DE3137967A1 - Method of founding a drilling and production platform of a drilling rig in a stretch of water - Google Patents

Method of founding a drilling and production platform of a drilling rig in a stretch of water

Info

Publication number
DE3137967A1
DE3137967A1 DE19813137967 DE3137967A DE3137967A1 DE 3137967 A1 DE3137967 A1 DE 3137967A1 DE 19813137967 DE19813137967 DE 19813137967 DE 3137967 A DE3137967 A DE 3137967A DE 3137967 A1 DE3137967 A1 DE 3137967A1
Authority
DE
Germany
Prior art keywords
water
pile
pile foundation
drilling
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19813137967
Other languages
German (de)
Other versions
DE3137967C2 (en
Inventor
Bernhard Dipl.-Ing. 4300 Essen Breuer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochtief AG
Original Assignee
Hochtief AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochtief AG filed Critical Hochtief AG
Priority to DE19813137967 priority Critical patent/DE3137967C2/en
Publication of DE3137967A1 publication Critical patent/DE3137967A1/en
Application granted granted Critical
Publication of DE3137967C2 publication Critical patent/DE3137967C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

To found a drilling and production platform, having at least one base body (1), of a drilling rig in a stretch of water having a yielding bed (4), first of all a middle centring pile (2) and several auxiliary piles (3) around the middle centring pile (2) are put into the bed (4) of the stretch of water in the foundation area. A pile foundation body (6) is then put down onto the end (5), projecting from the bed (4) of the stretch of water, of the middle centring pile (2) and the auxiliary piles (3). A multiplicity of main piles (11) are then put into the bed (4) through guides (10) of the pile foundation body (6) and are connected to the pile foundation body (6). Finally, the base body (1) is lowered onto the middle centring pile (2) and the pile foundation body (6). <IMAGE>

Description

Die Erfindung betrifft ein Gründungsverfahren gemäß Ober-The invention relates to a foundation method according to

begriff des Patentanspruches 1.term of claim 1.

Bei aus der Praxis bekannten Verfahren der genannten Art werden weitere Maßnahmen regelnäßig nicht durchgeführt, d.h.In the case of methods of the type mentioned known from practice, further Measures not carried out according to the rules, i.e.

handelt es sich ausschließlich um Schwerkraftgründungen Bei nachgiebigem, beispielsweise sumpfigem Gewässerboden sind solche Gründungen aber oft nicht ohne Probleme, weil sich die Bohrinsel im Verlauf der Zeit absenken kann Hier will die Erfindung Abhilfe schaffen.it is exclusively a matter of gravity foundations. Such foundations are often not without, for example, swampy water bottom Problems because the oil rig can sink over time Invention to remedy the situation.

Der Erfindung liegt die Aufgabe zugrunde, das eingangs genannte Verfahren so weiter zu entwickeln, daß auch bei nachgiebigem Gewässerboden eine über längere Zeiträume einwandfreie Gründung gewährleistet ist.The invention is based on the object of the aforementioned method to develop further in such a way that even with a yielding seabed one over a longer period of time Periods of perfect foundation is guaranteed.

Diese Aufgabe wird gemäß der Erfindung durch die im Kennzeichen des Patentanspruches 1 angegebenen Merkmale gelöst. -Die Erfindung nutzt hierbei die Erkenntnis, daß bei nachgiebigem GEwässerboden eine über längere Zeiträume einwandfrei bleibende Gründung einer Bohrinsel praktisch nur durch eine Kombination von Schwerkraft und Pfahlgründung gegeben ist, die unter Berücksichtigung der besonderen Gegebenheiten in der beschriebenen Art und Weise problemlos durchgeführt werden kann. Pfahlgründungen sind an sich schon seit langem bekannt, haben aber die Probleme um Gründungen von Bohrinseln bisher nicht beeinflußt. - Ein Hauptvorteil des erfindungsgemäßen Verfahrens ist darin zu sehen, daß die aufwendigen Gründungsarbeiten zunächst ohne Plattform ausgeführt werden können und letztere erst später zu einem wählbaren günstigen Zeitpunkt (Ruhigwetterperiode) schnell errichtet werden kann.This object is achieved according to the invention by the in the characterizing part of Patent claim 1 specified features solved. -The invention uses the Realization that if the bottom of the water is yielding, one works perfectly over long periods of time permanent foundation of an oil rig practically only through a combination of gravity and pile foundation is given, taking into account the special circumstances can be carried out in the manner described without any problems. Pile foundations have been known per se for a long time, but have problems with founding Oil rigs not influenced so far. - A main advantage of the invention Procedure can be seen in the fact that the complex foundation work initially without Platform can be run and the latter later at a selectable cheap Time (calm weather period) can be set up quickly.

Für die weitere Ausgestaltung bestehen im Rahmen der Erfindung mehrere Möglichkeiten, deren bevorzugte sich aus den Patentansprüchen 2 bis 5 ergeben.For the further development there are several within the scope of the invention Possibilities, the preferred of which result from claims 2 to 5.

Im folgenden wird die Erfindung anhand einer ein Ausführungsbeispiel darstellenden Zeichnung erläutert; es zeigen: Fig. 1 eine Aufsicht auf die Pfahlgründung vor-dem Absetzen der Plattform-Fußkörper und Fig. 2 einen Querschnitt durch eine fertige Gründung im Bereich eines Fußkörpers.In the following the invention is based on an exemplary embodiment illustrative drawing explained; They show: FIG. 1 a plan view of the pile foundation before the platform foot body is set down and FIG. 2 shows a cross section through a finished foundation in the area of a foot body.

Die im einzelnen nicht dargestellte Bohr- und Produktionsplattform der Bohrinsel besteht in bekannter Weise aus einem Dreibeingerüst, welches im zusammengelegten Zustand an den Gründungsort verbracht und dort entfaltet sowie dabei abgesenkt wird. Jedes Bein des Dreibeingerüstes ist an seinem unteren Ende mit einem Fußkörper 1 ausgerüstet. Im entfalteten Zustand liegen die Fußkörper 1 an den Ecken eines gleichseitigen Dreiecks.The drilling and production platform, not shown in detail the drilling rig consists in a known manner of a three-legged frame, which in the collapsed State brought to the place of foundation and unfolded there and lowered in the process. Each leg of the tripod frame is provided with a foot body 1 at its lower end equipped. In the unfolded state, the foot bodies 1 lie at the corners of an equilateral Triangle.

Zum Gründen der Plattform in einem Gewässer werden im Gründungsbereich pro Fußkörper 1 zunächst ein Zentrierungsmittelpfahl 2 und auf einem zu diesem konzentrischen Kreis mit gleichbleibendem Abstand voneinander vier Hilfspfähle 3 in den Gewässerboden 4 gerammt. Anschließend wird auf das aus dem Gewässerboden 4 vorkragende Ende 5 des Zentrierungsmittelpfahles 2 und die Hilfspfähle 3 jeweils ein schwimmfähiger Pfahlgründungskörper 6 durch Fluten von an bzw in diesem vorgesehenen Auftriebskammern 7 abgesetzt, wobei der Zentrierungsmittelpfahl 2 mit seinem oberen Ende 5 durch eine Zentrierführung 8 des Pfahlgründungskörpers 6 gleitet und anschließend aus dem Pfahlgründungskörper 6 herausragt, während die Hilfspfähle 3 den Pfahlgründungskörper 6 an seinem Außenrand bzw. Außenrandflanschen 9 stützen. Danach wird nun durch im Pfahlgründungskörper 6 vorgesehene Führungen 10 hindurch im Bereich zwischen dem Zentrierungsmittelpfahl 2 und den äußeren Hilfspfählen 3 in gleichmäßiger Verteilung eine Vielzahl von Hauptpfählen 11 in den Gewässerboden 4 gerammt und mit dem Pfahlgründungskörper 6 verbunden. Abschließend werden die Fußkörper 1 auf den Zentrierungspfählen 2 und den Pfahlgründungskörpern 6 abgesetzt wobei das lagerichtige Absetzen durch jeweils eine untere Zentralkonusausnehmung 12 im Fußkörper 1 erleichtert wird. Der zwischen dem Pfahlgründungskörper 6 und Fußkörper a verbleibende Zwischenraum 13 wird hernach mit Mörtel ausgefüllt, um die Belastung zu vergleichmäßigen. Abschließend kann noch durch zumindest teilweises Lenzen der Auftriebskammern 7 mit einem Auftriebsmedium - z.B. Luft - die von der Plattform auf die Pfahlgründungen ausgeübte Druckkraft vermindert bzw. eingeteilt werden.To found the platform in a body of water, the foundation area per foot body 1 initially a centering post 2 and on one concentric to this Circle with a constant distance from each other four auxiliary piles 3 in the bottom of the water 4 rammed. Subsequently, the end 5 protruding from the bottom of the water of the centering post 2 and the auxiliary piles 3 each a buoyant one Pile foundation body 6 by flooding of buoyancy chambers provided on or in this 7 discontinued, the centering post 2 with its upper end 5 through a centering guide 8 of the pile foundation body 6 slides and then off the pile foundation body 6 protrudes, while the auxiliary piles 3 the pile foundation body 6 support on its outer edge or outer edge flanges 9. After that, im Pile foundation body 6 provided guides 10 through in the area between the Centering center pile 2 and the outer auxiliary piles 3 in an even distribution a plurality of main piles 11 rammed into the water floor 4 and with the pile foundation body 6 connected. Finally, the foot body 1 on the centering posts 2 and the pile foundation bodies 6 deposited with the correct positioning through each a lower central cone recess 12 in the foot body 1 is facilitated. The between the pile foundation body 6 and foot body a remaining space 13 is afterwards filled with mortar to even out the load. Finally can by at least partially purging the buoyancy chambers 7 with a buoyancy medium - e.g. air - the compressive force exerted by the platform on the pile foundations be reduced or divided.

Claims (5)

Verfahren zum Gründen einer Bohr- und Produktionsplattform einer Bohrinsel in einem Gewässer Patentansprüche 1. Verfahren zum Gründen einer wenigstens einen Fußkörper aufweisenden Bohr- und -Produktionsplattform einer Bohrinsel in einem Gewässer, wobei der Fußkörper auf den Boden des Gewässers abgesenkt wird, d a d u r c h g e k e n n -z e i c h n e t, daß im Gründungsbereich zunächst ein Zentrierungsmittelpfahl und um diesen herum mehrere Hilfspfähle in den Gewässerboden gesetzt werden, daß anschließend auf das aus dem Gewässerboden vorkragende Ende des Zentrierungsmittelpfahles und die Hilfspfähle ein Pfahlgründungskörper abgesetzt wird, daß danach durch Führungen des Pfahlgründungskörpers hindurch eine Vielzahl von Hauptpfählen in den Gewässerboden gesetzt sowie mit dem Pfahlgründungskörper verbunden wird, und daß abschließend der Fußkörper auf dem Zentrierungsmittelpfahl und dem Pfahlgründungskörper abgesetzt wird. Method for setting up a drilling and production platform Oil rig in a body of water Patent claims 1. Method for establishing at least one a drilling and production platform of an oil rig having a foot body in a body of water, the body of the foot being lowered to the bottom of the body of water, d a d u r c h e k e n n -z e i c h n e t that in the foundation area initially a Centering post and around it several auxiliary piles in the Bodies of water are set that then protruding from the floor of the water End of the centering center pile and the auxiliary piles a pile foundation body is deposited that then through guides of the pile foundation body through a A large number of main piles are set in the bottom of the water and with the pile foundation is connected, and that finally the foot body on the centering post and the pile foundation body is deposited. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Hilfspfähle auf einem zum Zentrierungsmittelpfahl konzentrischen Kreis mit gleichbleibendem Abstand voneinander gesetzt werden.2. The method according to claim 1, characterized in that the auxiliary piles on a circle concentric to the centering post with a constant Distance from each other. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Hauptpfähle im Bereich zwischen dem Zentrierungsmittelpfahl und den Hilfspfählen gesetzt werden.3. The method according to claim 1 or 2, characterized in that the Main piles in the area between the centering center pile and the auxiliary piles be set. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß der Pfahlgründungskörper durch Fluten von Auftriebskammern abgesenkt wird, die nach dem Absetzen des Fußkörpers zumindest teilweise mit einem Auftriebsmedium lenzbar sind.4. The method according to any one of claims 1 to 3, characterized in that that the pile foundation body is lowered by flooding of buoyancy chambers that after the foot body has been set down, it can be at least partially drained with a buoyancy medium are. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß ein zwischen dem Pfahlgründungskörper und Fußkörper verbleibender Zwischenraum mit Mörtel verfüllt wird.5. The method according to any one of claims 1 to 4, characterized in that that a gap remaining between the pile foundation body and foot body is filled with mortar.
DE19813137967 1981-09-24 1981-09-24 Method for founding a drilling and production platform of an oil rig having at least one foot body in a body of water Expired DE3137967C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19813137967 DE3137967C2 (en) 1981-09-24 1981-09-24 Method for founding a drilling and production platform of an oil rig having at least one foot body in a body of water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19813137967 DE3137967C2 (en) 1981-09-24 1981-09-24 Method for founding a drilling and production platform of an oil rig having at least one foot body in a body of water

Publications (2)

Publication Number Publication Date
DE3137967A1 true DE3137967A1 (en) 1983-04-14
DE3137967C2 DE3137967C2 (en) 1984-04-05

Family

ID=6142471

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19813137967 Expired DE3137967C2 (en) 1981-09-24 1981-09-24 Method for founding a drilling and production platform of an oil rig having at least one foot body in a body of water

Country Status (1)

Country Link
DE (1) DE3137967C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8157481B1 (en) 1994-05-02 2012-04-17 Shell Oil Company Method for templateless foundation installation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2940266A (en) * 1956-07-30 1960-06-14 Shamrock Drilling Co Method of constructing an offshore well drilling island
DE2454242A1 (en) * 1974-11-15 1976-05-20 Salzgitter Maschinen Ag Offshore drilling/production platform - with inclined legs resting on sea floor and joined only above sea level
GB2021182A (en) * 1978-05-18 1979-11-28 Veth H Ingbureau Installing Offshore Drilling Platforms

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2940266A (en) * 1956-07-30 1960-06-14 Shamrock Drilling Co Method of constructing an offshore well drilling island
DE2454242A1 (en) * 1974-11-15 1976-05-20 Salzgitter Maschinen Ag Offshore drilling/production platform - with inclined legs resting on sea floor and joined only above sea level
GB2021182A (en) * 1978-05-18 1979-11-28 Veth H Ingbureau Installing Offshore Drilling Platforms

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8157481B1 (en) 1994-05-02 2012-04-17 Shell Oil Company Method for templateless foundation installation

Also Published As

Publication number Publication date
DE3137967C2 (en) 1984-04-05

Similar Documents

Publication Publication Date Title
DE3605161C2 (en)
DE2459478C3 (en) Procedure for the construction of an artificial island
DE1484043A1 (en) Building construction and connecting elements for it
DE2839699A1 (en) UNDERWATER DRILLING TEMPLATE WITH CAROUSEL GUIDE SYSTEM
DE2424698A1 (en) OFFSHORE CONSTRUCTION IN THE FORM OF A TOWER
DE1634585A1 (en) System that can be set up on water surfaces
DE3341609A1 (en) METHOD FOR PRODUCING CONCRETE PILES SHAPED IN THE GROUND
DE1781162A1 (en) Connection structure for the struts of a truss construction
DE2323139A1 (en) DEVICE FOR FASTENING A PIPE WITH LARGE DIAMETER TO A SURROUNDING COVERED PIPE UNDER WATER
DE2920165A1 (en) DEVICE FOR SEALING CYLINDRICAL PIPES AND THE like.
DE2559498A1 (en) METHOD OF MANUFACTURING A TOWER CONSTRUCTION
DE3137967A1 (en) Method of founding a drilling and production platform of a drilling rig in a stretch of water
DE102013015299A1 (en) Jacket for a wind turbine and method of manufacture
DE102019217692A1 (en) Foundation for a tower of a wind turbine
DE2510656C3 (en) Process for the production of an underwater structure from parts connected to one another by screwing and welding and the formation of a joint to connect the parts
DE68903583T2 (en) METHOD FOR ESTABLISHING HYDROELECTRIC STRUCTURES, LIKE MOLEN, HARBOR INSULATION AND THE LIKE.
DE2354172A1 (en) Anchoring for preventing buoyancy lift of structures - uses temporary tensioning members operated above ground water level
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE2645910A1 (en) FORMWORK AND PROCEDURES FOR ERECTING FUNNEL OR CONE-SHAPED CONCRETE BUILDINGS
DE3443451C1 (en) Apparatus for installing a support
EP0594157A1 (en) Log cabin
DE3726247C1 (en) Fastener
DE2531251C3 (en) Method of making an artificial island
EP0050836A1 (en) Fuel-element bundle for a nuclear reactor
DE867828C (en) Process for the production and installation of a permanent concrete coating, open at the top and bottom, for foundation pillars or the like.

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee