DE3010604A1 - Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above - Google Patents

Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above

Info

Publication number
DE3010604A1
DE3010604A1 DE19803010604 DE3010604A DE3010604A1 DE 3010604 A1 DE3010604 A1 DE 3010604A1 DE 19803010604 DE19803010604 DE 19803010604 DE 3010604 A DE3010604 A DE 3010604A DE 3010604 A1 DE3010604 A1 DE 3010604A1
Authority
DE
Germany
Prior art keywords
conveyor
rope
rollers
roller
over
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19803010604
Other languages
German (de)
Inventor
Antrag Auf Nichtnennung
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
B & N Maschbau GmbH
Original Assignee
B & N Maschbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by B & N Maschbau GmbH filed Critical B & N Maschbau GmbH
Priority to DE19803010604 priority Critical patent/DE3010604A1/en
Publication of DE3010604A1 publication Critical patent/DE3010604A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G41/00Supporting frames or bases for conveyors as a whole, e.g. transportable conveyor frames
    • B65G41/02Frames mounted on wheels for movement on rail tracks
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/02Transport of mined mineral in galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The equipment suspends a conveyor etc. at a variable height, being partic. for use when mining or tunnelling. Crabs are accommodated at intervals along a hanger rail, each with a transverse beam having pulleys at the ends on both sides of the conveyor, over which a rope is reeved, this being hauled in to lift the conveyor. The rope (25) runs roughly horizontally between adjacent pulleys (26) on the conveyor (13) in the lengthwise direction, there being on each side of the conveyor a pulley directly below each one (23) on a cross-member (22, 24). The rope is reeved round these pulleys (23, 26) in a series of falls.

Description

Anordnung zum höhenveränderlichen Aufhängen einerFörder-Arrangement for height-adjustable suspension of a conveyor

einrichtung oder dergleichen, insbesondere für den Untertagebau oder den Tunnelbau.facility or the like, especially for underground mining or tunneling.

Die Erfindung betrifft eine Anordnung zum höhenveränderlichen Aufhängen einer Fördereinrichtung oder dergleichen, insbesondere für den Untertagebau oder den Tunnelbau, mit einer Hängeschiene, mit über die Länge derselben verteilt angeordneten Laufkatzen, mit jeweils einer quer zur Bewegungsrichtung der Laufkatze an dieser befestigten Quertraverse, mit Laufrollen an den Enden der Quertraverse.The invention relates to an arrangement for height-adjustable suspension a conveyor or the like, especially for underground mining or the tunnel construction, with a hanging rail, with arranged distributed over the length of the same Trolleys, each with one at right angles to the direction of movement of the trolley attached crossbar, with rollers at the ends of the crossbar.

und an beiden Seiten der Fördereinrichtung und mit einem über die Laufrollen geführten Seil, dessen Verkürzung ein Anheben der Fördereinrichtung bewirkt.and on both sides of the conveyor and with one over the Rope guided by rollers, the shortening of which causes the conveyor to be raised.

Zum Beispiel auf dem Gebiet des Untertagebaus ist es oft notwendig, eine Fördereinrichtung von verhAltnismäßig großer Länge in ihrer Längsrichtung zu verfahren.For example in the field of underground mining it is often necessary a conveyor of relatively great length in its longitudinal direction procedure.

Da der Untergrund einer Förderstrecke im allgemeinen einen Transport auf Rädern oder Rollen nicht zuläßt, wird die Fördereinrichtung über Laufkatzen an einer Hängeschiene aufgehängt, die am Streckenausbau befestigt ist.Since the underground of a conveyor line is generally a transport on wheels or rollers, the conveyor is over trolleys suspended from a hanging rail that is attached to the track extension.

Die Hänge schiene läßt sich meist nicht in gleichbleibender Höhe fUhren. Die Fördereinrichtung, zum Beispiel ein Kettenkratzförderer, ist eine über die ganze Länge hin starre Konstruktion, die nicht in der Lage ist, von sich aus Höhenunterschiede im Verlauf der Hängeschiene auszugleichen. Aber auch deshalb, weil die Höhe der Fördereinrichtung gegenüber dem Boden gelegentlich verändert werden muß, muß die Aufhängung der Fördereinrichtung so ausgebildet sein, daß der Abstand zwischen den Aufhängepunkten an der Hänge schiene und den Haltepunkten an der Fördereinrichtung unterschiedlich bzw. veränderbar sein kann.The hanging rail can usually not be guided at a constant height. The conveyor, for example a chain scraper conveyor, is one over the whole The construction is rigid in length and is incapable of inherently height differences equalize in the course of the hanging rail. But also because the amount of Conveyor must be changed occasionally with respect to the ground, the must Suspension of the conveyor be designed so that the distance between the Suspension points on the hanging rail and the breakpoints at the Conveyor can be different or changeable.

