DE1684742A1 - Rigid assembly chimney - Google Patents

Rigid assembly chimney

Info

Publication number
DE1684742A1
DE1684742A1 DE19681684742 DE1684742A DE1684742A1 DE 1684742 A1 DE1684742 A1 DE 1684742A1 DE 19681684742 DE19681684742 DE 19681684742 DE 1684742 A DE1684742 A DE 1684742A DE 1684742 A1 DE1684742 A1 DE 1684742A1
Authority
DE
Germany
Prior art keywords
free
chimney
standing
chimney according
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19681684742
Other languages
German (de)
Inventor
Heide Erich Von Der
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE1684742A1 publication Critical patent/DE1684742A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/28Chimney stacks, e.g. free-standing, or similar ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

"biegungsateifer Montageschornstein" Diese Erfindung betrifft einen frei stehenden, aber auch möglicher-weise verspannten Schornstein, der aus vorgefertigten Teilen so zusammengefügt ist, daß in seinem Schaft auch Biegezugkräfte aufgenommen werden können, Man unterscheidet in statischer Hinsicht zwei Gruppen von frei stehenden Schornsteinen."biegungsateifer assembly chimney" This invention relates to a free-standing, but also possibly strained chimney, which is assembled from prefabricated parts so that even tensile bending stresses may be included in its shank, are distinguished in static point of two groups of free-standing chimneys.

Die erste Gruppe umfaßt die Schwergewichtskamine. Bei diesen überwiegt in allen Querschnitten das erforderliche Standmoment aus dem Eigengewicht dem möglichen Kippmoment aus den äußeren xräften, im wesentlichen also aus dem Windanfall. Solche Schornsteine haben eine große Masse und besitzen eine hohe Dämpfung. The first group includes the heavyweight fireplaces. With these, in all cross-sections, the required static moment from the dead weight outweighs the possible overturning moment from the external forces, i.e. essentially from the incidence of wind. Such chimneys have a large mass and have a high level of attenuation.

Sie sind unempfindlich gegen Schwingungen. Die Schornsteine dieser Gruppe sind sehr teuer; sie werden im allgemeinen gemauert aus Ziegeln oder speziellen Formsteinen. Neben den hohen Kosten ist es weiter von Nachteil, daß diese Schornsteine einer längeren Austrocknungazeit bedürfen, bevor eine Inbetriebnahme möglich ist, Die zweite Gruppe umfaßt die Schornsteine, deren Schaft durch besondere Vorkehrungen nicht nur Drucle- sondern auch Zugkräfte übertragen kann. In den Querschnitten kann das Kippmoment also größer sein als das Standmoment, somit ist Biegezug möglich. In diese Gruppe gehört vor allem der Stahlbeton- und der Blechschornstein. ` Das Verfahren des kontinäierlieh hochgeführten Stahlbetonschornateins ist sehr teuer und kann einigermaßen wirtschaftlich zumeist nur bei größeren Objekten angewendet werden, Dem Wachstum sind infolge des Abbindevorgangs Grenzen gesetzt. Bei kalter Witterung ist ein Weiterarbeiten ohne Schutzmaßnahmen gegen Frostwirkung nicht zulässig. Der Stahlbetonachornatein muß vor Inbetriebnahme genügend lange bei langsam steigender Temperatur getrocknet werden, wobei hiermit frühestens 28 Tage nach Einbringen des letzten Betone begonnen werden darf, Wesentliche Vorteile des Stahlbetonachornateins mind.seine Wartunga. Freiheit bei im allgemeinen guter lebenadauer. Die Schwingungsdämpfung ist ausreichend, so d.aß ein Auftreten gefährlicher Schwankungen nicht bekannt ist.They are insensitive to vibrations. The chimneys of this group are very expensive; they are generally built from bricks or special shaped stones. In addition to the high costs, it is also disadvantageous that these chimneys require a longer Ausrocknungazeit before commissioning is possible. The second group comprises the chimneys, the shaft of which can transmit not only pressure but also tensile forces through special precautions. In the cross-sections, the tilting moment can therefore be greater than the static moment, which means that bending tension is possible. This group mainly includes reinforced concrete and sheet metal chimneys. The method of continually raised reinforced concrete chimney is very expensive and can mostly only be used economically for larger objects. There are limits to growth due to the setting process. In cold weather, no further work is permitted without protective measures against the effects of frost. The Stahlbetonachornatein must be dried at slowly increasing temperature before operating long enough, and hereby least 28 days must be started after the introduction of the last concretes main advantages of the Stahlbetonachornateins mind.seine Wartunga. Freedom with a generally good lifespan. The vibration damping is sufficient so that dangerous fluctuations are not known to occur.

Am einfachsten-lassen sich frei stehende Schornsteine aus Stahl erstellen. Sie werden aus einzelnen vorgefertigten Schüssen zusammengefügt, Die Montagezeiten sind kurz. Ein solcher Sahornstein kann nach seiner Fertigstellung sofort in, Betrieb genommen werden, Leider ist diese Bauweise mit erheblichen Mängeln behaftet. Zunächst bedarf es eines aufwendigen Korosioneschutzes, der nach Verlauf einiger Zeit immer wieder erneuert worden muß. Trotzdem ist die hebensdauer eines solchen Sohorneteins oft nicht sehr groß. Ein nach neueren Erkenntnissen hinzukommender Faktor ist die Uneiaherheit der tatsächlichen Windbelastung bzw, deren Polgen.. Die Windbelastungen eines schlanken Bauwerks können in drei Formen auftreten.The easiest way to make free-standing chimneys out of steel. They are put together from individual prefabricated sections, the assembly times are short. Such a chimney stone can be put into operation immediately after its completion. Unfortunately, this construction method is afflicted with considerable defects. First, it requires a complex Korosioneschutzes which must have been continually renewed after some time. Nevertheless, the lifespan of such a Sohornetein is often not very long. According to more recent findings, an additional factor is the inaccuracy of the actual wind load or its poles. The wind loads on a slim structure can occur in three forms.

1. Die statische Windbelastung aus Druck und Sog.1. The static wind load from pressure and suction.

2. Die dynamische Windbelastung aus der Böenwirkung in Windriehtung. Die maximalen: Beanspruchungen treten durchweg in den oberen Windgeschwindigkeitabereichen auf.2. The dynamic wind load from the gust effect in the direction of the wind. The maximum: loads occur consistently in the upper wind speed ranges on.

Die dynamische Windbelastung quer zur Windrichtung 'aus den Impulsen seitlicher Wirbelabrisse. Die gefährlichsten Werte werden durchweg im unteren Windgeschwindigkeitsbereich erreicht.-Insbesondere die letztgenannte Beanspruchung kann bei Blechschornsteinen zu gefährlichen Schwankungen bis zu bekannten Schadensfällen führen, wenn die Wirbelabrißfrequenz gleich der Eigenfrequenz des Schornsteins ist und die zumeist nur geringe Dämpfung des Blechschornsteins nicht ausreicht. Um dem zu begegnen, müßte in den meisten fällen die Eigenfrequenz herabgestzt werden, was bei im allgemeinen festliegender Höhe und gefordertem Durchmesser nur durch eine Vergrößerung der Masse möglich ist. Dies ist bei einem Blechschornstein eine unwirtschaftliche Maßnahme.The dynamic wind load across the wind direction 'from the impulses lateral vortex tears. The most dangerous values are consistently in the lower wind speed range achieved lead to dangerous fluctuations up to known cases of damage if the frequency of the vortex rupture is equal to the natural frequency of the chimney and the mostly only low damping the sheet metal chimney is not sufficient. To counter this, most would have to cases the natural frequency are reduced, which is generally more fixed Height and required diameter is only possible by increasing the mass. This is an uneconomical measure with a sheet metal chimney.

Bei der Abwägung der Vor.- und Nachteile der Bauweise aus Stahl-und Stahlbeton zeichnet sich also die Notwendigkeit einer Konatruktion,ab, die den nachfolgenden Anforderungen genügen sollte: 1. Der Schornstein sollte aus vorgefertigten transportgerechten Teilen zusammengefügt sein.In weighing up the advantages and disadvantages of Vor.- design of steel and reinforced concrete, therefore, the need for Konatruktion records, from which should satisfy the following requirements: 1. The chimney should be assembled from prefabricated parts transportation fair.

2. Um.apäter eine ausreichende Masse und Dämpfung gegen dynamische Windbelastungen zu erhalten, sollten die vorgefertigten Teile in-der Grundstruktur aus Beton, möglicherweise auch aus Asbestzement bestehen.2. Um.apater a sufficient mass and damping against dynamic To maintain wind loads, the prefabricated parts should be in-the basic structure made of concrete, possibly also of asbestos cement.

3. Der Schornstein sollte eine, den Anforderungen entsprechende, in ihrer Anordnung möglichst variierbare, vornehmlich für die Aufnahme von Biegezugkräften berechnete Bewehrung erhalten, die erst während der Montage in endgültiger Weise zusammengefügt und möglicherweise ganz oder teilweise auch Transport-. bewehrung ist.3. The chimney should be one in their arrangement as variable as possible, primarily for the absorption of bending tensile forces calculated reinforcement received, which is only finalized during assembly put together and possibly in whole or in part also transport. reinforcement is.

4. Die Forderung nach bestmöglichem Korosionsschutz insbesondere der statisch erforderlichen und konstruktiv verbindenden teile muß erfüllt werden.4. The demand for the best possible corrosion protection, especially the statically required and structurally connecting parts must be met.

Auf Abbildung I ist ein aus vorgefertigten Teilen zusammengefügter Schornstein schematisch dargestellt. Die Schüsse 1) werden bei der Montage untereinander bzwo mit dem Fundament 2 biegungefest verbunden. Der Querschnitt muß nicht unbedingt rund sein. Bin solcher Schornstein läßt sich den Anforderungen entsprechend.Figure I shows a schematic of a chimney assembled from prefabricated parts. The shots 1) are connected with each other bzwo biegungefest during assembly with the foundation. 2 The cross-section does not necessarily have to be round. Such a chimney can be built according to the requirements.

ein" oder mehrschalig ausbild'en,von denen erfindungsgemäß zumindest eine Schale aus Beton (bzw. Asbestzement) ®ein muB. one or more shells, of which according to the invention at least one shell made of concrete (or asbestos cement) has to be.

Ein Hauptmerkmal dieser Erfindung ist, daß die einzelnen Schüsse zur Aufnahme der aus äußeren Kräften resultierenden Biegezugkräfte mittels einer,zwaindest teilweise auf ganzer Schornsteinlänge =-dureh,aufenden Bewehrung miteinander verbunden sind. Diese den gesamten Zusammenhab& gewährleistende. Bewehrung einschl. deren Verbindungsmittel sollten den Witterungseinflüssen weitgehendst entzogen sein. Zwei Möglichkeiten der Bewehrungsanordnung sind auf den Abbildungen II-V bzw. VI--VIII dargestellt. Die Montagemerk- male unterscheiden sich hierbei sehr wesentlich. Abbildung III zeigt einen dreischichtig aufgebauten Querschnitt. Die äußere Schale (3) besteht aus Beton. Eine innere Schale (4), z.B. Schamott, ist durch eine Isolierschicht (5) von der Außenschale getrennt. Im Betonmantel verlaufen längs durch das ganze Fertigteil (Ansicht Abb. 1I) ausgesparte Röhren (6).-Die Zugbewehrung (7) wird bei der Montage als einzelne Stäbe in diese Röhren ein- geführt und von 2ertigteil zu Fertigteil möglicherweise aber auch in größeren hängen gleichzeitig über mehrere Teile- mittels extralanger Muttern (9) gegen eine ünterlegscheibe (1u) verschraubt. Der in der Verlängerung folgende Bewehrungsstab wird in die zuvor eingebaute letzte Mutter mit eingedreht, und so setzt sich während des gesamten Plontageverlauf s diese Arbeitsweise fort. Will man die Bewehrung auf ganzer Länge unter Vorspannung setzen" so genügt es, wenn die letzte Mutter eines jeden Stranges entsprechend angezogen wird. Es ist nicht uribedingt erforderlich., dall jede Röhre (6) einen Bewehrungs Stab (7) erhält. Dies richtet sicrl. vielmehr nach den aufzunehmenden Biegezugkräften, dien im oberen :L'ei.l eines Schornsteins geringer sind als in Fundamentnähe. Häufig wird eine gestaffelte Bewehrung zweclanäßig sod.n. Die Bewehrung ist einschl. ihrer Verbindungsstücke Korosionseiazflüssen weitest entzogen. rin bchornutein aer vorgenannten bauweise :t.11Bt sich durch ein Aufeinanderfügen, aber auch durch ein Untereinanderfügen der einzelnen.Tertigteile zuso,mmeliliatzein. Im Ufizteren Falle müßten die bereites miteinander vcrbtziidesicn Teile durch entsprrolielde Geräte (z.T. hydraul.ieichcPumpeii) hochgedrückt werden in-id erst das le=t=zte Teil. wird mit deirPundament vez=btuldell. Nährend de=r Montage leönnte der Sc@liorll;3t.ein gegen ein llmliillpein verspannt: werden. für das letztgenannte Verfahren 4 prechcn erhebliche Vorteile, da immer zur ebenen Erde; bzw, in;Gx::in frc:r Höhe: gearbeitet werden kann lind hierdurch die Arbeitsqualität und Überwachun möglichkeiten verbessert werden. Statt; au fwcndiger Krananlagen und Hebezeuge wären nur kleinere; kräftigere Geräteeinliei_t:ciin erforderlich, die sich auf das vorhandenes [email protected] stützen und immer wieder verwendet worden hon nein. Nach Abschlouß der Elontage können die Höhen (6) mit TJiört.cl. ..a. ausgepreßt vaerden. Die Verbindungsi c:i l c , insbesondere aie Scheiben, sind Bierfür entspre=chend auszubilden. Die Röhren können auch durch St:alil rolirc (t3) ausgehlei det sei 1l , welche dann gleichzeitig als Transporthc-viehrung dienen. Möglicherweise ließen sich die Wilden dieser Bohre dann SO ausbilden, daß sich diese miteinanäcr iloil llollr ztz Bohr -#Ter°- etlrauircn. lassen. Eine solche lau s izhiuilg leitet Tiber u ein(r lj.onstrulcaion gem. Abbildung VI - VIz, In den Betonmantel eines Schornsteinfertigteils sind gemäß Abbildung V'I die Bewehrungsstäbe (11) in den für den Endzustand erforderlichen Abmessungen fest einbetoniert. Die Stäbe sind an ihren Enden mit einem Gewinde versehen und dienen zunächst als Transportbewehrung. An dem einen Ende (Abb. YII) überragt die Bewehrung das Fertigteil,'an dem anderen Ende steht es in einer Aussparung um zumindest das gleiche Maß zurück.A main feature of this invention is that the individual sections for absorbing the bending tensile forces resulting from external forces are connected to one another by means of reinforcement extending over the entire length of the chimney at least partially. This guarantees the entire cohesion. Reinforcement, including their fasteners, should be largely protected from the effects of the weather . There are two ways of arranging the reinforcement Figures II-V and VI - VIII shown. The assembly notes here are very different from each other. Figure III shows a three-layer cross-section. The outer shell (3) is made of concrete. An inner shell (4), Eg fireclay is covered by an insulating layer (5) from the Separate outer shell. In the concrete shell run lengthways through the entire precast element (View Fig. 1I) recessed tubes (6) - the tensile reinforcement (7) is inserted into these tubes as individual rods during assembly guided and from 2-finished part to finished part possibly but even in larger ones hang over several parts at the same time using extra-long nuts (9) against a washer (1u) screwed. The reinforcing bar following in the extension is screwed into the previously installed last nut, and so this continues during the entire course of the planning Working method continued. If you want the reinforcement over the entire length put under tension "so it is enough if the last mother of each strand is tightened accordingly. It is not necessary that each tube (6) has one Reinforcing bar (7) receives. This sets up sicrl. rather after the bending tensile forces to be absorbed, serve in the upper part: L'ei.l one Chimney are lower than near the foundation. Frequently becomes a staggered reinforcement alternately so. The reinforcement is including their connecting pieces Korosionseiazflüsse the largest possible withdrawn. rin bchornutein aer the aforementioned construction: t.11Bt cuts through a Joining them together, but also by joining them together the individual prefabricated parts together, mmeliliatzein. In the Ufizter case would have to go through the parts that are ready to be connected to each other Corresponding devices (partly hydraulic pump) pushed up the last part becomes in-id first. becomes with deirPundament vez = btuldell. During the assembly the Sc @ liorll; 3t.ein against a llmliillpein tense: become. for the latter method 4 prechcn considerable advantages, there always to the level ground; or, in; Gx :: in frc: r Height: worked This can improve the quality of work and monitoring opportunities to be improved. Instead of; complex crane systems and hoists would only be smaller; more powerful device: ciin required referring to the existing [email protected] support and have been used over and over again hon no. After completing the Elontage, the heights (6) with TJiört.cl. ..a. pressed vaerden. The connection i c: ilc, in particular aie Disks, are to be trained accordingly for beer. The tubes can also be borrowed by St: alil rolirc (t3) be 1l, which then also serve as transport cattle. Possibly the savages of this drill then let SO train that these with one another iloil llollr ztz Bohr - # Ter ° - etlrauircn. permit. Such a lau s izhiuilg introduces Tiber u (r lj.onstrulcaion according to Figure VI - VIz, In the concrete shell of a prefabricated chimney part, the reinforcing bars (11) are firmly concreted in the dimensions required for the final state, as shown in Figure V'I. The rods are provided with a thread at their ends and are initially used as transport reinforcement. At one end (Fig. YII) the reinforcement protrudes beyond the prefabricated part, at the other end it is set back in a recess by at least the same amount.

Solche Fertigteile werden,wie oben beschrieben aufeinander bzw. untereinander gefügt und in diesem Falle mit einer Spezialverschraubung (12) miteinander verbunden. Die Aussparung für diese Verschraubung wird nach außen mit- Mörtel o.a. verstrichen.Such finished parts are, as described above, on top of each other or among each other joined and in this case connected to one another with a special screw connection (12). The recess for this screw connection is spread outwards with mortar or similar.

Der Beton kann ausschließlich auf die Strukturerfordernisse eines Schornsteins abgestellt werden und unter Umständen frei von einer mittragenaen Funktion sein, wenn die Bewehrung auch zur Ausnahme von Druckkräften ausreichend ausgebildet und entsprechend verbunden ist. SolcheFertigteile könnten auch aus Leichtbeton sein.The concrete can be based solely on the structural requirements of a Chimney and possibly free of a supporting function if the reinforcement is sufficiently designed to withstand compressive forces and is connected accordingly. Such prefabricated parts could also be made of lightweight concrete.

Beim Zusammenfügen der Fertigteile, die auch in mehrschaliger Bauweise möglich sind, können-die Fugen statt Mörtel auch mit halbfestem bis festem Dichtungsmaterial (13) z.B. Asbestfilz ausgelegt werden. ' Die vorstehend erläuterten Konstruktionsmerkmale gem. Abbildung I - YIII machen die nach diesen Gesichtspunkten aus Fertigteilen zusammengefügten Schornsteine auf-Biegung ---hervorstechend Biegezug- beanspruchbar. Solche Schornsteine können frei stehend, aber auch verspannt sein.When joining the prefabricated parts, also in multi-shell construction are possible, the joints can also be made with semi-solid to solid sealing material instead of mortar (13) e.g. asbestos felt. The design features explained above According to Figure I - YIII, make them from prefabricated parts according to this point of view assembled chimneys on-bend --- prominent bending tensile loadable. Such chimneys can be free-standing, but they can also be braced.

Schornsteine dieser Bauart können sofort nach ihrer Fertigstellung in Betrieb genommen werden.Chimneys of this type can be used immediately after their completion be put into operation.

Claims (1)

Schutzansprüche: 1. Freistehender, selbsttragend oder verspannter, aus vorgefertigten Montageteilen zusammengefügter Schornstein in ein-oder mehrschaliger Bauweise mit zumindest einer Schale aus Beton oder Asbestzement, dadurch gekennzeichnet, daß zur Aufnahme aus Wind resultierender Biegezugkräfte Bewehrungsstäbe angeordnet sind. _ 2. Aus Fertigteilen zusammengefügter freistehender Schornstein nach Anspruch 1, dadurch gekennzeichnet, daß die Bewehrungsstäbe, bezogen auf ihre längsaehse, aus mehreren Einzelstäben bestehen, die erst bei der Montage des Schornsteins zu einem im statischen Sinne wirksamen Ganzen verbunden, vorzugsweise verschraubt worden eindo _ 3. Freistehender Schornstein nach Anspruch 2, dadurch gekennzeichnet, daß die Verbindungen der Bewehrungseinzelstäbe im Querschnittsbereieh der Beton- bzw. Asbestzementschale liegen und dem unmittelbaren Zutritt von Niederschlagswasser entzogen sind. 4. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die verwendeten Fertigteile vor deren Zusammenbau in der Beton-bzw. Asbestzementschale in längsrichtung verlaufende Röhren aufwiesen. 50 Freistehender Schornstein nach Anspruch 4,_dadurch gekennzeichnet, daß die längsverlaufenden Röhren mit einem Material ausgekleidet sind, welches möglicherweise auch als Transportbewehrung der verwendeten Fertigteile gedient hat. 6. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daB die die Biegezugkräfte aufnehmenden Bewehrungsstäbe erst während der Montage der Fertigteile in diese eingeführtNerden brauchen. 7o freistehender Schornstein nach einem oder mehreren. der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die Bewehrung entsprechend den statischen Notwendigkeiten im Gesamtquersohnitt gestaffelt angeordnet ist. (Gesamtquerschnitt = Summe der Pläohe der Bewehrungsstäbe in jeweils einem Schornsteinquerschnitt) 8o Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die senkrecht verlaufende Bewehrung (Biegezugbewehrung) gänzlich oder teilweise unter Voropannung steht. 9. freistehender Schornstein nach Anspruch 8, dadurch gekennzeichnet, daß diese Vorspannung aus einer eingebrachten Zugkraft resultiert. 10. Freistehender Schornstein nach Anspruch 8, dadurch gekennzeichA daß diese Vorspannung durch das aufgebrachte Eigengewicht des Schornsteins erzeugt wird und die Biegezugbewehrung dadurch unter Druckvorspannung steht. 11. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die Röhren . gem. Anspruch 4 nach der Montage teilweise oder ganz ausgefüllt wurden. 12. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die Haupttragbewehrung im wesentlichen rohrförmigen Querschnitt hat. 13. 2reistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß zwischen mehreren oder "allen Schüssen ein-. oder mehrteilige Dichtscheiben angeordnet sind. 14. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß die Außenfuge zwischen einzelnen Schüssen mit dauerplastischem Kitt verstrichen ist. 15. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüche, dadurch gekennzeichnet, daß das Zusammenfügen der vorgefertigten Einzelteile in der Weise erfolgte, daß diese vorzugsweise untereinandere(im Gegensatz zu"aufeinander") gesetzt wurden. 16. Freistehender Schornstein nach einem oder mehreren der vorgenannten Ansprüchep dadurch gekennzeichnet, daß der zuletzt montierte Schuss mit dem Fundament zugfest verbunden ist. -Bemerkung: Im 1. Schutzanspruch bedeutet "selbst-tragend" gleich "frei stehend". Es umschreibt nicht die Eigenschaft eines Schwergewichtskamins gem. 1. Seite, Absatz 3.Protection claims: 1. Free-standing, self-supporting or tensioned chimney assembled from prefabricated assembly parts in a single or multi-shell construction with at least one shell made of concrete or asbestos cement, characterized in that reinforcing bars are arranged to absorb bending tensile forces resulting from the wind. _ 2. Freestanding chimney assembled from prefabricated parts according to claim 1, characterized in that the reinforcing bars, based on their longitudinal view, consist of several individual bars which are only connected, preferably screwed, to a whole that is effective in the static sense during the assembly of the chimney. 3. Free-standing chimney according to claim 2, characterized in that the connections of the individual reinforcement bars lie in the cross-sectional area of the concrete or asbestos-cement shell and are withdrawn from the direct access of rainwater. 4. Free-standing chimney according to one or more of the preceding claims, characterized in that the prefabricated parts used before their assembly in the concrete or. Asbestos-cement shell had tubes running lengthwise. 50 Free-standing chimney according to claim 4, characterized in that the longitudinal tubes are lined with a material which may also have served as transport reinforcement for the prefabricated parts used. 6. Free-standing chimney according to one or more of the preceding claims, characterized in that the reinforcing bars absorbing the bending tensile forces only need to be introduced into the prefabricated parts during the assembly thereof. 7o free-standing chimney after one or more. of the aforementioned claims, characterized in that the reinforcement is arranged in a staggered manner in accordance with the static requirements in the overall cross-section. (Total cross-section = sum of the planes of the reinforcing bars in each chimney cross-section) 8o Free-standing chimney according to one or more of the preceding claims, characterized in that the vertical reinforcement (flexural reinforcement) is completely or partially under pre-tension. 9. freestanding chimney according to claim 8, characterized in that this bias results from an introduced tensile force. 10. Free-standing chimney according to claim 8, characterized gekennzeichA that this prestress is generated by the applied weight of the chimney and the flexural reinforcement is thereby under compressive prestress. 11. Free-standing chimney according to one or more of the preceding claims, characterized in that the tubes. according to claim 4 were partially or completely filled out after assembly. 12. Free-standing chimney according to one or more of the preceding claims, characterized in that the main supporting reinforcement has a substantially tubular cross-section. 13. Freestanding chimney according to one or more of the preceding claims, characterized in that one or more-part sealing washers are arranged between several or "all sections. 14. Free-standing chimney according to one or more of the preceding claims, characterized in that the outer joint between 15. Free-standing chimney according to one or more of the preceding claims, characterized in that the prefabricated individual parts were assembled in such a way that they were preferably placed one below the other (as opposed to "one on top of the other") . Free-standing chimney according to one or more of the aforementioned claims, characterized in that the last installed section is connected to the foundation with tensile strength. -Remark: In the 1st protection claim, "self-supporting" means "free-standing". It does not describe the property of a Heavy weight chimney according to 1. Page, paragraph 3.
DE19681684742 1968-03-18 1968-03-18 Rigid assembly chimney Pending DE1684742A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEH0065637 1968-03-18

Publications (1)

Publication Number Publication Date
DE1684742A1 true DE1684742A1 (en) 1971-04-15

Family

ID=7163247

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19681684742 Pending DE1684742A1 (en) 1968-03-18 1968-03-18 Rigid assembly chimney

Country Status (1)

Country Link
DE (1) DE1684742A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2504966A1 (en) * 1981-04-30 1982-11-05 Teplotechna Np Prefabricated tall industrial chimney - has vertical reinforcing element in ducts passing through reinforced concrete sections
DE3115212A1 (en) * 1981-04-15 1982-11-11 Teplotechna N.P., Praha Building structure
FR2638093A1 (en) * 1988-10-21 1990-04-27 Valade Jacques Shaft for rapid and safe evacuation of a building
DE4111179A1 (en) * 1991-04-06 1992-10-08 Delta Wohnbau Gmbh Chimney stack with glass flue liner - has statically supporting outer tube with definite spacing between it and glass liner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3115212A1 (en) * 1981-04-15 1982-11-11 Teplotechna N.P., Praha Building structure
FR2504966A1 (en) * 1981-04-30 1982-11-05 Teplotechna Np Prefabricated tall industrial chimney - has vertical reinforcing element in ducts passing through reinforced concrete sections
FR2638093A1 (en) * 1988-10-21 1990-04-27 Valade Jacques Shaft for rapid and safe evacuation of a building
DE4111179A1 (en) * 1991-04-06 1992-10-08 Delta Wohnbau Gmbh Chimney stack with glass flue liner - has statically supporting outer tube with definite spacing between it and glass liner

Similar Documents

Publication Publication Date Title
DE68921644T2 (en) PRE-PREPARED BUILDING FOUNDATION ELEMENT.
EP2984197A2 (en) Method for building prestressed concrete structures by means of profiles consisting of a shape-memory alloy, and structure produced using said method
EP3234277A1 (en) Method for producing prestressed structures and structural parts by means of sma tension elements, and structure and structural part equipped therewith
EP2914790A1 (en) Method for producing a tower construction from reinforced concrete
DE1684742A1 (en) Rigid assembly chimney
CH666505A5 (en) Expansion component bridging reinforced-concrete seam - comprises second oblong member fixed at ends to first and third ones
EP2963206B1 (en) Tower, in particular for power lines
DE102013100176B4 (en) Tower, especially for power lines
DE2154530A1 (en) COOLING TOWER CONSTRUCTION
DE102011102987A1 (en) Incremental launching method for mounting road- and railway bridges with beam cross section, involves providing two steel main girders and carriageway slab made from steel, reinforced concrete or prestressed concrete
EP2369075B1 (en) External wall system for a building
CH702665A2 (en) Static resilient heat insulating prefabricated member i.e. prefabricated wall element, has reinforced concrete structure integrated in natural fiber reinforced concrete, where static function is accomplished in concrete structure
WO2002012657A1 (en) Construction module for producing bridges, buildings and towers, for example for wind power plants
DE69413950T2 (en) BRIDGE CONSTRUCTION
DE102010040332B4 (en) foundation element
AT520519B1 (en) Support ceiling node for a reinforced concrete floor and two concrete columns in the storey
DE2723591C2 (en)
AT520529B1 (en) Support ceiling node for a reinforced concrete floor and two concrete columns in the storey
AT235531B (en) Process for the production of beam ceilings
DE919135C (en) Process for the production of ceilings from cylindrical or prismatic shells and reinforced in-situ concrete ribs
DE903375C (en) Skeleton construction
DE850947C (en) Connection of precast reinforced concrete parts with each other or with in-situ concrete parts
DE1659252A1 (en) Prestressed composite structural element
WO2019118998A1 (en) Column-ceiling node for a reinforced concrete ceiling and two concrete columns in storey construction
AT523024A1 (en) Building construction and method of forming the same