DE3320460C1 - Resilient mountain anchor - Google Patents

Resilient mountain anchor

Info

Publication number
DE3320460C1
DE3320460C1 DE19833320460 DE3320460A DE3320460C1 DE 3320460 C1 DE3320460 C1 DE 3320460C1 DE 19833320460 DE19833320460 DE 19833320460 DE 3320460 A DE3320460 A DE 3320460A DE 3320460 C1 DE3320460 C1 DE 3320460C1
Authority
DE
Germany
Prior art keywords
tension member
rock
anchor according
rock anchor
borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19833320460
Other languages
German (de)
Inventor
Josef 5106 Düren Bauer
Dietmar 4236 Hamminkeln Ulbricht
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ThyssenKrupp Technologies AG
Original Assignee
Thyssen Industrie AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thyssen Industrie AG filed Critical Thyssen Industrie AG
Priority to DE19833320460 priority Critical patent/DE3320460C1/en
Priority to BE0/213031A priority patent/BE899784A/en
Priority to GB08414253A priority patent/GB2141804A/en
Priority to FR8408931A priority patent/FR2547351B1/en
Application granted granted Critical
Publication of DE3320460C1 publication Critical patent/DE3320460C1/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/14Non-metallic plugs or sleeves; Use of liquid, loose solid or kneadable material therefor
    • F16B13/141Fixing plugs in holes by the use of settable material
    • F16B2013/148Means for inhibiting adhesion between dowel or anchor bolt parts and the surrounding grouting composition

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

Die Erfindung betrifft einen Gebirgsanker, der im Oberbegriff des Hauptanspruches angegebenen Gattung. The invention relates to a rock anchor of the type specified in the preamble of the main claim.

Mehr oder weniger nachgiebige Bauarten von Gebirgsankern sind bekannt und werden insbesondere im untertägigcn Berg- und Tunnelbau dort eingesetzt, wo aufgrund von großer Konvergenz eine gewisse Nachgiebigkeit des Ankerausbaues erforderlich ist.More or less flexible types of rock anchors are known and are particularly in the Underground mining and tunneling are used where there is a certain degree of flexibility due to great convergence the anchor removal is required.

Bei einem aus der DE-PS 25 11 706 bekannten Gebirgsanker wird die Nachgiebigkeit z. B. dadurch erreicht, daß zwei den Gebirgsanker bildende Teile unter Last gegeneinander verschiebbar miteinander verbunden sind. Über die Länge des Ankers können mehrere derartige Verbindungsstellen vorgesehen werden, die H) dann unter Last nachgeben, so daß eine gebremste Entspannungsbewegung des Gebirges zugelassen wird. Abgesehen von der aufwendigen Herstellungsweise eines derartigen Ankers ist das Einbringen aufwendig und eine genaue Vorgabe der gebremsten Entspannungsbewcgung nicht oder nur mit sehr hohem Aufwand möglich. In a rock anchor known from DE-PS 25 11 706, the flexibility z. B. achieved by that two parts forming the rock anchor are connected to one another so as to be slidable against one another under load are. Several such connection points can be provided over the length of the anchor H) then give way under load, so that a braked relaxation movement of the mountains is permitted. Apart from that of the complex production method of such an anchor, the introduction is expensive and an exact specification of the braked relaxation movement is not possible or only possible with a great deal of effort.

In Glückauf 117 (1981), Nr. 18, Seiten 1185 bis 1186 sind sogenannte Gleitanker beschrieben, die aus der eigentlichen Ankerstange und einem Blockierungsteil bestehen. Als Blockierungsteil dient ein mit Mörtel gefülltes Gleitrohr, durch das das mit Schernocken versehene Ankerende hindurchgezogen werden muß. Die für das Zerspanen des Mörtels benötigte Kraft ist gleich der Ansprech- und Gleitkraft.In Glückauf 117 (1981), No. 18, pages 1185 to 1186, so-called sliding anchors are described, which from the actual An anchor rod and a blocking part exist. A filled with mortar serves as a blocking part Sliding tube through which the anchor end provided with shear cams must be pulled. The one for that The force required to cut the mortar is equal to the response and sliding force.

Andere Anker weisen einen ähnlichen Nachgiebigkeitsmechanismus auf, bei der die aus kalt verformbarem Stahl bestehende Ankerstange durch eine Ziehnuß hindurchgezogen werden muß. Ähnliche weitere Vorschläge sind in der Beschreibung wiedergegeben. Nachteilig bei all diesen zweiteiligen Gleitankern ist der beschriebene hohe Herstellungsaufwand für die Ankerstangen an sich und für die Bohrlöcher im untertägigen Bereich bzw. im Bereich der Baugruben und Baustellen. Abgesehen davon, ist die Wirksamkeit derartiger Anker nicht unwesentlich von der Sorgfalt abhängig, mit der diese eingebaut werden.Other anchors have a compliance mechanism similar to that of the cold deformable Steel existing anchor rod must be pulled through a draw nut. Similar other suggestions are given in the description. The one described is disadvantageous with all of these two-part sliding anchors high manufacturing costs for the anchor rods per se and for the boreholes in the underground Area or in the area of construction pits and construction sites. Apart from that, the effectiveness of such anchors is not insignificantly dependent on the care with which they are installed.

Gegenstand der Erläuterung in Glückauf 117 (1981), Nr. 17, Seite 1113 ist der weiter vorn bereits beschriebene Gleilanker mit einer mit Schernocken versehenen Ankerstange, die durch einen Scherbelag hindurchgezogen werden müssen. Sie weist die gleiche, wie oben beschrieben, Problematik auf und ist daher durch einen hohen Herstellungsaufwand gekennzeichnet.The subject of the explanation in Glückauf 117 (1981), No. 17, page 1113 is that already described above Sliding anchor with an anchor rod provided with shear cams, which is pulled through a shear layer Need to become. It has the same problems as described above and is therefore by a marked high manufacturing costs.

