DE2051311C3 - Device for the automatic laying of a thread reserve on a bobbin tube outside the bobbin area - Google Patents

Device for the automatic laying of a thread reserve on a bobbin tube outside the bobbin area

Info

Publication number
DE2051311C3
DE2051311C3 DE2051311A DE2051311A DE2051311C3 DE 2051311 C3 DE2051311 C3 DE 2051311C3 DE 2051311 A DE2051311 A DE 2051311A DE 2051311 A DE2051311 A DE 2051311A DE 2051311 C3 DE2051311 C3 DE 2051311C3
Authority
DE
Germany
Prior art keywords
bobbin
thread
cable
winding
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2051311A
Other languages
German (de)
Other versions
DE2051311A1 (en
DE2051311B2 (en
Inventor
Helmut Wattwil Ritter (Schweiz)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heberlein and Co AG
Original Assignee
Heberlein and Co AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heberlein and Co AG filed Critical Heberlein and Co AG
Publication of DE2051311A1 publication Critical patent/DE2051311A1/en
Publication of DE2051311B2 publication Critical patent/DE2051311B2/en
Application granted granted Critical
Publication of DE2051311C3 publication Critical patent/DE2051311C3/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/28Traversing devices; Package-shaping arrangements
    • B65H54/34Traversing devices; Package-shaping arrangements for laying subsidiary winding, e.g. transfer tails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Landscapes

  • Winding Filamentary Materials (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Description

Die Erfindung betrifft eine Vorrichtung zur automatischen Verlegung einer Fadenreserve auf eine Spulenhülse außerhalb des Spulbereichs mittels eines über die gesamte Hülsenlänge hinwegbewegbaren Hilfsfadenführers an einer Fadenaufwickelvorrichtung mit kontinuierlicher Fadenzulieferung und mit halbautomatisch mittels eines an einem Schaltrevolver angeordneten Schalthebels schaltbarem Spulenwechsler.The invention relates to a device for the automatic laying of a thread reserve on a bobbin outside the winding area by means of an auxiliary thread guide which can be moved over the entire length of the tube on a thread winding device with continuous thread supply and with semi-automatic bobbin changer switchable by means of a switching lever arranged on a switching turret.

Bei üblichen Aufwickelvorrichtungen werden zumIn conventional winders are used for

Zwecke des Spulenwechsels ein oder mehrere Spulenkörper durch Trennung derselben von einem Antriebsmittel stillgelegt, wodurch der Wickelvorgang unterbrochen wird. Da jedoch zum Beispiel bei Falschdrall-Maschinen zur Gamtexturierung eine kontinuierlicheFor the purpose of changing bobbins, one or more bobbins by separating them from a drive means shut down, whereby the wrapping process is interrupted. However, this is the case with false twist machines, for example for game texturing a continuous

Fadenförderung erfolgt, muß auch der sich daranIf the thread is conveyed, it must also take care of it

anschließende Wickelvorgang ein kontinuierlicher sein.subsequent winding process will be a continuous one.

Hierzu ist die Bildung einer Fadenreserve für die oderFor this purpose, the formation of a thread reserve for the or

auf den zum Spulenwechsel vorgesehenen, noch leerenon the one provided for bobbin change, still empty

Wickelhülsen erforderlich, welche in bekannter WeiseWinding cores required, which in a known manner

*o durch Abziehen der für den Übergang von der vollen Spule zur leeren Wickelhülse erforderlichen Fadenlänge von Hand oder durch Absaugvorrichtungen (von dritter Hand) und durch das Aufbringen einiger Reservewicklungen auf den Spulenkörper ebenfalls von Hand oder durch Maschinen erfolgt, wobei der Fadenanfang auf der Wickelhülse durch Verwendung einer adhäsiven Oberflächenbildung der Wickelhülse wie zum Beispiel durch deren Beflockung, Aufrauhen oder Einkerbungen festgehalten wird. Diese Ve'fahrev sind zeitlich sehr aufwendig und führen zu erheblichen Materialeinbußen. Ebenfalls sind Zusatzeinrichtungen bekannt, bei welchen die Reservebildung des Fadens auf stern- oder zylinderförmigen Tragkörpern erfolgt, die der Wickelhülse in Richtung des Fadenlaufes gesehen vor- oder nachgelagert sind und durch elastische Kopplung entweder mit dem Lieferwerk oder mit dem Antrieb der Wickelspule verbunden sind. Bei einer späteren Weiterverarbeitung der Spulen mit Fadenreserve darf der Übergang von einer auf die andere Spule sich nicht* o by subtracting the transition from the full Bobbin for the empty winding tube required thread length by hand or by suction devices (from a third party Hand) and by applying some reserve windings to the bobbin also by hand or done by machines, the thread beginning on the winding tube by using an adhesive Surface formation of the winding core, for example through its flocking, roughening or notches is being held. These Ve'fahrev are very time-consuming and lead to considerable material losses. Additional devices are also known in which the reserve formation of the thread on star or cylindrical support bodies takes place, which the winding tube seen in the direction of the thread path or are downstream and by elastic coupling either with the delivery system or with the drive of the Winding coil are connected. When further processing the bobbins with thread reserve later, this is allowed the transition from one to the other coil does not change

w störend auswirken und die Verknotung der Fäden beider Spulen keine große Zeit beanspruchen. Eine Fadenreserve soll daher im Idealfall kein längeres Fadenende besitzen als zur Verknotung notwendig ist. Zu lange Enden müssen jeweils manuell wieder w have a disruptive effect and the knotting of the threads of both bobbins does not take much time. A thread reserve should therefore ideally not have a longer thread end than is necessary for knotting. Too long ends have to be re-entered manually

Vt abgewickelt werden, was einen zu großen Zeitaufwand erfordert. Vt be handled, which requires too much time.

Aus der CH-PS 3 80 610 ist ferner eine Spulvorrichtung bekannt, welche die Verlegung einer Fadenreserve während des Spulvorgangs außerhalb des Spulbereichs der Spulenhülse gestattet. Bei dieser Vorrichtung weist die Antriebswalze für die Spulenhülse an ihrem einen Ende eine Ringnut zur Aufnahme des Spulfadens auf, wobei der Spulfaden mittels eines von Hand bedienbaren, über die gesamte Hülsenlänge hinwegbewegbarenFrom CH-PS 3 80 610 is also a winding device known which the laying of a thread reserve during the winding process outside of the winding area the bobbin case. In this device has the drive roller for the bobbin tube has an annular groove at one end for receiving the bobbin thread, wherein the winding thread can be moved over the entire length of the tube by means of a manually operated one

6^ Hilfsfadenführers in die Ringnut eingelegt und nach Verlegen der Fadenreserve aus dieser entfernt wird. 6 ^ the auxiliary thread guide is inserted into the ring groove and removed from it after the thread reserve has been laid.

Die Erfindung hat den Zweck, an einem halb- oder vollautomatischen Spulenwechsler, wie er zum BeispielThe purpose of the invention is to work on a semiautomatic or fully automatic bobbin changer, such as that for example

in der CH-PS 4 63 342 beschrieben ist, durch eine Vorrichtung die automatische Bildung einer Fadenreserve während des Spulenwechsels zu bewirken, wobei eine leere Wickelhülse gegen einen vollen Spulenkörper während der kontinuierlichen Rotation eines Treibzylinders ausgetauscht wird.is described in CH-PS 4 63 342, the automatic formation of a thread reserve by a device to effect during the bobbin change, with an empty winding tube against a full bobbin is exchanged during the continuous rotation of a drive cylinder.

Dieser Zweck wird erfindungsgemäß dadurch erreicht, daß die Hilfsfadenführungsvorrichtung eine Auslenkchangieryorrichtung ist mit zwei parallel zur Spulenachse und zur Einlaufebene des Fadens verlaufenden und sich insgesamt über den Fadenreservebereich sowie den Wickelbereich der Spulenhülse erstreckenden, auf einer Bodenplatte starr befestigten Führungsrohren sowie mit auf letzteren gleitendem, mittels einer Seilzugvorrichtung bewegbarem Schlitten mit auf dessen Oberfläche befestigtem hakenförmigem Hilfsfadenführer zum Aufnehmen des Spulfadens während des Spulenwechsels zwischen einer leeren Wickelhülse und einem bewickelten Spulenkörper sowie zum Auslenken in den wahlweise an einem der beiden Randabschnitte der leeren Wickelhülse liegen den Fadenreservebereich.This purpose is achieved according to the invention in that the auxiliary thread guide device a Auslenkchangieryorrichtung is with two parallel to the bobbin axis and to the inlet plane of the thread and extends over the thread reserve area as well as the winding area of the bobbin tube extending guide tubes rigidly attached to a base plate as well as with sliding on the latter, by means of a cable device movable carriage with a hook-shaped slide attached to its surface Auxiliary thread guide for taking up the bobbin thread while changing the bobbin between an empty one Winding tube and a wound bobbin and for deflecting into the optionally on one of the both edge sections of the empty winding tube are the thread reserve area.

Die mit der erfindungsgemäßen Vorrichtung erzielten Vorteile bestehen darin, daß der durch die Bildung der Fadenreserve entstehende Fadenverlust auf diejenige geringe Fadenlänge verringert wird, die während der für den Spulenwechsel erforderlichen kurzen Schaltzeit kontinuierlich zugeführt wird, daß Fadenabsaug- oder Fadenabziehvorrichtungen entfallen und manuelle Eingriffe zwischen die rotierenden Teile der Maschine nicht jo mehr erforderlich sind, so daß die latente Unfallgefahr für das Bedienungspersonal verringert wird. Die erfindurigsgemäße Vorrichtung führt daher tu einer wesentlichen Steigerung der Wirtschaftlichkeit der Gesamtanlage. v> The advantages achieved with the device according to the invention are that the thread loss resulting from the formation of the thread reserve is reduced to that small thread length that is continuously fed during the short switching time required for the bobbin change, that thread suction or thread pulling devices are omitted and manual interventions between the rotating parts of the machine are no longer required, so that the latent risk of accidents for the operating personnel is reduced. Therefore, the apparatus performs erfindurigsgemäße the economics of the overall plant tu a significant increase. v>

Ein Ausfuhrungsbeispiel der Erfindung ist in der Zeichnung dargestellt und wird im Folgenden näher beschrieben.An exemplary embodiment of the invention is shown in the drawing and will be described in more detail below described.

Fig. 1 zeigt eine perspektivische Darstellung der Vorrichtung vährend des Aufwickelvorganges mit dem -to Faden in Mittel- und in linker Spulstellung.Fig. 1 shows a perspective view of the device during the winding process with the -to Thread in middle and left winding position.

F i g. 2 zeigt eine perspektivische Darstellung der Vorrichtung im Augenblick der Bildung der Fadenreserve. F i g. 2 shows a perspective view of the device at the moment of the formation of the thread reserve.

Fig. 1 zeigt einen Maschinenteil 1 eines halbautoma- 4ί tischen Spulenwechslers gemäß der CH-PS 4 63 342, in welchem zwei sternförmige Spulenaufhängungen 2, 2' durch eine Achse 2" verbunden und um dieselbe drehbar gelagert sind. Deren lagemäßige Veränderung wird durch einen an einer Schaltnabe 3 befestigten Schalthebel 4 bewirkt. Im Drehsinn A der Schaltnabe 3 gesehen ist vor dem Schahhebel 4 eine Federbüchse 5 mittels einer Schraube 6 mit der Schaltnabe 3 starr verbunden, wobei die Achse X des Schalthebels 4 und die Achse Vder Federbüchse 5 einen Winkel α bilden. v> Fig. 1 shows a machine part 1 of a semi-automatic 4ί table bobbin changer according to CH-PS 4 63 342, in which two star-shaped bobbin suspensions 2, 2 'are connected by an axis 2 " and rotatably mounted about the same Shift lever 4 attached to a shift hub 3. Viewed in the direction of rotation A of the shift hub 3, a spring sleeve 5 is rigidly connected to the shift hub 3 by means of a screw 6 in front of the shift lever 4, the axis X of the shift lever 4 and the axis V of the spring sleeve 5 at an angle form α. v>

Die Federbüchse 5 am Seilzuganfang dient zur Vorspannung .ie« Seilzuges 12 und zu Jessen Betätigungsverzögerung während der Zunahme des Spulendurchmessers. Die Vorspannung des Seilzuges 12 durch die Federbüchse S wird durch eine darin gelagerte w> Spannfeder 7 bewirkt, deren eines Ende auf einem als Mundstück 8 ausgebildeten Verschluß der Federbüchse 5 und deren anderes Ende auf einem axial beweglichen Gleitbolzen 9 abgestützt ist. Die Federkraft wirkt über den Gleitbolzen ? auf den in dessen Bohrung 10 <r, verankerten Seilzug 12, welcher durch eine Bohrung 11 des Mundstückes 8 die Federbuchse 5 verläßt.The spring sleeve 5 at the start of the cable pull serves to pre-tension the cable pull 12 and to delay the actuation during the increase in the coil diameter. The bias of the cable 12 through the spring sleeve S is supported by a w> Tension spring 7 causes one end of which on a closure formed as a mouthpiece 8 of the spring sleeve 5 and the other end of which is supported on an axially movable sliding bolt 9. The spring force acts over the slide bolt? on the cable 12 anchored in its bore 10 <r, which through a bore 11 of the mouthpiece 8 leaves the spring bushing 5.

Eine mit dem Seilzug 12 durch die Ringöse 13 und mitOne with the cable 12 through the eyelet 13 and with

dem Seilzug 12' durch eine Ringöse 15 gekuppelte Ausgleichsteder 14 gestattet nach erfolgter Traversiet bewegung eines Schlittens 35 bis zum Anschlag 31, den Schalthebel 4 bis zur Beendigung des Spulenwechsel-Vorganges noch weiter zu bewegen.the cable pull 12 'through an eyelet 15 coupled compensating spring 14 allows movement after the Traversiet a slide 35 up to the stop 31, the shift lever 4 up to the end of the bobbin change process to move even further.

Eine Seilrolle 16, in deren keilförmiger Führungsnut 17 das Ende des Seilzuges 12' verankert ist und eine damit starr verbundene Seilrolle 18 dienen als Vorgelege für den in einem Schlitz 20 der keilförmigen Führungsnut 19 verankerten weiteren Seilzug 12". Die Seilrollen 16 und 18 sind auf einer Achse 21 drehbar gelagert, welche in einem mit dem Maschinenlei! 1 starr verbundenen Maschinenteil 22 befestigt istA pulley 16, in whose wedge-shaped guide groove 17 the end of the cable 12 'is anchored and a rope pulley 18 rigidly connected therewith serve as an intermediate gear for the in a slot 20 of the wedge-shaped Guide groove 19 anchored another cable 12 ″. The cable pulleys 16 and 18 are rotatable on an axis 21 stored, which in one with the machinery! 1 rigidly connected machine part 22 is attached

