DE3900990A1 - Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry - Google Patents

Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry

Info

Publication number
DE3900990A1
DE3900990A1 DE3900990A DE3900990A DE3900990A1 DE 3900990 A1 DE3900990 A1 DE 3900990A1 DE 3900990 A DE3900990 A DE 3900990A DE 3900990 A DE3900990 A DE 3900990A DE 3900990 A1 DE3900990 A1 DE 3900990A1
Authority
DE
Germany
Prior art keywords
computer
bending
coordinate values
small
lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE3900990A
Other languages
German (de)
Inventor
Walter Dipl Ing Mueffke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUNDY GmbH
Original Assignee
BUNDY GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUNDY GmbH filed Critical BUNDY GmbH
Priority to DE3900990A priority Critical patent/DE3900990A1/en
Publication of DE3900990A1 publication Critical patent/DE3900990A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D7/00Bending rods, profiles, or tubes
    • B21D7/12Bending rods, profiles, or tubes with programme control
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/42Recording and playback systems, i.e. in which the programme is recorded from a cycle of operations, e.g. the cycle of operations being manually controlled, after which this record is played back on the same machine
    • G05B19/4202Recording and playback systems, i.e. in which the programme is recorded from a cycle of operations, e.g. the cycle of operations being manually controlled, after which this record is played back on the same machine preparation of the programme medium using a drawing, a model
    • G05B19/4207Recording and playback systems, i.e. in which the programme is recorded from a cycle of operations, e.g. the cycle of operations being manually controlled, after which this record is played back on the same machine preparation of the programme medium using a drawing, a model in which a model is traced or scanned and corresponding data recorded
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31033Record on site dimensions of pipe, tube configuration, to install pipe
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45143Press-brake, bending machine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)

Abstract

The previous system of determining small-calibre, spatially bent pipelines (2) on the drawing board is improved in that, in a first step using a mechanically actuated measuring pin (6), spatial points (7) of the course of the pipeline are recorded and the corresponding spatial coordinate values are stored in a memory (8) of a computer (9), and in that subsequently, in a second step, using a conversion program (10) loaded into the computer (9), the spatial coordinate values of the intersection points of the centre lines are calculated by in each case two pipeline sections (11a, and 11b). <IMAGE>

Description

Die Erfindung betrifft ein Verfahren zum rechnergestützten Auslegen des Verlaufs, ferner ein Verfahren zum Herstellen und außerdem eine Einrichtung zur Auslegung und Herstellung von kleinkalibrigen Rohrleitungen, insbesondere von Kraftstoff- oder Bremsleitungen im Kraftfahrzeugbau.The invention relates to a method for computer-aided design of the History, also a method of manufacturing and also a Device for the design and manufacture of small-caliber Pipelines, especially of fuel or brake lines in the Motor vehicle construction.

Derartige, mit räumlich winkligem Verlauf gebogene, kleinkalibrige Rohrleitungen werden praktisch ausschließlich auf dem Reißbrett festgelegt. Im Kraftfahrzeugbau werden solche Rohrleitungen entworfen, wenn das Fahrzeug fertig konzipiert ist. Anschließend fertigt man gewöhnlich ein Drahtmodell an, das auf einem Meßtisch ausgemessen wird. Ein solches Auslegungsverfahren ist umständlich, zeitaufwendig und relativ ungenau. Da solche winklig gebogenen Rohrleitungen bis zu zehn und mehr Biegestellen aufweisen und selbst nicht im Automobilwerk hergestellt werden, ist die Konzeption eines Modells nach einem ersten Muster notwendig, auf das meist ein zweites Muster folgt. Das erhaltene xte Muster muß dennoch nicht biegetechnisch günstig sein. Das System des Auslegens, der Herstellung und der Gestaltung der Einrichtung zum Biegen ist daher erheblich verbesserungsbedürftig. Als Beispiel für die Herstellungseinrichtung solcher winklig gebogener Rohrleitungen im Kraftfahrzeugbau ist die DE-C1-12 02 100 anzusehen.Such small-caliber, curved with a spatially angular course Pipelines are practically exclusively on the drawing board fixed. In automotive engineering, such pipelines are designed when the vehicle is designed. Then you manufacture usually a wireframe that is measured on a measuring table. Such a design process is cumbersome, time consuming and relatively inaccurate. Because such angled pipes up to ten and have more bending points and not even in the automotive plant be produced is the conception of a model after an initial one Pattern required, which is usually followed by a second pattern. The received Xte pattern does not have to be cheap in terms of bending technology. The system of the Design, manufacture and design of the device for bending is therefore in need of considerable improvement. As an example of that Manufacturing facility of such angled pipes in Motor vehicle construction can be seen in DE-C1-12 02 100.

Der Erfindung liegt die Aufgabe zugrunde, das Gesamtsystem der Auslegung von räumlich winklig gebogenen Rohrleitungen, später der Herstellung und der Einrichtung zu verbessern, d. h. aufeinander systemtechnisch abzustimmen und außerdem den Übertragungsweg zwischen Auslegung und Herstellung bzw. Gestaltung der Einrichtung zu beschleunigen.The invention has for its object the overall system of design of spatially angled pipes, later the manufacture and improve the facility, d. H. one another in terms of system technology  to coordinate and also the transmission path between design and Accelerate the manufacture or design of the facility.

Die gestellte Aufgabe wird erfindungsgemäß dadurch gelöst, daß in einem ersten Schritt über einen mechanisch betätigten Meßtaster Raumpunkte des Rohrleitungsverlaufs aufgenommen und die entsprechenden Raumkoordinatenwerte in einem Speicher eines Rechners abgelegt werden und daß danach in einem zweiten Schritt über ein in den Rechner geladenes Umrechnungsprogramm die Raumkoordinatenwerte der Schnittpunkte der Mittellinien von jeweils zwei Rohrleitungsabschnitten errechnet werden. Dieses Verfahren erspart eine Drahtmodellentwicklung oder eine langwierige Konstruktion auf dem Reißbrett. Vorteilhafterweise können die errechneten Raumkoordinatenwerte als Ausgangsbasis für weitere Systemverbesserungen dienen.The object is achieved in that in one first step via a mechanically operated probe Pipeline course recorded and the corresponding Room coordinate values are stored in a memory of a computer and that after that in a second step into the computer loaded conversion program the spatial coordinate values of the intersection points the center lines of two pipe sections will. This process saves wire model development or lengthy construction on the drawing board. Can advantageously the calculated room coordinate values as a basis for further System improvements serve.

Eine diesbezügliche Verbesserung besteht darin, daß in einem dritten Schritt die Rückfederung eines Rohrleitungsabschnitts und die Verdrillung des Rohrs in Abhängigkeit von der Länge des Rohrleitungsabschnittes in Form eines empirischen Wertes, der in einer Erfahrungstabelle abgespeichert ist, entnommen und aus diesen Werten die Ebenen von Biegeelementen errechnet werden. Diese Maßnahme wirkt sich letztlich vorteilhaft auf die Gestaltung der Biegeeinrichtung aus.One improvement in this regard is that in a third Step the springback of a pipe section and the Twisting of the pipe depending on the length of the Pipe section in the form of an empirical value, which in a Experience table is stored, taken and from these values the Layers of bending elements can be calculated. This measure has an effect ultimately advantageous from the design of the bending device.

Die bisher mühsam nachvollzogenen, über sich ständig ändernde Konstruktionszeichnungen oder Modelländerungen sich ergebenden neuen Biegeverläufe können nach einer anderen Verfahrensweise dadurch als umgangen gelten, daß die Biegefolgen schrittweise abgearbeitet werden und daß aufgrund vorgegebener Objektkonstruktionen für jede Biegefolge eine Kollisionsprüfung durchgeführt wird.The previously painstakingly comprehensible, constantly changing Construction drawings or model changes resulting in new ones According to a different procedure, bending profiles can be as bypassed apply that the bending sequences are processed step by step and that based on given object constructions for each bending sequence a collision check is carried out.

