DE4405011C1 - Scaffolding trestle - Google Patents

Scaffolding trestle

Info

Publication number
DE4405011C1
DE4405011C1 DE19944405011 DE4405011A DE4405011C1 DE 4405011 C1 DE4405011 C1 DE 4405011C1 DE 19944405011 DE19944405011 DE 19944405011 DE 4405011 A DE4405011 A DE 4405011A DE 4405011 C1 DE4405011 C1 DE 4405011C1
Authority
DE
Germany
Prior art keywords
scaffolding
support
trestle according
bolt
trestle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE19944405011
Other languages
German (de)
Inventor
Gottlob Klein
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STERA GmbH
Original Assignee
STERA GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STERA GmbH filed Critical STERA GmbH
Priority to DE19944405011 priority Critical patent/DE4405011C1/en
Priority to EP95102199A priority patent/EP0668417A1/en
Application granted granted Critical
Publication of DE4405011C1 publication Critical patent/DE4405011C1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/34Scaffold constructions able to be folded in prismatic or flat parts or able to be turned down

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)
  • Movable Scaffolding (AREA)

Description

Bei Innenausbauarbeiten, Montagearbeiten in Räumen, wie beispielsweise Kabelverlegearbeiten oder ähnlichem sowie bei verwandten Tätigkeiten muß der betreffende Handwer­ ker oder Heimwerker gelegentlich in oberen Wand- oder Deckenbereichen arbeiten, wozu er einen erhöhten Stand benötigt.For interior work, assembly work in rooms, such as for example cable laying work or the like as well in related activities, the trader concerned ker or handyman occasionally in upper wall or Ceiling areas work, for which he has a raised stand needed.

Zu diesem Zweck können Treppen- oder Trittleitern die­ nen, die jedoch die Bewegungsfreiheit einschränken und für Arbeiten an verschiedenen Stellen jeweils weiterge­ rückt werden müssen.For this purpose, stairs or step ladders can be used nen, however, restrict the freedom of movement and for work in different places have to be moved.

Ebenfalls als Hilfsmittel für den obengenannten Zweck werden in der Praxis häufig Behelfsgerüste aus festen Gerüstböcken, Treppenleitern oder dergleichen sowie Boh­ len verwendet. Die festen Gerüstböcke und Klappleitern sind jedoch relativ sperrig und werden deshalb in der Praxis der Bequemlichkeit wegen häufig durch Kisten, Hocker oder dergleichen behelfsmäßig ersetzt. Derartige Behelfsaufbauten sind meist nicht ausreichend standsi­ cher und stellen somit eine ständige Gefahrenquelle dar. Also as an aid for the above purpose In practice, makeshift structures are often made of solid Scaffolding trestles, stair ladders or the like and Boh len used. The fixed scaffolding trestles and folding ladders are however relatively bulky and are therefore in the Practice of convenience due to often by boxes, Stool or the like temporarily replaced. Such Makeshift structures are usually not sufficiently stable and therefore represent a constant source of danger.  

Aus der GB-PS 1 525 130 ist ein Gerüstbock bekannt, der einen in Seitenansicht dreieckigen, mit zwei Füßen ver­ sehenen Ständer aufweist, an dem ein horizontal orien­ tiertes, als Riegel dienendes Rohr mit einem Ende um eine Vertikalachse drehbar gelagert ist, das mit seinem anderen Ende von einem einen Standfuß tragenden senk­ rechten Standrohr abgestützt ist. Zur Lagerung ist das horizontale Rohr mit einem relativ kurzen Vertikalrohr verbunden, das drehbar in einem entsprechenden, an dem Ständer vorgesehenen Aufnahmerohr steckt. Der Ständer ist deshalb gegen den mit dem Stützfuß versehenen Riegel schwenkbar. Zur Arretierung der jeweiligen Schwenkstel­ lung ist eine Krone vorgesehen, die mit dem vertikalen Aufnahmerohr verbunden ist und zwischen deren Zacken das den Riegel bildende horizontale Rohr liegen kann. Obwohl der Ständer und der den Stützfuß aufweisende Riegel in Bezug aufeinander verschwenkt werden können, ist der Gerüstbock relativ unhandlich.From GB-PS 1 525 130 a scaffold frame is known which a triangular in side view, with two feet ver has a stand on which a horizontal orien tied, serving as a bar with one end around a vertical axis is rotatably mounted with its the other end of a lower supporting a base right standpipe is supported. For storage it is horizontal tube with a relatively short vertical tube connected, the rotatable in a corresponding, on the Stand provided mounting tube is inserted. The stand is therefore against the bolt provided with the support foot swiveling. To lock the respective swivel a crown is provided that matches the vertical Receiving tube is connected and between the points of the the horizontal tube forming the bar may lie. Although the stand and the bolt with the support foot in Can be pivoted in relation to each other is the Scaffolding trestle relatively unwieldy.

Davon ausgehend ist es eine Aufgabe der Erfindung, einen Gerüstbock zu schaffen, mit dem sich standsichere Gerü­ ste aus leicht zu handhabenden Teilen aufbauen lassen.Based on this, it is an object of the invention, one To create scaffolding trestle with which stable scaffold let it be assembled from easy-to-use parts.

Die obengenannte Aufgabe wird durch einen Gerüstbock mit den Merkmalen des Patentanspruchs 1 gelöst.The above task is performed using a scaffolding trestle solved the features of claim 1.

Der Gerüstbock weist wenigstens zwei schwenkbar anein­ ander gelagerte Ausleger auf. Die von der Scharniereinrichtung vorgegebene Schwenkachse steht da­ bei vertikal, wenn der Gerüstbock auf dem Fußboden auf­ gestellt ist. Ebenfalls vertikal greifen alle Gewichts­ kräfte an dem Gerüstbock an. Die bei einer gewöhnlichen Belastung auftretenden Gewichtskräfte wirken somit in Richtung der Drehachse. Sie verursachen kein die als Konsolen oder Riegel dienenden Ausleger schwenkendes Drehmoment. Der Gerüstbock kann deshalb von den auf ge­ nommenen Gewichtskräften nicht zusammengeklappt werden. Über seine Scharniereinrichtung kann der Gerüstbock je­ doch bedarfsweise von Hand zusammengeklappt werden, wo­ bei er in zusammengeklapptem Zustand handlich transpor­ tiert werden kann.The trestle has at least two pivotable other booms. The of the Hinge device predetermined swivel axis is there at vertical when the trestle is on the floor is posed. All weights also grip vertically forces on the trestle. The one with an ordinary one Weight forces occurring in load thus act in Direction of the axis of rotation. They don't create the as Brackets or bars used to swing the boom Torque. The scaffold frame can therefore from the ge weight forces taken are not folded. The scaffold frame can each via its hinge device  but can be folded by hand where necessary when he is in the folded state, easy to transport can be tiert.

Der Gerüstbock kann in einer vorteilhaften Ausführungs­ form auch drei Ausleger aufweisen, wobei die dritte Stützfläche an dem zusätzlichen dritten Ausleger entsei­ tig vorgesehen ist. Bei diesem Gerüstbock sind die Ab­ stände zwischen seinen Stützflächen relativ groß. Die sich ergebende gesamte überspannte Standfläche ist da­ durch ebenfalls groß. Wegen der somit weit voneinander­ liegenden Stützflächen steht der Gerüstbock unabhängig von der jeweiligen Belastung besonders standsicher. Ent­ sprechend der jeweils gewählten Schwenkstellung stehen die Ausleger von der bzw. den Scharnierachsen ungefähr radial weg, so daß der Gerüstbock von oben gesehen mehr oder weniger sternförmig ist. Die sternförmig gespreiz­ ten Ausleger geben dem Gerüstbock Standfestigkeit.The scaffold frame can be in an advantageous embodiment form also have three arms, the third Support surface on the additional third boom tig is provided. With this trestle, the Ab would be relatively large between its support surfaces. The resulting total spanned stand space is there through also great. Because of that, so far apart the scaffolding stand is independent of horizontal support surfaces particularly stable from the respective load. Ent according to the selected swivel position the arms of the hinge axis (s) approximately radially away, so that the trestle seen from above more or less star-shaped. The star-shaped spread th jibs give the scaffold stand stability.

Die Ausleger sind endseitig, d. h., bezogen auf die je­ weilige Scharnierachse, an ihrem radial außen liegenden Ende mit einem als Stützelement dienenden Stützfuß ver­ sehen, der im einfachsten Falle ein im wesentlichen ver­ tikal stehendes Rohr ist, das mit einer Aufstandfläche auf dem Fußboden steht. Der Gerüstbock ist somit drei­ beinig und hat dadurch einen sicheren Stand. Auch wenn der Fußboden mehr oder weniger wellig ist, steht der Gerüstbock ohne zu wackeln.The arms are at the end, i.e. that is, based on each because of the hinge axis, on its radially outer side Ver end with a support foot serving as a support element see who in the simplest case a ver tical standing pipe is that with a footprint stands on the floor. The trestle is therefore three leggy and therefore has a secure footing. Even if the floor is more or less wavy, the Scaffolding trestle without wobbling.