Gegenstand der DE-AS 15 83 803 ist ein Stahlankerbolzen aus Rundstahl, der auf der Außenseite schraubenförmige Verankerungsrippen aufweist. Er ist mit einem besonders ausgebildeten Ziehring versehen, mit dem die richtige Verspannkraft aufgebracht und eingehalten werden kann. Von einem Gleitanker kann daher im vorliegenden Fall nicht gesprochen werden, vielmehr handelt es sich um einen üblichen Gebirgsanker, der zwar begrenzt auch nachgeben kann, aber bei auftretenden Schcrbcanspruchungen frühzeitig bricht.The subject of DE-AS 15 83 803 is a steel anchor bolt made of round steel, which is helical on the outside Has anchoring ribs. It is provided with a specially designed pull ring, with which the correct tensioning force can be applied and maintained. A sliding anchor can therefore in the present case are not spoken, rather it is a common mountain anchor, the can give in to a limited extent, but breaks early if stress occurs.

Nachteilig bei den vorstehend beschriebenen Gebirgsankern ist, daß diese aus mindestens zwei Teilen bestehen, wobei das sogenannte Nachgiebigkeitselement einen größeren Durchmesser als die eigentliche Ankerstange aufweist. Es ist daher notwendig, mehrstufige Bohrlöcher oder entsprechend größer dimensiobo nierte Bohrlöcher ins Gebirge zu stoßen, was einen erheblichen Mehraufwand darstellt. Aufwendig ist außerdem die 1 Jcrstellung derartiger Gebirgsanker, wobei zusätzlich beim Einbringen der Gebirgsanker in die Bohrlöcher besondere Sorgfalt erforderlich ist, um eine volle Wirksamkeit des Ankers zu gewährleisten.The disadvantage of the rock anchors described above is that they consist of at least two parts exist, whereby the so-called flexibility element has a larger diameter than the actual one Has anchor rod. It is therefore necessary to drill holes with multiple steps or correspondingly larger dimensions ned boreholes in the rock, which represents a considerable additional effort. It is also complex the creation of such rock anchors, with additional when inserting the rock anchors into the boreholes, special care is required in order to achieve a full Ensure effectiveness of the anchor.

Bei dem aus dem DE-GM 73 33 050 bekannten, gattungsbildcnden Gebirgsanker ist die Nachgiebigkeit bzw. das Dehnungsvermögen durch einen Schrumpf-The generic type known from DE-GM 73 33 050 The rock anchor is the resilience or the elongation through a shrinkage

schlauch erhöht worden, um so beim Aufreißen einer Kluft die auftretenden Bruchspannungen oder Scherbeanspruchungen leicht durch Dehnung abzubauen. Auch bei einem derartigen Gebirgsanker ist eine gezielte Nachgiebigkeit nicht vorgesehen und erreichbar, zumal bei den im Steinkohlengebirge auftretenden Scherbeanspruchungen durch das Aufreißen von Klüften das Dehnungsvermögen der Gebirgsanker frühzeitig überbeansprucht wird.hose has been increased in order to reduce the breaking stresses or shear stresses occurring when a gap is torn open easy to break down by stretching. A rock anchor of this type is also targeted Resilience is not intended and achievable, especially with the shear stresses that occur in the coal mountains The expansion capacity of the rock anchors is overstrained at an early stage due to the rupture of fissures will.

Der Erfindung liegt die Aufgabe zugrunde, einen im Aufbau einfachen und insgesamt einen geringen Außendurchmesser aufweisenden, nachgiebigen Gebirgsanker mit definierbarem Dehnungsvermögen zu schaffen.The invention is based on the object of providing an outer diameter which is simple in structure and which is small overall having resilient rock anchors with a definable expansion capacity.

Die Aufgabe wird gemäß der Erfindung dadurch gelöst, daß das dehnbare Zugglied aus rostfreiem, austenitischem Stahl besteht.The object is achieved according to the invention in that the expandable tension member is made of stainless, austenitic Steel is made.

Ein derartiger Gebirgsanker weist einen Durchmesser auf, der dem starrer Gebirgsanker entspricht, so daß die dafür erforderlichen Bohrlöcher mit üblichen Bohrhämmern ohne großen Aufwand hergestellt werden können. Da die Bohrlöcher durchgehend einstufig eingestellt werden, ist der Herstellungsaufwand weiter verringert und die Herstellungszeit niedriger. Dies hat den Vorteil, daß auch bei gebrächem Gebirge durch sofortiges Einbringen der Ankerstange einem Zusetzen des Bohrloches entgegengewirkt werden kann. Mit Hilfe des aus austenitischem Stahl hergestellten Zuggliedes kann die erforderliche hohe Einstellkraft kurzfristig erreicht werden, da sich dieses bei Verformung zusätzlich verfestigt, wobei die Ankerstange insgesamt über eine große Dehnung bei insgesamt flacher Dehnungskennlinie verfügt. Damit nähert sich die Kennlinie der optimalen Arbettskennlinie von nachgiebigen Gebirgsankern, wobei der Verschiebeweg durch Anordnung und Ausbildung des Materials den Gegebenheiten anzupassen ist.Such a rock anchor has a diameter which corresponds to the rigid rock anchor, so that the necessary drill holes can be made with conventional hammer drills without much effort can. Since the drill holes are continuously set in one step, the manufacturing effort is further reduced and the manufacturing time is lower. This has the advantage that even when the mountains are used immediately Insertion of the anchor rod clogging of the borehole can be counteracted. With help of the tension member made of austenitic steel, the required high adjustment force can be achieved in the short term be, since this also solidifies when deformed, the anchor rod overall over a large elongation with an overall flat elongation characteristic. The characteristic curve thus approaches the optimal one Arbett characteristic curve of resilient rock anchors, the displacement path being determined by arrangement and design of the material is to be adapted to the circumstances.

