DE457040C - Process for raising heaps, especially for opencast lignite mines - Google Patents

Process for raising heaps, especially for opencast lignite mines

Info

Publication number
DE457040C
DE457040C DEM94333D DEM0094333D DE457040C DE 457040 C DE457040 C DE 457040C DE M94333 D DEM94333 D DE M94333D DE M0094333 D DEM0094333 D DE M0094333D DE 457040 C DE457040 C DE 457040C
Authority
DE
Germany
Prior art keywords
dump
dam
embankment
tracks
conveyor belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEM94333D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Buckau Maschf AG
Original Assignee
Buckau Maschf AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Buckau Maschf AG filed Critical Buckau Maschf AG
Priority to DEM94333D priority Critical patent/DE457040C/en
Application granted granted Critical
Publication of DE457040C publication Critical patent/DE457040C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/28Piling or unpiling loose materials in bulk, e.g. coal, manure, timber, not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Verfahren zum Hochschütten von Halden, besonders für Tagebaue von Braunkohlenbergwerken. Die Erfindung betrifft ein Verfahren zum Hochschütten von Halden, insbesondere für Tagebaue von Braunkohlenbergwerken. Es kommt heute bei der wirtschaftlichen Lage der Braunkohlenbetriebe darauf an, die Leistungsfähigkeit des Abraumbetriebes zu steigern, da man zu einem immer ungünstigeren Verhältnis zwischen Kohle und Abraum kommt. Einer Vergrößerung der Abmessungen der Absetzgeräte stehen die Bedenken entgegen, daß die Absetzer auf aufgeschüttetem Boden fahren und daher sehr leicht Betriebsschwierigkeiten durch Bodensenkungen unter der Last der Absetzer eintreten können. Daher geht das vorliegende Verfahren von den Geräten aus, deren Größe und Bauart im wesentlichen erprobt sind, und will die Leistungssteigerung dadurch herbeiführen, daß diese Absetzgeräte in der mannigfaltigsten Weise ausgenutzt werden, indem einer bestimmten Stellung des Gerätes eine bestimmte Arbeitsperiode entspricht, wobei die Reihenfolge bestimmter Arbeitsperioden notwendig ist, um eine möglichst große Leistung des Absetzers zu erreichen.Process for the filling up of heaps, especially for opencast mines of Lignite mines. The invention relates to a method for pouring up Dumps, especially for opencast lignite mines. It comes at today the economic situation of the lignite companies depends on the efficiency to increase the overburden operation, as the relationship is becoming increasingly unfavorable comes between coal and spoil. An increase in the dimensions of the stripping devices there are concerns that the spreaders drive on heaped ground and therefore very easy operating difficulties due to subsidence under the load the weaning can occur. Therefore, the present method is based on the devices whose size and design are essentially tried and tested, and wants the increase in performance bring about the fact that these stripping devices are exploited in the most varied of ways be given by a certain position of the device a certain working period corresponds, whereby the order of certain working periods is necessary in order to achieve a to achieve the greatest possible output of the weaners.

Gleichzeitig wird der Rauminhalt der Kippe oder Halde, der von dem Band des Absetzers bestrichen wird, so groß wie möglich gemacht, um von einer Entnahmestelle. aus, die von den Förderzügen beschickt wird, einen möglichst großen Raum mit Abraum anzufüllen.At the same time, the volume of the dump or dump that is used by the Tape of the skimmer is swept, made as large as possible, to be taken from an extraction point. that is fed by the conveyor trains, as large a space as possible with overburden to be filled.