Der Seilzug 12" ist mittels einer Ringkupplung 23 und der Ringöse 24 mit dem Seilzug 12'" (Fig. 2) und der Ringöse 25 gekoppelt, welcher den in Richtung B und C erfolgenden und durch die Drehbewegung der Schaltnabe 3 und somit auch der Federbuchse 5 bewirkten Zug auf eine Auslenkchangiervorrichtung 26 für die Fadenreserve 29" (siehe F i g 2) über»'s.gtThe cable 12 "is coupled to the cable 12 '" (Fig. 2) and the ring eye 25 by means of a ring coupling 23 and the ring eyelet 24, which takes place in directions B and C and through the rotary movement of the shift hub 3 and thus also the spring bushing 5 caused tension on a deflecting traverse device 26 for the thread reserve 29 ″ (see FIG. 2) via »' s .gt

Die Ringkupplung 23 ermöglicht o>". Abkoppeln dt-s Seilzuges 12'" zum Zwecke der Entfernung der Auslenkchangiervorrichtung 26.The ring coupling 23 enables o> ". Decoupling dt-s Cable 12 ′ ″ for the purpose of removing the deflecting traversing device 26.

Die Auslenkchangiervorrichtung 26 ist durch B^festigungsm'ttel 27, 27' mit dem Maschinengestell 28 austauschbar derart verbunden, daß deren rechteckige Bodenplatte 30 vor der in Wickellage befindlichen Spule 46 und parallel zu deren Längsachse liegt Von der Ringkupplung 23 an durchläuft der Seilzug 12'" eine Umlenkrolle 32, die auf dem der Ringkupplung 23 zugewandten Ende der Oberfläche der Bodenplatte 30 angeordnet ist. Anschließend läuft dieser Seilzug durch ein Führungsrohr 33, das der Führung des Schlittens 35 dient, und wiederum über eine auf der Oberfläche des von der Ringkupplung 23 abgewandten Endes der Bodenplatte 30 angeordnete Umlenkrolle 34 und ist über den Schlitten 35 geführt, mit welchem dieser Seilzug mittels Schrauben 36 und 37 verbunden ι?t. Der Schlitten ist mit einem hakenförmigen Hilfsfadenführer 35' versehen zur Auslenkung des Fadens 29,29' aus dem Wi-kelbereich 47 der Spule 46 in den Fadenreservebereich 50 der leeren Spulenhülsen 49. Nach Führung über eine weitere Umlenkrolle 38 endet der Seihug 12'" im zweiten Führungsrohr 39 des Schlittens 35 au einer an einem Dorn 40 der Bodenplatte ZU befestigten Rückholfeder 41.The deflection traversing device 26 is interchangeably connected to the machine frame 28 by fastening means 27, 27 'in such a way that its rectangular base plate 30 lies in front of the coil 46 in the winding position and parallel to its longitudinal axis. "A deflection roller 32, which is arranged on the end of the surface of the base plate 30 facing the ring coupling 23. This cable pull then runs through a guide tube 33, which is used to guide the carriage 35, and in turn over one on the surface of the ring coupling 23 facing away from the end of the base plate 30 and is guided over the carriage 35 to which this cable is connected by means of screws 36 and 37. The carriage is provided with a hook-shaped auxiliary thread guide 35 'for deflecting the thread 29, 29' from the The winding area 47 of the bobbin 46 into the thread reserve area 50 of the empty bobbin tubes 49. After being guided over a further e deflection roller 38, the strainer 12 ′ ″ ends in the second guide tube 39 of the slide 35 on a return spring 41 fastened to a mandrel 40 of the base plate ZU.

Eine Stange 43 dient der Halterung eines Führungsbügels 44 für den Faden 29, 29', 29" während des Aufspulens im Wickelbereich 47 des changierenden Aufspulfadenführers 42, 42'. Eine vor dem Aufspulfadenführer 42, 42' angeordnete Niederhaltestange 45. welche sich der Länge nach über die Wickelbreite der Spule 46 erstreckt, verhindert durch das Unterführen Schwingungen im Faden 29, 29' und erleichtert dessen Aufgreifen durch den hakenförmigen Hilfsfadenführer 35' zum Zwecke der Reservefadenbildung bei Beendigung des Aufwickelvorganges.A rod 43 is used to hold a guide bracket 44 for the thread 29, 29 ', 29 "during the Winding up in the winding area 47 of the traversing winding thread guide 42, 42 '. One in front of the winding thread guide 42, 42 'arranged hold-down rod 45. which extends lengthwise over the winding width of the Coil 46 extends, prevents vibrations in the thread 29, 29 'by passing under and facilitates this Picking up by the hook-shaped auxiliary thread guide 35 'for the purpose of forming a reserve thread upon termination of the winding process.

Die Spule 46 wird durch eine Treibwalze 48 in Rotation versetzt Der rauhe Randteil der Spule ist der der Reservebildung dienende Reservefadenbereich 50, der daran anschließende Spulenkörper der Wickelteil 47. Nach Entnahme der vollen Spule 40 'ritt an deren Stelle die leere Spulenhülse 49 (siehe auch F i g. 2), deren eines Ende den Fadenreservebereich 50 und deren daran anschließende/ Teil den Wickelbereich 51 bildet.The spool 46 is rotated by a drive roller 48. The rough edge portion of the spool is the the reserve thread area 50 serving for the formation of reserves, the bobbin adjoining it the winding part 47. After the full bobbin 40 'had been removed, the empty bobbin case 49 (see also FIG. 2) took its place one end forms the thread reserve area 50 and its adjoining / part forms the winding area 51.

Die Auslenkchangiervorrichtung 26 kann gegen eine solche ausgetauscht werden, welche den Schlitten 35 in die entgegcngcscUte Richtung bringt, um wahlweiseThe deflecting traversing device 26 can be exchanged for one which the carriage 35 in the opposite direction brings to alternate

eine Links- oder Rechtsreserve bilden zu können. Bei dieser zweiten Ausführung entfällt die Umlenkrolle 32 nach der Ringkupplung 23,24, 25, die Auslenkchangiervorrichtung des Schlittens 35 ist um 180° gedreht und der Seilzug 12'" wird von der zweiten Umlenkrolle 34 geführt.to be able to form a left or right reserve. at In this second embodiment, the deflecting roller 32 after the ring coupling 23, 24, 25, the deflecting traversing device, is omitted of the slide 35 is rotated by 180 ° and the cable 12 ′ ″ is driven by the second deflection roller 34 guided.

Fig. 1 zeigt den Faden 29 während des Spulvorganges in Mittelstellung bzw. Faden 29' in linker Endstellung. Die Auslenkchangiervorrichtung 26 befindet sich hierbei in Ruhestellung, der Spulenwechsler in Betriebsstellung.Fig. 1 shows the thread 29 during the winding process in the middle position or thread 29 'in the left end position. The Auslenkchangiervorrichtung 26 is in this case in the rest position, the bobbin changer in the operating position.

Fig.2 zeigt den Augenblick der Bildung der Fadenreserve. Die neue Spulenhülse 49 ist bereits in Spulstellung, die volle Spule 46 ist zur Abnahme bereit.Fig.2 shows the moment when the thread reserve is formed. The new bobbin case 49 is already in Spool position, the full bobbin 46 is ready for removal.

Die durch die erwähnten Einzelelemente bewirkte automatische Fadenreservebildung geht folgendermaßen vor sich: Der durch den den Spulenwechsel bewirkenden Schalthebel 4 über den Seilzug 5, 12, 14, 12', 16,18, 12", 23, 12'" betätigte Schlitten 35 wird nach Abheben der vollen Spule 46 von der Treibwalze 48 und nach damit fast gleichzeitig bewirktem Ausfädeln des Fadens 29, 29' aus dem Aufspulfadenführer 42, 42' rechtwinklig zur Fadeneinlaufrichtung bewegt und erfaßt den von der Niederhaltestange 45 geführten Faden 29, 29' an beliebiger Stelle im Changierbereich des Aufspulfadenführers 42, 42'. Der Faden wird durch den hakenförmigen Hilfsfadenführer 35' über den Changierbereich hinaus in die Fadensteilung 29 und damit bis zu jener Stelle ausgelenkt, wo auf der Spulenhülse 49 der Fadenreservebereich 50 liegt (siehe Fig. 2).The automatic thread reserve formation brought about by the individual elements mentioned goes as follows in front of you: The shift lever 4 causing the bobbin change via the cable 5, 12, 14, 12 ', 16,18, 12 ", 23, 12'" actuated slide 35 is after Lifting the full bobbin 46 from the drive roller 48 and after almost simultaneously effected unthreading of the The thread 29, 29 'is moved out of the winding thread guide 42, 42' at right angles to the thread inlet direction and detects the thread 29, 29 'guided by the hold-down rod 45 at any point in the traversing area of the winding thread guide 42, 42 '. The thread is through the hook-shaped auxiliary thread guide 35 'over the Traversing area out into the thread pitch 29 and thus deflected up to the point where on the The bobbin tube 49 of the thread reserve area 50 is located (see FIG. 2).

Bis zu diesem Zeitpunkt ist der Spulenwechselvorgang etwa zur Hälfte abgelaufen und die neue leere Spulenhülse 49 befindet sich ungefähr senkrecht über dem hakenförmigen Hilfsfadenführer 35'. Die abgehobene volle Spule 46 befindet sich weiter in einer auslaufenden Rotation und spult den Faden 29' während einer kurzen Zeil noch auf. Die leere Spulenhülse 49 gelangt danach zur Treibwalze 48 und wird ebenfalls angetrieben.By this point in time, the bobbin change process is about halfway through and the new one is empty The bobbin tube 49 is located approximately vertically above the hook-shaped auxiliary thread guide 35 '. The lifted one full bobbin 46 is still in a decelerating rotation and winds the thread 29 'during a short line. The empty bobbin tube 49 then arrives at the drive roller 48 and is also driven.

