DE202022102224U1 - Vertical transport and lifting structure for curtain wall unit panels - Google Patents

Vertical transport and lifting structure for curtain wall unit panels Download PDF

Info

Publication number
DE202022102224U1
DE202022102224U1 DE202022102224.0U DE202022102224U DE202022102224U1 DE 202022102224 U1 DE202022102224 U1 DE 202022102224U1 DE 202022102224 U DE202022102224 U DE 202022102224U DE 202022102224 U1 DE202022102224 U1 DE 202022102224U1
Authority
DE
Germany
Prior art keywords
winch
level
curtain wall
lifting structure
wall unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE202022102224.0U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA CONSTRUCTION SECOND ENGINEERING BUREAU L, CN
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Publication of DE202022102224U1 publication Critical patent/DE202022102224U1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/201Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from above, e.g. by ceilings of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/202Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/04Pulley blocks or like devices in which force is applied to a rope, cable, or chain which passes over one or more pulleys, e.g. to obtain mechanical advantage
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten, dadurch gekennzeichnet, dass sie eine Hebestrukturebene umfasst, ein Auslegerkran an der zweiten Ebene der Hebestrukturebene verbunden ist, eine Seilbahn (1) zwischen dem Boden und dem Auslegerkran vorgesehen ist, ein Zugseil (2) zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebenevorgesehen ist, ein Windenverbindungsteil (3) am äußeren Ende der ersten Ebene der Hebestrukturebenevorgesehen ist, eine Winde (4) am inneren Ende der ersten Ebene der Hebestrukturebenevorgesehen ist, wobei der Auslegerkran, das Windenverbindungsteil (3) und die Winde (4) durch ein Windenseil (5) miteinander verbunden sind; wobei die Vorhangfassadeneinheitsplatte mit einer Seilbahnrutsche versehen ist, die zu der Seilbahn (1) passt.

Figure DE202022102224U1_0000
Vertical transport and lifting structure for curtain wall unit panels, characterized in that it comprises a lifting structure level, a jib crane is connected at the second level of the lifting structure level, a cable car (1) is provided between the ground and the jib crane, a traction rope (2) between the jib crane and the fourth level of the hoisting structure level, a winch connection part (3) is provided at the outer end of the first level of the hoisting structure level, a winch (4) is provided at the inner end of the first level of the hoisting structure level, the jib crane, the winch connection part (3) and the winch (4) connected together by a winch cable (5); wherein the curtain wall unit panel is provided with a cable car slide that fits the cable car (1).
Figure DE202022102224U1_0000

Description

Technischer BereichTechnical part

Das vorliegende Gebrauchsmuster gehört zum Bereich des Hochbaus, insbesondere zu einer vertikalen Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten.The present utility model belongs to the field of building construction, particularly to a vertical transport and lifting structure for curtain wall unit panels.

Hintergrundtechnikbackground technique

Bei bestehenden Bauprojekten werden die Vorhangfassadenmaterialien in der Regel mit Großgeräten direkt auf die Baustelle gehoben und dann gebaut. Es gibt jedoch einige Bauprojekte mit kleinen Baustellen, bei denen der Zugang und das Heben von Großgeräten unbequem ist, daher besteht ein dringender Bedarf an einer Hebestruktur, die direkt zwischen den Hebestrukturebenen vorgesehen ist, um das Problem der kleinen Baustellen und des unbequemen Materialhebens zu lösen.In existing construction projects, the curtain wall materials are usually directly lifted to the site with large equipment and then built. However, there are some construction projects with small construction sites where access and lifting of large equipment is inconvenient, so there is an urgent need for a lifting structure provided directly between the lifting structure levels to solve the problem of small construction sites and inconvenient material lifting .

Inhalt des GebrauchsmustersContent of the utility model

Der Zweck des vorliegenden Gebrauchsmusters besteht darin, eine vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten bereitzustellen, um die oben genannten technischen Probleme zu lösen, die in der Hintergrundtechnik erwähnt werden.The purpose of the present utility model is to provide a vertical transport and lifting structure for curtain wall unit panels to solve the above technical problems mentioned in the background art.

Um den oben genannten Zweck zu erreichen, verwendet das vorliegende Gebrauchsmuster die folgende technische Lösung:

  • Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten, umfassend eine Hebestrukturebene, ein Auslegerkran ist an der zweiten Ebene der Hebestrukturebene verbunden, eine Seilbahn ist zwischen dem Boden und dem Auslegerkran vorgesehen, ein Zugseil ist zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebene vorgesehen, ein Windenverbindungsteil ist am äußeren Ende der ersten Ebene der Hebestrukturebene vorgesehen, eine Winde ist am inneren Ende der ersten Ebene der Hebestrukturebene vorgesehen, wobei der Auslegerkran, das Windenverbindungsteil und die Winde durch ein Windenseil miteinander verbunden sind.
In order to achieve the above purpose, the present utility model adopts the following technical solution:
  • Vertical transport and lifting structure for curtain wall unit panels, comprising a lifting structure level, a jib crane is connected to the second level of the lifting structure level, a cable car is provided between the ground and the jib crane, a traction rope is provided between the jib crane and the fourth level of the lifting structure level, a winch connection part is provided at the outer end of the first level of the hoisting structure level, a winch is provided at the inner end of the first level of the hoisting structure level, the jib crane, the winch connection part and the winch are connected to each other by a winch rope.