Es ist zwar denkbar, für jede Betriebsstellung der Fördereinrichtung die diese mit der Hängeschiene bzw.It is conceivable for every operating position of the conveyor which these with the hanging rail or

den Quertraversen verbindenen Aufhängungen einzeln auf die jeweils erforderliche Länge einzustellen, so daß die einzelnen Aufhängungen etwa gleichmäßig belastet sind. Dies ist aber sehr arbeitsaufwendig und deshalb nachteilig. Wenn dann aber die Fördereinrichtung entlang der Hänge schiene in eine neue Betriebsstellung verfahren werden soll, läßt sich eine gleichmäßige Belastung aller Aufhängungen nicht mehr gewährleisten, wenn die Hängeschiene nicht in gleichbleibender Höhe verläuft. Ein Nachstellen der einzelnen Aufhängungen während des Längstransportes ist unmöglich. Es wird vielmehr dazu konnten, daß einige Aufhängungen entlastet und andere Aufhängungen überlastet werden.the suspensions connecting the crossbars individually to the respective set the required length so that the individual suspensions are approximately even are burdened. However, this is very labor-intensive and therefore disadvantageous. if but then the conveyor along the hanging rail in a new operating position is to be moved, an even load on all suspensions can be achieved can no longer be guaranteed if the hanging rail does not run at the same height. It is impossible to readjust the individual suspensions during longitudinal transport. Rather, it is possible that some suspensions are relieved and other suspensions become overloaded.

Letzteres gilt insbesondere für die Aufhängungen im Endbereich der Fördereinrichtung. Diese Überlastungen sind aber auch in ihrer Größe nicht immer vorhersehbar.The latter applies in particular to the suspensions in the end area of the Conveyor. However, these overloads are not always large, either predictable.

Abgesehen davon, daßeine Auslegung der Aufhängungen für größere Überlastungen aieinem erheblichen technischen Rehraufwand führen würde, läßt es sich in keinem Fall mit der erforderlichen Sicherheit ausschließen, daß insbesondere im Endbereich der Fördereinrichtung eine Aufhängung bricht. Dies hat meist zur Folge, daß der Reihe nach auch die anderen Aufhängungen brechen.Apart from the fact that the suspension is designed for greater overloads ai would result in considerable technical effort, it cannot be used in any Rule out the case with the necessary certainty, especially in the end area the conveyor breaks a suspension. This usually has the consequence that the Break the other suspensions one by one.

Die hiermit verbundenen Schwierigkeiten hat man bereits dadurch zu lösen versucht, daß die Aufhängung an jeder Seite der Fördereinrichtung unter Verwendung eines durchgehenden Seiles erfolgte, das über Laufrollen an der Fördereinrichtung und an den Quertraversen geführt wurde.The difficulties associated with this are already recognized by this try to solve that using the suspension on each side of the conveyor a continuous rope was carried out over pulleys on the Conveyor and was guided on the crossbars.

Die Führung des Seiles war hierbei foigendermaßen ausgebildet: Die Laufrollen an der Fördereinrichtung und die Laufrollen an den Quertraversen waren zueinander versetzt angeordnet. Das Seil wurde von einer Laufrolle an der Fördereinrichtung schräg nach oben zu einer Laufrolle an der Quertraverse und von dort aus schräg nach unten zu der nächsten Laufrolle an der Fördereinrichtung geführt. Von dort aus verlief das Seil wieder schräg nach oben zu einer Laufrolle an der in Längsrichtung benachbarten nächsten Quertraverse.The guide of the rope was designed as follows: The There were rollers on the conveyor and the rollers on the crossbars arranged offset to one another. The rope was from a pulley on the conveyor obliquely upwards to a roller on the cross member and from there obliquely down to the next roller on the conveyor. From there from the rope ran diagonally upwards to a roller on the in the longitudinal direction adjacent next cross member.

Der Verlauf des Seils war somit dreieckförmig.The course of the rope was thus triangular.