Es wird dieses dadurch erreicht, daß der Absetzer selbst nicht auf dem Förderhorizont fährt, auf dem die Fördergleise liegen, sondern der Absetzer fährt auf einem Damm von beträchtlicher Höhe, er entnimmt das Gut dann aus der Entnahmestelle (Graben) durch eine Eimerkette von beträchtlicher Länge, die das Gut an der Böschung entlang bis über den Zuführungstrichter für das Förderband hebt. Das Förderband, das sowohl schwenkbar wie heb- und senkbar ist, kann also dann-bei einer Länge, die nach den praktischen Erfahrungen im allgemeinen nicht überschritten wird, auf eine viel größere Höhe fördern, so daß dadurch die Aufnahmefähigkeit der Kippe erhöht wird, ohne das Förderband zu verlängern.This is achieved by the fact that the settler itself does not open the conveyor horizon on which the conveyor tracks lie, but rather the stacker drives on a dam of considerable height, he then removes the goods from the removal point (Digging) by a chain of buckets of considerable length, which the property on the embankment lifts along to over the feed hopper for the conveyor belt. The conveyor belt, which can be swiveled as well as raised and lowered, can then - with a length which, according to practical experience, is generally not exceeded promote a much greater height, so that this increases the capacity of the dump without extending the conveyor belt.

Für den Arbeitsvorgang auf der Kippe ist dabei Bedingung das ständige Zuführen von Förderbit durch eine möglichst rasche Zugfolge, und hieraus ergibt sich wieder, daß die Zeitspanne für das Rücken' der Gleise Verluste an Arbeitsleistung des Absetzers sind, und daß es daher notwendig ist, die Rückspanne so groß wie möglich zu gestalten. Das soll hauptsächlich durch das vorliegende Arbeitsverfahren erreicht werden.For the work process on the dump, the condition is constant Feeding of conveyor bit by the fastest possible train sequence, and this results again that the period of time for the back 'of the tracks loss of work performance of the settler and that it is therefore necessary to keep the backbone as large as possible to design. This is mainly intended to be achieved by the present working method will.

Bei den älteren Verfahren muß das Zufahrtsgleis für den Abraum stetig in kleinen Zeitabschnitten etwas gerückt werden, oder es wurde entsprechend dem Vortrieb der Kippe das Gleis vorgebaut und dann wieder abgebaut, wenn der Absetzer eine neue Schicht ansetzen sollte. Diese Änderungen der Gleisanlage sind besonders deswegen unangenehm, weil damit gleichzeitig eine Verlegung der Fahrleitung und der Masten verbunden ist und man diese sehr schlecht stückweise an- oder abbauen kann.With the older methods, the access track for the overburden must be steady in small periods of time something moved, or it was accordingly Driving the dump the track was pre-built and then dismantled again when the stacker should start a new layer. These changes to the track system are special therefore uncomfortable because it also means relocation the Catenary and the masts are connected and they are very bad piece by piece can grow or remove.

Das neue Arbeitsverfahren geht daher einerseits davon aus, die Zufahrtsgleise so anzuordnen, daß man sie bei Änderung der Gleisanlage im ganzen um ein erhebliches Stück verschiebt, so daß alle Einzelarbeiten am Gleise fortfallen. Die Arbeitsweise des Absetzers wird dabei auch in mindestens zwei Abschnitte unterteilt. Im ersten Abschnitt wirft der Absetzer vor Kopf einen Damm auf, der ihm als Unterlage für seine Fahrbewegung dient. Läuft also der Absetzer auf Gleisen, so werden die Gleise abschnittweise auf der fertiggestellten Dammkrone verlegt. Im zweiten Abschnitt wird .dann die Hochschüttung neben .dem Damm hergestellt, indem man das Förderband quer zur Fahrtrichtung des Absetzers einstellt. Diese abschnittweise Arbeit kann dann beliebig oft wiederholt werden.The new working procedure therefore assumes, on the one hand, that the access tracks to be arranged in such a way that they can be changed considerably when the track system is changed Moves piece so that all individual work on the track is omitted. The way of working the wiper is also divided into at least two sections. In the first Section, the weaners raise a dam in front of his head, which he uses as a base for its driving motion is used. So if the stacker runs on rails, the rails become laid in sections on the completed dam crest. In the second section Then the embankment next to the dam is made by moving the conveyor belt adjusts transversely to the direction of travel of the skip. This sectional work can can then be repeated as often as required.