Ferner umfassend eine Vorhangfassadeneinheitsplatte, wobei die Vorhangfassadeneinheitsplatte mit einer Seilbahnrutsche versehen ist, die zu der Seilbahn passt.Further comprising a unit curtain wall panel, the unit curtain wall panel being provided with a cable car slide that fits the cable car.

Weitere bevorzugte technische Lösung: Der Auslegerkran umfasst einen freitragenden I-Träger, der mit einer zweiten Ebene der Hebestrukturebene verbunden ist, eine obere Ösenplatte, die mit der oberen Oberfläche des freitragenden 1-Trägers verbunden ist, eine äußere Ösenplatte, die mit der Außenseite des freitragenden I-Trägers verbunden ist, und einen Rollenzug-Stahlträger, der mit der Unterseite des freitragenden 1-Trägers verbunden ist, wobei der Rollenzug-Stahlträger mit einer festen Rolle versehen ist.More preferred technical solution: The jib crane comprises a cantilever I-beam connected to a second level of the lifting structure level, an upper eyelet plate connected to the upper surface of the cantilever I-beam, an outer eyelet plate connected to the outside of the cantilever I-beam, and a roller-pulley steel beam connected to the underside of the cantilever I-beam, the roller-pulley steel beam being provided with a fixed pulley.

Weitere bevorzugte technische Lösung: Eine dritte U-förmige Schnalle ist mit der oberen Ösenplatte verbunden, und die dritte U-förmige Schnalle ist mit einem ersten Spannschloss versehen.Another preferred technical solution: A third U-shaped buckle is connected to the upper eyelet plate, and the third U-shaped buckle is provided with a first turnbuckle.

Weitere bevorzugte technische Lösung: Der Boden ist mit einem ersten vorvergrabenen Teil vorvergraben, die obere Oberfläche des ersten vorvergrabenen Teils ist mit einer ersten Ösenplatte geschweißt, die erste Ösenplatte ist mit einer ersten U-förmigen Schnalle verbunden, die erste U-förmige Schnalle ist mit einem zweiten Spannschloss versehen.More preferred technical solution: the bottom is pre-buried with a first pre-buried part, the upper surface of the first pre-buried part is welded with a first eyelet plate, the first eyelet plate is connected with a first U-shaped buckle, the first U-shaped buckle is with provided with a second turnbuckle.

Weitere bevorzugte technische Lösung: Das untere Ende der Seilbahn wird in die erste U-förmige Schnalle eingefädelt und durch die Schnalle befestigt, das obere Ende der Seilbahn wird in die äußere Ösenplatte eingefädelt und durch die Schnalle befestigt.More preferred technical solution: the bottom end of the cable car is threaded into the first U-shaped buckle and fixed by the buckle, the top end of the cable car is threaded into the outer eyelet plate and fixed by the buckle.

Weitere bevorzugte technische Lösung: Ein zweites vorvergrabenes Teil wird am äußeren Ende der oberen Oberfläche der ersten Ebene der Hebestrukturebene vorvergraben, eine zweite Ösenplatte wird auf das zweite vorvergrabene Teil geschweißt und eine zweite U-förmige Schnalle wird mit einer zweiten Ösenplatte verbunden.Another preferred technical solution: A second pre-buried part is pre-buried at the outer end of the upper surface of the first level of the lifting structure level, a second eyelet plate is welded to the second pre-buried part, and a second U-shaped buckle is connected to a second eyelet plate.

Weitere bevorzugte technische Lösung: Das obere Ende des Zugseils wird in die zweite U-förmige Schnalle eingefädelt und durch die Schnalle befestigt, das untere Ende des Zugseils wird in das erste Spannschloss eingefädelt und durch die Schnalle befestigt.Another preferred technical solution: the upper end of the traction rope is threaded into the second U-shaped buckle and fixed by the buckle, the lower end of the traction rope is threaded into the first turnbuckle and fixed by the buckle.

Weitere bevorzugte technische Lösung: Das Windenverbindungsteil umfasst ein vorvergrabenes Windenteil, das in der ersten Ebene der Hebestrukturebene vorvergraben ist, eine Windenösenplatte, die auf die obere Oberfläche des vorvergrabenen Windenteils geschweißt ist, und eine Winden- U-förmige-Schnalle, die mit der Windenösenplatte verbunden ist.More preferred technical solution: The winch connection part includes a pre-buried winch part pre-buried in the first level of the lifting structure level, a winch eye plate welded to the upper surface of the pre-buried winch part, and a winch U-shaped buckle connected to the winch eye plate connected is.

Weitere bevorzugte technische Lösung: Das Windenseil läuft nacheinander durch feste Rolle, Winden- U-förmige-Schnalle und die Winde.More preferred technical solution: the winch rope runs through the fixed pulley, winch U-shaped buckle and the winch in sequence.

Weitere bevorzugte technische Lösung: Ein Ende des Windenseils ist mit einem Haken versehen und das andere Ende ist mit der Winde verbunden.Another preferred technical solution: one end of the winch rope is provided with a hook and the other end is connected to the winch.