Als austenitisches Material zur Herstellung der Ankerstangen hat sich eine Stahllegierung mit Nickel- und Chromanteil als vorteilhaft erwiesen, wobei als Material zweckmäßig eine Stahllegierung mit 12 bis 18% Chrom und 6 bis 10, vorzugsweise 6 bis 8% Nickel Verwendung findet. Eine derartige Stahllegierung führt unter Zugbelastung und dadurch erfolgender plastischer Verformung zu einer Kaltverfestigung, da durch die Verformung eine mehr oder weniger starke Umwandlung in Martensit erfolgt. Die Härtung oder Kaltverfestigung kann dabei über den Nickelanteil gesteuert werden, so daß andererseits die Wirkung des Gebirgsankers den Gegebenheiten anzupassen ist.A steel alloy with nickel and nickel has proven to be an austenitic material for the manufacture of the anchor rods Chromium content has proven to be advantageous, a steel alloy with 12 to 18% chromium being expedient as the material and 6 to 10, preferably 6 to 8% nickel is used. Such a steel alloy leads under tensile load and the resulting plastic deformation to strain hardening, since the deformation a more or less strong transformation into martensite takes place. Hardening or work hardening can be controlled via the nickel content, so that on the other hand the effect of the rock anchor Is to be adapted to the circumstances.

Um eine einwandfreie Wirksamkeit des nachgiebigen Gebirgsankers zu gewährleisten, ist es vorteilhaft, wenn das Zugglied eine definierte Nachgiebigkeitszone aus einem Stab mit geringerem Durchmesser aufweist. Dabei wird die notwendige Nachgiebigkeit in dieser Nachgiebigkeitszone erreicht, während die beiden Enden mit dem Gebirge verbunden sind, so daß das Mittelteil entsprechend auf Zug belastbar ist. Die Nachgiebigkeitszone kann dabei durch Wahl der eingebundenen Endbereiche des Zuggliedes genau in die Mitte des Zuggliedes oder mehr in die Nähe des Bohrlochmundes oder des Bohrlochtiefsten verlegt werden, je nachdem, wie es die vorgefundenen Gegebenheiten erfordern.In order to ensure perfect effectiveness of the resilient rock anchor, it is advantageous if the tension member has a defined flexibility zone made of a rod with a smaller diameter. Included the necessary resilience is achieved in this resilience zone, while the two ends with are connected to the mountains, so that the middle part is resilient to train accordingly. The compliance zone can by choosing the integrated end areas of the tension member exactly in the middle of the tension member or more near the mouth of the borehole or the deepest of the borehole, depending on how the require the given conditions.

Da die eingebundenen Enden zur Nachgiebigkeit des Gebirgsankers nichts beitragen müssen, kann es zweckmäßig sein, das Mittelteil des Zuggliedes mit der Nachgiebigkeitszone aus austenitischem und die Enden aus Normalstahlmaterial herzustellen. Damit kann kostengünstigeres Material für diese Bereiche verwendet werden, ohne daß die Wirksamkeit des Gebirgsankers insgesamt dadurch negativ beeinflußt wird.Since the bound ends do not have to contribute anything to the flexibility of the rock anchor, it can be useful The middle part of the tension member with the flexibility zone is made of austenitic and the ends are made of To manufacture mild steel material. This means that less expensive material can be used for these areas, without the effectiveness of the rock anchor as a whole being negatively affected.

Der Gebirgsanker kann auch mit Hilfe der dem Bohrlochmund zugeordneten Ankerplatte und der Mutter im Bohrloch verspannt werden. Dann ist es zweckmäßig, das aus dem Bohrloch herausragende Ende des Zuggliedes aus Normalstahlmaterial herzustellen und mit dem Mittelteil vorzugsweise zu verschweißen. Das Aufbringen der Ankerplatte und der Mutter und dabei der Ver-Spannkräfte ist so vorteilhaft möglich. Da sich das Material in diesem Bereich nicht oder nur geringfügig längt, kann die Mutter bei Erfordernis auch zum Nachspannen später auf dem Gewinde des unteren Endes verschoben werden.The rock anchor can also with the help of the anchor plate assigned to the borehole mouth and the nut in the Borehole be braced. Then it is expedient for the end of the tension member protruding from the borehole Manufactured from normal steel material and preferably welded to the central part. The application the anchor plate and the nut and thereby the clamping forces is advantageously possible. As the material Does not or only slightly lengthens in this area, the mother can, if necessary, also for re-tensioning later moved on the thread of the lower end.

is Das Gleiten des Zuggliedes im Bohrloch bzw. insbesondere des Mittelteils mit der Nachgiebigkeitszone wird durch den Kleber nicht behindert und blockiert, wenn, wie an sich bekannt, die das Mittelteil des Zuggliedes bildende Nachgiebigkeitszone insgesamt mit einer dehnfähigen Beschichtung versehen ist. Als dehnfähige Beschichtung ist beispielsweise ein Schrumpfschlauch einzusetzen, wie er aus der DE-GM 75 33 050 grundsätzlich bekannt ist. Damit ist sichergestellt, daß der Kleber auch bei dem im Bohrloch unter Umständen herrschenden Druck nicht bis auf den Außenmantel der Ankerstange bzw. des Mittelteils dringen kann.is the sliding of the tension member in the borehole or in particular the middle part with the flexibility zone is not hindered and blocked by the adhesive, if, as is known per se, the center part of the tension member forming the flexibility zone as a whole with a stretchable coating is provided. A shrink tube, for example, is an expandable coating use as it is basically known from DE-GM 75 33 050. This ensures that even with the pressure that may be present in the borehole, the adhesive does not extend to the outer jacket of the The anchor rod or the middle part can penetrate.