Auf der Zeichnung stellt Abb. i einen Querschnitt durch eine derartig hergestellte Hochkippe dar, Abb. 2 eine Aufsicht auf die Kippe in kleinerem Maßstabe.On the drawing, Fig. I shows a cross-section through one of these produced high dump, Fig. 2 is a plan view of the dump on a smaller scale.

Abb. i läßt die verschiedenen Abschnitte des Verfahrens erkennen. Zunächst wirft der Absetzer den Damm i auf, indem er vor Kopf arbeitet, wobei er den Abraum aus dem Graben 5a neben den Zuführungsgleisen entnimmt. Das Band des Absetzers wird vor Kopf dabei um einen bestimmten Winkel geschwenkt, so d.aß der Damm mit seinem vorgeschriebenen Profil fertiggestellt werden kann. Das Band des Absetzers wird dann quer gestellt (Abb. i) und schüttet hier auf die Hochhalde 2 an.Fig. I shows the various stages of the process. First of all, the weaned man raises the dam i by working in front of his head, whereby he removes the overburden from the trench 5a next to the feeder tracks. The band of the Weapon is swiveled in front of the head by a certain angle, so d.aß the Dam can be completed with its prescribed profile. The band of the The spreader is then placed across (Fig. I) and pours here onto the high pile 2 at.

Diese Art der Arbeitsweise hat noch den großen Vorteil, daß man die Haldenkrone erheblich höher legen kann, als dieses bisher möglich ist. Damit wird aber auch die Halde selbst aufnahmefähiger. Wenn beispielsweise die übliche Schütthöhe eines Absetzers 18 m, von der Schienenkante an bis zur Krone gemessen, beträgt, so kcnnmt im vorliegenden Fall noch für .die Gesamthöhe die Höhe des Dammes hinzu, die etwa 8 m betragen kann. Die Gesamthöhe wird also auf 26 m gesteigert, so daß die so hergestellte Kippe wesentlich aufnahmefähiger an Abraum ist.This way of working has the great advantage that you can use the Stockpile crown can put significantly higher than this was previously possible. So that will but also the heap itself is more receptive. If, for example, the usual dump height of a skip is 18 m, measured from the rail edge to the crown, so in the present case the height of the dam is added to the total height, which can be about 8 m. The total height is increased to 26 m, so that the dump produced in this way is much more receptive to overburden.

Der Absetzer, der mit einem schwenkbaren und heb- und senkbaren Förderband versehen ist, wird außerdem noch mit einem Höhenförderer, einer Eimerkette, ausgerüstet, deren Länge so bemessen ist, daß sie das Fördergut von der Entnahmestelle im Förderhorizont an der Dammböschung entlangführt bis über die Aufgabestelle für das Förderband. Die Eimerkette erhält dadurch eine verhältnismäßig große Länge, wie sie bisher bei Absetzern noch nicht ausgeführt worden ist.The stacker with a swiveling and raising and lowering conveyor belt is provided, is also equipped with a height conveyor, a bucket chain, the length of which is dimensioned so that it takes the conveyed goods from the extraction point in the conveying horizon along the embankment to the feed point for the conveyor belt. The bucket chain is given a relatively long length, as it was previously at Weaning has not yet been carried out.

Diese Anordnung hat den Vorteil einer beßseren Gewichtsverteilung als bei den bisherigen Absetzern. Bei diesen wurde das Kippmoment, das. durch das weitausladende Förderband hervorgerufen wurde, durch Gegengewichte ausgeglichen. Man hat auch diese Gegengewichte schon fahrbar gemacht, um das Moment des Gegengewichtes von der Einstellung des Förderbandes abhängig zu machen. Bei dem Absetzer der vorliegenden Bauart bildet schon die Förderkette einen Teil des Gewichtes, das also auf diese Weise nutzbar gemacht ist und keine tote Last darstellt.This arrangement has the advantage of better weight distribution than with the previous weaners. With these, the overturning moment, the The sweeping conveyor belt was created, balanced by counterweights. These counterweights have already been made mobile, around the moment of the counterweight to make dependent on the setting of the conveyor belt. At the weaning of the present Design already forms part of the weight of the conveyor chain, that is to say that on this Is made usable in a way that is not a dead burden.

