet werden. Währenddem der vorliegende Aspekt in Verbindung mit jenem Bauwerk dargestellt wird, wird hier deutlich gemacht, dass der vorliegende Aspekt unabhängig von einem solchen Bauwerk verwendet werden kann und dass durch die Darstellung dieser Erfindung in Kombination mit der Erfindung, dargestellt in 114, keine Einschränkung des Erfindungsbereichs beabsichtigt ist. Die Grundstruktur, dargestellt im ersten Aspekt, ist in 15 als Bauwerk 10 dargestellt. Wie in den Aspekten von 114 gezeigt, umfasst das überschüttete Bogenbauwerk 10 einen flachen Bogen 12, welcher in den 114 aus Beton besteht und einen freien Raum 14 überspannt. Die Seiten dieses freien Raumes werden durch gekrümmte oder gerade Wände sowie die Wände 16 gebildet, und verfestigte Zonen von Erdmaterial (hinterfüllt oder als gewachsener Boden) sind in Kontakt mit den Enden des Bogens und/oder hinter den Wänden, und sie bilden Gründungsblöcke (so wie Gründungsblock 18), welche in direktem Kontakt über Bogengründungen (so wie Gründung 20) mit den Enden des Bogens oder mit den oberen Teilen der Seitenwände sind, derart, dass das Bogenbauwerk den ganzen oder den grössten Teil der Bogenstützkräfte auf die Gründungsblöcke abgibt. Diese, auf Grund ihrer Grösse und ihres Gewichts, übertragen und verteilen die Bogenstützkräfte auf den Baugrund, z.B. den Baugrund 22, welcher Hinterfüllung oder gewachsener Boden sein kann, derart, dass die Verschiebungen, besonders in horizontaler Richtung, minimal sind. Eine Überschüttung (so wie die Erdüberschüttung 24) wird auf den Bogen 12 aufgebracht. Die Darstellung dieses Bauwerks wird in den 1531 nicht weiter dargestellt, unter Bezug auf den Aspekt der 114 für diese Darstellung.In the general treatment of a second aspect of the invention, with reference to the 15 - 31 is discussed (these figures have their own reference numbers, which correspond to the reference numbers of 1 - 14 cover), the arch structure and its elements of the present invention, independently or in conjunction with the showered in 1 - 14 bridge can be used. While the present aspect is illustrated in connection with that structure, it is to be understood that the present aspect may be utilized independently of such structure, and that by the presentation of this invention in combination with the invention shown in FIG 1 - 14 , no limitation of the scope of the invention is intended. The basic structure shown in the first aspect is in 15 as a building 10 shown. As in the aspects of 1 - 14 shown, covers the overgrown arch building 10 a flat arch 12 , which in the 1 - 14 consists of concrete and a free space 14 spans. The sides of this blank are defined by curved or straight walls as well as the walls 16 formed and solidified zones of soil material (backfilled or as grown soil) are in contact with the ends of the arch and / or behind the walls, and they form foundation blocks (such as foundation block 18 ), which are in direct contact via arch foundations (such as founding 20 ) are with the ends of the sheet or with the upper parts of the side walls, such that the sheet structure the whole or the larger th part of the sheet support forces on the foundation blocks gives. These, due to their size and weight, transfer and distribute the sheet support forces on the ground, eg the ground 22 which may be backfill or grown soil such that the displacements are minimal, especially in the horizontal direction. A covering (as well as the earth overburden 24 ) gets on the bow 12 applied. The representation of this building is in the 15 - 31 not further illustrated with reference to the aspect of 1 - 14 for this presentation.

Wie oben erörtert, verbindet das überschüttete Bogenbauwerk der vorliegenden Erfindung die Vorteile der Fertigteil-Bauweise und der Ortbeton-Bauweise, und sie stabilisiert auch das Bogenbauwerk.As discussed above connects the overgrown arched structure the present invention, the advantages of precast construction and in-situ concrete construction, and it also stabilizes the arch structure.

Mit Bezug auf die 1618 ist ersichtlich, dass die vorliegende Erfindung eine überschüttete Brückenkonstruktion 28 mit einem Bogen 30 einschliesst, welcher eine untere Lage 32 als Fertigteil und eine obere Lage 34 als Ortbetonteil umfasst. Wie in 15 dargestellt, sind diese Bogenlagen in Kontakt mit Gründungen, so, wie z.B. Gründung 18 an den Bogenenden, wenn sie, so wie dargestellt in den 114, verwendet werden. Fertigteile bilden die Bogenform und Ortbeton wird über die Fertigteile aufgebracht, um den überschütteten Bogen zu bilden – einen Bogen, dessen Form und Dicke ähnlich ist wie die Form und Dicke oben dargestellter Bauwerke.With reference to the 16 - 18 It can be seen that the present invention is a spilled bridge construction 28 with a bow 30 includes, which is a lower layer 32 as finished part and an upper layer 34 as in-situ concrete part. As in 15 shown, these sheet layers are in contact with foundations, such as founding 18 at the ends of the bow, if they are, as shown in the 1 - 14 , be used. Prefabricated parts form the arch form and in-situ concrete is applied over the prefabricated parts to form the overburdened arch - an arch whose shape and thickness is similar to the shape and thickness of the above structures.

Wie aus den 16, 17 und 18 ersichtlich, können die Schichten 32 und 34 aus Stahlbeton mit Längsbewehrungen (so, wie Bewehrung 36 und weitere Bewehrungen) sowie Bewehrung 38 bestehen. Fugenfüllungen, so, wie die Fugenfüllung 40, sind auch inbegriffen sowie Abdichtungen, wie z.B. Abdichtung 42, welche zwischen den Schichten 32 und 34 verwendet werden können. Fugen zur Einleitung von Schwindrissen, so, wie 46, können in den Ortbeton eingelegt werden, so, wie Fuge 44, an die Stossfugen zwischen Fertigteilen. Wie aus 18 ersichtlich, kann die Dicke der Ortbetonschicht 34 lokal bei den Stossfugen zwischen den Elementen erhöht werden, sodass der Betonquerschnitt an diesem Ort grösser ist. Das hat den Vorteil, dass die Längsmomenten-Tragfähigkeit an diesen Orten erhöht wird, wobei damit die Längs-Lastübertragung, ein Vorteil der Ortbeton-Bauweise, erhalten bleibt.Like from the 16 . 17 and 18 Obviously, the layers can 32 and 34 made of reinforced concrete with longitudinal reinforcement (same as reinforcement 36 and other reinforcements) as well as reinforcement 38 consist. Joint fillings, as well as the joint filling 40 , are also included as well as seals, such as sealing 42 which is between the layers 32 and 34 can be used. Joints for inducing shrinkage cracks, such as 46 , can be inserted into the in-situ concrete, as well as joint 44 , to the butt joints between finished parts. How out 18 can be seen, the thickness of the in-situ concrete layer 34 be locally increased at the joints between the elements, so that the concrete cross-section is larger in this place. This has the advantage of increasing the longitudinal moment load capacity at these locations, thereby maintaining longitudinal load transfer, an advantage of cast-in-place construction.

Die Fertigteilschicht des Bogens ergibt die Form (verlorene Schalung) des gesamten Bogens, aber sie ist dünner und deshalb leichter zu transportieren und zu handhaben als herkömmliche bogenförmige Fertigteile. Die Bogenfertigteile werden so dimensioniert, dass sie genügend widerstandsfähig sind, um ihr Eigengewicht während des Transportes und der Montage zu tragen, und um die Ortbetonschicht 34 aufzunehmen. Für den Fachmann ist ersichtlich, wie das Fertigteil 32 auf Grund dieser Darstellung zu bemessen ist. Der Komposit-Aufbau zwischen einem Fertigteil und einem Ortbetonteil erreicht die Dicke und Stärke von oben beschriebenen Bauwerken, welche ausschliesslich aus Fertigteilen oder aus Ortbeton bestehen.The precast layer of the sheet gives the shape (lost formwork) of the entire sheet, but it is thinner and therefore easier to transport and handle than conventional arcuate finished parts. The precast sheets are dimensioned so that they are sufficiently resistant to carry their own weight during transport and assembly, and to the in-situ concrete layer 34 take. For the skilled person is apparent as the finished part 32 is to be measured on the basis of this representation. The composite structure between a finished part and an in-situ concrete part reaches the thickness and thickness of structures described above, which consist exclusively of precast concrete or in-situ concrete.

Die Hauptvorteile des Komposit-Bogensystems des vorliegenden Aspekts in den 1531 umfasst:
das Gewicht der zu transportierenden Elemente ist geringer, und es kann die Hälfte von früher beschriebenen Fertigteilen sein (oder die Elemente können entsprechend breiter sein, sodass weniger Elemente transportiert werden müssen); und
die Ortbetonschicht 34 erleichtert die Lastverteilung für Einzellasten in Längsrichtung.
The main advantages of the composite arch system of the present aspect in the 15 - 31 includes:
the weight of the elements to be transported is less, and it may be half of previously described finished parts (or the elements may be correspondingly wider, so fewer elements have to be transported); and
the in-situ concrete layer 34 facilitates the load distribution for single loads in the longitudinal direction.

