DE2342887A1 - Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out - Google Patents
Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling outInfo
- Publication number
- DE2342887A1 DE2342887A1 DE19732342887 DE2342887A DE2342887A1 DE 2342887 A1 DE2342887 A1 DE 2342887A1 DE 19732342887 DE19732342887 DE 19732342887 DE 2342887 A DE2342887 A DE 2342887A DE 2342887 A1 DE2342887 A1 DE 2342887A1
- Authority
- DE
- Germany
- Prior art keywords
- tunnel
- building
- earth
- cleared
- piling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D35/00—Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/08—Sinking workpieces into water or soil inasmuch as not provided for elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Verfahren unö Vorrichtung '/rar T^ so j tigurig von Schutzbau!'» η .oder Eöton'baiv ei-he ι uwd de/glo Procedure unö device '/ rar T ^ so j tigurig von Schutzbau!' »Η. Or Eöton'baiv ei-he ι uwd de / gl o
Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Preilegung den Bauwerkes oder Wie derbe irutuang dos BaugrvmdoB bezw. zur anderweitige3!! Benutzung des Bauwerkes.The invention relates to a method and a device for prelimitation of the building or How derbe irutuang dos KonstruvmdoB respectively. to the other 3 !! Use of the building.
Bisher mußte das Bauwerk gesprengt,die Sprengteile weitgehend zerkleinert und abtransportiert werden, was sehr erheblichen Zeit und Kostenaufwand erforderte,sodaß regelmäßig daYon abge sehen werden mußte, obwohl oft die *Beseitigung des Bauwerkes für Betonbunker aus Iiriegszeiten häufig dringend erwünscht ii?t.So far the structure had to be blown up, most of the explosive parts be shredded and transported away, which required considerable time and expense, so that daYon are regularly abandoned had to be, although often the * removal of the structure often urgently required for concrete bunkers from times of war.
Erfindungsgomäß wird darin Abhilfe geschaffen das bei den neuen Verfahren(Absenkung) nur ein Bruchteil an Zeit und Eosteil entstehen.,
außerdem hat das neue Verfahren den Vorteil das die Bunker nach Schaffung neuer Ein u. Ausgänge sowie Isolierung der Aussenflachen
für einen späteren Notfall als Atom-Se hu tabau hergerichtet werden
kännen,ein weiterer Vorteil liegt darin.daß nun eine neue Bebau -■
ung des Grundstückes erfolgen kann.
Weitere Einzelheiten auf Blatt 2According to the invention, a remedy is created in that with the new method (lowering) only a fraction of time and Eosteil arise. In addition, the new method has the advantage that the bunker after creating new entrances and exits as well as isolation of the outer surfaces for a later emergency as an atom - They can be prepared, another advantage is that new buildings can now be built on the property.
Further details on sheet 2
888880888888888888888888880888888888888888
509811/0471
BAD ORIGINAL 509811/0471
BATH ORIGINAL
Verfaliren und Vorrichtung zur Beseitigung von Schutzbauten oder Betonbauwe-'k.iM und dergl.Procedures and devices for the removal of protective structures or Betonbauwe-'k.iM and the like.
1. Der Grundwasserspiegel wird auf ca. 15 m Tiefe abgesenkt.1. The groundwater level is lowered to a depth of approx. 15 m.
2. Um den Bunker werden Spundbohlen aus Stahl eingerammt.2. Steel sheet piles are driven in around the bunker.
3. In der Mitte unterhalb des Bunkers wird ein Durchbrach von ca. 2 m breite angelegt.3. In the middle below the bunker there is a breakthrough of about 2 m wide.
4. Der Bodenaushub wird mit einem Bagger,der mit einen Schürf kübel versehen ist ausgeführt.4. The excavation is done with an excavator with a scraper provided is executed.
5. An den Schürfkübel wird ein Stahlseil fest angebracht, daß mit einer Automatischen Seilwinde verbunden ist und hinter dem Bunker steht. Die Seilwinde wird auf Schienen fest mon tiert und ist nach beiden Seiten beweglich.5. A steel cable is firmly attached to the scraper that is connected to an automatic cable winch and behind the bunker. The cable winch is firmly mounted on rails and can be moved to both sides.
6. Der Schürfkübel kann nun mit ililfe der Seilwinde nach hinten unterhalb des Bunkers gezogen werden und dort entsprechend angesetzt worden.6. The scraper can now move backwards with the help of the cable winch be pulled below the bunker and applied accordingly.
7. Zum Schutz der Stahlseile von Bagger u. Seilwinde werden an den Unterkanten des Bunkers Rollen angebracht.7. To protect the steel cables of the excavator and cable winch, rollers are attached to the lower edges of the bunker.
8. Der Bodenaushub erfolgt immer von der Mitte unterhalb des Bunkers wo die Böschungen Trichterförmig zusammen treffen. Der hohe Druck des Bunkers bwirkt das der Boden seitlich nachgibt. Eine evt.-einseitige nachgäbe der Böschung,kann durch eine stärkere wegnähme auf der anderen Seite korigiert werden.8. The soil is always excavated from the center below the Bunkers where the slopes meet in a funnel shape. The high pressure of the bunker affects the bottom laterally gives way. A possible one-sided yield of the embankment can corrected by a stronger removal on the other side will.
S. Bei Bunkern mit Dachaufbauten werden diese vorher abgebaut.S. In the case of bunkers with roof structures, these are dismantled beforehand.
10. Bunker die für eine weitere Verwendung als Atom-Schutzbauten nicht geeignet sind, werden nach der Absenkung mit Sandboden einge schwemmt.10. Bunkers for further use as nuclear protective structures are not suitable, are washed in with sandy soil after subsidence.
509811/04 71509811/04 71
BAD ORIGINALBATH ORIGINAL
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732342887 DE2342887A1 (en) | 1973-08-24 | 1973-08-24 | Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732342887 DE2342887A1 (en) | 1973-08-24 | 1973-08-24 | Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2342887A1 true DE2342887A1 (en) | 1975-03-13 |
Family
ID=5890670
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19732342887 Pending DE2342887A1 (en) | 1973-08-24 | 1973-08-24 | Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2342887A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2854330A1 (en) * | 1978-12-15 | 1980-06-26 | Kunz Alfred & Co | METHOD FOR REMOVAL OF DISCONTINUED NUCLEAR POWER PLANTS |
DE3827004A1 (en) * | 1988-08-09 | 1990-02-15 | Gkn Keller Gmbh | Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings |
DE3908005A1 (en) * | 1988-08-10 | 1990-02-15 | Aicher Max | Method of founding a structure by lowering |
DE4027181A1 (en) * | 1990-08-28 | 1992-03-05 | Harald Weisz | Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side |
-
1973
- 1973-08-24 DE DE19732342887 patent/DE2342887A1/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2854330A1 (en) * | 1978-12-15 | 1980-06-26 | Kunz Alfred & Co | METHOD FOR REMOVAL OF DISCONTINUED NUCLEAR POWER PLANTS |
US4483790A (en) * | 1978-12-15 | 1984-11-20 | Alfred Kunz & Co. | Method of disposing of shut-down nuclear power plants |
DE3827004A1 (en) * | 1988-08-09 | 1990-02-15 | Gkn Keller Gmbh | Method and arrangement for compensating for settlement of the development at the surface, preferably inclined positions of buildings |
DE3908005A1 (en) * | 1988-08-10 | 1990-02-15 | Aicher Max | Method of founding a structure by lowering |
DE4027181A1 (en) * | 1990-08-28 | 1992-03-05 | Harald Weisz | Building tilt correction method - involves forming small dia. horizontal chambers below foundation on opposite side |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69635549T2 (en) | METHOD AND DEVICE FOR ESTABLISHING ENDLESS UNDERGROUND WALLS | |
DE112015000180T5 (en) | mining methods | |
DE1902137A1 (en) | Method and device for applying drainage sealing aprons in the ground | |
DE2615395A1 (en) | PROCESS AND DEVICE FOR THE SUCCESSIVE INDEPENDENT DRIVING OF SEVERAL UNITS | |
DE4226067A1 (en) | Device and method for stabilising highways in sloping locations - involves vertical injection posts fitted in lowermost stage with externally extending sections provided with inclined posts and steel reinforcement of concrete support wall | |
DE2737646A1 (en) | Tunnel construction for high water content strata - uses concrete walls and low grade concrete pilings which are drilled out to allow water flow after completion | |
DE2622671A1 (en) | EQUIPMENT FOR DRIVING A TRENCH IN THE OPEN SHEET FOR PIPE LAYING | |
DE19514052A1 (en) | Excavation method and device for carrying it out | |
DE2342887A1 (en) | Building site clearance - concrete structures cleared by piling, excavating one side, and tunneling out | |
EP2758633B1 (en) | Shield driving device | |
EP0206371B1 (en) | Cutter head for advancing prefabricated concrete pipes for the construction of galleries or tunnels | |
DE2712869C2 (en) | Method of preventing water from entering underground cavities | |
JPH0462230A (en) | Setting construction for underground structure | |
DE3607499A1 (en) | Method of sealing the soil surface area of an old or operating landfill site in a gastight and watertight manner | |
DE3424981A1 (en) | Method of sealing off the bases of extensive landfills from ground water | |
AT225629B (en) | Method and device for making trenches and for forming sealing aprons | |
DE4324433C1 (en) | Process for the sanitation of industrial sedimentation sites | |
DE620764C (en) | Driving shield for the creation of tunnels or galleries in soft or water-bearing soil | |
DE2737647A1 (en) | Underground tunnel section making system - leaves frozen gaps for dry excavation and ground water flow | |
DE3716750A1 (en) | Method of constructing and sinking foundation structures | |
DE10037320C2 (en) | Method and devices for laying a pipe string consisting of a number of pipes in a channel at the bottom of a body of water | |
DE3314813C1 (en) | Method of producing galleries and tunnels from precast concrete tubes | |
DE3727752A1 (en) | Method of constructing a retaining wall | |
DE102004017648B4 (en) | Process for the construction of tunnels under the seabed | |
DE2543997A1 (en) | Press forwarding tubular structure into embankment - uses sliding tracks for support under shield protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OHA | Expiration of time for request for examination |