Aufgrund der schwenkbaren Lagerung der Ausleger anein­ ander kann der Gerüstbock zum Aufbau von Gerüsten viel­ seitig eingesetzt werden. Unabhängig von der Schwenk­ stellung der Ausleger zueinander liegen die Auflageflä­ chen des Gerüstbocks immer im wesentlichen waagerecht, wenn dieser auf dem Fußboden aufgestellt ist. Somit kön­ nen auf jeden Ausleger ein oder mehrere begehbare Bohlen aufgelegt werden. Die Ausleger werden dabei so ge­ schwenkt und gestellt, wie es für den jeweiligen Zweck gerade erforderlich ist. Beispielsweise ist es ohne wei­ teres möglich, einen Ausleger in eine Zimmerecke zu stellen und die anderen in entsprechend abgespreizter Stellung in den Raum ragen zu lassen. Damit bietet der Gerüstbock selbst in ansonsten schlecht zugänglichen Zimmerecken eine saubere und sichere Auflage für Gerüst­ bohlen.Due to the pivotable mounting of the booms together the scaffold stand can do a lot of other things to build scaffolding be used on both sides. Regardless of the pan position of the cantilevers to each other is the contact surface always essentially horizontal, when it is placed on the floor. Thus, one or more walkable planks on each boom be put on. The booms are so ge pivots and poses as is for the purpose  is just required. For example, it is without white teres possible to extend a boom in a corner of the room places and the others in correspondingly spread Let position protrude into the room. The Scaffolding trestle even in otherwise difficult to access Room corners provide a clean and safe support for scaffolding planks.

Die schwenkbare Lagerung der Ausleger aneinander mittels der Scharniereinrichtung gestattet es nicht nur, den Gerüstbock je nach Bedarfin unterschiedliche Gebrauchs­ stellungen zu bringen, sondern ihn darüberhinaus zusam­ menzuklappen, so daß er handlich und leicht transpor­ tierbar ist. Der zusammengeklappte Gerüstbock nimmt kaum mehr Platz als einer seiner Ausleger ein, so daß eine nicht allzu große Ausführungen desselben ohne weiteres beispielsweise in einem Kofferraum von einem PKW oder in einem kleineren Lieferwagen, wie er bei Handwerkern ge­ bräuchlich ist, transportiert werden kann. Wegen seiner Handlichkeit besteht kaum die Gefahr, daß der Gerüstbock behelfsweise durch untaugliche Mittel ersetzt werden würde, so daß im Endeffekt die Unfallgefahr verringert und die Arbeitssicherheit erhöht ist.The pivotable mounting of the booms together the hinge device not only allows the Scaffolding trestle in different uses depending on requirements bring positions, but also put him together to fold up so that it is easy to carry and transport is animal. The folded trestle hardly takes more space than one of its outriggers, so that one not too large versions of the same without further ado for example in a trunk of a car or in a smaller van like the one used by craftsmen is common, can be transported. Because of his Handyness there is hardly any risk that the trestle temporarily replaced by unsuitable means would, so that in the end the risk of accidents is reduced and occupational safety is increased.

Der an dem Gerüstbock vorgesehene und prinzipiell in verschiedenen Ausführungen denkbare Stützfuß ist vor­ zugsweise eine längliche, gerade ausgebildete Stütze. Diese ergibt, insbesondere wenn sie vertikal gestellt ist, eine hohe Tragfähigkeit bei geringer Materialbean­ spruchung. Sie kann deshalb entsprechend leicht ausge­ legt werden.The provided on the scaffold frame and in principle in Different designs possible support leg is in front preferably an elongated, straight support. This results, especially when placed vertically is a high load capacity with a low material bean saying. You can therefore easily out accordingly be placed.

Eine gute Standsicherheit ergibt insbesondere ein Stütz­ fuß, der von einem Rohrabschnitt gebildet ist. Dieser ist knickfest und verträgt, vertikal aufgestellt, hohe Traglasten. A good stability provides a support foot, which is formed by a pipe section. This is kink-resistant and tolerant, set up vertically, high Loads.  

Ebenfalls sowohl eine hohe Tragfähigkeit als auch ein geringes Gewicht wird mit einem Kastenprofil als Stütz­ fuß erreicht. Dieses bietet aber darüberhinaus den Vor­ teil, daß es aufgrund seiner im wesentlichen ebenen Sei­ tenflächen gut mit weiteren Teile des Auslegers, wie beispielsweise den Riegeln zu verbinden ist. Diese wer­ den beispielsweise an den planen Seitenflächen stumpf angeschweißt.Also both a high load capacity and a Light weight comes with a box profile as a support reached foot. But this also offers the advantages partly because of its essentially flat nature surfaces well with other parts of the boom, such as For example, the bars must be connected. This who for example, blunt on the flat side surfaces welded on.

Der als Kastenprofil ausgebildete Stützfuß kann an sei­ nem auf dem Fußboden aufzustellenden Ende mit einem Fuß versehen sein, der das auf dem Stützfuß liegende Gewicht verteilt und somit den auf den Fußboden ausgeübten Druck relativ gering hält. Ein Eindrücken des Stützfußes in den Fußboden wird so vermieden. Dadurch ist bei Verwen­ dung des Gerüstbocks bei Außenarbeiten die Standsicher­ heit verbessert und, bei Innenarbeiten, der betreffende Fußboden einigermaßen geschützt. Eine Verbesserung die­ ses Schutzes wird erzielt, indem an dem Stützfuß im Be­ reiche seiner Stützfläche, also beispielsweise an seinem Fuß, eine weiche, nicht kratzende Beschichtung vorgese­ hen wird. Dieses kann eine Filz-, Gummi- oder eine an­ derweitige Beschichtung sein.The support leg designed as a box profile can be on End to be placed on the floor with one foot be provided, the weight lying on the support foot distributed and thus the pressure exerted on the floor keeps relatively low. Pressing the support foot in this avoids the floor. This makes us use of the scaffold stand during outdoor work improved and, for interior work, the person concerned Floor somewhat protected. An improvement that This protection is achieved by using the support foot in the loading reach his support surface, for example on his Foot, a soft, non-scratchy coating hen. This can be a felt, rubber or one further coating.

Der im Gebrauch vertikal stehende Stützfuß kann an sei­ ner Oberseite mit einem Kupplungsstück zur Verbindung mit weiteren Stützfüßen versehen sein. Dadurch wird es möglich, mehrere Gerüstböcke übereinander zu stapeln und somit Gerüste mit unterschiedlichen Höhen zu erstellen. Eine einfache Ausführung des Kupplungsstücks ist ein mit dem Stützfuß fluchtender, abgesetzter Zapfen. Dessen Durchmesser ist etwas geringer als der Innendurchmesser des beispielsweise als Rohr ausgebildeten Stützfußes, wobei der Zapfen in dem Stützfuß ortsfest gehalten ist. Auf die Zapfen kann ein weiterer Gerüstbock aufgesteckt werden. Eventuell an dem aufzusteckenden Gerüstbock be­ festigte Füße werden dabei vorher abgenommen. The support leg standing vertically in use can be on ner top with a coupling piece for connection be provided with additional support feet. It will possible to stack several trestles on top of each other and thus creating scaffolds with different heights. A simple version of the coupling piece is a the support foot is aligned and offset. Whose Diameter is slightly less than the inside diameter of the support leg, for example in the form of a tube, wherein the pin is held stationary in the support foot. Another trestle can be attached to the pins become. Possibly on the scaffold frame to be attached Firm feet are removed beforehand.  

Der an dem Gerüstbock zwischen der Scharniereinrichtung und dem Stützfuß gelegene Riegel kann ein länglicher biegesteifer Träger, also beispielsweise ein T- oder U- Profil sein. Vorteilhafterweise ist es jedoch ein Rohr­ abschnitt oder ein Kastenprofil. Diese lassen sich mit dem Stützfuß gut verbinden und sind nach außen hin ge­ schlossen, so daß keine Schmutzecken ausgebildet werden. Außerdem weisen insbesondere Kastenprofile eine hohe Biegesteifigkeit auf, so daß die Ausleger im einzelnen und der Gerüstbock insgesamt stabil und standfest wer­ den.The one on the trestle between the hinge device and the bar located on the support leg can be an elongated one rigid support, for example a T- or U- Profile. However, it is advantageously a tube section or a box profile. These can be used connect the support leg well and are facing outwards closed so that no dirt corners are formed. In addition, box profiles in particular have a high profile Flexural rigidity so that the boom in detail and the scaffolding trestle overall stable and stable the.

Der endseitig an dem Stützfuß befestigte Riegel kann mit dem Stützfuß, beispielsweise an dessen Ende, verbunden sein. Jedoch ist es im Hinblick auf die Abrutschsicher­ heit einer auf den Gerüstbock, d. h. auf den Riegel auf­ gelegten Gerüstbohle vorteilhaft, wenn der Riegel an dem Stützfuß seitlich befestigt ist. Dann steht ein Teil des Stützfußes nach oben über die Auflagefläche des Riegels über, wobei dieser Überstand ein seitliches Abrutschen der Gerüstbohle verhindert.The bolt fastened at the end to the support foot can also be used the support leg, for example at the end thereof his. However, it is safe from slipping one on the trestle, d. H. on the bolt placed scaffolding advantageous if the bolt on the Support foot is attached laterally. Then part of the Support foot upwards over the support surface of the transom above, this supernatant slipping sideways the scaffold prevents.