Nach einer weiteren Ausbildung der Erfindung kann die Nachgiebigkeitszone dadurch variiert werden, daß das Zugglied ein Mittelteil aus einem Bündel von Stäben oder Drähten aufweist. Derartige Bündel bzw. Litzenanker sind grundsätzlich aus »Tiefbau, Ingenieurbau, Straßenbau« 8/1980, Seiten 674 bis 677 bekannt, dort allerdings wie übliche einteilige Gebirgsanker eingesetzt. Im Gegensatz dazu bestehen bei der erfindungsgemäßen Ausbildung alle Stäbe aus austenitischem rostfreiem Stahl, wobei sie einzeln oder insgesamt zweckmäßig von einer dchnfähigen Beschichtung bzw. einem Schrumpfschlauch umhüllt sind. Durch Durchmesserwahl, Vielzahl und Anordnung der Stäbe kann die Nachgiebigkeit des Gebirgsankers hier zusätzlich variiert werden.According to a further embodiment of the invention, the flexibility zone can be varied in that the tension member has a central part of a bundle of rods or wires. Such bundles or strand anchors are basically known from "Civil engineering, civil engineering, road construction" 8/1980, pages 674 to 677, there however, used as usual one-piece rock anchors. In contrast, exist in the invention Training all rods from austenitic stainless steel, individually or collectively expedient are encased by a thin coating or a shrink tube. By choosing a diameter, The flexibility of the rock anchor can also be varied here in the number and arrangement of the rods will.

Je nach Einsatzbereich des Gebirgsankers ist es vorteilhaft, das Zugglied im Bohrlochtiefsten zu verkleben und dann mit Hilfe der Ankerplatte und der Mutter zu verspannen oder aber beide Endbereiche des Zuggliedes mit dem Gebirge wirksam über den Kleber zu verbinden. Dabei kann erfindungsgemäß in vorteilhafter Weise das Mittelteil von Kleber freigehalten werden, indem das Zugglied als Injizierlanze ausgebildet ist, wieDepending on the area of application of the rock anchor, it is advantageous to glue the tension member in the deepest part of the borehole and then to brace with the help of the anchor plate and the nut or both end regions of the tension member to be effectively connected to the mountains via the adhesive. According to the invention, this can be advantageous Way, the middle part can be kept free of glue by designing the tension member as an injection lance, like

so dies beispielsweise aus der DE-OS 25 5b 493 bekannt ist. Über die Injizierlanze ist das im Bohrloch eingeführte Ende oder gleichzeitig auch das gegenüberliegende Ende gezielt zu verkleben bzw. im Bohrloch festzulegen. Durch die gezielte Injizierung entweder mit Hilfe einer Bohrung und der entsprechenden Kanälen in dem Zugglied oder aber auch durch gesonderte dünne Injizierlanzen kann das Zugglied auch bei großen Längen gezielt dort befestigt bzw. mit dem Gebirge verbunden werden, wo dies für die Wirksamkeit des gesamten Ge-so this is known from DE-OS 25 5b 493, for example. The end inserted in the borehole or at the same time also the opposite end is via the injection lance to be glued in a targeted manner or to be fixed in the drill hole. Through the targeted injection either with the help of a Bore and the corresponding channels in the tension member or also through separate thin injection lances the tension member can be specifically fastened there or connected to the mountain range, even with great lengths where this is necessary for the effectiveness of the entire

fao birgsankers von Vorteil ist.fao birgsankers is an advantage.

Zur Erleichterung des Einführens des Zuggliedes in das Bohrloch, beispielsweise durch Verkanten oder Festsetzen an Vorsprüngen oder Klüften, dient die Ausbildung der Erfindung, nach der der Durchmesser desTo facilitate the introduction of the tension member into the borehole, for example by tilting or Fixing on projections or crevices, the formation of the invention is used, according to which the diameter of the

b5 Mittelteils zusammen mit der aufgebrachten Beschichtung dem der Enden entspricht. Damit ist ein durchgehend gleichmäßiger Stab geschaffen, der wie erwähnt sicher und ohne großen Arbeitsaufwand in das Bohrlochb5 middle part together with the applied coating corresponds to that of the ends. This creates a uniform rod throughout, which, as mentioned into the borehole safely and without great effort

eingeführt werden kann. Eine Verschweißung des austenitischen Mittelteils mit den Normalstahlenden ist ohne nachteilige Auswirkungen möglich, wenn, wie erfindungsgemäß vorgesehen, die Schweißstelle im Abstand zum Übergang zur definierten Nachgiebigkeitszone im Bereich der Stange mit größerem Durchmesser angeordnet ist.can be introduced. A welding of the austenitic middle part with the normal steel ends is without adverse effects are possible if, as provided in accordance with the invention, the welding point is at a distance arranged at the transition to the defined flexibility zone in the area of the rod with a larger diameter is.

Die Erfindung zeichnet sich insbesondere dadurch aus, daß ein nachgiebiger Gebirgsanker geschaffen ist, der einfach herzustellen und zu verwenden ist, der eine annähernd optimale Arbeitskennlinie mit hoher Einstellkraft aufweist und der darüber hinaus aufgrund des Chromanteiles rostfrei und somit insbesondere auch als Erdanker zu verwenden ist. Aufgrund der Rostfreiheit behält er auch nach langen Standzeiten seine volle Wirksamkeit, wobei durch Einstellung der Legierung, Form und Zuordnung der Nachgiebigkeitszone eine Anpassung an die jeweiligen Gegebenheiten vorhanden ist. Der erfindungsgemäße Gebirgsanker verfügt bei annähernd optimaler Einstellkraft über eine hohe Dehnung von flacher Dehnungskennlinie, so daß er die Bedingungen, die an Gleitanker gestellt werden, voll erfüllt. The invention is particularly characterized in that a resilient rock anchor is created, which is easy to manufacture and use, which has an approximately optimal working characteristic with a high setting force and which is also rustproof due to the chromium content and thus in particular also as Ground anchor is to be used. Because it is rust-free, it retains its full potential even after long periods of inactivity Effectiveness, whereby by setting the alloy, shape and assignment of the zone of compliance a Adaptation to the respective circumstances is available. The rock anchor according to the invention has approximately optimal setting force over a high elongation with a flat elongation characteristic curve, so that the conditions that are placed on sliding anchors are fully met.

