DE1784012A1 - Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and - Google Patents

Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and

Info

Publication number
DE1784012A1
DE1784012A1 DE19681784012 DE1784012A DE1784012A1 DE 1784012 A1 DE1784012 A1 DE 1784012A1 DE 19681784012 DE19681784012 DE 19681784012 DE 1784012 A DE1784012 A DE 1784012A DE 1784012 A1 DE1784012 A1 DE 1784012A1
Authority
DE
Germany
Prior art keywords
rock
similar
combination
binders
gas pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19681784012
Other languages
German (de)
Inventor
Detlev Dipl-Ing Schirwitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE19681784012 priority Critical patent/DE1784012A1/en
Publication of DE1784012A1 publication Critical patent/DE1784012A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Sealing Material Composition (AREA)

Description

von ver.#-ittcnuen und aichtenuen Bindemitteln mit ii.ari=Lelsiäbli:@L@en :jpr;.ngsto:-i'en oder @nder;:n ihnlic:hen, @_u3'zizei tg_g Gasruck erze*ugenden Treibmittuln zw(:eks Jtus- fi.i-iirL;ng st-DI3arziL-er Injei;.tionen Ir@ Ger'ri#Uufte- t,:n -Lind )oröstri Gesteinen o«er cüinlic:@Len -aterialien von 1@o=3rlöo_=;:rn uncE. @Lnv@% er@W::nysY eb:1 r-t : soll int Tun -elbau, ii- Bergb,u, in Steinbruch- bet-ri(,4b::n iuid in -uubetr i erben ver.@enf)e-t @=ieruen, in denen ein ferner bei Reparaturen an ge- rissenen :@LU..eT'en unLt dort, wo Loeh:erboden .anstellt. Zudem -n,ter'e ::ebieLe @jenn ein irinliciies -ateri-a zu und :f;u dichten iot. Z@yec@@: Jer GL:saruck :@es üetonieren:aerl .;prerigstofes oder wnderer in @:rzeugenüer ..iittel - beide im "Tr:ibicic tel" genannt - soll das Binaeitiittel, sicä :::i-t :"te::_ '-iirc=ib-=ii-ttel zusa._: ,en in demselben vor- bee:-citet::n@Lu:2 (Bohrloch o..) des zu behanaeßAden Materials befin,iet, in offen lie@en,@e .wisse, Klüfte arid Poren dräcken, soddB :.xie Biiiaeci<ittel irulewohnenden, dann aktivierten .::dh:-siveri nr;.ifte die ;furch die lRi;,se getrennte Gesteinsteile ve:r ::i tten -und auch in ,jen feineren Gesteinsporen bewirken. jie a;i, goren us:@. @cv:,nen von i"latur aus rae@;:.:bs:n -z#triutehen, ien --:her :auch iia Augenblick- vier veto- ri=zL Lon eines Treibaittels erze:u!:t ,fr@oruen. per @ruc@der -xt@:kosionsLLt:3e ue;3 -L2mges--tzten @.'reibmittels eioll gleichzeitiL Ait de:.i Her.-:usbrecti(-:n Ües Geste: ins (z.i3. in iuLSätelv:)rtrieb) dLe: goren usw`1 weiter reic;@i=:.-rr.ie U@L;;esbunA hine.I1i, ,11:ä der ;°usbruch hergestellt wird, ver;:-leb:n e::rt,i äJ:iiit fei, `.;t@@ndfes-tigkeit der den umgebenden Geu tainszonen herstellen bzw. er- soll i;.- aasgebrochenen Gestein eine un- ;:r'?;._n:;-@t@te vermindert und die 1-1; tubbild-ung :@.:r=,.btre3:ts.t .;ez#üen. 'c:ra@@r.: ;- fen da;siit in :,tefe;ktera i@iauc:rwe;rk oder Beton von Bauraerken in glui;;licr Jei;-ie ver:.-ittet und da«iit (:1S Bail.- .;:@rk re@[email protected]..:rt. Kombination w -r-:.ieri "z,ußerrden. Zooicerböcleri u.itd Ver- wi R. terilruAgunut s t-:-ricle:st r;emacht utia fauch andere ver4Iandt Materialien ähnlicher Ausbildung verfz- sogt und ver..#icii-;at. Zugleich ,wird eine Dichtung gegen zufließende -,iäs;jer (e;@::ho.f- fen. Unten' Umständen kann eine gewisse cxasdich"tig!#7l#it er- reicht werdün. Rand fier `; eciinik: Rissige und .iclüftige Gesteine sind nach ihrer @rcile._,-.ulg zur freien Fläuhe hin wenig standfest unu neigen teils sof::rt, teils später zu kusbr;iehen von :;esG@insst@@clien, ti@ v _rie GE°- fahr für die Belegs-ririft d@ir:@ Zellen und bei brölJe rL;i @@ Lnbril- chen inful_;e xi)-t,vorräi`,er Reparatar eril.@bll.;iie ;:o5cer@ suchen. Die begrenGz#n,.@;3n eines 1'uTL'tels 0.ä. 'r-@:@"!'aen lJ.is- her nach dem ;iusbrecricn und x'reile@en ;:es neuere Ei nbrine;en e.-nes stützenden@lsb,ues, :..ier @.US Materialien bes-,jenem _.-1_LLin, und evti. @[email protected]._@ier In je:;t io_ o.ä. Jem -lusbrec.ren vorausgreifende Injekti.,nen - eins: @.n:@üri-lethode - kon@i@:.:ä@ nur iii einem besonderer- @lrbeit;@;l.ng, der dCrly normalen Fort an g uni- erbr2#ch, mit Hilfe besoziderer durch bcsonciers ausgebildetes Perk1Jn@!.l erhebliche. iosten:.#Luf@:vand erledigt -.":er--ten. Jie.daserdichti! LE:#it bzvr. die regulierte kann nur ait Hilfe <<:es:@n;lert auf--- und einbebrachter Dich- tungsmaterialien erriciit werden. Eine 'x@isabdicl2-tun@ zu errei;:@i,n wurde bisüer d-urc:i n @sli_rg- liches Aufbrinhcii Einpressen dicht,-n,.er sucht. ='ritik des St@nides der uchnik: Die Methode des ;-5t@itzens der Ausbru@hsflUciieri durch c:irieii bau beKannter Art ist zeitraubend und erfolst insofern Zu spät, als es ni-'ht verliiridert rvtxaeii kann, däß bis d;Li:iri Gestein irifol:@@: vorhandener bisse, Klüfte, äedimen"t-2.tiDiis- flächen usw. zwischenzeitlich here=inbricht. Dazu ko t, da:.; der detonier;:nde Sprerli;stoff 'pur dzts stehenbleibende Gestein rissebildend einwirkt und daliiit die Standfe. tigkeit der r@-yuiji- begrenzenden Zonen wesentlich herabsetzt. Der Kostenaufwand für den Ausbau ist die Untersttitzu:ig duz-ch ihn nie so vollko@;:=tien, daß ein wei- teres eigenst;ndiges Lösen des Gesteines, dis zur dberbe;ui- spruühung des tiuebaues und zu seinem :Bruch führen kann, unter- bunden wird. Die Methode des vox-uusgreifen:ien Verfestigens des anstehen- den Gebirges h"st den großem l#auiiteil, duß sie für lenL,e Zeit den noriricalen @rbc@its;:@.n;- un-cerbri;:ht, da zwecks HEr- stellens der ßohrläe:licr eine besondere Kannsuhaft einzu- setzen ist, speyielle Liascainen installiert :,erden müssen uiic somit erhebliche Nebenkosten entstehen. Das hnbrinfen bvw. Finbrin@:en wasserabdichtender Materialien kann bisher #zuch nur erst nachträg--ich erfolgen und erfor- dert spekiielle, mit zus"zlichen mosten verbundene Arbeits- vorginge. Die AbdichtLuig geen uner w#(;nschte Gase koL@lite bisher glEich- f--ills erst nachträälich erfol##:en und erforderte zusätzliche, kostenbringende Arbeitsvorg,-..nge. Der ::ri @lg war meist des- h...sb gering., weil die Vereinigung des gasdichtenden nit dem zu Ciichtenden Material müht vollko :@:_-ien war. Die Fein.täckigkeit ist oft mengenmäßig zu hoch und bringt Schwierigkeiten bei den Verleidevorgängen des Haufwerhes. Die Bildung von gesundheitschädlichem Gesteins-caub ist bis- her erheblich und erfordert zur Unterbindung besondere Auf- wendungen. Auf .:.ixe: Zs ist die Aufgabe der Erfindung - das den Raum begrenzende Gestein durch Verkitten der natürlichen und aer durch die Detonation des &äpreng- stoffes oder Treibmittels erzeugten Risse, 11.-lüfte, Po- ren usw. iüi voraus bzw. gleichzeitig mit dem_ Heraus- brechen des Ges t:-;ins so zu behandeln, daß die den neuen Raum begrenzenden Gesteinszonen sofort ausreichende - Stt.@ndfestigkeit bekommen, viodurch eine yv:.itere Unter- Stützung dure;i, einen Ausbau weitgehend bzw. überhaupt entfallen karui, - die Gefahrenquelle eines Steinfalles auszuschalten, - die Verg°ü.tung der Ausbruchsflächen ohne besonders gro- ßen Material- und Arbeitsaufwand durchzuführen, - den Einsatz von besonderem Personal und spezieller Ma- schinen zu vermeiden, - unerwünschte Wasserzuflüsse und Gaszutritte zu unter- binden bzw. zu regulieren, - die Feinstückiekeit des ausgebrochenen Gesteins zu ver- rindern, - die Bildung Yon gesundheitsschädigendem Gesteinsstaub schon in ku,,g$r.p2h_völ,gang_ zu uuiterbinden. Lösung: aas Bindemittel wird in die Bohrlöcher, die zur lufii.,@iinie des Sprengstoffes oder des Treibmittels sowieso hergestellt we-r- den, so eingebracht, daß es den späteren raumbegrenzenden Gesteinszonen zunächst liegt (siehe Abb. 2). Ls :vizd z.B. bei den inneren Löchern eines Abschlages im Tumlel- oder x)trecken# vortrieb zum Bohrlochtiefsten hin eingesetzt und in den Lö- chern des-Kranzes so verteilt, daß das -unter Druck gesetzte Bindemittel in die Risse, Klzfte, Poren us". a.er Gesteins- nachbars;:ris.ft einwanc.Lrn kann:. Bei einseitigem Freilegen von Flächen ist das Bindemittel entsprechend wie bei den löchern des Kranzes e.inzusutzen. Das Bindeüiiitel selbst wird in Form einer Paste, in !.leinen zerdräckbaren Behältern mit der Größe des Boi-irlochdul°cimies- sers oder auch ähnlich in fester Form eingesetzt. Jer druck herrUhrend aus der- Umsetzung des Treibi:iittels dr [email protected] das Binde.ittel in die natürlich freiliegenden öder ent- standenen Risse und sonstige Räume hinein und vcrf,:.-i:ip@t so- it schon während des Ausbrechvorg-,,nges die stehenblf:_ib("nucn, raumbegrenzenden Gesteinszohen, wohei die `idtiäsiüns@-r#'l.te .-)ef, Bindemittels aktiviert werden -und @.iic beiderseits eines Risses o.ä. niteinan--:er ver _i-@@teü. ic: an jetzt und beson.@@_ers bei dem ciU.=Jzltigen Erh".rten ie- mittels in den Rissen der -z--:L'ist ein wt:J.iidfe- Gewölbe im Gestein selbst gebilkiet, welciits vorläufigen, sa-ter einzusetzenden Au-bau bel@«n@~zte1:.r°t er- setzt. deitere Ausgestaltung der Erfindung: Die Kombination eines Bindeiüitt@ls mit einen '1'r -:ib i1.1: @1 kann zur Reparatur zerbrochenen t«auerwerks undez°i;@@e:r:.r:r Betonbauten zur- Schlie2un@ von :Iii ssen mit Dein: -ic@l ver@xc,#n- det werden, die getrermten i.aterialstdüke uicü die onskräfte des eingepreßten Binuemittels in s;@,-ztisciicr iiin- sicht wieder zu vereinigen. Die gleiche Kombination kann ferner zur Ver f,_ s-@i;_,ung locker anstehenden Bodens, verwitterten Gesteins, i;luft"Lusfülluli`-,en ' o.ä. verwendet werden. Durch das Eindringen des _Biiidemittels in die ' offenen Räume ' der Risse, r@hü.ft@e, Poren usw. im Gestein @@°@:@°@<en (y ic_@se aus--E- füllt und wasserdicht, gegebenenfalls auch ,4;asaiehtend ver- schlossen. Das Ableiten uuu' .@äss@:l.' bzw. äc.z ca-Lzse:.kann inuiiae@iii, plaiunäßig erfolgen. Beschreibung inehrerer Ausf#tihrungsbeispieles 1. Ge:qxß Abbild:uig 1 ist in Bohrlö-hern, wie sie in Übli- cher :reise im Tunnelbau, Bergbau, Steinbruchbetrieb usw: hergestellt werden, das Binüemittel in Kombination zu- saaL-ien wit einem handelsüblichen Sprengstoff eingebracht. Dabei ist die =Kombination Bindeuri G' tsl-Sprengs soff in der Form und in vier Mengenverteilung variabel. Das Bindemit- tel kann Bnärlochtiefsten eingesetzt werden, es kann auch zwischen den Sprengstoffpatronen eingefügt sein, es karin den Sprengstoff umhüllen usw.. Die Menge des Binde-- mittels im Bohrloch richtet sich nach der Volumengrüße der zu verkittenden Räume im Gestein, braucht aber nicht genau dosiert zu werden, da der Überschuß der Bindemittel- menge die Gesteinsoberfläche überziehen oder auch in das ausgebrochene Gestein entweichen und hier eine unerwiinsch- te Feinstückigkeit und Staubbildung-vermindern kann. 2. Die Abbildung 2 verdeutlicht den Einsatz und die Wirkungs- weise der Bindesnittel-Sprengstoff-Kombination in Bohr- löchern zur -'_'erc:in.-,ewirmung eines Abschlages beim Tunnel- oder Streckenvortrieb. Die schraffierte Zone ist die, de- ren Risse aus dein Bohrlochtiefsten her durch das Binde- mittel verrittet werden. Die punktierte Zone ist die, die nach de:a Ausbrechen des Gesteines als vergüteter, stand- fester Mantel um den neu geschaffenen Ramä herum zugleich was sei- und gasdichtend verbleibt. 3. In Abbildung 3 ist eine nachträgliche Verfestigung zer- brochenen Mauerwer.ies und Betons skizziert. Hierzu wird ein Bohrloch derart in d::@s zu sanierende Material ge- bohrt, daß es die vorhandenen Risse schneidet. Das Binde- mittel wird durch das Gasvolumen des Treibmittels, wie oben beschrieben in den Riss hineingedrückt, sodaß bei- de itiater ixl-t- i.le durch cl ie Jirkunder Adhäsivkräfte wie- der verbunden .erden. Dieselbe Methode karre zum nachträglichen Verfestigen von Gestein vom Tunnel- bza. Streckenraum her angewendet wer- den. 4. Gemäß Abb. 4 ist ein Locxqrboden z.8. einen Baugruben- randes zu verfestigen. Hierbei ist in den Bohrlöchern I cuid TI jeweils "a" das Treibmittel (md "b" das Bindemit- tel, üeloheo durch den Gandruek des Treibmittels in die Poren uen Loukerbodens getrieben wird und somit eine Ver- fe:itis;ung seiner tAatc:rialteile erzielt. 5. Ähnliche ',firkungen einer Verfesti;ung oder "V@erlei-:iiuig lassen sich auch in anderen losen, gestsnichteten uria zer- klUfteten Materialien erzeugen. @ugleiuh wird in den obigen Beispielen eine was@-,er- -und gas- dichtende Jirkung erreicht. # Erzielbare Vorteile: Bei Anwendung im Beispiel Abb. 2 (Tunnel- und Strec,-renvor- trieb) wird gleichzeitig ci<it dem lusbrechvorg-lng eine all- zeitig standfeste Gesteinszone :iili stehenbleibenuen Gesteins- mantel gebildet, die das bisher notwendige .abtreiben her- abhängender Gesteinsstücke und die Er-tellung eines zu,iin- dest vorläufigen Ausbaues nach dein Ausbrechen erUbri,t. Bei- de Arbeitsvorgänge umfassen ca 20 - 30@ der Gesarata.rbeits- zeit beim Hereinholen eines Abschlages. Außerdem wird die Unfallgefahr durüh Steinschlag erheblich gefaindert bzw. ausgeschaltet. Der verfestigte Gesteinsmantel kann gegebenenfalls auch einen endgUltigen Ausbau ersetzen. Gemäß Abb. 3 ist der Aufwand an Zeit und Material bei der Re- paratur von gerissenem idauerwerk und Beton sehr niedrig. Nach Abb. 4 ist die Erhöhung der Standfestigkeit von Locker- böden oder Verwitterungszonen mit geringem AufviL#nd Bai Geit und Material möglich. Mit dei:i Einoatz der Kombination Bindeiuibtel--.@reibai-ctel wird der Arbeitsvorgang des Auf- bzw. Einbr.ngens was; er- dichtender bzw. gastsichtender LIa-terialien erspart bzw. für nachfolg: nde besondere yichtungsarbeiten lcostensoar"nd vor- bereitet. Eine zu .große Feinstüekigkeit des ausgebrochenen Haufwer- kes verursacht wegen B@@hin(lerimg des Verl::ide-,[email protected],@rt- und Entladevorgängee, sowie des @:)-tapelns erhebliche losten, die ein vergröbertes H:@ufr@,.:rk nicht hat. Die Gesteinsstaubentwicklung ist bekanntlich saht qeSund- heitrsehädigend und verursaoht erhebliche Kosten für seine Unterbindung ixnd flilhie Beseiti -ung der Schäden. Ihre Ver- meidung bzw. Verminderung schon während des AusbrechvorL;@ui- ges wird [email protected] Einsparun -,en Lait sich bringen. Insges..ilat gesehen ist zusiitzlioh nur eine gewisse 2,:eiige an Bindemitteln einzusetzen. :Eine besondere .tlusbildt.tii-, dex- iie- legachaft bzw. ihr ßr2üta durch bpe:L;ialkr4fte 3.5t nic;lit not- wendig. Die maschinelle =lusrUstung bleibt dieselbe wie bis- her. Jie [email protected] dosten sind erheblich ge- ringer .-:1s bei den bishurit;#_ri kethoaen. of ver. # - ittcnuen and alien binders with ii.ari = Lelsiäbli: @ L @ en: jpr; .ngsto: -i'en or @nder;: n himlic: hen, @ _u3'zizei tg_g gas pressure erze * ugenden propellants between (: eks Jtus- fi.i-iirL; ng st-DI3arziL-er Injei; .tionen Ir @ Ger'ri #U ufte- t,: n -Lind) oröstri rocks o «er cüinlic: @Len -materialien von 1 @ o = 3rlöo _ = ;: rn uncE. @ Lnv @% e r @ W :: nysY eb: 1 rt: should int Tun -elbau, ii- Bergb, u, in quarry- bet-ri (, 4b :: n iuid in -uubetr i inherit ver. @ enf) et @ = ieruen, in which a also for repairs to rissenen: @ LU..eT'en unLt where Loeh: erboden. hires. In addition -n, ter'e :: ebieLe @jenn a irinliciies -ateri-a z u and: f; u dense iot. Z @ ye c @@: Jer GL: saruck: @es üetonieren: aerl.; Prerigstofes or wnderer in @: rzeugenüer ..iittel - both im Called "Tr: ibicic tel" - is supposed to be the sicä ::: it: "te :: _ '-iirc = ib- = ii-ttel together_:, en in the same previous bee: -citet :: n @ Lu: 2 (borehole o ..) of the material to be treated befin, iet, in let @ e .know, fissures arid press pores, soddB: .xie Biiiaeci <ittel irule residents, then activated . :: dh: -siveri no; .ifte die; for the lRi;, se separate rock fragments ve: r :: i tten -and also in those finer rock pores cause. jie a; i, goren us: @. @ cv:, NEN from i "lature rae @;:.: bs: n -z # triutehen, ien -: her: also iia moment- four veto- ri = zL Lon of a driving agent ores: u!: t, fr @ oruen. per @ ruc @ der -xt @: kosionsLLt: 3e ue; 3 -L2mges - tzten @. 'abrasive eioll at the same timeiL Ait de: .i Her .-: usbrecti (-: n Ües gesture: ins (z.i3. in iuLSätelv:) rtrieb) dLe: goren etc. reic; @i =: .- rr.ie U @ L ;; esbunA eing.I1i,, 11: ä the; ° outbreak is established, ver;: - leb: ne :: rt, i äJ: iiit fei, `.; t @@ ndfes-tigkeit der den create or create the surrounding Geu tains zones should i; .- broken rock an un- ;: r '?; ._ n:; - @ t @ te decreased and the 1-1; tubbild-ung : @ .: r = ,. btre3: ts.t.; ez # üen. 'c: ra @@ r .:; - fen da; siit in:, tefe; ktera i @ iauc: rwe; rk or concrete von Bauraerken in glui ;; licr Jei; -ie ver: .- ittet and da «iit (: 1S Bail.- .;: @ rk re @ f @ a.r3 ..: rt. Combination w -r -:. Ieri "z, uterrden. Zooicerböcleri u.itd ver wi R. terilruAgunut s t -: - ricle: st r; emacht utia fauch other ver4Iandt Materials of a similar training, delayed and ver .. # icii-; at. At the same time, a seal against inflowing -, iäs; jer ( e; @ :: ho.f- fen. Below 'circumstances, a certain amount of cxasdich "tig! # 7l # it he enough will be. Edge fier `; eciinik: Cracked and ventilated rocks are, according to their @rcile ._, -. Ulg zur in the open space not very stable and sometimes tend to sof :: rt, partly later to kusbr; iehen from:; esG @ insst @@ clien, ti @ v _rie GE ° - drive for the receipt ririft d @ ir: @ cells and at brölJe rL; i @@ Lnbril- chen inful_; e xi) -t, vorräi`, er Reparatar eril. @ bll.; iie;: o5cer @ looking for. The limit # n,. @; 3n of a 1'uTL'tels 0.ä. 'r - @: @ "!' aen lJ.is- her after the; iusbrecricn and x'reile @ en;: it newer Ei nbrine; en e.-nes supportive @ lsb, ues,: .. ier @. US Materials bes-, that _.- 1_LLin, and evti. @ us @ .tz.Li ._ @ ier In je:; t io_ or similar Jem -lusbrec.ren anticipatory injections, nen - one: @ .n: @ üri-lethode - kon @ i @:.: Ä @ only iii a special- @work; @; l.ng, the dCrly normal fort at g uni-err2 # ch, with the help of socider Perk1Jn@!.l trained by bcsonciers substantial. iosten:. # Luf @: vand done -. ": erten. Jie.daserproofi! LE: #it or vr. the regulated can only help <<: es: @n; learns --- and brought in seal- management materials can be obtained. An 'x @ isabdicl2-tun @ to achieve;: @ i, n was bisüer d-urc: i n @ sli_rg- Liches Aufbrinhcii pressing tight, -n, .er seeks. = 'ritic of the St @ nides of the uchnik: The method of; -5t @ itzens der Ausru @ hsflUciieri by c: irieii Construction of the known type is time-consuming and is therefore too successful late, when it can not be lost, that up to d; Li: iri Rock irifol: @@: existing cracks, fissures, aedimen "t-2.tiDiis- areas etc. in the meantime here = inbricht. In addition, because:.; the detonator;: nde Sprerli; stoff 'pur dzts standing stone acts to form cracks and daliiit the standfe. activity of the r @ -yuiji- delimiting zones is significantly reduced. The cost of the expansion is the support to: ig duz-ch him never so fully @;: = tien that a white more independent loosening of the rock, dis to overbe; ui- spraying of the tiuebaues and its: rupture can lead to, under- is bound. The method of vox-uusgrip: ien consolidation of the pending the mountains have the big part, duss them for lenL, e Time den noriricalen @ rbc @ its;: @. N; - un-cerbri;: ht, there for the sake of setting the earl is set, special Liascainen installed:, uiic need to ground thus there are considerable additional costs. Bring bvw. Finbrin @: en waterproofing materials so far #zuch can only be done retrospectively - I do and require special labor, which is associated with additional costs went ahead. The sealing liquid geen unwanted gases koL @ lite so far the same f - ills only succeed afterwards and required additional, cost-generating work processes, - .. nge. The :: ri @lg was mostly the- h ... sb low. because the union of the gas-tight nit the to Ciichtenden material struggles Vollko: @: _- ien was. The delicacy is often too high in terms of quantity and is beneficial Difficulties in the process of disguising the crowd. The formation of harmful rock caub is up to considerable and requires special measures to prevent turns. On.:. Ixe: Zs is the object of the invention - the rock delimiting the space by cementing the natural and aer by the detonation of the & äpreng- material or propellant generated cracks, 11.-airs, po- ren etc. iüi ahead or at the same time as the breaking the law: -; ins to treat the new Space-delimiting rock zones are immediately sufficient - Stt. @ Nd strength get, by a yv: .itere lower Support dure; i, an expansion largely or at all omitted karui, - to switch off the source of danger of a stone fall, - the aging of the excavated areas without particularly large to carry out material and labor costs, - the use of special staff and special measures avoid machines, - to reduce unwanted water and gas inflows bind or regulate, - to reduce the fineness of the broken rock cattle, - the formation of unhealthy rock dust already in ku ,, g $ r.p2h_vö l, g ang_ to uuiterbinden. Solution: aas binding agent is put into the boreholes leading to the lufii., @ Iinie des Explosives or propellants are manufactured anyway the, introduced in such a way that it later delimits the space Rock zones initially lies (see Fig. 2). Ls: vizd e.g. at the inner holes of a tee in the tumble or x) trek # drive to the deepest point of the borehole and chern des-wreath distributed so that the -pressurized Binder in the cracks, crevices, pores etc. a.er rock neighbors;: ris.ft einwanc.Lrn can :. If surfaces are exposed on one side, the binding agent is to be used in the same way as for the holes in the wreath. The tie itself is in the form of a paste, in linen crushable containers the size of the Boi-irlochdul ° cimies- sers or similarly used in solid form. Jer pressure originating from the implementation of the propellant: i means dr c @ .- t the binding agent in the naturally exposed or cracks and other spaces inside and vcrf,: .- i: ip @ t so- it is already during the stripping process: _ib ("nucn, space-delimiting rocks, wohei die `idtiäsiüns@-r#'l.te .-) ef, Binder to be activated -and @ .iic on both sides of a crack or the like niteinan -: er ver _i - @@ teü. ic: an now and especially. @@ _ ers at the ciU. means in the cracks of -z-: L'is a wt: J.iidfe- Vaults in the stone itself, welciits provisional structure to be used later on @ «n @ ~ zte1: .r ° t puts. Another embodiment of the invention: The combination of a bond @ ls with a '1'r -: ib i1.1: @ 1 can repair broken t «auerwerk undez ° i; @@ e: r: .r: r Concrete buildings to- Schlie2un @ by: Iii ssen mit Dein: -ic @ l ver @ xc, # n- be det, the separated material thickness uicü the on forces of the pressed-in binary means in s; @, - ztisciicr iiin- view to reunite. The same combination can also be used for ver f, _ s- @ i; _, ung loosely standing soil, weathered rock, i; luft "Lusfülluli`-, en 'or similar can be used. Through the penetration of the organic substance into the 'open spaces' the cracks, r @ hü.ft @ e, pores etc. in the rock @@ ° @: @ ° @ <en (y ic_ @ se from - E- filled and watertight, if necessary also, 4; closed. Deriving u u u '. @ Äss @: l.' or äc.z ca-Lzse: .can inuiiae @ iii, be plausible. Description of several exemplary embodiments 1. Ge: qxß Image: uig 1 is in drill holes, as they are in usual cher: travel in tunneling, mining, quarrying etc: be produced, the binding means in combination to- saaL-ien with a commercially available explosive. The = combination of Bindeuri G 'tsl-Sprengs is in the Form and variable in four quantity distribution. The binding agent tel can be used as deep as possible, it can also be inserted between the explosive cartridges, it karin envelop the explosives, etc. The amount of bandage-- means in the borehole depends on the volume of the spaces to be cemented in the rock, but does not need to to be dosed precisely, since the excess of the binding agent amount of the rock surface or even in the erupted rock escape and here an undesirable te fineness and dust formation. 2. Figure 2 illustrates the use and the effectiveness way of the binder-explosives combination in drilling holes for -'_ 'erc: in .-, ewirmung a tee off at the tunnel- or tunneling. The hatched zone is that de- tears from the deepest part of the borehole through the medium to be represented. The dotted zone is the one that after de: a breaking out of the rock as tempered, steadfast solid coat around the newly created rama at the same time what remains to be and gas-tight. 3. In Figure 3, a subsequent solidification is Broken masonry.ies and concrete outlines. This is done a borehole in such a way in d :: @ s to be rehabilitated material drills that it cuts the existing cracks. The binding medium is determined by the gas volume of the propellant, such as pressed into the crack as described above, so that both de itiater ixl-t- i.le through the Jirkunder adhesive forces connected. The same method of trolley for subsequent consolidation of Rock from the tunnel or Advertising applied Haul Space ago the. 4. According to Fig. 4, a Locxqrboden z.8. an excavation to solidify the edge. Here is in the boreholes I cuid TI "a" the propellant (md "b" the binder tel, üeloheo through the Gandruek of the propellant into the Pores uen Loukerbodens is driven and thus a displacement fe: itis; ung his tAatc: rialteile achieved. 5. Similar 'firings of a solidification or' V @ suffer-: iiuig can also be broken down in other loose, cut uria create fissured materials. @ugleiuh is a what @ -, er -and gas- sealing effect achieved. # Achievable benefits: When used in the example in Fig. 2 (tunnel and stretch, -renvor- drive) at the same time ci <it the breakout process an all- early stable rock zone: iili remain standing rock- sheath formed, which drift off the previously necessary. hanging pieces of rock and the creation of a at least provisional expansion after your breakout erUbri, t. At- de work processes include approx. 20 - 30 @ the Gesarata.rbeits- time to get a tee. In addition, the risk of accidents due to falling rocks is considerable disabled or switched off. The solidified rock mantle can optionally also be a Replace final removal. According to Fig. 3, the expenditure of time and material in the re- Repair of cracked masonry and concrete very low. According to Fig. 4, the increase in the stability of loose soils or weathering zones with little overlay and material possible. With dei: i Einoatz of the combination Bindeiuibtel -. @ Reibai-ctel is the work process of bringing in or bringing in something; he- sealing or gas-sifting LIa-materials saved or for successor: nde special yichtung work lcostensoar "nd pre- prepares. Too great a degree of fine-grainedness in the broken kes caused because of B @@ hin (lerimg des Verl :: ide-, Cr @ .nsp, @ rt- and unloading processes, as well as the @:) - tapelns considerable lots, which does not have a coarsened H: @ufr @ ,.: rk. The development of rock dust is well known saht qeSund- Cheerful and causes considerable costs for his Prevention and elimination of damage. Your avoidance or reduction already during the stripping process; @ ui- [email protected] will bring savings, en lait. All in all, there is also only a certain 2,: Use binders. : A special .tlusbildt.tii-, dex- iie- legachaft or your ßr2üta through bpe: L; ialkr4fte 3.5t nic; lit not- agile. The mechanical equipment remains the same as before here. Jie inagesju @ .t dozen are considerably ringer .-: 1s with the bishurit; #_ ri kethoaen.

Claims (1)

Patelita.iisj)rii.che:
OberbeF:r if f h@mbinätion von Bindem.itteln @_it üprengstoffen oder anderer in ähnlich kurzer Zeit Gdsvolui_ien und d3.uiit Druck erzeugen- . , den Troibmitteln zur sofortigen Verf-sti#-:ung von raumbe- grenzenden Gesteinszonen beine. Tunnel- oäer Streckenvortrieb bzw. frontaler Absprengung von Gesteinsmassen wie im Stein- -s unter 3insparung des stützenden Ausbaues und Ausschalten der SteinfallgefLthr, zulii Verfestieen vC)n defek- tem Viauerwerk und Beton, sowie zuin Verfestigen von Lockerböcbn und lockerem Material ähnlicher Form, Kennzeichnender Teil: dadurch gekennzeichnet, daß c.ie Xombination Bindemittel- Treibmittel zusammen in ein Bohrloch oder ähnlichen Raum eingebracht wird und das Bindemittel durch den Gasdruck des . sich umsetzenden Treibmittels in die freigelegten bzw. ent- standenen Risse, Klüfte, Poren usw. hineingepreßt wird, so- daß vermöge der adhäsiv wirkenden Bindekräfte des ]Rindemit- tels die einzelnen, von einander getrennten Gesteinsstücke der stehenbleibenden, raumbegrenzenden Gesteinszone mitein- ander verklebt werden, also gleichzeitig mit dein Ausbrechen des Gesteines des Abschlages rund um den neuen Raum herum ein standfester Gesteinsmantel geschaffen wird; ferner da- durch gekennzeichnet, daß in ähnlicher ,rcise die Gesteins- stücke neu hergestellter Fronten im Gestein miteinander ver- kittet werden und damit eine standfeste Zone bilden; ferner dadurch gekennzeichnet, daß in ähnlicher ,leise Risse im Mau- erwerk und Beton repariert .und ferner auch Materialien wie Zockerböden, Verwitterungszonen u.a.m. verfestigt werden. Oberbegriff des Unteranspruches 1 s Kombination Bindemittel-Treibmittel saun Xsnspruch 1, Kennzeichnender feil des Unteranspruches 1 : gekennzeichnet dadurch, daß d#-..s Bindemittel mit dem Ein- dringen in die offenen Räuae der Umgebung_des neu herge- stellten Raumes eine Wasser- (d.h. insge--Limt Flüsigkeits-@ dichtigkeit erreicht Zugleic:i wird damit eine gt#.s- ' dichtende ,drkung erzielt.
.rk enll-eichm.L #--,:, - i -- irj ar#s,z u Z- s 2: Ee@@.@@r@@@.@.._l- .,@.._- , @ci:11."; @$ #U.r=@3' -r; .,_ä#- @@::abbil,=-.Y@ übr._-ct_@ cr: .12L .@ :%-
t@@rb"_-'rif@. ,.t i -a __ ' . Iss3#lW_ri#.l.h:# Ii:_ :.e- =3..L üCi-_E.# #-i : i-- -G, ,j, ryal: Z:1=Uü1l@ C i.b- vi, vorher o-:er n..-c@@her, s..@iE und .:t- h2'#zt.ltc-rn in e4n @ücz och oe_Ze, _ ., " 2e G i ; 3. _I e @nr> ., el=:,i.c # 6 K'rr.. @@s'L
Patelita.iisj) rii.che:
OberbeF: r if f h @ mbinätion von binders @_it üprengstoffen or others in a similarly short time Gdsvolui_ien and d3.uiit generate pressure- . , the Troibmittel for the immediate establishment of space bordering rock zones legs. Tunnel or road driving or frontal blasting of rock masses as in stone -s under 3 saving of the supporting expansion and Switch off the stone trap, allow solidification vC) n defective tempo via fireworks and concrete, as well as for consolidating loose beams and loose material of a similar shape, Identifying part: characterized in that the combination of binders Propellant together in a borehole or similar space is introduced and the binder by the gas pressure of the . converting propellant into the exposed or detached existing cracks, crevices, pores, etc. is pressed into it, so- that by virtue of the adhesive forces of the] bovine by means of the individual, separated pieces of rock the remaining, space-delimiting rock zone with glued to another, i.e. at the same time as you break out the rock of the tee around the new room a stable rock mantle is created; furthermore that characterized by the fact that in a similar, rcise the rock pieces of newly manufactured fronts in the rock be cemented and thus form a stable zone; further characterized in that similar, quiet cracks in the wall erwerk and concrete repairs. and also materials such as Gambling floors, weathering zones, etc. are consolidated. Preamble of sub-claim 1 s Combination of binder and propellant saun Xsnspruch 1, Characteristic part of dependent claim 1 : characterized in that d # - .. s binder with the penetrate into the open spaces of the surroundings_ of the newly put a water (i.e. total - Limt liquid @ tightness achieved at the same time: i becomes a gt # .s- 'sealing, pressure achieved.
.rk enll-eichm. L # -,:, - i - irj ar # s, z u Z- s 2: Ee @@. @@ r @@@. @ .._ l- ., @ .._-, @ci: 11. "; @ $ # Ur = @ 3 '-r;., _ ä # - @@ :: abbil, = -. Y @ other ._- ct_ @ cr: .12L. @:% -
t @@ rb "_- 'rif @. , .ti -a __ ' . Iss3 # lW_ri # .lh: # Ii: _ :. e - = 3..L üCi-_E. # # -i: i-- -G,, j, ryal: Z: 1 = Uü1l @ C ib- vi, before o-: er n ..- c @@ her, s .. @ iE and.: t- h2 '# zt.ltc-rn in e4n @ üc z och oe_Ze, _., "2e G i; 3. _I e @nr> ., el = :, ic # 6 K'rr .. @@ s'L
DE19681784012 1968-06-28 1968-06-28 Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and Pending DE1784012A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19681784012 DE1784012A1 (en) 1968-06-28 1968-06-28 Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19681784012 DE1784012A1 (en) 1968-06-28 1968-06-28 Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and

Publications (1)

Publication Number Publication Date
DE1784012A1 true DE1784012A1 (en) 1971-07-08

Family

ID=5705388

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19681784012 Pending DE1784012A1 (en) 1968-06-28 1968-06-28 Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and

Country Status (1)

Country Link
DE (1) DE1784012A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1258205B (en) * 1961-02-14 1968-01-04 Mirto Serafini Bearing for a drive shaft arranged coaxially in a liquid delivery pipe, in particular the delivery pipe of a deep well pump
DE3300971A1 (en) * 1983-01-13 1984-07-19 Stump Bohr Gmbh, 8045 Ismaning Method of producing stabilised or compacted zones or holes in the earth and device for carrying out the method
DE3332256A1 (en) * 1983-02-26 1984-09-06 MC-Bauchemie Müller GmbH & Co, Chemische Fabrik, 4300 Essen METHOD AND DEVICE FOR STRENGTHENING SOIL INFORMATION BY SOIL COMPACTION
DE3348301C2 (en) * 1983-01-13 1994-11-17 Stump Bohr Gmbh Consolidation of zones or holes in ground

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1258205B (en) * 1961-02-14 1968-01-04 Mirto Serafini Bearing for a drive shaft arranged coaxially in a liquid delivery pipe, in particular the delivery pipe of a deep well pump
DE3300971A1 (en) * 1983-01-13 1984-07-19 Stump Bohr Gmbh, 8045 Ismaning Method of producing stabilised or compacted zones or holes in the earth and device for carrying out the method
DE3348301C2 (en) * 1983-01-13 1994-11-17 Stump Bohr Gmbh Consolidation of zones or holes in ground
DE3332256A1 (en) * 1983-02-26 1984-09-06 MC-Bauchemie Müller GmbH & Co, Chemische Fabrik, 4300 Essen METHOD AND DEVICE FOR STRENGTHENING SOIL INFORMATION BY SOIL COMPACTION
EP0131678A1 (en) * 1983-02-26 1985-01-23 MC-Bauchemie Müller GmbH & Co. Process for the solidification of geologic formations by means of soil compression

Similar Documents

Publication Publication Date Title
Herrenknecht et al. The development of earth pressure shields: from the beginning to the present/Entwicklung der Erddruckschilde: Von den Anfängen bis zur Gegenwart
DE2428497A1 (en) METHOD OF SEALING CRACKS AND CAVITIES IN VARIOUS TYPES OF STRUCTURES, E.G. BUILDINGS IN THE ROCK, MADE OF CONCRETE, BRICK WALLS AND WOOD
DE3409591C3 (en) Process for the subsequent production of an underground sealing sole
DE1784012A1 (en) Combination of cementing and sealing binders with commercially available explosives or other similar, short-term gas pressure generating propellants for the purpose of performing sudden injections in torn, fissured and porous rocks or similar materials, of boreholes and
DE2921907C2 (en)
DE4100137C2 (en) Sealing wall with piles placed at mutual distances from one another and with rigid sealing wall elements inserted between the piles, and methods for their production
DE102006000920B4 (en) Method for environmentally friendly production of underground stations of suburban trains and the like
DE4119259A1 (en) Method for constructing basements under existing building - uses root piles to underpin existing load-bearing walls for construction of concrete ceiling, foundation blocks, support columns
AT391905B (en) INJECTION METHODS FOR IMPROVING THE SOIL IN LOCKED STONE, ESPECIALLY FOR FASTENING LITTLE WATERPROOF AND / OR WATERPROOF, D.H. BINDING SOILS AND DEVICE FOR CARRYING OUT THE PROCESS
DE2651149B2 (en) Sealing process when producing tunnel gates by means of shield jacking devices and device for carrying out the process
DE1634589A1 (en) Network for consolidating the ground in the vicinity of already existing structures or for holding the ground in zones which are exposed to landslides, and method for producing such a network
DE2629841A1 (en) Reducing gas and dust emission from a coal seam - using methane-oxidising bacteria and sealing with a polymer
DE19604525A1 (en) High-pressure injection sealing bed for excavation
CH90630A (en) Process for sealing, securing and strengthening shafts and tunnels in loose rock layers.
DE2135544C3 (en) Device to shut off underground gas storage facilities in the salt mountains
DE1064006B (en) Process for driving and securing the excavation of tunnels and tunnels or the like in loose, coarse and swellable surface layers
DE1947294A1 (en) Method for driving cavities for the production of underground structures, especially tunnels, tunnels or the like.
DE19522592C1 (en) Process for sealing an excavation pit against ground water
RU2715503C1 (en) Method for open-underground development of flat-lying formations
AT217676B (en) Method for the repair of soil mechanically stressed retaining walls, vaults and the like. like
DE3621019A1 (en) Method for producing a tunnel structure
Gamper et al. Jenbach Tunnel–a shallow hydroshield drive
DE4013145C1 (en) Backfilling mined cavities in coal mine - uses water absorbent waste material and mineral material, swelling on contact with water
DE2936820C2 (en) Nuclear power plant with a nuclear part surrounded by a containment
DE2515652C2 (en) METHOD AND DEVICE FOR SEALING TRAENK HOLES BY CEMENTING