Bei einer relativ großen Bauform des Gerüstbocks, bei der die Stützfüße deutlich länger als die Riegel sind, kann der von dem Riegel und dem Stützfuß eingeschlossene Winkel ein stumpfer Winkel sein, so daß die Stützfüße im Gebrauch schräg stehen. Das gestattet es, bei dieser größeren Bauform eine gute Standfestigkeit zu erreichen. Jedoch ist es insbesondere bei handlicheren Größen, wie sie für den Innenausbau zu verwenden sind, vorteilhaft, wenn der zwischen dem Riegel und dem Stützfuß einge­ schlossene Winkel ein rechter Winkel ist. Die Stützfüße stehen dadurch senkrecht auf dem Fußboden, wodurch sie im wesentlichen lediglich einer Druckbelastung ausge­ setzt sind. Sie können demnach relativ dünnwandig und somit leicht ausgeführt werden, ohne daß Stabilitätspro­ bleme auftreten. Dies erhöht die Handlichkeit. Außerdem nimmt der zusammengeklappte Gerüstbock eine lediglich geringere, etwa rechteckige Fläche ein, so daß er sich bequem transportieren läßt.With a relatively large design of the trestle, at the support feet are significantly longer than the bars, can the one enclosed by the latch and the support foot Angle be an obtuse angle, so that the support feet in Use at an angle. That allows with this larger size to achieve good stability. However, it is especially with more manageable sizes, such as they are to be used for the interior, advantageous if the inserted between the latch and the support foot closed angle is a right angle. The support feet stand vertically on the floor, causing them essentially just a pressure load sets are. They can therefore be relatively thin-walled and can therefore be easily carried out without stability pro bleme occur. This increases the handiness. also the folded trestle only takes one  smaller, approximately rectangular area, so that it is can be easily transported.

Die Stützfüße und der Riegel, also mit anderen Worten der Ausleger, können bzw. kann aus Metall hergestellt sein. Als Metalle sind sowohl Aluminium als auch Stahl geeignet, wobei der Stahl zum Korrosionsschutz verzinkt sowie mit einem Farbanstrich versehen sein kann.The support feet and the bar, in other words the boom, can or can be made of metal his. Both aluminum and steel are metals suitable, the steel galvanized for corrosion protection and can be painted.

Der Gerüstbock kann Ausleger mit zwei oder mehreren Riegeln aufweisen. Sind beispielsweise zwei Riegel vor­ gesehen, werden mit dem Gerüstbock bereits mittlere Hö­ hen erreicht, wobei ihm die beispielsweise aus Kasten­ profilmaterial bestehenden Riegel eine gute Stabilität verleihen. Bei dieser Ausführungsform kann die endseitig an den Riegeln vorgesehene Scharniereinrichtung relativ einfach ausgebildet werden. Durch den vertikalen Abstand der Riegel voneinander sind die Ausleger bezüglich der von der Scharniereinrichtung definierten Scharnierachse sicher geführt. Ein seitliches Wegklappen der Ausleger durch ein Versagen der Scharniereinrichtung ist nicht zu befürchten.The scaffolding trestle can have two or more jibs Have bars. For example, there are two bars seen, the scaffolding trestle is already medium height hen reached, for example from box profile material existing bars good stability to lend. In this embodiment, the end provided on the latch hinge device relative just be trained. Because of the vertical distance the bars from each other are the cantilevers with respect to the hinge axis defined by the hinge device led safely. A sideways folding of the boom failure of the hinge device is not too fear.

Die Scharniereinrichtung ermöglicht den Auslegern einen weiten Schwenkbereich, so daß sie für den Transport wie ein Buch zusammengeklappt werden können. Dabei liegen die drei untereinander im wesentlichen gleich ausgebil­ deten Ausleger aufeinander. Zum Aufstellen können sie jedoch um die von der Scharniereinrichtung definierte Scharnierachse nahezu beliebig weggeschwenkt werden.The hinge device enables the booms wide swivel range so they like for transportation a book can be folded up. Lying there the three are essentially the same among each other cantilevers on each other. They can be set up however by the one defined by the hinge device Hinge axis can be swiveled away almost anywhere.

Die Scharniereinrichtung kann in einfacher Weise durch an dem Riegel bzw. den Riegeln einer der Ausleger je­ weils vorgesehene Laschen gebildet sein, die beispiels­ weise an dem jeweiligen Riegel aufgeschweißt sind. Je­ weils zwischen zwei im Abstand parallel zueinander lie­ genden Laschen des einen Auslegers liegt der Riegel des benachbarten Auslegers. Sowohl die Laschen als auch der Riegel sind von einem Bolzen durchgriffen, wodurch ein Scharnier ausgebildet ist. Ein derartiges Scharnier ist einfach herzustellen und weist ein gewisses Spiel auf. Dieses Spiel stellt sicher, daß sich mehrere, von der Scharniereinrichtung umfaßte einzelne Scharniere gegen­ seitig nicht blockieren können. Auch wenn sie bei der Herstellung um einige Millimeter versetzt sind, so daß ihre Drehachsen nicht exakt fluchten, definieren sie ge­ meinsam eine Scharnierachse, um die die Ausleger schwenkbar sind. Die dadurch möglichen relativ großen Toleranzen bei der Herstellung der Scharniere senken den Aufwand und somit die Herstellungskosten.The hinge device can be carried out in a simple manner on the bar or the bars of one of the brackets each Weil provided tabs are formed, for example are welded to the respective latch. Each because it was parallel between two at a distance lugs of the one arm is the latch of the neighboring boom. Both the tabs and the  Bolts are penetrated by a bolt, creating a Hinge is formed. Such a hinge is easy to manufacture and has some play. This game ensures that there are several, of which Hinge device included individual hinges against cannot block each other. Even if at the Manufacturing are offset by a few millimeters, so that they do not exactly align their axes of rotation, they define ge together a hinge axis around which the boom are pivotable. The relatively large possible Tolerances in the manufacture of the hinges reduce the Effort and thus the manufacturing costs.

Der Gerüstbock kann mit einer Halteeinrichtung versehen sein, an der beispielsweise eine Deckenstütze befestig­ bar ist. Diese sichert den Gerüstbock insbesondere bei höher gebauten Gerüsten zuverlässig gegen Umfallen. Die Halteeinrichtung ist vorzugsweise bei der Scharnierein­ richtung vorgesehen. Eine hier befestigte Deckenstütze sichert den Gerüstbock an einem zentralen Angriffspunkt und behindert außerdem nicht den Zugang zu den Auflage­ flächen. Gerüstbohlen oder dergleichen können ungehin­ dert auf die Riegel aufgelegt werden. Die Halteeinrich­ tung gibt dem betreffenden Ausleger und damit dem gesam­ ten Gerüstbock zusätzlichen Halt, wenn sie zwischen den Riegeln des betreffenden Auslegers angeordnet ist. Sie dient dadurch gleichzeitig der Aussteifung des Auslegers. Die Halteeinrichtung kann dabei ein Träger, wie beispielsweise ein Rohrstück oder ein Kastenprofil­ stück sein.The trestle can be provided with a holding device be attached to the ceiling support, for example is cash. This secures the trestle in particular higher scaffolding reliably against falling over. The Holding device is preferably at the hinge direction provided. A ceiling prop attached here secures the trestle at a central point of attack and also does not hinder access to the edition surfaces. Scaffolding planks or the like can be unpleasant be placed on the bars. The holding device tion gives the boom in question and thus the whole additional support if they stand between the Bolts of the relevant boom is arranged. she thereby serves to stiffen the Cantilever. The holding device can be a carrier, such as a piece of pipe or a box profile be piece.

Als Widerlager für an der Halteeinrichtung zu befesti­ gende längliche Teile kann bei der Scharniereinrichtung ein Anschlagmittel vorgesehen sein. Dieses kann bei­ spielsweise als Prisma ausgebildet sein, so daß das An­ schlagmittel zwei Anlageflächen aufweist, die in einem Winkel zueinander stehend, der sich von dem Träger weg öffnet. Eine beispielsweise zu befestigende Deckenstütze wird in das Anschlagmittel eingelegt, so daß sie beide Anlageflächen berührt. Die Deckenstütze kann dann mit einem hakenförmigen oder U-förmigen Bolzen, der sich an der Halteeinrichtung abstützt, fest an die Anlageflächen gepreßt werden. Der Reibschluß zwischen diesen und der Deckenstütze ergibt eine sichere Verbindung zwischen derselben und dem Gerüstbock.As an abutment for attaching to the holding device The elongated parts can be in the hinge device a sling may be provided. This can be done at be designed as a prism, for example, so that the has two abutment surfaces in one Angle to each other, which is away from the wearer opens. A ceiling prop to be attached, for example  is inserted into the sling so that both of them Touched contact surfaces. The ceiling prop can then be used a hook-shaped or U-shaped bolt that attaches to the holding device supports, firmly on the contact surfaces be pressed. The friction between these and the Ceiling support provides a secure connection between the same and the trestle.