Die Berücksichtigung des Biegewerkzeuges erfolgt weiterhin dadurch, daß über ein korrigierendes Biegeprogramm Raumkoordinatenwerte für die Achsen von rollenförmigen Biegeelementen ermittelt werden. Diese Maßnahme erleichtert wie die vorhergehenden die Konstruktion und Einrichtung bzw. Ausrichtung der Biegeelemente eines Biegewerkzeuges.The bending tool is also taken into account in that  via a corrective bending program spatial coordinate values for the Axes of roll-shaped bending elements can be determined. These Measure facilitates the construction and the like the previous ones Setup or alignment of the bending elements of a bending tool.

Ein anderer Vorschlag richtet sich auf den Ablauf der aufeinanderfolgenden Biegefolgen und dient der Vermeidung von Schwierigkeiten während der Herstellung im Biegewerkzeug. Es wird daher vorgeschlagen, daß unter Verwendung von in der Achse der Winkelhalbierenden des Biegewinkels postierten Normbiegeelementen die Biegeelemente derart geschwenkt werden, daß der zum Einlegen der geraden Rohrleitungen bzw. der zum Entnehmen erforderliche Freiraum in einer notwendigen Einlegeebene bzw. in einer notwendigen Entnahmeebene zu liegen kommt.Another proposal focuses on the expiry of the successive bending sequences and serves to avoid Difficulties during manufacturing in the bending tool. It will therefore suggested that using in the axis of Bisectors of the bending angle posted standard bending elements Bending elements are pivoted so that the straight for inserting Pipelines or the space required for removal in one necessary insertion level or in a necessary removal level comes to lie.

Eine Einrichtung zur rechnergestützten Auslegung des Verlaufs von räumlich winklig gebogenen kleinkalibrigen Rohrleitungen, insbesondere von Kraftstoff- oder Bremsleitungen im Kraftfahrzeugbau und für die Herstellung solcher mehrfach unter Winkelverlauf gebogener Rohrleitungen wird vorteilhafterweise dahingehend gestaltet, daß ein Meßwertgeber einen gelenkigen Tastarm aufweist, der mit einem Winkeldrehgeber in dem Gelenk verbunden ist und an den Speicher eines Rechners angeschlossen ist. Diese Einrichtung gestattet an einem Objekt (z. B. Kraftfahrzeug), den Verlauf von winklig gebogenen räumlich verlegten Rohrleitungen in einem Schnellverfahren unmittelbar festzuhalten bzw. festzulegen.A device for the computer-aided interpretation of the course of spatially angled small-caliber pipes, in particular of fuel or brake lines in motor vehicle construction and for the Production of such pipes bent several times at an angle is advantageously designed so that a transmitter has an articulated probe arm with an angle encoder in the Joint is connected and connected to the memory of a computer is. This device allows an object (e.g. motor vehicle) the course of angularly bent pipelines in to immediately record or determine a rapid procedure.

Ein weiterer Vorschlag geht dahin, daß die im Rechner abgespeicherten Raumkoordinatenwerte eines Rohrleitungsverlaufs als Maschinensteuerungsdaten für eine frei programmierbare Steuerung einer Biegemaschine nach einem vorgegebenen Programm verwendbar sind. Aufgrund der vorgegebenen Daten können kurzfristig die Biegeelemente (z. B. Biegerollen) durch Roboterarme in eine neue Lage verschoben werden, um einen neuen Biegeverlauf für eingeführte kleinkalibrige Rohrleitungen einzurichten. Demnach sind mehrere unterschiedliche Biegewerkzeuge für mehrere unterschiedlich gebogene Rohrleitungen nicht mehr erforderlich.Another suggestion is that the ones stored in the computer Spatial coordinate values of a pipe run as Machine control data for a freely programmable control of a Bending machine can be used according to a predetermined program. Because of The bending elements can use the specified data at short notice  (e.g. bending rollers) are moved to a new position by robotic arms, around a new bending curve for introduced small-caliber pipelines to set up. Accordingly, there are several different bending tools for several differently bent pipes are no longer required.