Zudem wird die Anordnung der Abdichtung zwischen den vorfabrizierten Elementen gegenüber früher erleichtert. Damit hat das Komposit-System dieses hier dargestellten Zweiten Aspekts Vorteile gegenüber einem voll vorfabrizierten Bogen. Für die Erstellung des Bogens gemäss diesem Zweiten Aspekt (1531) wird keine Schalung oder Rüstung benötigt. Die Weglassung von Schalung oder Rüstung ergibt erhebliche Einsparungen, und der freie Raum unterhalb des Bogens wird nicht eingeschränkt während der Bauausführung, da eine provisorische Unterstützung wegfällt. Damit hat die Konstruktion, dargestellt im Aspekt der 1531 der vorliegenden Erfindung, auch Vorteile gegenüber Ortbetonbögen.In addition, the arrangement of the seal between the prefabricated elements is facilitated compared to earlier. Thus, the composite system of this second aspect presented has advantages over a fully prefabricated sheet. For the creation of the bow according to this second aspect ( 15 - 31 ) no formwork or armor is needed. The omission of formwork or armor results in significant savings, and the free space below the arch is not restricted during construction, as a temporary support is eliminated. Thus the construction, represented in the aspect of the 15 - 31 of the present invention, also advantages over in-situ concrete arches.

Wie vorgängig erwähnt, umfasst das überschüttete Bogenbauwerk der vorliegenden Erfindung auch Mittel zur Reduktion der Biegemomente im überschütteten Bogen und zur Reduktion der Empfindlichkeit des Bogens auf irgendwelche Auswärtsverschiebungen der Bogengründungen. Durch die Reduktion der Biegemomente wird auch die Dicke und die Bewehrung der Bauteile verringert, was entsprechende Vorteile mit sich bringt.As previously mentioned, includes the overgrown arch structure The present invention also means for reducing the bending moments in the shower and to reduce the sensitivity of the sheet to any Away shifts the sheet foundations. By reducing the bending moments, the thickness and the Reinforcement of the components decreases, which has corresponding advantages brings.

Generell umfassen diese Mittel und Möglichkeiten sowohl die je nach Projekt gestalteten Bogenenden wie auch vorgespannte Bögen, wobei die Vorspannung vor oder während der Belastung erfolgen kann.As a general rule include these resources and opportunities both the bow ends, which are designed according to the project, as well as prestressed Sheets, being the bias before or during the load can be done.

Mit Bezug auf die 19 und 20 wird auf die Bogengründung 50 zwischen einem Bogen CA und der Wand 17 und dem Gründungsblock 18 verwiesen. Ein Lager 54 wird zwischen dem Bogenende und der Bogengründung eingesetzt. Die Überschüttung 24 erfolgt über dem Bogen CA.With reference to the 19 and 20 is on the sheet foundation 50 between a bow CA and the wall 17 and the founding block 18 directed. A warehouse 54 is used between the bow end and the bow foundation. The overburden 24 takes place over the arch CA.

Das Bauwerk des zweiten Aspekts dieser Erfindung (1531) bietet Verbesserungen gegenüber der Bogengründung, wie sie in 19 und 20 gezeigt wird. Die Konstruktionsart gemäss den 1531 der vorliegenden Erfindung umfasst zwei hauptsächliche Mittel, mit denen die Biegemomente und damit die Bauwerksdicke und die Bewehrung reduziert werden können. Die Mittel gemäss den 1531 der vorliegenden Erfindung umfassen eine spezielle Bogenendgeometrie (23, 24 & 25) und eine spezielle Bogenvorspannung vor oder während der Belastung (26 & 2731).The building of the second aspect of this invention ( 15 - 31 ) offers improvements opposite the bow foundation, as in 19 and 20 will be shown. The type of construction according to 15 - 31 The present invention comprises two principal means by which the bending moments, and thus the structural thickness and the reinforcement, can be reduced. The funds according to the 15 - 31 of the present invention comprise a special Bogenendgeometrie ( 23 . 24 & 25 ) and a special arc prestress before or during loading ( 26 & 27 - 31 ).

Mit Bezug auf die 21 und 22 wird ein herkömmliches Bogenauflager PS in Zusammenhang mit einem Bogen C (Bogenaxe CL) gezeigt. Wie in 21 gezeigt wird, wird das Bogenauflager PS so gestaltet, dass es mittig auf der Bogenaxe CL liegt. Die entsprechende Momentenverteilung wird in 22 mit einer gestrichelten Linie IM gezeigt, wobei die negativen Biegemomente NM in der Nähe der seitlichen Bogenbereiche und das positive Biegemoment BM1 gezeigt wird, im Scheitel des Bogens.With reference to the 21 and 22 For example, a conventional sheet support PS is shown in conjunction with an arc C (Bogenaxe CL). As in 21 is shown, the sheet support PS is designed so that it is centered on the Bogenaxe CL. The corresponding torque distribution is in 22 with a dashed line IM showing the negative bending moments NM in the vicinity of the lateral arc portions and the positive bending moment BM1 at the apex of the arc.

Die Massnahmen gemäss dem Aspekt der 1531 der vorliegenden Erfindung sind dargestellt in 23; sie umfassen eine exzentrische Bogenstützung 60. Wie in 23 dargestellt, ist das exzentrische Lager 60 so angeordnet, dass es die Bogenreaktion 62 in einem Abstand von der Bogenaxe CL des Bogens C einleitet, wobei die Exzentrizität in 23 mit der Nummer 64 angegeben wird. Das Moment, das durch diese Exzentrizität bewirkt wird, ist durch eine gestrichelte Linie in 24 dargestellt. Wie 24 zeigt, bewirkt die Exzentrizität der Bogenreaktion ein konstantes negatives Moment BM2 im Bogen.The measures according to the aspect of 15 - 31 of the present invention are shown in FIG 23 ; they include an eccentric arc support 60 , As in 23 pictured is the eccentric bearing 60 arranged so that it is the bow reaction 62 at a distance from the Bogenaxe CL of the arc C, wherein the eccentricity in 23 with the number 64 is specified. The moment caused by this eccentricity is indicated by a dashed line in 24 shown. As 24 shows, the eccentricity of the arc reaction causes a constant negative moment BM2 in the arc.

Mit Bezug auf 23 ist ersichtlich, dass das Hinzufügen eines konstanten negativen Momentes BM2 auf die negativen/positiven Momente gem. 22 eine resultierende Momentenverteilung RM als punktierte Linie in 25 bewirkt. Wie aus 25 ersichtlich, ergibt die resultierende Momentenverteilung RM ein erhöhtes negatives Moment RMN in den Seitenbereichen und ein verringertes positives Biegemoment SM im Scheitelbereich. Das Biegemoment SM ergibt sich aus der Addition der Biegemomente BM1 und BM2 mit dem Total von BM1 und BM2, welches kleiner ist als BM1, auf Grund der Vorzeichen der Biegemomente. Dies kann auch gesehen werden als absoluter Wert von BM1 und BM2. Damit werden die maximalen positiven Momente im Bogen verringert gegenüber herkömmlichen (nicht exzentrischen) Arten der Bogenauflagerung.Regarding 23 It can be seen that the addition of a constant negative torque BM2 to the negative / positive moments acc. 22 a resulting moment distribution RM as a dotted line in 25 causes. How out 25 As can be seen, the resulting torque distribution RM results in an increased negative torque RMN in the side regions and a reduced positive bending moment SM in the apex region. The bending moment SM results from the addition of the bending moments BM1 and BM2 with the total of BM1 and BM2, which is smaller than BM1, on the basis of the signs of the bending moments. This can also be seen as the absolute value of BM1 and BM2. This reduces the maximum positive moments in the arc compared to conventional (non-eccentric) types of Bogenauflagerung.

Eine Vorspannung kann ebenfalls zur Verringerung der Biegemomente in einem erdüberschütteten Bogen verwendet werden. Die Vorspannung ist in den 2631 dargestellt. So wie 27 zeigt, wird eine Belastung L auf den Bogen ein Biegemoment IM' bewirken, welches wie bei 22 erörtert, ein negatives Biegemoment NM' auf den Seitenbereichen des Bogens und ein positives Biegemoment BM' im Scheitelbereich ergibt. 27 ist ähnlich zu 22, wird aber hier deshalb gezeigt, um die Wirkung der Vorspannung des Aspektes der 1531 der vorliegenden Erfindung zu zeigen.Bias can also be used to reduce bending moments in a buried sheet. The bias is in the 26 - 31 shown. Such as 27 shows, a load L on the bow will cause a bending moment IM ', which as in 22 discussed, gives a negative bending moment NM 'on the side regions of the arc and a positive bending moment BM' in the apex region. 27 is similar to 22 , but is shown here therefore to the effect of the bias of the aspect 15 - 31 of the present invention.

Wie in 26 gezeigt, werden die Vorspannkräfte PL auf den Bogen angesetzt, um die Bogenenden um einen Abstand DPL vor oder während der Belastung des Bogens nach innen zu verschieben. 28 zeigt das veränderliche negative Moment IMS mit einem negativen Betrag von BM2' im Bogenscheitel. Während des Vorspannen wird ein Bogenmoment eingeführt und es verbleibt im Bogen. Dieses Moment ist entgegengesetzt zum maximalen Moment im Bogenscheitel eines herkömmlich gestützten Bogens.As in 26 2, the biasing forces PL are applied to the sheet to move the sheet ends inwardly by a distance DPL before or during the loading of the sheet. 28 shows the variable negative moment IMS with a negative amount of BM2 'in the vertex of the bow. During toughening, an arc moment is introduced and it remains in the arc. This moment is opposite to the maximum moment in the vertex of a conventionally supported arc.

