DE20313550U1 - Translating device for translating persons and / or loads of ships to an offshore platform - Google Patents

Translating device for translating persons and / or loads of ships to an offshore platform Download PDF

Info

Publication number
DE20313550U1
DE20313550U1 DE20313550U DE20313550U DE20313550U1 DE 20313550 U1 DE20313550 U1 DE 20313550U1 DE 20313550 U DE20313550 U DE 20313550U DE 20313550 U DE20313550 U DE 20313550U DE 20313550 U1 DE20313550 U1 DE 20313550U1
Authority
DE
Germany
Prior art keywords
offshore platform
crane
crane boom
pivot
translating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE20313550U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
B Teupen Maschinenbau GmbH
Original Assignee
B Teupen Maschinenbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by B Teupen Maschinenbau GmbH filed Critical B Teupen Maschinenbau GmbH
Priority to DE20313550U priority Critical patent/DE20313550U1/en
Priority to DE50304236T priority patent/DE50304236D1/en
Priority to PT03026389T priority patent/PT1510496E/en
Priority to DK03026389T priority patent/DK1510496T3/en
Priority to EP03026389A priority patent/EP1510496B1/en
Priority to AT03026389T priority patent/ATE332869T1/en
Priority to SI200330440T priority patent/SI1510496T1/en
Priority to ES03026389T priority patent/ES2268258T3/en
Publication of DE20313550U1 publication Critical patent/DE20313550U1/en
Priority to CY20061101398T priority patent/CY1106173T1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/10Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Jib Cranes (AREA)
  • Ship Loading And Unloading (AREA)
  • Types And Forms Of Lifts (AREA)
  • Pallets (AREA)
  • Manipulator (AREA)

Abstract

Übersetzvorrichtung (100) für das Übersetzen von Personen und/oder Lasten von Schiffen auf eine Offshore-Plattform (200), bestehend aus wenigstens:
– einem mit der Offshore-Plattform zu verbindenden Basiselement (30), einem ersten Kranauslegerelement (10) und einem zweiten Kranauslegerelement (20), die über eine erste und eine zweite Schwenkachse (12; 22) miteinander verbunden sind, wobei das erste Kranauslegerelement (10) über wenigstens ein Stellelement (14) gegenüber dem Basiselement (30) verschwenkbar ist;
– einer Seilwindeneinrichtung, deren Seil (60) bis zu einer Umlenkeinrichtung (26) an dem zweiten Kranauslegerelement (20) geführt ist; und
– einem Dreipunktlenkerelement (40) mit wenigstens drei Schwenklagern (41, 42, 43),
– das über eine Führungsstange (12) anlenkbar ist, welche sich von einem Schwenklager (31) am Basiselement (30) entlang des ersten Kranauslegerelements (10) bis zu einem ersten Schwenklager (41) erstreckt,
– das mit einem zweiten Schwenklager (42) an der Schwenkachse (22) zwischen dem ersten und dem zweiten Kranauslegerelement (10; 20) gelagert...
Transmission device (100) for translating persons and / or loads of ships onto an offshore platform (200), comprising at least:
A base element (30) to be connected to the offshore platform, a first crane jib element (10) and a second crane jib element (20) which are connected to each other via a first and a second pivot axis (12; 10) via at least one adjusting element (14) relative to the base element (30) is pivotable;
- A cable winch device whose cable (60) is guided to a deflection device (26) on the second crane jib member (20); and
A three-point link element (40) with at least three pivot bearings (41, 42, 43),
- Which is articulated via a guide rod (12) extending from a pivot bearing (31) on the base member (30) along the first crane jib member (10) to a first pivot bearing (41),
- Which with a second pivot bearing (42) on the pivot axis (22) between the first and the second crane jib member (10; 20) mounted ...

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Übersetzvorrichtung für das Übersetzen von Personen und/oder Lasten von Schiffen auf eine Offshore-Plattform.The invention relates to a transmission device for translating of persons and / or loads of ships on an offshore platform.

Windenergieanlagen werden zunehmend im Meer vor der Küste errichtet, da wegen der dortigen besseren Windverhältnisse eine größere Energieausbeute möglich ist, und auch, weil die Aufstellung an Land wegen Geräuschentwicklung, Schattenwirkung etc. zunehmend weniger akzeptiert wird.Wind turbines are increasing in the sea off the coast built because of the better wind conditions there a greater energy yield possible is, and also because the installation on land due to noise, Shadow effect, etc. increasingly less accepted.

Bei solchen Offshore-Windenergieanlagen ergibt sich das Problem, dass zur Reparatur- und Wartungszwecken Personen, Werkzeuge, Betriebsstoffe und Ersatzteile auf diese unbemannten Anlagen übergesetzt werden müssen. Ein Übersetzen mittels Hubschrauber auf die oben an dem Turm der Windenergieanlage befindliche Gondel, in der Rotor gelagert und der Generator angeordnet ist, ist nur bei günstigen Windverhältnissen möglich und setzt weiterhin voraus, dass der Rotor sicher arretierbar ist. Bei widrigen Witterungsverhältnissen ist ein Hubschraubertransport nicht sicher durchführbar.In such offshore wind turbines results the problem that for repair and maintenance purposes people, Tools, supplies and spare parts to these unmanned Plants translated Need to become. A translation by means of Helicopter on the top of the tower of the wind turbine located Nacelle, stored in the rotor and the generator is arranged, is only at cheap wind conditions possible and further assumes that the rotor can be securely locked. at adverse weather conditions a helicopter transport is not safe to carry out.