Ausführungsbeispiele der Erfindung sind in der Zeichnung schematisch dargestellt und werden nachfolgend näher beschrieben. Es zeigen:Embodiments of the invention are schematic in the drawing are shown and are described in more detail below. Show it:

Fig. 1 eine Systemdarstellung für die rechnergestützte Auslegung des Verlaufs räumlich verlaufender, winklig gebogener kleinkalibriger Rohrleitungen und Fig. 1 is a system representation for the computer-aided design of the course of spatially extending, angled small-diameter pipes and

Fig. 2 eine Systemdarstellung eines durch Raumkoordinatenwerte in einem Rechner abgespeicherten Verlaufs einer winklig gebogenen Rohrleitung zwecks automatischer Einstellung von Biegeelementen eines Biegeautomaten, Fig. 2 is a system diagram of a stored spatial coordinates by values in a computer course of an angularly bent pipe for the purpose of automatic adjustment of the bending elements of a bending machine,

Fig. 3 den Freiraum während einer Rohrbiegung, Fig. 3 the open space during a tube bend,

Fig. 4 die Entnahmeebene nach einer Rohrbiegung. Fig. 4 shows the removal level after a pipe bend.

In einem Objekt 1, d. h. beispielsweise in einem Kraftfahrzeug, werden Kraftstoff- oder Bremsleitungen in Form von kleinkalibrigen räumlich mehrfach winklig gebogener Rohrleitungen 2 benötigt. Derartige Rohrleitungen 2 weisen einen Außendurchmesser von ca. 10 mm auf und sind druckfest und korrosionsbeständig. Meist sind solche Rohrleitungen durch ein Wickelverfahren (sog. Bundy-Verfahren) hergestellt und bestehen daher aus mehreren Schichten, die durch Schweiß- oder Lötverbindungen verschmolzen sind.In an object 1 , that is to say, for example, in a motor vehicle, fuel or brake lines in the form of small-caliber pipes 2 that are bent at multiple angles in space are required. Such pipes 2 have an outer diameter of approximately 10 mm and are pressure-resistant and corrosion-resistant. Such pipelines are usually produced by a winding process (so-called bundy process) and therefore consist of several layers that are fused by welded or soldered connections.

Im Ausführungsbeispiel verläuft die Rohrleitung 2 von einem Treibstofftank 3 über mehrere Biegewinkel 4 zu einem Motor 5. Zur Ersparnis von vielen Konstruktionsstunden werden in einem ersten Schritt über einen Meßtaster 6 Raumpunkte 7 des räumlichen Rohrleitungsverlaufs aufgenommen und die erhaltenen Raumkoordinatenwerte in einem Speicher 8 eines Rechners 9 abgelegt. Danach werden in einem zweiten Schritt über ein in den Rechner 9 geladenes Umrechnungsprogramm 10 die Raumkoordinatenwerte der Schnittpunkte der Mittellinien von jeweils zwei Rohrleitungsabschnitten, z. B. 11 a und 11 b errechnet.In the exemplary embodiment, the pipeline 2 runs from a fuel tank 3 via a plurality of bending angles 4 to an engine 5 . In order to save many construction hours, in a first step 6 spatial points 7 of the spatial pipe run are recorded via a measuring probe and the spatial coordinate values obtained are stored in a memory 8 of a computer 9 . Thereafter, in a second step over a charged in the computer 9 conversion program 10, the space coordinate values of the points of intersection of the center lines of two respective pipeline sections, for example. B. 11 a and 11 b calculated.

In einem dritten Schritt wird die durch den metallischen Werkstoff natürlicherweise vorhandene Rückfederung jeweils eines Rohrleitungsabschnittes 11 a oder 11 b und seine Verdrillung in Abhängigkeit von dem Rohrleitungsabschnitt 11 a oder 11 b in Form eines empirischen Wertes, der in einer Erfahrungstabelle 12 abgespeichert ist, entnommen und aus diesem Wert jeweils die Ebenen von Biegeelementen, wie z. B. Biegerollen, errechnet.In a third step, the springback naturally present by the metallic material of each pipe section 11 a or 11 b and its twisting as a function of the pipe section 11 a or 11 b in the form of an empirical value, which is stored in an experience table 12 , is taken and from this value the levels of bending elements, such as. B. bending rolls.

