DE1932667U - COMPONENT SET FOR A MOVEMENT. - Google Patents

COMPONENT SET FOR A MOVEMENT.

Info

Publication number
DE1932667U
DE1932667U DE1965SC039060 DESC039060U DE1932667U DE 1932667 U DE1932667 U DE 1932667U DE 1965SC039060 DE1965SC039060 DE 1965SC039060 DE SC039060 U DESC039060 U DE SC039060U DE 1932667 U DE1932667 U DE 1932667U
Authority
DE
Germany
Prior art keywords
bridge
movement
component set
crossings
connections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1965SC039060
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
J H SCHMITZ SOEHNE GmbH
Original Assignee
J H SCHMITZ SOEHNE GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by J H SCHMITZ SOEHNE GmbH filed Critical J H SCHMITZ SOEHNE GmbH
Priority to DE1965SC039060 priority Critical patent/DE1932667U/en
Publication of DE1932667U publication Critical patent/DE1932667U/en
Priority to BE680609D priority patent/BE680609A/fr
Priority to NL6608640A priority patent/NL6608640A/xx
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Steps, Ramps, And Handrails (AREA)

Description

11 Bauelemente für Überwege w 11 components for crossings w

Es ist "bekannt, Brücken und Überbrückungen für !Fußgänger, Radfahrer, usw. aus verschiedenen Teilen zu errichten» Als Konstruktionselemente kommen dabei vornehmlich 3 Einzelelemente infrage:It is known "bridges and bridges for! Pedestrians, cyclists, etc. to be built from different parts »As construction elements there are mainly 3 individual elements:

Die Brücke, das Podest, die Treppe oder Rampe» Bekannt ist fernerhin, diese Teile zu kombinieren. Zur Aufstellung dieser Überwege sind die am Einsatzort vorliegenden Platzverhältnisse sehr maßgebend. Da diese recht verschieden und meist sehr knapp sind, muß die Form des Überweges diesem Platz jeweils angepaßt werden. Außerdem müssen Auf- und Abgänge sich den jeweiligen Verkehrsrichtungen anpassen. Die Forderung, solche Brücken schnell aufstellen zu können und sie für eventuelle Einsätze auf einem Lager vorrätig zu halten, um sie bei Bedarf schnell zu montieren, bringt neben der Forderung auf einfachste Montage zwei weitere Forderungen mit sich« Wenn man nicht zu viele Typen auf Lager halten will, muß man 1. dafür sorgen, mit möglichst wenig Elementen möglichst viele Formen entsprechend der Platzverhältnisse herstellen zu können, 2. darf man keine aufwendigen Fundamente verwenden. Diesen drei Forderungen tragen die Bauelemente für Überwege der nachfolgenden Erfindung in neuem und besonderem Maß Eechnung, Sie bringen damit entscheidende wirtschaftliche Vorteile gegenüber den bisher bekannten Kons trukti onen„The bridge, the pedestal, the stairs or the ramp. to combine these parts. To list these crossings are the The space available at the place of use is very important. This one are quite different and mostly very scarce, the shape of the crossing must be adapted to this place. In addition, up and Exits adapt to the respective traffic directions. The requirement to be able to erect such bridges quickly and to be able to use them for eventual Keeping inserts in stock in order to assemble them quickly if necessary brings two things in addition to the requirement for the simplest assembly further demands with it «If you don't have too many types in stock If you want to hold, you have to 1. make sure that there are as few elements as possible to be able to produce as many shapes as possible according to the available space, 2. one must not use complex foundations. This one The components for the crossings of the following ones bear three requirements Invention in a new and special way Eechnung, you bring with it decisive economic advantages compared to the previously known constructions "

Jeder Überweg kann aus 3 Elementen hergestellt werden. Das erste ist nach Abbildung 1 Figur A das Brückenteil mit Stützen, Geländer und Laufbahn als Fertigteil mit den lormanschlüssen Abb„ 1 A 1 an den Enden, Das zweite Element sind Podeste Abb, 1 C, ebenfalls mit Geländer und Laufbahn als Fertigteil mit allseitigen lormanschlüssen Abb, 1 C 1. Das dritte Element sind Treppen nach Abb, 1 B mit Wangen, Stufen und Geländern als Fertigteile und den Hormanschlüssen Abb. 1 B 1 an beiden Enden.Each crossing can be made from 3 elements. The first is According to Figure 1 Figure A, the bridge part with supports, railing and runway as a prefabricated part with the Lorman connections Fig “1 A 1 to the Ends, the second element are pedestals Fig, 1 C, also with Handrail and runway as a prefabricated part with lorry connections on all sides Fig. 1 C 1. The third element are stairs according to Fig. 1 B with stringers, Steps and railings as prefabricated parts and the horizontal connections Fig. 1 B 1 at both ends.

Die Fundamente für die Stützen der Überwege Abb. 1 A sind ähnlich wie Abstützungen an Autokranen in Form von Grundplatten Abb. 1 A 2 mittels Spindeln Abb. 1 A 3 entsprechend den Bodenverhältnissen anstellbar.The foundations for the supports of the crossings in Fig. 1 A are similar such as supports on mobile cranes in the form of base plates Fig. 1 A 2 adjustable by means of spindles Fig. 1 A 3 according to the soil conditions.

Die lormanschlüsse sind so gehalten, daß sie für alle möglichen Kombinationen von Brücken, Podesten und Treppen passen. Abb. 1 B zeigt eine Kombination, bei der in gerader Linie rechts und links an die Brücke A jeweils eine Treppe B5 ein Podest 0 und wieder eine Treppe B angebaut sind»The lorries are designed to fit all possible combinations of bridges, platforms and stairs. Fig. 1 B shows a combination in which a staircase B 5, a landing 0 and again a staircase B are attached in a straight line to the right and left of the bridge A »

Abb ο 3 zeigt 5 daß durch Übereinandersteilen von 2 Podesten 3 C, anschließend an die Brücke Abb» 3 A, die laufbahn der Brücke um die Podestbreite verlängert wird und so wegen des rechtwinkligen Treppenabgangs von der Verlängerung aus, wie Abb.. 4 zeigt, eine besonders schmale Bauform des Überweges erreicht wird.Fig ο 3 shows 5 that by stacking 2 platforms 3 C, next to the bridge Fig »3 A, the track of the bridge is extended by the width of the platform and so because of the right-angled staircase from the extension, as Fig. 4 shows, a particularly narrow design of the crossing is achieved.

Darüber hinaus lassen sich auch wie Abb. 5 zeigt, 2 Treppen Abb. 5 B direkt ohne Podest zusammenfügen. Weiterhin lassen sich nach Abb. 6 auch 2 Brückenteile Abb. 6 A nebeneinanderstellen,und damit wird die doppelte Brückenlänge erreicht.In addition, as Fig. 5 shows, 2 stairs Fig. 5 B assemble directly without a pedestal. Furthermore, according to Fig. 6 also place 2 bridge parts Fig. 6 A next to each other, and with that the double bridge length achieved.

Stöße an den Trennstellen der Konstruktion entstehen lediglich am Handlauf der Geländer. Dieser wird durch beiderseits aufgeschobene Plastikverbindungen überbrückt. Alle anderen Stöße sind EOrmverbindungen, die jederzeit passen. Aus Abb. 7 sind einige Kombinationsmöglichkeiten der Bauelemente für 'Überwege zu erkennen, insgesamt gibt es 28 mögliche und sinnvoll anwendbare Kombinationen.Joints at the dividing points of the construction only occur on the handrail of the railing. This is postponed by both sides Plastic connections bridged. All other joints are EOrm connections, that fit at any time. Fig. 7 shows some possible combinations of the components for 'crossings to be recognized, there are a total of 28 possible and usable combinations.

Claims (1)

RA. 626 8 2 4* 30,1ί. 65RA. 626 8 2 4 * 30.1ί. 65 J„Η.SCHMITZ SÖHNE GMlH.J "Η.SCHMITZ SÖHNE GMlH. l.)l.) ι,. Abb. 1 S# wd ßesäesite. Abb-, 1 C 3 Elemente ©is Par^gteSS© ay^ebSMei·ι ,. Fig. 1 S # wd ßesäesite. Fig-, 1C3 elements © is Par ^ gteSS © ay ^ ebSMei · ©s© s I·)I ·) bb. 1 Abb. 1 A SÖHNE GiVlH.SONS GiVlH. Ίβ·Κί*ίνβ JU «te« pb-f'CfiSfi fie(.en oeliejörtΊβ · Κί * ίνβ JU «te« pb-f'CfiSfi fie (.en oeliejört
DE1965SC039060 1965-10-07 1965-10-07 COMPONENT SET FOR A MOVEMENT. Expired DE1932667U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE1965SC039060 DE1932667U (en) 1965-10-07 1965-10-07 COMPONENT SET FOR A MOVEMENT.
BE680609D BE680609A (en) 1965-10-07 1966-05-06
NL6608640A NL6608640A (en) 1965-10-07 1966-06-22

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1965SC039060 DE1932667U (en) 1965-10-07 1965-10-07 COMPONENT SET FOR A MOVEMENT.

Publications (1)

Publication Number Publication Date
DE1932667U true DE1932667U (en) 1966-02-17

Family

ID=7434977

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1965SC039060 Expired DE1932667U (en) 1965-10-07 1965-10-07 COMPONENT SET FOR A MOVEMENT.

Country Status (3)

Country Link
BE (1) BE680609A (en)
DE (1) DE1932667U (en)
NL (1) NL6608640A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3308556A1 (en) * 1983-03-10 1984-09-20 Roland 7036 Schönaich Gabert Pedestrian bridge and assembly bridge for shafts, assembly holes and cable ditches

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3308556A1 (en) * 1983-03-10 1984-09-20 Roland 7036 Schönaich Gabert Pedestrian bridge and assembly bridge for shafts, assembly holes and cable ditches

Also Published As

Publication number Publication date
NL6608640A (en) 1967-04-10
BE680609A (en) 1966-10-17

Similar Documents

Publication Publication Date Title
DE202014011579U1 (en) Track system for an amusement ride, in particular for a roller coaster or monorail
DE1932667U (en) COMPONENT SET FOR A MOVEMENT.
DE2702005C3 (en) Water slide for people
DE3823850A1 (en) High building
DE3243785C2 (en) Staircase with a handrail in an arch
DE3635091C1 (en) Blocking-off railing
DE442080C (en) Bump-free track
AT229001B (en) Concrete stairs
DE2052107C3 (en) Dismountable bridge
DE1965533A1 (en) Chassis of a motor vehicle with a central support tube
DE406870C (en) Wheel arrangement on turntables and transfer platforms
DE3200032A1 (en) Stairway made of three-dimensional modules
DE202017003948U1 (en) Transportable bridge
DE7716020U1 (en) SUPPORT FOR ELECTRIC HEATING RODS WITH CONNECTOR HEAD IN SWITCH
AT295112B (en) stairway
DE7825360U1 (en) HEIGHT-ADJUSTABLE BUILDING FLOOR
DE29605949U1 (en) Urban (topographical) model building in segment construction
DE1484314A1 (en) Multi-layer outer wall
DE8102257U1 (en) STAIRWAY
DE1478355A1 (en) Bridge girders or ramps for bridges for model and toy trains
DE1296100B (en) Conveyor channel with guide cheeks
DE1973106U (en) RUBBER SEALING PROFILE FOR PRECAST CONCRETE WALLS
DE8703680U1 (en) Ramp element for model buildings
DE1988546U (en) TRACK SUBSTRUCTION FOR RAIL SYSTEMS OF MODEL RAILWAYS.
DE6931694U (en) HANGING DEVICE FOR CEILING LIGHTS