Eine Anlandung von Personen und Material von Schiffen aus durch Anlegen und Festmachen des Schiffes an dem Turm ist nur bei einer Wellenhöhe bis ca. 1,50 m sicher möglich. Bei größeren Wellenhöhen ist es nicht mehr gefahrlos möglich, dass Personen von einem Schiff aus auf den Fußbereich des Turms der Windenergieanlage übersteigen. Bei den an den deutschen Küsten vorherrschenden Wetterverhältnissen sind während ca. 45 % des Jahres die Witterungsverhältnisse dafür zu ungünstig, insbesondere ist der Seegang zu hoch, so dass während dieser Zeit ein Ausfall einer Windenergieanlage nicht behoben werden kann, wodurch die Wirtschaftlichkeit der Anlage erheblich gemindert ist.A landing of persons and material of Ships out by mooring and mooring the ship to the tower is only up to a wave height 1.50 m certainly possible. For larger wave heights it is no longer possible to safely that people from a ship to the foot of the tower of the wind turbine exceed. At the on the German coasts prevailing weather conditions are during about 45% of the year, the weather conditions for unfavorable, in particular the Swell too high, so while This time a failure of a wind turbine can not be solved can, which significantly reduces the cost of the plant is.

Aus der DE 100 21 163 A1 ist ein Wasserfahrzeug zum Versorgen einer Offshore-Windenergieanlage bekannt. Hierbei sind von dem Schiffskörper absenkbare Tragsäulen vorgesehen, die sich auf dem Meeresboden abstützen und damit das Wasserfahrzeug unabhängig vom Seegang auf einer bestimmten Höhe an der Offshore-Plattform der Windenergieanlage halten. Nachteilig ist hierbei, dass das jeweilige Senken und Heben der Tragsäulen viel Zeit in Anspruch nimmt.From the DE 100 21 163 A1 is a watercraft for supplying an offshore wind turbine known. In this case, lowerable support columns are provided by the hull, which are supported on the seabed and thus keep the vessel independent of the sea state at a certain height at the offshore platform of the wind turbine. The disadvantage here is that the respective lowering and lifting of the support columns takes a lot of time.

Auch sind die Kosten für dieses speziell konstruierte Wasserfahrzeug hoch. Ein wesentlicher Nachteil besteht darin, dass das Fahrzeug in bestimmten küstennahen Bereichen nicht eingesetzt werden kann, in denen Seekabel oder Erdgas- bzw. Erdöl-Pipelines verlaufen, weil die Gefahr einer Beschädigung mit weit reichenden Konsequenzen besteht.Also, the cost of this specially designed watercraft high. A major disadvantage is that the vehicle is not used in certain offshore areas may be where submarine cables or gas pipelines run because of the risk of damage with far-reaching consequences.

Es stellt sich daher die Aufgabe, eine kostengünstige Übersetzvorrichtung für das Übersetzen von Personen und/oder Lasten auf eine Offshore-Plattform anzugeben, mit der während eines größeren Teils des Jahres ein Übersetzen möglich ist.It is therefore the task an inexpensive translation device for translating Persons and / or loads on an offshore platform, with while a larger part Translating the year is possible.

Diese Aufgabe wird gelöst durch eine Übersetzvorrichtung für das Übersetzen von Personen und/oder Lasten von Schiffen auf eine Offshore-Plattform, bestehend aus wenigstens:This task is solved by a translator for translating of persons and / or loads of ships on an offshore platform, consisting of at least:

  • – einem mit der Offshore-Plattform zu verbindenden Basiselement, einem ersten Kranauslegerelement und einem zweiten Kranauslegerelement, die über eine erste und eine zweite Schwenkachse miteinander verbunden sind, wobei das erste Kranauslegerelement über wenigstens ein Stellelement gegenüber dem Basiselement verschwenkbar ist;- one to be connected to the offshore platform base element, a first Crane boom element and a second crane boom element, which has a first and a second pivot axis are interconnected, wherein the first crane jib element over at least one actuating element relative to the base element pivotable is;
  • – einer Seilwindeneinrichtung, deren Seil bis zu einer Umlenkeinrichtung an dem zweiten Kranauslegerelement geführt ist; und- one Cable winch device whose rope up to a deflection is guided on the second crane boom element; and
  • – einem Dreipunktlenkerelement mit wenigstens drei Schwenklagern, – das über eine Führungsstange anlenkbar ist, welche sich von einem Schwenklager am Basiselement entlang des ersten Kranauslegerelements bis zu einem ersten Schwenklager erstreckt, – das mit einem zweiten Schwenklager an der Schwenkachse zwischen dem ersten und dem zweiten Kranauslegerelement gelagert ist, und – das über ein an einem dritten Schwenklager gelagertes Stellelement mit dem zweiten Kranauslegerelement verbunden ist.- one Three-point link element with at least three pivot bearings,  - that about one guide rod is articulated, which is a pivot bearing on the base element along the first crane boom element up to a first pivot bearing extends  - the with a second pivot bearing on the pivot axis between the is mounted first and the second crane boom element, and  - about one Actuator mounted on a third pivot bearing with the second Crane boom element is connected.

Vorteilhaft ist hierbei, dass es sich um eine recht einfach aufgebaute, robuste, kranähnliche Vorrichtung handelt, die aufgrund ihrer kinematischen Konstruktion für das Übersetzen von Personen und/oder Lasten optimiert ist.The advantage here is that it It's a fairly simple, robust, crane-like design Device is due to their kinematic design for translating is optimized by persons and / or loads.

Vorteilhaft ist auch, dass die nachfolgend zu erläuternden Bewegungen der erfindungsgemäßen Übersetzvorrichtung auch ohne elektronische Regelungen, selbst im Handbetrieb mittels einer Funkfernsteuerung, einfach zu betreiben ist. Die erfindungsgemäße Kinematik bedingt eine Zwangsführung des zweiten, äußeren Kranauslegerelements, von dem ein Seil einer Seilwindeneinrichtung mit einem Lasthaken herabhängt.It is also advantageous that the following to be explained Movements of the inventive translation device even without electronic controls, even in manual mode by means of a radio remote control, easy to operate. The kinematics according to the invention conditionally a forced tour the second, outer crane jib element, from which a rope of a cable winch device with a load hook hangs.