Vor allen Dingen hat aber diese Anordnung den großen Vorteil, daß man mit der bisher üblichen Länge der Bänder auskommt und die Kipphöhe auf diese Weise entsprechend steigern kann.Above all, this arrangement has the great advantage that you can get by with the previously usual length of the belts and the tilting height on this Way can increase accordingly.

Nachdem auf die vorher beschriebene Weise mit dem Absetzer, der einen Höhenförderer, z. B. eine Eimerleiter, beträchtlicher Länge besitzt, die erste Arbeitsperiode beendet ist und die Gleise verschoben sind, fährt der Absetzer an den Anfangspunkt der Kippe zurück und wirft hier vor Kopf einen Zwickel 3 (Abb, 3) auf, auf den dann der Anfang seines Gleises verlegt wird. Der Absetzer stellt nunmehr vor Kopf arbeitend eine Verbreiterung 4 des Dammes i in derselben Weise her, wie den ersten Damm. Hierzu wird das Gut aus dem Graben 5 entnommen, .das auf den Fahrgleisen 6 herangeführt wird. Diese können bis an das Ende der Kippe vorgestreckt werden (Abb. 2).After in the manner previously described with the weaners, the one Elevator, e.g. B. has a bucket ladder of considerable length, the first working period is finished and the tracks have been shifted, the stacker moves to the starting point the butt back and throws up a gusset 3 (Fig, 3) in front of the head, onto which then the beginning of its track is laid. The weaner is now working in front of his head a widening 4 of the dam i in the same way as the first dam. For this If the goods are removed from the trench 5, it is brought up to the tracks 6 will. These can be stretched out to the end of the butt (Fig. 2).

Ist ein Teil der Dammverbreiterung aufgeworfen und die Krone an den Stellen, an denen das Gleis verlegt werden soll, noch entsprechend geebnet, so können nunmehr die Absetzergleise abschnittweise von dem Damm i auf die Verbreiterung 4 verlegt werden (Abb. 2). Zu diesem Zweck sind an dein Ausleger 7 für das Förderband die Flaschenzüge 8 befestigt (Abb. 4), die die Baggergleise hochnehmen. Durch Schwenken des Auslegers 7 werden dann die einzelnen Gleisabschnitte vor Kopf des Absetzers verlegt. Der Absetzer kann dann um ein entsprechendes Stück vorrücken und vor Kopf weiter eine Verbreiterung des Dammes i anschütten.Is part of the dam widening raised and the crown to the Places where the track is to be laid, leveled accordingly, so can now the separation tracks in sections from dam i to widening 4 be laid (Fig. 2). For this purpose there are 7 on your boom for the conveyor belt the pulley blocks 8 attached (Fig. 4), which take up the dredging tracks. By panning of the boom 7 are then the individual track sections before the head of the depositor relocated. The weaner can then move forward a corresponding distance and in front of the head further fill in a widening of the dam i.

Um die Dammkrone an den Stellen, an denen das Gleise für den Absetzer verlegt werden soll, zu ebnen, wird an dem Ausleger für das Förderband noch ein Einebnungsgerät 9 angebracht (Abb. 4). Der Ausleger wird mit seinem vorderen Ende gesenkt, bis das Einebnungsgerät auf die Dammkrone herunterkommt, und nunmehr der Absetzer verfahren, so daß .die Gleisabschnitte auf dem geebneten Boden.gut verlegt werden können. Man kann aber auch das Einebnungsgerät am Ausleger mit Hilfe von ein oder zwei Laufkatzen fahrbar anordnen (Abb. ¢), um bei stillstehendem Absetzer einebnen zu können. Diese Anordnung hat den Vorteil, daß Unebenheiten des schon vorhandenen Absetzergleises nicht auf die auszugleichende Krone übertragen werden.Around the crest of the dam at the points where the track for the stacker is to be laid, to level, is still one on the boom for the conveyor belt Leveling device 9 attached (Fig. 4). The boom is with its front end lowered until the leveling device comes down to the top of the dam, and now the Move the stacker so that .the track sections on the leveled Soil. Can be laid well. But you can also use the leveling device on the boom Arrange mobile with the help of one or two trolleys (Fig. ¢), in order to To be able to level off settlers. This arrangement has the advantage that unevenness of the already existing setter track not transferred to the crown to be compensated will.