29 zeigt das Biegemoment RMM, welches daraus resultiert, dass das Biegemoment IMS infolge Vorspannung zum Biegemoment IM' aus der Bogenstützung resultiert. Wie oben enthält das Biegemoment RMM ein negatives Biegemoment NBM an den Seiten des Bogens, welches grösser ist als die negativen Momente NM' an den Seiten, aber ein verringertes positives Biegemoment SM' im Scheitelbereich des Bogens. Wie oben erörtert, ist – wegen der Vorzeichen der Momente – das Total von BM1' + BM2' geringer als BM1'. Das Vorspannen des Bogens reduziert also die Empfindlichkeit des Bogen auf eine Auswärtsverschiebung der Bogengründung. 29 shows the bending moment RMM, which results from the fact that the bending moment IMS results due to bias to the bending moment IM 'from the sheet support. As above, the bending moment RMM includes a negative bending moment NBM at the sides of the arc which is greater than the negative moments NM 'at the sides, but a reduced positive bending moment SM' at the apex of the arc. As discussed above, because of the signs of the moments, the total of BM1 '+ BM2' is less than BM1 '. The biasing of the sheet thus reduces the sensitivity of the sheet to an outward displacement of the sheet foundation.

30 zeigt ein Mittel für das Vorspannen des Bogens. Wie in 30 gezeigt wird, wird ein Teil 80 eingelegt zwischen der Bogengründung und dem Bogen. Teil 80 spannt den Bogen vor, so wie es oben erörtert wurde. Eine bestimmte Art des Teils 80 umfasst ein aufpressbares Element sowie einen Schlauch oder ein anderes Mittel. Solch ein Schlauch kann aufgepresst werden mit einer Substanz, die nachher erhärtet, sodass die Vorspannung im Bogen "eingebaut" bleibt. Wie in 30 gezeigt ist, wird ein Lager 82 zwischen dem Bogenende und der Bogengründung eingelegt, es hat einen kleinen Reibungswert auf der Fläche 86 zwischen dem Bogen und dem Lager 82. Der Bogen kann dabei der gleiche Bogen sein, wie er in den Aspekten von 114 diskutiert wurde oder ein Kompositbogen wie er in den Aspekten der 1531 dargestellt wurde. Wie aus der vorliegenden Darstellung der 30 shows a means for biasing the bow. As in 30 is shown becomes a part 80 inserted between the sheet foundation and the bow. part 80 spans the bow, as discussed above. A specific type of part 80 includes a compressible element and a hose or other means. Such a tube can be pressed with a substance that hardens afterwards, so that the bias remains "built-in" in the bow. As in 30 shown is a warehouse 82 inserted between the end of the sheet and the sheet foundation, it has a small friction value on the surface 86 between the bow and the bearing 82 , The bow can be the same bow as in the aspects of 1 - 14 was discussed or a composite bow as in the aspects of 15 - 31 was presented. As from the present presentation of

1531 ersichtlich, kann die Anordnung des Bogenauflagers gem. 23 an beiden Bogenenden angewendet werden, sodass der Bogen von beiden Enden her vorgespannt wird. 15 - 31 can be seen, the arrangement of the Bogenauflagers acc. 23 be applied to both ends of the bow, so that the bow is biased from both ends.

31 stellt eine andere Art der Vorspannung des Bogens dar, wobei ein Zugband (oder Zugbänder) an den Bogenenden befestigt und gespannt wird, sodass der Bogen analog zur Saite eines Armbrustbogens gespannt wird. 31 represents a different kind of Vorspan tion of the bow, with a drawstring (or drawstrings) attached to the bow ends and tensioned, so that the arc is stretched analogous to the string of a crossbow.

DRITTER ASPEKTTHIRD ASPECT

Unter Bezug auf einen dritten Aspekt der Erfindung (hier erörtert mit Bezug auf die 3251, wobei deren Bezugsnummern sich mit denjenigen der 131 decken können) wird in 32 ein Bogenabstützsystem gezeigt, wie dargestellt in 114. Es wird hier verwiesen auf die Erörterung der 114 für eine volle Darstellung des Systems, dargestellt in 32. Nun ist aber in 32 ein System 10 dargestellt, welches einen Bogen 12 umfasst, welcher auch als Bogenelement bezeichnet wird (oder einfach als Bogen) und welcher das Dach eines Hohlraums oder offenen Raums 14 innerhalb eines erdgefüllten Raumes bildet. Unterhalb des Bogens 12 stützen die Wände 16 und 18, welche auch als Seitenwände oder Stützwände bezeichnet werden, die hinterfüllte Erde 20 oder die Aushubkanten 22 und 24 von bereits vorher vorhandenem (gewachsenem) Bodenmaterial auf beiden Seiten des Hohlraumes oder offenen Raumes 14 über dem Bogen 12, und mit einer Erdüberschüttung OV wird eine Ebene 36 geschaffen. Der Bogen und die Stützwände können miteinander baulich verbunden sein oder auch nicht. Die Ausführung der vorliegenden Erfindung ermöglicht es, den Bogen und die Wände unabhängig voneinander zu bauen, in verschiedenen Bauphasen. Der Zweck und die Form des Bogens der Stützwände und der Gründung dieser beiden Hauptbestandteile der hinterfüllten und überschütteten Struktur werden ersichtlich aus den 114.With reference to a third aspect of the invention (discussed here with reference to FIGS 32 - 51 , whose reference numbers coincide with those of 1 - 31 can cover) in 32 a Bogenabstützsystem shown as shown in 1 - 14 , Reference is made here to the discussion of 1 - 14 for a full representation of the system, presented in 32 , Well, but in 32 a system 10 shown, which is a bow 12 which is also referred to as an arch element (or simply an arch) and which is the roof of a cavity or open space 14 within a space filled with earth. Below the arch 12 support the walls 16 and 18 which are also referred to as sidewalls or retaining walls, the backfilled earth 20 or the excavation edges 22 and 24 from pre-existing (grown) soil on both sides of the cavity or open space 14 over the arch 12 , and with a burial OV becomes a plane 36 created. The bow and the supporting walls can be structurally connected to one another or not. The embodiment of the present invention makes it possible to build the arch and the walls independently of each other, in different stages of construction. The purpose and shape of the arc of the retaining walls and the foundation of these two main components of the backfilled and overfilled structure are apparent from the 1 - 14 ,

Das Bauteil 10 kann zwischen einer ersten ausgewählten Ebene 30, welche der Boden eines Hohlraumes oder eine untere Ebene sein kann (und welche die Fläche 32 einschliesst), und einer zweiten Ebene 34, welche das Dach eines Hohlraums oder eine obere Ebene sein kann (welche die Fläche 36 umschliesst), angeordnet sein. Die Spannweite 12 und das überschüttete Erdmaterial OV wird angeordnet zur Schaffung der Ebene 36.The component 10 can be between a first selected level 30 which may be the bottom of a cavity or a lower level (and which may be the area 32 includes), and a second level 34 which may be the roof of a cavity or an upper level (which is the area 36 encloses). The span 12 and the overfilled earth material OV is arranged to create the plane 36 ,

Der Bogen wird gegründet über die Bogengründungen 48 und 50 und die Gründungsblöcke 40 und 42, welche auf der Erdaufschüttung 20 oder auf dem gewachsenen Boden (nach dessen teilweisen Aushub) liegt. Die Gründungsblöcke 40 und 42 werden hinter den entsprechenden Seitenwänden 18 und 16 der überschütteten Bogenkonstruktion angeordnet, während des Baues. Die Bogengründungen 48 und 50, bestehend aus Beton oder Stahlbeton, werden zwischen die Bogenenden 44 und 46 (welche auch als Enden des Bogens 12 bezeichnet werden) und die Gründungsblöcke eingeschaltet, um die Kräfte über eine breite Fläche zu verteilen, sodass die Festigkeits- und Steifigkeitsanforderungen des verfestigten Hinterfüllmaterials der Gründungsblöcke tief gehalten werden können.The bow is founded on the foundations of the bow 48 and 50 and the foundation blocks 40 and 42 which are on the earth dump 20 or on the grown soil (after its partial excavation). The foundation blocks 40 and 42 be behind the corresponding side walls 18 and 16 the overcast arch construction arranged during construction. The sheet foundations 48 and 50 consisting of concrete or reinforced concrete, are between the bow ends 44 and 46 (which also as ends of the bow 12 and the foundation blocks are turned on to distribute the forces over a wide area so that the strength and stiffness requirements of the consolidated backfill material of the foundation blocks can be kept low.

Wie erwähnt bei der Erörterung der 114, verteilen die Gründungsblöcke die konzentrierte Bogenendlast über Bogengründungen auf eine genügend breite Bodenfläche derart, dass die Bodenpressungen keine unannehmbaren Verschiebungen, besonders in horizontaler Richtung, erzeugen.As mentioned in the discussion of 1 - 14 , the foundation blocks distribute the concentrated arc end load over sheet foundations to a sufficiently wide ground surface such that the soil compaction does not create unacceptable shifts, especially in the horizontal direction.

Wie auch in 32 gezeigt wird, kann eine Strasse K (mit einem Belag P) über dem System angeordnet werden und einem Belag P' unter dem System.As well as in 32 2, a road K (with a pavement P) may be placed over the system and a pavement P 'under the system.

