DE19917561C1 - Strip treatment line for metal strips, especially for high-strength stainless steel strips - Google Patents
Strip treatment line for metal strips, especially for high-strength stainless steel stripsInfo
- Publication number
- DE19917561C1 DE19917561C1 DE19917561A DE19917561A DE19917561C1 DE 19917561 C1 DE19917561 C1 DE 19917561C1 DE 19917561 A DE19917561 A DE 19917561A DE 19917561 A DE19917561 A DE 19917561A DE 19917561 C1 DE19917561 C1 DE 19917561C1
- Authority
- DE
- Germany
- Prior art keywords
- belt
- metal strip
- treatment line
- line according
- strip
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 title claims abstract description 44
- 229910001220 stainless steel Inorganic materials 0.000 title claims description 32
- 239000010935 stainless steel Substances 0.000 title claims description 32
- 239000007788 liquid Substances 0.000 claims abstract description 21
- 238000005452 bending Methods 0.000 claims abstract description 14
- 238000004140 cleaning Methods 0.000 claims description 24
- 238000000137 annealing Methods 0.000 claims description 7
- 238000005259 measurement Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 abstract description 9
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
- 239000012535 impurity Substances 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000005097 cold rolling Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D1/00—Straightening, restoring form or removing local distortions of sheet metal or specific articles made therefrom; Stretching sheet metal combined with rolling
- B21D1/02—Straightening, restoring form or removing local distortions of sheet metal or specific articles made therefrom; Stretching sheet metal combined with rolling by rollers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/02—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
- B21B45/0269—Cleaning
- B21B45/0275—Cleaning devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B2015/0071—Levelling the rolled product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B3/00—Rolling materials of special alloys so far as the composition of the alloy requires or permits special rolling methods or sequences ; Rolling of aluminium, copper, zinc or other non-ferrous metals
- B21B3/02—Rolling special iron alloys, e.g. stainless steel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/004—Heating the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Heat Treatment Of Strip Materials And Filament Materials (AREA)
- Straightening Metal Sheet-Like Bodies (AREA)
Abstract
Description
Die Erfindung betrifft eine Bandbehandlungslinie für Metallbänder, insbesondere für hochfeste Edelstahlbänder, mit einem Bandbehandlungsabschnitt, der eine erste Behandlungsstation umfaßt, in welcher eine Flüssigkeit das jeweils verarbeitete Metallband benetzt. In derartigen Behandlungslinien durchlaufen beispielsweise kaltgewalzte Edelsstahlbänder eine Reinigungsstation, bevor sie in einen Glühofen gelangen und einer Weiterverarbeitung zugeführt werden. In der Reinigungsstation werden große Mengen von Reinigungsflüssigkeit auf das Band ausgebracht, um auf ihm haftende Rückstände, wie losen Zunder, Flitter, Ölreste und anderes, zu entfernen, welche bei den vorhergehenden Herstellschritten entstanden oder auf dem Band verblieben sind.The invention relates to a belt treatment line for Metal straps, especially for high-strength stainless steel straps, with a belt treatment section which is a first Treatment station includes, in which a liquid each processed metal tape wetted. In such Treatment lines run through cold-rolled, for example Stainless steel belts at a cleaning station before entering a Annealing furnace arrive and further processing become. Large quantities of Cleaning liquid applied to the tape to be on it adhesive residues such as loose scale, flakes, oil residues and other, to remove which in the previous Manufacturing steps emerged or remained on the belt are.
Ein grundsätzliches Problem bei der Behandlung von Metallbändern besteht darin, daß das Band in vielen Fällen abhängig von der Gestaltung und Funktion der jeweiligen Behandlungsstationen über eine größere Weglänge ohne die Möglichkeit einer Abstützung geführt werden muß. Dies kann beispielsweise in Glühöfen, in Schlingentürmen oder ähnlichen Einrichtungen erforderlich sein.A fundamental problem in the treatment of Metal straps are made in many cases depending on the design and function of each Treatment stations over a longer path length without the Possibility of support must be performed. This can for example in annealing furnaces, in loop towers or similar facilities may be required.
Im Bereich der frei durchlaufenen Wegstrecken kann es aufgrund von Planheits- oder anderen Geometriefehlern des verarbeiteten Metallbandes dazu kommen, daß das Band sich in Längs- und/oder Querrichtung bogenförmig verformt. In the area of the free routes it can due to flatness or other geometry errors of the processed metal tape come to the tape itself deformed arcuately in the longitudinal and / or transverse direction.
Diese Verformung führt zum einen zu einem seitlichen Verlaufen des Bandes aus seinem Förderweg. Zum anderen besteht die Gefahr, daß sich das Band wölbt und nicht mehr einwandfrei in der Ebene des Förderweges liegt.This deformation leads to a lateral one The belt runs out of its path. On the other hand there is a risk that the tape will bulge and no longer lies perfectly in the level of the conveyor path.
Sowohl das Verlaufen als auch die aus der Ebene des Förderwegs hinausführende Wölbung des Metallbandes bringen die Gefahr mit sich, daß das gewölbte oder verzogene Band in nicht vorherbestimmbarer Weise mit Führungen oder anderen ortsfesten Installationen der jeweiligen Einrichtung in Berührung kommt. Diese Kontakte führen zu einer Beschädigung und Markierung der Bandoberfläche, durch welche die Marktfähigkeit des jeweiligen Metallbandproduktes erheblich beeinträchtigt wird. Verstärkt wird dieses Problem dadurch, daß die Bänder mit hohen Geschwindigkeiten durch die Behandlungslinien gefördert werden, wodurch die Gefahr einer instabilen Lage des mit Planheitsfehlern behafteten Bandes in Bezug auf den ihm zugedachten Förderweg erhöht wird.Both the course and that from the level of Bring the metal belt out of the conveying path there is a risk that the curved or warped band in a way that cannot be predetermined with guided tours or other fixed installations of the respective Device comes into contact. These contacts lead to damage and marking of the belt surface which the marketability of each Metal strip product is significantly affected. This problem is exacerbated by the fact that the tapes with high speeds through the treatment lines are promoted, reducing the risk of an unstable situation of the band with flatness errors in relation to the intended funding path is increased.
In der Vergangenheit sind aufwendige Maßnahmen ergriffen worden, um einen einwandfreien Lauf des Bandes durch eine Behandlungslinie zu gewährleisten. So sind mechanische Bandlaufregelungen eingesetzt worden, die in Abhängigkeit vom jeweiligen Verlaufen des Bandes gezielt Bremskräfte auf das Band aufbringen, um durch dessen Ungleichförmigkeiten verursachte Abweichungen vom Förderweg auszugleichen.Complex measures have been taken in the past been to ensure the tape runs smoothly through a Ensure treatment line. So are mechanical Belt guiding systems have been used that are dependent targeted braking forces depending on the course of the belt apply the tape to pass through its irregularities compensate for any deviations caused by the funding route.
Eine andere Möglichkeit, eine korrekte Ausrichtung des Bandverlaufs zu erreichen, besteht darin, die Geometriefehler des Bandes selbst zu beseitigen. Zu diesem Zweck werden in der Regel Streck-Biege-Richtmaschinen eingesetzt, in welchen durch das kombinierte Aufbringen von Zug- und Biegekräften die Planheit des Bandes erhöht wird. Another way to correctly align the Reaching the course of the band consists in the Eliminate the geometry errors of the belt itself. To this The purpose of this is usually stretch-bend-straightening machines used in which by the combined application of Tension and bending forces increase the flatness of the belt.
Zwar können durch die voranstehend erwähnten Maßnahmen gewisse Verbesserungen des Bandlaufs erreicht werden. In der Praxis zeigt sich jedoch, daß dazu ein erheblicher apparativer Aufwand erforderlich ist. So müssen nicht nur aufwendige Vorrichtungen für die Verformung der Bänder selbst eingesetzt werden, sondern es sind auch erhebliche Antriebskräfte erforderlich, um das Band durch die betreffenden Vorrichtungen zu fördern.Although the measures mentioned above can certain improvements in tape run can be achieved. In practice shows, however, that this is a considerable one apparatus expenditure is required. So not only elaborate devices for the deformation of the bands be used themselves, but there are also significant ones Driving forces required to pass through the belt to promote the devices concerned.
Dieser Aufwand bringt nicht nur hohe Kosten mit sich, sondern führt in vielen Fällen auch nicht zu dem gewünschten Erfolg. Letzteres gilt insbesondere bei der Behandlung von hochfestem Edelstahlband, dessen Planheit sich nach dem Kaltwalzen nur unter größeren Schwierigkeiten korrigieren läßt.This effort not only entails high costs, but in many cases does not lead to that desired success. The latter applies in particular to the Treatment of high-strength stainless steel strip, its flatness after cold rolling only with greater difficulty can be corrected.
Zur Beseitigung der voranstehend zusammengefaßten Nachteile ist in der EP 0 865 839 A2 vorgeschlagen worden, das Band durch eine Richteinrichtung zu führen, in der es durch reine Biegeformänderung gerichtet wird. Zu diesem Zweck ist die bekannte Richteinrichtung mit einer Richtrolle ausgestattet, die von dem Band zwischen zwei Berührungslinien teilweise umschlungen wird. Gleichzeitig sind zwei Führungsrollen vorgesehen, welche das Band in Anlage an der Richtrolle halten. So wird erreicht, daß der Biegeradius des Metallbandes dem Radius der Richtrolle entspricht.To eliminate the disadvantages summarized above has been proposed in EP 0 865 839 A2, the tape through a straightening device in which it is to be carried out pure bending shape change is directed. For this purpose the known straightening device with a straightening roller equipped by the tape between two Contact lines are partially wrapped around. At the same time there are two guide rollers which guide the belt in Hold the system at the straightening roller. This ensures that the Bending radius of the metal strip the radius of the straightening roll corresponds.
Der Vorteil der bekannten Einrichtung besteht darin, daß sich durch eine geeignete Positionierung der Richtrolle in Bezug auf die ihr zugeordneten Führungsrollen die Größe und die Art der für die Korrektur von Planheitsfehlern des Bandes benötigten Verformung auf einfache Weise einstellen lassen. Da die Verformung als reine Biegeformänderung durchgeführt wird, werden für das Richten selbst keine zusätzlichen Zugkräfte benötigt, so daß der Bandzug lediglich für den Transport des Bandes durch die Einrichtung bemessen sein muß.The advantage of the known device is that through a suitable positioning of the guide role in Regarding the guide roles assigned to it, the size and the type of for the correction of flatness errors of the Set the required deformation in a simple manner to let. Because the deformation as a pure change in bending shape is carried out for the judging itself additional tensile forces are required so that the belt tension only for the transport of the tape through the Facility must be sized.
Bei der praktischen Erprobung der aus der EP 0 865 839 A2 bekannten Vorrichtung zum Biegerichten eines Metallbandes ist festgestellt worden, daß der enge, formschlüssige Kontakt des Bandes mit den Richt- und Führungsrollen dazu führt, daß Ablagerungen von dem Band auf die Rollenoberflächen übertragen und dort eingewalzt werden. Diese Ablagerungen verursachen wiederum unerwünschte Markierungen der Bandoberfläche, welche nachträglich entfernt werden müssen, um den an hochwertige Oberflächen von Metallbändern gestellten Ansprüchen zu genügen. Besonders problematisch erweist sich dies auch in diesem Zusammenhang bei der Verarbeitung von Edelstahlbändern, an deren Oberflächenbeschaffenheit besonders hohe Anforderungen gestellt werden.In the practical testing of EP 0 865 839 A2 known device for straightening a metal strip it has been found that the tight, form-fitting Contact of the belt with the straightening and guiding rollers leads to deposits on the belt Roll surfaces are transferred and rolled there. These deposits in turn cause undesirable Markings on the belt surface, which subsequently must be removed in order to adhere to high quality surfaces to meet the demands made of metal strips. This also proves to be particularly problematic in this Connection in the processing of stainless steel strips their surface quality is particularly high Requirements are made.
Die Aufgabe der Erfindung besteht darin, eine Bandbehandlungslinie der eingangs erläuterten Art zu schaffen, in welcher das Risiko einer Beschädigung der Oberfläche des verarbeiteten Metallbandes weiter vermindert ist.The object of the invention is a Belt treatment line of the type explained at the beginning create in which the risk of damage to the Surface of the processed metal strip is further reduced is.
Diese Aufgabe wird dadurch gelöst, daß bei einer Bandbehandlungslinie für Metallbänder, insbesondere für hochfeste Edelstahlbänder, mit einem Bandbehandlungsabschnitt, der eine erste Behandlungstation umfaßt, in welcher eine Flüssigkeit das Metallband benetzt, das mit Flüssigkeit benetzte Metallband eine Verformungseinrichtung durchläuft, welche das Metallband durch im wesentlichen reine Biegeformänderung richtet. This object is achieved in that Strip treatment line for metal strips, especially for high-strength stainless steel strips, with a Belt treatment section, which is a first treatment station in which a liquid wets the metal strip, the metal tape wetted with liquid Deforming device passes through the metal strip through essentially pure change in bending shape.
Indem das Band im noch mit Flüssigkeit benetzten Zustand durch die Verformungseinrichtung geführt wird, wird erreicht, daß auch zwischen den Richtelementen der Verformungseinrichtung, wie Richt- und/oder Führungsrollen, und dem jeweiligen Metallband stets ein Flüssigkeitsfilm vorhanden ist. Dieser Flüssigkeitsfilm verhindert, daß auf dem Band haftende Rückstände auf die betreffenden Elemente der Verformungseinrichtung gelangen, dort haften bleiben und anschließend eine Beschädigung der Bandoberfläche verursachen. Die Erfindung nutzt somit das Vorhandensein von Flüssigkeit im Naßteil der Behandlungslinie aus, um eine Beschädigung der Bandoberfläche beim Richten in der Verformungseinrichtung zu verhindern. So ist nicht nur der Aufwand für das Biegerichten als solches auf ein Minimum reduziert, sondern es ist auch kein zusätzlicher Aufwand für das Aufbringen oder Entfernen von Schmierstoffen oder ähnlichen Flüssigkeiten im Bereich der Verformungseinrichtung erforderlich.By keeping the tape still wet is guided through the deformation device achieved that between the directional elements of the Deformation device, such as straightening and / or Guide rollers, and the respective metal band always Liquid film is present. This liquid film prevents residues from sticking to the tape relevant elements of the deformation device arrive, stick there and then damage the Cause belt surface. The invention thus uses that Presence of liquid in the wet part of the Treatment line out to damage the Belt surface when straightening in the forming device to prevent. It's not just the effort for that Bending judges as such are reduced to a minimum, but it is also no additional effort for application or removing lubricants or the like Liquids in the area of the deformation device required.
Bei der Verformungseinrichtung kann es sich beispielsweise um eine Vorrichtung zum Biegerichten handeln, wie sie in der erwähnten EP 0 865 839 A2 beschrieben ist. Wesentlich ist, daß die Verformung des Metallbandes zum weitaus überwiegenden Teil als Biegeformänderung ausgeführt wird, bei der Zugkräfte im wesentlichen ausschließlich zum Transport des Bandes benötigt werden, und daß das verarbeitete Band mit einer Flüssigkeit benetzt ist. Neben dem Vorteil der Einsparung von Energie und apparativem Aufwand für die Antriebe stellt dies sicher, daß das Band während des Richtens selbst keiner übermäßigen Belastung unterworfen wird, die wieder zu unerwünschten Verformungen führen könnten. The deformation device can be, for example are a device for bending straightening, as described in of the mentioned EP 0 865 839 A2. Essential is that the deformation of the metal band is far too predominantly as a change in bending shape, in the tractive forces essentially exclusively for Transport of the tape are needed, and that the processed tape is wetted with a liquid. Next the advantage of saving energy and equipment Effort for the drives ensures that the belt no excessive strain during judging itself is subjected again to undesirable deformations could lead.
Besonders vorteilhaft läßt sich die erfindungsgemäße Ausgestaltung einer Bandbehandlungslinie dann verwirklichen, wenn die Behandlungsstation eine Bandreinigungseinrichtung ist. In einer solchen Reinigungseinrichtung werden große Mengen Reinigungsflüssigkeit auf das Band gebracht, so daß ein stets ausreichend dicker Flüssigkeitsfilm vorhanden ist, wenn das Band in die Verformungseinrichtung eintritt.The invention can be particularly advantageous Design of a belt treatment line then realize when the treatment station a Belt cleaning device is. In one Cleaning equipment will be large quantities Brought cleaning liquid on the tape so that a there is always a sufficiently thick film of liquid, when the tape enters the deforming device.
Letzteres läßt sich insbesondere dann gewährleisten, wenn die Verformungseinrichtung innerhalb der Behandlungsstation angeordnet ist. Bei dieser Anordnung entsteht auf dem Metallband ein Flüssigkeitsfilm, der so stark ist, daß sich zwischen dem Band und den Richtelementen der Verformungseinrichtung, Flüssigkeit nach Art eines "Aquaplaning-Effekts" aufstaut und so einen direkten Kontakt zwischen Band und Richtelementen wirkungsvoll verhindert. Zweckmäßig ist es in diesem Zusammenhang, wenn die Verformungseinrichtung nahe dem Ausgang der Behandlungsstation angeordnet ist, da in diesem Bereich die Menge der auf dem Band haftenden Verunreinigungen, wie Flitter, Zunderreste etc., zum großen Teil entfernt sind.The latter can be ensured in particular if the deformation device within the treatment station is arranged. This arrangement creates on the Metal tape is a film of liquid that is so strong that between the tape and the straightening elements of the Deformation device, liquid like a "Aquaplaning effect" builds up and so a direct Effective contact between belt and straightening elements prevented. In this context it is useful if the deforming device near the exit of the Treatment station is arranged because in this area Amount of impurities adhering to the tape, such as Tinsel, scraps etc. are largely removed.
Alternativ zu einer Anordnung der Verformungseinrichtung direkt im Naßabschnitt der Bandbehandlungslinie kann es in Abhängigkeit von den jeweiligen Gegebenheiten ebenso zweckmäßig sein, die Verformungseinrichtung in Förderrichtung des Metallbandes in unmittelbarem Anschluß an die Behandlungsstation anzuordnen. Wesentlich ist lediglich, daß ein ausreichender Flüssigkeitsfilm auf dem Metallband vorhanden ist, wenn es in die Verformungseinrichtung eintritt. As an alternative to an arrangement of the deformation device directly in the wet section of the belt treatment line Dependence on the respective circumstances as well be useful, the deformation device in Direction of conveyance of the metal strip in direct connection to be arranged at the treatment station. Is essential only that there is a sufficient film of liquid on the Metal strap is in place when it is in the Deformation device occurs.
Eine andere Möglichkeit der Ausbildung der Verformungseinrichtung besteht darin, daß die Verformungseinrichtung zwei von dem Metallband nacheinander teil-umschlungene Richtrollen besitzt. Auch durch die Verwendung zweier Richtrollen, die von dem Metallband in unmittelbarem Anschluß aneinander passiert werden, lassen sich die Metallbänder biegerichten, ohne daß zusätzliche Zugkräfte eingebracht werden müssen. Dabei hat der Weg des Metallbands im Bereich der Verformungseinrichtung zweckmäßigerweise einen S-förmigen Verlauf. Dies ermöglicht es, die Richtrollen besonders wirkungsvoll einzusetzen.Another way of training Deformation device is that the Deformation device two of the metal strip in succession has partially wrapped straightening roles. Even through the Use of two straightening rollers that are in the metal band direct connection to each other the metal strips bend without additional Tensile forces must be introduced. The way of Metal strips in the area of the deformation device expediently an S-shaped course. this makes possible it to use the straightening roles particularly effectively.
Eine weitere vorteilhafte Ausgestaltung der Erfindung besteht darin, daß die Verformungseinrichtung eine Steuereinrichtung umfaßt, welche das in der Verformungseinrichtung durchgeführte Biegerichten in Abhängigkeit vom Ergebnis einer an dem Metallband vorgenommenen Bandkrümmungsmessung steuert.Another advantageous embodiment of the invention is that the deformation device is a Includes control device which in the Bending straightening performed in Depends on the result of one on the metal band tape curvature measurement controls.
Nachfolgend wird die Erfindung anhand einer ein Ausführungsbeispiel darstellenden Zeichnung näher erläutert. Es zeigen in schematischer Darstellung:The invention is based on a Exemplary embodiment drawing closer explained. In a schematic representation:
Fig. 1 eine Behandlungslinie in einer seitlichen Ansicht; Fig. 1 shows a processing line in a side view;
Fig. 2 eine in der Behandlungslinie eingesetzte Verformungseinrichtung in seitlicher Ansicht; Fig. 2 shows a processing line used in the deformation device in side view;
Fig. 3 die Verformungseinrichtung in einer Ansicht von oben. Fig. 3 shows the deformation device in a view from above.
Die Bandbehandlungslinie 1 umfaßt eine Abwickeleinrichtung 2 zum Abhaspeln eines zu einem Coil 3 gewickelten kaltgewalzten Edelstahlbandes B. Das abgehaspelte Edelstahlband B durchläuft in Förderrichtung F zunächst eine Reinigungseinrichtung 4. Daran anschließend wird es in einem mit Abstand zu der Reinigungseinrichtung 4 angeordneten Durchlaufglühofen 5 geglüht. Am Ende der Bandbehandlungslinie 1 ist schließlich eine Haspeleinrichtung 6 positioniert, auf der das geglühte Edelstahlband B wieder zu einem Coil 7 gehaspelt wird.The strip treatment line 1 comprises an unwinding device 2 for uncoiling a cold-rolled stainless steel strip B wound into a coil 3. The unwound stainless steel strip B first passes through a cleaning device 4 in the conveying direction F. Subsequently, it is annealed in a continuous annealing furnace 5 arranged at a distance from the cleaning device 4 . Finally, a reel device 6 is positioned at the end of the strip treatment line 1 , on which the annealed stainless steel strip B is rewound to form a coil 7 .
Das Edelstahlband B tritt durch eine Eingangsöffnung 8 in die sich über eine bestimmte Länge L erstreckende Reinigungseinrichtung 4 ein. In der Reinigungseinrichtung 4 sind in mehreren in Förderrichtung F aufeinanderfolgenden Reihen Düsen 9 angeordnet, über welche Reinigungsflüssigkeit unter erhöhtem Druck auf die Ober- und Unterseite des Edelstahlbandes B ausgebracht wird, um auf dem Edelstahlband B haftende Verunreinigungen, wie Flitter, Ölrückstände und ähnliches, zu entfernen. Das Edelstahlband B verläßt die Reinigungseinrichtung 4 durch eine Ausgangsöffnung 10, nachdem die Reinigungsflüssigkeit mittels einer eng benachbart zur Ausgangsöffnung 10 positionierten Abstreifeinrichtung 11 von seinen Oberflächen entfernt worden ist.The stainless steel strip B enters the cleaning device 4, which extends over a certain length L, through an inlet opening 8 . In the cleaning device 4 are arranged in several successive rows in the conveying direction F nozzles 9 , via which cleaning liquid is applied under increased pressure on the top and bottom of the stainless steel strip B, in order to prevent impurities adhering to the stainless steel strip B, such as flakes, oil residues and the like remove. The stainless steel strip B leaves the cleaning device 4 through an exit opening 10 after the cleaning liquid has been removed from its surfaces by means of a wiping device 11 positioned closely adjacent to the exit opening 10 .
Unmittelbar vor dem Erreichen der Abstreifeinrichtung 11 wird das Edelstahlband B in einer innerhalb der Reinigungseinrichtung 4 angeordneten Verformungseinrichtung 12 biegegerichtet. Die Verformungseinrichtung 12 weist eine von dem Edelstahlband B teil-umschlungene Richtrolle 13 und zwei Führungsrollen 14, 15 auf. Die Führungsrollen 14, 15 weisen einen größeren Durchmesser auf als die Richtrolle 13. Sie sind achsparallel derart eng benachbart angeordnet, daß zwischen ihnen ein Zwickelbereich 16 ausgebildet ist, in welchem die Richtrolle 13 positioniert ist.Immediately before reaching the stripping means 11, the stainless steel strip B is bend-oriented in a disposed inside the cleaning device 4 deforming means 12th The deformation device 12 has a straightening roller 13 partially wrapped in the stainless steel strip B and two guide rollers 14 , 15 . The guide rollers 14 , 15 have a larger diameter than the straightening roller 13 . They are arranged so closely adjacent to one another axially parallel that a gusset area 16 is formed between them, in which the straightening roller 13 is positioned.
Durch die Führungsrollen 14, 15 wird das Edelstahlband B in Anlage an der Richtrolle 13 gehalten. Dabei wird der Anfang und das Ende der Umschlingung der Richtrolle 13 durch jeweils eine Berührungslinie 17, 18 bestimmt, in welcher die Führungsrollen 14, 15 jeweils mittelbar über das Edelstahlband B die Richtrolle 13 berühren.The stainless steel strip B is held in contact with the straightening roller 13 by the guide rollers 14 , 15 . The beginning and the end of the wrap around the straightening roller 13 are each determined by a contact line 17 , 18 , in which the guide rollers 14 , 15 each touch the straightening roller 13 indirectly via the stainless steel belt B.
Durch hier nicht dargestellte Verstelleinrichtungen kann die Lage der Richtrolle 13 und der Führungsrollen 14, 15 relativ zueinander verstellt werden. Zudem ist die Drehachse 19 der Richtrolle 13 zusätzlich in einer Ebene 20 verstellbar, die senkrecht zur Ebene des Edelstahlbandes B verstellbar ist.The position of the straightening roller 13 and the guide rollers 14 , 15 can be adjusted relative to one another by adjusting devices (not shown here). In addition, the axis of rotation 19 of the straightening roller 13 is additionally adjustable in a plane 20 which is adjustable perpendicular to the plane of the stainless steel strip B.
Durch die Verstellung der relativen Lage der Richt- und Führungsrollen 13, 14, 15 zueinander kann der Grad der Umschlingung der Richtrolle 13 durch das Edelstahlband B eingestellt werden. Dabei erfolgt diese Einstellung in Abhängigkeit vom Ergebnis einer durch eine Messeinrichtung 21 durchgeführten Messung der Planheit des Edelstahlbandes B beim Verlassen der Reinigungseinrichtung 4.By adjusting the relative position of the straightening and guide rollers 13, 14, 15 to each other, the degree of the looping of the straightening roll 13 are adjusted by the stainless steel strip B. This setting is made depending on the result of a measurement of the flatness of the stainless steel strip B carried out by a measuring device 21 when leaving the cleaning device 4 .
Innerhalb der Verformungseinrichtung 12 wird das Edelstahlband B durch eine reine Biegeformänderung gerichtet. Die Anordnung und geometrischen Verhältnisse der Richt- und der Führungsrollen 13, 14, 15 sind dabei so gewählt, daß der auf das Edelstahlband B wirkende Bandzug zu dieser Formänderung keinen Beitrag leistet. Er dient lediglich zum Transport des Edelstahlbandes B durch die Bandbehandlungslinie 1. Auf diese Weise wird vermieden, daß das Edelstahlband B beim Durchlauf durch die Verformungseinrichtung 12 eine Streckung erfährt.Inside the deformation device 12 , the stainless steel strip B is straightened by a pure change in the bending shape. The arrangement and geometrical relationships of the straightening and guide rollers 13 , 14 , 15 are chosen so that the strip tension acting on the stainless steel strip B makes no contribution to this change in shape. It only serves to transport the stainless steel strip B through the strip treatment line 1 . In this way it is avoided that the stainless steel strip B is stretched as it passes through the deformation device 12 .
Die Reinigungsflüssigkeit R, mit welcher das Edelstahlband B in der Reinigungseinrichtung 4 benetzt wird, staut sich im Bereich der Berührungslinien 17, 18 nach Art eines "Aquaplaning-Effektes" auf. Der sich auf diese Weise zwischen den Führungswalzen 14, 15 und der Oberseite des Edelstahlbandes B bzw. zwischen der Richtrolle 13 und der Unterseite des Edelstahlbandes B einstellende Flüssigkeitsfilm bewirkt, daß auf dem Edelstahlband B noch vorhandene lose Verunreinigungen auf die Umfangsflächen der Richt- und der Führungsrollen 13, 14, 15 gelangen und dort eingewalzt werden. Auf diese Weise wird wirkungsvoll verhindert, daß es im Bereich der Verformungseinrichtung 12 zu einer Beschädigung der Oberflächen des Edelstahlbandes B kommt.The cleaning liquid R, with which the stainless steel strip B is wetted in the cleaning device 4 , builds up in the region of the contact lines 17 , 18 in the manner of an "aquaplaning effect". The resulting in this way between the guide rollers 14 , 15 and the top of the stainless steel belt B or between the straightening roller 13 and the underside of the stainless steel belt B causes that loose impurities still present on the stainless steel belt B on the peripheral surfaces of the straightening and Guide rollers 13 , 14 , 15 arrive and be rolled in there. In this way, it is effectively prevented that the surfaces of the stainless steel strip B are damaged in the region of the deformation device 12 .
Gleichzeitig werden durch die im wesentlichen reine Biegeverformung, die das jeweils in der Bandbehandlungslinie 1 behandelte Metallband in der Verformungseinrichtung 12 erfährt, auch bei hochfesten Metallbändern Planheits- und sonstige Geometriefehler wirkungsvoll korrigiert. Dies hat zur Folge, daß das betreffende Band beim Durchlauf des Glühofens 5, in welchem es über eine längere Strecke frei und ungestützt bewegt wird, keine Quer- oder Längsauswölbungen ausbildet und auch nicht aus seiner Förderrichtung F verläuft. Unbeabsichtigte Kontakte mit Einbauten des Glühofens 5 werden auf diese Weise sicher vermieden. At the same time, the essentially pure bending deformation experienced by the metal strip treated in the strip treatment line 1 in the deformation device 12 effectively corrects flatness and other geometry errors even in the case of high-strength metal strips. The consequence of this is that the strip in question does not form any transverse or longitudinal bulges when it passes through the annealing furnace 5 , in which it is moved freely and unsupported over a longer distance, and also does not extend from its conveying direction F. Unintentional contacts with internals of the annealing furnace 5 are reliably avoided in this way.
11
Bandbehandlungslinie
Belt treatment line
22nd
Abwickeleinrichtung
Unwinder
33rd
Coil
Coil
44th
Reinigungseinrichtung
Cleaning facility
55
Durchlaufglühofen
Continuous annealing furnace
66
Haspeleinrichtung
Decoiler
77
Coil
Coil
88th
Eingangsöffnung der Reinigungseinrichtung Entry opening of the cleaning device
44th
99
Düsen der Reinigungseinrichtung Cleaning device nozzles
44th
1010th
Ausgangsöffnung der Reinigungseinrichtung Outlet opening of the cleaning device
44th
1111
Abstreifeinrichtung der Reinigungseinrichtung Wiping device of the cleaning device
44th
1212th
Verformungseinrichtung
Deformation device
1313
Richtrolle der Verformungseinrichtung Straightening roll of the deformation device
1212th
1414
, ,
1515
Führungsrollen der Verformungseinrichtung Guide rollers of the deformation device
1212th
1616
Zwickelbereich zwischen den Führungsrollen Gusset area between the guide rollers
1414
, ,
1515
1717th
, ,
1818th
Berührungslinie an der Richtrolle Contact line at the straightening roller
1313
1919th
Drehachse der Richtrolle Axis of rotation of the straightening roller
1313
2020th
Ebene senkrecht zur Ebene des Edelstahlbandes B
Level perpendicular to the level of the stainless steel band B
2121
Messeinrichtung
B kaltgewalztes Edelstahlband
F Förderrichtung
L Länge der Reinigungseinrichtung Measuring device
B cold rolled stainless steel strip
F conveying direction
L length of the cleaning device
44th
R Reinigungsflüssigkeit
R cleaning fluid
Claims (13)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19917561A DE19917561C1 (en) | 1999-04-19 | 1999-04-19 | Strip treatment line for metal strips, especially for high-strength stainless steel strips |
PCT/EP2000/001704 WO2000062950A1 (en) | 1999-04-19 | 2000-03-01 | Strip-processing line for metal strips, especially for highly resistant high-grade steel strips |
EP00922489A EP1171249B1 (en) | 1999-04-19 | 2000-03-01 | Strip-processing line and method for processing metal strips, especially for highly resistant high-grade steel strips |
DE20023724U DE20023724U1 (en) | 1999-04-19 | 2000-03-01 | Strip treatment line, especially for high strength special steel strip, has a liquid treatment station followed by a straightener in which the wet strip is subjected to purely bending deformation |
DE50010520T DE50010520D1 (en) | 1999-04-19 | 2000-03-01 | TREATMENT LINE AND METHOD OF TREATING METAL TAPES, ESPECIALLY FOR HIGH-STRENGTH STAINLESS STEEL TAPES |
AT00922489T ATE297271T1 (en) | 1999-04-19 | 2000-03-01 | TREATMENT LINE AND METHOD FOR TREATING METAL STRIPS, ESPECIALLY FOR HIGH-STRENGTH STAINLESS STEEL STRIPS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19917561A DE19917561C1 (en) | 1999-04-19 | 1999-04-19 | Strip treatment line for metal strips, especially for high-strength stainless steel strips |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19917561C1 true DE19917561C1 (en) | 2000-11-30 |
Family
ID=7905028
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19917561A Expired - Lifetime DE19917561C1 (en) | 1999-04-19 | 1999-04-19 | Strip treatment line for metal strips, especially for high-strength stainless steel strips |
DE50010520T Expired - Lifetime DE50010520D1 (en) | 1999-04-19 | 2000-03-01 | TREATMENT LINE AND METHOD OF TREATING METAL TAPES, ESPECIALLY FOR HIGH-STRENGTH STAINLESS STEEL TAPES |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE50010520T Expired - Lifetime DE50010520D1 (en) | 1999-04-19 | 2000-03-01 | TREATMENT LINE AND METHOD OF TREATING METAL TAPES, ESPECIALLY FOR HIGH-STRENGTH STAINLESS STEEL TAPES |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1171249B1 (en) |
AT (1) | ATE297271T1 (en) |
DE (2) | DE19917561C1 (en) |
WO (1) | WO2000062950A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10124836A1 (en) * | 2001-05-22 | 2002-12-19 | Bwg Bergwerk Walzwerk | Method and device for eliminating transverse curvatures in metal strips |
DE10328291B3 (en) * | 2003-06-23 | 2005-02-24 | Thyssenkrupp Stahl Ag | Method and device for forming metallic strips |
WO2013156316A1 (en) | 2012-04-18 | 2013-10-24 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method and device for descaling a scaled metal strip |
CN113618344A (en) * | 2021-08-27 | 2021-11-09 | 青岛春牧机械有限公司 | Processing technology for rolling and forming agricultural mechanical equipment parts |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10135743C1 (en) * | 2001-07-21 | 2002-12-05 | Sundwig Kohler Gmbh | Washing machine used for washing metal strips comprises a housing with an inlet and an outlet, devices for applying cleaning liquid to the metal strip, a squeezing device arranged |
US8707529B2 (en) | 2008-12-11 | 2014-04-29 | The Material Works, Ltd. | Method and apparatus for breaking scale from sheet metal with recoiler tension and rollers adapted to generate scale breaking wrap angles |
CN113245293B (en) * | 2021-04-23 | 2023-04-07 | 山东辛诚生态科技有限公司 | Centrifugal deep cleaning device for straw fracture part in straw fiber paddle board |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4423664A1 (en) * | 1994-07-07 | 1996-05-15 | Bwg Bergwerk Walzwerk | Process for producing cold-rolled steel strips from stainless steel and metal strips, in particular from titanium alloys |
EP0865839A2 (en) * | 1997-03-03 | 1998-09-23 | BETRIEBSFORSCHUNGSINSTITUT VDEh, INSTITUT FÜR ANGEWANDTE FORSCHUNG GmbH | Roller leveller for metal strip |
DE19749466C1 (en) * | 1997-11-08 | 1998-12-24 | Bwg Bergwerk Walzwerk | Production of rolled or cast metal strip with descaled surface, especially strip consisting of special steel and titanium alloys |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2537188C3 (en) * | 1975-08-21 | 1978-05-18 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh, 4100 Duisburg | Method and device for the production of hot strip with improved quality properties |
BE1006465A3 (en) * | 1992-12-08 | 1994-09-06 | Cockerill Mech Ind Sa | Method and installation of steel bands cleaning. |
-
1999
- 1999-04-19 DE DE19917561A patent/DE19917561C1/en not_active Expired - Lifetime
-
2000
- 2000-03-01 EP EP00922489A patent/EP1171249B1/en not_active Expired - Lifetime
- 2000-03-01 AT AT00922489T patent/ATE297271T1/en active
- 2000-03-01 DE DE50010520T patent/DE50010520D1/en not_active Expired - Lifetime
- 2000-03-01 WO PCT/EP2000/001704 patent/WO2000062950A1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4423664A1 (en) * | 1994-07-07 | 1996-05-15 | Bwg Bergwerk Walzwerk | Process for producing cold-rolled steel strips from stainless steel and metal strips, in particular from titanium alloys |
EP0865839A2 (en) * | 1997-03-03 | 1998-09-23 | BETRIEBSFORSCHUNGSINSTITUT VDEh, INSTITUT FÜR ANGEWANDTE FORSCHUNG GmbH | Roller leveller for metal strip |
DE19749466C1 (en) * | 1997-11-08 | 1998-12-24 | Bwg Bergwerk Walzwerk | Production of rolled or cast metal strip with descaled surface, especially strip consisting of special steel and titanium alloys |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10124836A1 (en) * | 2001-05-22 | 2002-12-19 | Bwg Bergwerk Walzwerk | Method and device for eliminating transverse curvatures in metal strips |
EP1275446A2 (en) † | 2001-05-22 | 2003-01-15 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method and apparatus for eliminating of gutter curvatures in metal sheets |
DE10124836B4 (en) * | 2001-05-22 | 2004-08-26 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method and device for eliminating transverse curvatures in a metal strip |
DE10124836C5 (en) * | 2001-05-22 | 2007-07-19 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method for eliminating transverse curvatures in a metal strip |
EP1275446B2 (en) † | 2001-05-22 | 2013-09-04 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method for eliminating of gutter curvatures in metal sheets |
DE10328291B3 (en) * | 2003-06-23 | 2005-02-24 | Thyssenkrupp Stahl Ag | Method and device for forming metallic strips |
WO2013156316A1 (en) | 2012-04-18 | 2013-10-24 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method and device for descaling a scaled metal strip |
DE102012103366A1 (en) | 2012-04-18 | 2013-10-24 | Bwg Bergwerk- Und Walzwerk-Maschinenbau Gmbh | Method and apparatus for crushing a scale-damaged metal strip |
CN113618344A (en) * | 2021-08-27 | 2021-11-09 | 青岛春牧机械有限公司 | Processing technology for rolling and forming agricultural mechanical equipment parts |
Also Published As
Publication number | Publication date |
---|---|
ATE297271T1 (en) | 2005-06-15 |
EP1171249B1 (en) | 2005-06-08 |
DE50010520D1 (en) | 2005-07-14 |
WO2000062950A1 (en) | 2000-10-26 |
EP1171249A1 (en) | 2002-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2119514B1 (en) | Method for straightening a metal strip | |
DE102007006810B3 (en) | Device for leveling metal strips | |
DE3234160C2 (en) | Method and hot strip mill for producing thin metal strip, in particular metal wide strip, from hot strip | |
DE19520541C2 (en) | Method and device for correcting a rolled metal strip which is bent horizontally in the strip plane, in particular a metal strip with a strip thickness of 0.5 mm to 2.0 mm | |
EP0865839B1 (en) | Roller leveller for metal strip | |
DE19917561C1 (en) | Strip treatment line for metal strips, especially for high-strength stainless steel strips | |
AT509831B1 (en) | METHOD AND DEVICE FOR MINIMIZING THE STRAP TRAIN OF A ROLL | |
DE4230243C1 (en) | Roller set for the S-shaped deflection of thin metal strips to be leveled | |
DE4323385C1 (en) | Method for eliminating transverse curvatures in metal strips, in particular thin metal strips up to 2.0 mm thick | |
EP2838676A1 (en) | Method and device for descaling a scaled metal strip | |
DE3636707C2 (en) | ||
EP0611717A1 (en) | Method and device for turning a running steel strip | |
DE10357622A1 (en) | Process and plant for rolling rolling stock | |
DE4024794C2 (en) | Process for straightening metal strips | |
DE10124836B4 (en) | Method and device for eliminating transverse curvatures in a metal strip | |
EP1025918B1 (en) | Method and installation for forming metal strip | |
DE2830890C2 (en) | Process for lengthening hot-rolled round wire with an initial diameter d ″ of up to 20 mm, for example, with a carbon content of 0.1 to 1% by high-grade cold forming, and a device for carrying out the process | |
EP1454681A3 (en) | Device and method for rolling metal strips | |
DE20023724U1 (en) | Strip treatment line, especially for high strength special steel strip, has a liquid treatment station followed by a straightener in which the wet strip is subjected to purely bending deformation | |
EP1167258A2 (en) | Band accumulator for metal bands, especially spiral looper for thick steel bands | |
DE4113876C1 (en) | ||
DE4124800A1 (en) | METHOD FOR TREATING METAL BANDS, ESPECIALLY HOT-ROLLED METAL BANDS IN THE INLET PART OF A CONTINUOUSLY CONTINUOUS STICK LINE | |
WO2004054731A1 (en) | Coiler device for rolled strip | |
DE19809444B4 (en) | Method for tension-free transporting of a belt and corresponding transport path | |
EP1051269B1 (en) | Device for aligning a band, especially a metal band |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of patent without earlier publication of application | ||
D1 | Grant (no unexamined application published) patent law 81 | ||
8364 | No opposition during term of opposition | ||
R071 | Expiry of right |