Der Fadenreservebereich 50 der leeren Spulenhülse 49, welcher aufgerauht, gekerbt oder beflockt ist, erfaßt den Faden 29", begünstigt durch das inzwischen langsamer gewordene Aufspulen der abgehobenen vollen Spule 46 und reißt den Faden ab.The thread reserve area 50 of the empty bobbin tube 49, which is roughened, notched or flocked, is detected the thread 29 ", favored by the now slower winding of the lifted full bobbin 46 and breaks the thread.

Nach dem Aufspulen von einigen Windungen auf den Fadenreservebereich 50 der Spulenhülse 49 wird der den Spulenwechselvorgang bewirkende Schalthebel 4 wieder in Ausgangsstellung gebracht. Damit springt gleichzeitig auch der Schlitten 35 mit dem hakenförmigen Hilfsfadenführer 35' unter Mitwirkung der sich nunmehr wieder zusammenziehenden Rückholfeder 41 in seine Ausgangsstellung bis zum Anschlag 3Γ gemäß Fig.! zurück und der nicht mehr ausgelenkte Faden 29, 29' wird im Changierbereich des Aufspulfadenführers 42,42' von diesem selbsttätig erfaßt und wieder geführt.After winding a few turns onto the thread reserve area 50 of the bobbin tube 49, the the bobbin changing operation causing shift lever 4 brought back to the starting position. So that jumps at the same time also the carriage 35 with the hook-shaped auxiliary thread guide 35 'with the participation of themselves now contracting return spring 41 in its starting position up to the stop 3Γ according to Fig.! back and the no longer deflected thread 29, 29 'is automatically detected by this in the traversing area of the winding thread guide 42, 42' and guided again.

Die erfindungsgemäße Vorrichtung kann auch mit anderen geeigneten Spulenwechsler-Vorrichtungen gekoppelt werden, so daß während des Wechselvorganges zugleich die automatische Fadenreservebildung erfolgt.The device according to the invention can also be coupled with other suitable bobbin changer devices so that the automatic thread reserve formation takes place at the same time during the changing process.

Hierzu 2 Blatt ZeichnungenFor this purpose 2 sheets of drawings

Claims (7)