Ist die Dammverbreiterung ganz oder teilweise hergestellt, so wird das Förderband wieder in die Querstellung gebracht, wie in Abb. i und. 2 dargestellt ist, und nunmehr der Teil io der Hochböschung angeschüttet. Die Anschüttung kann fortgesetzt werden, bis das Förderband in der Stellung i i angekommen ist und die Böschungskante fast bis an die Gleise des Absetzers heranreicht. Die Arbeitsweise des Absetzers, wobei das Band abwechselnd vor Kopf und seitlich abwirft, ist auch in der Abb. 2 veranschaulicht.Is the dam widening completely or partially established, so is brought the conveyor belt back into the transverse position, as in Fig. i and. 2 shown is, and now the part io of the high embankment poured up. The embankment can be continued until the conveyor belt has arrived in position i i and the The edge of the embankment almost reaches the track of the skip. The way of working of the weaners, with the tape dropping alternately in front of the head and to the side, is also illustrated in fig.

Während dieser ganzen Arbeitszeit entnimmt der Absetzer das Gut aus dem Graben 5, der sich neben der Dammböschung erstreckt.During this entire working time, the weaner removes the goods the ditch 5, which extends next to the embankment.

Ist auch dieser Arbeitsabschnitt beendet, so müssen die Gleise 6 wieder gerückt werden, und zwar um eine Strecke, welche der Entfernung a entspricht, die sich also aus der Anlage der neuen Böschungskante ergibt. Es kommen hierfür im allgemeinen .einige 2o m in Frage, um die das Gleise im ganzen verschoben wird, wie das auch aus Abb. 3 Zu entnehmen ist.If this section of work has also been completed, track 6 must be restored be moved, namely by a distance which corresponds to the distance a, the thus results from the layout of the new embankment edge. There come for this in general .some 20 m in question, by which the track as a whole is shifted, like that too can be seen from Fig. 3.

Dieses Arbeitsverfahren kann auch noch verschiedene Abänderungen erfahren. Es kann jeder Arbeitsperiode noch ein dritter Arbeitsgang hinzugefügt werden, wie in Abb. 5 bis 7 dargestellt ist.This working procedure can also be modified in various ways. A third work step can be added to each work period, such as is shown in Fig. 5 to 7.

Nachdem der Damm i und die Hcrhkippe 2 hergestellt sind, kann der Albsetzer die Hochschüttung noch um die Fläche 13 verbreitern, und zwar in der Weise, daß der Albsetzer vom Ende der Kippe an rückwärts fahrend mit dem Band in der Arbeitsstellung »vor Kopf« diese Verbreiterung aufwirft. Diesb Anschüttung kann bis an die Fahrgleise 6 heranreichen, wobei also der Graben 5 mit zugeschüttet wird.After the dam i and the top 2 are made, the Albsetzer widen the embankment by area 13, in such a way that that the Albsetzer from the end of the dump moving backwards with the belt in the working position "In front of the head" raises this broadening. This embankment can reach the tracks 6, so that the trench 5 is also filled in.