In der nachfolgenden Beschreibung wird die Erfindung anhand der Zeichnung, in der bevorzugte Ausführungsbeispiele mit den dazu notwendigen Einzelheiten und Einzelteilen dargestellt sind, näher erläutert. Es zeigtIn the following description the invention will be described based on the drawing, in the preferred exemplary embodiments with the necessary details and individual parts are shown, explained in more detail. It shows

F i g. 1 einen Gebirgsanker im Einsatz, Fig.2 einen Schnitt des Gebirgsanker im Bereich jo der Nachgiebigkeitszone,F i g. 1 a rock anchor in use, FIG. 2 a section of the rock anchor in the area jo the compliance zone,

F i g. 3 einen Schnitt durch den Gebirgsanker im Bereich der Nachgiebigkeitszone, wobei mehrere Stäbe das Mittelteil bilden,F i g. 3 a section through the rock anchor in the area of the flexibility zone, with several rods forming the central part,

F i g. 4 einen Schnitt gemäß F i g. 3 mit anders ausgebildeter Beschichtung undF i g. 4 shows a section according to FIG. 3 with a differently designed coating and

Fig.5 einen Schnitt durch einen gleichzeitig als Injizierlanze ausgebildeten Gebirgsanker.5 shows a section through a lance that is used at the same time as an injection lance trained mountain anchor.

F i g. 1 zeigt ein ins Gebirge 1 eingebrachtes Bohrloch 2, in das ein nachgiebig ausgebildeter Gebirgsanker 5 eingeführt ist. Dieser Gebirgsanker 5 ist mit seiner Ankerspitze 6 bis dicht ans Bohrlochtiefste 8 herangeführt und dort mit Hilfe eines Klebers 9 festgelegt. Der das Bohrloch auch im übrigen zusätzlich zum Gebirgsanker 5 ausfüllende Kleber verbindet auch das dem Bohrlochmund 7 zugewandte Ende des Gebirgsankers wirksam mit dem Gebirge 1. Das gesamte Zugglied to, dessen aus dem Bohrlochmund 7 herausragendes Ende ein Gewinde 11 trägt, kann mit Hilfe der Ankerplatte 12 und der · Mutter 13 im Bohrloch 2 verspannt werden oder sie wird an beiden Enden eingeklebt.F i g. 1 shows a borehole 2 made in the rock 1, into which a resilient rock anchor 5 is introduced. This rock anchor 5 is brought with its anchor tip 6 up to the deepest 8 of the borehole and fixed there with the aid of an adhesive 9. The borehole also in addition to the rock anchor 5 filling adhesive also effectively connects the end of the rock anchor facing the borehole mouth 7 with the mountains 1. The entire tension member to, whose end protruding from the borehole mouth 7 has a thread 11 can be braced in the borehole 2 with the aid of the anchor plate 12 and the nut 13, or they is glued in at both ends.

Die notwendige Nachgiebigkeit erhält der Gebirgsanker 5 gemäß F i g. 1 durch eine mittig angeordnete und ausgebildete Nachgiebigkeitszone 15. Während die beiden Enden 16,17 des Zuggliedes 10 über den Kleber 9 mit dem Gebirge verbunden sind, weist das Mittelteil 18 eine Beschichtung 19 auf, so daß der Kleber 9 die Verschiebung des aus austenitischem Material hergestellten Mittelteils 18 nicht behindern kann. Bei der in F i g. 1 dargestellten Ausführungsform sind die Enden ω 16,17 aus Normalstahl mit dem aus einer austcnitischcn Stahllegierung bestehenden Mittelteil 18 verschweißt. Die Schweißstellen sind mit 20 bezeichnet.The rock anchor 5 is given the necessary flexibility according to FIG. 1 by a centrally arranged and formed flexibility zone 15. While the two ends 16, 17 of the tension member 10 over the adhesive 9 are connected to the mountains, the middle part 18 has a coating 19 so that the adhesive 9 the Can not hinder displacement of the middle part 18 made of austenitic material. At the in F i g. 1, the ends ω 16, 17 are made of normal steel with that of an Austcnitischcn Steel alloy existing middle part 18 welded. The welding points are denoted by 20.

Der in F i g. 1 dargestellte Gebirgsanker 5 ist im Bereich der Nachgiebigkeitszone 15 bzw. des Mittelteils 18 geschnitten und als solcher in Fig.2 dargestellt. Das Zugglied 10 bzw. das Mittelteil 18 ist wie dargestellt mit einer beispielsweise aus einem Schrumpfschlauch bestehenden Beschichtung 19 umhüllt. Mit 26 ist der Außenrand des Endes 17 des Zuggliedes 10 bezeichnet. Die F i g. 3 und 4 zeigen eine Ausführungsform, bei der das Mittelteil 18 aus einem Bündel von Stäben 22, 23, 24 besteht. Die Stäbe 22 bis 24 bestehen aus der beschriebenen auslenitischen Stahllegierung und sind von einer Beschichtung 19 umgeben. Diese Beschichtung 19 kann nach F i g. 3 als das Bündel umhüllender Mantel oder als einbindende Außenhaut ausgebildet sein.The in F i g. The rock anchor 5 shown in FIG. 1 is in the area of the flexibility zone 15 or the central part 18 cut and shown as such in Fig.2. That The tension member 10 or the central part 18 is, as shown, with a device consisting, for example, of a shrink tube Coating 19 enveloped. With the outer edge of the end 17 of the tension member 10 is designated. the F i g. 3 and 4 show an embodiment in which the central part 18 consists of a bundle of rods 22, 23, 24 consists. The rods 22 to 24 are made of the auslenitic steel alloy described and are of a Coating 19 surrounded. This coating 19 can according to FIG. 3 as a coat enveloping the bundle or as a be formed integrating outer skin.