Vorteilhaft ist bei der erfindungsgemäßen Übersetzvorrichtung weiterhin, dass das Anheben einer auf dem Deck eines Schiffes stehenden Person bzw. Last nicht allein nur durch das Aufwinden mittels des Seiles erfolgt, sondern im Wesentlichen durch die zusätzliche Bewegung der beiden Kranauslegerelemente. Es ist somit allein durch die Kinematik der Kranauslegerelemente möglich, die Person bzw. Last gleichzeitig vertikal nach oben und zugleich seitlich an den Turm der Windenergieanlage heran zu heben, wobei das Straffen des Tragseils durch eine Seilwindeneinrichtung nur noch unterstützend zu wirken braucht. Durch diese schnelle Hoch-Seitwärts-Bewegung kann die Person so schnell aus dem Gefahrenbereich des Schiffes weggezogen werden, dass die Person nicht mehr durch Aufbauten am Schiff verletzt werden kann, wenn der nächste Wellenberg das Schiff anhebt. Das Verlassen des Schiffs kann somit innerhalb einer sehr kurzen Zeit er folgen, die kürzer ist als die Periode der Wellenbewegung.It is also advantageous in the case of the inventive transmission device that the lifting of a person or load standing on the deck of a ship does not take place solely by the winding by means of the rope, but essentially by the additional movement of the two crane jib elements. It is thus possible solely by the kinematics of the crane jib elements to raise the person or load at the same time vertically upwards and at the same time on the tower of the wind turbine zoom, the tightening of the supporting cable needs to be supported by a cable winch device only supportive. This fast high-sideward movement allows the person to be pulled away from the ship's danger area so quickly that the person can no longer be injured by build-ups on the ship when the next wel lenberg lifts the ship. The departure of the ship can thus follow within a very short time, which is shorter than the period of wave motion.

Die Neigung des zweiten Kranauslegerelements ist dabei durch die erfindungsgemäße Kinematik festgelegt. Wird das zweite Kranauslegerelement waagerecht ausgerichtet, so behält es diese Orientierung auch dann, wenn seine absolute Lage im Raum durch Absenken oder Anheben des ersten Kranauslegerelements verändert wird.The inclination of the second crane boom element is determined by the kinematics of the invention. Becomes the second crane boom element horizontally aligned, so it retains this orientation even if its absolute location in the room by lowering or Lifting the first crane boom element is changed.

Vorteilhafterweise ist die Führungsstange oberhalb des ersten Kranauslegerelements und parallel zu diesem angeordnet, wobei dann das zweite Stellelement an der Unterseite der Kranauslegerelemente angeordnet ist. Bei dieser Ausführungsform kann die erfindungsgemäße Übersetzvorrichtung besonders platzsparend zusammengeklappt werden, so dass sie wenig Angriffsfläche für Wind und Wellen bietet.Advantageously, the guide rod is above the first crane jib element and arranged parallel to this, in which case the second actuating element on the underside of the crane jib elements is arranged. In this embodiment can the inventive translation device to be folded in a particularly space-saving way, so that they have little attack surface for wind and waves.

Vorzugsweise ist das Basiselement um eine vertikale Drehachse drehbar gelagert. Damit kann der gesamte Kranausleger der Übersetzvorrichtung seitlich verschwenkt werden, beispielsweise um den Kranausleger der zu übernehmenden Person auf dem Schiffsdeck nachzuführen. Auch kann durch die zusätzliche Schwenkbewegung in der horizontalen Ebene die Person oder die Last zusätzlich beschleunigt werden, so dass sie noch schneller aus dem Gefahrenbereich des Schiffes herausgehoben wird. Das Anheben des ersten Kranauslegerelements gegenüber dem Basiselement erfolgt vorzugsweise durch einen Hydraulik-Zylinder. Möglich ist auch, einen Pneumatik-Zylinder oder eine Seilwinde einzusetzen.Preferably, the base element rotatably mounted about a vertical axis of rotation. This can be the whole Crane boom of the translating device laterally be pivoted, for example, the crane boom to be taken over Tracking the person on the ship's deck. Also can by the additional Pivoting movement in the horizontal plane the person or the load additionally be accelerated, making them even faster out of the danger area lifted out of the ship. Lifting the first crane jib element across from the base element is preferably effected by a hydraulic cylinder. Possible is also to use a pneumatic cylinder or a winch.

Vorzugsweise ist der Hydraulik-Zylinder unterhalb der ersten Schwenkachse mit dem Basiselement verbunden, insbesondere bei einer auf der Oberseite des ersten Kranauslegerelements angeordneten Führungsstange.Preferably, the hydraulic cylinder connected to the base element below the first pivot axis, in particular at one on the top of the first crane jib member arranged guide rod.

Weitere vorteilhafte Ausgestaltungen der Erfindung sind den weiteren Unteransprüchen zu entnehmen und werden nachfolgend anhand eines Ausführungsbeispiels näher erläutert. Die Figuren zeigen im Einzelnen:Further advantageous embodiments The invention can be found in the further subclaims and become below with reference to an embodiment explained in more detail. The Figures show in detail:

1 Die erfindungsgemäße Übersetzvorrichtung in einer Ausgangsstellung, 1 The inventive translation device in a starting position,

2 die Übersetzvorrichtung in einer ersten Arbeitsstellung und 2 the transmission device in a first working position and

3 die Übersetzvorrichtung in einer zweiten Arbeitsstellung. 3 the transmission device in a second working position.

1 zeigt die Ausgangsstellung der erfindungsgemäßen Übersetzvorrichtung 100, die außenbords auf einer an einer Offshore-Plattform 200 befestigten Konsole 201 angeordnet ist. Die Übersetzvorrichtung 100 besteht im Wesentlichen aus 1 shows the starting position of the transmission device according to the invention 100 outboard on an offshore platform 200 attached console 201 is arranged. The translating device 100 consists essentially of

  • – einem Basiselement 30,- a base element 30 .
  • – zwei Kranauslegerelementen 10, 20,- two crane boom elements 10 . 20 .
  • – einem Dreipunktlenkerelement 40 und- A three-point linkage element 40 and
  • – einer Führungsstange 18.- a guide rod 18 ,

In 2 ist eine erste Arbeitsstellung gezeigt, bei der nur das zweite Kranauslegerelement 20 um etwa 80° auf eine Horizontale angehoben ist, während das erste Kranauslegerelement 10 von dieser Bewegung unbeeinflusst in der Ausgangsstellung verharrt. Aus dieser Stellung kann das zweite Kranauslegerelement 20 um ca. weitere 90° angeho ben werden, so dass sich eine gestreckte Lage beider Kranauslegerelemente 10, 20 ergibt.In 2 is shown a first working position, in which only the second crane boom element 20 is raised by about 80 ° to a horizontal, while the first crane jib element 10 unaffected by this movement remains in the starting position. From this position, the second crane boom element 20 be raised by about another 90 °, so that a stretched position of both crane boom elements 10 . 20 results.

In 3 ist eine zweite Arbeitsstellung gezeigt, bei der das erste Kranauslegerelement 10 gegenüber der Stellung aus den 1 und 2 um ca. 90° nach unten gekippt ist und so ebenfalls eine gestreckte Lage eingenommen ist.In 3 a second working position is shown in which the first crane jib element 10 opposite the position from the 1 and 2 is tilted down by about 90 ° and so also a stretched position is taken.

Das Basiselement 30 ist mit der Arbeitsplattform 201 verbunden. Über Schwenkachsen 31, 32 sind ein erstes Kranauslegerelement 10 und eine Führungsstange 18 mit dem Basiselement 30 verbunden.The basic element 30 is with the work platform 201 connected. About swivel axes 31 . 32 are a first crane boom element 10 and a guide bar 18 with the base element 30 connected.

In dem dargestellten Ausführungsbeispiel ist ein erstes Stellelement 14 als Hydraulikzylinder ausgebildet, der unterhalb der Schwenkachse 32 des Kranauslegerelements 10 über ein Gelenk 33 an dem Basiselement 30 befestigt ist. Über das Stellelement 14 kann das Kranauslegerelement 10 mit den nachfolgenden Baugruppen angehoben bzw. gesenkt werden.In the illustrated embodiment, a first actuator 14 designed as a hydraulic cylinder, which is below the pivot axis 32 of the crane boom element 10 about a joint 33 on the base element 30 is attached. About the actuator 14 can the crane jib element 10 be raised or lowered with the following modules.

An dem dem Basiselement 30 gegenüberliegenden Ende ist das erste Kranauslegerelements 10 über eine Schwenkachse 22 mit einem zweiten Kranauslegerelement 20 verbunden. Dieses weist vorzugsweise an seinem freien Ende eine Umlenkrolle 26 auf, über die ein Seil 60 mit einem Lasthaken 62 geführt ist.At the base element 30 opposite end is the first crane jib element 10 via a pivot axis 22 with a second crane boom element 20 connected. This preferably has a deflection roller at its free end 26 on, over which a rope 60 with a load hook 62 is guided.

An der zweiten Schwenkachse 22 ist außerdem ein Dreipunktlenkerelement 40 schwenkbar angeordnet. Dieses weist insgesamt wenigstens drei Schwenklager 41, 42 und 43 auf. Im dargestellten Ausführungsbeispiel ist das mittlere, zweite Schwenklager 42 mit der Schwenkachse 22 verbunden.At the second pivot axis 22 is also a three-point linkage element 40 arranged pivotally. This has a total of at least three pivot bearings 41 . 42 and 43 on. In the illustrated embodiment, the middle, second pivot bearing 42 with the pivot axis 22 connected.

Die erste Lagerstelle 41 hingegen ist mit der Führungsstange 18, die parallel zu dem ersten Kranauslegerelement 10 angeordnet ist, verbunden. Das dritte Schwenklager 43 dient als Anschlagspunkt für ein weiteres Stellelement 24, bei dem es sich in dem dargestellten Ausführungsbeispiel der Erfindung wiederum um einen Hydraulikzylinder handelt. Hierdurch kann das zweite Kranauslegerelement 20. mit den nachfolgenden Baugruppen gegenüber dem ersten Kranauslegerelement 10 abgestützt und gehoben bzw. gesenkt werden.The first depository 41 however, is with the guide rod 18 parallel to the first crane jib element 10 is arranged, connected. The third pivot bearing 43 serves as a stop point for another actuator 24 , which in turn is a hydraulic cylinder in the illustrated embodiment of the invention. This allows the second crane boom element 20 , with the following assemblies relative to the first crane boom element 10 be supported and raised or lowered.

Das Basiselement 30, das erste Kranauslegerelement 10, die Führungsstange 18 und Teile des Dreipunktlenkerelements 40 sind an parallelen Achsen 31, 32, 41, 42 bzw. 22 gelenkig gelagert und bilden ein geschlossenes Viereck. Vorzugsweise sind dabei:The basic element 30 , the first crane jib element 10 , the guide rod 18 and parts of the three-point link element 40 are on parallel axes 31 . 32 . 41 . 42 respectively. 22 articulated and form a closed square. Preferably:

  • – die Abstände zwischen den Schwenklagern 32, 22 am ersten Kranauslegerelement 10 und an der Führungsstange 18 gleich und- the distances between the pivot bearings 32 . 22 on the first crane boom element 10 and on the guide rod 18 same and
  • – die Abstände zwischen den Schwenklagern 31, 32 am Basiselement 30 und den Lagerstellen 41, 42 am Dreipunktelenkerelement 40 gleich,- the distances between the pivot bearings 31 . 32 at the base element 30 and the bearings 41 . 42 on the three-point link element 40 equal,

wodurch die zuvor genannte, durch die Elemente 10, 18, 30, 40 gebildete Gliederkette die Form eines Parallelogramms aufweist.causing the aforementioned, through the elements 10 . 18 . 30 . 40 formed link chain has the shape of a parallelogram.

Die Verbindungsstrebe am Dreipunktlenkerelement 40 zwischen den Lagerstellen 41 und 42 behält somit immer die gleiche Neigung wie das ortsfeste Basiselement 30; es findet also beim Schwenken des ersten Kranauslegerelements 10 nach oben oder unten nicht nur eine Parallelverschiebung dieser Verbindungsstrebe statt, sondern eine rein translatorische Bewegung des Dreipunktlenkerele ments 40 insgesamt, das heißt, die relative Ausrichtung aller Lagerstellen 41, 42 und 43 zum zweiten Kranauslegerelement 20 ändert sich bei einer Bewegung des ersten Kranauslegerelements 10 nicht; das Dreipunktlenkerelement 40 führt keine Drehbewegung durch.The connecting strut on the three-point link element 40 between the bearings 41 and 42 thus always retains the same inclination as the stationary base element 30 ; it thus finds when pivoting the first crane boom element 10 up or down not only a parallel displacement of this connecting bar instead, but a purely translational movement of Dreipunktlenkerele management 40 overall, that is, the relative orientation of all bearings 41 . 42 and 43 to the second crane boom element 20 changes with a movement of the first crane boom element 10 Not; the three-point linkage element 40 does not rotate.

Damit muss keine aufwändige Synchronisierung der Stellelemente 14, 24 erfolgen, um den Holepunkt der gesamten Übersetzvorrichtung 100, also den Punkt, der für das Heben bzw. Senken einer Last ausschlaggebend ist und der im vorliegenden Beispiel durch die Seilrolle 26 definiert ist, zu beeinflussen. Es kann vielmehr völlig unabhängig voneinander die Lage des zweiten Kranauslegerelements 20 gegenüber dem ersten Kranauslegerelement 10 durch das Stellelement 24 und die Lage des ersten Kranauslegerelements 10 gegenüber dem Basiselement 30 verändert werden. Die erfindungsgemäße Übersetzvorrichtung 100 kann dadurch einfach, kostengünstig und besonders robust und witterungsbeständig gebaut werden, weil elektronische oder hydraulische bzw. pneumatische Regelungen zur Synchronisation der beiden Kranauslegerelemente 10, 20 nicht notwendig sind.This requires no time-consuming synchronization of the control elements 14 . 24 done to the break point of the entire translating device 100 That is, the point that is crucial for the lifting or lowering of a load and in the present example by the pulley 26 is defined to influence. It can rather completely independent of each other, the location of the second crane boom element 20 opposite the first crane boom element 10 through the actuator 24 and the location of the first crane boom element 10 opposite the base element 30 to be changed. The inventive translation device 100 This makes it easy, inexpensive and very robust and weather-resistant to be built, because electronic or hydraulic or pneumatic controls for the synchronization of the two crane jib elements 10 . 20 are not necessary.

Neben der Ausbildung der Stellelemente 14, 24 als hydraulische oder pneumatische Zylinder sind auch andere Antriebsarten denkbar. Das erste Kranauslegerelement 10 könnte beispielsweise auch durch eine an der Offshore-Plattform 200 installierte Seilwinde bewegt werden.In addition to the training of the control elements 14 . 24 as hydraulic or pneumatic cylinders and other types of drive are conceivable. The first crane jib element 10 For example, it could also be done by an offshore platform 200 installed winch be moved.

An der Offshore-Plattform 200 kann weiterhin eine Koppeleinrichtung 50 vorgesehen sein, um den ersten Kranausleger 10 gegenüber der Offshore-Plattform 200 zu arretie ren und bei Nichtgebrauch vor dem Angriff des Windes. oder der See zu schützen.At the offshore platform 200 can continue a coupling device 50 be provided to the first crane boom 10 opposite the offshore platform 200 to arrest and when not in use against the wind. or to protect the lake.

Durch Überlagerung der Schwenkbereiche:By overlapping the swivel ranges:

  • – des ersten Kranauslegerelements 10 um die Schwenkachse 32 um ca. 90°- The first crane boom element 10 around the pivot axis 32 about 90 °
  • – des zweiten Kranauslegerelements 20 um die Schwenkachse 22 um ca. 170- The second crane boom element 20 around the pivot axis 22 around 170

ergibt sich der in 4 skizzierte Arbeitsraum der erfindungsgemäßen Übersetzvorrichtung 100 mit Bezug auf die Seilrolle 26 am äußeren Ende des zweiten Kranauslegerelements 20.results in the 4 sketched working space of the transmission device according to the invention 100 with reference to the pulley 26 at the outer end of the second crane jib element 20 ,

Gerade eine Bewegung entlang der rechten Begrenzungskurve des Arbeitsraums erzielt den für den Zweck einer Übernahme von Personen und Material bei Seegang gewünschten Effekt, nämlich eine schnelle Aufwärtsbewegung und zugleich eine seitliche Bewegung von einem bei der Offshore-Plattform auf Position gegangenen Schiff zu erzeugen.Just a movement along the Right working space limit curve achieves that for the purpose a takeover of people and material in swell desired effect, namely a fast upward movement and at the same time a lateral movement of one at the offshore platform Position to go ship gone.

Die erfindungsgemäße Übersetzvorrichtung kann insbesondere bei ruhigem Wetter von einer Ausgangslage der Seilrolle 26 beim Punkt P1 in 4 hin zum Punkt P2 betrieben werden. Diese Bewegung beinhaltet einen in etwa horizontalen Anfangsabschnitt, auf dem die Last zunächst horizontal von der Windkraftanlage weg bewegt und durch die Seilwinde angehoben wird. Bei dieser Betriebsweise kann das zweite Kranauslegerelement tiefer nach unten greifen, und das Seil kann entsprechend kürzer gehalten werden, wodurch der Pendelradius der schwebenden Last gemindert ist.The translating device according to the invention can in particular in calm weather from a starting position of the pulley 26 at point P1 in 4 operated to the point P2. This movement includes an approximately horizontal initial section on which the load initially moves horizontally away from the wind turbine and is lifted by the winch. In this mode of operation, the second crane jib member can grip lower down and the rope can be kept correspondingly shorter, thereby reducing the pendulum radius of the suspended load.

Bei schwerem Wetter wird die erfindungsgemäße Übersetzvorrichtung bevorzugt vom Punkt P2 aus so betrieben, dass die Bewegung der Kranauslegerelemente 10, 20 zusätzlich zum aufspulenden Seil 60 eine vertikale Komponente ergibt, die die Aufwärtsbewegung verstärkt. Von P2 aus kann mit abgespultem Seil eine Last in der beschriebenen Weise gehoben werden, wobei die Bahn der Seilrolle in P2 beginnt und im äußersten Punkt P3 der inneren Bahn endet. Am Punkt P3 ist das Kranauslegerelement 10 wieder in etwa senkrecht und das Kranauslegerelement 20 in etwa waagerecht positioniert. Die Armbewegung hat dadurch die Umlenkrolle 26 als Bezugspunkt um die Länge des Kranauslegerelements 10, entsprechend etwa 8 m in einer bevorzugten Ausführungsform, in vertikaler und horizontaler Richtung in kurzer Zeit bewegt. Dadurch kann der Gefahrenbereich schneller verlassen werden.In heavy weather, the transmission device according to the invention is preferably operated from the point P2 so that the movement of the crane jib elements 10 . 20 in addition to the winding rope 60 gives a vertical component that enhances the upward movement. From P2 a load can be lifted with the rope unwound in the manner described, with the web of the pulley beginning in P2 and ending at the outermost point P3 of the inner web. At point P3 is the crane boom element 10 again approximately perpendicular and the crane jib element 20 positioned approximately horizontally. The arm movement thereby has the pulley 26 as a reference point around the length of the crane jib element 10 , corresponding to about 8 m in a preferred embodiment, moved in the vertical and horizontal directions in a short time. As a result, the danger zone can be left faster.

Claims (13)

Übersetzvorrichtung (100) für das Übersetzen von Personen und/oder Lasten von Schiffen auf eine Offshore-Plattform (200), bestehend aus wenigstens: – einem mit der Offshore-Plattform zu verbindenden Basiselement (30), einem ersten Kranauslegerelement (10) und einem zweiten Kranauslegerelement (20), die über eine erste und eine zweite Schwenkachse (12; 22) miteinander verbunden sind, wobei das erste Kranauslegerelement (10) über wenigstens ein Stellelement (14) gegenüber dem Basiselement (30) verschwenkbar ist; – einer Seilwindeneinrichtung, deren Seil (60) bis zu einer Umlenkeinrichtung (26) an dem zweiten Kranauslegerelement (20) geführt ist; und – einem Dreipunktlenkerelement (40) mit wenigstens drei Schwenklagern (41, 42, 43), – das über eine Führungsstange (12) anlenkbar ist, welche sich von einem Schwenklager (31) am Basiselement (30) entlang des ersten Kranauslegerelements (10) bis zu einem ersten Schwenklager (41) erstreckt, – das mit einem zweiten Schwenklager (42) an der Schwenkachse (22) zwischen dem ersten und dem zweiten Kranauslegerelement (10; 20) gelagert ist, und – das über ein an einem dritten Schwenklager (43) gelagertes Stellelement (24) mit dem zweiten Kranauslegerelement (20) verbunden ist.Translating device ( 100 ) for the transfer of persons and / or loads of ships to an offshore platform ( 200 ), comprising at least: - a base element to be connected to the offshore platform ( 30 ), a first crane boom element ( 10 ) and a second crane boom element ( 20 ), which have a first and a second pivot axis ( 12 ; 22 ), wherein the first crane boom element ( 10 ) via at least one actuating element ( 14 ) relative to the base element ( 30 ) is pivotable; - a cable winch device whose rope ( 60 ) to a deflection device ( 26 ) on the second crane jib element ( 20 ) is guided; and - a three-point linkage element ( 40 ) with at least three pivot bearings ( 41 . 42 . 43 ), - that via a guide rod ( 12 ) is articulated, which from a pivot bearing ( 31 ) on the base element ( 30 ) along the first crane boom element ( 10 ) to a first pivot bearing ( 41 ) extends, - that with a second pivot bearing ( 42 ) on the pivot axis ( 22 ) between the first and the second crane boom element ( 10 ; 20 ) is mounted, and - the one on a third pivot bearing ( 43 ) mounted actuator ( 24 ) with the second crane jib element ( 20 ) connected is. Übersetzvorrichtung (100) nach Anspruch 1, dadurch gekennzeichnet, dass die Führungsstange (12) oberhalb des ersten Kranauslegerelements (10) und parallel zu diesem angeordnet ist und dass das zweite Stellelement (24) an der Unterseite der Kranauslegerelements (10; 20) angeordnet ist.Translating device ( 100 ) according to claim 1, characterized in that the guide rod ( 12 ) above the first crane boom element ( 10 ) and is arranged parallel to this and that the second actuating element ( 24 ) on the underside of the crane jib element ( 10 ; 20 ) is arranged. Übersetzvorrichtung (100) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das Dreipunktlenkerelement (40) senkrecht zur zweiten Schwenkachse (22) ausgerichtet ist.Translating device ( 100 ) according to claim 1 or 2, characterized in that the three-point linkage element ( 40 ) perpendicular to the second pivot axis ( 22 ) is aligned. Übersetzvorrichtung (100) nach Anspruch 3, dadurch gekennzeichnet, dass das Dreipunktlenkerelement (40) als dreieckiger Rahmen ausgebildet ist.Translating device ( 100 ) according to claim 3, characterized in that the three-point link element ( 40 ) is formed as a triangular frame. Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass – die Abstände zwischen den Schwenklagern (32, 22) am ersten Kranauslegerelement (10) und an der Führungsstange (18) gleich sind und dass – die Abstände zwischen den Schwenklagern (31, 32) am Basiselement (30) und den Lagerstellen (41, 42) am Dreipunktelenkerelement (40) gleich sind.Translating device ( 100 ) according to one of claims 1 to 4, characterized in that - the distances between the pivot bearings ( 32 . 22 ) on the first crane boom element ( 10 ) and on the guide rod ( 18 ) are the same and that - the distances between the pivot bearings ( 31 . 32 ) on the base element ( 30 ) and the depositories ( 41 . 42 ) on the three-point link element ( 40 ) are the same. Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass das Basiselement (30) um eine vertikale Drehachse (35) drehbar gelagert ist.Translating device ( 100 ) according to one of claims 1 to 5, characterized in that the base element ( 30 ) about a vertical axis of rotation ( 35 ) is rotatably mounted. Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass wenigstens eines der Stellelemente (14; 24) ein Hydraulik- oder Pneumatikzylinder ist.Translating device ( 100 ) according to one of claims 1 to 6, characterized in that at least one of the adjusting elements ( 14 ; 24 ) is a hydraulic or pneumatic cylinder. Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass wenigstens eines der Stellelemente eine Seilwindeneinrichtung ist.Translating device ( 100 ) according to one of claims 1 to 6, characterized in that at least one of the adjusting elements is a cable winch device. Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass das erste Kranauslegerelement (10) eine Länge von 6 .. 12m, insbesondere 8m, aufweist.Translating device ( 100 ) according to one of claims 1 to 8, characterized in that the first crane jib element ( 10 ) has a length of 6 .. 12m, in particular 8m. Offshore-Plattform (200) für eine Windenergieanlage mit wenigstens einem im Wasser angeordneten Fundament und einer Übersetzvorrichtung (100) nach einem der Ansprüche 1 bis 9.Offshore platform ( 200 ) for a wind energy plant with at least one foundation arranged in the water and a transmission device ( 100 ) according to one of claims 1 to 9. Offshore-Plattform (200) nach Anspruch 10, dadurch gekennzeichnet, dass das Basiselement (30) auf einer Konsole (201) gelagert ist.Offshore platform ( 200 ) according to claim 10, characterized in that the base element ( 30 ) on a console ( 201 ) is stored. Offshore-Plattform nach Anspruch 11, dadurch gekennzeichnet, dass die Konsole (201) in einer Höhe von 2 m über dem höchsten zu erwartenden Wasserstand angeordnet ist.Offshore platform according to claim 11, characterized in that the console ( 201 ) is located at a height of 2 m above the highest expected water level. Offshore-Plattform nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass das erste Kranauslegerelement (10) im Bereich der zweiten Schwenkachse (22) über eine Koppeleinrichtung (50) gegenüber der Offshore-Plattform (200) arretierbar ist.Offshore platform according to one of claims 1 to 12, characterized in that the first crane boom element ( 10 ) in the region of the second pivot axis ( 22 ) via a coupling device ( 50 ) compared to the offshore platform ( 200 ) is lockable.
DE20313550U 2003-08-29 2003-08-29 Translating device for translating persons and / or loads of ships to an offshore platform Expired - Lifetime DE20313550U1 (en)

Priority Applications (9)

Application Number Priority Date Filing Date Title
DE20313550U DE20313550U1 (en) 2003-08-29 2003-08-29 Translating device for translating persons and / or loads of ships to an offshore platform
AT03026389T ATE332869T1 (en) 2003-08-29 2003-11-18 TRANSLATION DEVICE FOR TRANSFERRING PERSONS AND/OR LOADS FROM SHIPS TO AN OFFSHORE PLATFORM
PT03026389T PT1510496E (en) 2003-08-29 2003-11-18 Hoisting device for transfering people and/or charge from a ship to an offshore plattform
DK03026389T DK1510496T3 (en) 2003-08-29 2003-11-18 Transfer device for transfer of persons and / or cargo from ships to an offshore platform
EP03026389A EP1510496B1 (en) 2003-08-29 2003-11-18 Hoisting device for transfering people and/or charge from a ship to an offshore plattform
DE50304236T DE50304236D1 (en) 2003-08-29 2003-11-18 Translation device for translating persons and / or loads of ships to an offshore platform
SI200330440T SI1510496T1 (en) 2003-08-29 2003-11-18 Hoisting device for transfering people and/or charge from a ship to an offshore plattform
ES03026389T ES2268258T3 (en) 2003-08-29 2003-11-18 TRANSFER DEVICE TO TRANSFER PEOPLE AND / OR LOADS FROM BOATS TO A PLATFORM NEAR THE COAST.
CY20061101398T CY1106173T1 (en) 2003-08-29 2006-09-27 TRANSPORT ARRANGEMENT FOR TRANSPORTATION OF PEOPLE AND/OR CARGO FROM SHIPS TO A PLATFORM AWAY FROM THE SHORE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE20313550U DE20313550U1 (en) 2003-08-29 2003-08-29 Translating device for translating persons and / or loads of ships to an offshore platform

Publications (1)

Publication Number Publication Date
DE20313550U1 true DE20313550U1 (en) 2004-04-08

Family

ID=32103561

Family Applications (2)

Application Number Title Priority Date Filing Date
DE20313550U Expired - Lifetime DE20313550U1 (en) 2003-08-29 2003-08-29 Translating device for translating persons and / or loads of ships to an offshore platform
DE50304236T Expired - Fee Related DE50304236D1 (en) 2003-08-29 2003-11-18 Translation device for translating persons and / or loads of ships to an offshore platform

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE50304236T Expired - Fee Related DE50304236D1 (en) 2003-08-29 2003-11-18 Translation device for translating persons and / or loads of ships to an offshore platform

Country Status (8)

Country Link
EP (1) EP1510496B1 (en)
AT (1) ATE332869T1 (en)
CY (1) CY1106173T1 (en)
DE (2) DE20313550U1 (en)
DK (1) DK1510496T3 (en)
ES (1) ES2268258T3 (en)
PT (1) PT1510496E (en)
SI (1) SI1510496T1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004026992B4 (en) * 2004-06-03 2007-12-06 Hmb Hydraulik & Maschinenbau Buxtehude Gmbh System for lifting loads
NL1035627C2 (en) * 2008-06-25 2009-12-30 2Me Special Engineering B V Crane for e.g. ship, has two swivel arms pivotally attached at intervals, rotating arm tilted by hydraulic cylinder, and upper arm equipped with single or multiple, hydraulic or mechanical sliding section
WO2011095316A1 (en) * 2010-02-02 2011-08-11 Xemc Darwind B.V. A method of transferring a load between a vessel and a wind turbine, and a wind turbine

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2009740C2 (en) * 2012-11-01 2014-05-06 Ihc Holland Ie Bv Device for and method of transferring personnel, equipment and/or structural elements from a surface vessel to an offshore structure.

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4112863A (en) * 1977-08-31 1978-09-12 Nelson Christian E Barge-supported crane with hydraulically actuated ram corner lift means
NL8301580A (en) * 1983-05-04 1984-12-03 Seumeren Agenturen B V Van LIFTING TOOL.
US4846357A (en) * 1987-06-15 1989-07-11 Paxton-Mitchell Company Offshore station articulated boom maintenance unit
DE10021163B4 (en) * 2000-04-29 2006-03-02 Aerodyn Engineering Gmbh Watercraft to power an offshore wind turbine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004026992B4 (en) * 2004-06-03 2007-12-06 Hmb Hydraulik & Maschinenbau Buxtehude Gmbh System for lifting loads
NL1035627C2 (en) * 2008-06-25 2009-12-30 2Me Special Engineering B V Crane for e.g. ship, has two swivel arms pivotally attached at intervals, rotating arm tilted by hydraulic cylinder, and upper arm equipped with single or multiple, hydraulic or mechanical sliding section
WO2011095316A1 (en) * 2010-02-02 2011-08-11 Xemc Darwind B.V. A method of transferring a load between a vessel and a wind turbine, and a wind turbine

Also Published As

Publication number Publication date
CY1106173T1 (en) 2011-06-08
DK1510496T3 (en) 2006-10-30
EP1510496A1 (en) 2005-03-02
SI1510496T1 (en) 2006-12-31
PT1510496E (en) 2006-11-30
ATE332869T1 (en) 2006-08-15
ES2268258T3 (en) 2007-03-16
DE50304236D1 (en) 2006-08-24
EP1510496B1 (en) 2006-07-12

Similar Documents

Publication Publication Date Title
DE10205988B4 (en) Wind turbine
AT511611B1 (en) ARRANGEMENT OF SWIMMING PLATFORMS
DE60009007T2 (en) METHOD AND SHIP FOR INSTALLING WIND POWER PLANTS AT SEA
DE60316279T2 (en) METHOD AND WATER VEHICLE FOR MANIPULATING AN OFFSHORE PLANT
EP2344752B1 (en) Method for transporting a rotor blade of a wind power plant and transport device for conducting the method
DE102005025646A1 (en) Maintenance, repair and mounting works method e.g. for gondola of wind energy plant, having telescopic maintenance mast moved beside tower of wind-powered device
WO2007121904A1 (en) Sail for the rotor of a wind generation facility
WO2011103988A1 (en) Device for transporting and installing an arrangement of an offshore wind turbine comprising a raft foundation and method for transporting and installing such an arrangement having a raft foundation
WO2006005705A1 (en) Lifting device for water vehicles, mounted to an offshore wind energy installation
DE10332382B4 (en) Set-up device for a wind energy plant, watercraft for transporting a stand-up device and method for setting up an off-shore wind energy plant
DE102011051469B3 (en) Device for transferring e.g. people from watercraft to fixed building, has cylinder assembly for raising and lowering platform relative to watercraft and for moving/swiveling of support cylinder around articulated connection
EP1510496B1 (en) Hoisting device for transfering people and/or charge from a ship to an offshore plattform
DE102012010644A1 (en) Offshore crane for supplying offshore installation e.g. offshore wind power plant from supply ship, has jib sections that are interconnected by pivot axis extending anti-parallel to another pivotal axes
WO2010115918A2 (en) Nondestructive device for generating energy from water waves
DE102008020965A1 (en) Apparatus and method for the installation and service of underwater power plants
DE102021111680B4 (en) OFF-SHORE WIND TURBINES ASSEMBLY SHIP AND OFF-SHORE WIND TURBINES ASSEMBLY PROCEDURE
EP1384883B1 (en) Lifting barge for transporting nacelles of offshore wind turbines and associated method
EP1565619B1 (en) Device for landing a watercraft at a water-based structure
DE112006001727T5 (en) Installation of offshore installations
WO2019170831A1 (en) Boat lift
EP1321671A1 (en) Barge for the transport of offshore wind turbines
EP1321669B1 (en) System for the transport and installation of offshore wind turbines
DE2514522C3 (en) Offshore platform
DE102020101612B4 (en) Landing area arrangement with a plurality of detachable segments and a method for operating such a landing area arrangement
DE3707365C2 (en)

Legal Events

Date Code Title Description
R409 Internal rectification of the legal status completed
R123 Application deemed withdrawn due to non-payment of filing fee
R207 Utility model specification

Effective date: 20040513

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20070206

R081 Change of applicant/patentee

Owner name: TEUPEN MASCHINENBAU GMBH, DE

Free format text: FORMER OWNER: B. TEUPEN MASCHINENBAU GMBH, 48599 GRONAU, DE

Effective date: 20080923

R157 Lapse of ip right after 6 years

Effective date: 20100302