Dargestellt in den 33a33c sind Beispiele einer Art von Systemen, welche gemäss den vorliegenden Darlegungen gebildet werden können. Wie 33a zeigt, kann das System schiefe Elemente SB enthalten. 33b zeigt, wie eine im Grundriss runde Brücke RB durch eine Vielzahl von trapezförmigen Bogenelementen erstellt werden kann, oder 33c, wie eine im Grundriss eckige Form AB mit verschiedenen Elementen 127' hergestellt werden kann. Die Grundrisse der verschiedenen Bogenbauwerke sind in den 34a, 34b und 34c als gekrümmte Elemente CB, schiefe Elemente SE und gerade Elemente STE dargestellt.Shown in the 33a - 33c are examples of one type of system that may be formed according to the present disclosure. As 33a The system may include skewed elements SB. 33b shows how a circular bridge RB can be created by a multitude of trapezoidal arch elements, or 33c like a rectangular shape AB with different elements 127 ' can be produced. The floor plans of the various arch structures are in the 34a . 34b and 34c shown as curved elements CB, oblique elements SE and straight elements STE.

Wie weiter oben dargestellt, werden gemäss dem vorliegenden Aspekt der 3251 die Bogenfertigteile in ihrer definitiven Lage hergestellt. Die definitive Lage für das Bogenelement 12 ist in 32 gezeigt, demgegenüber wäre das Bogenfertigteil 12, wenn in stehender Lage, in einem Winkel von 90° gegenüber der Lage von 32 orientiert. Wie oben dargestellt, bringt die Herstellung der Bogenfertigteile in ihrer definitiven Lage mehrere Vorteile gegenüber der Herstellung in einer stehenden Lage. Eine Schalung 60 wird in 35 im Grundriss gezeigt; sie kann verwendet werden für die Herstellung gerader Elemente STE und/oder für die Herstellung von schiefen Elementen SE und/oder für trapezförmige Elemente TE. Die schiefen Elemente können einen Winkel α zur Senkrechten bilden. Die Schalung 60 kann auch Abschalungen so wie 62 und äussere Randschalungen so wie 64 enthalten. Die Materialien und die Arbeitsabläufe für die Herstellung der Bogenfertigteile passen sich der entsprechenden Schalung an. Die Schalung ist sehr einfach, und es werden keine Konterschalungen benötigt. Die Schalung kann auf einer Seite angehoben oder abgesenkt werden, wie angedeutet mit dem doppelten Pfeil 66 in 36, damit das Einbringen und das Vibrieren des Betons auf der Schalung vereinfacht wird, und damit durch die Veränderung der Neigung der Schalung ein Wegfliessen des vibrierten Betons verhindert wird. Das Anheben kann mit einer geeigneten Presse erfolgen. Die Schalung kann auch selbst vibriert werden, und wenn das System mit dem Anheben mit geeigneten Pressen verwendet wird, kann die Vibration der Schalung in Hälften oder Dritteln des Bogenfertigteils erfolgen.As described above, according to the present aspect, the 32 - 51 the curved sections are made in their final position. The definitive position for the arch element 12 is in 32 In contrast, the prefabricated arched section would be shown 12 when in a standing position, at an angle of 90 ° relative to the location of 32 oriented. As stated above, the manufacture of the precast sheets in their final position brings several advantages over the production in a standing position. A formwork 60 is in 35 shown in the floor plan; it can be used for the production of straight elements STE and / or for the production of inclined elements SE and / or for trapezoidal elements TE. The inclined elements can form an angle α to the vertical. The formwork 60 can also shutdowns as well 62 and outer edge formworks as well 64 contain. The materials and the work processes for the production of the curved components adapt to the appropriate formwork. The formwork is very simple and no counter formworks are needed. The formwork can be raised or lowered on one side, as indicated by the double arrow 66 in 36 so that the introduction and vibration of the concrete on the formwork is simplified, and thus by the change in the inclination of the formwork, a flow of the vibrated concrete is prevented. Lifting can be done with a suitable press. The formwork can also be vibrated by itself, and if the system is used with lifting with suitable presses, the vibration of the formwork can be done in halves or thirds of the sheet precast.

Sobald der Beton eingebracht und erhärtet ist, werden die Elemente in ihrer definitive Lage von der Schalung zum Aufstapeln transportiert und von dort zu einem Transportmittel, wobei ein Kran oder ähnliches verwendet wird. Wie in den 37a und 37b gezeigt wird, wird ein Element 12x an einem (nicht gezeigten) Kran mit dem Gehänge 68 angehängt, wobei dieses Gehänge Kabel 70 und 72 enthält, die an eine erste Fläche 74 des Elementes 12x befestigt sind. Beim Abheben des Elementes 12x von der Schalung wird sich dieses unter seinem Eigengewicht von einer urverformten Gestalt 12x1 (mit ausgezogenen Linien in 37a gezeigt) zu einer verformten Gestalt 12x2 (mit gestrichelten Linien in 37a gezeigt) verformen. Diese Biegungsverformung kann verwendet werden, damit die gewünschte Vorverformung für die Vorspannung des Bogens erreicht wird, womit der Einfluss einer möglichen Auswärtsbewegung der Gründungsblöcke bei Belastung in seiner endgültigen Position ausgeglichen wird. Die Bogenfertigteile werden in ihrer vorverformten Lage (angegeben mit der gestrichelten Linie in 37a) montiert und kehren zu ihrer ursprünglichen Form (angegeben mit einer ausgezogenen Linie in 37a) zurück, wenn die Überschüttung erfolgt. Wenn die Bogenfertigteile mit ihrer gestrichelt eingezeichneten Gestalt auf die Fundationsblöcke gelegt werden, werden sich die Fundationsblöcke unter dem Eigengewicht des Bogens allein kaum bewegen. Wenn alle Elemente montiert sind, wird die Überschüttung aufgebracht, wodurch die totale Belastung grösser ist als diejenige der Bogenfertigteile allein. Dieser Belastungsfall, d.h. die Überschüttung und das Gewicht des Bogens, bewirkt einen beträchtlichen Horizontalschub auf die Gründungsblöcke. Wenn der Gründungsblock – oder Gründungsblöcke – nicht so steif sind wie erwünscht, so kann diese Belastung die Gründungsblöcke um einen kleinen Betrag nach auswärts verschieben.Once the concrete is introduced and hardened, the elements are transported in their final position of the formwork for stacking and from there to a means of transport, using a crane or the like is used. As in the 37a and 37b is shown becomes an element 12x on a crane (not shown) with the hanger 68 attached, this hanger cable 70 and 72 Contains that on a first surface 74 of the element 12x are attached. When lifting the element 12x from the formwork this becomes under its own weight of a urverformten form 12x1 (with solid lines in 37a shown) to a deformed shape 12x2 (with dashed lines in 37a shown) deform. This flexural deformation can be used to achieve the desired preload for the bow, thus compensating for the influence of possible outward movement of the foundation blocks under load in its final position. The precast sheets are in their pre-formed position (indicated by the dashed line in FIG 37a ) and return to their original shape (indicated by a solid line in 37a ) back when the overflow occurs. If the curved panels are placed with their dashed line shape on the foundation blocks, the foundation blocks will hardly move under the weight of the sheet alone. When all the elements are mounted, the overburden is applied, whereby the total load is greater than that of the curved panels alone. This load case, ie the overfill and the weight of the bow, causes a considerable horizontal thrust on the foundation blocks. If the foundation block - or foundation blocks - are not as stiff as desired, this load may displace the foundation blocks outwardly a small amount.

Sogar kleine Verschiebungen der Gründungsblöcke bewirken die Aktivierung des Bodenwiderstandes derart, dass weitere Verschiebungen des Gründungsblockes vermieden werden. Im Idealfall wird sich der Gründungsblock etwa so viel nach aussen bewegen, wie die Bogenfertigteile durch die Vorverformung vor der Montage zusammengezogen wurden. Wenn dies der Fall ist, werden die durch das Zusammenziehen der Bogenenden und die entgegengesetzten Momente durch die Auswärtsbewegung der Gründungsblöcke weitgehend kompensieren, sodass die Elemente, bevor Verkehrslasten aufgebracht werden, in einem Zustand mit sehr geringer Momentenbeanspruchung sind. Dies trägt dazu bei, dass die Nachteile infolge des Nachgeben der Gründungsblöcke überwunden werden können. Wenn die Gründungsblöcke nicht nachgeben, ist die Vorspannung oder Vorverformung nicht schädlich, weil sie nur innerhalb zulässiger Grenzen der Bogenbemessung erfolgt. Zusätzlich werden die durch die Vorspannung erzeugten Momente entgegen den hauptsächlichsten Momenten aus Verkehrslasten sein, sodass sie sich nicht schädlich auswirken auf die Tragfähigkeit des Bogen.Even cause small displacements of the foundation blocks the activation of soil resistance such that further shifts of the foundation block be avoided. Ideally, the foundation block will be about as much after move outside as the curved panels by the pre-deformation were contracted before assembly. If this is the case, become by the contraction of the bow ends and the opposite Moments through the outward movement the foundation blocks largely compensate, so the elements applied before traffic loads be in a state with very low moment load are. This carries helping to overcome the disadvantages of yielding the foundation blocks can be. If the foundation blocks not give, the bias or pre-deformation is not harmful, because they only within allowed Limits of the sheet design takes place. In addition, those by the Preload generated moments contrary to the main ones Moments from traffic loads so they do not cause any harm on the carrying capacity of the Bow.

Die Vorspannung der Bogenfertigteile kann auch mit baulichen Mitteln, so wie mit einem Zugband 80 für das Bogenelement 12x2 erzeugt werden. Das Zugband 80 kann auch eine Vorspannvorrichtung oder ähnliches enthalten, damit der geeignete Betrag der Überhöhung oder Vorverformung des Bogenfertigteils erreicht werden kann.The bias of the curved panels can also be using structural means, such as a drawstring 80 for the arch element 12x2 be generated. The drawstring 80 may also include a biasing device or the like, so that the appropriate amount of elevation or pre-deformation of the sheet precast can be achieved.