In der Zeichnung ist ein Ausführungsbeispiel der Erfin­ dung dargestellt. Es zeigen:In the drawing is an embodiment of the Erfin shown. Show it:

Fig. 1 ein in einem Raum aufgebautes Gerüst mit meh­ reren Gerüstböcken in Draufsicht, Fig. 1 is a built in a space frame containing more reren scaffolding frames in plan view,

Fig. 2 einen der in Fig. 1 dargestellten Gerüstböcke in Draufsicht und in einem anderem Maßstab, Fig. 2 one of the trestles shown in Fig. 1 in top view and in a different scale,

Fig. 3 den Gerüstbock nach Fig. 2 in einer Seitenan­ sicht mit Blickrichtung auf seine Scharnier­ einrichtung, Figure 3 device. The trestle of Fig. 2 in a view Seitenan with a view toward its hinge,

Fig. 4 eine weitere insbesondere zum Aufstocken ge­ eignete Ausführungsform des Gerüstbockes, Fig. 4 shows a further particular ge for stacking suitable embodiment of the scaffolding bracket,

Fig. 5 einen mit einer Halteeinrichtung versehenen Gerüstbock in Draufsicht, Fig. 5 is a provided with a holding device trestle in plan view,

Fig. 6 den Gerüstbock nach Fig. 5 in einer Seitenan­ sicht mit Blickrichtung auf seine Scharnier­ einrichtung und Fig. 6 the scaffold frame of FIG. 5 in a Seitenan view with a view of its hinge device and

Fig. 7 ein in einem Raum aufgestelltes Gerüst in ei­ ner ausschnittsweisen Darstellung, mit Gerüst­ böcken einer weiteren Ausführungsform, in Draufsicht. Fig. 7 is a scaffold erected in a room in egg ner partial representation, with scaffolding trestles of a further embodiment, in plan view.

In Fig. 1 ist ein Gerüst 1 in Draufsicht dargestellt, das auf einem Fußboden 2 in einem Zimmer 3 entlang sei­ ner Wände 4 aufgestellt ist. Die Wände 4 sind dabei par­ allel zu dem Fußboden 2 oberhalb des Gerüstes 1 ge­ schnitten und die Blickrichtung ist senkrecht zu dem Fußboden 2.In Fig. 1, a scaffold 1 is shown in plan view, which is set up on a floor 2 in a room 3 along its walls 4 . The walls 4 are cut par allel to the floor 2 above the scaffold 1 and the viewing direction is perpendicular to the floor 2 .

Das Gerüst 1 besteht aus insgesamt sieben untereinander völlig gleichartig ausgebildeten Gerüstböcken 6 sowie mehreren Gerüstbohlen 7, die ungefähr parallel zu dem Fußboden 2 in geringem Abstand zu den Wänden 4 auf die Gerüstböcke 6 aufgelegt sind.The scaffolding 1 consists of a total of seven scaffolding trestles 6 which are completely identical to one another and a plurality of scaffolding planks 7 which are placed on the scaffolding trestles 6 approximately parallel to the floor 2 and at a short distance from the walls 4 .

Jeder Gerüstbock 6 weist drei über eine Scharnierein­ richtung 8 schwenkbar aneinander gelagerte Ausleger oder Konsolen 11, 12, 13 auf, die, wie aus Fig. 1 hervorgeht, vertikal stehend in unterschiedliche Winkelstellungen zueinander ausgerichtet werden können.Each trestle 6 has three over a Scharnierein device 8 pivotally mounted arms or brackets 11 , 12 , 13 , which, as shown in Fig. 1, can be aligned vertically standing in different angular positions to each other.

Die Ausleger 11, 12, 13 des in den Fig. 2 und 3 separat dargestellten Gerüstbockes 6 sind dabei untereinander im wesentlichen gleich ausgebildet. Der Ausleger 11 weist ein Standrohr 14 auf, das an einem Kastenprofil aus Stahl mit quadratischem Querschnitt gebildet ist. An dem fußbodenseitigen Ende 15 des Standrohrs 19 ist ein Fuß 16 mit einer einige Quadratzentimeter großen Stützfläche 17 vorgesehen. An seinem gegenüberliegenden Ende 18 ist das Standrohr 14 mit einem Zapfen 19 versehen, der in einem Kegelstumpf endet und der Verbindung mit weiteren aufzustapelnden Gerüstböcken 6 dient.The arms 11 , 12 , 13 of the scaffold bracket 6 shown separately in FIGS . 2 and 3 are essentially identical to one another. The boom 11 has a standpipe 14 which is formed on a box section made of steel with a square cross section. On the floor-side end 15 of the standpipe 19 , a foot 16 with a support surface 17 of a few square centimeters is provided. At its opposite end 18 , the standpipe 14 is provided with a pin 19 which ends in a truncated cone and is used for connection to further scaffolding frames 6 to be stacked.

Zu dem Ausleger 11 gehört eine wie schon das Standrohr 14 aus einem Kastenprofil aus Stahl gebildete Strebe, die als Riegel 21 dient und die bei dem Ende 18 etwas gegen das Standrohr 14 nach unten versetzt an einer sei­ ner Seitenflächen angeschweißt ist. Der Riegel 21 und das Standrohr 14 schließen miteinander einen rechten Winkel ein. Dabei ist der Riegel 21 so angeordnet, daß er mit einer Flachseite 22 nach oben weist, die somit eine Auflagefläche für die aufzulegenden Gerüstbohlen 7 bildet.To the boom 11 includes a strut formed like a standpipe 14 from a box section made of steel, which serves as a latch 21 and which at the end 18 is offset somewhat downwards against the standpipe 14 and welded to one of its side surfaces. The latch 21 and the standpipe 14 form a right angle with one another. The bolt 21 is arranged so that it has a flat side 22 upwards, which thus forms a support surface for the scaffolding planks 7 to be placed .

Im Abstand und parallel zu dem Riegel 21 ist eine weite­ re als Quersprosse dienende Strebe vorgesehen, die eben­ falls endseitig mit dem Standrohr 14 verschweißt ist und einen zweiten Riegel 23 bildet. Der in seinen Abmessun­ gen mit dem Riegel 21 übereinstimmende Riegel 23 ist dabei etwas unterhalb der Mitte des Standrohres 14 mit diesem verschweißt. Sowohl die Riegel 21, 23 als auch das Standrohr 14 liegen mit ihren jeweiligen Längsmit­ telachsen in einer gemeinsamen Ebene.At a distance and parallel to the bolt 21 , a wide re serving as a crossbar strut is provided, which is just welded at the end to the standpipe 14 and forms a second bolt 23 . The matching in its dimensions with the bolt 21 bolt 23 is slightly below the center of the standpipe 14 welded to it. Both the latch 21 , 23 and the standpipe 14 are telaxes with their respective Längenmit in a common plane.

Die Ausleger 12, 13 sind hinsichtlich des Standrohres 14 der Zapfen 19 und der Riegel 21, 23 mit dem Ausleger 11 baugleich, so daß auf eine erneute Beschreibung an die­ ser Stelle verzichtet wird und die gleichen Bezugszeichen für entsprechende Teile verwendet werden.The arms 12 , 13 are identical with respect to the standpipe 14 of the pin 19 and the bolt 21 , 23 with the arm 11 , so that a renewed description of the water point is dispensed with and the same reference numerals are used for corresponding parts.

Die Scharniereinrichtung 8 ist endseitig an den Riegeln 21, 23 des mittleren Auslegers 12 vorgesehen. Sie umfaßt insgesamt vier einzelne Scharniere 25, 26, 27 und 28. Zur Ausbildung der beidseits des Riegels 21 des Ausle­ gers 12 liegenden Scharniere 25, 26 sind an dem Riegel 21 an dessen oberer Flachseite 22 und seiner dieser ge­ genüberliegenden, unteren Flachseite flache Laschen 31, 32 angeschweißt. Die obere Lasche 31 ist dabei genauso groß wie die untere Lasche 32 und parallel zu dieser angeordnet. Mit dem Riegel 21 bilden die Laschen 31, 32 seitlich geöffnete Mäuler, die den Riegel 21 des Ausle­ gers 11, 13 aufnehmen. Die Laschen 31, 32 und der je­ weils zwischen ihnen liegende Riegel 21 weisen miteinan­ der fluchtende Bohrungen auf, die von einem Scharnier­ bolzen 33 durchgriffen sind. The hinge device 8 is provided at the ends on the bolts 21 , 23 of the middle arm 12 . It comprises a total of four individual hinges 25 , 26 , 27 and 28 . To form the two sides of the bolt 21 of the Ausle gers 12 lying hinges 25 , 26 are welded to the bolt 21 on its upper flat side 22 and its opposite, lower flat side flat tabs 31 , 32 . The upper tab 31 is the same size as the lower tab 32 and is arranged parallel to it. With the latch 21 , the tabs 31 , 32 form laterally open mouths which receive the latch 21 of the Ausle gers 11 , 13 . The tabs 31 , 32 and the latch 21 located between them each have miteinan the aligned bores, which are penetrated by a hinge pin 33 .

Das die Riegel 23 der Ausleger 11, 12 miteinander ver­ bindende Scharnier 28 ist mit dem oben beschriebenen Scharnier 25 völlig baugleich. Ebenso ist das die Riegel 23 der Ausleger 12, 13 miteinander verbindende Scharnier 27 mit dem oben beschriebenen Scharnier 26 baugleich.The bolt 23 of the boom 11 , 12 ver binding hinge 28 is completely identical to the hinge 25 described above. Likewise, the hinge 27 connecting the bolts 23 of the brackets 12 , 13 to one another is identical in construction to the hinge 26 described above.