Verglichen mit dem Stand der Technik weist das vorliegende Gebrauchsmuster folgende Eigenschaften und vorteilhafte Wirkungen auf:

  1. 1. Zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebene wird ein Zugseil vorgesehen, der Auslegerkran wird durch das Zugseil gebunden, um die Verbindungsstärke des Auslegerkrans zu erhöhen; die beiden Enden des Zugseils sind fest mit dem Auslegerkran und der vierten Ebene der Hebestrukturebene verbunden, um die Bindungsstärke und Sicherheit des Zugseils zu gewährleisten.
  2. 2. Zwischen dem Boden und dem Auslegerkran wird eine Seilbahn vorgesehen, die Vorhangfassadeneinheitsplatte ist mit einer Seilbahnrutsche versehen, die zur Seilbahn 1 passt, wenn die Vorhangfassadeneinheitsplatte angehoben wird, wird die Seilbahn 1 in die Seilbahnrutsche gesteckt, und die Vorhangfassadeneinheitsplatte bewegt sich entlang der Seilbahn nach oben, um die Stabilität des Transports der Vorhangfassadeneinheitsplatte zu gewährleisten.
  3. 3. Die beiden Enden der Seilbahn sind fest mit dem Boden und dem Auslegerkran verbunden, um die Verbindungsstärke und Sicherheit der Seilbahn zu gewährleisten; der Boden der Seilbahn ist mit einem ersten vorvergrabenen Teil auf dem Boden durch ein zweites Spannschloss befestigt, wodurch die Seilbahn durch Verstellen des zweiten Spannschlosses in einen Spannungszustand versetzt werden kann.
Compared to the prior art, the present utility model has the following properties and beneficial effects:
  1. 1. A traction rope is provided between the jib crane and the fourth level of the lifting structure level, the jib crane is tied by the traction rope to increase the connection strength of the jib crane; the two ends of the traction rope are firmly connected to the jib crane and the fourth level of the lifting structure level to ensure the binding strength and safety of the traction rope.
  2. 2. A cable car is provided between the ground and the jib crane, the curtain wall unit panel is provided with a cable car slide that fits the cable car 1, when the curtain wall unit panel is raised, the cable car 1 is inserted into the cable car slide, and the curtain wall unit panel moves along the cable car up to ensure the stability of the transportation of the curtain wall unit panel.
  3. 3. The two ends of the cable car are firmly connected to the ground and the jib crane to ensure the connection strength and safety of the cable car; the bottom of the cable car is fixed with a first pre-buried part on the ground by a second turnbuckle, whereby the cable car can be put into a state of tension by adjusting the second turnbuckle.

Figurenlistecharacter list

  • 1 ist eine schematische Darstellung I einer vertikalen Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten des vorliegenden Gebrauchsmusters. 1 Fig. 1 is a schematic representation I of a vertical transport and elevating structure for unit curtain wall panels of the present utility model.
  • 2 ist eine schematische Darstellung II einer vertikalen Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten des vorliegenden Gebrauchsmusters. 2 Fig. 12 is a schematic representation II of a vertical transport and lifting structure for unit curtain wall panels of the present utility model.
  • 3 ist eine vergrößerte Ansicht von Teil A in 2 des vorliegenden Gebrauchsmusters. 3 is an enlarged view of part A in 2 of the present utility model.
  • 4 ist eine vergrößerte Ansicht von Teil B in 2 des vorliegenden Gebrauchsmusters. 4 is an enlarged view of part B in 2 of the present utility model.
  • 5 ist eine vergrößerte Ansicht von Teil C in 2 des vorliegenden Gebrauchsmusters. 5 is an enlarged view of part C in 2 of the present utility model.
  • 6 ist eine vergrößerte Ansicht von Teil D in 2 des vorliegenden Gebrauchsmusters. 6 is an enlarged view of part D in 2 of the present utility model.

BezugszeichenlisteReference List

11
Seilbahncable car
22
Zugseilpull rope
33
Windenverbindungsteilwinch connector
44
Windewinch
55
Windenseilwinch rope
66
obere Ösenplattetop grommet panel
77
äußere Ösenplatteouter grommet panel
88th
Rollenzug-StahlträgerPulley Steel Girder
99
erstes vorvergrabenes Teilfirst pre-buried part
1010
erste Ösenplattefirst eyelet panel
1111
erste U-förmige Schnallefirst U-shaped buckle
1212
zweites vorvergrabenes Teilsecond pre-buried part
1313
zweite Ösenplattesecond eyelet panel
1414
zweite U-förmige Schnallesecond U-shaped buckle
1515
dritte U-förmige Schnallethird U-shaped buckle
1616
erstes Spannschlossfirst turnbuckle
1717
zweites Spannschlosssecond turnbuckle
1818
feste Rollefixed role

Spezifische AusführungsformenSpecific Embodiments

Wie in den 1 und 2 gezeigt, umfasst die vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten eine Hebestrukturebene, ein Auslegerkran ist an der zweiten Ebene der Hebestrukturebene verbunden, eine Seilbahn 1 ist zwischen dem Boden und dem Auslegerkran vorgesehen, ein Zugseil 2 ist zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebene vorgesehen, ein Windenverbindungsteil 3 ist am äußeren Ende der ersten Ebene der Hebestrukturebene vorgesehen, eine Winde 4 ist am inneren Ende der ersten Ebene der Hebestrukturebene vorgesehen, wobei der Auslegerkran, das Windenverbindungsteil 3 und die Winde 4 durch ein Windenseil 5 miteinander verbunden sind.As in the 1 and 2 shown, the vertical transport and hoisting structure for curtain wall unit panels includes a hoisting structure plane, a jib crane is connected to the second plane of the hoisting structure plane, a cable car 1 is provided between the ground and the jib crane, a traction rope 2 is between the jib crane and the fourth plane of the hoisting structure plane provided, a winch connection part 3 is provided at the outer end of the first level of the hoisting structure level, a winch 4 is provided at the inner end of the first level of the hoist structure level, the jib crane, the winch connection part 3 and the winch 4 are connected to each other by a winch rope 5.