F i g. 5 schließlich zeigt einen Schnitt durch das Zugglied im Bereich des Endes 16 oder 17, wobei hier das Zugglied 10 als Injizierlanzc ausgebildet und dementsprechend mit einer durchgehenden Bohrung 27 versehen ist. Im Bereich der Enden 16,17 oder nur eines der beiden Enden sind Kanäle 28 vorgesehen, über die das Verpreßmalcrial oder der Kleber in den jeweils vorgesehenen Ringraum eindringen kann, um das Zugglied 10 so zu verkleben und mit dem Gebirge 1 zu verbinden. Dabei kann ein vorteilhaft geringer Bohrlochdurchmesser zum Einsatz kommen, was zu einer Reduzierung der Herstellungskosten führt, allerdings Mehrkosten bei der Herstellung des Zuggliedes 10 erbringt.F i g. 5 finally shows a section through the tension member in the area of the end 16 or 17 Tension member 10 designed as Injizierlanzc and accordingly is provided with a through hole 27. In the area of the ends 16, 17 or only one of the Channels 28 are provided at both ends through which the Verpreßmalcrial or the adhesive in the respective provided Annular space can penetrate in order to glue the tension member 10 and to connect it to the rock 1. In this case, an advantageously small borehole diameter can be used, which leads to a reduction in the Leads to manufacturing costs, but brings about additional costs in the manufacture of the tension member 10.

Eine Verschweißung des austenitischen Materials mit dem Normalstahl kann sicher vorgenommen werden, da gemäß Fig. 1 die Schweißstellen in den Bereich des Zuggliedes mit normalem Durchmesser gelegt sind. Damit ist gleichzeitig sichergestellt, daß eine Gefügeänderung durch den Schweißvorgang im Bereich der definierten Nachgiebigkeitszone nicht eintreten kann.A welding of the austenitic material with the normal steel can be done safely because According to FIG. 1, the welds are placed in the area of the tension member with a normal diameter. In order to it is ensured at the same time that a structural change due to the welding process in the area of the defined Zone of compliance cannot occur.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (11)

Patentansprüche:Patent claims: 1. Gebirgsanker zur Sicherung von Strecken und Räumen im Berg- und Tunnelbau sowie Baugruben u. ä., der aus einem im Bohrlochtiefsten und am Bohrlochmund festlegbaren Zugglied sowie gegebenenfalls einer an das Gebirge bzw. die Abgrenzung anpreßbaren Ankerplatte besteht, wobei das Zugglied aus einem dehnbaren Stahl hergestellt ist, dadurch gekennzeichnet, daß das dehnbare Zugglied (10) aus rostfreiem, austenitischem Stahl besteht.1. Rock anchors for securing routes and spaces in mining and tunnel construction as well as construction pits and the like, which consists of a tension member which can be fixed in the deepest part of the borehole and at the mouth of the borehole, as well as, if necessary an anchor plate that can be pressed against the rock or the delimitation, the tension member is made of a ductile steel, characterized in that the ductile Tension member (10) consists of stainless, austenitic steel. 2. Gebirgsanker nach Anspruch 1, dadurch gekennzeichnet, daß das Zugglied (10) aus einer Stahllegierung mit Nickel- und Chromanteil hergestellt ist.2. Rock anchor according to claim 1, characterized in that the tension member (10) made of a steel alloy is made with nickel and chromium. 3. Gebirgsanker nach Anspruch 1 und Anspruch 2, dadurch gekennzeichnet, daß das Zugglied (10) ganz oder teilweise aus einer Stahllegierung besteht, die 12 bis 18% Chrom und 6 bis 10% Nickel aufweist.3. Rock anchor according to claim 1 and claim 2, characterized in that the tension member (10) entirely or partially consists of a steel alloy which has 12 to 18% chromium and 6 to 10% nickel. 4. Gebirgsanker nach Anspruch 1, dadurch gekennzeichnet, daß das Zugglied (10) eine definierte Nachgiebigkeitszone (15) aus einem Stab mit geringerem Durchmesser aufweist.4. Rock anchor according to claim 1, characterized in that the tension member (10) has a defined Has compliance zone (15) made of a rod with a smaller diameter. 5. Gebirgsanker nach Anspruch 1 und Anspruch 4, dadurch gekennzeichnet, daß das Mittelteil (18) des Zuggliedes (10) mit der Nachgiebigkeitszone (15) aus austenitischem und die Enden (16, 17) aus Normalstahlmaterial besteht.5. rock anchor according to claim 1 and claim 4, characterized in that the central part (18) of the Tension member (10) with the flexibility zone (15) made of austenitic and the ends (16, 17) made of normal steel material consists. 6. Gebirgsanker nach Anspruch 1 und Anspruch 4, dadurch gekennzeichnet, daß nur das aus dem Bohrloch (2) hervorragende Ende des Zuggliedes (10) aus Normalstahlmaterial hergestellt und mit dem Mittelteil (18) vorzugsweise verschweißt ist.6. rock anchor according to claim 1 and claim 4, characterized in that only that from the borehole (2) protruding end of the tension member (10) made of mild steel material and connected to the central part (18) is preferably welded. 7. Gebirgsanker nach Anspruch 4, dadurch gekennzeichnet, daß die das Mittelteil (18) des Zuggliedes (10) bildenden Nachgiebigkeitszone (15) in an sich bekannter Weise mit einer dehnfähigen Beschichtung (19) versehen ist.7. Rock anchor according to claim 4, characterized in that the central part (18) of the tension member (10) forming resilience zone (15) in a manner known per se with an expandable coating (19) is provided. 8. Gebirgsanker nach Anspruch 1 und Anspruch 4, dadurch gekennzeichnet, daß das Zugglied (10) einen Mittelteil (18) aus einem an sich bekannten Bündel von Stäben (22,23,24) oder Drähten aufweist.8. rock anchor according to claim 1 and claim 4, characterized in that the tension member (10) has a Has middle part (18) from a known bundle of rods (22,23,24) or wires. 9. Gebirgsanker nach Anspruch 1, dadurch gekennzeichnet, daß das Zugglied (10) in an sich bekannter Weise als Injizierlanze ausgebildet ist, über die das in das Bohrloch (2) eingeführte Ende (17) oder gleichzeitig auch das gegenüberliegende Ende (16) gezielt zu verkleben bzw. im Bohrloch festzulegen sind.9. Rock anchor according to claim 1, characterized in that the tension member (10) in a known per se Way is designed as an injection lance through which the end (17) inserted into the borehole (2) or at the same time also to glue the opposite end (16) in a targeted manner or to fix it in the borehole are. 10. Gebirgsanker nach Anspruch 4 und Anspruch 7, dadurch gekennzeichnet, daß der Durchmesser des Mittelteils (18) zusammen mit der Beschichtung (19) dem der Enden (16,17) entspricht.10. rock anchor according to claim 4 and claim 7, characterized in that the diameter of the middle part (18) together with the coating (19) corresponds to that of the ends (16, 17). 11. Gebirgsanker nach Anspruch 5 oder Anspruch 6, dadurch gekennzeichnet, daß die Schweißstelle (20) im Abstand zum Übergang (21) zur definierten Nachgiebigkeitszone (15) angeordnet ist.11. Rock anchor according to claim 5 or claim 6, characterized in that the welding point (20) is arranged at a distance from the transition (21) to the defined flexibility zone (15).
DE19833320460 1983-06-07 1983-06-07 Resilient mountain anchor Expired DE3320460C1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE19833320460 DE3320460C1 (en) 1983-06-07 1983-06-07 Resilient mountain anchor
BE0/213031A BE899784A (en) 1983-06-07 1984-05-29 FLEXIBLE ANCHORING ELEMENT.
GB08414253A GB2141804A (en) 1983-06-07 1984-06-05 Rock bolt
FR8408931A FR2547351B1 (en) 1983-06-07 1984-06-07 FLEXIBLE ANCHOR BOLT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19833320460 DE3320460C1 (en) 1983-06-07 1983-06-07 Resilient mountain anchor