Wie oben erörtert, kann zwischen benachbarten Bogenfertigteilen in einem System mit einer Vielzahl von Elementen eine unterschiedliche Verschiebung auftreten. Diese unterschiedliche Verschiebung kann dadurch vermieden oder zumindest minimiert werden, dass benachbarte Elemente miteinander an Ort und Stelle verbunden werden. Die Verbindung kann Schubkräfte zwischen Bogenfertigteilen aufnehmen und dadurch die Relativverformungen auf Null oder beinahe Null bringen. Zudem wird die Tragfähigkeit erhöht, weil zwei oder mehr Elemente die aufgebrachten Lasten gemeinsam tragen.As discussed above can be between adjacent precast sheets in a system with a variety of elements a different shift occur. This different shift can be avoided or at least minimize that neighboring elements with each other be connected in place. The connection can shear forces between Take up sheet finished parts and thereby the relative deformations bring to zero or almost zero. In addition, the load capacity elevated, because two or more elements share the applied loads wear.

Die Methode des Aspektes von 3251 der vorliegenden Erfindung schliesst die Verbindung zwischen benachbarten Betonfertigteilen auf eine oder mehrere Arten ein.The method of the aspect of 32 - 51 The present invention includes the connection between adjacent precast concrete components in one or more ways.

Die erste Art der Verbindung ist diejenige durch Nachspannen von einem oder von mehreren Spannelementen. Dies kann durch die Einführung von Spannvorrichtungen bei den Spannelementen erfolgen. Die Nachspannkraft erzeugt Reibung zwischen benachbarten Elementen, welche dadurch einen Scherwiderstand erzeugt. Der Scherwiderstand verhindert unterschiedliche Verformungen zwischen benachbarten Bogenfertigteilen.The first type of connection is the one by retightening one or of several clamping elements. This can be done through the introduction of Clamping done at the clamping elements. The tensioning force creates friction between adjacent elements which thereby generates a shear resistance. The shear resistance prevents different Deformations between adjacent curved panels.

Eine zweite Art der Verbindung ist diejenige mit Dübeln. Die Verdübelung ist in den 3944 dargestellt. Durchgehende Löcher (so wie das Loch 90) werden durch jedes Bogenfertigteil angeordnet. Die Löcher können hergestellt werden durch das Einlegen von Rohren in die Schalung während der Herstellung der Bogenfertigteile. Die Löcher in jedem Element sind so angeordnet, dass sie durchgehend sind (vgl. 41, 12xa1 und 12xa2). Ein relativ dicker Stab oder Dübel 94 (Bewehrungsstahl) wird in die durchgehenden Löcher eingeführt, sodass er durch die Löcher von mindestens zwei aneinander anliegenden Elementen führt. Um sicher zu stellen, dass die Stahlstäbe zentrisch im Loch liegen, werden Zentrierelemente 96 in den Löchern der Bogenfertigteilen angeordnet. Für die Gewährleistung eines sauberen Anliegens und geeigneter Lastübertragung wird der Stahlstab mit einem Plastikschlauch umgeben, welcher dünn aber zäh ist. Nach dem Einführen des Stabes wird der Plastikschlauch mit Mörtel (Zement mit Sand [oder Füllstoff] und Wasser) unter einem gewissen Druck injiziert. Der Mörtel füllt den Zwischenraum zwischen dem Stab und dem Bogenelement in den Löchern. Der Mörtel verhindert ein Spiel zwischen dem Stab und dem Bogenelement. Der Stab oder Dübel wird, nach dem Erhärten des Mörtels, ein fester Bestandteil des Bogenfertigteils. Ein Hohlraum 99 zwischen dem Plastikschlauch und dem Bogenelement füllt sich, wenn der Plastikschlauch sich nach dem Einführen von Mörtel unter Druck ausdehnt. Bei den Ringfugen, so wie bei der Ringfuge RJ (vgl. 34a34c) geht der Stab durch die Elemente hindurch. Auch hier ist der Stab mit Mörtel umgeben, wodurch er gegen Korrosion geschützt wird. Da sich der Plastikschlauch auf die ganze Länge des Stabes oder Dübels erstreckt, wird der Mörtel nicht aus dem Plastikschlauch ausfliessen, bevor er erhärtet ist. Der Plastikschlauch wird sich so ausdehnen, dass er das Loch oder die Löcher dicht füllt. An den Fugen zwischen den Betonfertigteilen, so wie an der Fuge 102, verhindert der Plastikschlauch das Austreten des Mörtels. Zusätzlich, wie in 13 gezeigt, kann eine Fugenfüllung 104 angeordnet werden, womit das Bauwerk wasserdicht wird.A second type of connection is the one with dowels. The dowelling is in the 39 - 44 shown. Through holes (like the hole 90 ) are arranged through each precast part. The holes can be made by inserting pipes into the formwork during the manufacture of the precast sheets. The holes in each element are arranged so that they are continuous (see. 41 . 12xa1 and 12xa2 ). A relatively thick rod or dowel 94 (Reinforcing steel) is inserted into the through holes so that it passes through the holes of at least two adjacent elements. To ensure that the steel bars are centered in the hole, centering elements become 96 arranged in the holes of the curved panels. To ensure a clean fit and proper load transfer, the steel rod is surrounded with a plastic tube that is thin but tough. After insertion of the rod, the plastic tube is injected with mortar (cement with sand or filler) and water under a certain pressure. The mortar fills the gap between the rod and the arch element in the holes. The mortar prevents play between the rod and the arch element. The rod or dowel, after hardening of the mortar, an integral part of the sheet precast. A cavity 99 between the plastic tube and the arch element fills up when the plastic tube expands under pressure after the introduction of mortar. For the ring joints, as in the case of the ring joint RJ (cf. 34a - 34c ) the wand goes through the elements. Again, the rod is surrounded with mortar, whereby it is protected against corrosion. Since the plastic tubing extends the full length of the rod or dowel, the mortar will not leak out of the plastic tubing before it hardens. The plastic tube will expand to fill the hole or holes tightly. At the joints between the precast concrete elements, as at the joint 102 , the plastic tube prevents the mortar from escaping. In addition, as in 13 shown, can be a joint filling 104 be arranged, making the structure is waterproof.

Es ist zu beachten, dass bei der Herstellung einer Brücke aus Betonfertigteilen mehrere Teile, die kleiner sind als die ganze Brücke, eingesetzt werden müssen. Diese Teile (Elemente) können an Ort und Stelle mit dem System der Dübel und Vermörtelung gemäss obiger Angabe verbunden werden.It It should be noted that when making a bridge out Precast concrete parts several parts smaller than the whole Bridge, must be used. These parts (elements) can in place with the system of dowels and mortars according to the above Indication to be connected.

Es ist auch anzumerken, dass infolge der Stäbe oder Dübel die Fertigteilbrücke der 3251 sich bezüglich Verformung und Widerstand fast gleich gut verhält, wie wenn die Ringfugen nicht vorhanden wären – so wie es der Fall wäre bei einem Ortbeton-Bauwerk. Die ganze Brücke wirkt als homogenes Gewölbe und nicht wie eine Anzahl einzelner Bogenfertigteile, eines neben dem anderen. Deshalb sind die Stäbe oder Dübel ein wirksames Mittel, um die Nachteile von Fertigteilbauwerken, welche ja durch Fugen getrennt und nicht homogen sind wie Ortbetonbauwerke, vermieden werden.It should also be noted that due to the bars or dowels the precast bridge of 32 - 51 behaves almost equally well in terms of deformation and resistance, as if the ring joints were not present - as would be the case with an in-situ concrete structure. The whole bridge acts as a homogeneous vault and not like a number of single curved panels, one next to the other. Therefore, the rods or dowels are an effective means to avoid the disadvantages of precast structures, which are indeed separated by joints and not homogeneous, such as in-situ concrete structures.

Es können weitere Mittel verwendet werden, um benachbarte Betonbogenfertigteile zu verbinden. So ein weiteres Mittel ist in der 45 dargestellt; es enthält einen Nocken 110 in einem Bogenelement und eine entsprechende Vertiefung 112 im anschliessenden Bogenelement. Jedes Bogenelement enthält Nocken und Vertiefungen. Ein Nocken in einem Element wird eingeführt in die entsprechende Vertiefung im benachbarten Element, sodass die beiden benachbarten Elemente zusammengefügt werden. Ein Klebemittel kann auf den Nocken und/oder auf die Vertiefung aufgebracht werden, sodass eine satte (spielfreie) Verbindung entsteht.Additional means may be used to connect adjacent precast concrete panels. So another remedy is in the 45 shown; it contains a cam 110 in an arch element and a corresponding recess 112 in the subsequent arch element. Each arch element contains cams and recesses. A cam in one element is inserted into the corresponding recess in the adjacent element so that the two adjacent elements are joined together. An adhesive can be applied to the cam and / or recess, resulting in a rich (zero-backlash) bond.