Patentansprüche:Patent claims: 1. Vorrichtung zur automatischen Verlegung einer Fadenreserve auf eine Spulenhülse außerhalb des Spulbereiches mittels eines über die gesamte Hülsenlänge hinwegbewegbaren Hilfsfadenführers ein einer Fadenaufwickelvorrichtung mit kontinuierlicher Fadenzulieferung und mit halbautomatisch mittels eines an einem Schaltrevolver angeordneten Schalthebels schaltbarem Spulenwechsler, dadurch gekennzeichnet, daß die Hilfsfadenführungsvorrichtung eine Auslenkchangiervorrichtung (26) ist mit zwei parallel zur Spulenachse und zur Einlaufebene des Fadens verlaufenden und sich insgesamt über den Fadenreservebereich (50) sowie den Wickelbereich (51) der Spulenhülse (49) erstreckenden, auf einer Bodenplatte (30, 31, 31') starr befestigten Führungsrohren (33,39) sowie mit auf letzteren gleitendem, mittels einer Seilzugvorrichtung (5, ϊ2.12', 12", 12'", 13,14,15.16.18,23,24, 25, 41) bewegbarem Schlitten (35) mit auf dessen Oberfläche befestigtem Hilfsfadenführer (35') zum Aufnehmen des Spulfadens (29, 29") während des Spulenwechsels zwischen einer leeren Wickelhülse (49) und einem bewickelten Spulenkörper (46) sowie zum Auslenken in den wahlweisen an einem der beiden Randabschnitte der leeren Wickelhülse (49) liegenden Fadenreservebereich (50).1. Device for the automatic laying of a thread reserve on a bobbin outside of the Winding area by means of an auxiliary thread guide which can be moved over the entire length of the tube one of a thread winding device with continuous thread supply and with semi-automatic bobbin changer switchable by means of a switching lever arranged on a switching turret, thereby characterized in that the auxiliary thread guide device is a Auslenkchangiervorrichtung (26) is with two parallel to the bobbin axis and to the inlet plane of the thread and running overall over the thread reserve area (50) and the winding area (51) of the bobbin tube (49) extending, on a base plate (30, 31, 31 ') rigidly attached guide tubes (33, 39) and with on the latter sliding, by means of a cable device (5, ϊ2.12 ', 12 ", 12'", 13,14,15.16.18,23,24, 25, 41) movable carriage (35) with an auxiliary thread guide (35 ') attached to its surface for Taking up the bobbin thread (29, 29 ") while changing the bobbin between an empty winding tube (49) and a wound bobbin (46) and for deflection in the optional on one of the both edge sections of the empty winding tube (49) lying thread reserve area (50). 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Bodenplatte (30) der Auslenkchangiervorrichtu.ig (26) zwei in deren Endbereich angeordnete starre Anschlagstollen (31, 3Γ) zur Lagerung der Führungsrohr«: (33, 39) und zur Begrenzung der Changierbewegung des Schlittens (35) aufweist2. Apparatus according to claim 1, characterized in that the base plate (30) of the Auslenkchangiervorrichtu.ig (26) two rigid stop lugs (31, 3Γ) arranged in the end region thereof Storage of the guide tube ": (33, 39) and to limit the traversing movement of the slide (35) 3. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der den Seilzug (12) mit der Schaltnabe (3) verbindende Teil eine in letzterer verschraubte Federbüchse (5) mit darin gelagerter sich an einem Gleitbolzen (9) zur Aufnahme des Endes des Seilzuges (12) sowie an einem Mundstück (8) mit Bohrung (U) für den Seilzugdurchlaß abstützenden Vorspannfeder (7) ist3. Apparatus according to claim 1 or 2, characterized in that the cable (12) with the Shift hub (3) connecting part of a spring bushing (5) screwed into the latter with a spring bushing mounted therein on a sliding bolt (9) for receiving the end of the cable pull (12) and on a mouthpiece (8) with a hole (U) for the tensioning spring (7) supporting the cable passage 4. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß an dem von der Federbüchse (5) abgewandten Ende des Seilzuges (12) eine mit demselben durch eine Ringöse (13) verbundene und nach erfolgtem Anschlag des Schlittens (35) an einem der Anschlagstollen (31, 31') einen zur Beendigung des Spulenwechsels erforderlichen Wegausgleich des Seilzuges (12) bewirkende Ausgleichsfeder (14) angeordnet ist.4. Apparatus according to claim 3, characterized in that on the one of the spring sleeve (5) remote end of the cable (12) connected to the same by an eyelet (13) and after the carriage (35) has hit one of the stop lugs (31, 31 ') one to the Completion of the bobbin change required compensation spring for the cable pull (12) (14) is arranged. 5. Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß an dem Maschinengestell (22) ein aus einer Seilrolle (16) und aus einer damit starr verbundenen Seilrolle (18) bestehendes Vorgelege angeordnet ist zur Verbindung des an der Ausgleichsfeder (14) und der Seilrolls (16) befestigten Seilzuges (12') mit dem an der Seilrolle (18) eingehängten Seilzug (12").5. Device according to one of the preceding claims, characterized in that on the Machine frame (22) made up of a rope pulley (16) and a rope pulley (18) rigidly connected to it existing back gear is arranged to connect the on the compensating spring (14) and the Cable pulley (16) attached cable pull (12 ') with the cable pull (12 ") suspended from the cable pulley (18). 6. Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß eine Ringkupplung (23) den Seilzug (12") und dessen Ringöse (24) mit dem Seilzug (12'") und dessen Ringöse (25) verbindet zur Ermöglichung des Austausches der Auslenkchangiervorrichtiing (26).6. Device according to one of the preceding claims, characterized in that a Ring coupling (23) the cable (12 ") and its eyelet (24) with the cable (12 '") and its Ring eyelet (25) connects the Auslenkchangiervorrichtiing (26) to enable the exchange. 7. Vorrichtung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß eine Rückholfeder (41) in dem Führungsrohr (39) gelagert und zwischen einem Dorn (40) der Bodenplatte (30) und dem Seilzug (12"·) verspannt ist zum Bewegen des Schlittens (35) aus dem Fadenreservebereich der Wickelhülse (49) gegen einen der Anschlagstollen (31,31') nach beendetem Spulenwechsel.7. Device according to one of the preceding claims, characterized in that a Return spring (41) mounted in the guide tube (39) and between a mandrel (40) of the base plate (30) and the cable pull (12 "·) is tensioned to move the carriage (35) out of the thread reserve area of the Winding tube (49) against one of the stop lugs (31, 31 ') after the bobbin change has ended.
DE2051311A 1969-10-23 1970-10-20 Device for the automatic laying of a thread reserve on a bobbin tube outside the bobbin area Expired DE2051311C3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1595669A CH506431A (en) 1969-10-23 1969-10-23 Device for automatic formation of a thread reserve on a thread winding device with continuous thread supply

Publications (3)

Publication Number Publication Date
DE2051311A1 DE2051311A1 (en) 1971-05-06
DE2051311B2 DE2051311B2 (en) 1978-08-10
DE2051311C3 true DE2051311C3 (en) 1979-04-05

Family

ID=4413328

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2051311A Expired DE2051311C3 (en) 1969-10-23 1970-10-20 Device for the automatic laying of a thread reserve on a bobbin tube outside the bobbin area

Country Status (9)

Country Link
US (1) US3717310A (en)
JP (1) JPS4836693B1 (en)
BE (1) BE748916A (en)
CH (1) CH506431A (en)
CS (1) CS154296B2 (en)
DE (1) DE2051311C3 (en)
FR (1) FR2082909A5 (en)
GB (1) GB1318610A (en)
NL (1) NL7004398A (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3942731A (en) * 1972-07-06 1976-03-09 Rieter Machine Works, Ltd. Method and apparatus for forming reserve windings during a bobbin change on a spinning machine
DE2302095C2 (en) * 1973-01-17 1975-09-25 Barmag Barmer Maschinenfabrik Ag, 5600 Wuppertal Dishwasher
US3876161A (en) * 1973-04-26 1975-04-08 Karlsruhe Augsburg Iweka Automatic yarn transfer system
US4186890A (en) * 1977-06-24 1980-02-05 Industrie-Werke Karlsruhe Augsburg Aktiengesellschaft Mechanism and method for transferring yarn from a full package to an empty bobbin
US4102508A (en) * 1977-06-27 1978-07-25 Phillips Fibers Corporation Yarn supply package and method and apparatus for the winding thereof
US4103834A (en) * 1977-07-13 1978-08-01 Phillips Fibers Corporation Apparatus for winding an improved yarn supply package
JPS54114675A (en) * 1978-02-28 1979-09-06 Toray Ind Inc Turret type thread stripe winder
US4166587A (en) * 1978-06-01 1979-09-04 Industrie-Werke Karlsruhe Augsburg Aktiengesellschaft Method and aparatus for transferring yarn on a nearly full package to an empty bobbin
EP0410926B1 (en) * 1989-07-24 1995-04-19 Maschinenfabrik Rieter Ag Thread changing device for winding machines
US5653395A (en) * 1993-05-13 1997-08-05 Toray Engineering Co., Ltd. Yarn winding method and apparatus and package formed thereby
CN110626867B (en) * 2019-08-22 2021-01-22 荣成市红旗针织服装有限公司 Automatic bobbin winder of textile machinery

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3310247A (en) * 1964-10-26 1967-03-21 Du Pont Continuous yarn windup mechanism
GB1104156A (en) * 1965-03-04 1968-02-21 Ici Fibres Ltd Improvements in or relating to the collection of filaments or yarns
US3355117A (en) * 1965-08-04 1967-11-28 Inst Textilmaschinen Yarn-winding apparatus
US3385532A (en) * 1966-12-21 1968-05-28 Du Pont Yarn winding apparatus
US3428266A (en) * 1967-04-25 1969-02-18 Du Pont Yarn winding apparatus
CH463342A (en) * 1967-08-11 1968-09-30 Heberlein & Co Ag Continuously operating bobbin changer for thread and yarn winding machines with semi-automatic changing device

Also Published As

Publication number Publication date
NL7004398A (en) 1971-04-27
DE2051311A1 (en) 1971-05-06
CH506431A (en) 1971-04-30
JPS4836693B1 (en) 1973-11-06
CS154296B2 (en) 1974-03-29
BE748916A (en) 1970-10-14
DE2051311B2 (en) 1978-08-10
FR2082909A5 (en) 1971-12-10
GB1318610A (en) 1973-05-31
US3717310A (en) 1973-02-20

Similar Documents

Publication Publication Date Title
DE1535901C3 (en) Method and device for connecting the threads lying ready on the thread tensioners and pay-off bobbins of a creel
DE3802900C2 (en)
DE3808957C2 (en)
EP0367253B1 (en) Exchange system for a yarn-positioning device in winding machines
DE3833958C2 (en) Device for winding wire-like material onto two-flange spools
DE2051311C3 (en) Device for the automatic laying of a thread reserve on a bobbin tube outside the bobbin area
DE2627643C2 (en) Method and device for introducing threads, yarns and the like into a winding device
DE9310332U1 (en) Device for the automatic winding of a thread reserve
DE2312609A1 (en) METHOD AND DEVICE FOR REPLACING A FULL CROSS COIL FOR AN EMPTY CASE
DE102019129966B3 (en) Device and method for winding a thread
EP2192213A1 (en) Service device for supplying the workplaces of an open-end spinning machine
DE2519066A1 (en) DEVICE FOR THE FORMATION OF THREAD RESERVES ON SPOOLS
DE2526768A1 (en) Yarn cross winding machine yarn inserter - formed by axially slidable arm carrying a number of yarn guides and pivotable into contact with bobbins
EP0521816B1 (en) Method for transferring a yarn from a full bobbin to a winding tube and winding machine
EP0051222B1 (en) Device for introducing yarns and the like in a winding machine
CH685622A5 (en) Bobbin tube cradle.
DE10239334A1 (en) Thread winder has tensile strength detector arranged between axially movable thread guide and traverse apparatus, which has guide portion to guide thread to tensile strength detection position
DE2364284C2 (en) Dishwasher
DE4122810A1 (en) METHOD FOR SEPARATING THE RUNS OF PRE-YARN BOBS MADE ON RASPING MACHINES
DE4115339B4 (en) winding tube
DE2729303C3 (en) Process for the continuous winding of wire or other thread-like material and winding apparatus therefor
DE3039857C2 (en) Device for forming fixed initial turns on empty bobbins of textile machines
DE19520153A1 (en) Pot spinner assembly
DE19644592B4 (en) Device for transferring a thread continuously supplied to a suction to a rotating empty tube
DE2616965A1 (en) METHOD AND DEVICE FOR TAKING UP A THREAD AND TRANSFERRING IT TO A BOBBIN AFTER A BOBBIN CHANGE

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
EHJ Ceased/non-payment of the annual fee