Publications (1)

Publication Number Publication Date
DE3320460C1 true DE3320460C1 (en) 1984-10-18

Family

ID=6200810

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19833320460 Expired DE3320460C1 (en) 1983-06-07 1983-06-07 Resilient mountain anchor

Country Status (4)

Country Link
BE (1) BE899784A (en)
DE (1) DE3320460C1 (en)
FR (1) FR2547351B1 (en)
GB (1) GB2141804A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0196451A1 (en) * 1985-03-05 1986-10-08 Dyckerhoff & Widmann Aktiengesellschaft Tension element for a rock bolt or the like
EP0251887A1 (en) * 1986-06-24 1988-01-07 Forges Et Boulonneries D'ars-Sur-Moselle Extensible support bolt, supporting method, use of the bolt
WO1988007141A2 (en) * 1987-03-18 1988-09-22 Upat Gmbh & Co. Fixing rod
FR2613438A1 (en) * 1987-03-30 1988-10-07 Ars Forges Boulonneries Improvement to an extensible support bolt and support method
DE4445154A1 (en) * 1994-12-17 1996-06-20 Fischer Artur Werke Gmbh Process for producing an expansion anchor made of corrosion-resistant steel
DE19716926A1 (en) * 1997-04-23 1998-10-29 Mkt Metall Kunststoff Technik Expansion dowels, especially made of stainless steel
DE102011012955A1 (en) * 2011-03-08 2012-09-13 Karlsruher Institut für Technologie Anchor fastener
DE102020132950A1 (en) 2020-12-10 2022-06-15 Geobrugg Ag Corrosion protection device, corrosion protection system, corrosion-protected slope stabilization system and method for corrosion-protected anchoring of a geotechnical anchor element

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2002953368A0 (en) * 2002-12-16 2003-01-09 Garford Pty Ltd A yielding rock bolt
AU2007233555B2 (en) * 2006-04-06 2011-04-28 Garock Pty Ltd. A yielding rock bolt
AU2009337040A1 (en) * 2009-01-07 2011-07-14 Mansour Mining Technologies Inc. Yieldable cone bolt and method of manufacturing same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1583803B1 (en) * 1967-06-15 1971-07-01 Louis Lille Lamendin External tensioning device for rock bolts
DE7533050U (en) * 1975-10-17 1976-02-19 Bergwerksverband Gmbh, 4300 Essen Mountain anchor
DE2511706B2 (en) * 1975-03-18 1977-04-28 Bergwerksverband Gmbh, 4300 Essen MOUNTAIN ANCHORS
DE2556493A1 (en) * 1975-12-16 1977-06-30 Alfons Harke Adhesively fixed wall anchor bolt - uses helical web to influence adhesive flow behind outer sealing ring