Die Gründung der Betonfertigteile (3251) ist im Prinzip die Gleiche wie die Gründung, welche in den 114 dargestellt wird. Die Gründung enthält einen Gründungsblock. Die Bogenelemente können eine Bogengründung, so wie dargestellt in 32 als Bogengründungen 48 und 50, enthalten. In der Darstellung der Methoden der vorliegenden Erfindung können die Bogengründungen zusammen mit dem Bogenfertigteil vorgefertigt werden, so wie dargestellt für Bogengründung 50p in 49, welche direkt auf dem Gründungsblock aufliegt. Eine andere Art der Bogengründung wird in 50 als Gründung 50p1 gezeigt, welche an Ort erstellt wird und mit dem Bogenelement, das ohne vorgefertigte Gründung erzeugt wird, verbunden. Eine weitere Art der Bogengründung wird in 51 als Gründung 50p2 gezeigt. Die Gründung 50p2 enthält eine kleine Gründung 50p2' (welche mit dem Bogenfertigteil zusammen hergestellt wird) sowie eine Schicht von Ortbeton 50p2'' zwischen der vorgefertigten Gründung und dem Gründungsblock. Dieses Vorgehen gestattet, die vorgefertigte Gründung klein zu halten (sodass das Bogenfertigteil nur wenig zusätzliches Gewicht erhält) währenddem der Beton (vorzugsweise unbewehrt), welcher an Ort und Stelle zwischen dem Betonfertigteil und dem Gründungsblock erstellt wird, die Bogenkräfte genügend verteilt, sodass sie durch das verfestigte Erdmaterial des Gründungsblockes aufgenommen werden können. Dieser Ortbeton würde nach der Montage der Betonfertigteile in ihrer Endposition eingebracht, wobei die Betonfertigteile provisorisch auf den lokal vorstehenden Teilen der Betonfertigteile LPP in den 34a34c oder Element 124 in 47 abgestützt werden. Dies gewährleistet die definitive Abstützung zwischen dem breiteren Teil des Bogenelements und dem Gründungsblock via Ortbeton.The foundation of precast concrete parts ( 32 - 51 ) is in principle the same as the foundation, which in the 1 - 14 is pictured. The foundation contains a foundation block. The bow elements can be a bow foundation, as shown in 32 as bow foundations 48 and 50 , contain. In the illustration of the methods of the present invention, the sheet foundations can be prefabricated together with the sheet precast as shown for sheet foundation 50p in 49 , which rests directly on the foundation block. Another type of bow foundation will be in 50 as a foundation 50p1 shown, which is created in place and connected to the arch element, which is produced without prefabricated foundation. Another type of sheet founding is in 51 as a foundation 50p2 shown. The foundation 50p2 contains a small foundation 50p2 ' (which is made with the precast part together) and a layer of in-situ concrete 50p2 '' between the prefabricated foundation and the foundation block. This procedure makes it possible to keep the prefabricated foundation small (so that the precast part receives little additional weight) while the concrete (preferably unreinforced), which is created in situ between the precast concrete element and the foundation block, sufficiently distributed the arc forces so that they through the consolidated soil material of the foundation block can be accommodated. This in-situ concrete would be placed after the installation of precast concrete in its final position, the precast concrete parts provisionally on the locally projecting parts of the precast concrete LPP in the 34a - 34c or element 124 in 47 be supported. This ensures the definitive support between the wider part of the arch element and the foundation block via in-situ concrete.

Dieser Vorgang des Einbringen von Ortbeton zwischen den Bogenelementen und dem Gründungsblock wird in den 4648 dargestellt, wobei das Bogenfertigteil 120 einen Endbereich 122 aufweist. Ein Element 124, eine Verlängerung des Bogenelementes, stützt sich auf den Gründungblock ab, wenn das Element montiert wird. Bewehrter oder unbewehrter Beton 126 wird dann um das Ende des Bogenelementes eingebracht und anschliessend wird die Überschüttung 128 in Schichten auf den erhärteten Ortbeton aufgebracht. Beton kann auch zwischen dem Ende des Bogenelements und dem Gründungsblock eingebracht werden, wie dargestellt in 46 mit dem Ortbeton 130'.This process of introducing in situ concrete between the arch elements and the foundation block is in the 46 - 48 represented, wherein the sheet precast 120 an end area 122 having. An element 124 , an extension of the arch element, rests on the foundation block as the element is assembled. Reinforced or unreinforced concrete 126 is then placed around the end of the arch element and then the overburden 128 Applied in layers on the hardened in-situ concrete. Concrete may also be introduced between the end of the arch element and the foundation block, as shown in FIG 46 with the in-situ concrete 130 ' ,

Wie hier (mit Bezug auf die 3251 verwendet) bezieht sich der Ausdruck "Vorspannung" auf den Zustand eines Bogenfertigteils, so wie gezeigt in den 37a und 38 vor der Montage des Bogenfertigteils; und der Begriff "Nachspannung" bezeiht sich auf den Zustand eines Bogenfertigteils nachdem es montiert wurde. Damit sind die Bogenfertigteile gemäss 37a und 38 vorgespannt; dagegen werden die Bogenfertigteile 12 durch die Nachspannung und damit der Reibungskraft von einem Bogenfertigteil auf das nächste nachgespannt.As here (with reference to the 32 - 51 used), the term "preload" refers to the condition of a sheet precast as shown in FIGS 37a and 38 before the assembly of the curved part; and the term "post-tension" refers to the condition of a precast part after it has been assembled. Thus, the curved panels are according to 37a and 38 biased; on the other hand, the finished arched parts 12 tensioned by the post-tension and thus the frictional force from one sheet-finished part to the next.

Es ist anzumerken, dass die Erfindung, dadurch, dass gewisse Ausführungsformen hier gezeigt und beschrieben werden, nicht auf die bestimmten Formen oder Anordnungen ihrer Teile, wie sie hier beschrieben sind, beschränkt ist.It It should be noted that the invention, in that certain embodiments shown and described here, not on the specific forms or arrangements of their parts, as described herein, is limited.

Claims (19)