Die Vorhangfassadeneinheitsplatte ist mit einer Seilbahnrutsche versehen, die zur Seilbahn 1 passt. Wenn die Vorhangfassadeneinheitsplatte angehoben wird, wird die Seilbahn 1 in die Seilbahnrutsche gesteckt, und die Vorhangfassadeneinheitsplatte bewegt sich entlang der Seilbahn nach oben.The curtain wall unit panel is provided with a cable car slide that matches cable car 1. When the curtain wall unit panel is raised, the cable car 1 is inserted into the cable car slide, and the curtain wall unit panel moves up along the cable car.

Wie in 3 gezeigt, umfasst der Auslegerkran einen freitragenden I-Träger, der mit einer zweiten Ebene der Hebestrukturebene verbunden ist, eine obere Ösenplatte 6, die mit der oberen Oberfläche des freitragenden 1-Trägers verbunden ist, eine äußere Ösenplatte 7, die mit der Außenseite des freitragenden 1-Trägers verbunden ist, und einen Rollenzug-Stahlträger 8, der mit der Unterseite des freitragenden 1-Trägers verbunden ist, wobei der Rollenzug-Stahlträger 8 mit einer festen Rolle 18 versehen ist; eine dritte U-förmige Schnalle 15 ist mit der oberen Ösenplatte 6 verbunden, und die dritte U-förmige Schnalle 15 ist mit einem ersten Spannschloss 16 versehen.As in 3 As shown, the jib crane comprises a cantilever I-beam connected to a second level of the hoisting structure level, an upper eyelet plate 6 connected to the top surface of the cantilever I-beam, an outer eyelet plate 7 connected to the outside of the cantilever 1 beam, and a roller train steel beam 8 connected to the underside of the cantilever 1 beam, the roller train steel beam 8 being provided with a fixed roller 18; a third U-shaped buckle 15 is connected to the connected to the upper eyelet plate 6, and the third U-shaped buckle 15 is provided with a first turnbuckle 16.

Der Rollenzug-Stahlträger 8 ist eine rechteckige Trommelstruktur mit einer geschlossenen oberen Öffnung und einer Teleskopstange im Inneren; die feste Rolle 18 ist mit dem unteren Ende der Teleskopstange verbunden.The roller train steel beam 8 is a rectangular drum structure with a closed top opening and a telescopic rod inside; the fixed roller 18 is connected to the lower end of the telescopic rod.

Der freitragende I-Träger ist ein 22# I-Träger; das Ende des freitragenden I-Trägers ist 1,8 m von der Kante der zweiten Ebene der Hebestrukturebene entfernt. Wie in 4 gezeigt, wird ein erstes vorvergrabenes Teil 9 im Boden vorvergraben und mit Bolzen befestigt, die obere Oberfläche des ersten vorvergrabenen Teils 9 ist mit einer ersten Ösenplatte 10 geschweißt, die erste Ösenplatte 10 ist mit einer ersten U-förmigen Schnalle 11 verbunden, die erste U-förmige Schnalle 11 ist mit einem zweiten Spannschloss 17 versehen; ein erstes vorvergrabenes Teil 9 umfasst eine Platte und einen geraden Stab, der mit der Unterseite der Platte geschweißt ist.The cantilever I-beam is a 22# I-beam; the end of the cantilever I-beam is 1.8 m from the edge of the second level of the elevation structure level. As in 4 shown, a first pre-buried part 9 is pre-buried in the ground and fastened with bolts, the upper surface of the first pre-buried part 9 is welded to a first eyelet plate 10, the first eyelet plate 10 is connected to a first U-shaped buckle 11, the first U -shaped buckle 11 is provided with a second turnbuckle 17; a first pre-buried part 9 comprises a plate and a straight bar welded to the underside of the plate.

Das untere Ende der Seilbahn 1 wird in die erste U-förmige Schnalle 11 eingefädelt und durch die Schnalle befestigt, das obere Ende der Seilbahn 1 wird in die äußere Ösenplatte 7 eingefädelt und durch die Schnalle befestigt.The lower end of the cable car 1 is threaded into the first U-shaped buckle 11 and fastened by the buckle, the upper end of the cable car 1 is threaded into the outer eyelet plate 7 and fastened by the buckle.

Die Seilbahn 1 ist ein Stahldrahtseil mit einem Durchmesser von mehr als 12 mm, damit die Vorhangfassadeneinheitsplatte beim Anheben entlang der Seilbahn nach oben wandern und ein Schwingen verhindert wird; der Boden der Seilbahn 1 ist mit einem ersten vorvergrabenen Teil 9 auf dem Boden durch ein zweites Spannschloss 17 befestigt, wodurch die Seilbahn 1 durch Verstellen des zweiten Spannschlosses 17 in einen Spannungszustand versetzt wird.The ropeway 1 is a steel wire rope with a diameter of more than 12mm, so that the curtain wall unit panel travel up along the ropeway when lifting, and prevent swinging; the bottom of the cable car 1 is fixed with a first pre-buried part 9 on the ground by a second turnbuckle 17, whereby the cable car 1 is put into a state of tension by adjusting the second turnbuckle 17.