Die Scharnierbolzen 33 der Scharniere 25, 28 definieren eine gemeinsame Scharnierachse 36, die vertikal, d. h. parallel zu den Längsmittelachsen der Standrohre 14 aus­ gerichtet ist. Sie liegt ungefähr in der von den Riegeln 21, 23 sowie dem Standrohr 14, bzw. deren Längsmittel­ achsen definierten Ebene des Auslegers 11. Jedoch liegt sie gegen die Riegel 21, 23 des mittleren Auslegers 12 seitlich und zwar in Fig. 3 nach rechts versetzt.The hinge bolts 33 of the hinges 25 , 28 define a common hinge axis 36 which is oriented vertically, ie parallel to the longitudinal central axes of the standpipes 14 . It lies approximately in the plane of the boom 11 defined by the bars 21 , 23 and the standpipe 14 , or the longitudinal center axis thereof. However, it lies laterally against the bolts 21 , 23 of the middle arm 12, namely to the right in FIG. 3.

Die Scharnierbolzen 33 der Scharniere 26, 27 definieren ebenfalls eine Drehachse 37. Sie ist parallel zu den Standrohren 14 und somit auch parallel zu der anderen Drehachse 36 ausgerichtet. Der Gerüstbock 6 ist somit bezüglich einer von dem mittleren Ausleger 12 durch die Längsmittelachsen der Riegel 21, 23 sowie des Standrohrs 14 definierten Ebene symmetrisch aufgebaut.The hinge bolts 33 of the hinges 26 , 27 also define an axis of rotation 37 . It is aligned parallel to the standpipes 14 and thus also parallel to the other axis of rotation 36 . The scaffold frame 6 is thus constructed symmetrically with respect to a plane defined by the central boom 12 through the longitudinal central axes of the bars 21 , 23 and the standpipe 14 .

Wie aus Fig. 2 ersichtlich ist, sind die Ausleger 11, 13 auf den Ausleger 12 zu klappbar, so daß sie in zusammen­ geklapptem Zustand an dem Ausleger 12 mehr oder weniger dicht anliegen. Diese Stellung ist in Fig. 2 durch strichpunktierte Linien angedeutet. Der Ausleger 11 kann um einen Winkel von über 180° von dem Ausleger 12 wegge­ klappt werden. Das gleiche gilt für den Ausleger 13, der ebenfalls in einem weiten Bereich schwenkbar ist.As is apparent from Fig. 2, the arms 11, 13 on the boom 12 to be folded, such that they fit tightly together in folded position on the boom 12 more or less. This position is indicated in Fig. 2 by dash-dotted lines. The boom 11 can be folded away by an angle of over 180 ° from the boom 12 . The same applies to the boom 13 , which is also pivotable in a wide range.

Der insoweit beschriebene Gerüstbock 6 wird zum Aufbau eines Gerüstes wie folgt verwendet:The scaffolding trestle 6 described so far is used to construct a scaffolding as follows:

Der Gerüstbock 6 wird, wie in Fig. 1 dargestellt, aus­ einander geklappt, wobei die Ausleger 11, 12, 13 in die an der jeweiligen Stelle erforderlichen Winkelstellungen zueinander gebracht werden. Beispielsweise kann ein an der laufenden Wand 4 aufzustellender Gerüstbock 6 mit einem Ausleger 12 rechtwinklig zur Wand und mit den Aus­ legern 11, 13 parallel zur Wand aufgestellt werden, wie in Fig. 1 unten dargestellt ist. Die entsprechenden Ge­ rüstbohlen 7 werden dann auf die Auflagefläche 22 des mittleren Auslegers 12 aufgelegt. Diese Aufstellung bie­ tet eine sehr gute Standsicherheit.As is shown in FIG. 1, the scaffolding trestle 6 is folded apart, the arms 11 , 12 , 13 being brought into the angular positions required at the respective point. For example, a scaffolding stand 6 to be set up on the running wall 4 with an arm 12 perpendicular to the wall and with the arm 11 , 13 from parallel to the wall, as shown in Fig. 1 below. The corresponding Ge scaffolding planks 7 are then placed on the bearing surface 22 of the middle boom 12 . This set-up offers very good stability.

Eine andere Aufstellungsweise des Gerüstbocks 6 an der laufenden Wand 4 ist in Fig. 1 oben dargestellt. Hier steht der Ausleger 12 ebenfalls rechtwinklig zu der Wand 4, jedoch weist er von dieser weg. Die Ausleger 11, 13 stehen voneinander weggespreizt schräg zu der Wand 4. Diese Art und Weise der Aufstellung hat den Vorzug, daß die entsprechenden aufzulegenden Gerüstbohlen 7 jeweils einzeln, d. h. ohne gegenseitige Überlappung auf die Aus­ leger 11, 13 aufgelegt werden können. Die Gerüstbohlen stoßen stirnseitig aneinander. Infolge der Überlappungs­ freiheit wird eine weitgehend ebene Gehfläche ausgebil­ det, auf der keine durch irgendwelche Stufen verursachte Stolpergefahr besteht.Another way of setting up the scaffold 6 on the moving wall 4 is shown in FIG. 1 above. Here the boom 12 is also perpendicular to the wall 4 , but it points away from this. The arms 11 , 13 are spread apart from one another at an angle to the wall 4 . This way of setting up has the advantage that the corresponding scaffolding planks 7 to be placed can be placed individually, that is, without mutual overlap, from the layers 11 , 13 . The scaffolding boards meet on the front. As a result of the freedom of overlap, a largely flat walking surface is formed on which there is no risk of tripping caused by any steps.

Wie aus Fig. 1 links unten ersichtlich ist, kann auf dem rechtwinklig zur laufenden Wand 4 aufgestellten Ausleger 12 die Gerüstbohle 7 nahezu mit ihrem äußersten Endbe­ reich aufgelegt werden, wobei die Ausleger 11, 13 ent­ sprechend abgespreizt sind, um eine ausreichende Stand­ festigkeit zu erbringen. Bei dieser Aufstellung des Ge­ rüstbockes 6 besteht keine Gefahr dahingehend, daß ein auf dem Gerüst Beschäftigter auf ein nicht unterstütztes Ende der Gerüstbohle 7 treten und somit abstürzen würde. Weitere Varianten der Aufstellung des Gerüstbockes 6 sind in der Fig. 1 rechts unten sowie rechts oben darge­ stellt.As can be seen from Fig. 1 bottom left, can be placed on the right at right angles to the running wall 4 boom 12, the scaffold 7 almost with its outermost Endbe, the booms 11 , 13 are spread apart accordingly to provide sufficient stability provide. In this setup of the Ge scaffolding bracket 6 there is no danger that an employee on the scaffolding step on an unsupported end of the scaffolding plank 7 and would therefore crash. Further variants of the erection of the scaffold frame 6 are shown in Fig. 1 bottom right and top right Darge.

Allen dargestellten Aufstellungsvarianten des Gerüstbok­ kes 6 ist gemeinsam, daß dieser mit seinen insgesamt drei Stützflächen 17 wackelfrei und kippsicher auf dem Fußboden 2 aufgestellt ist. Die Stützflächen 17 liegen dabei insbesondere im Vergleich zu einem Gerüstbock mit lediglich zwei Auslegern, bei dem ein Fuß vertikal unter dem Scharnier angeordnet ist, weit auseinander und geben dem Gerüstbock 6 somit eine sehr gute Standfestigkeit.All the illustrated installation variants of the Gerüstbok kes 6 have in common that it is set up with its total of three support surfaces 17 wobble-free and tilt-proof on the floor 2 . The support surfaces 17 are in particular in comparison to a scaffolding trestle with only two arms, in which a foot is arranged vertically under the hinge, far apart and thus give the scaffolding trestle 6 very good stability.

Ein weiteres Ausführungsbeispiel des Gerüstbockes 6 ist in Fig. 4 dargestellt, wobei dieser Gerüstbock 6′ ins­ besondere zum Aufstocken des in den Fig. 1 bis 3 darge­ stellten Gerüstbockes 6 dient. Der Gerüstbock 6′ weist, wie der vorstehend beschriebene, drei Ausleger 11′, 12′, 13′ auf, die untereinander ebenfalls mit einer Schar­ niereinrichtung 8′ verbunden sind. Der Ausleger 11′ be­ steht hier aber lediglich aus dem hier einzigen Riegel 21′ und dem verkürzten Standrohr 14′. Dieses ist mit keinem Fuß versehen, um ein Aufsetzen auf den Zapfen 19 des Gerüstbocks 6 zu ermöglichen.A further embodiment of the scaffold frame 6 is shown in Fig. 4, this scaffold frame 6 'is used in particular to increase the scaffold frame 6 shown in Figs. 1 to 3 Darge. The scaffold frame 6 ', like the one described above, has three brackets 11 ', 12 ', 13 ', which are also connected to each other with a coulter niereinrichtung 8 '. The boom 11 'be here is only from the only latch 21 ' and the shortened standpipe 14 '. This is not provided with a foot in order to enable it to be placed on the pin 19 of the scaffold frame 6 .