Ein Bogentragwerks-System umfassend: A) Eine erste gewählte Fläche (32) mit seitlichen Rändern; B) Eine zweite gewählte Fläche (34), welche über der erwähnten ersten gewählten Fläche liegt und welche sich bis ausserhalb der senkrechten Projektion der seitlichen Ränder der erwähnten ersten gewählten Fläche erstreckt; C) Ein Bogentragwerk, welches zwischen der ersten gewählten Fläche und der zweiten gewählten Fläche liegt; D) wobei das erwähnte Bogentragwerk je eine seitliche Wand (16, 18) anschliessend an beide seitlichen Ränder der erwähnten ersten gewählten Fläche, und ein Bogenelement, welches die erste gewählte Fläche überspannt, enthält, und wobei das erwähnte Bogenelement unterhalb der erwähnten zweiten ausgewählten Fläche liegt; E) wobei jede seitliche Wand des erwähnten Bogentragwerkes ein unteres Ende anschliessend an die erste gewählte Fläche und ein oberes Ende (55) über der erwähnten ersten gewählten Fläche besitzt; und F) wobei das Bogenelement (12) des erwähnten Bogentragwerks ein Ende aufweist, das anschliessend an das erwähnte obere Ende jeder Seitenwand des erwähnten Bogentragwerks liegt, gekennzeichnet durch G) einen Gründungsblock (40, 42), der in unmittelbarer Nähe und hinter jeder Seitenwand des erwähnten Bogentragwerks liegt, wobei jeder Gründungsblock eines der Enden des Bogenelements des erwähnten Bogentragwerks stützt und wobei jeder Gründungsblock aus Bodenmaterial besteht (Bodenmaterial enthält).An archwire system comprising: A) a first selected area ( 32 ) with lateral edges; B) A second selected area ( 34 ) which lies above said first selected area and which extends to outside the perpendicular projection of the lateral edges of said first selected area; C) an arch structure which lies between the first selected area and the second selected area; D) wherein the mentioned arch support structure each have a lateral wall ( 16 . 18 ) subsequently to both lateral edges of said first selected area, and an arch member spanning the first selected area, and wherein said arch member lies below said second selected area; E) each side wall of said arch structure having a lower end adjacent to the first selected surface and an upper end ( 55 ) over said first selected area; and F) wherein the arch element ( 12 ) of said arch structure has an end which subsequently adjoins said upper end of each side wall of said arch structure, characterized by G) a foundation block ( 40 . 42 ) located in the immediate vicinity of and behind each side wall of said arch structure, each foundation block supporting one of the ends of the arch element of said arch structure and wherein each foundation block is made of soil material (containing soil material). Ein Bogentragwerks-System gemäss Anspruch 1, in welchem das Bodenmaterial (a) mit Zement stabilisiert ist; (b) mit Kalk stabilisiert ist; (c) durch Verwendung von erhärtendem Flüssigfüllmaterial (flowable fill) stabilisiert ist, (d) durch erhärtendes Leicht-Flüssigfüllmaterial stabilisiert ist; oder (e) durch Hochdruckinjektion (Jetting) vermörtelt ist.An arch support system according to claim 1, in which the Soil material (a) stabilized with cement; (b) stabilized with lime is; (c) by using hardening liquid filling material (flowable fill) (d) by hardening light liquid filling material is stabilized; or (e) by high pressure injection (jetting). Das Bogentragwerks-System definiert in Anspruch 1, welches ein Merkmal enthält, das aus folgenden Möglichkeiten ausgewählt wird: (i) die Enden des Bogenelements liegen in einem Abstand von den oberen Enden (55) der seitlichen Wände; (ii) ein Gründungselement (48, 50; 52), welches jedes der Enden des Bogenelements mit je einem der oberen Enden der seitlichen Wände verbindet; (iii) die Gründungsblöcke (40, 42), eingeschlossen die stabilisierten Bodenmaterial-Zonen, wobei vorzugsweise die stabilisierten Bodenmaterialzonen erhärtete Bodenzonen einschliessen; (iv) die erste gewählte Fläche (32), welche eine Ebene enthält, wobei die seitlichen Wände in einer – zu dieser Ebene in der ersten gewählten Fläche senkrecht stehenden – Ebene gekrümmt sind; (v) Betongründungen (48, 50; 52), welche auf mindestens einem der erwähnten Gründungsblöcke aufliegen und welche die Bogenstützkräfte auf diese erwähnten Gründungsblöcke übertragen und verteilen; (vi) das Bogenelement besteht aus Stahlbeton; (vii) stabilisierende Bauteile in unmittelbarer Nähe des erwähnten Bogentragwerks; (viii) die erwähnten Gründungsblöcke (40/42) enthalten mit Kalk stabilisierte Erde; (ix) die erwähnten Gründungsblöcke (40/42) enthalten mit Zement stabilisierte Erde; (x) die erwähnten Gründungsblöcke (40/42) enthalten erhärtetes Flüssigfüllmaterial; (xi) die erwähnten Gründungsblöcke (40/42) enthalten Erde, die durch oberflächennahes Vermischen des Bodens verbessert wurde; (xii) die erwähnten Gründungsblöcke (40/42) berühren die Seitenwände zur Kraftübertragung aus den Seitenwänden; (xiii) jeder Gründungsblock (40, 42) stützt die angrenzende Seitenwand; (xiv) die erwähnte erste gewählte Fläche, eingeschlossen ein unterer Weg, und die erwähnte zweite gewählte Fläche, eingeschlossen ein oberer Weg; (xv) Bogengründungen (48, 50) an diesem Bogenelement; (xvi) die erwähnten seitlichen Wände (16, 18) bestehen aus Stahlbeton.The archwire system defined in claim 1, which includes a feature selected from the following: (i) the ends of the arch element are at a distance from the upper ends ( 55 ) of the side walls; (ii) a foundation element ( 48 . 50 ; 52 ) connecting each of the ends of the arch member to each one of the upper ends of the side walls; (iii) the founding blocks ( 40 . 42 ), including the stabilized soil material zones, wherein preferably the stabilized soil material zones include hardened soil zones; (iv) the first chosen area ( 32 ) containing a plane, said lateral walls being curved in a plane perpendicular to said plane in said first selected surface; (v) concrete foundations ( 48 . 50 ; 52 ) which rest on at least one of said foundation blocks and which transmit and distribute the sheet support forces to said foundation blocks; (vi) the arch element is made of reinforced concrete; (vii) stabilizing components in the immediate vicinity of said arch structure; (viii) the mentioned foundation blocks ( 40 / 42 ) contain lime stabilized soil; (ix) the mentioned foundation blocks ( 40 / 42 ) contain cement stabilized soil; (x) the mentioned foundation blocks ( 40 / 42 ) contain hardened liquid filling material; (xi) the mentioned foundation blocks ( 40 / 42 ) contain soil that has been improved by near-surface mixing of the soil; (xii) the mentioned foundation blocks ( 40 / 42 ) contact the side walls for power transmission from the side walls; (xiii) each foundation block ( 40 . 42 ) supports the adjacent sidewall; (xiv) said first selected area including a lower path and said second selected area including an upper path; (xv) sheet foundations ( 48 . 50 ) on this arch element; (xvi) the mentioned lateral walls ( 16 . 18 ) are made of reinforced concrete. Das Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass die Enden des Bogenelements (12'; 12'') und die oberen Enden der seitlichen Wände miteinander integral verbunden sind; und dass das erwähnte Bogentragwerk, vorzugsweise, mit den erwähnten seitlichen Wänden kombiniert ist, wobei vorzugsweise die erwähnte Bogenstruktur und die seitlichen Wände ein einziges monolithisches Bauteil bilden.The arch support system according to claim 1, characterized in that the ends of the arch element ( 12 '; 12 '' ) and the upper ends of the side walls are integrally connected to each other; and that said arch support structure is preferably combined with said lateral walls, preferably wherein said arch structure and side walls form a single monolithic member. Das Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass die seitlichen Wände in einer Ebene liegen; und vorzugsweise, dass die erwähnte erste gewählte Fläche eine Ebene enthält und dass die seitlichen Wände einen schiefen Winkel mit der – in der erwähnten ersten gewählten Fläche enthaltenen – Ebene bilden.The arch support system according to claim 1, characterized that the side walls lie in one plane; and preferably that said first one elected area contains a layer and that the side walls an oblique angle with the - in the mentioned first elected area contained - level form. Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass das erwähnte Bogentragwerk monolithisch ist; und dass es vorzugsweise ein Charakteristikum enthält (i) aus einer Bauweise in Ortbeton des erwähnten Bogentragwerks (ii) aus einer Fertigteile enthaltenen Bauweise des erwähnten Bogentragwerks.Arch support system according to claim 1, characterized in that that mentioned Arched structure is monolithic; and that it is preferably a characteristic contains (I) from a construction method in situ concrete of the mentioned arch structure (Ii) From a prefabricated construction of the mentioned arch structure. Bogentragwerks-System gemäss Anspruch 1, welches enthält: A) Bodenmaterial; und B) einen Hohlraum (14) im erwähnten Bodenmaterial: wobei die zwei seitlichen Wände (16, 18) an den erwähnten Hohlraum anliegen, wobei das Bogenelement (12) den erwähnten Hohlraum überspannt; und wobei ein Ende des erwähnten Bogenelements an beiden Gründungsblöcke so anliegt, dass es die Kräfte aus den Enden des erwähnten Bogentragwerks auf die Gründungsblöcke überträgt.An archwire system according to claim 1, which contains: A) soil material; and B) a cavity ( 14 ) in said soil material: the two lateral walls ( 16 . 18 ) abut the said cavity, wherein the curved element ( 12 ) spans the said cavity; and wherein one end of said arch element bears against both foundation blocks so as to transmit the forces from the ends of said arch structure to the foundation blocks. Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass es einen Hohlraum (14) im erwähnten Bodenmaterial aufweist, in welchem das Bogenelement ein Domtragwerk enthält, welches den erwähnten Hohlraum überbrückt und eine um den Hohlraum umlaufende Begrenzung besitzt; und in welchem der äussere/untere Rand des erwähnten Domtragwerks auf dem erwähnten Gründungsblock (96, 98) aufliegt, sodass die Stützkräfte des Doms auf den Gründungsblock übertragen werden.An archwire system according to claim 1, characterized in that it has a cavity ( 14 ) in said soil material, in which the arch element contains a dome structure which bridges said cavity and has a peripheral boundary around the cavity; and in which the outer / lower edge of the mentioned Domtragwerks on said foundation block ( 96 . 98 ) so that the supporting forces of the dome are transferred to the foundation block. Methode zur Herstellung eines Bogentragwerks-Systems, welche folgende Bauphasen enthält: A) Verlegen von Elementen in den Boden und Herstellung von seitlichen Wänden (16, 18), dadurch gekennzeichnet, dass B) Erstellung von Gründungsblöcken (40/42) aus Bodenmaterial; C) Erstellung der Gründungsblöcke anschliessend an eine gewählte Fläche, D) Ausführen eines Bogenelements (12) derart, dass es den Abstand zwischen zwei benachbarten Gründungsblöcken überspannt und auf den Gründungsblöcken aufliegt, E) Aushub des Bodenmaterials zwischen den seitlichen Wänden.Method of manufacturing an arch support system which includes the following stages of construction: A) Laying elements in the ground and making sidewalls ( 16 . 18 ), characterized in that B) creation of foundation blocks ( 40 / 42 ) of soil material; C) creation of the foundation blocks following a selected surface, D) execution of an arch element ( 12 ) such that it spans the distance between two adjacent foundation blocks and rests on the foundation blocks, E) excavating the soil material between the lateral walls. Methode gemäss Anspruch 9, dadurch gekennzeichnet, dass der Aushub des Bodenmaterials zwischen den seitlichen Wänden vor dem Einbau des Bogenelements zur Überbrückung des Abstandes zwischen den zwei benachbarten Gründungsblöcken erfolgt.Method according to Claim 9, characterized in that the excavation of the soil material between the side walls before installing the arch element to bridge the distance between the two adjacent foundation blocks takes place. Bogentragwerks-System gemäss Anspruch 1 oder Anspruch 7, dadurch gekennzeichnet, dass das erwähnte Bogenelement und die erwähnten seitlichen Wände ein schiefes Bogenbrücken-System (300) bilden.An archwire system according to claim 1 or claim 7, characterized in that said arch member and said side walls comprise a crooked arch bridge system ( 300 ) form. Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass es Bestandteile enthält aus: (I) dem erwähnten Bogentragwerk mit einer Oberfläche, mit der zweiten gewählten Fläche, die eine Ebene enthält, die mit der Oberfläche des Bogentragwerks übereinstimmt (ii) Bodenmaterial zwischen der erwähnten zweiten gewählten Fläche und ausserhalb des Raumes zwischen dem genannten Bogenelement, der erwähnten ersten gewählten Fläche und den erwähnten seitlichen Wänden, und wobei der erwähnte Gründungsblock (40, 42) das erwähnte Füllmaterial anliegend an das erwähnte Bogentragwerk berührt, sodass eine Kraftübertragung vom abgestützten Bogenelement (12) auf das Bodenmaterial anschliessend an das erwähnte Bogentragwerk erfolgt, und (iii) gewachsenem Boden unterhalb der erwähnten zweiten gewählten Fläche und ausserhalb des Raumes zwischen dem erwähnten Bogenelement, der erwähnten ersten gewählten Fläche und den erwähnten seitlichen Wänden, und wobei der erwähnte Gründungsblock den erwähnten gewachsenen Boden anschliessend an das erwähnte Bogentragwerk in einer Art und Weise berührt, bei welcher die Kräfte vom Bogenelement auf den gewachsenen Boden anschliessend an das erwähnte Bogentragwerk übertragen werden.An archwire system according to claim 1, characterized in that it comprises components of: (I) said arch structure having a surface with the second selected surface containing a plane coincident with the surface of the arch structure (ii) soil material between said second selected area and outside the space between said arch element, said first selected area and said side walls, and wherein said foundation block ( 40 . 42 ) touches said filling material adjacent to said arch support structure, so that a force transmission from the supported arch element ( 12 ) to the soil material subsequent to said arch structure, and (iii) grown soil below said second selected area and outside the space between said arc element, said first selected area and said lateral walls, and wherein said foundation block is said to be grown soil then touched on the mentioned arch structure in a manner in which the forces are transmitted from the sheet member to the grown soil then to the mentioned arch structure. Methode gemäss Anspruch 9, dadurch gekennzeichnet, dass eine weitere Bauphase erfolgt, in welcher das Bogenelement überschüttet wird.Method according to Claim 9, characterized in that a further construction phase takes place, in which the arch element is showered. Bogentragwerks-System gemäss Anspruch 1, in welchem das Bogenelement ein Fertigteil umfasst.An archwire system according to claim 1, in which the Arch element comprises a finished part. Bogentragwerks-System gemäss Anspruch 14, dadurch gekennzeichnet, dass es eine Bogengründung enthält, welche monolithischer Bestandteil des erwähnten Bogen-Fertigteils ist.Arch support system according to claim 14, characterized in that that it's a bow foundation contains which is monolithic component of said sheet-finished part. Bogentragwerk gemäss Anspruch 1, dadurch gekennzeichnet, dass das Bogenelement ein Mehrfachbogenbauwerk (200) mit mehreren aneinander gereihten Bogenelementen (202) zwischen den seitlichen Wänden enthält.Arch support according to claim 1, characterized in that the arch element is a multiple arch construction ( 200 ) with a plurality of curved elements ( 202 ) between the side walls. Bogentragwerks-System gemäss Anspruch 1, dadurch gekennzeichnet, dass das Bogenelement eine erste Lage (32) eines Betonfertigteils und eine zweite Lage (34) von Ortbeton enthält.An archwire system according to claim 1, characterized in that the arch element is a first layer ( 32 ) of a precast concrete element and a second layer ( 34 ) of in-situ concrete. Bogentragwerk gemäss Anspruch 17, dadurch gekennzeichnet, dass es ein Bestandteil enthält aus (i) Bewehrungsstäben in der erwähnten ersten Lage und in der erwähnten zweiten Lage; und (ii) Fugen in der erwähnten ersten Lage.An arch support according to claim 17, characterized that it contains a component out (i) Reinforcing bars in the mentioned first location and in the mentioned second location; and (ii) joints in the mentioned first layer. Bogentragwerk gemäss Anspruch 1 dadurch gekennzeichnet, dass es eine Aufschüttung (24) über dem Bogenelement aufweist.Arch support structure according to claim 1, characterized in that it comprises a bedding ( 24 ) over the arch element.
DE60317779T 2002-03-22 2003-03-20 ARC SYSTEMS Expired - Lifetime DE60317779T2 (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
US131526 1993-10-01
US102921 2002-03-22
US10/102,921 US6719492B1 (en) 2002-03-22 2002-03-22 Top arch overfilled system
US10/131,526 US7305798B1 (en) 2002-04-25 2002-04-25 Composite overfilled arch system
US338906 2003-01-09
US10/338,906 US6988337B1 (en) 2002-03-22 2003-01-09 Means and method for constructing a fully precast top arch overfilled system
PCT/EP2003/003025 WO2003080942A1 (en) 2002-03-22 2003-03-20 Arch systems

Publications (2)

Publication Number Publication Date
DE60317779D1 DE60317779D1 (en) 2008-01-10
DE60317779T2 true DE60317779T2 (en) 2008-04-10

Family

ID=28457678

Family Applications (1)

Application Number Title Priority Date Filing Date
DE60317779T Expired - Lifetime DE60317779T2 (en) 2002-03-22 2003-03-20 ARC SYSTEMS

Country Status (5)

Country Link
EP (1) EP1495191B1 (en)
AU (1) AU2003226697A1 (en)
CA (1) CA2423228C (en)
DE (1) DE60317779T2 (en)
WO (1) WO2003080942A1 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2686507B1 (en) 2011-03-15 2017-05-03 Lock-Block Ltd. A formwork for use in the construction of arched structures and a method of constructing arched structures
CN102322028B (en) * 2011-07-20 2013-05-01 中铁四局集团第一工程有限公司 Semi-automatic arch culvert construction template
JP6239306B2 (en) 2013-07-31 2017-11-29 イビデン株式会社 Honeycomb filter
US20180030684A1 (en) 2015-02-13 2018-02-01 Bebo Arch International Ag Arched cut-and-cover structure and method of its construction
CN107012887B (en) * 2017-04-18 2023-01-24 中交武汉港湾工程设计研究院有限公司 Prefabricated pin-connected panel node of arc top utility tunnel piecemeal
CN107842032B (en) * 2017-12-20 2023-06-23 广西大学 Large-span arch bridge foundation
CN109853399B (en) * 2019-04-09 2020-05-05 招商局重庆交通科研设计院有限公司 Large-section inclined tunnel type arch support structure for arch bridge and construction method thereof
CN110080294A (en) * 2019-04-23 2019-08-02 中铁第四勘察设计院集团有限公司 A kind of lid of assembled vault greatly across no column underground structure digs half reversed construction method
CN113586079B (en) * 2021-08-24 2024-02-13 中国电建集团中南勘测设计研究院有限公司 Tunnel cross intersection structure and construction method thereof
CN114411686B (en) * 2022-03-01 2022-09-27 山东大学 Bad foundation reinforcement system based on underground arch structure and reinforcement method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH479781A (en) 1966-08-18 1969-10-15 Heierli Walter Dipl Ing Covered building
US3999394A (en) * 1976-03-29 1976-12-28 Eberhardt William H Precast ribbed arch subway structure and method
US4458457A (en) 1980-12-08 1984-07-10 Werner Heierli Overfilled arch out of prefab reinforced concrete shells
AT397981B (en) * 1986-06-18 1994-08-25 Alpine Bau Gmbh Method of producing tunnel tubes
AT395894B (en) * 1987-06-11 1993-03-25 Mayreder Kraus & Co Ing Method for the driving of near-surface tunnels
JPH07107359B2 (en) * 1988-06-15 1995-11-15 株式会社小松製作所 Underground cavity construction method and tunnel excavator
JPH073826A (en) * 1992-04-02 1995-01-06 Tokyo Gas Co Ltd Construction method of dome-like roof in underground tank
NL192744C (en) * 1993-03-26 1998-01-06 Beton Son Bv Civil construction, installed in a sunken pit.

Also Published As

Publication number Publication date
DE60317779D1 (en) 2008-01-10
CA2423228C (en) 2009-08-25
WO2003080942A1 (en) 2003-10-02
EP1495191B1 (en) 2007-11-28
EP1495191A1 (en) 2005-01-12
AU2003226697A1 (en) 2003-10-08
CA2423228A1 (en) 2003-09-22

Similar Documents

Publication Publication Date Title
DE69611931T2 (en) UNDERGROUND CONSTRUCTION, ESPECIALLY FOR THE PRODUCTION OF TUNNELS, UNDERWAYS, UNDERGROUND GARAGE, ETC. AND ITS MANUFACTURING PROCESS
DE69926791T2 (en) STAUDAMM AND SEALING METHOD
DE69715194T2 (en) METAL PANELS FILLED WITH CONCRETE WITH REINFORCEMENT ELEMENTS FOR ARCH STRUCTURES
DE69532510T2 (en) TENSION-FREE PILLAR FOUNDATION
DE69936511T2 (en) METHOD FOR CONNECTING AND MANUFACTURING LOAD TRANSMISSION BETWEEN CONCRETE PARTS
DE69032103T2 (en) CELLULAR STRUCTURES TO SUPPORT WALLS
AT396141B (en) BRIDGE RESERVE AND METHOD FOR ITS ESTABLISHMENT
EP3673113B1 (en) Method for producing an integral bridge, and integral bridge
DE60317779T2 (en) ARC SYSTEMS
DE7624329U1 (en) EXPANSION JOINT KIT
DE2823950C2 (en) Shaft construction, especially for the construction of deep shafts in unstable, water-bearing mountains
DE60002318T2 (en) METHOD FOR FORMING A WATERPROOF SECTION AND INCREASING THE CRACKING LIMIT
US5871307A (en) Pre-cast concrete panel wall
EP1514998A1 (en) Tunnel drainage construction
DE4440787A1 (en) Prefabricated support for use on weak or unstable ground
DE3335141A1 (en) Container made of prefabricated concrete elements and its production
DE102006036540A1 (en) Arrangement for the foundation of a building with prefabricated building elements
EP1707685A2 (en) Foundation for a high water barrier
DE102020109990A1 (en) Bridge structure
EP1964978B1 (en) Method for erecting a wharfage and wharfage
DE19814538C2 (en) Method of making a curved structure spanning a length
DE3335072C2 (en) Embankment wall
EP1457609B1 (en) Floor for a building
DE29609852U1 (en) Support device for covering shafts located in traffic areas
DE953689C (en) Reinforced concrete sheet pile

Legal Events

Date Code Title Description
8364 No opposition during term of opposition