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1352599A (en) * 1971-08-24 1974-05-08 Tokai Cold Forming Co Ltd Connecting rod bolts
GB1411077A (en) * 1971-10-29 1975-10-22 Harris Ltd Edgar Method of fastening two or more members with respect to one another
DE2624559C2 (en) * 1976-06-01 1985-09-05 Gebirgssicherung GmbH, Salzburg Mountain anchor
AT371840B (en) * 1978-05-31 1983-08-10 Voest Ag METHOD FOR PRODUCING ANCHOR BARS OR ANCHOR WIRE
FR2442988A1 (en) * 1978-12-01 1980-06-27 Bbc Brown Boveri & Cie Expansion screw for components affected by heat - has sleeve made in one or two parts with threads engaging on threads of screw (NL 3.6.80)
DE3146587C2 (en) * 1981-11-25 1984-11-08 Bergwerksverband Gmbh, 4300 Essen Mountain anchor
DE8311672U1 (en) * 1983-04-20 1983-11-03 Bochumer Eisenhütte Heintzmann GmbH & Co KG, 4630 Bochum Mountain anchor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1583803B1 (en) * 1967-06-15 1971-07-01 Louis Lille Lamendin External tensioning device for rock bolts
DE2511706B2 (en) * 1975-03-18 1977-04-28 Bergwerksverband Gmbh, 4300 Essen MOUNTAIN ANCHORS
DE7533050U (en) * 1975-10-17 1976-02-19 Bergwerksverband Gmbh, 4300 Essen Mountain anchor
DE2556493A1 (en) * 1975-12-16 1977-06-30 Alfons Harke Adhesively fixed wall anchor bolt - uses helical web to influence adhesive flow behind outer sealing ring

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Glückauf 117 (1981) Nr.17, S.1113 *
Glückauf 117 (1981) Nr.18, S.1085,1086 *
Tiefbau, Ingenieursbau, Straßenbau 8/1980, S.674-677 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0196451A1 (en) * 1985-03-05 1986-10-08 Dyckerhoff & Widmann Aktiengesellschaft Tension element for a rock bolt or the like
EP0251887A1 (en) * 1986-06-24 1988-01-07 Forges Et Boulonneries D'ars-Sur-Moselle Extensible support bolt, supporting method, use of the bolt
WO1988007142A3 (en) * 1987-03-18 1988-12-01 Upat Max Langensiepen Kg Anchoring bar for a hydraulic mortar
WO1988007142A2 (en) * 1987-03-18 1988-09-22 Upat Gmbh & Co. Anchoring bar for a hydraulic mortar
WO1988007141A3 (en) * 1987-03-18 1988-12-01 Upat Max Langensiepen Kg Fixing rod
WO1988007141A2 (en) * 1987-03-18 1988-09-22 Upat Gmbh & Co. Fixing rod
FR2613438A1 (en) * 1987-03-30 1988-10-07 Ars Forges Boulonneries Improvement to an extensible support bolt and support method
DE4445154A1 (en) * 1994-12-17 1996-06-20 Fischer Artur Werke Gmbh Process for producing an expansion anchor made of corrosion-resistant steel
DE19716926A1 (en) * 1997-04-23 1998-10-29 Mkt Metall Kunststoff Technik Expansion dowels, especially made of stainless steel
DE102011012955A1 (en) * 2011-03-08 2012-09-13 Karlsruher Institut für Technologie Anchor fastener
WO2012119763A1 (en) * 2011-03-08 2012-09-13 Karlsruher Institut für Technologie Anchor fastening element
DE102020132950A1 (en) 2020-12-10 2022-06-15 Geobrugg Ag Corrosion protection device, corrosion protection system, corrosion-protected slope stabilization system and method for corrosion-protected anchoring of a geotechnical anchor element
WO2022122468A2 (en) 2020-12-10 2022-06-16 Geobrugg Ag Corrosion protection device, corrosion protection system, corrosion-protected embankment stabilisation system, and method for corrosion-protected anchoring of a geotechnical anchor element

Also Published As

Publication number Publication date
GB2141804A (en) 1985-01-03
FR2547351B1 (en) 1987-01-23
BE899784A (en) 1984-09-17
GB8414253D0 (en) 1984-07-11
FR2547351A1 (en) 1984-12-14

Similar Documents

Publication Publication Date Title
DE2627524C3 (en) Grouting anchor
EP0394179B1 (en) Combined rigid profile and extension anchor with expansion element
DE3417252C1 (en) Combined rigid profile and expansion anchor
EP0190460B1 (en) Anchoring device for the traction member of an anchor, especially a rock anchor
EP0014426B1 (en) Rock anchor
EP2257690B1 (en) Corrosion-protected self-drilling anchor and anchor subunit and method for the production thereof
EP2087203B1 (en) Improved sliding anchor
EP1505223A1 (en) Corrosion protected tendon, especially for prestressed concrete
EP2817465B1 (en) Device for the application of force to tension members from fiber-reinforced plastic plates
EP0976873B2 (en) Injection- or prestressed ground anchor
DE3320460C1 (en) Resilient mountain anchor
EP1381756B1 (en) Method and device for drilling a hole and for securing an anchorage in a bore hole
EP2606185B1 (en) Device for introducing a force into tension members made of fiber-reinforced plastic flat strip lamella
DE4432128C2 (en) Method for producing an anchor element for an earth or rock anchor, rock bolts or the like from a strand of twisted steel wires
EP0189443B1 (en) Prestressed anchorage rod and pile
DE3322346C1 (en) Rock bolt
DE2927953A1 (en) MOUNTAIN ANCHOR
EP2295719A2 (en) Fixing element and method for manufacturing the same
EP0739442B1 (en) Tensionable gfp rock anchor
EP3517688A1 (en) Ground anchor element
DE2201950B2 (en) Structural component anchorage for earth or rock - involves tension member comprising elastic and non-elastic steel parts
DE3116850A1 (en) SPREADING SLEEVE FOR CONSTRUCTION PARTS
DE8316554U1 (en) Resilient mountain anchor
DE1634273A1 (en) Ground anchor and process for its manufacture
EP0899382B1 (en) Anchor element for a prestressed groundanchor

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee