DE1409751A1 - Procedure for the replacement and bedding of sleepers - Google Patents

Procedure for the replacement and bedding of sleepers

Info

Publication number
DE1409751A1
DE1409751A1 DE19621409751 DE1409751A DE1409751A1 DE 1409751 A1 DE1409751 A1 DE 1409751A1 DE 19621409751 DE19621409751 DE 19621409751 DE 1409751 A DE1409751 A DE 1409751A DE 1409751 A1 DE1409751 A1 DE 1409751A1
Authority
DE
Germany
Prior art keywords
rails
sleepers
new
net
following
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19621409751
Other languages
German (de)
Inventor
Auf Nichtnennung Antrag
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BINGMANN DR ING WALDEMAR
Original Assignee
BINGMANN DR ING WALDEMAR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BINGMANN DR ING WALDEMAR filed Critical BINGMANN DR ING WALDEMAR
Publication of DE1409751A1 publication Critical patent/DE1409751A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/06Pavings adjacent tramways rails ; Pavings comprising railway tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

Vorfahren zur Auswechslung und Bettuns von Schwellen. Die Erfindung -betrifft ein Verfahren zur Auswechslung und Bettuns von Schwellen, mit dem es möglich ist, ohne Unterbrechung des Eisenbahnbe-.t$riobea ein fortlaufendes Auswechseln der Schwellen und des Schotters vorzunehmen. . -.Bisher wurde bei einer solchen Arbeit in der'Weise vorgegangen, daß der Altschotter unter den Schienen mühselig ausgegabelt wurde, die -freie Stelle unterklotzt und sodann der Schotter unter der alten Schwelle entfernt wurde. Danach wurde die Schwelle seitlich herausgezogen! neuer Sehotter eingebracht und die neue schwelle eingezogen. Ein solches Verfahren war zeitraubend, umständlichund ermöglichte nur einen geringen Arbeitsfortschritt. Um ein einwandfreies und sicheres Arbeiten zu gewährleisten, war immer eine Geschwindigkeitsbeschränkung de® Bisenbahnbetriebes.notwendig, bei manchen Verfahren sogar eine völlige Sperrung des Gleises erforderlich.Ancestors for replacing and bedding sleepers. The invention relates to a method for replacing and bedding sleepers, with which it is possible to continuously replace sleepers and ballast without interrupting the railway work. . So far, such work has been done in such a way that the old ballast was laboriously forked out under the rails, the free area was padded and then the ballast was removed from under the old sleeper. Then the threshold was pulled out to the side! new Sehotter introduced and the new threshold drawn in. Such a procedure was time consuming, cumbersome and allowed little work progress. In order to guarantee perfect and safe work , a speed limit of the railway company was always necessary, with some procedures even a complete closure of the track was necessary.

Die Erfindung hat en sieh zur Aufgabe gestellt, die bisher bestehenden Nachteile zu vermeiden und ein sicheres, einwandfreies und schnelles Auswechseln von Schwellen und Schotter auch während des Eisenbahnbe-triebes zu ermöglichen, vor allem das Auswechseln von Wegschwellen für Bahnübergänge. Das erfindungsgemäße Verfahren zur Bettuns von Gleisen. besteht darin, .daß zunächst an einer von Schotter freigemachten Stelle eine über das $ghnkörperplanum zu bewegende Vorrichtung unter die Schienen gebracht ,wird, die dann mit Hilfe von Zug- oder Druckvorrichtungen über das Plenum fortbewegt wird. Danach wird der Altschotter und die Alteohwelle im Arbeitsbereich dieser"Vorriohtung ausgebaut, die Vorrichtung erneut vorgezogen und in dem nun entstehenden freien Raum in und hinter der 'YOrr@ohtung die neue Schwelle und der neue Schotter eingebracht und eingebaut. Die Vorrichtung hängt an Rollen, die auf dem Nufl der eohienen lauten und wird entweder vorgezogen oder vorgeschoben. Während d@iser Arbeitsvorgänge-werden die Schienen mit Hilfe von Stützvorriohtungen gehalten. Dadurch kann der Eisenbahnbetrieb während aller Arbeitsvorgänge voll iufreoht erhalten werden.- . Erfindungsgemäß besteht die Vorrichtung zur Durchführung den Verfahrens aus einer nach vorn offenen Wanne, die eine in eine Schneide auslaufende Grundplatte besitzt, an die sich sveoi- mäßigerweise schrägliegende Seitenwände anschließen. Der rück- wärtige Teil dieser Vorrichtung ist von einer schrägliegenden Heckwand begrenzt, die dazu dient, den neuen Schotter während den Ausräumens den alten Schotters zu halten und ihn während der profilgerechten Verdichtung zu verdämmen. Die Einrichtungen zur Abstützung der Schienen während den Eisenbahnbetriebes sind erfindungsgemäß in der Vorrichtung selbst angebracht und be- stehen in ihres Vorderteil aus dicht hinter der Schneide ange- brachten Stützen und über den Heckbord angebrachten von Hand oder mechanisch #ewegbaren Tragvorrichtungen. Diese werden dann aus ihrer Stützstellung entfernt, wenn die einzubauenden schwel- len aus ihrer Stellung vor der Heckwand der Vorrichtung in ihre Endlage hinter dieser verschoben werden sollen. Nach einer weiteren Ausgestaltung der Erfindung ist die Schneide der Vorrichtung mit Dornen oder einer Bohervorriohtung versehen, um ein. leichteres Gleiten der Wanne während den Vor- schubes unter den Sohotterbett zu ermöglichen. Um ein leichtes Einschieben der Schwellen aus seitlicher Richtung unter die Schienen zu ermöglichen, sind in der Wanne Schienen zur Führung von zwei kleinen, .:die Schwellen aufnehmenden Wagen angebracht. Das längsversohieben der Schwellen dagegen geschieht durch auf den Schienen laufenden Bollen. Die Arbeitsweise den erfindungsgemiBen Verfahrens und der neuen Vorrichtung soll aufgrund der Zeichnung genauer erläutert werden. Die erfindungsgeaäße Vorrichtung ist in der Zeichnung beispielsweise und vereinfacht dargeställt. $s bedeutens fig. 1 eine Aufsicht auf einen Oberbau eines lahntiber-# ganges, äig. 2 einen Ungssohnitt durch einen Oberbau in Gleisrichtung, Rig. 3 einen Querschnitt entlang der hinke H-3 der ?kg. 2 und fig. 4 einen Querschnitt enßang der Miaie 0-0 der lis. 2. Bin unter den Gleisschienen I an Rollen hängender lrbeitaachild II bietet die über den Bshnkörperplanum III nach dem vorangegangenen Ausbau einer Altschwelle IV den Alteohotter Y vor den Schild auszuräumen. Sodann wird der Arbeitsschild II entweder durch ilinden oder Pressen vorgeschoben oder durch eine Zugvorrich- tung vorgezogen, wobei en vorteilhaft ist, den Vorschub in der Regel um die Breite der einzubauenden neuen Schwelle vorzunehmen und in den nun freien Raum hinter dem Arbeitsschild II den neuen oder gereinigten Schotter YI einzufüllen. Er dient als Lager für die neuen Schwellen VII, die im dargestellten Fall aus Überweg- sohwellen einer neuen Bauart bestehen, die in einem Bauelement die Schienen tragen und befestigen und gleichzeitig die Straßen- fahrbahn bilden. Bisher war der Einbau derartiger Überwegsohwellen immer mit einer üntrbreohnung den Eisenbahnbetriebes verknüpft. Um einen geführten Vorschub den wannenartigen Schildes II zu er- möglichen, hängt dieser an Rollen 1 an den Ptißen der Schienen I. Seine Grundplatte 2 liegt auf den Planuz III den Bahnkörpern auf und wird auf diesem vorgeschoben oder vorgezogen. Um ein leichten Vordringen in den Schotter zu ermöglichen, ist die Grundplatte 2 an ihrer Vorderkante mit einer Schneide 3 oder einer Schervor- riohtung veraehen.,Zweckmäßig wird der Schotter durch Schlagge- räte vor der Schneide aufgelockert und auf die Grundplatte 2 als Gabelfläche verlagert. Die Wanne II (Schild) ist, wie en aus der Zeichnung zu ersehen ist, (siehe Fig. 3 und 4) an beiden Seiten mit Seitenborden 4 und rückwärtig (siehe Figur 2) mit einer schräggeneigten Heckwand 5 versehen. 3a ist aus Figur 2 zu er- kennen, daß der Schotter bequem aus seiner Lage unter den Schienen in den freien Raum der Wanne II gebracht und aus dieser aunge- gabelt werden kann. Die Wanne II wird, wie en bereits erwähnt zmrde; durch eine in Richtung den Pfeiles 6 wirkende Zugvorrichtung durch den Altaohotter gezogen oder auch durch Druckpressen vorgeaohoben. Um einen einwandfreien Zugbetrieb sicherzustellen, sind innerhalb der Wanne II in Vorachubrichtung schmal gehaltene Stützen 7 angebracht, auf denen die Schienen an dieser Stelle ruhen. Die Abstützung über der Heckwand 5 erfolgt auf ihrer horizontalen AbaohluBplatte 8 mit Hilfe von verschiebbaren lager- platten 9 oder von entelhrechenden abaenkbaren oder ausfahrbaren Lagern, Rollen oder anderen Stützvorrichtungen. Die Absenkbarkeit oder Verachiebbarkeit ist erforderlich, um die neuen Schwellen #II aus dem Einsohubraum in der Wanne 2 vor der Heckwand 5 in ihre Binbau- stellung hinter der Heckwand 5 verschieben zu können. Die Heckwand 5 hält nach dem Vorschub der Wanne II um das Breiten- maß der einzubauenden Schwellen VII den neuen Schotter PI in seiner Lagerstätte und verdämmt ihn während der Verdichtung. Im freigeräumten Bereich unter den Schienen ist es nun möglich, in Tieflage über der Grundplatte 2 und vor der Reckwand-5 die neue Schwelle VII einzubringen. Nach dem Anheben dieser-neuen Rohwelle PII in die Einbauhöhenlage mit einem zweckmäßigerweise kurzfristigen leichten Anheben der Schienen durch Winden oder durch Rollenkipphebel an den Stützen 7 wird oberhalb der Heckwand 5 der Raum Ver- schieben der reuen Schwelle in die endgültige Zage hinter der Rock- wand 5 geschaffen. Die über der Heckwand 5 vorgesehenen eineohiebbaren oder hebbaren Auflagerplatten stützen in ihrer Wirkstellung während des Schotteraus- und-einbaues die Schienen I. Sie werden nur während des Einschiebens der Schwellen VII aus dem Einbauraum innerhalb der Wanne vor der Heckwand 5 in ihre Endlage hinter der Heckwand 5 abge- -senkt oder ausgeschoben. Ein praktisches Ausführungsbeispiel einer derartigen ein- und nus- schiebbaren Tragvorrichtung ist in Fig.4 gezeigt. Auf der oberen horizontalen Abschlußplatte 8'der Heckwand 5 ruht eine Tragvorrichtung. Sie besteht aus einer Zunge 9 in Verbindung mit einer Zahnstange 10, die in dem durch die Kurbel 13 drehbaren Ritzel 14-kämmt und dabei die an der Zahnstange 10 befestigte Zunge 9 entweder unter die Schiene I zu ihrer Stützung schiebt oder bei entgegengesetzter Drehung der Kurbel 13 den Raum zwischen der Schiene I und der Abdeokplatte 8 für das Verschieben der Schwelle VII aus dem Arbeitsbereich des Schildes IC auf das vorbereitete Schotterbett PI hinter der Heckwand 5 freigibt. Um ein leichtes Einbauen verhältnismäßig schwerer Überwegsohwellen YII zu ermöglichen, werden diese seitlich des (leises auf zwei kleine Wagen 11 abgesetzt, die auf der (randplatte 2 rollen und von Leit- schienen 15 an der Heckwand 5 geführt werden: Der erste Wegen nimmt das vordere Ende der Schwelle, der zweite, auf Abstand nachfolgende ',Va7en ihr hinteres Ende auf. Unter die G Gleisschienen I gefahren werden die neuen Schwellen VII durch auf den Schienen rollende Hubvorrichtungen 12 in ihre Ei2ibau- höhinlage angehoben und in ihre Einbaustellung hinter der Heck- wand 5 verfahren. Dort werden sie am Einbauort auf dem zuvor eben und in vorgeschriebener Höhenlage hergerichteten verdichteten Bchotterbett 9I abgesetzt und nach Abbau der Hubvorrichtungen 12 mit den Schienen durch die endgültigen Befestigungsmittel ver- bunden. J Danach wiederholt sich der Vorgang durch Vorziehen des Schildes II unter die nächste Altschwelle IV in dem Altsjchotterbett Y und der Ausbauvorgang beginnt von neuem. The invention has en see the task set to avoid the previously existing disadvantages and a safe, proper and rapid replacement of sleepers and ballast also allow drive during Eisenbahnbe-, especially the replacement of Wegschwellen for level crossings. The method according to the invention for bedding tracks. consists in .that a device to be moved over the subgrade is brought under the rails at a point cleared of gravel, which is then moved over the plenum with the help of pulling or pushing devices. Then the old ballast and the old shaft in the working area of this "Vorriohtung" are removed, the device is pulled forward again and the new sleeper and the new ballast are introduced and installed in the free space now created in and behind the 'YOrr @ ohtung. The device hangs on rollers, denominated in the Nufl the eohienen and is either advanced or advanced. while d @ iser operations-are the rails kept using Stützvorriohtungen. This allows operation of the railway during all operations werden.- receive full iufreoht. According to the invention, the device for performing the Procedure from a tub open at the front, one into a Edge has tapering base plate, to which sveoi- Connect moderately sloping side walls. The back The wärtige part of this device is of a sloping one Rear wall limited, which serves to support the new gravel during to keep the old gravel clearing out and use it while to dam the profile-appropriate compaction. The facilities to support the rails during railway operations attached according to the invention in the device itself and stand in their front part from close behind the cutting edge. brought supports and hand-mounted over the stern or mechanically #movable support devices. These will then removed from their support position when the smoldering len from their position in front of the rear wall of the device into their End position should be shifted behind this. According to a further embodiment of the invention is the Cut the jig with thorns or a drill bit provided to a. easier sliding of the tub during the to allow pushing under the sohotter bed. To enable the sleepers to be pushed in easily from the side Direction to allow under the rails are in the tub Rails for guiding two small,.: To accommodate the sleepers Car attached. The lengthways shifting of the sleepers on the other hand happens through bulls running on the rails. The operation of the method according to the invention and the new device is explained in more detail based on the drawing will. The device according to the invention is shown in the drawing, for example and presented in a simplified manner. $ s meaning fig. 1 a plan view of a superstructure of a lahntiber- # ganges, äig. 2 a U ngssohnitt through a superstructure in the direction of the track, Rig. 3 shows a cross section along the limb H-3 of the? Kg. 2 and fig. 4 a cross section of the enßang Miai e 0-0 of lis. 2. Am under the rails I hanging on rollers lrbeitaachild II offers the over the Bshnkörperplanum III after previous expansion of an old sleeper IV the Alteohotter Y before clear the shield. Then the work shield II is either advanced by lindening or pressing or by a pulling device device preferred, where en is advantageous, the feed in the Rule to set the width of the new threshold to be installed and in the now free space behind the work shield II the new one or filled with cleaned gravel YI. It serves as a warehouse for the new sleepers VII, which in the case shown are due to Sohwellen of a new type exist that in one component the rails carry and fasten and at the same time the road form roadway. So far, the installation of such overhead ohms was always linked to the railway operation with an overpricing. To ER- a guided feed the trough-like shield II possible, it hangs on rollers 1 at the ends of the rails I. Its base plate 2 rests on the Planuz III on the track bodies and is advanced or brought forward on this. To a light one To enable penetration into the ballast is the base plate 2 on its front edge with a cutting edge 3 or a shear The ballast is expediently advise loosened up in front of the cutting edge and on the base plate 2 as Shifted fork surface. The tub II (shield) is like the one from the Drawing can be seen (see Figs. 3 and 4) on both sides with side panels 4 and rearward (see Figure 2) with a sloping rear wall 5 provided. 3a can be seen from Figure 2 know that the ballast is comfortable from its position under the rails brought in the free space of the tub and II aunge- from this can be forked. As already mentioned, tub II is tied; by a pulling device acting in the direction of arrow 6 the Altaohotter pulled or pushed forward by pressing. To ensure trouble-free train operation, kept narrow in the Vorachubrichtung within the tub II Supports 7 attached on which the rails at this point rest. The support above the rear wall 5 takes place on her horizontal AbaohluBplatte 8 with the help of movable bearing plates 9 or of entelhrechenden retractable or extendable Bearings, rollers or other supporting devices. The lowerability or translatability is required in order to meet the new thresholds #II from the Einohubraum in the tub 2 in front of the rear wall 5 in their binbau- position behind the rear wall 5 to be able to move. The rear wall 5 stops after the tub II has been advanced by the width measured the new ballast PI in his of the sleepers VII to be installed Deposit and dam it during compaction. In the cleared area under the rails it is now possible to in the lower position above the base plate 2 and in front of the horizontal wall 5 the to introduce new threshold VII. After lifting this-new raw shaft PII in the installation height position with an expediently short-term easy lifting of the rails by winches or roller rocker arms on the supports 7 is above the rear wall 5 the space Ver pushing the regret threshold into the final fury behind the rock wall 5 created. The measures provided on the rear wall 5 eineohiebbaren or liftable support plates support in their operative position during of the ballast removal and installation the rails I. They are only used during the insertion of the thresholds VII from the installation space within the Tub in front of the rear wall 5 in its end position behind the rear wall 5 -sinks or extends. A practical embodiment of such a single and nutritious sliding support device is shown in Fig.4. On the top A support device rests on the horizontal closing plate 8 ′ of the rear wall 5. It consists of a tongue 9 in connection with a rack 10, which meshes with the pinion 14 which is rotatable by the crank 13 and thereby the tongue 9 attached to the rack 10 either under the rail I pushes to support it or the opposite rotation of the Crank 13 the space between the rail I and the Abdeokplatte 8 for moving the threshold VII out of the working area of the shield IC on the prepared gravel bed PI behind the rear wall 5 releases. A lightweight installing relatively heavy Überwegsohwellen YII to enable, these are on the side of the (quietly on two small Carriages 11 are deposited, which roll on the (edge plate 2 and are rails 15 are guided on the rear wall 5: the first takes paths the front end of the sleeper, the second, following at a distance ', Va7en her back end up. Under the G Track I run through the new sleepers VII Lifting devices 12 rolling on the rails into their egg raised and in its installation position behind the rear wall 5 procedure. There they are at the installation location on the previously flat and compacted at the prescribed altitude The ballast bed 9I is set down and after the lifting devices 12 have been dismantled connected to the rails by the final fasteners bound. J The process is then repeated by pulling out shield II under the next old sleeper IV in the old gravel bed Y and the The expansion process begins again.

Claims (1)

P a t e n t a n s p r ü o h e : 1. Verfahren zur Auswechslung und Bettung von Gleisen ohne Unterbrechung des Bisenbahnbetriebes, dadurch g e k e n n- z e i o h n e t, daß mit Hilfe einer über dem Bahnkörper- planum (III) zu bewegend@n Vorriahtung (II) zunächst die lltsehwelle (IV) ausgebaut, sodann der Altschotter (Y) vor und im Bereich der Vorrichtung (II) ausgeräumt und/ oder gereinigt, die Vorrichtung vorgeschoben oder -gezo- gen und. der neue oder gereinigte Schotter (9I) hinter der Vorrichtung (II) eingefüllt und verdichtet wird, so daB er als leger für die anschließend einzubringenden neuen Schwellen (YII) dient. 2. Verfahren nach Ansprach 1, dadurch g e k e n n s e i o h- n e t, daß die Schienen (I) während des Ausbaues der Altschwellen (IV) und des Altschotters (Y) sowie des Binbaues der neuen Schwellen (YII) mittels Tragvorrich- tungen (7,9) gehalten werden. 3. Verfahren nach Anspruch 1 und/oder 2, dadurch g e k e n n- z e i e h n e t, daß die Vorrichtung (II) an dem f einer oder beider Schienen geführt vorgeschoben oder vorgezogen wird. 4. Verfahren nach Anspruch 1 und/oder einem der folgenden, dadurch g e k e n n z e i c h n e t, daB das Vorschieben oder Vorziehen der Vorrichtung (II) mit Hilfe von Druck- oder Zugvorrichtungen erfolgt. 5. Verfahren nach Anspruch 1 und/oder einen der folgenden, dadurch g o k.e n n z e i o h n e t, daß die einzubauen- den neuen Schwellen im Bereich der Vorrichtung II auf kleine Wagen (11) abgesetzt, geführt unter die Schienen (1] gefahren, durch eine Hubvorrichtung (12) angehoben und
in ihre endgültige $inbaustellung verfahren werden. 6. Vorrichtung zur Durchführung des Verfahrens nach Anspruch 1 und/oder einen der folgenden, dadurch g e k e n n z e i c h n e t # daß die Vorrichtung (II ) aus einer nach vorn offenen Wanne besteht, die eine in eine Schneide (3) auslaufende Grundplatte (2) besitzt, an die sich Seitenborde (4) anschließen. 7. Vorrichtung nach Anspruch 6, dadurch g e k e n n z e i c h n e t, daß die Vorrichtung (II) eine schrägliegende Heckwand (5) besitzt. B. Vorrichtung nach Anspruch 6, dadurph g e k e n n z e i c h. n e tp daß in der Vorrichtung (II) Einrichtungen zur Ab- stützung der Schienen (I) während des Eisenbahnbetriebes angebracht sind. 9. Vorrichtung nach Ansprach 6, dadurch g e k e n n z e i c h. n e t, daß in der Vorrichtung (II) Einrichtungen zur Anhebung der Schienen (I) während des Ausbauen bzw Ein- baues der Schwellen angeordnet sind. 10. Vorrichtung nach Anspruch 8 und/oder 9, dadurch g e k e na : e i c h n e t, iiaß in der Vorrichtung (II) in Vorschub- richtung auf der Grundplatte (2) Stützen (7) und auf der Lbdeokplatte (8) der Heckwand (5) von Hand oder meoha- nisoh bewegbare Tragvorrichtungen (9) angebracht Bind, 11. Vorrichtungen nach Anspruch 10, dadurch g e k e n n s e idi n e t, daß die Tragvorrichtung (9) aus einer von eines Ritsel (14) angetriebenen Zahnstange (10) besteht, die in die tragende Zunge (9) ausläuft. 12. Vorrichtung nach Anspruch 6 und/oder einem der folgenden, dadurch g e k e n n s e i o h n e t, daß die Vorrichtung an Rollen (1) an den Schienenfüßen geführt bewegbar ist.
"!3. Torriohtuag.naoh Ä»prnoh 6# dadurqh S e k a a a s e i Q h. n e t, da£ die Schneide (3) mit llornoat =A/oder einer - eohervorriohtung versehen ist» 14. Yorriohtung nach Ansprach 6 nmd%der einest der folgenden, dadnroh g e k e a a s e i o h a e t, dai in der Torrichtung (II) Leitspiieaet (15) «r x**"& de. Wage» (11) mm nnsoäieben der i0»11« (M) aus seitlicher Richtung unter die SQhienes angeiraäd-eiad. 15. Yorriohtung nach den Ansprtohen 6 und 139 dadnsoh g e 1r e n n s e i ohne t * das «f dem ßoiei«4ä (I) eine rollbare Hubterriohtua# (12) s» s@rershielem der Bohrrehen (YII) au'setsbar aste 16e 'Porriohtung nach lnspruoh 149 dadurgh g. e k e a a s e i o h n e t, daß die Schwellen, (III) anu einer ßtel# lnag vor der Reckwand (5) in eine stellmg -hinter dieser rersohiebbar sind,
Patent claims: 1. Procedure for replacing and bedding tracks without Interruption of the railway operation, thereby geken n- i ze Ohnet that by means of a body over the web planum (III) to move @ n device (II) first the lltsehwelle (IV) removed, then the old gravel (Y) cleared in front of and in the area of the device (II) and / or cleaned, the device advanced or -drawn- gen and. the new or cleaned ballast (9I) behind the Device (II) is filled and compressed so that it as casual for the new ones to be brought in afterwards Thresholds (YII) are used. 2. The method according spoke 1, thereby gekennse i o h- n et that the rails (I) during the expansion of the Old sleepers (IV) and old ballast (Y) as well as the Bin construction of the new sleepers (YII) by means of support (7,9) are kept. 3. The method according to claim 1 and / or 2, characterized geke n n- i z e ehnet that the device (II) at the f one or both rails advanced or guided is preferred. 4. The method according to claim 1 and / or one of the following, characterized by the fact that the advancement or pulling the device (II) forward with the help of pressure or pulling devices. 5. The method according to claim 1 and / or one of the following, thereby go ke nnzeiohnet that the to be built-in the new thresholds in the area of device II small carriages (11) set down, guided under the rails (1] driven, raised by a lifting device (12) and
can be moved into their final installation position. 6. Device for performing the method according to Claim 1 and / or one of the following, characterized ge k ennze i # chnet that the V orrichtung (II) consists of a tub open to the front, the one has a base plate (2) ending in a cutting edge (3) , to which the side rims (4) connect. 7. Apparatus according to claim 6, characterized in that i ch net that the device (II) an inclined Has rear wall (5) . B. Apparatus according to claim 6, dadurph gekennze i c h. ne tp that in the device (II) facilities for support of the rails (I) during railway operations are appropriate. 9. The device according spoke 6, characterized thereby i c h. net that in the device (II) facilities for Raising the rails (I) during removal or installation construction of the sleepers are arranged. 10. Apparatus according to claim 8 and / or 9, characterized ge ke na : e i chnet, iiaß in the device (II) in feed direction on the base plate (2) supports (7) and on the Lbdeokplatte (8) of the rear wall (5) by hand or meoha nisoh movable supports (9) attached bind, 11. Devices according to claim 10, characterized in se idi net that the support device (9) consists of one of one Ritsel (14) driven rack (10), which in the supporting tongue (9) runs out. 12. The device according to claim 6 and / or one of the following, by knowing that the device is movable guided on rollers (1) on the rail feet.
"! 3. Torriohtuag.naoh Ä» prnoh 6 # dadurqh S ekaaase i Q h. net, since the cutting edge (3) with llornoat = A / or a - eohervorriohtung is provided » 14. Yorriohtung after spoke 6 nmd% of one of the following, dadnroh gekeaaseiohaet, dai in the gate direction (II) Leitspiieaet (15) «rx **"& de. Scale " (11) mm" from the i0 "11" (M) lateral direction under the SQhienes angeira ä d-eiad. 15. Correction according to Proceedings 6 and 139 then ge 1r ennse i without t * das " f dem ßoiei " 4ä (I) a rollable Hubterriohtua # (12) s »s @ rershielem the drill turning (YII) attachable aste 16e 'Portriohtung according to Inspruoh 149 dadurgh g. ek eaa be aware that the thresholds, (III) anu a ßtel # lnag in front of the horizontal wall (5) in a position behind it are removable
DE19621409751 1962-10-05 1962-10-05 Procedure for the replacement and bedding of sleepers Pending DE1409751A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEB0069112 1962-10-05

Publications (1)

Publication Number Publication Date
DE1409751A1 true DE1409751A1 (en) 1968-11-28

Family

ID=6976165

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19621409751 Pending DE1409751A1 (en) 1962-10-05 1962-10-05 Procedure for the replacement and bedding of sleepers

Country Status (1)

Country Link
DE (1) DE1409751A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029008C2 (en) * 2005-05-11 2006-12-18 Movares Nederland Bv Railway sleeper replacement method, involves providing ballast replacement filler in container for placing beneath replacement sleeper

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1029008C2 (en) * 2005-05-11 2006-12-18 Movares Nederland Bv Railway sleeper replacement method, involves providing ballast replacement filler in container for placing beneath replacement sleeper

Similar Documents

Publication Publication Date Title
DE3227725C2 (en)
DE2065989C3 (en) Mobile track construction machine for processing the ballast bedding
EP0790352A2 (en) Arrangement for the subgrade-rehabilitation of a ballast for a track
DE1534078B2 (en) Mobile tamping, leveling and straightening machine
EP0255564A1 (en) Machine for replacing or renewing the rails and sleepers of an existing track
DE2057182A1 (en) Method and machine for the treatment of ballast ballast on railway tracks
DE2023979A1 (en) Processes and devices for continuously replacing or renewing sleepers and possibly the rails of a track
AT3878U2 (en) MACHINE AND METHOD FOR REMOVING AN OLD TRACK AND LAYING A NEW TRACK
DE4237712C2 (en) Plant for the production of a formation protection layer
DE3430291A1 (en) METHOD AND MACHINE FOR CLEANING A RAILWAY BED
DE4127383A1 (en) MACHINE FOR REPLACING THE SILLS OF A TRACK
DE3634399A1 (en) TRACKING MACHINE WITH LIFTING, STOPPING AND, IF NECESSARY, DIRECTIONAL UNIT
CH628380A5 (en) MOBILE DEVICE FOR THE CONTINUOUS REPLACEMENT OF A RAILWAY consisting of RAILS AND SILLS.
DE2619130A1 (en) EQUIPMENT FOR LAYING OR SECTIONS REPLACING A TRACK
DE1658343A1 (en) Processes and devices for the continuous renewal of tracks
DE3819717A1 (en) CONTINUOUSLY (NON-STOP) TRAVELABLE TRACKING MACHINE
DE1784659C3 (en) Mobile device and procedure for the maintenance of a railway superstructure
EP0771909B1 (en) Machine for dismantling old and installing new railway tracks
DE3814732A1 (en) TRACKABLE DEVICE OR PLANNING THE GRAVEL OF A TRACK WITH CROSS SLEEPERS
DE897716C (en) Movable track bed cleaning machine in the course of the main track
DE3634398C2 (en) Mobile system for the continuous renewal of the rails and sleepers of a track
DE202008003589U1 (en) Track rehabilitation machine with base layer milling machine
DE1658393A1 (en) Track cleaning device
DE1409751A1 (en) Procedure for the replacement and bedding of sleepers
DE481357C (en) Device for introducing and plugging mountain backfill