Die Verwendung des in Fig. 4 dargestellten Gerüstbockes 6′ erfolgt in Verbindung mit dem Gerüstbock 6, in dem der Gerüstbock 6′ in entsprechender Spreizstellung auf den Gerüstbock 6 aufgesetzt wird, so daß seine Standroh­ re 14′ auf die jeweiligen Zapfen 19 aufgesteckt werden. Der so aus den Gerüstböcken 6, 6′ entstandene erhöhte Gerüstbock wird, wie bereits oben im Zusammenhang mit der Fig. 1 erläutert, verwendet.The use of the scaffolding bracket 6 shown in Fig. 4 'takes place in connection with the scaffolding frame 6 , in which the scaffolding frame 6 ' is placed in a corresponding spreading position on the scaffolding frame 6 , so that its standpipes re 14 'are attached to the respective pin 19 . The resulting from the scaffolding frames 6 , 6 'increased scaffolding frame is used, as already explained above in connection with FIG. 1.

Weitere Ausführungsformen des Gerüstbockes 6′ sind in Fig. 4 strichpunktiert angedeutet. Eine weist neben dem Riegel 21′ einen weiteren Riegel 23′ auf, der zu dem Riegel 21′ im Abstand parallel verläuft. Die Verwendung dieses Gerüstbockes 6′′ entspricht der des Gerüstbockes 6′, wobei entsprechend größere Gerüsthöhen erreicht wer­ den. Bei einer weiteren Bauform ist zusätzlich ein dritter Riegel 39 vorgesehen, der zu dem Riegel 23′ pa­ rallel angeordnet ist. Die Bauhöhe diesem Gerüstbocks 6′′ ist höher, wobei er sowohl gesondert als auch zum Aufstocken verwendet werden kann. Im erstgenannten Fall wird er mit Füßen versehen.Further embodiments of the trestle 6 'are indicated by dash-dotted lines in Fig. 4. One has in addition to the bolt 21 'a further bolt 23 ', which runs parallel to the bolt 21 'at a distance. The use of this trestle 6 '' corresponds to that of the trestle 6 ', with correspondingly greater scaffolding heights who reached the. In a further design, a third bolt 39 is additionally provided, which is arranged parallel to the bolt 23 'pa. The overall height of this trestle 6 '' is higher, whereby it can be used both separately and for adding to it. In the former case, it is provided with feet.

In den Fig. 5 und 6 ist eine weitere Ausführungsform des Gerüstbocks 6 dargestellt, bei dem im Bereich der Schar­ niere 25, 26, 27, 28 eine Halteeinrichtung 40 zur Befe­ stigung einer senkrechten Stütze 41 vorgesehen ist. Die Stütze 41 kann beispielsweise eine Deckenstütze sein, mit der der Gerüstbock an der Decke zusätzlich gegen Schaukelbewegungen gesichert werden kann. Zu der Halte­ einrichtung 40 gehört ein parallel zu dem Standrohr 14 zwischen den Riegeln 21, 23 angeordneter Träger 42. Der Träger 42 ist ein aus Stahl bestehendes Kastenprofil, dessen Länge dem Abstand zwischen den Riegeln 21, 23 entspricht. Der Träger ist dabei unmittelbar im Anschluß an die Laschen 31, 32 zwischen die Riegel 21, 23 ge­ schweißt.In FIGS. 5 and 6, another embodiment of the trestle 6 is shown, in the kidney in the area of the blade 25, 26, 27, 28 a holding device 40 for stigung BEFE a vertical support 41 is provided. The support 41 can be, for example, a ceiling support, with which the trestle on the ceiling can additionally be secured against rocking movements. To the holding device 40 includes a parallel to the standpipe 14 between the bars 21 , 23 arranged support 42nd The carrier 42 is a box section made of steel, the length of which corresponds to the distance between the bars 21 , 23 . The carrier is directly welded to the tabs 31 , 32 between the bolts 21 , 23 .

An dem Träger 42 ist etwa mittig zwischen den Riegeln 21, 23 über eine entsprechende Halterung eine Führungs­ buchse 43 angeschweißt, deren zylinderförmige Öffnung 44 im wesentlichen parallel zu den Riegeln 21, 23 ausge­ richtet ist und die seitlich gegen den Träger 42 ver­ setzt angeordnet ist.On the carrier 42 , a guide bush 43 is welded approximately centrally between the bolts 21 , 23 via a corresponding holder, the cylindrical opening 44 of which is oriented essentially parallel to the bolts 21 , 23 and which is arranged laterally against the carrier 42 .

Die Öffnung 44 ist von einem Gewindebolzen 45 durchgrif­ fen, der mit einer Flügelmutter 46 an der Führungsbuchse 43 gesichert ist. Der Gewindebolzen 45 ist an seinem aus der Öffnung 44 ragenden freien Ende zu einem Haken gebo­ gen.The opening 44 is penetrated by a threaded bolt 45 which is secured to the guide bush 43 with a wing nut 46 . The threaded bolt 45 is bent at its protruding from the opening 44 free end to a hook.

Als Widerlager für die von dem Gewindebolzen 45 in Richtung auf den Träger 42 zu spannende Stütze sind die Lasche 31 der Scharniere 25, 26 sowie die Lasche 32 der Scharniere 27, 28 dreieckförmig ausgeschnitten. Die La­ sche 31 weist dadurch zwei Anlageflächen 47, 48 auf, die einen rechten, sich in Richtung von dem Träger 42 weg öffnenden Winkel miteinander einschließen. Das gleiche gilt für die Lasche 32.The tab 31 of the hinges 25 , 26 and the tab 32 of the hinges 27 , 28 are cut out triangularly as an abutment for the support to be tensioned by the threaded bolt 45 in the direction of the support 42 . The La cal 31 thereby has two contact surfaces 47 , 48 , which enclose a right angle, which opens in the direction away from the carrier 42 , with one another. The same applies to the tab 32 .

Zur Befestigung der Stütze 41 an dem Ausleger 12 wird die Flügelmutter 46 gelöst, bis der Gewindebolzen 45 mit seinem hakenförmigen Abschnitt um die an den Anlageflä­ chen 47, 48 anliegende Stütze 41 gelegt werden kann. Danach wird die Flügelmutter 46 straff angezogen, bis der zwischen der Stütze 41 und den Anlageflächen 47, 48 auftretende Reibschluß ein sicheres Festklemmen der Stütze 41 bewirkt.To attach the support 41 to the boom 12 , the wing nut 46 is loosened until the threaded bolt 45 with its hook-shaped section can be placed around the support 41 resting on the contact surfaces 47 , 48 . Then the wing nut 46 is tightened until the frictional engagement between the support 41 and the contact surfaces 47 , 48 causes the support 41 to be securely clamped.

Obwohl der Gerüstbock 6 vorzugsweise als Schweißkon­ struktion aus Stahl mit nachfolgender Korrosionsschutz­ behandlung herzustellen ist, kann er an aus Blechhalb­ schalen genietet oder aus anderen Metallen, wie bspw. Aluminium hergestellt werden.Although the scaffolding trestle 6 is preferably a welded construction made of steel with subsequent corrosion protection treatment, it can be riveted to half-shells or made from other metals such as aluminum.

Bei dem in Fig. 7 im Ausschnitt dargestellten Gerüst 1 ist eine weitere, ebenfalls mit dem Bezugszeichen "6" bezeichnete Ausführungsform des Gerüstbockes 6 dar­ gestellt. Soweit dieser Gerüstbock 6 Elemente aufweist, die mit denen der vorstehend beschriebenen Ausführungs­ formen übereinstimmen, werden ohne erneute Bezugnahme und Erläuterung die gleichen Bezugszeichen verwendet.In the illustrated in Fig. 7 in the cutout frame 1 further, also designated by the numeral "6" embodiment of the scaffolding bracket 6 is provided is. Insofar as this scaffolding trestle has 6 elements which correspond to those of the embodiments described above, the same reference numerals are used without repeated reference and explanation.

Der Gerüstbock 6 weist lediglich die beiden Ausleger 11, 12 auf, die mit den vorstehend beschriebenen Auslegern 11, 12 weitgehend identisch sind. Sie weisen ebenfalls Riegel 21, 23 auf, die endseitig mit jeweils einem Standrohr 14 verschweißt sind. Jedes Standrohr 14 trägt eine Stützfläche 17, über die der betreffende Ausleger 11, 12 auf dem Fußboden 2 steht.The trestle 6 has only the two arms 11 , 12 , which are largely identical to the arms 11 , 12 described above. They also have bolts 21 , 23 , which are welded at the ends to a standpipe 14 . Each standpipe 14 carries a support surface 17 , over which the relevant boom 11 , 12 stands on the floor 2 .

Der Ausleger 12 ist an seinem dem Standrohr 14 gegen­ überliegenden Ende über die Scharniereinrichtung 8 mit dem Ausleger 11 schwenkbar verbunden. Die Scharnierachse 36 steht vertikal und die Scharniere 25, 28 sind wie in Fig. 3 dargestellt und in Zusammenhang mit der Ausfüh­ rungsform erläutert ausgebildet, die drei Ausleger 11, 12, 13 aufweist.The boom 12 is pivotally connected to the boom 11 at its end opposite the standpipe 14 via the hinge device 8 . The hinge axis 36 is vertical and the hinges 25 , 28 are designed as shown in FIG. 3 and explained in connection with the embodiment, which has three arms 11 , 12 , 13 .

Zusätzlich sind die Riegel 21, 23 des Auslegers 12 zur Aussteifung bei der Scharniereinrichtung 8 untereinander durch einen Pfosten verbunden. Die Riegel 21, 23, das Standrohr 14 und der Pfosten beschreiben ein Rechteck.In addition, the bars 21 , 23 of the arm 12 are connected to one another by a post for stiffening in the hinge device 8 . The bars 21 , 23 , the standpipe 14 and the post describe a rectangle.