Diese Arbeitsweise des rückwärts fahrenden Albsetzers ist auch aus Abb. 5 zu erkennen. Sie hat den Vorteil, daß das Rücken der Zufahrtsgleise gegenüber dem ersten Verfahren erst später zu erfolgen hat. Hierbei macht sich also der Vorteil der Zufahrtsgleise, .die unabhängig von der Arbeit des Albsetzers sind, besonders bemerkbar, denn dem Albsetzer wird ständig Albraum zugeführt, nur die Fahrgleise des Albsetzers müssen abschnittweise abgebaut werden. Die einzelnen Joche 1q. werden neben die Zufahrtsgleise gelegt. Sie beanspruchen dabei wenig Platz, weil die Schienen der Fahrgleise nicht durch durchgehende Schwellen verbunden sind.This working method of the reversing Albsetzers is also off Fig. 5 can be seen. It has the advantage that the back of the access tracks opposite the first procedure has to take place later. So here is the advantage the access tracks, which are independent of the work of the Albsetzers, especially noticeable, because the Albsetzer is constantly being fed with nightmares, only the tracks des Albsetzers must be dismantled in sections. The individual yokes 1q. will placed next to the access tracks. They take up little space because the rails the tracks are not connected by continuous sleepers.

Ist der Absetzer dann am Anfangspunkt wieder angekommen, so, werden zunächst die Zufahrtsgleise herausgerückt bis hinter den neuen, noch herzustellenden Graben, und der Absetzer wirft dann vor Kopf einen neuen Damm 15 auf. Nach Herstellung eines Dammstückes nimmt der Absetzer seine Gleise wieder auf und verlegt sie selbst. Die. Weiterarbeit geschieht dann in der beschriebenen Weise.If the stacker has then returned to the starting point, so will first the access tracks moved out to behind the new ones still to be built Dig, and the spreader then throws a new dam 15 in front of the head. After manufacture of a piece of dam, the spreader picks up its tracks again and lays them himself. The. Work then continues in the manner described.

Abb. 8, 9 und io stellen eine weitere Abänderung des Verfahrens dar.Fig. 8, 9 and io represent a further modification of the procedure.

Hier wird zunächst in der eben beschriebenen Weise verfahren, also der Damm i vorwärts vor Kopf, Hochhalde 2 vorwärts seitlich angeschüttet und hierauf mit dem Anschütten der Verbreiterung io rückwärtig vor Kopf begonnen. Gleichzeitig wird jetzt aber auch der neue Damm 16 jenseits der Fahrgleise 6 aufgeworfen. Der Anfang des Dammes ist in Abb. 9 dargestellt. Der Albsetzer arbeitet also jetzt rückwärts, an zwei verschiedenen Stellen Albraum abwerfend.The procedure just described is initially carried out here, that is the dam i forwards in front of the head, high heap 2 forwards poured in on the side and on top started with the filling of the widening io backwards in front of the head. Simultaneously However, the new dam 16 is now also thrown up on the other side of the tracks 6. Of the The beginning of the dam is shown in Fig. 9. So the Albsetzer is now working backwards, Throwing nightmares in two different places.

Hat der Albsetzer seine Rückwärtsfahrt beendet, sa ist auch der neue Damm 16 hergestellt, und der Albsetzer kann nunmehr auf dem Damm verfahren und bei seitlich gestelltem Förderband den Zwischenraum 17 zwischen dem Damm 16 und der Hochkippe ausfüllen. Vorher müssen natürlich die Zufahrtsgleise 6 aus dem Zwischenraum zwischen Damm 16 und der Hochkippe entfernt und auf die Außenseite des Dammes 16 verlegt werden, wobei der nötige Platz für den Graben vorzusehen ist.When the Albsetzer has finished reversing, the new dam 16 is also made, and the Albsetzer can now move on the dam and fill the gap 17 between the dam 16 and the high dump with the conveyor belt positioned to the side. Before that, of course, the access tracks 6 must be removed from the space between the embankment 16 and the high dump and laid on the outside of the embankment 16, with the necessary space being provided for the trench.

Die vorstehend beschriebenen Verfahren sind nicht an eine bestimmte Bauart des Albsetzers gebunden. Wesentlich ist nur, daß die Eimerleiter eine genügende Länge be- sitzt, um den Albraum aus dem Graben bis auf das Förderband zu heben. Die Eimerleiter kann auch mit dem Förderband an einem Fahrzeug angebracht sein. Der Albsetzer kann statt auf Gleisen auch auf Raupen laufen.The methods described above are not tied to a specific type of Albsetzers. It is only important that the loading bucket ladder sits a length sufficient to lift the Albraum out of the trench down to the conveyor belt. The bucket ladder can also be attached to a vehicle with the conveyor belt. The Albsetzer can also run on caterpillars instead of tracks.

Claims (7)

PATENTANSPRÜCHE: i. -Verfahren zum Hochschütten von Halden, besonders für Tagebaue von Braunkohlenbergwerken, mittels eines Albsetzers mit schwenkbarem Förderband, dadurch gekennzeichnet, daß der Albsetzer zunächst vor Kopf unter Schwenken des an sich bekannten Förderbandes einen Damm aufschüttet, der als Fahrbahn für den Albsetzer dient, während die Zufahrtsgleise für das Fördergut und die Entnahmestelle für den Höhenförderer auf dem tieferliegenden Förderhorizont neben der zu bildenden Dammböschung bis zu deren Ende vorgestreckt werden, worauf nach Fertigstellung des Dammes das Förderband in an sich bekannter Weise quer zur Fahrtrichtung eingestellt und die Hochkippe längs des Dammes aufgeschüttet wird, unter ständiger Entnahme des Fördergutes aus derselben tief gelegenen Entnahmestelle. PATENT CLAIMS: i. -Methods for backfilling heaps, especially for open-cast mining of lignite mines, by means of a Albsetzers with swiveling Conveyor belt, characterized in that the Albsetzer initially swivels in front of the head the well-known conveyor belt piles up a dam, which is used as a roadway for the Albsetzer serves while the access tracks for the conveyed goods and the extraction point for the elevator on the lower conveyor horizon next to the embankment to be formed are stretched to the end, whereupon after completion of the dam the conveyor belt in a known manner across to The direction of travel is adjusted and the high dump is heaped up along the dam, with constant removal of the conveyed material from the same low-lying removal point. 2. Vorrichtung zur Ausführung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß der mit schwenkbarem und heb- und senkbarem Förderband versehene Absetzer noch mit einem Höhenförderer (Eimerkette) versehen ist, dessen Länge so bemessen wird, daß er das Fördergut von der Entnahmestelle am Förderhorizont an der Dammböschung entlang bis über die Aufgabestelle des Förderbandes hebt. 2. Device for carrying out the method according to claim i, characterized in that that the stacker, which is equipped with a swiveling and lifting and lowering conveyor belt, is still there is provided with a height conveyor (bucket chain), the length of which is measured in such a way that that he transports the goods from the extraction point on the conveyor horizon to the embankment lifts along to above the feed point of the conveyor belt. 3. Erweiterung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß der Absetzer vom Ende der Kippe rückwärts fahrend vor Kopf die Hochkippe soweit verbreitert, daß die Böschung der Hochkippe bis nahe an die Zufahrtsgleise reicht. q.. 3. Extension of the procedure according to claim i, characterized in that the spreader from the end of the dump backwards driving in front of the head widened the high dump so that the embankment of the high dump reaches close to the access tracks. q .. Erweiterung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß die Zufahrtsgleise um eine Arbeitsbreite gerückt wenden, während der Absetzer am Anfangspunkt der Kippe einen Zwikkel aufwirft, auf dem vorfahrend er zunächst den vorher angeschütteten Fahrdamm und dann die Hochhalde entsprechend verbreitert. Extension of the method according to claim i, characterized in that the access tracks moved by a working width turn while the spreader throws up a twist at the starting point of the dump As he drove up, he first took the previously filled road embankment and then the high dump widened accordingly. 5. Abänderung des Verfahrens nach Anspruch 3, dadurch gekennzeichnet, daß der Absetzer während des Vorrückens auf dem verbreiterten Damm seine eigenen Gleise abschnittweise aus ,der alten Fahrstrecke in die neue überhebt. 5. Modification of the method according to claim 3, characterized characterized that the spreader while advancing on the widened dam sections of its own tracks, lifting the old route into the new one. 6. Abänderung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß vom Anfang der Kippe aus ein neuer Damm jenseits der bisherigen Zufahrtsstrecke aufgeschüttet wird, nachdem die Zufahrtsgleise vorher verlegt worden sind. 6. Modification of the method according to claim i, characterized in that from the beginning the dump from a new dam on the other side of the previous access route after the access tracks have been laid beforehand. 7. Abänderung des Verfahrens nach Anspruch q., dadurch gekennzeichnet, daß der neue Damm, am Ende der Kippe beginnend, von der vorherigen Fahrstrecke des Absetzers aus jenseits der Zufahrtsgleise zugleich mit der Verbreiterung der Hochkippe angeschüttet wird, wobei die Zufahrtsgleise nach dem Anschütten des Dammes abgebaut und auf dessen andere Seite verlegt werden.7. Modification of the procedure according to claim q., characterized in that the new dam, beginning at the end of the dump, from the previous route of the skip at the same time beyond the access tracks with the widening of the high dump is poured, with the access tracks dismantled after the embankment has been filled in and relocated to its other side.
DEM94333D 1926-05-01 1926-05-01 Process for raising heaps, especially for opencast lignite mines Expired DE457040C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEM94333D DE457040C (en) 1926-05-01 1926-05-01 Process for raising heaps, especially for opencast lignite mines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM94333D DE457040C (en) 1926-05-01 1926-05-01 Process for raising heaps, especially for opencast lignite mines