Auch diese Art der Aufhängung hat noch erhebliche Nachteile. Wenn die Fördereinrichtung verhältnismäßig weit angehoben werden mußte, so verliefen die einzelnen Bereiche des Seiles entsprechend flach, d.h., daß der Winkel mit der Horizontalen verhältnismäßig klein war.This type of suspension also has considerable disadvantages. if the conveyor had to be raised relatively far, so went the individual areas of the rope are correspondingly flat, i.e. the angle with the Horizontal was relatively small.

Bekanntlich wächst aber die durch ein Gewicht verursachte Belastung in einem Seil mit einem zun zunehmend horizontalen Verlauf desselben. Das Seil mußte deshalb verhältnismäßig stark dimensioniert werden. Um aber Überlastungen mit Sicherheit zu vermeiden, konnte vielfach die sonst mögliche Hubhöhe nicht ausgenutzt werden. Weitere Schwierigkeiten bezüglich der Gleichmäßigkeit der Belastung für Seil und Aufhängungen ergabensich ferner im Bereich eines steigenden oder fallenden Verlaufs der Fördereinrichtung selbst.It is well known, however, that the load caused by a weight increases in a rope with an increasingly horizontal course of the same. The rope had to therefore be dimensioned relatively large. But about overloads with certainty To avoid this, the otherwise possible lifting height could often not be used. Further difficulties regarding the uniformity of the load for rope and Suspensions were also found in the area of a rising or falling course the funding body itself.

Es war deshalb Aufgabe der vorliegenden Erfindung, eine zum höhenveränderlichen Aufhängen ceeignete Anordnung zu schaffen, deren Seil unabhängig vom Verlauf der Hänge schiene und der Fördereinrichtung und unabhängig von der jeweils einzustellenden Aufhängungshöhe eine gleichmäßige Seilbelastung gewährleistet, und zwar auch während des Transports der Fördereinrichtung in ihrer Längsrichtung.It was therefore the object of the present invention to provide a height-adjustable Hanging in a suitable arrangement to create their rope independently of the course of the hanging rail and the conveyor and regardless of which one The suspension height to be set ensures an even load on the rope, and although also during the transport of the conveyor in its longitudinal direction.

Zur Lösung dieser Aufgabe wird erfindungsgemäß vorgeschlagen, daß das Seil zwischen in Längsrichtung der Fördereinrichtung benachbarten Laufrollen zumindest angenähert horizontal -verläuft, daß an jeder Seite jeweils eine am Ende der Quertraverse befestigte laufrolle und eine an der Fördereinrichtung befestigte Laufrolle zumindest angenähert vertikal untereinander angeordnet sind und daß das Seil über diese Rollen in Form einer Schlaufe geführt ist.To solve this problem it is proposed according to the invention that the rope between adjacent rollers in the longitudinal direction of the conveyor at least approximately horizontally, that one on each side at the end the crossbar attached to the roller and one attached to the conveyor Rollers are arranged at least approximately vertically one below the other and that the Rope is guided over these rollers in the form of a loop.

Durch diese Ausbildung wird erreicht, daß die Verlauf richtung des Seils unabhängig von der jeweils vorgesehenen Höheneinstellung immer nur zumindest angenähert vertikal und horizontal ist. Es ist also in keinem Bereich des Seiles ein Schrägverlauf vorhanden, der zu einer Erhöhung der Seilbelastung. führen könnte. Durch die von der Erfindung vorgeschlagene Ausbildung ist eine gleichbleibende Belastung an allen Aufhängungspunkten gewährleistet, und zwar auch während eines Längstransportes der Fördereinrichtung. Wenn die Hängeschiene zum Beispiel in ihrem Verlauf steigt oder fällt, so werden die dadurch bedingten unterschiedlichen Abstände durch das Seil selbsttätig ausgeglichen, ohne daß es zu überhöhten Belastungen kommen kann. Dies läßt sich mit einem nur geringen technischen Aufwand erreichen, was ebenfalls vorteilhaft ist.This training ensures that the course direction of the Rope regardless of the intended height adjustment always at least is approximately vertical and horizontal. So it is not in any part of the rope there is an incline that increases the load on the rope. could lead. The design proposed by the invention results in a constant load guaranteed at all suspension points, even during longitudinal transport the conveyor. If, for example, the hanging rail rises in its course or falls, the different distances caused by the The rope is automatically balanced without the risk of excessive loads. This can be achieved with only little technical effort, and that too is advantageous.

Gemäß einem weiteren Vorschlag der Erfindung kann die Anordnung so ausgebildet sein, daß der eine Schlaufe bildende Teil des Seiles jeweils von einer an der Fördereinrichtung befestigten Laufrolle ausgehend zu der Laufrolle an der darüber befindlichen Quertraverse und zurück verläuft. In diesem Fall verlaufen die horizontal geführten Bereiche des Seiles neben der Fördereinrichtung. Wenn die Anordnung zum Beispiel für den Untertagebau verwendet wird und die Laufkatzen als Unterflansch-Laufkatzen ausgebildet sind, könnten bei einer Horizontal-Führuny des Seiles in Höhe der Quertraversen sonst Verkantungen entstehen, durch die die Laufkatzen gebremst werden.According to a further proposal of the invention, the arrangement can be so be designed that the part of the rope forming a loop is in each case by one attached to the conveyor roller starting to the roller on the crossbar above it and back. In this case, expire the horizontally guided areas of the rope next to the conveyor. If the Arrangement is used for example for underground mining and the trolleys as Bottom flange trolleys are formed, could with a horizontal guide of the Otherwise, the rope at the level of the cross members will cause canting, which will cause the trolleys be braked.

Ferner kann erfindungsgemäß am Ausgangspunkt einer Schlaufe für den abgehenden und den rückkehrenden Schlaufenteil jeweils eine Laufrolle vorgesehen sein, wobei es günstig ist, wenn diese beiden Laufrollen zueinander koaxial angeordnet werden.Furthermore, according to the invention at the starting point of a loop for the outgoing and the returning loop part each provided a roller be, it is advantageous if these two rollers are arranged coaxially to one another will.

Im allgemeinen wird sich an dem einen Ende der Fördereinrichtung eine Antriebseinheit für die Fördereinrichtung selbst befinden. Das gegenüberliegende Ende der Fördereinrichtung stellt die sogenannte Kehre dar, an der ein endloses Förderband, eine mit Mitnehmern versehene Förderkette oder dergleichen vom Obertrum in den Untertrum übergehen. Ein zum Verlängern oder Verkürzen des Seils dienender Antrieb wird meist auch im Bereich der zurvor genannten Antriebseinheit angeordnet werden. Es ist grundsätzlich möglich, an jeder Seite der Fördereinrichtung ein separates Seil zu verwenden und beide Teile gleichmäßig zu verlängern oder zu verkürzen. Es ist aber ebensogut auch denkbar, nur ein einziges durchgehendes Seil zu verwenden, das von der Antriebseinheit aus an der einen Seite der Fördereinrichtung entlang verläuft, im Bereich der Kehre auf die andere Seite herübergeführt wird und dort bis zur Antriebseinheit zurückläuft. Das eine Ende des Seils ist dann an einer geeigneten Stelle fest angeschlagen, während das andere Ende mit dem hierfür vorgesehenen Antrieb verbunden ist. Für diese Ausführungsform ist es günstig, wenn das Herüberführen des Seiles auf die andere Seite der Fördereinrichtung über die Laufrollen einer Quertraverse erfolgt, also im Bereich oberhalb der Fördereinrichtung. Dies ist günstiger als eine Führung des Seiles im unteren Endbereich der Fördereinrichtung.In general, at one end of the conveyor there will be a Drive unit for the conveyor itself are located. The opposite The end of the conveyor is the so-called turn, at which an endless one Conveyor belt, a conveyor chain provided with drivers or the like from the upper run merge into the lower run. One used to lengthen or shorten the rope The drive is usually also arranged in the area of the aforementioned drive unit will. It is basically possible to have a separate one on each side of the conveyor Use rope and lengthen or shorten both parts equally. It but it is just as conceivable, only a single continuous Use rope running from the drive unit to one side of the conveyor runs along, is led over to the other side in the area of the bend and there runs back to the drive unit. One end of the rope is then on firmly attached to a suitable point, while the other end with the for this purpose intended drive is connected. For this embodiment it is advantageous if the transfer of the rope to the other side of the conveyor via the Rollers of a cross member takes place, that is, in the area above the conveyor. This is cheaper than guiding the rope in the lower end area of the conveyor.

Nachfolgend wird eine besonders bevorzugte Ausführungsform der Erfindung anhand einer Zeichnung näher beschrieben. Im einzelnen zeigen: Figur 1 in einer schematischen Seitenansicht den rechten Teil und Figur 2 den linken Teil einer an einer Hänge schiene aufgehängten Fördereinrichtung; Figur 3 einen Querschnitt durch die Fördereinrichtung und ihrer Aufhängung; Figur 4 eine Ansicht der Fördereinrichtung und ihrer Aufhängung an dem als Kehre ausgebildeten Ende, gesehen in Längsrichtung.The following is a particularly preferred embodiment of the invention described in more detail using a drawing. In detail: Figure 1 shows in a schematic side view the right part and Figure 2 the left part of a a suspension rail suspended conveyor; Figure 3 is a cross section through the conveyor and its suspension; Figure 4 is a view of the conveyor and their suspension at the end designed as a turn, viewed in the longitudinal direction.

Eine Hängeschiene 10 ist an einem hier nicht dargestellten Untertage-Streckenausbau befestigt, und zwar nicht nur mit horizontalem, sondern teils auch mit steigendem oder fallendem Verlauf. Während die Befestigung am oberen Teil des Doppel-T-Profils der Hängeschiene 10 erfolgt, dient der untere Teil derselben als Lauffläche für Unterflansch-Laufkatzen 11, die durch gelenkig an ihnen angreifende Kupplungsstangen 12 miteinander verbunden sind.A hanging rail 10 is on an underground track extension, not shown here fixed, not only with a horizontal, but partly also with an increasing one or falling course. While the attachment to the upper part of the double T-profile the hanging rail 10 takes place, the lower part of the same serves as a running surface for Lower flange trolleys 11, which are articulated by coupling rods acting on them 12 are connected to each other.

Eine allgemein mit der Bezugsziffer 13 bezeichnete Fördereinrichtung ist hier als Kettenkratzförderer ausgebildet und hat eine Förderrinne 14, an deren Boden mittels einer Kette 15 Mitnehmer 16 entlanggezogen werden. Der Antrieb der Fördereinrichtung 13 erfolgt von einer Antriebseinheit 17 aus, die sich an dem einen Ende der Fördereinrichtung 13 befindet und über Ketten 18 an einer tängstraverse 19 aufgehängt ist. Letztere wiederum wird über zwei weitere Längstraversen 20 von insgesamt vier Unterflansch-Laufkatzen 11 getragen.A conveyor generally designated by the reference numeral 13 is designed here as a chain scraper conveyor and has a conveyor trough 14 on which Floor are pulled along by means of a chain 15 carrier 16. The drive of the Conveying device 13 takes place from a drive unit 17, which is located on the one The end of the conveyor 13 is located and chains 18 on a longitudinal traverse 19 is suspended. The latter, in turn, is via two further longitudinal cross members 20 of a total of four lower flange trolleys 11 carried.

An dem der Antriebseinheit 17 gegenüberliegenden Ende der Fördereinrichtung 13 befindet sich die Kehre, an der der Obertrum über eine Kettenrolle 21 in den Untertrum übergeht. Fördereinrichtungen dieser Art können eine Gesamtlänge von 30 Metern bis zu 60 Metern oder sogar mehr haben. Sie sind meist über ihre ganze Länge hin als starre Konstruktion ausgeführt.At the end of the conveyor device opposite the drive unit 17 13 is the hairpin, where the upper run via a chain roller 21 in the Lower run passes. Conveyors of this type can have a total length of 30 Meters up to 60 meters or even more. They are usually over their entire length designed as a rigid construction.

Deshalb ist es erforderlich, die Fördereinrichtung 13 mit möglichst gleichmäßiger Lastverteilung aufzuhängen.Therefore, it is necessary to use the conveyor 13 as possible evenly distributed load.

Hierzu haben die über der Förderrinne 14 befindlichen Unterflansch-Laufkatzen 11 jeweils eine Quertraverse 22.For this purpose, the lower flange trolleys located above the conveyor trough 14 11 each have a cross member 22.

An den Enden der Quertraversen 22 sind Laufrollen 23 so befestigt, daß ihre Achsen parallel zu der Traversenachse verlaufen. Nur die letzte, im Bereich der Kehre angeordnete Quertraverse 24 hat Laufrollen 23, deren Achsen quer zur Traversenlängsachse verlaufen.At the ends of the cross members 22 rollers 23 are attached so that that their axes are parallel to the traverse axis. Just the last one in the area the bend arranged transverse traverse 24 has rollers 23, the axes of which are transverse to the longitudinal axis of the traverse get lost.

An der für den Betrachter erkennbaren Seite der in den Figuren 1 und 2 dargestellten Fördereinrichtung 13 verläuft ein Seil 25 von der Antriebseinheit 17 aus horL-zontal bis zu einem ersten Laufrollenpaar 2,an dessen einer Laufrolle das Seil 25 senkrecht nach oben zu der darüber befindlichen Laufrolle 23 einer Quertraverse 22 geführt wird. Die beiden Laufrollen eines Laufrollenpaares 26 sind jeweils auf die gleiche Achse aufgesetzt und auf dieser unabhängig voneinander frei drehbar.On the side that can be seen by the viewer in FIGS. 1 and 2, a cable 25 runs from the drive unit 17 from horL-zontal up to a first pair of rollers 2, on one of which rollers the rope 25 vertically upwards to the roller 23 of a cross member located above it 22 is performed. The two rollers of a pair of rollers 26 are each on placed on the same axis and freely rotatable on this independently of each other.

Von dort aus läuft das Seil 25 wieder nach unten zu der anderen Laufrolle desselben Laufrollenpaares 26.From there, the rope 25 runs back down to the other pulley of the same pair of rollers 26.

Von dort aus ist das Seil zu dem in Längsrichtung benachbarten nächsten Laufrollenpaar 26 geführt. An dieser Stelle bildet das Seil 25 in derselben Weise wieder eine Schlaufe, in dem es über die Laufrolle 23 an der über diesem Laufrollenpaar 26 befindlichen Quertraverse 22 verläuft.From there the rope is to the next one in the longitudinal direction Pair of rollers 26 out. At this point the rope 25 forms in the same way again a loop in which it is over the roller 23 on the above this pair of rollers 26 located cross member 22 runs.

An der letzten Quertraverse 24 schließlich wird das Seil 25 von der Laufrolle 23 aus quer über die Förderrinne 14 zu der anderen Laufrolle 23 derselben Quertraverse 24 geführt. Von.dort aus erstreckt es sich nach unten zu dem darunter befindlichen Laufrollenpaar 26 auf der anderen Seite der Fördereinrichtung 13.At the last cross member 24, finally, the rope 25 of the Roller 23 from across the conveyor trough 14 to the other roller 23 of the same Cross member 24 out. From there it extends down to the one below located roller pair 26 on the other side of the conveyor 13.

An dieser wird das Seil 25 in derselben Weise bis zur Antriebseinheit 17 zurückgeführt, wie es zuvor für die erste Seite der Fördereinrichtung 13 beschrieben wurde.At this the cable 25 is in the same way up to the drive unit 17, as previously described for the first side of the conveyor device 13 became.

Es ist also nur ein einziges Seil 25 vorhanden, das aneinem Ende fest angeschlagen ist, während an dem anderen Ende ein hier nicht dargestellter Antrieb angreift, mit dem das Seil ein Stück eingeholt oder nachgegeben werden kann. Beim Einholen des Seiles 25 verkürzen sich alle Schlaufen gleichmäßig, so daß die Fördereinrichtung 13 entsprechend gleichmäßig angehoben wird, wobei die Belastung an allen Unterflansch-Laufkatzen 11 ebenfalls gleichbleibt. Dasselbe gilt für ein Absenken der Fördereinrichtung 13 durch entsprechendes Verlängern der Schlaufen bzw. des Seiles 25.There is therefore only a single rope 25, which is tied at one end is posted, while at the other end a drive, not shown here attacks, with which the rope can be hauled in or yielded a little. At the Retrieving the rope 25 shortens all loops evenly, so that the conveyor 13 is raised accordingly evenly, with the load on all lower flange trolleys 11 also remains the same. The same applies to lowering the conveyor 13 by lengthening the loops or the rope 25 accordingly.

Aber auch bei einem Transport der Fördereinriphtung 13 an der Hängeschiene 10 entlang bleiben die an den Unterflansch-Laufkatzen 11 auftretenden Belastungen zumindest ungefähr gleich, In keinem Fall können Überbelastungen auftreten, die zu einem Brechen der Auflängung führen. Auch die im Verlauf der Hängeschiene 10 vorhandenen Höhenunterschiede gleichen sich während des Längstransports selbsttätig aus.But also when transporting the conveyor device 13 on the hanging rail The loads occurring on the lower flange trolleys 11 remain along 10 at least approximately the same, in no case can overloads occur lead to a break in the suspension. Also in the course of the hanging rail 10 Existing height differences are automatically equalized during longitudinal transport the end.

Im Rahmen dieses Ausführungsbeispiels wurde die Erfindung für die Aufhängung einer Fördereinrichtung im Untertagebetrieb beschrieben. Da die F6rdereinrichtung 13 eine starre Konstruktion hat, ist es für diese Anwendung günstiger, die horizontalen Strecken des Seilverlaufes der Fördereinrichtung zuzuordnen.In the context of this embodiment, the invention was for Suspension of a conveyor in underground operation described. Since the conveyor 13 has a rigid construction, the horizontal one is more favorable for this application Allocate stretches of the rope course to the conveyor.

Es kann aber auch Anwendungsfälle geben, bei denen es zweckmäßiger ist, die horizontalen Bereiche an der oberen Aufhängßng entlanglaufen zu lassen, insbesondere dann, wenp hierdurch der Längstransport nicht beeinträchtigt werden kann.But there can also be applications where it is more appropriate is to let the horizontal areas run along the upper suspension, especially if this does not affect the longitudinal transport can.

Dasselbe gjlt für eine weitere Abwandlung dahingehend, daß die Sphlaufe eines Seiles nicht von derselben Laufrolle nach unten zurückgeführt wird, sondern erst von der in Längsrichtung benachbrten nächsten Laufrolle aus. Welche Ausführungsform int Einzelfall zu wählen ist, hängt von den jeweiligen Gegebenheiten ab. Die Erfindung kann zum Beispiel im Bereich des Tunnelbaus auch für die Aufhängung und den Transport langer Röhren, Schienen oder dergleichen verwendet werden.The same applies to a further modification to the effect that the sphere of a rope is not returned down from the same pulley, but only from the next next roller in the longitudinal direction. Which embodiment int is to be selected on a case-by-case basis, depends on the respective circumstances. The invention can also be used for suspension and transport in the field of tunnel construction, for example long tubes, rails or the like can be used.

B e z u g s z i f f e r n 1 i s t e 10 Hängeschiene 11 Unterflansch-Laufkatze 12 Kupplungsstange 13 Fördereinrichtung 14 Förderrinne 15 Kette 16 Mitnehmer 17 Antriebseinheit 18 Kette 19 Längstraverse 20 Längstraverse 21 Kettenrolle 22 Quertraverse 23 Laufrolle 24 Quertraverse 25 Seil 26 LaufrollenpaarZ i f e r n 1 i s t e 10 hanging rail 11 bottom flange trolley 12 Coupling rod 13 Conveyor device 14 Conveyor trough 15 Chain 16 Carrier 17 Drive unit 18 chain 19 longitudinal beam 20 longitudinal beam 21 chain roller 22 cross beam 23 Roller 24 Cross member 25 Rope 26 Pair of rollers

Claims (6)

Anspriiche: 1. Anordnung zum böhenveränderlichen Aufhängen einer Fördereinrichtung oder dergleichen, insbesondere für den Untertagebau oder den Tunnelbau, mit einer Hängeschiene, mit über die Länge derselben verteilt angeordneten Laufkatzen, mit jeweils einer quer zur Bewegungsrichtung der Laufkatze an dieser befestigten Quertraverse, mit Laufrollen an den Enden der Quertraversen und an beiden Seiten der Fördereinrichtung und mit einem über die Laufrollen geführten Seil, dessen Verkürzung ein Anheben der Fördereinrichtung bewirkt, dadurch gekennzeichnet, daß das Seil (25) zwischen in Längsrichtung der Fördereinrichtung (13) benachbarten Laufrollen (26) zumindest angenähert horizontal verläuft, daß an jeder Seite jeweils eine am Ende einer Quertraverse (22,24) befestigte Laufrolle (23) und eine an der Fördereinrichtung (13) befestigte Laufrolle <26) zumindest angenähert vertikal untereinander angeordnet sind und daß das Seil (25) über diese Laufrollen (23,26) in Form einer Schlaufe geführt ist. Claims: 1. Arrangement for height-adjustable hanging a Conveyor equipment or the like, in particular for underground construction or tunnel construction, with a hanging rail, with trolleys distributed over the length of the same, with one attached at right angles to the direction of movement of the trolley Crossbar, with rollers at the ends of the crossbars and on both sides the conveyor and with a rope guided over the rollers, its shortening causes the conveyor device to be raised, characterized in that the rope (25) between rollers which are adjacent in the longitudinal direction of the conveyor device (13) (26) runs at least approximately horizontally so that on each side there is one am End of a cross member (22,24) attached roller (23) and one on the conveyor (13) attached roller <26) arranged at least approximately vertically one below the other are and that that Rope (25) over these rollers (23,26) in the form is guided in a loop. 2. Anordnung nach Anspruch 1, dadurch gekennzeichnet, daß der eine Schlaufe bildende Teil des Seiles (25) jeweils von einer an der Fördereinrichtung (13) befestigten Laufrolle (26) ausgehend zu der Laufrolle (23) an der darüber befindlichen Quertraverse (22) und zurück verläuft.2. Arrangement according to claim 1, characterized in that the one Loop-forming part of the rope (25) each from one on the conveyor (13) attached roller (26) starting from the roller (23) on the one above it Cross member (22) and runs back. 3. Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß am Ausgangspunkt einer Schlaufe für den abgehenden und den rückkehrenden Schlaufenteil jeweils eine Laufrolle (26) vorgesehen ist.3. Arrangement according to claim 1 or 2, characterized in that on Starting point of a loop for the outgoing and the returning loop part a roller (26) is provided in each case. 4. Anordnung nach Anspruch 3, dadurch gekennzeichnet, daß die beiden am Ausgangspunkt einer Schlaufe vorgesehenen Laufrollen (26) zueinander koaxial angeordnet sind, 4. Arrangement according to claim 3, characterized in that the two rollers (26) provided at the starting point of a loop are coaxial with one another are arranged 5. Anordnung nach einem der vorherigen Ansprüche, dadurch gekennzeichnet, daß nur an einem Ende des Seiles (25) ein Antrieb angreift und daß das Seil (25) am Ende der Fördereinrichtung (13) von der einen auf die andere Seite derselben herübergeführt ist.5. Arrangement according to one of the preceding claims, characterized in that that a drive engages only at one end of the rope (25) and that the rope (25) at the end of the conveyor (13) from one side to the other is brought over. 6. Anordnung nach Anspruch 5, dadurch gekennzeichnet, daß das Herüberführen des Seiles (25) auf die andere Seite der Fördereinrichtung (13) über die Laufrollen (23) einer Quertraverse (24) erfolgt.6. Arrangement according to claim 5, characterized in that the transfer of the rope (25) to the other side of the conveyor (13) over the rollers (23) a cross member (24) takes place.
DE19803010604 1980-03-20 1980-03-20 Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above Withdrawn DE3010604A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19803010604 DE3010604A1 (en) 1980-03-20 1980-03-20 Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803010604 DE3010604A1 (en) 1980-03-20 1980-03-20 Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above

Publications (1)

Publication Number Publication Date
DE3010604A1 true DE3010604A1 (en) 1981-09-24

Family

ID=6097703

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803010604 Withdrawn DE3010604A1 (en) 1980-03-20 1980-03-20 Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above

Country Status (1)

Country Link
DE (1) DE3010604A1 (en)

Similar Documents

Publication Publication Date Title
DE2719412A1 (en) MOBILE BELT CONVEYOR
DE10057150B4 (en) Device for immersing and dipping a substrate
DE102008059711A1 (en) Device for transferring objects and conveyor systems with such a device
EP0524458A2 (en) Scraper conveyor for loose bulk material
DE60111899T2 (en) Carriage for cable guide chain
DE3010604A1 (en) Variable-height conveyor suspension equipment - has ropes reeved between pulleys on conveyor and crab cross-members above
DE8007563U1 (en) ARRANGEMENT FOR THE VARIABLE HANGING OF A CONVEYOR OR THE LIKE. ESPECIALLY FOR UNDERGROUND CONSTRUCTION OR TUNNEL CONSTRUCTION
EP1273535A2 (en) Conveying system
DE954043C (en) Rubber conveyor belt, which is carried by ropes within the bandwidth
DE3416428C2 (en)
DE3322697C2 (en) Double center chain belt for a chain scraper conveyor
DE1291709B (en) Conveyor line for chain scraper conveyors, especially for mining
DE3235471A1 (en) Scraper conveyor
DE1254529B (en) Medium pull cord conveyor
DE3813799C2 (en) Scraper chain for medium chain scraper conveyors
AT126220B (en) Sponsor.
DE1556703C (en) Mobile elevator
DE206867C (en)
AT378894B (en) HEIGHT CONVEYOR FOR A STALL EMPTYING SYSTEM
DE1481780B2 (en) Wire rope conveyor system
DE1258788B (en) Belt conveyor
DE1813955C3 (en) Return of the conveyor belt system with a loading trolley
DE1456882A1 (en) Device for sorting or counting rods
DE2461843B2 (en) Circulating conveyor for conveyor baskets connected to one another by pull ropes
DE1294830B (en) Truck

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8130 Withdrawal
8165 Unexamined publication of following application revoked