DE306750C DENDAT306750D DE306750DA DE306750C DE 306750 C DE306750 C DE 306750C DE NDAT306750 D DENDAT306750 D DE NDAT306750D DE 306750D A DE306750D A DE 306750DA DE 306750 C DE306750 C DE 306750C
Authority
DE
Germany
Prior art keywords
earth
layer
concrete
floating
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DENDAT306750D
Other languages
German (de)
Publication of DE306750C publication Critical patent/DE306750C/de
Active legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)

Description

KAISERLICHES Λ IMPERIAL Λ

PATENTAMT.PATENT OFFICE.

PATENTSCHRIFTPATENT LETTERING

KLASSE 84 c. GRUPPECLASS 84 c. GROUP

LUDWIG ZIMMERMANN in FRANKFURT a. M.LUDWIG ZIMMERMANN in FRANKFURT a. M.

■n : ■ n :

Patentiert im Deutschen Reiche vom 26. Mai 1916 ab. ·Patented in the German Empire on May 26, 1916. ·

Bei allen Betonpfahlgründungen, welche, in einer abgebohrten (System Strauß)- oder auch gerammten Blechform auf dem Bauplatz ausgeführt werden, und bei welchen die Blechform entsprechend ihrer Füllung mit Beton stückweise hochgezogen wird, geschieht es leicht, daß die Pfahlform höher gezogen wird als die Betonfüllung in der Form steht. Auch ist es möglich, daß beim Antreffen von wei-: With all concrete pile foundations, which are carried out in a drilled (Strauss system) or rammed sheet metal form on the construction site, and in which the sheet metal form is pulled up piece by piece according to its filling with concrete, it easily happens that the pile shape is pulled higher than the Concrete filling in the form. It is also possible that when we encounter white :

ίο eher, schlammiger Erdschicht o. dgl. der im Maritelrohr vorgesehene Beton insofern nicht ausreicht als der Kern des Pfahles einen der weichen Erdschicht sich anpassenden, größeren Umfang annimmt als das Mantelrohr und folglich der eingebrachte Beton nicht die vorgesehene Verlähgerungd es Pfahlkernes erreicht. Dieser Umstand kann oft selbst bei größter Aufmerksamkeit nicht vermieden werden, da es nicht bestimmt festgestellt werden kann, in welchen Höhen der Schichtenwechsel zwischen festen und mehr zusammendrückbaren Erdschichten erfolgt. Der Beton sinkt in der Form tiefer hinab, sobald die Form beim Ziehen die Grenze zwischen einer festeren und leichteren Erdschicht überschreitet, z. B. zwischen weichem Ton oder Schlamm, Triebsand usw. . . . . ■ίο rather, muddy layer of earth or the like Maritelrohr provided concrete is insufficient as the core of the pile is one of the soft earth layer adapts to a larger extent than the jacket pipe and consequently the poured concrete does not reach the intended extension of the pile core. This fact can often not be avoided even with the greatest care it cannot be determined at what level the layers alternate between solid and more compressible Earth layers takes place. The concrete sinks deeper into the form as soon as the form is Pulling the boundary between a firmer and a lighter layer of earth exceeds, e.g. B. between soft clay or mud, sand, etc. . . . ■

Zur Behebung dieser Mängel dient das neue Verfahren, welches in der Zeichnung an einem Beispiel erläutert ist. Sowohl Fig. 1 wie Fig. 2 zeigen den Betonpfahl in senkrechtem Schnitt. Nachdem das Vortreibrohr a, b genügend tief in die tragfähige Erdschicht w hineingetrieben ist, wird der weiche Beton schichtenweise eingebracht und das Vortreibrohr stückweise hochgezogen. Bevor das Vortreibrohr aus der weicheren Bodenschicht ν gezogen ist, wird ein aus Streckmetall öder aus anderem Metallblech oder Drahtnetz o. dgl. gefertigter Zylinder y eingesetzt, welcher die Höhe der schlammigen Schicht ν oben und unten überragt. Wird nunmehr das Vortreibrohr mit sehr weichem Beton oder Mörtel gefüllt, um dem schlammigen Boden einen genügenden Gegendruck zu bieten, und das Vortreibrohr um die Höhe des Zylinders y hochgezogen, dann wird der weiche Beton durch die Maschen des Zylinders y in das ihn umgebende weiche Erdreich eindringen und es zurückdrängen, was durch Stampfen mit geeignetem Stampfer noch verstärkt werden kann. Es wird hierdurch erreicht, daß der Betonkern des Pfahles mit Sicherheit keine Unterbrechung erleidet. Außerdem bildet sich noch ein von oben nach unten sich verbreitender Wulst ζ über der festen Schicht w. The new method, which is explained using an example in the drawing, is used to remedy these deficiencies. Both Fig. 1 and Fig. 2 show the concrete pile in vertical section. After the driving pipe a, b has been driven sufficiently deep into the load-bearing soil layer w , the soft concrete is placed in layers and the driving pipe is pulled up piece by piece. Before the driving pipe is pulled out of the softer soil layer ν , a cylinder y made of expanded metal or other sheet metal or wire mesh or the like is inserted, which projects above the height of the muddy layer ν above and below. If the jacking pipe is now filled with very soft concrete or mortar in order to provide the muddy ground with sufficient counterpressure, and the jacking pipe is pulled up to the height of the cylinder y , the soft concrete is then passed through the mesh of the cylinder y into the soft soil surrounding it penetrate and push it back, which can be reinforced by tamping with a suitable tamper. It is thereby achieved that the concrete core of the pile will certainly not suffer any interruption. In addition, a bulge ζ that spreads from top to bottom is formed over the solid layer w.

Claims (1)

Patent-Anspruch:Patent claim: Verfahren zur Verhinderung des Unterbrechens des in ein Pfahlloch einzubringenden Betons durch schwimmende oder ähnliche Erdschichten, dadurch gekennzeichnet, daß an den Stellen der Erdschichtenfolge, wo eine wenig feste oder schwimmende Erdschicht (v) über einer festeren, trag-Method for preventing the interruption of the concrete to be introduced into a pile hole by floating or similar layers of earth, characterized in that at the points of the earth layer sequence where a less firm or floating earth layer (v) is over a firmer, load-bearing fähigen Erdschicht (w) liegt, ein oben und unten über die schwimmende Schicht hinausragender Zylinder (y) aus Netzwerk in das Vortreibrohr (α, h) eingebracht und dann mit Beton gefüllt wird, der beim allmählichen Hochziehen des Vortreibrohres durch die Maschen des Netzwerkes hindurchtretend den Pfahlquerschnitt innerhalb der schwimmenden Erdschicht wulstartig erweitert.capable earth layer (w) , a cylinder (y) made of network protruding above and below the floating layer is inserted into the driving pipe (α, h) and then filled with concrete, which passes through the mesh of the network when the driving pipe is gradually pulled up the pile cross-section within the floating layer of earth expanded like a bead. Hierzu ι Blatt Zeichnungen.For this purpose ι sheet of drawings.
DENDAT306750D Active DE306750C (en)

Publications (1)

Publication Number Publication Date
DE306750C true DE306750C (en)

Family

ID=560141

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT306750D Active DE306750C (en)

Country Status (1)

Country Link
DE (1) DE306750C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1298459B (en) * 1965-09-08 1969-06-26 Pleuger Friedrich Wilhelm Hose formwork for the production of in-situ concrete piles
AU2016298233B2 (en) * 2015-07-27 2021-08-12 Geopier Foundation Company, Inc. Open-bottom extensible shells and related methods for constructing a support pier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1298459B (en) * 1965-09-08 1969-06-26 Pleuger Friedrich Wilhelm Hose formwork for the production of in-situ concrete piles
AU2016298233B2 (en) * 2015-07-27 2021-08-12 Geopier Foundation Company, Inc. Open-bottom extensible shells and related methods for constructing a support pier

Similar Documents

Publication Publication Date Title
DE69215811T2 (en) SHORT PILLARS FROM AGGLOMERATE AND METHOD AND DEVICE FOR PRODUCING THE SAME
DE2318842A1 (en) DEVICE AND METHOD FOR THE FORMATION OF PILLARS IN THE SOIL
CH684102A5 (en) Method and apparatus for stabilizing roads on slopes.
EP0758699B1 (en) Method for installing tapered piles, tapered piles, and foundation structures made with these piles
DE2147051A1 (en) PROCEDURE FOR MAKING A PRESSURE POST IN THE SOIL
EP0580098A1 (en) Method and device for pile foundation
DE3630969C2 (en)
DE306750C (en)
DE1947249A1 (en) Foundation or civil engineering structure and process for its production
EP0788572A1 (en) Building underpinning process
DE69201409T2 (en) Method of making a foundation pile.
DE102010024607B4 (en) Foundation pile and process for its production
WO1983004276A1 (en) Hollow foundation element and manufacturing method thereof
DE102021116487B3 (en) Geotextile covered liquid soil columns
EP3351687B1 (en) Method of making a pile
DE2335378A1 (en) METHOD AND DEVICE FOR DRIVING SHAFTS
DE738329C (en) Device for the production of location posts
DE893469C (en) Process for the production of in-situ concrete piles
DE102007056408A1 (en) Roadway constructing system, has excavation area provided with gas, drinking water, and drainage lines, and embedment and soil exchange area, which are filled with self-condensing and hardable material mixture brought in flowable form
AT130301B (en) Method of making piles in poor terrain.
DE609238C (en) Method for producing a sufficiently watertight construction pit enclosure within the soil surrounding the pit
DE102020131395A1 (en) Method of securing a structure and placement of a structure on a site
DE330536C (en) Process to reduce the sagging of piles that occurs under constant load, which are produced by means of jacking pipes
DE232267C (en)
DE159228C (en)