Publications (1)

Publication Number Publication Date
DE457040C true DE457040C (en) 1928-03-08

Family

ID=7322683

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM94333D Expired DE457040C (en) 1926-05-01 1926-05-01 Process for raising heaps, especially for opencast lignite mines

Country Status (1)

Country Link
DE (1) DE457040C (en)

Similar Documents

Publication Publication Date Title
DE2057197A1 (en) Mobile machine for picking up, cleaning and reinstalling ballast ballast from railway tracks
EP0096236B1 (en) Track conveyer waggon, transport train and method of loading and unloading materials for railroad construction
US1980634A (en) Method for building levees
DE2532620A1 (en) PROCEDURE FOR REPLACING SLEEPERS IN RAILWAY TRACKS AND DEVICE FOR A FARM FOR PERFORMING THE PROCEDURE
DE457040C (en) Process for raising heaps, especially for opencast lignite mines
DE202005021058U1 (en) Mobile conveying and stacking system for the multi-layered dumping of ore has transfer grasshopper with conveying device forming in plan view an angle of 30 - 60 degrees to conveying devices of standard grasshoppers
DE4029623A1 (en) OPEN-DAY MINING METHOD
DE2821674C2 (en) Mobile flow rate equalizer
DE456347C (en) Bridge method with bucket wheel excavator for lignite mining
DE434193C (en) Depositing device for reducing the debris
DE1281942B (en) Method and device for mixing different bulk material components
DE404753C (en) Excavator track and conveyor trackless excavator operation
DE1173843B (en) Device for the continuous removal of the material that has been dumped in a pile
DE572012C (en) Settling system
DE581816C (en) Overburden spreader
DE348373C (en) Mining process for the extraction of lignite or the like in open-cast mining
DE584769C (en) Spreaders with a chain of buckets for picking up, conveying and freely discharging the goods
DE389235C (en) Bucket chain excavator with an articulated ladder that can be used for up and down excavation
DE630460C (en) Machine that can be moved on the main track to remove the track bedding
DE1484608A1 (en) Open pit mining equipment
DD154352A5 (en) BOESCHUNGSBRUECKE
DE629050C (en) Device for conveying the material extracted in the open pit, in particular lignite
DE504378C (en) Disposal device provided with pick-up and discharge conveyor
DE550616C (en) Stripping device for the simultaneous clogging of high and low heaps in opencast mining by means of a device that can be moved on a middle platform
DE195651C (en)