Unterhalb des Scharniers 28 ist ein ungefähr vertikal stehender Ständer angeordnet, der die dritte Stützfläche 17 trägt, die in der Nähe der Scharnierachse 36 angeord­ net ist. Der Ständer ist ein kurzer Kastenprofil­ abschnitt, der mit dem unteren Riegel 23 verschweißt ist.Below the hinge 28 , an approximately vertically standing stand is arranged which carries the third support surface 17 which is net angeord in the vicinity of the hinge axis 36 . The stand is a short box section section, which is welded to the lower bolt 23 .

Der Ständer kann sowohl genau vertikal als auch gegen die Vertikale geneigt angeordnet werden. Insbesondere kann er mit dem Riegel 23 einen stumpfen Winkel ein­ schließend von dem Ausleger 12 wegstehen.The stand can be arranged both vertically and inclined to the vertical. In particular, he can with the bolt 23 an obtuse angle from the boom 12 away.

Auch dieser Gerüstbock 6 steht über drei Stützflächen 17 standsicher. Die beispielsweise in einer Zimmerecke mög­ liche Aufstellung ist in Fig. 7 dargestellt. Die Ausle­ ger 11, 12 können dabei sowohl rechtwinklig als auch schräg zu der Wand 4 aufgestellt werden.This trestle 6 is also stable over three support surfaces 17 . The possible arrangement in a corner of the room, for example, is shown in Fig. 7. The Ausle ger 11 , 12 can be placed both at right angles and at an angle to the wall 4 .

Der Gerüstbock 6 kann auch gedreht, d. h. mit seiner Scharniereinrichtung 8 in der Ecke stehend aufgestellt werden. Die Ausleger ragen dann schräg in den Raum und dienen als Auflage für die Bohlen 7.The scaffolding trestle 6 can also be rotated, that is to say set up with its hinge device 8 standing in the corner. The outriggers then protrude into the room at an angle and serve as a support for the planks 7 .

Schließlich kann der Gerüstbock 6 auch an einer laufen­ den Wand verwendet werden, die Ausleger 11, 12 stehen dann voneinander leicht weggespreizt schräg zu der Wand 4 und die Scharniereinrichtung liegt bezogen auf die Bohle 7 raumseitig. Finally, the scaffolding trestle 6 can also be used on a running wall, the brackets 11 , 12 are then spread apart slightly at an angle to the wall 4 and the hinge device is located on the room side with respect to the screed 7 .

Diese Ausführungsform des Gerüstbockes ist leicht hand­ habbar. Außerdem weist der Gerüstbock lediglich ein ge­ ringes Gewicht auf und läßt sich auf Grund seiner klei­ nen Abmessungen leicht transportieren.This embodiment of the trestle is easy to handle available. In addition, the trestle has only one ge light weight and can be due to its small Easy to transport dimensions.

Der Gerüstbock 6 mit zwei Auslegern 11, 12 kann außerdem mit einer Halteeinrichtung 40 versehen werden, wie sie vorstehend beschrieben worden ist, wobei sich die im Zusammenhang mit der Halteeinrichtung 40 genannten Vor­ teile auch für diesen Gerüstbock 6 ergeben.The scaffolding trestle 6 with two arms 11 , 12 can also be provided with a holding device 40 , as has been described above, wherein the parts mentioned in connection with the holding device 40 also result for this scaffolding trestle 6 .

Claims (31)