Wie in 5 gezeigt, wird ein zweites vorvergrabenes Teil 12 am äußeren Ende der oberen Oberfläche der ersten Ebene der Hebestrukturebene vorvergraben, eine zweite Ösenplatte 13 wird auf das zweite vorvergrabene Teil 12 geschweißt und eine zweite U-förmige Schnalle 14 wird mit einer zweiten Ösenplatte 13 verbunden; eine Verbindungsplatte wird an der Unterseite der zweiten Ösenplatte 13 geschweißt, und die zweite Ösenplatte 13 wird durch die Verbindungsplatte an dem zweiten vorvergrabenen Teil 12 geschweißt und durch Bolzen befestigt; das zweite vorvergrabene Teil 12 umfasst eine obere Platte und einen L-förmigen Stab, der mit der Unterseite der oberen Platte geschweißt ist.As in 5 1, a second pre-buried portion 12 is pre-buried at the outer end of the upper surface of the first level of the lift structure level, a second eyelet plate 13 is welded to the second pre-buried portion 12, and a second U-shaped buckle 14 is connected to a second eyelet plate 13; a connection plate is welded to the underside of the second eyelet plate 13, and the second eyelet plate 13 is welded to the second pre-buried part 12 through the connection plate and fastened by bolts; the second pre-buried part 12 comprises a top plate and an L-shaped bar welded to the underside of the top plate.

Das obere Ende des Zugseils 2 wird in die zweite U-förmige Schnalle 14 eingefädelt und durch die Schnalle befestigt, das untere Ende des Zugseils 2 wird in das erste Spannschloss 16 eingefädelt und durch die Schnalle befestigt.The upper end of the traction cable 2 is threaded into the second U-shaped buckle 14 and fastened by the buckle, the lower end of the traction cable 2 is threaded into the first turnbuckle 16 and fastened by the buckle.

Das Zugseil 2 ist ein Stahldrahtseil mit einem Durchmesser von 26 mm.The traction cable 2 is a steel wire cable with a diameter of 26 mm.

Wie in 6 gezeigt, umfasst das Windenverbindungsteil 3 ein vorvergrabenes Windenteil, das in der ersten Ebene der Hebestrukturebene vorvergraben ist, eine Windenösenplatte, die auf die obere Oberfläche des vorvergrabenen Windenteils geschweißt ist, und eine Winden- U-förmige-Schnalle, die mit der Windenösenplatte verbunden ist.As in 6 As shown, the winch connection part 3 comprises a pre-buried winch part pre-buried in the first level of the hoisting structure level, a winch lug plate welded to the top surface of the pre-buried winch part, and a winch U-shaped buckle connected to the winch lug plate .

Das Windenseil 5 läuft nacheinander durch feste Rolle 18, Winden- U-förmige-Schnalle und die Winde 4; ein Ende des Windenseils 5 ist mit einem Haken versehen und das andere Ende ist mit der Winde 4 verbunden.The winch rope 5 successively passes through fixed pulley 18, winch U-shaped buckle and the winch 4; one end of the winch rope 5 is hooked and the other end is connected to the winch 4 .

In dem nächsten Stockwerk des Auslegerkrans, d. h. im ersten Stockwerk der Hebestrukturebene, wird eine kleine Winde 4 aufgestellt, um die Ein- und Ausfahrt des Windenseils 5 zu kontrollieren und die Aufgabe des Anhebens der Vorhangfassadeneinheitsplatte mit der Winde durchzuführen.In the next floor of the jib crane, i. H. on the first floor of the lifting structure level, a small winch 4 is set up to control the entry and exit of the winch rope 5 and carry out the task of lifting the curtain wall unit panel with the winch.

Der Arbeitsvorgang der vertikalen Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten des vorliegenden Gebrauchsmusters:

  1. 1. Installation des Auslegerkrans auf der zweiten Ebene der Hebestrukturebene.
  2. 2. Installation der Seilbahn 1 zwischen dem Boden und dem Auslegerkran.
  3. 3. Verbindung des Zugseils 2 zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebene.
  4. 4. Installation des Windenverbindungsteils 3 und der Winde 4 auf der zweiten Ebene der Hebestrukturebene.
  5. 5. Das Windenseil 5 wird nacheinander durch die feste Rolle 18, die Winden-U-förmige-Schnalle und die Winde 4 geführt, ein Ende des Windenseils 5 ist mit einem Haken versehen und das andere Ende ist mit der Winde 4 verbunden.
  6. 6. Dann wird die Vorhangfassadeneinheitsplatte zum Seilbahntransferbereich transportiert, die Vorhangfassadeneinheitsplatte wird auf einen Flachwagen mit Rädern gelegt, die Unterseite der Vorhangfassadeneinheitsplatte wird mit Seilen mit dem Flachwagen befestigt, und der Spreizer auf dem Oberteil der Vorhangfassadeneinheitsplatte, die spezielle Seilbahnrutsche usw. werden installiert.
  7. 7. Der Haken wird an den Spreizer eingehängt, die Seilbahn wird in die Seilbahnrutsche gesteckt, die Winde wird gestartet, der Flachwagen wird entlang der Bewegungsrichtung der Vorhangfassadeneinheitsplatte geschoben, nach dem langsamen Aufrichten der Einheitsplatte wird das Seil am Unterteil der Vorhangfassadeneinheitsplatte losgebunden.
  8. 8. Nachdem die Vorhangfassadeneinheitsplatte den Boden verlassen hat und stabil ist, Installation der Seilbahnrutsche am Unterteil der Vorhangfassadeneinheitsplatte, die Seilbahn wird in die untere Seilbahnrutsche gesteckt und langsam, gleichmäßig und mit konstanter Geschwindigkeit in die vorgesehene Etage gehoben.
  9. 9. Die Seilbahnrutsche fixiert einerseits die Vorhangfassadeneinheitsplatte und sorgt dafür, dass die Vorhangfassadeneinheitsplatte entlang der Seilbahn gleitet, um zu verhindern, dass die Vorhangfassadeneinheitsplatte mit der Struktur kollidiert und Schäden an der Oberfläche verursacht, und kann andererseits verhindern, dass die Seilbahn direkt an der Vorhangfassadeneinheitsplatte reibt, was die Erscheinungsqualität der Vorhangfassade beeinträchtigt.
The working procedure of vertical transport and lifting structure for curtain wall unit panels of the present utility model:
  1. 1. Installation of the jib crane on the second level of the lifting structure level.
  2. 2. Installation of cable car 1 between the ground and the jib crane.
  3. 3. Connection of the traction rope 2 between the jib crane and the fourth level of the lifting structure level.
  4. 4. Installation of the winch connection part 3 and the winch 4 on the second level of the lifting structure level.
  5. 5. The winch rope 5 is passed through the fixed pulley 18, the winch U-shaped buckle and the winch 4 in sequence, one end of the winch rope 5 is provided with a hook, and the other end is connected to the winch 4.
  6. 6. Then the curtain wall unit panel is transported to the cable car transfer area, the curtain wall unit panel is put on a flat car with wheels, the bottom of the curtain wall unit panel is fixed with ropes to the flat car, and the spreader on the top part of the curtain wall unit panel, the special cable car slide, etc. are installed.
  7. 7. The hook is hooked on the spreader, the cable car is put into the cable car chute, the winch is started, the flat car is pushed along the direction of movement of the curtain wall unit panel, after the unit panel is slowly erected, the rope is untied at the bottom of the curtain wall unit panel.
  8. 8. After the curtain wall unit panel leaves the ground and is stable, installation of the cable car slide at the bottom of the curtain wall unit panel, the cable car is inserted into the lower cable car slide and lifted to the designated floor slowly, steadily and at a constant speed.
  9. 9. The cable car slide, on the one hand, fixes the curtain wall unit panel and ensures that the curtain wall unit panel slides along the cable car, to prevent the curtain wall unit panel from colliding with the structure and causes damage to the surface, and on the other hand, can prevent the cable car from directly hitting the curtain wall unit panel rubs, which affects the appearance quality of the curtain wall.

Es ist für den Fachmann offensichtlich, dass das vorliegende Gebrauchsmuster nicht auf die Details der oben beschriebenen beispielhaften Ausführungsformen beschränkt ist und dass es in anderen spezifischen Formen realisiert werden kann, ohne vom Geist oder den wesentlichen Merkmalen des vorliegenden Gebrauchsmusters abzuweichen. Daher sollten die Ausführungsformen unter jedem Gesichtspunkt als beispielhaft und nicht einschränkend betrachtet werden, und der Umfang des vorliegenden Gebrauchsmusters wird durch die beigefügten Ansprüche und nicht durch die obige Beschreibung begrenzt und soll daher alle Variationen, die unter die Bedeutung und den Umfang äquivalenter Elemente der Ansprüche fallen, in das vorliegende Gebrauchsmuster eingeschlossen sind. Alle Bezugszeichen in den Ansprüchen sollen nicht als Einschränkung der betreffenden Ansprüche angesehen werden.It is apparent to those skilled in the art that the present utility model is not limited to the details of the exemplary embodiments described above and that it may be embodied in other specific forms without departing from the spirit or essential characteristics of the present utility model. Therefore, the embodiments should be considered in all respects as illustrative and not restrictive, and the scope of the present utility model is to be limited by the appended claims rather than the description above, and is therefore intended to include all variations that come within the meaning and scope of equivalent elements of the claims fall, are included in the present utility model. Any reference signs in the claims should not be construed as limiting the respective claims.

Außerdem versteht es sich, dass, obwohl diese Beschreibung anhand von Ausführungsformen beschrieben wird, nicht jede Ausführungsform nur eine unabhängige technische Lösung enthält. Diese Erläuterung in der Beschreibung dient nur der Klarheit, und der Fachmann sollte die Beschreibung als Ganzes betrachten, und die technischen Lösungen in jeder Ausführungsform können auch in geeigneter Weise kombiniert werden, um andere Ausführungsformen zu bilden, die für den Fachmann verständlich sind.In addition, although this description is described in terms of embodiments, it should be understood that each embodiment does not contain only one independent technical solution. This explanation in the description is for clarity only, and those skilled in the art should consider the description as a whole, and the technical solutions in each embodiment can also be combined as appropriate to form other embodiments that can be understood by those skilled in the art.

Claims (10)

Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten, dadurch gekennzeichnet, dass sie eine Hebestrukturebene umfasst, ein Auslegerkran an der zweiten Ebene der Hebestrukturebene verbunden ist, eine Seilbahn (1) zwischen dem Boden und dem Auslegerkran vorgesehen ist, ein Zugseil (2) zwischen dem Auslegerkran und der vierten Ebene der Hebestrukturebenevorgesehen ist, ein Windenverbindungsteil (3) am äußeren Ende der ersten Ebene der Hebestrukturebenevorgesehen ist, eine Winde (4) am inneren Ende der ersten Ebene der Hebestrukturebenevorgesehen ist, wobei der Auslegerkran, das Windenverbindungsteil (3) und die Winde (4) durch ein Windenseil (5) miteinander verbunden sind; wobei die Vorhangfassadeneinheitsplatte mit einer Seilbahnrutsche versehen ist, die zu der Seilbahn (1) passt.Vertical transport and lifting structure for curtain wall unit panels, characterized in that it comprises a lifting structure level, a jib crane is connected at the second level of the lifting structure level, a cable car (1) is provided between the ground and the jib crane, a traction rope (2) between the jib crane and the fourth level of the hoisting structure level, a winch connection part (3) is provided at the outer end of the first level of the hoisting structure level, a winch (4) is provided at the inner end of the first level of the hoisting structure level, the jib crane, the winch connection part (3) and the winch (4) connected together by a winch cable (5); wherein the curtain wall unit panel is provided with a cable car slide that fits the cable car (1). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 1, dadurch gekennzeichnet, dass der Auslegerkran einen freitragenden I-Träger umfasst, der mit einer zweiten Ebene der Hebestrukturebeneverbunden ist, eine obere Ösenplatte (6), die mitder oberen Oberfläche des freitragenden 1-Trägers verbunden ist, eine äußere Ösenplatte (7), die mit der Außenseite des freitragenden I-Trägers verbunden ist, und einen Rollenzug-Stahlträger (8), der mit der Unterseite des freitragenden 1-Trägers verbunden ist, wobei der Rollenzug-Stahlträger (8) mit einer festen Rolle (18) versehen ist.Vertical transport and lifting structure for curtain wall unit panels according to claim 1 characterized in that the jib crane comprises a cantilever I-beam connected to a second level of the hoisting structure level, an upper eyelet plate (6) connected to the upper surface of the cantilever I-beam, an outer eyelet plate (7) connected to connected to the outside of the I-beam cantilever, and a pulley steel beam (8) connected to the underside of the I-beam cantilever, the pulley steel beam (8) being provided with a fixed pulley (18). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 2, dadurch gekennzeichnet, dass eine dritte U-förmigeSchnalle (15) mit der oberen Ösenplatte (6) verbunden ist, und die dritte U-förmige Schnalle (15) mit einem ersten Spannschloss (16) versehen ist.Vertical transport and lifting structure for curtain wall unit panels according to claim 2 characterized in that a third U-shaped buckle (15) is connected to the upper eyelet plate (6), and the third U-shaped buckle (15) is provided with a first turnbuckle (16). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 1, dadurch gekennzeichnet, dass der Boden mit einem ersten vorvergrabenen Teil (9) vorvergraben ist, die obere Oberfläche des ersten vorvergrabenenTeils (9) mit einer ersten Ösenplatte geschweißt (10) ist, die erste Ösenplatte (10) mit einer ersten U-förmigen Schnalle (11) verbunden ist, die erste U-förmige Schnalle (11) mit einem zweiten Spannschloss (17) versehen ist.Vertical transport and lifting structure for curtain wall unit panels according to claim 1 characterized in that the bottom is pre-buried with a first pre-buried part (9), the top surface of the first pre-buried part (9) is welded (10) with a first eyelet plate, the first eyelet plate (10) with a first U-shaped buckle (11) is connected, the first U-shaped buckle (11) is provided with a second turnbuckle (17). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 4, dadurch gekennzeichnet, dass das untere Ende der Seilbahn (1) in die erste U-förmige Schnalle (11) eingefädelt und durch die Schnalle befestigt wird, das obere Ende der Seilbahn (1) in die äußere Ösenplatte (7) eingefädelt und durch die Schnalle befestigt wird.Vertical transport and lifting structure for curtain wall unit panels according to claim 4 , characterized in that the lower end of the cable car (1) is threaded into the first U-shaped buckle (11) and fastened by the buckle, the upper end of the cable car (1) is threaded into the outer eyelet plate (7) and fastened through the buckle is attached. Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 3, dadurch gekennzeichnet, dass ein zweites vorvergrabenesTeil (12) am äußeren Ende der oberen Oberfläche der ersten Ebene der Hebestrukturebene vorvergraben wird, eine zweite Ösenplatte (13) auf das zweite vorvergrabeneTeil (12) geschweißt wird und eine zweite U-förmige Schnalle (14) mit einer zweiten Ösenplatte (13) verbunden wird.Vertical transport and lifting structure for curtain wall unit panels according to claim 3 characterized in that a second pre-buried part (12) is pre-buried at the outer end of the upper surface of the first level of the lifting structure level, a second eyelet plate (13) is welded onto the second pre-buried part (12) and a second U-shaped buckle (14) connected to a second eyelet plate (13). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 6, dadurch gekennzeichnet, dass das obere Ende des Zugseils (2) in die zweite U-förmige Schnalle (14) eingefädelt und durch die Schnalle befestigt wird, das untere Ende des Zugseils (2) in das erste Spannschloss (16) eingefädelt und durch die Schnalle befestigt wird.Vertical transport and lifting structure for curtain wall unit panels according to claim 6 , characterized in that the upper end of the traction cable (2) is threaded into the second U-shaped buckle (14) and fastened by the buckle, the lower end of the traction cable (2) is threaded into the first turnbuckle (16) and through the buckle is attached. Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 1, dadurch gekennzeichnet, dass das Windenverbindungsteil (3) ein vorvergrabenesWindenteil, das in der ersten Ebene der Hebestrukturebene vorvergraben ist, eine Windenösenplatte, die auf die obere Oberfläche des vorvergrabenen Windenteils geschweißt ist, und eine Winden-U-förmige-Schnalle, die mit der Windenösenplatte verbunden ist, umfasst.Vertical transport and lifting structure for curtain wall unit panels according to claim 1 , characterized in that the winch connection part (3) comprises a pre-buried winch part pre-buried in the first level of the lifting structure level, a winch eye plate welded to the top surface of the pre-buried winch part, and a winch U-shaped buckle connected to the Winch plate is connected includes. Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 8, dadurch gekennzeichnet, dass das Windenseil (5) nacheinander durch feste Rolle (18), Winden-U-förmige-Schnalle und die Winde (4) läuft.Vertical transport and lifting structure for curtain wall unit panels according to claim 8 , characterized in that the winch cable (5) successively passes through fixed pulley (18), winch U-shaped buckle and the winch (4). Vertikale Transport- und Hebestruktur für Vorhangfassadeneinheitsplatten nach Anspruch 1, dadurch gekennzeichnet, dass ein Ende des Windenseils (5) mit einem Haken versehen ist und das andere Ende mit der Winde (4) verbunden ist.Vertical transport and lifting structure for curtain wall unit panels according to claim 1 , characterized in that one end of the winch cable (5) is provided with a hook and the other end is connected to the winch (4).
DE202022102224.0U 2021-11-18 2022-04-26 Vertical transport and lifting structure for curtain wall unit panels Active DE202022102224U1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202122828469.2 2021-11-18
CN202122828469.2U CN216235734U (en) 2021-11-18 2021-11-18 Vertical transportation hoisting structure for curtain wall unit plate

Publications (1)

Publication Number Publication Date
DE202022102224U1 true DE202022102224U1 (en) 2022-06-09

Family

ID=80944945

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202022102224.0U Active DE202022102224U1 (en) 2021-11-18 2022-04-26 Vertical transport and lifting structure for curtain wall unit panels

Country Status (2)

Country Link
CN (1) CN216235734U (en)
DE (1) DE202022102224U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116969346A (en) * 2023-09-21 2023-10-31 河南厚鼎建设工程有限公司 Consignment winch for building construction
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 Unit plate transfer rail system and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116969346A (en) * 2023-09-21 2023-10-31 河南厚鼎建设工程有限公司 Consignment winch for building construction
CN116969346B (en) * 2023-09-21 2024-01-05 河南厚鼎建设工程有限公司 Consignment winch for building construction
CN117759039A (en) * 2023-11-23 2024-03-26 中国建筑装饰集团有限公司 Unit plate transfer rail system and construction method

Also Published As

Publication number Publication date
CN216235734U (en) 2022-04-08

Similar Documents

Publication Publication Date Title
DE202022102224U1 (en) Vertical transport and lifting structure for curtain wall unit panels
DE69012875T2 (en) Rescue rack.
DE20022661U1 (en) Training device with cable pull over the cross
EP0501140A1 (en) Erecting scaffold moveable along an elevator shaft for erecting shaft equipment
DE3006491A1 (en) TRANSFORMABLE SCAFFOLDING AND WORK PROCEDURE FOR TRANSFORMING A SCAFFOLDING
DE60013714T2 (en) crane
DE3445610C1 (en) Dredger
DE202022103661U1 (en) Double machine lifting system for constructing the internal structure of a chimney
DE2602745A1 (en) Hoist mechanism for rectangular shaped bodies - has swan:necked jib with two hooks working together from U:shaped section head arms
DE976018C (en) Tower crane with a tower that can be erected around a horizontal axis of the crane carriage
DE698688C (en) Suspension for boom that can be pivoted in a vertical plane, e.g. B. bucket ladders and bucket wheel booms of excavators o.
DE2502147C2 (en) Building crane, especially with a trolley jib
DE2635387C2 (en) crane
DE932631C (en) Procedure for erecting wide-span structures
DE582712C (en) Foerdergeraet (bucket chain excavator, stacker) with a boom, which is secured against twisting in the lateral direction by a tension member acting on it from the side
DE1455024B2 (en) Roller box as a pull rope guide for monorail overhead monorails
DE1531606C (en) Device for raising and lowering platform decks in a transport ship
DE2437089A1 (en) GRAPPLE ARRANGEMENT FOR LIFTING EQUIPMENT
DE8436634U1 (en) SWIMMING EXCAVATORS
DE814931C (en) Crane, especially railway crane
DE202022102976U1 (en) Structural design of a lifting type steel truss navigable bridge
AT97751B (en) Construction elevator.
DE847478C (en) Inclined elevator for building and roofing materials
DE102020108747A1 (en) Tower crane with auxiliary hoist rope
DE2406251A1 (en) PROCEDURE FOR TENSIONING AND RELEASING ADDITIONAL ROPE SECTIONS OF A PULL ROPE ON A HOISTING GEAR AND DEVICE FOR PERFORMING THE PROCEDURE

Legal Events

Date Code Title Description
R081 Change of applicant/patentee

Owner name: CHINA CONSTRUCTION SECOND ENGINEERING BUREAU L, CN

Free format text: FORMER OWNER: CHINA CONSTRUCTION SECOND ENGINEERING BUREAU, BEIJING, CN

R207 Utility model specification