Bei sich sehr rasch während der Entwicklung oder gegen Ende der Entwicklung ändernden Objekten, wie z. B. Fahrzeugaggregaten, werden die Biegefolgen pro Rohrleitungsabschnitt 11 a, 11 b schrittweise abgearbeitet, und es wird aufgrund vorgegebener Objektkonstruktionen für jede Biegefolge eines Rohrleitungsabschnittes 11 a, 11 b eine Kollisionsprüfung gegenüber den Fahrzeugaggregaten durchgeführt.If objects change very quickly during development or towards the end of development, such as B. vehicle assemblies, the bending sequences per pipe section 11 a , 11 b are processed step by step, and it is carried out based on predetermined object designs for each bending sequence of a pipe section 11 a , 11 b, a collision check against the vehicle assemblies.

In den oder die Rechner 9 ist außerdem ein korrigierendes Biegeprogramm 13 ladbar, über das Raumkoordinaten für die Achsen 14 von rollenförmigen Biegeelementen ermittelt werden.A correcting bending program 13 can also be loaded into the computer (s) 9 , via which spatial coordinates for the axes 14 of roller-shaped bending elements are determined.

Das Herstellverfahren von räumlich winklig gebogenen, kleinkalibrigen Rohrleitungen 2, deren Verlauf durch in einem Rechner 9 abgespeicherten Raumkoordinaten und jeweils zwischen zwei Raumpunkten 15 und 16 (Fig. 2) verlaufenden Geraden 17 festgelegt wird, erfolgt unter Verwendung von in der Achse 14 der Winkelhalbierenden des Biegewinkels 18 postierten Normbiegeelementen 19 (Fig. 3), wobei die Biegeelemente 19 derart geschwenkt werden, daß der zum Einlegen der geraden Rohrleitungen 2 bzw. der zum Entnehmen erforderliche Freiraum 20 in einer notwendigen Einlageebene 20 a bzw. in einer notwendigen Entnahmeebene 20 b zu liegen kommt (Fig. 4).The manufacturing process of spatially angularly bent, small-caliber pipelines 2 , the course of which is determined by spatial coordinates stored in a computer 9 and straight lines 17 running between two spatial points 15 and 16 ( FIG. 2), is carried out using axis 14 of the bisector of the angle Bending angle 18 positioned standard bending elements 19 ( FIG. 3), the bending elements 19 being pivoted in such a way that the space 20 required for inserting the straight pipelines 2 or the space required for removal is in a necessary insert level 20 a or in a necessary removal level 20 b lies ( Fig. 4).

Der Rohrschenkel 28 (Fig. 3) könnte innerhalb des Biegewinkels 18 noch weiter gebogen werden. Dennoch bleibt der Freiraum 20 zum Herausnehmen der Rohrleitung 2 erhalten. Gemäß Fig. 4 werden die noch ungebogenen Rohre 29 über eine Transportstrecke 30 der Biegemaschine 26 zugeführt.The pipe leg 28 ( FIG. 3) could be bent even further within the bending angle 18 . Nevertheless, the free space 20 for removing the pipeline 2 remains. According to FIG. 4, the still unbent tubes are supplied to 29 via a transport section 30 of the bending machine 26.

Die Einrichtung zur rechnergestützten Auslegung des Verlaufs von räumlich winklig gebogenen, kleinkalibrigen Rohrleitungen 2 und für die Herstellung solcher mehrfach unter Winkelverlauf gebogener Rohrleitungen 2 weist für den Meßtaster 6 einen Meßwertgeber 21 auf, der aus einem Infrarotmeßtaster besteht, ferner einen gelenkigen Tastarm 22, der mit einem Winkeldrehgeber 23 in einem Gelenk verbunden ist und an den Speicher 8 des Rechners 9 angeschlossen ist.The device for computer-assisted interpretation of the course of spatially angularly bent, small-diameter pipes 2, and for the production of such multiple bends under angle profile pipes 2, for the probe 6 has a transmitter 21 which consists of a Infrarotmeßtaster, further comprising a pivotal scanning arm 22 connected an angle encoder 23 is connected in a joint and is connected to the memory 8 of the computer 9 .

Gemäß Fig. 2 sind die im Rechner 9 abgespeicherten Raumkoordinatenwerte 15 a, 16 a eines Verlaufs einer Rohrleitung 2, wie in Fig. 1 dargestellt ist, als Maschinensteuerungsdaten für eine frei programmierbare Steuerung 25 einer Biegemaschine 26 nach einem vorgegebenen Programm 27 verwendbar. Mittels weiter nicht gezeigter Roboterarme können die Biegeelemente (jeweils als Pfeile in Fig. 2 dargestellt) in die richtige Lage räumlich gefahren oder geschwenkt werden.Referring to FIG. 2, the data stored in the computer 9 space coordinate values 15 a, 16 a of a curve of a pipe 2 as shown in Fig. 1, 26 usable as machine control data for a programmable controller 25 of a bending machine according to a predetermined program 27,. The bending elements (each shown as arrows in FIG. 2) can be spatially moved or swiveled into the correct position by means of robot arms (not shown).

Claims (7)

1. Verfahren zum rechnergestützten Auslegen des Verlaufs von räumlich winklig gebogenen, kleinkalibrigen Rohrleitungen, insbesondere von Kraftstoff- oder Bremsleitungen im Kraftfahrzeugbau, dadurch gekennzeichnet, daß in einem ersten Schritt über einen mechanisch betätigten Meßtaster Raumpunkte des Rohrleitungsverlaufs aufgenommen und die entsprechenden Raumkoordinatenwerte in einem Speicher eines Rechners abgelegt werden und daß danach in einem zweiten Schritt über ein in den Rechner geladenes Umrechnungsprogramm die Raumkoordinatenwerte der Schnittpunkte der Mittellinien von jeweils zwei Rohrleitungsabschnitten errechnet werden. 1. A method for computer-aided design of the course of spatially angled, small-caliber pipelines, in particular of fuel or brake lines in motor vehicle construction, characterized in that in a first step spatial points of the pipeline course are recorded via a mechanically actuated probe and the corresponding spatial coordinate values are stored in a memory Are stored in the computer and that, in a second step, the spatial coordinate values of the intersection of the center lines of two pipe sections are then calculated using a conversion program loaded into the computer. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß in einem dritten Schritt die Rückfederung eines Rohrleitungsabschnitts und die Verdrillung des Rohrs in Abhängigkeit von der Länge des Rohrleitungsabschnittes in Form eines empirischen Wertes, der in einer Erfahrungstabelle abgespeichert ist, entnommen und aus diesen Werten die Ebenen von Biegeelementen errechnet werden.2. The method according to claim 1, characterized, that in a third step the springback of a Pipe section and the twisting of the pipe in Depends on the length of the pipe section in shape an empirical value that is in an experience table stored, taken and from these values the levels of Bending elements can be calculated. 3. Verfahren nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß die Biegefolgen schrittweise abgearbeitet werden und daß aufgrund vorgegebener Objektkonstruktionen für jede Biegefolge eine Kollisionsprüfung durchgeführt wird.3. The method according to claims 1 and 2, characterized, that the bending sequences are processed step by step and that based on given object constructions for each bending sequence Collision check is carried out. 4. Verfahren nach einem oder mehreren der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß über ein korrigierendes Biegeprogramm Raumkoordinatenwerte für die Achsen von rollenförmigen Biegeelementen ermittelt werden.4. The method according to one or more of claims 1 to 3, characterized, that via a corrective bending program spatial coordinate values for the axes of roll-shaped bending elements are determined. 5. Verfahren zum Herstellen von räumlich winklig gebogenen kleinkalibrigen Rohrleitungen, insbesondere von Kraftstoff- oder Bremsleitungen im Kraftfahrzeugbau, deren Verlauf durch in einem Rechner abgespeicherte Raumkoordinatenwerte und jeweils zwischen zwei Raumpunkten verlaufenden Geraden festgelegt sind, dadurch gekennzeichnet, daß unter Verwendung von in der Achse der Winkelhalbierenden des Biegewinkels postierten Normbiegeelementen die Biegeelemente derart geschwenkt werden, daß der zum Einlegen der geraden Rohrleitungen bzw. der zum Entnehmen erforderliche Freiraum in einer notwendigen Einlegeebene bzw. in einer notwendigen Entnahmeebene zu liegen kommt. 5. Method of making spatially angled small-caliber pipelines, especially of fuel or Brake lines in motor vehicle construction, the course of which in one Computer saved spatial coordinate values and each between two straight lines running in space are defined, characterized, that using in the axis of the bisector of the Bending angles such standard bending elements placed the bending elements be swiveled to insert straight pipes or the space required for removal in a necessary Laying level or in a necessary removal level is coming.   6. Einrichtung zur rechnergestützten Auslegung des Verlaufs von räumlich winklig gebogenen kleinkalibrigen Rohrleitungen, insbesondere von Kraftstoff- oder Bremsleitungen im Kraftfahrzeugbau und für die Herstellung solcher mehrfach unter Winkelverlauf gebogener Rohrleitungen, dadurch gekennzeichnet, daß ein Meßwertgeber (21) einen gelenkigen Tastarm (22) aufweist, der mit einem Winkeldrehgeber (23) in dem Gelenk verbunden ist und an den Speicher (8) eines Rechners (9) angeschlossen ist.6. A device for computer-aided interpretation of the course of spatially angularly bent small-caliber pipelines, in particular fuel or brake lines in motor vehicle construction and for the production of such pipes bent several times at an angle, characterized in that a sensor ( 21 ) has an articulated probe arm ( 22 ) , which is connected to an angle rotary encoder ( 23 ) in the joint and is connected to the memory ( 8 ) of a computer ( 9 ). 7. Einrichtung nach Anspruch 6, dadurch gekennzeichnet, daß die im Rechner (9) abgespeicherten Raumkoordinatenwerte (15 a, 16 a) eines Rohrleitungsverlaufs als Maschinensteuerungsdaten für eine freiprogrammierbare Steuerung (25) einer Biegemaschine (26) nach einem vorgegebenen Programm (27) verwendbar sind.7. Device according to claim 6, characterized in that the stored in the computer ( 9 ) spatial coordinate values ( 15 a , 16 a ) of a pipe run as machine control data for a freely programmable control ( 25 ) of a bending machine ( 26 ) according to a predetermined program ( 27 ) are.
DE3900990A 1989-01-12 1989-01-12 Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry Withdrawn DE3900990A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE3900990A DE3900990A1 (en) 1989-01-12 1989-01-12 Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE3900990A DE3900990A1 (en) 1989-01-12 1989-01-12 Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry

Publications (1)

Publication Number Publication Date
DE3900990A1 true DE3900990A1 (en) 1990-08-02

Family

ID=6372100

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3900990A Withdrawn DE3900990A1 (en) 1989-01-12 1989-01-12 Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry

Country Status (1)

Country Link
DE (1) DE3900990A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0760496A2 (en) * 1995-08-29 1997-03-05 Hubert Niemann Method to determine blank dimensions of tops
EP0789289A3 (en) * 1996-02-09 1998-10-21 Faro Technologies Inc. Method for designing or producing bent tubing
EP1690609A1 (en) * 1998-02-03 2006-08-16 Kabushiki Kaisha Opton Bending device
WO2009083770A1 (en) * 2008-01-02 2009-07-09 Alenia Aermacchi S.P.A. Method for bending pipes
DE102015120380A1 (en) * 2015-11-25 2017-06-01 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method for constructing and / or producing a fluid line system in a motor vehicle
CN113434959A (en) * 2021-06-28 2021-09-24 西北工业大学 Pipeline bending design method in three-dimensional space feasible region

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2064485A1 (en) * 1969-12-31 1971-07-22 Rolls Royce Method for making a copy of a tubular or rod-shaped model!

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2064485A1 (en) * 1969-12-31 1971-07-22 Rolls Royce Method for making a copy of a tubular or rod-shaped model!

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Bänder Bleche Rohre 1986, Nr. 5, S. 104 *
Technische Rundschau 1975, Nr. 6, S. 29 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0760496A2 (en) * 1995-08-29 1997-03-05 Hubert Niemann Method to determine blank dimensions of tops
EP0760496A3 (en) * 1995-08-29 1998-08-26 Hubert Niemann Method to determine blank dimensions of tops
EP0789289A3 (en) * 1996-02-09 1998-10-21 Faro Technologies Inc. Method for designing or producing bent tubing
EP1690609A1 (en) * 1998-02-03 2006-08-16 Kabushiki Kaisha Opton Bending device
WO2009083770A1 (en) * 2008-01-02 2009-07-09 Alenia Aermacchi S.P.A. Method for bending pipes
DE102015120380A1 (en) * 2015-11-25 2017-06-01 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method for constructing and / or producing a fluid line system in a motor vehicle
DE102015120380B4 (en) 2015-11-25 2023-08-10 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method for constructing and/or manufacturing a fluid line system in a motor vehicle
CN113434959A (en) * 2021-06-28 2021-09-24 西北工业大学 Pipeline bending design method in three-dimensional space feasible region
CN113434959B (en) * 2021-06-28 2023-03-03 西北工业大学 Pipeline bending design method in three-dimensional space feasible region

Similar Documents

Publication Publication Date Title
DE102009003950B4 (en) Bending device and method for bending a metal object
DE10050919B4 (en) Method for bending small diameter metal pipes and apparatus therefor
DE102007013902A1 (en) Device for profile bending
EP1532419B1 (en) Coordinate measuring device and method for measuring a workpiece
DE102011009660A1 (en) Automation tube forming press
DE2928120C2 (en) Device for the manufacture of motor vehicle exhaust pipes
EP1398094B1 (en) Method and device for determining the arm length of bent products
EP2012946B1 (en) Method for the mechanical tensile bending of bars, more particularly pipes
DE3900990A1 (en) Method for computer-supported mapping of the layout of, and device for manufacturing spatially bent, small-calibre pipelines, in particular fuel lines or brake lines in the car industry
WO2008107057A2 (en) Method and device for determining geometric data of a conical measurement object
DE3211489A1 (en) METHOD AND DEVICE FOR CORRECTING SETPOINT DIFFERENCES OF PLATFORMALLY DEFORMABLE OBJECTS
DE347410C (en) Teaching for the production of templates as well as for scribing, marking and shaping workpieces according to certain guidelines
DE4000019A1 (en) METHOD FOR PRODUCING A GUIDE TEMPLATE FOR BENDED PIPES
DE10130937C1 (en) Method and device for determining the spatial geometry of a curved extruded profile
DE2009370A1 (en) Method of making tubes conforming to a given sample tube using a numerically controlled tube bending machine
DE3039837C2 (en)
EP0334353A1 (en) Method and machine for bending by preference bar material
EP0384477B1 (en) Method and machine for bending tubes
DE2064485A1 (en) Method for making a copy of a tubular or rod-shaped model!
EP1893941B1 (en) Method and device for determining geometric parameters of a conical object to be measured
WO2022017785A1 (en) Method and spring winding machine for producing coil springs
DE19746219A1 (en) Method of bending tube or rod material
DE19637115B4 (en) Control of profile forming on bending machines with step-by-step workflow
EP2177288A2 (en) Method for mechanical bending of rods, in particular tubes
DE10242769C1 (en) Position measuring method for robot-guided workpiece using optical sensors in known positions relative to fixed tool

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8130 Withdrawal