1. Gerüstbock (6) zum Aufbau begehbarer Gerüste,
mit wenigstens zwei Auslegern (11, 12), die jeweils einen horizontalen Riegel (21, 23) sowie ein Stützelement (14) aufweisen, das an seinem un­ teren Ende eine Stützfläche (17) trägt,
mit einem dritten Stützelement (14), das an seinem unteren Ende eine Stützfläche (17) aufweist und das mit den Auslegern (11, 12) schwenkbar oder starr in Ver­ bindung steht, und
mit einer Scharniereinrichtung (8), die mit den Riegeln (21, 23) an ihren von dem jeweiligen Stütz­ element (14) abliegenden Ende verbunden ist, so daß die Ausleger (11, 12) um eine im Gebrauch im wesentlichen vertikal ausgerichtete Achse (36) schwenkbar miteinander verbunden und aneinander gelagert sind.
1. scaffolding stand ( 6 ) for the construction of accessible scaffolding,
with at least two arms ( 11 , 12 ), each having a horizontal bar ( 21 , 23 ) and a support element ( 14 ) which carries a support surface ( 17 ) at its lower end,
with a third support element ( 14 ) which has a support surface ( 17 ) at its lower end and which is pivotally or rigidly connected to the arms ( 11 , 12 ), and
with a hinge device ( 8 ) which is connected to the bolts ( 21 , 23 ) at their end remote from the respective support element ( 14 ), so that the arms ( 11 , 12 ) about an axis which is essentially vertically oriented during use ( 36 ) are pivotally connected to one another and supported on one another.
2. Gerüstbock (6) nach Anspruch 1, dadurch gekenn­ zeichnet, daß der Gerüstbock (6) einen dritten Aus­ leger (13) aufweist, der über die Scharniereinrich­ tung (8) um eine im Gebrauch im wesentlichen ver­ tikal stehende Scharnierachse (37) schwenkbar mit den anderen Auslegern (11, 12) verbunden ist und der an seinem von der Scharniereinrichtung (8) ab­ liegenden Ende die Stütze (14) mit der dritten Stützfläche (17) trägt.2. scaffolding trestle ( 6 ) according to claim 1, characterized in that the scaffolding trestle ( 6 ) has a third off leg ( 13 ), the device via the Scharniereinrich ( 8 ) around a hinge axis ( 37 ) which is essentially vertical in use. is pivotally connected to the other arms ( 11 , 12 ) and carries the support ( 14 ) with the third support surface ( 17 ) at its end lying away from the hinge device ( 8 ). 3. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß das Stützelement (14) eine Stütze ist. 3. scaffolding trestle according to claim 1, characterized in that the support element ( 14 ) is a support. 4. Gerüstbock nach Anspruch 3, dadurch gekennzeichnet, daß die Stütze ein Rohr ist.4. scaffolding trestle according to claim 3, characterized in that the support is a pipe. 5. Gerüstbock nach Anspruch 3 oder 4, dadurch gekenn­ zeichnet, daß die Stütze an ihrem Ende (15) mit einem Fuß (16) versehen ist, an dem die Stütz­ fläche (17) vorgesehen ist.5. scaffolding trestle according to claim 3 or 4, characterized in that the support at its end ( 15 ) is provided with a foot ( 16 ) on which the support surface ( 17 ) is provided. 6. Gerüstbock nach einem der Ansprüche 3 bis 5, da­ durch gekennzeichnet, daß die Stütze im Be­ reich ihrer Aufstandsfläche (17) eine weiche, nichtkratzende Beschichtung aufweist.6. scaffolding trestle according to one of claims 3 to 5, characterized in that the support in the loading area Be their contact surface ( 17 ) has a soft, non-scratchy coating. 7. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß das Stützelement (14) endseitig mit einem Kupp­ lungsstück (19) zur Verbindung mit weiteren Stütz­ elementen (14′) versehen ist.7. scaffolding trestle according to claim 1, characterized in that the support element ( 14 ) at the end with a hitch be piece ( 19 ) for connection to other support elements ( 14 ') is provided. 8. Gerüstbock nach Anspruch 7, dadurch gekennzeichnet, daß das Kupplungsstück (19) ein mit dem Stütz­ element (14) fluchtender, abgesetzter Zapfen ist.8. trestle according to claim 7, characterized in that the coupling piece ( 19 ) with the support element ( 14 ) is aligned, stepped pin. 9. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der Riegel (21) ein biegesteifer Träger ist.9. scaffolding trestle according to claim 1, characterized in that the bolt ( 21 ) is a rigid support. 10. Gerüstbock nach Anspruch 9, dadurch gekennzeichnet, daß der Riegel (21) ein Rohr ist.10. trestle according to claim 9, characterized in that the bolt ( 21 ) is a tube. 11. Gerüstbock nach Anspruch 10, dadurch gekennzeich­ net, daß der Riegel (21) ein Kastenprofil ist.11. trestle according to claim 10, characterized in that the bolt ( 21 ) is a box profile. 12. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der Riegel (21) mit einem seiner Enden mit dem Stützelement (14) verbunden ist.12. Scaffolding trestle according to claim 1, characterized in that the bolt ( 21 ) is connected with one of its ends to the support element ( 14 ). 13. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der Riegel (21) an dem Stützelement (14) seit­ lich befestigt ist. 13. A trestle according to claim 1, characterized in that the bolt ( 21 ) on the support element ( 14 ) is fastened since Lich. 14. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß das Stützelement (14) und der Riegel (21) mit­ einander einen im wesentlichen rechten Winkel ein­ schließen.14. Scaffolding trestle according to claim 1, characterized in that the support element ( 14 ) and the bolt ( 21 ) with each other form a substantially right angle. 15. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß das Stützelement (14) und der Riegel (21) aus Aluminium bestehen.15. A trestle according to claim 1, characterized in that the supporting element ( 14 ) and the bolt ( 21 ) consist of aluminum. 16. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß das Stützelement (14) und der Riegel (21) aus Stahl bestehen.16. A trestle according to claim 1, characterized in that the support element ( 14 ) and the bolt ( 21 ) consist of steel. 17. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß die Ausleger (11, 12, 13) im wesentlichen glei­ che Abmessungen aufweisen.17. A trestle according to claim 1, characterized in that the arms ( 11 , 12 , 13 ) have essentially the same dimensions. 18. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der Riegel (21) aus zwei im Abstand parallel zueinander verlaufende Stangen (22) gebildet ist.18. A trestle according to claim 1, characterized in that the bolt ( 21 ) is formed from two rods ( 22 ) running parallel to one another at a distance. 19. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der Schwenkbereich der Scharniereinrichtung (8) derart bemessen ist, daß einander benachbarte Aus­ leger (11, 12) sowohl aneinandergelegt werden, als auch weit voneinander weggeklappt werden können.19. Scaffolding trestle according to claim 1, characterized in that the pivoting range of the hinge device ( 8 ) is dimensioned such that adjacent leg from ( 11 , 12 ) are both placed against each other, and can be folded far apart. 20. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß der durch die Scharniereinrichtung (8) festge­ legte Schwenkbereich zweier Ausleger (11, 12) in Bezug aufeinander wenigstens 180° beträgt.20. Scaffolding trestle according to claim 1, characterized in that the pivot range of two brackets ( 11 , 12 ) laid by the hinge device ( 8 ) is at least 180 ° with respect to one another. 21. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß die Scharniereinrichtung (8) Laschen (31, 32) aufweist, die mit dem von dem Stützelement (14) abliegenden Ende des Riegels (21, 23) eines Ausle­ gers (12) fest verbunden sind. 21. Scaffolding trestle according to claim 1, characterized in that the hinge device ( 8 ) has tabs ( 31 , 32 ) which are fixedly connected to the end of the bolt ( 21 , 23 ) of an extension arm ( 12 ) which is remote from the supporting element ( 14 ) are. 22. Gerüstbock nach Anspruch 21, dadurch gekennzeich­ net, daß zwei Laschen (31, 32) im Abstand parallel zueinander an dem Ende des Riegels (21, 23) vorge­ sehen sind.22. A trestle according to claim 21, characterized in that two tabs ( 31 , 32 ) are spaced parallel to one another at the end of the latch ( 21 , 23 ). 23. Gerüstbock nach Anspruch 22, dadurch gekennzeich­ net, daß der Riegel (21, 23) jedes benachbarten Auslegers (11, 13) zwischen den Laschen (31, 32) angeordnet ist.23. A trestle according to claim 22, characterized in that the bolt ( 21 , 23 ) of each adjacent boom ( 11 , 13 ) is arranged between the tabs ( 31 , 32 ). 24. Gerüstbock nach Anspruch 22, dadurch gekennzeich­ net, daß sowohl die Laschen (31, 32) als auch das zwischen den Laschen (31, 32) gefaßte Ende des Rie­ gels (21, 23) von einem Bolzen durchgriffen ist.24. Scaffolding trestle according to claim 22, characterized in that both the tabs ( 31 , 32 ) and between the tabs ( 31 , 32 ) gripped end of the locking lever ( 21 , 23 ) is penetrated by a bolt. 25. Gerüstbock nach Anspruch 1, dadurch gekennzeichnet, daß an dem Riegel (21, 23) einer der Ausleger (12) eine Halteeinrichtung (40) zur Befestigung einer Stützeinrichtung (41) vorgesehen ist.25. Scaffolding trestle according to claim 1, characterized in that a holding device ( 40 ) for fastening a support device ( 41 ) is provided on the latch ( 21 , 23 ) of one of the arms ( 12 ). 26. Gerüstbock nach Anspruch 25, dadurch gekennzeich­ net, daß die Halteeinrichtung (40) bei der Schar­ niereinrichtung (8) vorgesehen ist.26. Scaffolding trestle according to claim 25, characterized in that the holding device ( 40 ) in the coulter niereinrichtung ( 8 ) is provided. 27. Gerüstbock nach Anspruch 26, dadurch gekennzeich­ net, daß die Halteeinrichtung (40) einen parallel zu der Achse (36, 37) der Scharniereinrichtung (8) angeordneten, mit dem Riegel (21, 23) verbundenen Träger (42) enthält.27. Scaffolding trestle according to claim 26, characterized in that the holding device ( 40 ) contains a support ( 42 ) arranged parallel to the axis ( 36 , 37 ) of the hinge device ( 8 ) and connected to the latch ( 21 , 23 ). 28. Gerüstbock nach Anspruch 26, dadurch gekennzeich­ net, daß die Halteeinrichtung (40) zwischen den Riegeln (21, 23) des Auslegers (12) angeordnet ist.28. Scaffolding trestle according to claim 26, characterized in that the holding device ( 40 ) is arranged between the bars ( 21 , 23 ) of the boom ( 12 ). 29. Gerüstbock nach Anspruch 26 oder 27, dadurch ge­ kennzeichnet, daß die Halteeinrichtung (40) Anschlagmittel (47, 48) zur Aufnahme und Lagerung der zu befestigenden Stützeinrichtung (41) auf­ weist.29. A trestle according to claim 26 or 27, characterized in that the holding device ( 40 ) has stop means ( 47 , 48 ) for receiving and mounting the support device ( 41 ) to be fastened. 30. Gerüstbock nach Anspruch 29, dadurch gekennzeich­ net, daß das Anschlagmittel (47, 48) zwei Anlage­ flächen (47, 48) aufweisen, die in einem Winkel zueinander stehen, der sich von dem Träger (42) weg öffnet.30. Scaffolding trestle according to claim 29, characterized in that the stop means ( 47 , 48 ) have two contact surfaces ( 47 , 48 ) which are at an angle to one another which opens away from the carrier ( 42 ). 31. Gerüstbock nach Anspruch 25, dadurch gekennzeich­ net, daß die Stützeinrichtung (41) eine Deckenstüt­ ze ist.31. Scaffolding trestle according to claim 25, characterized in that the support device ( 41 ) is a ceiling support ze.
DE19944405011 1994-02-17 1994-02-17 Scaffolding trestle Expired - Fee Related DE4405011C1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE19944405011 DE4405011C1 (en) 1994-02-17 1994-02-17 Scaffolding trestle
EP95102199A EP0668417A1 (en) 1994-02-17 1995-02-17 Scaffolding support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19944405011 DE4405011C1 (en) 1994-02-17 1994-02-17 Scaffolding trestle

Publications (1)

Publication Number Publication Date
DE4405011C1 true DE4405011C1 (en) 1995-07-27

Family

ID=6510446

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19944405011 Expired - Fee Related DE4405011C1 (en) 1994-02-17 1994-02-17 Scaffolding trestle

Country Status (2)

Country Link
EP (1) EP0668417A1 (en)
DE (1) DE4405011C1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1525130A (en) * 1974-12-31 1978-09-20 Somefran Scaffolding supports

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1422237A (en) * 1973-01-24 1976-01-21 Thomas Ltd Martin Staging suitable for builders
DE9309049U1 (en) * 1993-06-17 1993-08-12 Müller & Baum GmbH & Co KG, 59846 Sundern Support frame for vertical mounting of supports for concrete formwork

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1525130A (en) * 1974-12-31 1978-09-20 Somefran Scaffolding supports

Also Published As

Publication number Publication date
EP0668417A1 (en) 1995-08-23

Similar Documents

Publication Publication Date Title
DE2952555A1 (en) FOOTSTOOL
DE3735262A1 (en) FOLDABLE MACHINE FOR HANDLING AND TRANSPORTING LOADS
DE69407388T2 (en) Foldable scaffolding for construction work
DE4114531C2 (en) Working platform for walls or formwork
DE68903372T2 (en) COLLECTABLE CRANE WITH A BOOM CONSISING OF TWO OR THREE JOINTLY CONNECTED ELEMENTS.
DE7014580U (en) ADJUSTABLE HEIGHT SUPPORTING FRAME FOR BEAMS OF SCAFFOLDING
DE3922722C2 (en)
DE4405011C1 (en) Scaffolding trestle
EP0632171A1 (en) Foldable scaffold-platform
DE69301722T2 (en) Substructure for mobile scaffolding
EP0732466B1 (en) Scaffolding
DE19500705A1 (en) Ladder-based work platform
DE1756412A1 (en) Lifting device
DE4422753A1 (en) Device for supporting ceiling shuttering
EP0625619B1 (en) Scaffolding platform
CH705280B1 (en) Abschalplattenträger for a console.
DE19512489C1 (en) Combination trestle for internal building extension
DE69916815T2 (en) Frame for floor components of a scaffold
DE19512490C2 (en) Support frame, especially for interior work
DE19730932C1 (en) Trolley for positioning ceiling panels for building
DE3048043A1 (en) Ceiling formwork support structure - has folding legs swinging and set at angle round telescopic upright
DE29707782U1 (en) Storage device for providing lightweight insulation panels for facade insulation on scaffolding
DE4034229A1 (en) Scaffolding for mounting on sloping roof - is supported on pairs of beams which are pivoted together at upper ends
DE8616288U1 (en) Scaffolding for work on and around pitched roofs
DE10028404A1 (en) Stackable table or seat has three-sided, open frame which can be nested with other, similar frames and removable flat support or working surface which is held on it by support bars at top

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee