DE2342887A1 - Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out - Google Patents

Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out

Info

Publication number
DE2342887A1
DE2342887A1 DE19732342887 DE2342887A DE2342887A1 DE 2342887 A1 DE2342887 A1 DE 2342887A1 DE 19732342887 DE19732342887 DE 19732342887 DE 2342887 A DE2342887 A DE 2342887A DE 2342887 A1 DE2342887 A1 DE 2342887A1
Authority
DE
Germany
Prior art keywords
tunnel
building
earth
cleared
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19732342887
Other languages
German (de)
Inventor
Alwin Staufenbiel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19732342887 priority Critical patent/DE2342887A1/en
Publication of DE2342887A1 publication Critical patent/DE2342887A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

Building ground is cleared of air raid shelters or concrete building structures. The ground is secured by sheet steel piling, and on one side an excavation with a fall toward the building works is dug out. A tunnel is then made from it to the other side, and the middle part beneath the building is excavated from the opposite long sides of the tunnel and downward, with digger dredgers or earthmovers. The building is caused to sink progressively under its own weight. Preferably the digging from the tunnel is with the same or opposite direction of motion. The movement is effected by steel cables from the opposite sides into the middle of the tunnel, back and forth. The earthmovers are connected by cables to lifters which also fill lorries with the spoil. Less work is required than for explosive shattering of heavy, e.g. military, concrete and its subsequent piecemeal removal.

Description

Verfahren unö Vorrichtung '/rar T^ so j tigurig von Schutzbau!'» η .oder Eöton'baiv ei-he ι uwd de/glo Procedure unö device '/ rar T ^ so j tigurig von Schutzbau!' »Η. Or Eöton'baiv ei-he ι uwd de / gl o

Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Preilegung den Bauwerkes oder Wie derbe irutuang dos BaugrvmdoB bezw. zur anderweitige3!! Benutzung des Bauwerkes.The invention relates to a method and a device for prelimitation of the building or How derbe irutuang dos KonstruvmdoB respectively. to the other 3 !! Use of the building.

Bisher mußte das Bauwerk gesprengt,die Sprengteile weitgehend zerkleinert und abtransportiert werden, was sehr erheblichen Zeit und Kostenaufwand erforderte,sodaß regelmäßig daYon abge sehen werden mußte, obwohl oft die *Beseitigung des Bauwerkes für Betonbunker aus Iiriegszeiten häufig dringend erwünscht ii?t.So far the structure had to be blown up, most of the explosive parts be shredded and transported away, which required considerable time and expense, so that daYon are regularly abandoned had to be, although often the * removal of the structure often urgently required for concrete bunkers from times of war.

Erfindungsgomäß wird darin Abhilfe geschaffen das bei den neuen Verfahren(Absenkung) nur ein Bruchteil an Zeit und Eosteil entstehen., außerdem hat das neue Verfahren den Vorteil das die Bunker nach Schaffung neuer Ein u. Ausgänge sowie Isolierung der Aussenflachen für einen späteren Notfall als Atom-Se hu tabau hergerichtet werden kännen,ein weiterer Vorteil liegt darin.daß nun eine neue Bebau -■ ung des Grundstückes erfolgen kann.
Weitere Einzelheiten auf Blatt 2
According to the invention, a remedy is created in that with the new method (lowering) only a fraction of time and Eosteil arise. In addition, the new method has the advantage that the bunker after creating new entrances and exits as well as isolation of the outer surfaces for a later emergency as an atom - They can be prepared, another advantage is that new buildings can now be built on the property.
Further details on sheet 2

888880888888888888888888880888888888888888

509811/0471
BAD ORIGINAL
509811/0471
BATH ORIGINAL

Verfaliren und Vorrichtung zur Beseitigung von Schutzbauten oder Betonbauwe-'k.iM und dergl.Procedures and devices for the removal of protective structures or Betonbauwe-'k.iM and the like.

1. Der Grundwasserspiegel wird auf ca. 15 m Tiefe abgesenkt.1. The groundwater level is lowered to a depth of approx. 15 m.

2. Um den Bunker werden Spundbohlen aus Stahl eingerammt.2. Steel sheet piles are driven in around the bunker.

3. In der Mitte unterhalb des Bunkers wird ein Durchbrach von ca. 2 m breite angelegt.3. In the middle below the bunker there is a breakthrough of about 2 m wide.

4. Der Bodenaushub wird mit einem Bagger,der mit einen Schürf kübel versehen ist ausgeführt.4. The excavation is done with an excavator with a scraper provided is executed.

5. An den Schürfkübel wird ein Stahlseil fest angebracht, daß mit einer Automatischen Seilwinde verbunden ist und hinter dem Bunker steht. Die Seilwinde wird auf Schienen fest mon tiert und ist nach beiden Seiten beweglich.5. A steel cable is firmly attached to the scraper that is connected to an automatic cable winch and behind the bunker. The cable winch is firmly mounted on rails and can be moved to both sides.

6. Der Schürfkübel kann nun mit ililfe der Seilwinde nach hinten unterhalb des Bunkers gezogen werden und dort entsprechend angesetzt worden.6. The scraper can now move backwards with the help of the cable winch be pulled below the bunker and applied accordingly.

7. Zum Schutz der Stahlseile von Bagger u. Seilwinde werden an den Unterkanten des Bunkers Rollen angebracht.7. To protect the steel cables of the excavator and cable winch, rollers are attached to the lower edges of the bunker.

8. Der Bodenaushub erfolgt immer von der Mitte unterhalb des Bunkers wo die Böschungen Trichterförmig zusammen treffen. Der hohe Druck des Bunkers bwirkt das der Boden seitlich nachgibt. Eine evt.-einseitige nachgäbe der Böschung,kann durch eine stärkere wegnähme auf der anderen Seite korigiert werden.8. The soil is always excavated from the center below the Bunkers where the slopes meet in a funnel shape. The high pressure of the bunker affects the bottom laterally gives way. A possible one-sided yield of the embankment can corrected by a stronger removal on the other side will.

S. Bei Bunkern mit Dachaufbauten werden diese vorher abgebaut.S. In the case of bunkers with roof structures, these are dismantled beforehand.

10. Bunker die für eine weitere Verwendung als Atom-Schutzbauten nicht geeignet sind, werden nach der Absenkung mit Sandboden einge schwemmt.10. Bunkers for further use as nuclear protective structures are not suitable, are washed in with sandy soil after subsidence.

509811/04 71509811/04 71

BAD ORIGINALBATH ORIGINAL

Claims (1)

Patentanspruch β»_ Claim β »_ Verfahren zur Freilegung des Baugrundes von Schutz "bauten oder Betonbauwerken, dadurch gekennzeichnet,daß nach Absiche rung des Erdreiches durch StahlSpundbohlen, an einer Seite des Bauwerkes eine Baugrube mit Gefalle zum Bauwerk ausge hoben wird,danach von dieser Baugrube ausgehend ein Tunnel zur anderen Seite angelegt wird und danach von diesen Tunnel ausgehend nach den gegenüberliegenden Längsseiten des Tunnels und nach unten mittels Schürfbagger oder Erdbewegungsmaschinen den mittleren Teil unterhalb des Bauwerkes auszuheben , und das Bauwerk unter Ausnutzung seines Eigengewichtes fortlaufend zum Absenken gebracht wird.Procedure for exposing the subsoil of protection "buildings or concrete structures, characterized in that after hedging of the ground through steel sheet piles, on one side of the building a building pit with a slope towards the building is excavated, then a tunnel starting from this building pit to the other side and then starting from this tunnel to the opposite long sides of the tunnel and dig down the central part below the structure using a digger or earthmoving machine, and the structure is continuously lowered using its own weight. Verfahren nach Anspruch 1, dadairch gekennzeichnet, daß die Erd bewegungsmaschinen oder. Schürfbagger an beiden Seiten des Erdtunnels mit gleicher oder engegengesetzter Bewegungsrichtung zum Einsatz gebracht werden können. .Method according to claim 1, characterized in that the earth moving machines or. Excavators on both sides of the earth tunnel with the same or opposite direction of movement can be used. . Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß die Bewegung der Schürfbagger oder Erdbewegungsmaschinen durch Zugeinrichtungen und Zugorgane wie Stahlseile, von der gegen überliegenden Seite her in dem mittleren Tunnel hin und her bewegt werden.Method according to claim 2, characterized in that the Movement of the diggers or earthmoving machines by pulling devices and pulling elements such as steel cables, from the against opposite side can be moved back and forth in the middle tunnel. Verfahren nach Anspruch 3» dadurch gekennzeichnet, daß die Schürfbagger oder Erdbewegungsmaschinen für die Erdmassen ausgebildet sind, die über Seile mit Hub u.Ladeeinrichtungen in Verbindung stehen, und gleichzeitig zum Aufladen der abge tragenen Erdmassen auf Fahrzeuge verwendet werden« Verfahren nach Anspruch 1, dadurch gekennzeichnet,daß die Bau ~ gruben und der mittlere Erdtunnel jeweils nach Beseitigung einer Erdschicht unter dem Bauwerk erneut vertieft werden und danach wieder mit der Abtragung der Erdmassen unter dem Bauwerk fortgefahren wird.Method according to claim 3 »characterized in that the diggers or earth moving machines for the earth masses are formed, which are equipped with ropes with lifting and loading devices connected, and at the same time used to load the removed earth masses onto vehicles « Method according to claim 1, characterized in that the construction ~ and the middle underground tunnel is deepened again after removing a layer of earth under the structure and then the removal of the earth under the structure is continued. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß vor Beginn der Bauwerks — Absenkungsarbeiten oder in Intervallen, während derselben der Grundwasserspiegel um das Bauwerk herum abgesi chert und abgesenkt wird.Method according to claim 1, characterized in that before the start of the building - lowering work or at intervals during the same the groundwater level around the structure is secured and lowered. Vorrichtung -zur Ausübung des Verfahrens nach Anspruch 3, dadurch gekennzeichnet,daß die Zuge!richtungen und Zugorgane(Rückhole einrichtung) auf Schienen quer zum Bauwerk bewegbar eingerichtet sind·Device for carrying out the method according to claim 3, characterized in that the pulling devices and pulling elements (retrieval device) are arranged to be movable on rails transversely to the structure. 509811/0471509811/0471 LeerseiteBlank page
DE19732342887 1973-08-24 1973-08-24 Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out Pending DE2342887A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19732342887 DE2342887A1 (en) 1973-08-24 1973-08-24 Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19732342887 DE2342887A1 (en) 1973-08-24 1973-08-24 Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out

Publications (1)

Publication Number Publication Date
DE2342887A1 true DE2342887A1 (en) 1975-03-13

Family

ID=5890670

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732342887 Pending DE2342887A1 (en) 1973-08-24 1973-08-24 Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out

Country Status (1)

Country Link
DE (1) DE2342887A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2854330A1 (en) * 1978-12-15 1980-06-26 Kunz Alfred & Co METHOD FOR REMOVAL OF DISCONTINUED NUCLEAR POWER PLANTS
DE3827004A1 (en) * 1988-08-09 1990-02-15 Gkn Keller Gmbh Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings
DE3908005A1 (en) * 1988-08-10 1990-02-15 Aicher Max Method of founding a structure by lowering
DE4027181A1 (en) * 1990-08-28 1992-03-05 Harald Weisz Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2854330A1 (en) * 1978-12-15 1980-06-26 Kunz Alfred & Co METHOD FOR REMOVAL OF DISCONTINUED NUCLEAR POWER PLANTS
US4483790A (en) * 1978-12-15 1984-11-20 Alfred Kunz & Co. Method of disposing of shut-down nuclear power plants
DE3827004A1 (en) * 1988-08-09 1990-02-15 Gkn Keller Gmbh Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings
DE3908005A1 (en) * 1988-08-10 1990-02-15 Aicher Max Method of founding a structure by lowering
DE4027181A1 (en) * 1990-08-28 1992-03-05 Harald Weisz Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side

Similar Documents

Publication Publication Date Title
DE69635549T2 (en) METHOD AND DEVICE FOR ESTABLISHING ENDLESS UNDERGROUND WALLS
DE112015000180T5 (en) mining methods
DE1902137A1 (en) Method and device for applying drainage sealing aprons in the ground
DE2615395A1 (en) PROCESS AND DEVICE FOR THE SUCCESSIVE INDEPENDENT DRIVING OF SEVERAL UNITS
DE4226067A1 (en) Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall
DE2737646A1 (en) Tunnel construction for high water content strata - uses concrete walls and low grade concrete pilings which are drilled out to allow water flow after completion
DE2622671A1 (en) EQUIPMENT FOR DRIVING A TRENCH IN THE OPEN SHEET FOR PIPE LAYING
DE19514052A1 (en) Excavation method and device for carrying it out
DE2342887A1 (en) Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out
EP2758633B1 (en) Shield driving device
EP0206371B1 (en) Cutter head for advancing prefabricated concrete pipes for the construction of galleries or tunnels
DE2712869C2 (en) Method of preventing water from entering underground cavities
JPH0462230A (en) Setting construction for underground structure
DE3607499A1 (en) Method of sealing the soil surface area of an old or operating landfill site in a gastight and watertight manner
DE3424981A1 (en) Method of sealing off the bases of extensive landfills from ground water
AT225629B (en) Method and device for making trenches and for forming sealing aprons
DE4324433C1 (en) Process for the sanitation of industrial sedimentation sites
DE620764C (en) Driving shield for the creation of tunnels or galleries in soft or water-bearing soil
DE2737647A1 (en) Underground tunnel section making system - leaves frozen gaps for dry excavation and ground water flow
DE3716750A1 (en) Method of constructing and sinking foundation structures
DE10037320C2 (en) Method and devices for laying a pipe string consisting of a number of pipes in a channel at the bottom of a body of water
DE3314813C1 (en) Method of producing galleries and tunnels from precast concrete tubes
DE3727752A1 (en) Method of constructing a retaining wall
DE102004017648B4 (en) Process for the construction of tunnels under the seabed
DE2543997A1 (en) Press forwarding tubular structure into embankment - uses sliding tracks for support under shield protection