DE1256180B - Method and device for the dismantling of float-like deposits, in particular coal fields - Google Patents

Method and device for the dismantling of float-like deposits, in particular coal fields

Info

Publication number
DE1256180B
DE1256180B DEM43598A DEM0043598A DE1256180B DE 1256180 B DE1256180 B DE 1256180B DE M43598 A DEM43598 A DE M43598A DE M0043598 A DEM0043598 A DE M0043598A DE 1256180 B DE1256180 B DE 1256180B
Authority
DE
Germany
Prior art keywords
mining
short
offset
distance
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEM43598A
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIEN MASCHFAB
Maschinenfabrik und Eisengiesserei A Beien
Original Assignee
BEIEN MASCHFAB
Maschinenfabrik und Eisengiesserei A Beien
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIEN MASCHFAB, Maschinenfabrik und Eisengiesserei A Beien filed Critical BEIEN MASCHFAB
Priority to DEM43598A priority Critical patent/DE1256180B/en
Publication of DE1256180B publication Critical patent/DE1256180B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Verfahren und Einrichtung zum Abbau von unter Tage anstehenden, flözartigen Lagerstätten. insbesondere Kohlenflözen Für den Abbau von unter Tage anstehenden flözartigen Lagerstätten, insbesondere von Kohlenflözen, sind Abbauverfahren bekannt, bei welchen das Mineral zwischen zwei im Streichen der Lagerstätte aufgefahrenen Abbau- oder Teilsohlenstrecken von einem diese verbindenden, etwa im Einfallen der Lagerstätte verlaufenden Aufhauen aus in zweiflügligen Abbaubetriebspunkten mit schwebendem Verhieb hereingewonnen wird. An das der Wetterführung und Bergezufuhr dienende zentral angeordnete Aufhauen schließen sich beiderseits Abbaustöße in einer Länge von jeweils 100 bis 200 m an, so daß der Abbau auf einer Gesamtlänge von etwa 200 bis 400 m schwebend zu Felde getrieben wird. Die Hereingewinnung des insbesondere aus Kohle bestehenden Minerals erfolgt hierbei in der Regel durch Abbauhammerarbeit, während für den Strebausbau die üblichen hölzernen oder stählernen Grubenstempel Verwendung finden. Die Abbauhohlräume werden durch Hand-, Blas- oder Blindortversatz verfüllt, wobei auch das zentrale Aufhauen mit versetzt wird, während an beiden Rändern des Abbaus schwebende, mit fortschreitendem Abbau immer länger werdende Strecken nachgeführt werden, in denen Förderrutschen oder Förderbänder vorgesehen sind, auf die die Strebfördermittel austragen.Procedure and equipment for the extraction of seam-like structures underground Deposits. in particular coal seams For the mining of pending coal seams Seam-like deposits, especially coal seams, are known to be mining methods. in which the mineral was excavated between two in strike of the deposit Mining or partial level stretches of a connecting them, for example in the collapse of the Deposits running in two-leaf mining operating points with pending blow is won. To that of the weather management and mountain supply serving, centrally arranged knock-ups close on both sides mining joints in one Length of 100 to 200 m each, so that the dismantling on a total length of about 200 to 400 m floating in the field is driven. The winning of the particular minerals consisting of coal are usually carried out using a hammer, while the usual wooden or steel pit stamps are used for longwall mining Find use. The excavation voids are localized by hand, blow or blind backfilled, with the central roughening also being added, while on both The edges of the degradation are floating, and become longer as the degradation progresses Routes are tracked in which conveyor chutes or conveyor belts are provided are to which the face funding is carried out.

Trotz verschiedener Vorteile ist der Anwendungsbereich dieses sogenannten schwebenden Strebbaus bislang auf flach gelagerte Flöze mäßiger Mächtigkeit beschränkt geblieben, da mit größerem Einfallen die Kohlenfallgefahr erheblich zunimmt und es erhebliche Schwierigkeiten bereitet, das Strebfördermittel dem Abbaufortschritt folgend zu verlegen bzw. umzurücken. Ein weiterer Nachteil besteht darin, daß die streichenden Abbaustrecken vor Beginn des Abbaus in ihrer gesamten Länge aufgefahren werden müssen, was eine verhältnismäßig umfangreiche und zeitraubende Vorrichtung vor Beginn des Abbaus erforderlich macht. Außerdem ist ein verhältnismäßig großer Aufwand an Fördermitteln erforderlich, die infolge der geringen Gewinnungsleistung der mit Abbauhammerarbeit betriebenen Streben nur unzulänglich ausgenutzt werden. Da die im Einfallen verlaufende Bergezufuhrstrecke mit fortschreitendem Abbau verkürzt und die schwebend nachgeführten Förderstrecken entsprechend verlängert werden müssen, läßt sich bei diesem Verfahren das Einbringen des Versatzes nur während der Zeit vornehmen, in der der Abbaustoß nicht bearbeitet wird, so daß für die Gewinnungsarbeiten nur eine begrenzte Arbeitszeit zur Verfügung steht und eine geringe Ausnutzung des Kohlenstoßes die Folge ist. Um die verhältnismäßig geringe Gewinnungsleistung von mit Abbauhammerarbeit betriebenen schwebenden Abbaustreben zu verringern, hat man bereits vorgeschlagen, für die Hereingewinnung und Abförderung des Minerals durch Zugmittel am Abbaustoß entlangbewegte Schälschrapper zu verwenden. Der Abbau erfolgt hierbei ebenfalls zweiflüglig zwischen drei im Streichen oder im Einfallen der Lagerstätte aufgefahrenen Strecken, von denen die mittlere als Förderstrecke ausgebildet und mit mindestens einem endlos umlaufenden Fördermittel, beispielsweise einem Förderband, ausgerüstet ist. Die jeweils etwa eine Länge von 130 m besitzenden Abbaustöße werden durch zwei unabhängig voneinander arbeitenden Schälschrapperanlagen bearbeitet, welche das hereingewonnene Mineral der zentral angeordneten Förderstrecke zuführen.Despite various advantages, the scope of application is this so-called floating longwall has so far been limited to flat seams of moderate thickness remained, since the greater the incursion the risk of coal falling increases considerably and there is considerable difficulty in keeping the face mining progressing to relocate or move in the following. Another disadvantage is that the The entire length of the painting stretches was driven before the start of mining must be what a relatively extensive and time-consuming device before dismantling begins. It is also a relatively large one Expenditure on funding is required, which is due to the low extraction rate the struts operated with hammer work are only insufficiently exploited. Since the mountain supply route running in the collapse is shortened as the mining progresses and the floating conveyor lines have to be extended accordingly, With this method, the offset can only be introduced during the time make, in which the mining face is not processed, so that for the extraction work only limited working hours are available and little utilization of the Coal collision is the result. To the relatively low extraction rate of One has to reduce floating struts operated with hammer work already proposed for the extraction and removal of the mineral through To use traction devices moving along the working joint. The dismantling takes place here also two-winged between three in the strike or in the collapse of the deposit driven routes, of which the middle is designed as a conveyor line and with at least one endlessly rotating conveyor, for example a conveyor belt, is equipped. The mining joints, each about 130 m long, will be processed by two independently working scraper systems, which feed the extracted mineral to the centrally arranged conveyor line.

Dieses Verfahren besitzt gegenüber dem schwebenden Strebbau mit Abbauhammerbetrieb zwar den Vorteil einer größeren Gewinnungsleistung und einer Mechanisierung der Hereingewinnung, erfordert jedoch aus förder- und wettertechnischen Gründen die vorherige Auffahrung und anschließende Aufrechterhaltung der beiden am Rande des Abbaus angeordneten oder schwebenden Strecken sowie während des gesamten Abbaus die Aufrechterhaltung der zentral angeordneten Förderstrecke. Um ein Austragen der Schälschrapperanlage in das zentral angeordnete Streckenfördermittel zu ermöglichen, ist es unumgänglich, daß die zentral angeordnete Förderstrecke um ein erhebliches Maß im Liegenden nachgerissen wird und die Schrapperkästen bis über das in der Förderstrecke verlagerte Fördermittel hinaus bewegt werden können. Hierzu ist es erforderlich, die Antriebsstation für das Zugmittel der Schälschrapperanlage auf der dem von ihr bearbeiteten Abbaustoß entgegengesetzten Seite der Förderstrecke anzuordnen, was die vorherige von Hand vorzunehmende Herstellung verhältnismäßig großer Hohlräume im anstehenden Mineral bzw. die Offenhaltung entsprechend großer Hohlräume innerhalb des Versatzfeldes notwendig macht. Hierdurch und durch das verhältnismäßig umständliche Nachrücken der erhebliche Abmessungen besitzenden Antriebs- und Umkehrstationen der Schälschrapperanlagen wird die Abbauleistung dieser zweiflügligen Abbaubetriebe erheblich beeinträchtigt, ganz abgesehen davon, daß ein Nachführen des Ausbaus sowie ein Einbringen des Bergeversatzes während der Gewinnungsarbeit nicht möb lich ist. Ein weiterer Nachteil dieses bekannten Verfahrens besteht darin, daß infolge der verhältnismäßig großen Breite der Schrapperkästen ein entsprechend breiter Hangendstreifen entlang des Abbaustoßes ohne Ausbau verbleiben muß, so daß sich dieses Verfahren nur bei besonders günstigen Hangendverhältnissen anwenden läßt.This method has the opposite of floating longwall mining with pick hammer operation although the advantage of a greater extraction capacity and mechanization of the Winning in, however, requires the previous approach and subsequent maintenance of the two on the edge of the Dismantling arranged or suspended routes as well as during the entire dismantling the maintenance of the centrally arranged conveyor line. To unsubscribe the To enable peeling scraper system in the centrally arranged conveyor belt, it is inevitable that the centrally arranged conveyor line by a considerable Measure in the horizontal is torn down and the scraper boxes up over that in the conveyor line relocated funds can be moved out. For this it is necessary the drive station for the traction mechanism of the scraper system on that of her arranged working face opposite side of the conveyor line what the previous manual production of relatively large cavities in the pending mineral or keeping it open accordingly greater Makes cavities within the offset field necessary. Through this and through that proportionately awkward moving up of the drive and reversing stations, which have considerable dimensions the peeling scraper is the mining performance of these two-leaf mining operations considerably impaired, quite apart from the fact that a tracking of the expansion as well it is not possible to introduce the mountain backfill during the extraction work, please include. Another disadvantage of this known method is that as a result of relatively large width of the scraper boxes a correspondingly wide hanging strip must remain along the working face without expansion, so that this method can only be used in particularly favorable slope conditions.

Die Erfindung hat sich die Aufgabe gestellt, ausgehend von den vorstehend beschriebenen bekannten Verfahren, ein gleichfalls mit schwebendem Verhieb arbeitendes zweiflügliges Abbauverfahren zu schaffen, welches eine möglichst weitgehende Mechanisierung und Automatisierung sämtlicher mit der Hereingewinnung, der Abförderung, des Ausbaus und der Verfüllung verbundenen Arbeitsverrichtungen bei entsprechend geringem Personalaufwand ermöglicht und die Erzielung von besonders hohen Gewinnungsleistungen bei einem höchstmöglichen Ausnutzungsrad sämtlicher in den Abbaubetrieben eingesetzten Gewinnungs-, Förder-, Ausbau- und Versatzeinrichtungen erlaubt.The invention has set itself the task, based on the above described known method, a likewise working with floating propulsion to create a double-leaf mining process, which requires the greatest possible degree of mechanization and automation of everything with the acquisition, the removal, the expansion and work related to backfilling with correspondingly low personnel costs enables and the achievement of particularly high extraction rates with a highest possible degree of utilization of all extraction, Conveying, expansion and displacement equipment allowed.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß die Lagerstätte durch etwa parallel und in einem gegenüber der üblichen streichenden Länge zweiflügliger Abbaubetriebspunkte wesentlich geringeren Abstand von z. B. etwa 100 m aufgefahrene Aufhauen in streifenförmige Abbaufelder unterteilt und beiderseits der Aufhauen durch sich etwa über die Hälfte des Abstandes zweier benachbarter Aufhauen erstreckende Kurzstreben in der Weise abgebautwird, daß derAbbaustoß jedes Kurzstrebers durch selbsttätig gesteuerte, schälende Gewinnungseinrichtungen gleichzeitig am Hangenden und Liegenden bearbeitet wird und daß das hereingewonnene Raufwerk durch etwa parallel zum Abbaustoß angeordnete, endlos umlaufende Kurzfördermittel zum Aufhauen hin abgefördert wird und daß die Kurzfördermittel einschließlich der Führungs- und Antriebsmittel für die Gewinnungseinrichtungen in an sich bekannter Weise durch maschinell vorrückbare Strebausbaueinrichtungen selbsttätig dem Abbaufortschritt folgend nachgerückt werden, wobei die Strebausbaueinnchtungen eine sich über die gesamte Länge des Kurzstrebes erstreckende Blasleitung mitführen.This object is achieved according to the invention in that the storage facility by approximately parallel and in a two-winged length compared to the usual striking length Dismantling operating points much smaller distance from z. B. driven about 100 m Raising divided into strip-shaped mining fields and on both sides of the excavation by about half the distance between two adjacent knocks Short strut is mined in such a way that the working face of each short strut passes through automatically controlled, peeling extraction devices at the same time on the hanging wall and lying is processed and that the recovered volume by approximately parallel endlessly circulating short conveying means arranged to the excavation face are conveyed away for thickening and that the short-term funding including the guide and drive means for the extraction facilities in a manner known per se by mechanically advancing Longwall mining equipment is automatically moved up in line with the mining progress, the longwall construction equipment extending over the entire length of the short brace Carry an extended blow line with you.

Während bei den bekannten zweiflügligen Abbaubetrieben die schwebende Hereingewinnung des anstehenden Minerals an Abbaustößen von jeweils etwa 1.00 bis 200 m Länge erfolgte, wird bei dem erfindungsgemäß vorgeschlagenen Verfahren die Lagerstätte beiderseits der in vergleichsweise geringen streichenden Abständen aufgefahrenen Aufhauen in Streifen von etwa 40 bis 50 m Breite schwebend abgebaut, so daß sich der Abbau jeweils nur auf eine verhältnismäßig kurze Abbaufront konzentriert und die zur Vorrichtung des Abbaubetriebes erforderlichen Arbeiten einen entsprechend geringen Umfang haben. Infolge der gegenüber den bekannten Verfahren wesentlich geringeren Länge der Abbaustöße besitzen die verwendeten Gewinnungs-, Förder-, Versatz- und Ausbaueinrichtungen ebenfalls eine nur geringe Länge, so daß trotz Verwendung besonders leistungsfähiger sowie vollautomatisierter Einrichtungen deren Anlagekosten nicht übermäßig hoch sind. Andererseits schaffen erst derart kurze Streben von z. B. etwa 40 bis 50 m Länge die Voraussetzungen für eine Vollautomatisierung der Gewinnung, der Förderung, des Ausbaus und des Versatzes, da sich vollautomatische Einrichtungen dieser Art bei größeren Streblängen praktisch nicht mehr mit der erforderlichen Präzision automatisch schalten und steuern lassen und überdies viel zu störungsanfällig sind.While in the known two-winged mining operations the pending extraction of the pending mineral took place at mining impacts of about 1.00 to 200 m in length, in the method proposed according to the invention the deposit on both sides of the excavation, excavated at comparatively short sweeping distances, is made in strips of about 40 to 50 m wide pending dismantled, so that the dismantling is only concentrated on a relatively short mining front and the work required to set up the mining operation is correspondingly small. As a result of the significantly shorter length of the mining joints compared to the known methods, the extraction, conveying, offset and expansion devices used also have only a short length, so that their investment costs are not excessively high despite the use of particularly powerful and fully automated devices. On the other hand, create only such short struts of z. B. about 40 to 50 m length the prerequisites for fully automated extraction, promotion, expansion and offset, since fully automatic devices of this type can practically no longer switch and control automatically with the required precision with larger face lengths and, moreover, a lot are prone to failure.

Das erfindungsgemäß vorgeschlagene Verfahren stellt somit eine völlige Abkehr von der bisherigen Entwicklungslinie der vor allem für den deutschen Steinkohlenbergbau in Frage kommenden Abbauverfahren dar. Nachdem im Zuge der in den zwanziger Jahren durchgeführten Rationalisierungsmaßnahmen sich innerhalb weniger Jahre im deutschen Steinkohlenbergbau der sogenannte Langfrontstrebbau allgemein durchgesetzt hatte, war die Fachwelt allgemein der Auffassung, daß sich eine mechanisierte und rationelle Hereingewinnung unter den vor allem im deutschen Steinkohlenbergbau vorherrschenden Lagerungsverhältnissen - selbstverständlich in der flachen Lagerung - nur mittels des Langfrontstrebbaus erreichen lasse. Der Langfrontstrebbau war auch die grundlegende Voraussetzung für die Ende der vierziger und in den fünfziger Jahren erfolgte weitgehende Mechanisierung der Kohlengewinnung. Von der Erfindung wurde indessen erkannt, daß der Langfrontstrebbau ein wesentlicher Grund dafür gewesen ist, daß es in den Jahren vor dem Anmeldetag dem deutschen Steinkohlenbergbau nicht mehr möglich gewesen ist, eine nennenswerte weitere Leistungssteigerung zu erzielen bzw. über einen gewissen Leistungsgrenzwert wesentlich hinauszukommen.The method proposed according to the invention is therefore a complete one Departure from the previous line of development, especially for the German hard coal mining industry possible degradation methods. After in the course of the twenties Rationalization measures carried out within a few years in the German Coal mining was generally followed by the so-called long-front bracing, the professional world was generally of the opinion that a mechanized and rational Extraction among the predominant ones in the German hard coal mining industry Storage conditions - of course in flat storage - only by means of of the long front bracing. The long front bracing was also the basic one Prerequisite for the end of the forties and in the fifties took place extensive Mechanization of coal production. Of the invention, however, it was recognized that The long-front wall bracing has been a major reason for it over the years the German hard coal mining industry was no longer possible before the filing date, to achieve a significant further increase in performance or above a certain level To go significantly beyond the power limit.

Die Ursachen hierfür sind im wesentlichen folgende: Mit zunehmender Teufe werden die Lagerungs- und Abbauverhältnisse in den deutschen Steinkohlenrevieren zunehmend schwieriger, so daß es mit Vorrücken des Abbaus in größere Teufen immer problematischer wird, mit langen Abbaufronten von beispielsweise 200 oder noch mehr Metern Länge zu arbeiten. Derartige Langfront-Abbaubetriebe werden in immer stärkerem Maße durch geologische Störungen oder Zonen schwer zu beherrschenden Hangenden in ihrer Leistungsentfaltung sowie in ihrem Abbaufortschritt gehemmt. Die Mechanisierung der Gewinnungsbetriebe hat überdies inzwischen einen solchen Umfang erreicht, daß praktisch alle Betriebe, deren Lagerungs- und Nebengesteinsverhältnisse eine Mechanisierung mittels der für den Langfrontabbau zur Verfügung stehenden Einrichtungen zulassen, auch mechanisiert worden sind. Mit jedem weiteren Vorrücken des Abbaus zur Teufe hin wird es jedoch immer schwieriger, für den Einsatz der bislang bekannten maschinellen Gewinnungseinrichtungen Betriebe mit geeigneten Lagerungs- und Nebengesteinsverhältnissen und einer ausreichend großen Abbaufrontlänge zur Verfügung zu stellen. Andererseits ist die Wahrscheinlichkeit, daß ein Streb von beispielsweise 200 bis 250 m Stoßlänge in den Bereich einer Störungszone gerät, um ein Vielfaches größer als bei einem Streb mit beispielsweise nur etwa 40 bis 50 m Abbaufrontlänge. Außerdem wirkt sich eine im Bereich eines Langfront-Abbaubetriebes auftretende Störungszone naturgemäß auf den Arbeitsablauf des gesamten Langfrontbetriebes leistungshemmend aus, während bei einem Kurzfrontabbau nur der wesentlich kürzere Kurzfrontbetriebspunkt in Mitleidenschaft gezogen wird. Da sich Langfrontbetriebe außerdem wesentlich schlechter an unregelmäßige und gestörte Lagerungsverhältnisse anpassen lassen, als dies bei um ein Mehrfaches kürzeren Kurzfrontstreben der Fall ist, erscheint die Beibehaltung des im deutschen Steinkohlenbergbau seit Jahrzehnten in der flachen Lagerung ausschließlich angewendeten Langfrontstrebbaus mit weiterem Vorrücken zur Teufe hin außerordentlich fragwürdig.The reasons for this are essentially as follows: With increasing The storage and mining conditions in the German hard coal fields are becoming deeper increasingly difficult, so that with advancement of mining in greater depths it always becomes more problematic with long mining fronts of, for example, 200 or even more Meters in length to work. Such long-front mining operations are becoming stronger and stronger Dimensions due to geological faults or zones in hanging walls that are difficult to control their performance as well as their progress of degradation are inhibited. The mechanization the mining operations have meanwhile reached such a size that practically all businesses whose storage and secondary rock conditions require mechanization using the facilities available for long front dismantling, have also been mechanized. With each further advance of the mining to the depth however, it is becoming more and more difficult to use the previously known machine Extraction facilities Operations with suitable storage and secondary rock conditions and to provide a sufficiently large dismantling front length. on the other hand is the probability that a longwall face with a length of, for example, 200 to 250 m gets into the area of a fault zone, many times larger than with one Longwall face with, for example, only around 40 to 50 m excavation front length. It also affects one occurring in the area of a long-front mining operation Fault zone naturally restricting the work flow of the entire long-front operation off, while with a short front reduction only the much shorter short front operating point is affected. Since long-front farms are also much worse can be adapted to irregular and disturbed storage conditions than this at If the short front struts are several times shorter, the retention appears in the German hard coal mining industry for decades in flat storage The long-front bracing used with further advancement towards the depth is extraordinary questionable.

Auch in hoch mechanisierten Langfront-Abbaubetriebspunkten stellt der tatsächlich erzielte Abbaufortschritt nur einen kleinen Bruchteil des mittels der vorhandenen maschinellen Einrichtungen theoretisch erreichbaren Abbaufortschrittes dar. Die Ursache hierfür sind einmal die vorerwähnten, mit größer werdender Teufe immer schwieriger werdenden Lagerungsverhältnisse, die auch nicht annähernd eine volle Ausnutzung der Leistungsfähigkeit der vorhandenen maschinellen Einrichtungen zulassen. Hinzu kommt, daß bei einem Abbaubetriebspunkt von 200 bis 250 m Länge die Möglichkeit und Wahrscheinlichkeit sonstiger Betriebsstörungen, die sich leistungshemmend auf den gesamten Abbaubetriebspunkt auswirken, wesentlich größer ist als bei einem Kurzfrontbetrieb von nur etwa 40 bis 50 m Länge. Die Folge hiervon ist, daß sowohl die eigentliche Gewinnungseinrichtung als auch die gesamte übrige Strebausrüstung, nämlich Förder-, Ausbau- und Versatzeinrichtungen, selbst in hoch mechanisierten Langfrontbetrieben nur sehr schlecht ausgenutzt werden bzw. eine entsprechend hohe Belastung der geförderten Kohle durch Abschreibung und Amortisation sowie durch Unterhaltung und Wartung der sehr kostspieligen Strebausrüstung verursachen. Schließlich verlangt die Mechanisierung langer Kohlenfronten einen sehr hohen Kapitalaufwand, was bei der immer schwieriger werdenden Ertragslage des deutschen Steinkohlenbergbaus ebenfalls ein wesentlicher Gesichtspunkt ist.Also in highly mechanized long-front mining operating points the actually achieved mining progress is only a small fraction of the mean of the existing machine facilities theoretically achievable mining progress The cause for this are once the aforementioned, with increasing depth increasingly difficult storage conditions, which are not even close to a full utilization of the capabilities of the existing machine facilities allow. In addition, at a dismantling operating point of 200 to 250 m in length the possibility and likelihood of other operational disruptions that affect performance affect the entire mining operating point, is significantly greater than with one Short front operation of only about 40 to 50 m in length. The consequence of this is that both the actual extraction facility as well as all other longwall equipment, namely conveyor, expansion and displacement facilities, even in highly mechanized ones Long-front operations are only used very poorly or a correspondingly high level Load on the coal produced by depreciation and amortization as well as by Cause maintenance and servicing of the very expensive longwall equipment. In the end the mechanization of long coal fronts requires a very high capital expenditure, what about the increasingly difficult earnings situation in the German hard coal mining industry is also an important consideration.

Die immer schwieriger und gestörter werdenden Lagerungsverhältnisse im deutschen Steinkohlenbergbau führen weiter dazu, daß die durchschnittliche streichende Baulänge der Langfrontbetriebe zur Teufe hin immer kleiner wird, so daß in immer kürzeren Abständen neue Betriebspunkte vor- und hergerichtet sowie auslaufende Betriebe ausgeraubt werden müssen, was bei einem hoch mechanisierten Langfrontbetrieb ebenfalls mit einem erheblichen Schichten- und Zeitaufwand verbunden ist. Ein weiterer Nachteil des Langfrontabbaus besteht darin, daß regelmäßig beim Anfahren von spitzwinklig zum Abbaustoß verlaufenden Störungen größere Vorräte sitzenbleiben, die sich maschinell nicht mehr hereingewinnen lassen, sondern allenfalls noch von Hand hereinzugewinnen sind, während es durch einen Kurzfrontabbau in weit höherem Maße möglich ist, auch in der Nähe von Störungszonen sitzende Kohlenvorräte maschinell abzubauen.The increasingly difficult and disturbed storage conditions in German hard coal mining lead to the fact that the average trending The length of the long-front operations becomes smaller and smaller towards the depth, so that in always New operating points prepared and set up at shorter intervals, as well as operations that are being phased out must be robbed, which is also the case with a highly mechanized long-front operation is associated with a considerable amount of shifts and time. Another disadvantage the long-front reduction consists in the fact that regularly when approaching from acute-angled larger supplies remain, which are mechanically can no longer be won in, but at best can still be won by hand are, while it is possible to a far greater extent through short-front mining, too mechanically dismantle coal stocks in the vicinity of fault zones.

Schließlich hat sich beim Langfrontabbau die Mechanisierung des Abbaus bislang praktisch ausschließlich auf die eigentliche Kohlengewinnung beschränkt, während nach wie vor nahezu alle anderen Arbeitsvorgänge sowohl im Streb als auch insbesondere bei der Vorrichtung, Herrichtung und beim Ausrauben der Abbaubetriebspunkte sowie bei der Abbaustreckenauffahrung und -unterhaltung praktisch ausschließlich von Hand vorgenommen werden. Die Folge hiervon ist, daß der Prozentsatz der unmittelbar mit der Kohlengewinnung Beschäftigten im deutschen Steinkohlenbergbau in den letzten Jahren immer kleiner geworden ist. Andererseits ist hierdurch sowie durch die immer kürzer werdende Arbeitszeit und die ständig steigenden Löhne die Belastung der Abbaubetriebe durch die nicht unmittelbar durch die Kohlengewinnung verursachten Kosten laufend gestiegen.Ultimately, the mechanization of mining has become a thing of the past in long-front mining so far limited practically exclusively to the actual coal production, while still almost all other work processes both in the face and especially when it comes to the device, the preparation and the robbery of the mining operating points as well as practically exclusively for the excavation and maintenance of the excavation route be done by hand. The consequence of this is that the percentage of immediate employees in the German hard coal mining industry in the last few years Has become smaller and smaller over the years. On the other hand, through this as well as through the always Shorter working hours and the steadily rising wages put the burden on the mining operations due to the costs not directly caused by coal extraction gone up.

Ein weiterer Gesichtspunkt, der gegen die Beibehaltung des Langfrontstrebbaues spricht ist der, daß sich der einzelne Arbeiter bei der Größe der zur Zeit üblichen Langfrontbetriebe anonymer fühlt als in kleinen Kameradschaften. Sein Interesse erstreckt sich vielfach nur auf seinen unmittelbaren Arbeitsbereich. Es fehlt daher oft an der Bereitschaft mit anzufassen, wenn außerhalb seines eigenen Arbeitsbereiches Störungen zu beheben sind oder der Arbeitsablauf unterstützt werden muß.Another point of view that opposes the retention of the long-front bracing what speaks is that the individual worker is at the height of the usual at the time Long-front farms feel more anonymous than in small comradeships. His interest often only extends to his immediate work area. It is therefore missing often willing to help out when outside of his own work area Faults need to be eliminated or the workflow needs to be supported.

Alle diese Nachteile des bislang in der flachen Lagerung der deutschen Steinkohlenreviere praktisch ausschließlich angewendeten Langfrontabbaues werden durch das erfindungsgemäß vorgeschlagene Kurzfront-Abbauverfahren beseitigt.All these disadvantages of so far in the flat storage of the German Coal mining areas are practically exclusively used long-front mining eliminated by the short front degradation method proposed according to the invention.

So lassen sich zunächst mittels des erfindungsgemäß vorgeschlagenen Kurzfront-Verfahrens auch weniger regelmäßig gelagerte und stärker gestörte Flöze vollmechanisiert abbauen, die im Langfrontabbau weder von Hand noch maschinell wirtschaftlich hereinzugewinnen sind. Damit wird zunächst die Voraussetzung dafür geschaffen, daß mit weiterem Vorrücken des Abbaus zur Teufe hin nicht nur der Anteil der vollmechanisierten Gewinnung an der Gesamtförderung gehalten, sondern weiter erhöht werden kann, dadurch, daß eine vollmechanisierte Hereingewinnung solcher Flöze ermöglicht wird, die sich im Langfrontabbau nicht maschinell abbauen lassen. Andererseits wirken sich bei dem erfindungsgemäß vorgeschlagenen Abbauverfahren ungünstige und gestörte Lagerungsverhältnisse sowie auch in der Praxis nicht zu vermeidende Betriebsstörungen in wesentlich geringerem Maße auf die Leistungsentfaltung und den Abbaufortschritt aus, als dies beim Langfrontbetrieb der Fall ist. Als Belegschaft eines Kurzfrontbetriebes genügt eine verhältnismäßig kleine Arbeitsgruppe, innerhalb welcher sich der einzelne Arbeiter erfahrungsgemäß wesentlich intensiver und uneigennütziger einsetzt als dies bei großen Kameradschaften der Fall ist, so daß auch dieser Umstand sich vorteilhaft auf die Leistungsentfaltung auswirkt.So can initially be by means of the proposed according to the invention Short front method also less regular and more disturbed seams Fully mechanized dismantling, while long-front dismantling is not economical either by hand or by machine are to be won. This first creates the prerequisite that with further advancement of the mining towards the depth not only the proportion of the fully mechanized The production of the total funding is kept, but can be increased further, as a result, that a fully mechanized extraction of such seams is made possible, which Do not allow machine to be dismantled in long-front dismantling. On the other hand, contribute the degradation method proposed according to the invention unfavorable and disturbed storage conditions as well as operational disruptions that cannot be avoided in practice to a much lesser extent Measures on the performance development and the progress of mining than in the case of long-front operation the case is. As a workforce in a short-front company, one is relatively sufficient small working group, within which the individual worker is based on experience uses much more intensely and unselfishly than is the case with large comradeships is the case, so that this fact also has an advantageous effect on the development of power affects.

Aus all diesen Gründen ergibt sich somit bei dem erfindungsgemäß vorgeschlagenen Abbauverfahren die Möglichkeit zur Erzielung von außerordentlich hohen Abbaufortschritten - z. B. von 1,5 bis 2 m/Stunde - die um ein Mehrfaches höher liegen als sie im Langfrontabbau auch unter besonders günstigen Verhältnissen sowie bei weitestgehender Mechanisierung der Gewinnungs- und Förderarbeiten zu erreichen sind. Diese außerordentlich großen Abbaufortschritte haben nicht nur eine sehr hohe Gewinnungsleistung und eine sehr hohe Ausnutzung des Abbaustoßes zur Folge, sondern gewährleisten außerdem eine optimale Ausnutzung der in ihrer Anschaffung naturgemäß entsprechend teuren vollautomatischen Gewinnungs-, Förder-, Ausbau- und Ver- Satzeinrichtungen, so daß die Tonne hereingewonnenen Minerals mit wesentlich geringeren Kosten an Maschinenmiete für die maschinelle Kurzfront-Ausrüstung belastet wird als dies bei vollmechanisierten Langfrontbetrieben der Fall ist. Die hohen Abbaufortschritte und der verhältnismäßig geringe Schichtenbedarf für die überwachung und Betätigung der vollautomatischen Abbaueinrichtungen haben ferner eine wesentliche Verringerung der Lohnkosten je Tonne hereingewonnener Kohle zur Folge, so daß insgesamt gesehen sich eine wesentliche Leistungssteigerung bzw. eine erhebliche Verringerung der Gewinnungskosten erreichen läßt. Die gegenüber den bekannten Verfahren wesentlich geringere Streblänge führt außerdem dazu, daß die auf die Menge des hereingewonnenen Minerals bezogene freiliegende Hangendfläche wesentlich geringer ist bei den bekannten Abbauverfahren. Die gegenüber dem Langfrontabbau um ein Vielfaches größeren Abbaufortschritte haben ferner die Folge, daß sich auch bei weniger guten Hangendverhältnissen eine weitgehend unzerstörte Erhaltung des Hangenden erreichen läßt, während bei besseren Hangendverhältnissen unter Umständen auf eine Unterstützung der freiliegenden Hangendfläche ganz oder teilweise verzichtet werden kann.For all these reasons, there is thus obtained in the case of the one proposed according to the invention Mining process the possibility of achieving extraordinarily high mining progress - e.g. B. from 1.5 to 2 m / hour - which are several times higher than they are in long-front mining even under particularly favorable conditions and with the greatest possible degree of mechanization the extraction and extraction work are to be achieved. These extraordinarily large ones Mining progress has not only a very high extraction rate and a very result in high utilization of the excavation impact, but also ensure optimal Utilization of the fully automatic ones, which are naturally correspondingly expensive to purchase Extraction, promotion, expansion and supply Sentence setups so that the tonne of mined minerals with much lower machine rental costs for mechanical short-front equipment is more stressed than for fully mechanized ones Long-front operation is the case. The high progress of dismantling and the relatively high low shift requirement for monitoring and actuation of the fully automatic Mining facilities also have a substantial reduction in labor costs each Ton of recovered coal result, so that overall, a substantial one Achieve an increase in performance or a significant reduction in extraction costs leaves. The length of the face is considerably shorter than with the known methods in addition to the fact that the exposed amount related to the amount of mineral extracted The hanging area is much smaller with the known mining methods. The opposite The long-front mining has also made many times greater mining progress The result is that, even with poor slope conditions, one is largely undestroyed Preservation of the hanging wall can be achieved, while with better hanging wall conditions under certain circumstances on a support of the exposed hanging end surface completely or can be partially dispensed with.

Um ein völlig störungsfreies selbsttätiges, dem Abbaufortschritt entsprechendes Vorrücken der Strebausbaueinrichtungen bei gleichzeitigem Nachrücken der Gewinnungs- und Fördereinrichtungen einschließlich ihrer Führungs- und Antriebsmittel zu gewährleisten, ist es erforderlich, daß der Abbaustoß gleichzeitig am Hangenden und Liegenden durch ebenfalls automatisch arbeitende schälende Gewinnungseinrichtungen bearbeitet wird, die mit Sicherheit eine vollständige Hereingewinnung des Minerals über die gesamte Flözmächtigkeit gewährleisten und außerdem eine gleichzeitige Bearbeitung des vergleichsweise kurzen Abbaustoßes an mehreren Stellen ermöglichen.A completely trouble-free automatic, the progress of the dismantling Advance of the longwall mining equipment with simultaneous advancement of the mining and to ensure conveyor systems including their guide and drive means, it is necessary that the excavation joint through the hanging and lying walls at the same time also automatically working peeling extraction equipment is processed, which with certainty a complete recovery of the mineral over the whole Ensure seam thickness and also a simultaneous processing of the comparatively allow short excavation impact in several places.

Es ist bereits eine für größere Streblängen bestimmte Schräm- und Fördereinrichtung bekannt, die mit über die Länge des Abbaustoßes verteilt angeordneten, in Richtung auf den Abbaustoß nachrückbaren Strebausbaueinrichtungen verbunden ist. Diese mechanisierte Schräm- und Fördereinrichtung besitzt eine endlose umlaufende Schrämkette, deren oberes Trum kurz unterhalb des Hangenden und deren unteres Trum am Liegenden schrämend in am Strebausbau vorgesehenen bzw. am Strebförderer befestigten Führungsgehäusen geführt ist. Abgesehen davon, daß diese kombinierte Schräm-, Förder- und Ausbaueinrichtung speziell für größere Streblängen, d. h. für den Langfrontabbau, bestimmt ist und eine dementsprechend große Länge besitzt, erfolgt die Hereingewinnung bei dieser bekannten Einrichtung im Gegensatz zu dem erfindungsgemäß vorgeschlagenen Verfahren nicht schälend, sondern schrämend. Bei dieser Schräm- und Fördereinrichtung ist es jedoch an sich bekannt, den Strebförderer einschließlich der Führungs- und Antriebsmittel für die Schrämkette durch maschinell vorrückbare Strebausbaueinrichtungen dem Abbaufortschritt folgend nachzurücken. Eine von den Strebausbaueinrichtungen mitgeführte, sich über die gesamte Länge des Strebs erstreckende Blasleitung ist jedoch bei dieser bekannten Einrichtung nicht vorhanden.It is already a cut and intended for longer face lengths Conveyor known, which is arranged with distributed over the length of the working face, is connected in the direction of the working face movable face mining facilities. This mechanized cutting and conveying device has an endless circulating one Schrämkette, the upper run of which is just below the hanging wall and the lower run of which sloping on the horizontal in the face structure provided or attached to the face conveyor Guide housing is performed. Apart from the fact that this combined cutting, conveying and extension equipment especially for larger face lengths, d. H. for long front dismantling, is determined and has a correspondingly large length, the winning takes place in this known device in contrast to that proposed according to the invention Process not peeling, but scraping. With this cutting and conveying device However, it is known per se, the face conveyor including the guide and Drive means for the cutting chain through mechanically advanced longwall mining equipment to follow the progress of dismantling. One of the longwall mining facilities entrained blow line extending over the entire length of the longwall is but not present in this known device.

Es ist ferner ein Abbauverfahren bekannt, bei welchem die Lagerstätte zunächst durch im Streichen und Einfallen aufgefahrene Kammern großer Breite in rechteckige Abschnitte unterteilt wird, die dann mittels einer kombinierten Gewinnungs- und Fördereinrichtung in schmalen Streifen im streichenden Verhieb hereingewonnen werden. Es handelt sich somit nicht um ein Abbauverfahren mit schwebendem Verhieb, wobei außerdem die Lagerstätte nicht mittels zweiflügliger Abbaubetriebspunkte hereingewonnen wird. Ferner erfolgt bei diesem bekannten Abbauverfahren keine Abförderung des hereingewonnenen Haufwerkes zu einem zentral angeordneten Aufhauen. Des weiteren sind bei diesem bekannten Abbauverfahren die Merkmale des erfindungsgemäß vorgeschlagenen Abbauverfahrens nicht erfüllt, gemäß welchen die Lagerstätte durch parallel und in einem gegenüber der üblichen streichenden Länge zweiflügliger Abbaubetriebspunkte wesentlich geringeren Abstand von z. B. etwa 100 m aufgefahrene Aufhauen in streifenförmige Abbaufelder unterteilt und beiderseits der Aufhauen durch sich etwa über die Hälfte des Abstandes zweier benachbarter Aufhauen erstreckende Kurzstreben abgebaut wird.It is also known a mining method in which the deposit initially through large-width chambers opened up by brushing and collapsing in rectangular sections is subdivided, which then by means of a combined extraction and conveyor in narrow strips won by stroking will. It is therefore not a matter of a dismantling process with a floating cut, furthermore, the deposit was not reclaimed through double leaf mining operating points will. Furthermore, with this known mining method, there is no removal of the extracted Heaped up to a centrally arranged chopping up. Furthermore are with this known degradation methods have the features of the degradation method proposed according to the invention not met, according to which the deposit through parallel and in one opposite the usual striking length of double-leaf mining operating points is much smaller Distance from z. B. excavated about 100 m in strip-shaped mining fields divided and on both sides of the knocking through about half the distance short struts extending from two adjacent Aufhauen is dismantled.

Bei der bekannten Arbeitsweise wird ferner der Abbaustoß der nur eine relativ geringe Länge besitzenden Streben durch schälende Gewinnungseinrichtungen lediglich am Liegenden bearbeitet, während bei dem erfindungsgemäß vorgeschlagenen Verfahren gleichzeitig auch eine Bearbeitung am Hangenden erfolgt und die schälenden Gewinnungseinrichtungen - was bei dem vorbekannten Verfahren ebenfalls nicht der Fall ist - selbsttätig gesteuert werden. Bei der bekannten Arbeitsweise erfolgt außerdem die Abförderung des hereingewonnenen Haufwerkes - wiederum im Gegensatz zur Erfindung - nicht zu dem zentralen Aufhauen eines zweiflügligen Abbaubetriebspunktes hin, sondern zu einer im Streichen der Lagerstätte verlaufenden Kammer relativ großer Breite. Strebausbaueinrichtungen sind bei diesem vorbekannten Abbauverfahren nicht vorgesehen, so daß ihm auch das weitere Merkmal der Erfindung nicht zu entnehmen ist, daß die Kurzfördermittel' einschließlich der Führungs-und Antriebsmittel für die Gewinnungseinrichtungen durch maschinell vorrückbare Strebausbaueinrichtungen selbsttätig dem Abbaufortschritt folgend nachgerückt werden. Schließlich ist bei dem bekannten Abbauverfahren keine von den Strebausbaueinrichtungen mitgeführte, sich über die gesamte Länge des Kurzstrebes erstreckende Blasleitung vorhanden. Vielmehr soll bei diesem bekannten Abbauverfahren nicht mit Blasversatz, sondern mit Strebbruchbau gearbeitet werden.In the known mode of operation, the mining face is also only one relatively short struts by peeling extraction facilities edited only on the lying, while in the proposed according to the invention Process at the same time also a processing on the hanging wall takes place and the peeling Extraction facilities - which is also not the case with the previously known method Case is - be controlled automatically. In the known way of working takes place also the removal of the collected debris - again in contrast to the invention - not to the central knocking up of a two-leaf mining operating point but to a relatively large chamber running along the strike of the deposit Broad. Longwall mining facilities are not involved in this previously known mining method provided so that the further feature of the invention can not be inferred from him is that the short conveyor means' including the guide and drive means for the extraction facilities by mechanically advanced longwall mining facilities be automatically moved up following the progress of the dismantling process. Finally is at none of the longwall mining equipment carried along with the known mining method, There is a blow line extending over the entire length of the short strut. Rather, in this known degradation process, it is not intended to use a blow offset, but rather be worked with longwall construction.

Bei einer zweckmäßigen Ausführungsform des erfindungsgemäß vorgeschlagenen Verfahrens werden die Gewinnungs-, Förder- und Ausbaueinrichtungen der Kurzfrontstreben von einem, insbesondere im Bereich des Aufhauens angeordneten, zentralen Steuerstand ausgeschaltet und gesteuert. Hierdurch ergibt sich die Möglichkeit, die gesamten Gewinnungs-, Förder- und Ausbauarbeiten von dem zentralen Aufhauen aus vollautomatisch durchzuführen und zu steuern, ohne daß während der Betätigung der verschiedenen automatischen Vorrichtungen der Aufenthalt von Arbeitskräften im Bereich der Kurzstreben erforderlich ist. Hierbei ist es ohne weiteres möglich, von einem im Bereich des zentralen Aufhauens angeordneten Steuerstand aus die automatisehen Gewinnungs-, Förder- und Ausbaueinrichtungen beider Kurzstreben eines zweiflügligen Abbaubetriebspunktes zu schalten und zu steuern.In an expedient embodiment of the proposed according to the invention The extraction, conveying and expansion facilities of the short front struts are used from a central control station, which is arranged in particular in the area of the chopping up switched off and controlled. This results in the possibility of the entire Extraction, conveyance and expansion work from the central chopping up fully automatically carry out and control without having to operate the various automatic devices for the stay of workers in the area of short stays is required. Here it is easily possible from one in the area of the central hewing arranged control station from the automatic view Extraction, Funding and expansion facilities for both short struts of a double-leaf mining operating point to switch and control.

Bei einem Abbauverfahren, bei welchem in an sich bekannter Weise die Abbauhohlräume unmittelbar nach dem Durchgang der Strebausbaueinrichtungen durch eine Versatzeinrichtung - insbesondere Blasversatzeinrichtung - verfüllt werden, ergibt sich eine weitere Verbesserung dadurch, daß die Versatzeinrichtung dem Abbaufortschritt der Kurzfrontstreben entsprechend selbsttätig vorgerückt sowie ebenfalls von dem zentralen Steuerstand aus geschaltet und gesteuert wird.In a degradation process in which in a known manner the Mining cavities immediately after the longwall mining equipment has passed through a displacement device - in particular a blow displacement device - are filled, A further improvement results from the fact that the offset device follows the progress of mining the short front struts automatically advanced accordingly and also from the central control station is switched off and controlled.

Bei einem Verfahren zum Einbringen von Glasversatz beim Langfrontabbau ist es bekannt, eine Blasversatzleitung an den zum Versatzfeld hin überkragenden Enden der Kappen von Ausbaurahmen aufzuhängen. Die einzelnen Blasversatzrohre sind hierbei über Ketten mit einer Laufkatze verbunden, die auf der als Laufbahn ausgebildeten unteren Kante des zum Versatzfeld hin überkragenden Endes der Ausbaukappe geführt ist. Im Gegensatz zu dem erfindungsgemäß vorgeschlagenen Verfahren werden bei dieser bekannten Arbeitsweise die einzelnen Blasversatzrohre bei dem schwebenden Einbringen des Versatzes nach und nach von der Blasversatzleitung gelöst und von Hand auf dem überkragenden Teil der Ausbaukappe hängend unmittelbar an den versatzseitigen Stempel des Ausbaurahmens in das neue Versatzfeld verschoben. Abgesehen davon, daß bei diesem bekannten Verfahren das Vorrücken der Versatzeinrichtung nicht selbsttätig erfolgt, ist bei ihm erst recht keine Schaltung und Steuerung der Versatzeinrichtung von einem zentralen Steuerstand aus vorgesehen.In a method for introducing glass offset during long-front mining it is known to attach a blow offset line to the cantilevered line towards the offset field Hang up the ends of the caps from the extension frame. The individual blow pipes are here connected via chains with a trolley, which is designed as a running track out of the lower edge of the end of the expansion cap protruding towards the offset field is. In contrast to the method proposed according to the invention, this known mode of operation, the individual blower pipes in the floating introduction of the offset gradually released from the Blasversatzleitung and by hand on the protruding part of the expansion cap hanging directly from the stamp on the offset side of the extension frame moved to the new offset field. Apart from the fact that with this one known methods the advance of the offset device does not take place automatically, there is certainly no switching and control of the offset device for him provided from a central steering position.

Bei einer vorteilhaften Ausführungsform des Verfahrens nach der Erfindung werden die Aufhauen entsprechend dem fortschreitenden Verhieb der beiderseits vorgetriebenen Kurzstreben durch im Streichen verlaufende, in einem gegenüber dem Abstand der Aufhauen größeren Abstand angeordnete Teilsohlenstrecken verbunden, welche beim Verfüllen der Abbauhohlräume im Versatz ausgespart und anschließend durch Nachreißen des Nebengesteins auf den jeweils gewünschten Streckenquerschnitt vergrößert werden. Diese Teilsohlenstrecken werden zweckmäßig unmittelbar, nachdem der Abbau über die für ihren Verlauf vorgesehene Stelle hinweggegangen ist, hergestellt, so daß sie möglichst bald nach dem Vorübergehen des Abbaus für die Wetterführung und Abförderung des hereingewonnenen Minerals herangezogen werden können. Hierdurch ist es möglich, nach der Fertigstellung einer neuen Teilsohlenstrecke den im Einfallen unterhalb desselben gelegenen Teil des Aufhauens vollständig abzuwerfen und!oder mit Versatzgut zu verfüllen.In an advantageous embodiment of the method according to the invention the thrown-ups are carried out in accordance with the progressive blow of those driven on both sides Short striving by running in the brush, in one opposite the distance of the Aufhauen larger distance arranged partial sole routes connected, which when backfilling the excavation cavities in the backfill and then by cracking the adjacent rock can be enlarged to the desired cross-section of the route. These partial sole routes are expedient immediately after the dismantling over the period provided for their course Body has passed, so that they can be seen as soon as possible after passing the mining for the weather management and removal of the extracted mineral used can be. This makes it possible after the completion of a new partial level route to completely throw off that part of the roughening which lies below it in the collapse and! or to be filled with backfill.

Der Verhieb der Lagerstätte im Bereich des einen Kurzstrebes eines zweiflügligen Abbaubetriebspunktes eilt zweckmäßig dem Verhieb des anderen Kurzstrebs um ein größeres Maß - z. B. um den flachen Abstand zweier Teilsohlenstrecken - nach, um eine gegenseitige Störung der Gewinnungs-, Förder-, Ausbau- und Versatzarbeiten der beiden einem Aufhauen zugeordneten Kurzstreben zu vermeiden. Dies bietet außerdem den Vorteil, daß die im Versatz ausgesparten und anschließend auf einen größeren Streckenquerschnitt erweiterten Teilsohlenstrecken im Bereich der beiderseits des Aufhauens angeordneten Abbaufelder jeweils nacheinander hergestellt werden können, so daß sich eine gleichmäßige Auslastung der mit der Herstellung dieser Strecken befaßten Arbeitskräfte und der hierzu verwendeten Vorrichtungen ergibt.The removal of the deposit in the area of one short strut of one The two-leaf dismantling operating point expediently rushes the other short strut to a greater extent - z. B. about the flat distance between two partial floor sections - after, a mutual disturbance of the extraction, extraction, expansion and backfilling work to avoid the two short struts associated with a chopping up. This also offers the advantage that the recessed in the offset and then on a larger one Track cross-section of extended partial level tracks in the area of both sides of the Excavation fields arranged one after the other can be produced, so that there is an even utilization of the production of these routes employed workers and the devices used for this purpose.

In den Fällen, in denen aus einem Abbaufeld bzw. einer Bauabteilung eine besonders hohe Förderleistung erzielt werden soll, wird die Lagerstätte zweckmäßig gleichzeitig von mehreren, unmittelbar benachbarten Aufhauen aus zweiflüglig abgebaut, wobei es sich aus arbeitstechnischen Gründen sowie im Interesse einer möglichst unzerstörten Erhaltung des Hangenden empfiehlt, den Verhieb der Lagerstätte an den einzelnen im Streichen benachbarten Kurzstreben mit solchem zeitlichen Abstand aufzunehmen und weiterzuführen, daß ihre Abbaustöße treppenförmig gegeneinander abgesetzt sind.In those cases in which from a dismantling field or a construction department If a particularly high conveying capacity is to be achieved, the storage facility is expedient simultaneously dismantled from several, immediately adjacent Aufhau-wing from two wings, whereby it is for technical reasons as well as in the interest of a possible The undestroyed preservation of the hanging wall recommends the removal of the deposit to the to record individual short struts adjacent to the brush with such a time interval and to continue that their mining joints are set off against each other in steps.

Gegenstand der Erfindung bildet ferner eine Einrichtung zur Durchführung des erfindungsgemäß vorgeschlagenen Verfahrens, deren Strebausbaueinrichtung aus über die Streblänge verteilt angeordneten Ausbauwagen besteht, welche am Hangenden und Liegenden anliegende Raupenfahrwerke besitzen und sich dadurch kennzeichnet, daß die Raupenfahrwerke der Ausbauwagen durch hydraulisch beaufschlagbare Druckzylinder gegen Hangendes und Liegendes andrückbar sowie durch vorzugsweise ebenfalls hydraulische Antriebsmittel vorrückbar sind.The invention also provides a device for implementation of the method proposed according to the invention, their longwall mining equipment from There is an expansion wagon distributed over the length of the face, which is on the hanging wall and lying-on crawler tracks and are characterized by that the crawler tracks of the expansion wagon by hydraulically actuated pressure cylinders can be pressed against hanging and lying surfaces and preferably also by hydraulic ones Drive means are advanced.

Strebausbaueinrichtungen mit über die Streblänge verteilt angeordneten Ausbauwagen, welche am Hangenden und Liegenden anliegende Raupenfahrwerke besitzen, sind an sich bekannt. Bei diesen bekannten Ausbauwagen sind die Raupenfahrwerke jedoch nicht durch hydraulisch beaufschlagbare Druckzylinder gegen Hangendes und Liegendes andrückbar sowie ferner nicht durch vorzugsweise ebenfalls hydraulische Antriebsmittel vorrückbar. Dadurch, daß bei der erfindungsgemäß vorgeschlagenen Einrichtung die Raupenfahrwerke der Ausbaurahmen durch hydraulisch beaufschlagbare Druckzylinder gegen Hangendes und Liegendes andrückbar sowie durch vorzugsweise ebenfalls hydraulische Antriebsmittel vorrückbar sind, ergibt sich eine besonders zweckmäßige und fortschrittliche Konstruktion, die durch die bekannten Ausbauwagen weder vorbekannt noch nahegelegt ist.Longwall structures with distributed over the length of the face Expansion wagons that have crawler tracks attached to the hanging and lying walls, are known per se. In these known expansion wagons are the crawler tracks but not by hydraulically actuated pressure cylinders against the hanging wall and Lying down can be pressed and furthermore not by preferably also hydraulic Drive means advancable. The fact that in the proposed according to the invention Setting up the crawler tracks of the expansion frame by hydraulically actuated Pressure cylinder can be pressed against hanging and lying and preferably by Hydraulic drive means can also be advanced, there is a special one Functional and progressive construction, thanks to the well-known expansion car is neither known nor suggested.

Bei einer zweckmäßigen Ausführungsform der Einrichtung nach der Erfindung, deren Strebausbaueinrichtung in an sich bekannter Weise eine sich etwa über die gesamte Streblänge erstreckende Blasleitung mitführt, ergibt sich eine besonders vorteilhafte Ausbildung dadurch, daß die Ausbauwagen jedes Kurzstrebs eine sich etwa über dessen gesamte Länge erstreckende Blasleitung tragen, welche mit mehreren, im Abstand zueinander angeordneten Ausblasöffnungen versehen ist, die durch Fernbetätigung zu öffnen und zu schließen sind. Auf diese Weise ergibt sich eine automatisch mit dem Vorrücken des Strebausbaus vorrückende Einrichtung zum Einbringen des Bergeversatzes, welche vollautomatisch von einem zentralen Steuerstand aus gesteuert und betätigt werden kann.In an expedient embodiment of the device according to the invention, whose longwall construction facility in a manner known per se is about the Carrying along the entire length of the stretcher blow pipe, there is a special one advantageous training in that the expansion car each short strut one itself carry approximately over its entire length extending blow line, which with several, at a distance from each other arranged exhaust openings is provided, which by remote control open and close. In this way one results automatically with the advancement of the face construction advancing device for the introduction of the recovery offset, which is controlled and operated fully automatically from a central control station can be.

In der Zeichnung ist die Erfindung an einem Ausführungsbeispiel veranschaulicht. Es zeigt F i g. 1 eine nach dem Verfahren gemäß der Erfindung abgebaute Bauabteilung schematisch in der Draufsicht, F i g. 2 die Bauabteilung gemäß F i g. 1 bei fortgeschrittenem Abbau, F i g. 3 einen zweiflügligen Abbaubetriebspunkt gemäß der Erfindung schematisch in der Draufsicht, F i g. 4 einen Ausschnitt aus F i g. 3 unter Fortlassung der Ausbaukappen im Bereich des Aufhauens, F i g. 5 einen Schnitt nach der Linie V-V der F i g. 4, F i g. 6 die Anordnung der Ausbaukappen bei dem Ausschnitt gemäß F i g. 4, Fi g. 7 einen Schnitt nach der Linie VII-VII der Fig.6.In the drawing, the invention is illustrated using an exemplary embodiment. It shows F i g. 1 a construction department dismantled according to the method according to the invention schematically in plan view, F i g. 2 the construction department according to F i g. 1 in the case of advanced dismantling, F i g. 3 a two-leaf dismantling operating point according to the invention schematically in plan view, FIG. 4 a section F i g. 3 omitting the expansion caps in the area of the opening, F i g. 5 one Section along the line V-V in FIG. 4, fig. 6 the arrangement of the expansion caps in the section according to FIG. 4, Fig. 7 shows a section along the line VII-VII of Fig. 6.

In den F i g. 1 und 2 ist mit 1 ein quer zum Einfallen des Steinkohlenflözes 2 aufgefahrener Querschlag bezeichnet, von dem im Abstand von beispielsweise etwa 200 m Blindschächte 3, 4, 5 bis zum Flöz 2 hochgebrochen sind. Das Flöz 2 besitzt bei dem in der Zeichnung dargestellten Ausführungsbeispiel ein verhältnismäßig geringes Einfallen von etwa 10 bis 15°, jedoch läßt sich das erfindungsgemäß vorgeschlagene Verfahren ohne weiteres auch bei einem größeren Einfallen anwenden. Von dem Querschlag 1 aus werden in einem einem Mehrfachen des Abstandes der Blindschächte 3, 4, 5 entsprechenden Abstand im Streichen verlaufende Abbaustrecken 6, 7 aufgefahren, welche die obere und untere Begrenzung des abzubauenden Feldes darstellen. Die obere und untere Abbaustrecke 6 bzw. 7 können vor Aufnahme des Abbaus bis zur Grenze des jeweiligen Baufeldes aufgefahren werden, in jedem Falle aber sollen diese Abbaustrecken um mindestens 100 m über die Grenze des jeweils abgebauten Teilfeldes hinaus aufgefahren sein. Die Auffahrung der Grundstrecke 6 kann hierbei in solcher Weise erfolgen, daß man zunächst eine gegenüber der endgültigen Strekkenbreite breitere Strecke in der anstehenden Kohle vortreibt, diese dann in ihrem mittleren Bereich durch Nachreißen des Hangenden und/oder Liegenden auf den jeweils gewünschten Streckenquerschnitt vergrößert und die hierbei anfallenden Berge beispielsweise unter Zuhilfenahme einer Schaufellademaschine und eines dieser nachgeschalteten, allseitig beweglichen fahrbaren Querförderers unterhalb und gegebenenfalls auch oberhalb der endgültigen Strekkenbreite als Bergedamm versetzt. Hierdurch ergibt sich nicht nur ein zweckmäßiges Verfahren zur Auffahrung der Grundstrecke 6, sondern außerdem eine Sicherung der Strecke gegen Beanspruchungen durch den im Gefolge des Abbaus auftretenden Gebirgsdruck.In the F i g. 1 and 2, 1 denotes a cross passage driven transversely to the collapse of the coal seam 2, from which blind shafts 3, 4, 5 have broken up to the seam 2 at a distance of, for example, about 200 m. In the embodiment shown in the drawing, the seam 2 has a relatively small dip of about 10 to 15 °, but the method proposed according to the invention can easily be used even with a larger dip. Mining stretches 6, 7 are driven from cross passage 1 at a distance corresponding to a multiple of the distance between blind shafts 3, 4, 5 and represent the upper and lower boundaries of the field to be mined. The upper and lower mining sections 6 and 7 can be driven to the limit of the respective construction site before mining begins, but in any case these mining sections should be driven at least 100 m beyond the boundary of the respective excavated subfield. The excavation of the base section 6 can be done in such a way that one first drives a section in the pending coal that is wider than the final section width, then enlarges it in its central area by tearing the hanging wall and / or lying down to the respectively desired section cross-section and the Mountains arising in this case, for example, with the aid of a shovel loading machine and one of these downstream, all-round movable mobile transverse conveyor below and possibly also above the final route width as a mountain dam. This not only results in an expedient method for driving up the base section 6, but also secures the section against stresses caused by the rock pressure occurring in the wake of the mining.

Bevor mit dem Abbau des zwischen den Abbaustrecken 6 und 7 liegenden Baufeldes begonnen wird, wird zunächst oberhalb des Querschlages 1 ein Flözstreifen 8 von etwa 40 bis 50 m Breite abgebaut und mit Bergeversatz dicht verfüllt. Von den Blindschächten 3, 4 aus werden in dem mit Bergeversatz verfüllten, ausgekohlten Streifen 8 bis zur Grenze des abzubauenden Feldes verlaufende Teilsohlenstrecken 9, 10 ausgespart und anschließend durch Nachreißen des Nebengesteins auf den gewünschten Streckenquerschnitt vergrößert und ausgebaut.Before excavation of the construction site between the excavation sections 6 and 7 begins, a seam strip 8 approximately 40 to 50 m wide is first excavated above the crosscut 1 and filled in tightly with a backfill. From the blind shafts 3, 4, in the excavated strip 8, which is filled with backfilled rock, the subsoil stretches 9, 10 extending to the border of the field to be mined are cut out and then enlarged and expanded to the desired route cross-section by tearing down the adjacent rock.

In einem streichenden Abstand von etwa 70 bis 80 m vom Querschlag 1 wird von der Grundstrecke 6 aus ein im Einfallen verlaufendes Aufhauen 11 von der Grundstrecke 6 bis zur Kopfstrecke 7 vorgetrieben. Das Aufhauen kann eine Breite von beispielsweise 5 m besitzen und wird - wie aus F i g. 4 bis 7 ersichtlich - zweckmäßig durch in seinem seitlichen Randbereich vorgesehene Wanderpfeiler 12 ausgebaut, die im Einfallen in einem Abstand von z. B. etwa 1,5 m angeordnet sind. Die Wanderpfeiler 12 dienen zur Abstützung von etwa parallel und in geringem Abstand nebeneinander angeordneten, im Streichen und im Einfallen verlaufenden Kappen 13, 13a bzw. 14, 14a. Die im Streichen des Flözes 2 angeordneten Querkappen 13,13 a sind jeweils paarweise nebeneinander angeordnet und mit ihren Enden auf den beiderseits des Aufhauens 11 vorgesehenen Wanderpfeilern 12 abgestützt, während sie in ihrem mittleren Längenbereich zusätzlich durch längenverstellbare Grubenstempel 15 üblicher Bauart unterfangen werden.At a stroking distance of about 70 to 80 m from the cross passage 1, a rake 11, which runs in the incline, is driven from the base route 6 from the base route 6 to the head route 7. The roughening can have a width of, for example, 5 m and is - as shown in FIG. 4 to 7 can be seen - expediently expanded by provided in its lateral edge area hiking pillar 12, which in the collapse at a distance of z. B. are arranged about 1.5 m. The traveling pillars 12 are used to support approximately parallel and at a short distance next to each other, in the brush and in the collapse extending caps 13, 13 a and 14, 14 a. The cross caps 13, 13 a arranged in the strike of the seam 2 are each arranged in pairs next to one another and their ends are supported on the traveling piers 12 provided on both sides of the hewing 11 , while they are additionally underpinned in their middle length range by length-adjustable pit punches 15 of the usual design.

Die im Einfallen der Lagerstätte angeordneten Längskappen 14, 14a besitzen eine sich über mindestens drei benachbarte Wanderpfeiler 12 erstrekkende Länge, wobei die Enden der paarweise nebeneinander angeordneten Kappen 14,14a jeweils um das Maß des Abstandes zweier Wanderpfeiler 12 gegeneinander versetzt angeordnet werden. Bei dem in der Zeichnung dargestellten Ausführungsbeispiel besitzen die Längskappen 14,14 a eine Länge von etwa 4 m und liegen jeweils auf drei Wanderpfeilern 12 auf, so daß infolge der versetzten Anordnung ihrer Enden auf jedem Wanderpfeiler 12 der Mittelteil einer Längskappe, z. B. 14, und die Enden zweier in Richtung des Einfallens sich um ein geringes Maß überlappender Längskappen, z. B. 14a, aufliegen. The longitudinal caps 14, 14a arranged in the collapse of the deposit have a length extending over at least three adjacent hiking pillars 12, the ends of the caps 14, 14a arranged in pairs next to one another being offset from one another by the amount of the distance between two hiking pillars 12. In the embodiment shown in the drawing, the longitudinal caps 14,14 a have a length of about 4 m and each rest on three hiking pillars 12, so that due to the offset arrangement of their ends on each hiking pillar 12 of the middle part of a longitudinal cap, z. B. 14, and the ends of two in the direction of collapse by a small amount overlapping longitudinal caps, z. B. 14a, rest.

Die Querkappen 13, 13 a sind - wie aus F i g. 6 ersichtlich - oberhalb der Längskappen 14,14a angeordnet und in ihrem mittleren Bereich durch jeweils zwei Grubenstempel 15 unterstützt, zwischen denen ein in Längsrichtung des Breitaufhauens 11 verlaufendes, kontinuierlich förderndes Streckenfördermittel 16 angeordnet ist, das bei dem in der Zeichnung dargestellten Ausführungsbeispiel als Doppelketten-Kratzerförderer ausgebildet ist.The transverse caps 13, 13 a are - as shown in FIG. 6 can be seen - arranged above the longitudinal caps 14,14a and supported in their middle area by two pit punches 15 , between which a continuously conveying conveyor means 16 running in the longitudinal direction of the widening 11 is arranged, which in the embodiment shown in the drawing as a double chain Scraper conveyor is formed.

Die erfindungsgemäß vorgeschlagene Anordnung der Längs- und Querkappen bietet die Möglichkeit, wie aus F i g. 4 und 6 hervorgeht, bei dem Vorrükken des Abbaus jeweils einen in F i g. 4 gestrichelt dargestellten Wanderkasten 12a sowie einzelne Stempel 15 vorübergehend zu entfernen, ohne daß es erforderlich ist, die Längs- und Querkappen 13, 13 a bzw. 14,14a in diesem Bereich zusätzlich abzustützen bzw. ohne daß das Hangende in diesem Bereich seine ausreichende Unterstützung verliert.The arrangement of the longitudinal and transverse caps proposed according to the invention offers the possibility, as shown in FIG. 4 and 6, when the dismantling is advanced, one in each case in FIG. 4 to temporarily remove hiking box 12a and individual stamps 15, shown in dashed lines, without it being necessary to additionally support the longitudinal and transverse caps 13, 13a and 14,14a in this area or without the hanging wall in this area being adequately supported loses.

Nach der Auffahrung des Aufhauens 11 von der Grundstrecke 6 bis zur Kopfstrecke 7 wird beiderseits des Aufhauens 11 ein etwa 40 bis 50 m breiter Streifen 17 bzw. 18 des Abbaufeldes von der Grundstrecke 6 aus in schwebendem Verhieb abgebaut. Hierbei ist es zweckmäßig, mit dem Abbau zunächst in dem an den oberhalb des Querschlages 1 angeordneten. mit Bergen versetzten Streifen 8 angrenzenden Flözstreifen 17 zu beginnen, dem dann mit einem gewissen zeitlichen Abstand der Abbau im Bereich des Flözstreifens 18 folgt. Der Abbau beiderseits des Aufhauens 11 erfolgt somit durch Kurzstreben 19 bzw. 20, die jeweils eine streichende Länge von etwa 40 bis 50 m aufweisen und mit einem im Einfallen gemessenen Abstand von mindestens 50 bis 100 m schwebend zu Felde getrieben werden. Das Maß der gegenseitigen Versetzung der Kurzstreben 19 und 20 wird hierbei zweckmäßig in der jeweils gewünschten Weise auf die vorliegenden Verhältnisse abgestimmt,. wobei es ohne weiteres möglich ist, den Abbau im Bereich des Flözstreifens 17 zunächst um ein größeres Maß voranzutreiben, bevor dann unter gleichzeitiger Stillsetzung des Kurzstrebes 19 der Kurzstreb 20 etwa um das gleiche Maß vorangetrieben wird, bevor wiederum mit der Weiterführung des Abbaus im Bereich des Kurzstrebes 19 begonnen wird. Zweckmäßig ist es jedoch in der Regel, den Abbau im Bereich der Kurzstreben 19 und 20 möglichst gleichzeitig voranzutreiben, um eine höchstmögliche Ausnutzung des freigelegten Abbaustoßes sowie der vorhandenen Gewinnungs-, Förder-, Ausbau und Versatzeinrichtungen zu erzielen.After the excavation 11 has been driven from the base section 6 to the head section 7, an approximately 40 to 50 m wide strip 17 or 18 of the mining field from the base section 6 is dismantled on both sides of the excavation 11 in a floating movement. In this case, it is useful to begin with the dismantling in the one above the cross passage 1. to begin with strips 8 adjacent to the seam strip 17 offset by mountains, which is then followed by mining in the area of the seam strip 18 at a certain time interval. The dismantling on both sides of the hacking 11 is thus carried out by short struts 19 and 20, each of which has a sweeping length of about 40 to 50 m and is drifted to the field with a distance of at least 50 to 100 m measured during the collapse. The extent to which the short struts 19 and 20 are offset from one another is expediently matched to the prevailing conditions in the manner desired in each case. whereby it is easily possible to first advance the mining in the area of the seam strip 17 by a larger amount, before the short strut 20 is then advanced by approximately the same amount with the simultaneous shutdown of the short strut 19 before further mining in the area of the Short strut 19 is started. As a rule, however, it is expedient to advance the dismantling in the area of the short struts 19 and 20 as simultaneously as possible in order to achieve the maximum possible utilization of the exposed mining face and the existing extraction, conveying, expansion and displacement facilities.

Während der Anlaufphase des Abbaus im Bereich der Flözstreifen 17, 18 wird zweckmäßig in einem der doppelten Länge eines Kurzstrebes 19 bzw. 20 entsprechenden, streichenden Abstand von dem Aufhauen 11 mit der Auffahrung des nächsten Aufhauens 11a begonnen, welches gleichfalls von der Grundstrecke 6 bis zur Kopfstrecke 7 vorgetrieben wird. Nachdem der Abbau im Bereich der Flözstreifen 17, 18 - wie aus F i g. 2 ersichtlich - um ein gewisses Maß zu Felde getrieben ist, wird im Bereich der beiderseits des Aufhauens 11a angeordneten Flözstreifen 21, 22 ebenfalls mit dem Abbau begonnen, der in der gleichen Weise durch Kurzstreben 23, 24 von etwa 40 bis 50 m Länge erfolgt. Wie aus F i g. 2 ersichtlich, sind die Kurzstreben 19, 20, 23, 24 in Richtung des Einfallens treppenförmig um ein größeres Maß gegeneinander abgesetzt. Während des Anlaufens der Kurzstreben 23, 24 wird zweckmäßig bereits mit dem Auffahren des nächsten Aufhauens 11 b begonnen, das der Vorrichtung des aus den Flözstreifen 25, 26 bestehenden nächstfolgenden Abbaufeldes dient. Die Kurzstreben 19, 20 bzw. 23, 24 sind in der gleichen Weise mit einer vollautomatischen, in der Zeichnung nur schematisch angedeuteten Gewinnungseinrichtung 27 ausgerüstet, die mindestens zwei am Hangenden und Liegenden angreifende schälende Gewinnungsgeräte besitzt, die durch ein endloses Zugmittel28 von einem am Strebende angeordneten Antrieb 29 mit wechselnder Bewegungsrichtung angetrieben sind, wobei die am Hangenden und Liegenden angeordneten Hobelgeräte jeweils eine gegenläufige Bewegung ausführen. Die sich am Ende des Schälbereiches der Gewinnungsgeräte selbsttätig umschaltende Gewinnungseinrichtung 27 ist an einem als Doppelketten-Kratzerförderer ausgebildeten Kurzfördermittel 30 sowie der selbsttätig dem Abbaufortschritt folgend vorrükkenden Strebausbaueinrichtung mittelbar oder unmittelbar geführt. Die Strebausbaueinrichtung besteht aus einer größeren Anzahl von in geringem seitlichen Abstand nebeneinander angeordneten Ausbauwagen 31, die mit am Hangenden und Liegenden anliegenden Raupenfahrwerken ausgerüstet sind und die vorzugsweise unabhängig voneinander sowie selbsttätig in Abhängigkeit von dem Vorrücken des Abbaustoßes vorgeschoben werden können. Durch die Ausbauwagen 31 wird außerdem dem Abbaufortschritt entsprechend der Kurzförderer 30 und die Gewinnungseinrichtung 27 entsprechend dem Fortschritt der Schälarbeit selbsttätig vorgeschoben.During the start-up phase of mining in the area of the seam strips 17, 18, it is advisable to start the next hewing 11a at a distance equal to twice the length of a short strut 19 or 20 from the hewing 11a, which also starts from the base section 6 to the Head section 7 is advanced. After the mining in the area of the seam strips 17, 18 - as shown in FIG. 2 - is driven into the field to a certain extent, mining is also started in the area of the seam strips 21, 22 arranged on both sides of the hacking 11a, which is carried out in the same way by short struts 23, 24 of about 40 to 50 m in length. As shown in FIG. 2, the short struts 19, 20, 23, 24 are offset from one another in a step-like manner in the direction of incidence by a larger amount. While the short struts 23, 24 are starting up, the next digging 11 b, which is used for the device of the next mining field consisting of the seam strips 25, 26, is expediently started. The short struts 19, 20 and 23, 24 are equipped in the same way with a fully automatic extraction device 27, which is only indicated schematically in the drawing, which has at least two peeling extraction devices that attack the hanging wall and the lying, which by an endless traction device28 of one on the strut end arranged drive 29 are driven with alternating direction of movement, the planing devices arranged on the hanging wall and lying on the floor each perform an opposite movement. The extraction device 27 , which switches automatically at the end of the peeling area of the extraction devices, is directly or indirectly guided on a short conveyor 30 designed as a double chain scraper conveyor and on the longwall construction device that automatically follows the mining progress. The longwall construction device consists of a large number of spaced apart carriages 31 side by side, which are equipped with crawler tracks resting on the hanging and lying walls and which can preferably be advanced independently of one another and automatically depending on the advancement of the working face. The removal carriage 31 also automatically advances the short conveyor 30 and the extraction device 27 in accordance with the progress of the peeling work in accordance with the progress of the mining work.

Die aus den Ausbauwagen 31 bestehende Ausbaueinrichtung führt auf ihrer Rückseite eine Versatzeinrichtung 32 mit, welche als mit mehreren, im Abstand zueinander angeordneten Austrittsstutzen 33 versehene Blasleitung ausgebildet ist. Die Ausblasstutzen 33 sind verschließbar ausgebildet und können durch Fernbetätigung nacheinander geöffnet werden, so daß der ausgekohlte Hohlraum von einem Ende des Kurzstrebs beginnend nacheinander versetzt werden kann. Die Blasleitung 32 wird von den Ausbauwagen 31 dem Abbaufortschritt entsprechend ebenfalls selbsttätig umgerückt, so daß sich die Blasanlage 32 dem Abbaufortschritt entsprechend zusammen mit der Gewinnungs-, Förder- und Ausbaueinrichtung in Verhiebrichtung mit voranbewegt.The expansion equipment consisting of the expansion wagons 31 lists its back with an offset device 32, which as with several, at a distance mutually arranged outlet nozzle 33 provided blow line is formed. The exhaust connection 33 are designed to be closable and can be operated remotely are opened sequentially so that the carburized cavity from one end of the Short struts can be moved one after the other beginning. The blow line 32 is also automatically moved by the dismantling wagons 31 according to the progress of the dismantling process, so that the blower 32 according to the degradation progress together with the Extraction, conveying and expansion equipment moved forward in the direction of sale.

Die Blasversatzeinrichtung 32 ist an eine im Hauptaufhauen 11 bzw. 11a verlegte Blasversatzleitung 34 angeschlossen, die zu einer in der Kopfstrecke7 angeordneten Blasversatzmaschine35 führt. Die Blasversatzleitung 34 besteht in ihrem sich an die Blasversatzanlage 32 anschließenden Längenbereich aus mehreren Teleskoprohren 36, die ohne Unterbrechung des Blasbetriebes eine dem Vorrükken der Abbaufront entsprechende Verkürzung der Blasleitung 34 gestatten. Die Teleskoprohre 36 bestehen aus zwei oder mehr teleskopartig ineinanderschiebbaren Rohrabschnitten, welche z. B. durch Druckmittelbetätigung ein- sowie vorzugsweise ebenfalls ausgeschoben werden können. Um hierbei eine Verschiebung in Längsrichtung des Aufhauens zu ermöglichen, sind die Teleskoprohre 36 an einer an den Querkappen 13, 13a befestigten Führungsschiene 37, beispielsweise durch mit Rollen versehene Tragbügel 38, längsverschieblich aufgehängt. Nachdem das durch die Anzahl der Teleskoprohre 36 bestimmte größtmögliche Einschubmaß erreicht ist, werden aus der Blasversatzleitung 34 einige Blasversatzrohre normaler Bauart ausgebaut und anschließend die Teleskoprohre 36 wieder bis zum Anschluß an das Ende der Blasversatzleitung ausgefahren.The blow displacement device 32 is connected to a blow displacement line 34 laid in the main heap 11 or 11a, which leads to a blow displacement machine 35 arranged in the head section 7. In its length region adjoining the blower installation 32, the blow-off line 34 consists of a plurality of telescopic tubes 36, which allow the blow-off line 34 to be shortened in accordance with the advancement of the dismantling front without interrupting the blower operation. The telescopic tubes 36 consist of two or more telescopically telescopic tube sections which, for. B. can be pushed in and preferably also pushed out by actuation of the pressure medium. In order to enable a displacement in the longitudinal direction of the hacking, the telescopic tubes 36 are suspended longitudinally displaceably on a guide rail 37 fastened to the transverse caps 13, 13a, for example by means of support brackets 38 provided with rollers. After the maximum possible insertion dimension determined by the number of telescopic tubes 36 is reached, some normal blown blown tubes are removed from the blown blower line 34 and then the telescopic tubes 36 extended again to the end of the blower blower line.

Wie aus F i g. 3 ersichtlich, können an die in der Kopfstrecke 7 angeordnete Blasversatzmaschine 35 die Blasleitungen 34 beider Kurzstreben 19, 20 eines zweiflügligen Abbaubetriebspunktes angeschlossen werden, wobei diese entweder gleichzeitig, vorzugsweise jedoch abwechselnd mit Blasgut beaufschlagt werden.As shown in FIG. 3 can be seen on the arranged in the head section 7 Blow stowing machine 35 the blow lines 34 of both short struts 19, 20 of a two-winged one Dismantling operating point are connected, these either at the same time, preferably however, blown material can be applied alternately.

Die Schaltung, Steuerung und Überwachung der Gewinnungs-, Förder-, Ausbau und Versatzeinrichtungen jedes Kurzstrebes 19, 20 oder aber beider Kurzstreben des zweiflügligen Abbaubetriebspunktes erfolgt zweckmäßig von einem zentral angeordneten Steuerstand, der ortsbeweglich im Bereich des Aufhauensll angeordnet werden kann.The switching, control and monitoring of the extraction, conveying, expansion and offsetting devices of each short strut 19, 20 or both short struts of the two-wing mining operating point is expediently carried out from a centrally located control station, which can be moved in the area of the Aufhauensll.

Die Kurzfördermittel 30 der Kurzstreben, z. B. 19, 20, tragen auf das in Längsrichtung des Aufhauens, z. B.11, verlaufende Streckenfördermittel 16 aus, das die hereingewonnene Kohle, solange der Abbau im Bereich der Kurzstreben 19, 20 sich zwischen der Grundstrecke 6 und der Teilsohlenstrecke 9 bewegt, in ein in der Grundstrecke 6 angeordnetes Streckenfördermittel, beispielsweise ein Förderband 37, austrägt.The short funding 30 of the short struts, e.g. B. 19, 20, wear on the in the longitudinal direction of the roughing, z. B.11, running line conveyor 16, which, as long as the mining in the area of the short struts 19, 20 moves between the base route 6 and the subsoil route 9, discharges the coal gained into a route conveyor arranged in the base route 6, for example a conveyor belt 37 .

Der Antrieb der Kurzfördermittel 30 ist - was aus der Zeichnung nicht hervorgeht - an dem dem Aufhauen 11 bzw. 11a abgekehrten Ende der Kurzförderer 30 angeordnet. In diesem Bereich ist ferner - wie in F i g. 3 schematisch angedeutet - ein mit Schneidwerkzeugen ausgerüstetes Stallvortriebsgerät 38 angeordnet, das den Raum für den Fördererantrieb und die Umkehre der Gewinnungseinrichtung 27 freischneidet. Dieses Stahlvortriebsgerät 38 wird gleichfalls entsprechend dem Abbaufortschritt selbsttätig vorbewegt.The drive of the short conveyor 30 is - what is not shown in the drawing is apparent - at the end of the short conveyor 30 facing away from the roughening 11 or 11a arranged. In this area, as in FIG. 3 indicated schematically - A stable driving device equipped with cutting tools 38 is arranged, the clears the space for the conveyor drive and the reverse of the extraction device 27. This steel jacking device 38 is likewise according to the Dismantling progress automatically advanced.

Zur Bewetterung der zweiflügligen Abbaubetriebspunkte 19, 20 bzw. 23, 24 werden an dem dem zentralen Aufhauen 11. bzw. lla abgekehrten Ende der Kurzstreben Wetterröschen 39, 40 im Versatz ausgespart, während - um Wetterkurzschlüsse zu vermeiden-wie aus F i g. 1 und 3 hervorgeht, das Aufhauen 11 oberhalb der Grundstrecke 6 durch Wettertüren 41 verschlossen wird.For ventilating the two-leaf mining operating points 19, 20 and 23, 24 are at the end of the short struts facing away from the central knocking 11 or 11a Weather roses 39, 40 left out in the offset, while - in order to avoid short-circuits in the weather - like from Fig. 1 and 3, the roughening 11 above the basic route 6 by Weather doors 41 is closed.

Sobald der im Flözstreifen 17 schwebend zu Felde getriebene Kurzstreb 19 die Höhe der Teilsohle 9 überfährt, wird die Blasversatzarbeit unterbrochen und ein mindestens der doppelten Breite der Teilsohle 9 entsprechender, streichend verlaufender Streifen im Versatz ausgespart. Die Teilsohlenstrecke wird anschließend bis zum Aufhauen 11 durch Nachreißen des Nebengesteins auf den gewünschten Streckenquerschnitt vergrößert und ausgebaut, wobei das hierbei anfallende Haufwerk unter Zuhilfenahme von Querförderern beiderseits der Teilsohlenstrecke 9 verpackt wird.As soon as the short strut floated into the field in the seam strip 17 19 passes over the height of the partial sole 9, the blow offset work is interrupted and one that is at least twice the width of the partial sole 9 and runs in a stroking manner Stripes left out in the offset. The partial level route is then up to Raising 11 by tearing the adjacent rock to the desired cross-section of the route enlarged and expanded, with the help of the accumulating heap is packed by cross conveyors on both sides of the partial floor section 9.

Während des Nachreißens der Teilsohlenstrecke 9 im Bereich des streifenförmigen Teilfeldes 17 kann der Kurzstreb 19 stillgesetzt werden, so daß nunmehr lediglich im Bereich des Kurzstrebes 20 der Abbau weiter zu Felde getrieben wird. Es ist jedoch auch möglich, den Kurzstreb 19 während der Verlängerung der Teilsohlenstrecke 9 bis zum Aufhauen 11 weiterlaufen zu lassen. In jedem Falle sollen jedoch die mit der Verlängerung der Teilsohlenstrecke 9 bis zum Aufhauen 11 verbundenen Arbeiten abgeschlossen sein, bevor der Kurzstreb 20 die Höhe der Teilsohlenstrecke 9 erreicht.During the subsequent tearing of the partial sole section 9 in the area of the strip-shaped Subfield 17, the short strut 19 can be stopped so that now only In the area of the short strut 20, the mining is driven further into the field. However, it is also possible to use the short strut 19 during the extension of the section 9 to let it continue until the break 11. In any case, however, the the extension of the partial level route 9 up to the knocking 11 related work be completed before the short strut 20 reaches the level of the partial level section 9.

Nachdem der Kurzstreb 20 die Höhe der Teilsohle 9 überfahren hat, wird die Teilsohlenstrecke bis zur Grenze des Teilfeldes 18 durch Nachreißen des Nebengesteins und Einbringen des Ausbaus verlängert, wobei die hierbei anfallenden Berge in der gleichen Weise beiderseits der Teilsohlenstrecke 9 verpackt werden. Der Kurzstreb 20 kann während dieser Arbeiten gleichfalls stillgesetzt werden. Es ist jedoch auch möglich, ihn ohne Unterbrechung des Verhiebs weiterlaufen zu lassen.After the short strut 20 has passed the height of the partial bottom 9, is the partial level route to the border of the subfield 18 by tearing the Adjacent rock and introduction of the expansion extended, with the resulting Mountains are packed in the same way on both sides of the partial level section 9. The short strut 20 can also be stopped during this work. It however, it is also possible to let it continue running without interrupting the cut.

Nachdem die Teilsohlenstrecke 9 bis zur Grenze des Teilfeldes 18 aufgefahren ist, wird in dieser ein zum Blindschacht 3 führendes Streckenfördermittel - z. B. ein Förderband 42 - angeordnet, das die Förderung des im Aufhauen 11 verlegten Streckenfördermittels 16 aufnimmt. Der zwischen der Teilsohlenstrecke 9 und der Grundstrecke 6 angeordnete Abschnitt des Streckenfördermittels 16 kann nunmehr ausgebaut und an anderer Stelle eingesetzt werden. Außerdem kann der Ausbau im Bereich des zwischen der Teilsohlenstrecke 9 und der Grundstrecke 6 liegenden Teils des Aufhauens 11 geraubt und das Aufhauen selbst entweder versetzt oder zu Bruch geworfen werden.After the partial level section 9 has been driven up to the border of the partial field 18 is, in this one leading to the blind shaft 3 line conveyor - z. B. a conveyor belt 42 - arranged, which the conveyance of the conveyor means laid in the chopping 11 16 records. The one arranged between the partial level section 9 and the base section 6 Section of the conveyor belt 16 can now be expanded and elsewhere can be used. In addition, the expansion in the area between the partial level route 9 and the basic route 6 lying part of the Aufhauens 11 stolen and the Aufhauen themselves either displaced or thrown to break.

Nachdem der Kurzstreb 19 die Höhe der Teilsohlenstrecke 9 überfahren hat, wird der untere Teil der Wetterrösche 39 oberhalb der Grundstrecke 6 und unterhalb der Teilsohlenstrecke 9 möglichst dicht mit Bergen verpackt, während man im übrigen Bereich dieses Teilabschnittes der Wetterrösche 39 das Hangende zu Bruch gehen läßt.After the short strut 19 has passed the height of the partial level section 9 has, the lower part of the weather rose 39 is above the base section 6 and below the partial level route 9 packed as tightly as possible with mountains, while the rest Area of this section of the weather rose 39 lets the hanging wall break.

Die am entgegengesetzten Rand des Abbaufeldes 17,18 angeordnete Wetterrösche 40 wird demgegenüber zweckmäßig auch nachdem der Kurzstreb 20 die Teilsohlenstrecke 9 überfahren hat im Bereich zwischen Grundstrecke 6 und Teilsohlenstrecke 9 offengehalten und dient zusätzlich zur Teilsohlenstrecke 9 zur Bewetterung des Kurzstrebs 20.The weather rose arranged on the opposite edge of the mining field 17, 18 40, on the other hand, is expedient even after the short strut 20 has reached the partial level 9 has been kept open in the area between the base section 6 and section 9 and is used in addition to the partial level section 9 to ventilate the short strut 20.

Nachdem der zwischen Teilsohlenstrecke 9 und Grundstrecke 6 liegende Teil des Aufhauens 11 abgeworfen ist, wird dieses oberhalb der Teilsohlenstrecke 9 durch eine Wettertür 41a verschlossen. In ähnlicher Weise wird - nachdem die Kurzstreben 19 bzw. 20 die Höhe der Teilsohle 10 erreicht bzw. überfahren haben - die Teilsohlenstrecke 10 zunächst bis zum Aufhauen 11 und anschließend bis zur Grenze des Teilfeldes 18 verlängert, worauf dann der zwischen den Teilsohlenstrecken 9 und 10 liegende Teil des Aufhauens 11 ebenfalls abgeworfen und versetzt bzw. zu Bruch geworfen wird.After the one lying between the partial level route 9 and the base route 6 Part of the hacking 11 is thrown off, this is above the partial floor section 9 closed by a weather door 41a. In a similar way - after the short struts 19 or 20 have reached or driven over the height of the partial floor 10 - the partial floor section 10 first up to the knocking up 11 and then up to the border of the subfield 18 extended, whereupon the part lying between the partial sole lines 9 and 10 des Aufhauens 11 is also thrown off and displaced or thrown to breakage.

Die Vorrichtung und der Abbau im Bereich der in Richtung des Streichens benachbarten Abbaufelder 21, 22 bzw. 25, 26 erfolgt in derselben Weise, wobei sich die Anzahl der nebeneinander angeordneten Aufhauen nach der jeweils vorhandenen streichenden Baulänge des Gesamtfeldes richtet.The device and the breakdown in the area of the direction of the painting adjacent mining fields 21, 22 or 25, 26 takes place in the same way, with the number of knocks arranged next to one another according to the existing one the overall length of the entire field.

Die Länge der Kurzstreben, der Teilsohlenabstand sowie die Anzahl der zwischen oberer und unterer Abbaustrecke vorgesehenen Teilsohlen kann selbstverständlich auch kleiner oder größer als bei dem in der Zeichnung dargestellten Ausführungsbeispiel gewählt werden, wobei es sich jedoch in der Regel empfiehlt, die Länge der Kurzstreben 19, 20 bzw. 23, 24 nicht größer als etwa 50 bis 60 m zu wählen, während die flache Bauhöhe zwischen der Grundstrecke 6 und der Kopfstrecke 7 möglichst groß gewählt werden sollte, um den für das Einrichten der Kurzstreben 19, 20 bzw. 23, 24 und die überführung der Gewinnungs-, Förder-, Ausbau- und Versatzeinrichtungen in ein neues Abbaufeld erforderlichen Zeit- und Arbeitsaufwand - bezogen auf die Fördermenge - möglichst gering zu halten.The length of the short struts, the partial sole spacing and the number the partial floors provided between the upper and lower mining section can of course also smaller or larger than in the embodiment shown in the drawing can be selected, although it is usually advisable to reduce the length of the short struts 19, 20 or 23, 24 should not be larger than about 50 to 60 m, while the flat one The height between the base section 6 and the top section 7 is chosen to be as large as possible should be in order to set up the short struts 19, 20 or 23, 24 and the transfer of the extraction, conveying, expansion and displacement facilities into one the time and effort required for the new mining field - based on the delivery rate - to be kept as low as possible.

Selbstverständlich läßt sich das erfindungsgemäß vorgeschlagene Abbauverfahren nicht nur in Verbindung mit Blasversatz, sondern auch in Verbindung mit anderen mechanischen Versatzverfahren oder aber ohne Einbringung von Bergeversatz unter Zubruchwerfen des Hangenden durchführen.Of course, the degradation method proposed according to the invention can be used not only in connection with blow offset, but also in connection with others mechanical offset method or without the introduction of mountain offset under Carry out collapse of the hanging wall.

Claims (12)

Patentansprüche: 1. Verfahren zum Abbau von unter Tage anstehenden, flözartigen Lagerstätten, insbesondere Kohlenflözen, bei welchen das Mineral von etwa im Einfallen der Lagerstätte verlaufenden Aufhauen aus in zweiflügligen Abbaubetriebspunkten mit schwebendem Verhieb durch am Abbaustoß entlangbewegte schälende Gewinnungsgeräte hereingewonnen und zu dem zentral angeordneten, mit mindestens einem endlos umlaufenden Fördermittel ausgerüsteten Aufhauen abgefördert wird, dadurch gekennzeichnet, daß die Lagerstätte (2) durch etwa parallel und in einem gegenüber der üblichen streichenden Länge zweiflügliger Abbaubetriebspunkte wesentlich geringeren Abstand von z. B. etwa 100 m aufgefahrene Aufhauen (11, 11a, 11 b) in streifenförmige Abbaufelder (17,18) unterteilt und beiderseits der Aufhauen (11,11 a,11 b) durch sich etwa über die Hälfte des Abstandes zweier benachbarter Aufhauen (11,11a) erstreckende Kurzstreben (19, 20) in der Weise abgebaut wird, daß der Abbaustoß jedes Kurzstrebes (19, 20) durch selbsttätig gesteuerte, schälende Gewinnungseinrichtungen (27) gleichzeitig am Hangenden und Liegenden bearbeitet wird, daß das hereingewonnene Haufwerk durch etwa parallel zum Abbaustoß angeordnete, endlos umlaufende Kurzfördermittel (30) zum Aufhauen (11) hin abgefördert wird und daß die Kurzfördermittel (30) einschließlich der Führungs- und Antriebsm-Ittel (28, 29) für die Gewinnungseinrichtungen (27) in an sich bekannter Weise durch maschinell vorrückbare Strebausbaueinrichtungen selbsttätig dem Abbaufortschritt folgend nachgerückt werden, wobei die Strebausbaueinrichtungen (31) eine sich über die gesamte Länge des Kurzstrebes (19, 20) erstreckende Blasleitung (32) mitführen. Claims: 1. A method for the mining of seam-like deposits located underground, in particular coal seams, in which the mineral is extracted from hewing up roughly in the collapse of the deposit from two-leaf mining operating points with floating displacement by peeling extraction devices moving along the working face and to the centrally arranged, is conveyed away with at least one endlessly revolving conveying means equipped chopping, characterized in that the deposit (2) by approximately parallel and at a distance of z. B. Raising (11, 11a, 11 b) that is driven about 100 m is divided into strip-shaped mining fields (17, 18) and on both sides of the Raising (11, 11 a, 11 b) by about half the distance between two adjacent Raising (11 , 11a) extending short struts (19, 20) is dismantled in such a way that the mining impact of each short strut (19, 20) is processed by automatically controlled, peeling extraction devices (27) at the same time on the hanging wall and lying, that the recovered debris through approximately parallel endlessly circulating short conveying means (30) arranged for the excavation face for chopping up (11) is conveyed away and that the short conveying means (30) including the guiding and driving means (28, 29) for the extraction devices (27) are carried out in a manner known per se Mechanically advanced longwall construction devices are automatically moved in following the progress of mining, the longwall construction devices (31) extending over the entire length of the short strut (19, 20) Take along the blowing line (32) . 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Gewinnungs-, Förder- und Ausbaueinrichtungen (27, 30, 31) der Kurzfrontstreben (19, 20) von einem, insbesondere im Bereich des Aufhauens(11) angeordneten, zentralen Steuerstand aus geschaltet und gesteuert werden. 2. The method according to claim 1, characterized in that the extraction, conveying and expansion devices (27, 30, 31) of the short front struts (19, 20) of a, in particular in the area of the hewing (11) arranged, switched from the central control station and controlled. 3. Verfahren nach Anspruch 1 und 2, bei welchen die Abbauhohlräume unmittelbar nach dem Durchgang der Strebausbaueinrichtungen durch eine Versatzeinrichtung - insbesondere Blasversatz-Einrichtung - verfüllt werden, dadurch gekennzeichnet, daß die Versatzeinrichtung (32, 33) dem Abbaufortschritt der Kurzfrontstreben entsprechend selbsttätig vorgerückt sowie ebenfalls von dem zentralen Steuerstand aus geschaltet und gesteuert wird. 3. The method according to claim 1 and 2, in which the excavation cavities immediately after the longwall mining equipment has passed through by an offset device - in particular a blow offset device - filled are, characterized in that the offset device (32, 33) the mining progress the short front struts automatically advanced accordingly and also from the central control station is switched off and controlled. 4. Verfahren nach Anspruch 1 oder einem der folgenden, dadurch gekennzeichnet, daß die Aufhauen (11, 11 a, 11 b) entsprechend dem fortschreitenden Verhieb der beiderseits vorgetriebenen Kurzstreben (19, 20) durch im Streichen verlaufende, in einem gegenüber dem Abstand der Aufhauen (11, 11 a, 11 b) größeren Abstand angeordnete Teilsohlenstrecken (9, 10) verbunden werden, welche beim Verfüllen der Abbauhohlräume im Versatz ausgespart und anschließend durch Nachreißen des Nebengesteins auf den jeweils gewünschten Streckenquerschnitt vergrößert werden. 4. The method according to claim 1 or one of the following, characterized in that the Aufhauen (11, 11 a, 11 b) according to the progressive displacement of both sides driven short struts (19, 20) by stroking, in one opposite the distance of Raising (11, 11 a, 11 b) larger spaced partial floor sections (9, 10) are connected, which are left out in the offset when filling the excavation cavities and then enlarged to the desired section cross-section by re-tearing the adjacent rock. 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß nach der Fertigstellung einer neuen Teilsohlenstrecke (9) der im Einfallen unterhalb derselben gelegene Teil des Aufhauens (11) abgeworfen und versetzt wird. 5. The method according to claim 4, characterized in that after the completion of a new partial floor section (9) the part of the hacking (11) located below the same in the incidence is thrown off and offset. 6. Verfahren nach Anspruch 1 oder einem der folgenden, dadurch gekennzeichnet, daß der Verhieb der Lagerstätte im Bereich des einen Kurzstrebes (20) eines zweiflügeligen Abbaubetriebspunktes dem Verhieb des anderen Kurzstrebes (19) um ein größeres Maß - z. B. etwa um den flachen Abstand zweier Teilsohlenstrecken (9, 10) - nacheilt. 6. The method according to claim 1 or one of the following, characterized in that the displacement of the deposit in the area of one short strut (20) of a two-wing mining operating point the displacement of the other short strut (19) to a greater extent - z. B. about the flat distance between two partial sole lines (9, 10) - lags. 7. Verfahren nach Anspruch 1 oder einem der folgenden, dadurch gekennzeichnet, daß die Lagerstätte (2) gleichzeitig von mehreren, unmittelbar benachbarten Aufhauen (11, 11 a, 11 b) aus zweiflüglig abgebaut wird. B. 7. The method according to claim 1 or one of the following, characterized in that the deposit (2) is simultaneously dismantled by several, immediately adjacent Aufhauen (11, 11 a, 11 b) from two leaves. B. Verfahren nach Anspruch 7, dadurch gekennzeichnet, daß der Verhieb der Lagerstätte (2) an den einzelnen, in Streichen benachbarten Kurzstreben (19, 20, 23, 24) mit solchem Abstand aufgenommen und weitergeführt wird, daß ihre Abbaustöße treppenförmig gegeneinander abgesetzt sind. Method according to claim 7, characterized in that the displacement of the deposit (2) on the individual short struts (19, 20, 23, 24) adjacent in stripes is recorded and continued with such a spacing that their mining joints are offset from one another in steps. 9. Verfahren nach Anspruch 1 oder einem der folgenden, dadurch gekennzeichnet, daß die im Einfallen der Lagerstätte verlaufenden Aufhauen (11, 11 a, 11 b) als Breitaufhauen von z. B. etwa 5 m Breite aufgefahren und durch in ihren seitlichen Randbereichen im Einfallen im Abstand zueinander angeordnete Wanderpfeiler (12) ausgebaut werden, die jeweils zur Abstützung von etwa parallel und in geringem Abstand nebeneinander angeordneten, im Streichen und im Einfallen verlaufenden Kappen (13, 13 a bzw. 14, 14a) größerer Länge dienen. 9. The method according to claim 1 or one of the following, characterized in that the incidence of the deposit running Aufhauen (11, 11 a, 11 b) as a Breitaufhauen of z. B. about 5 m wide and expanded by in their lateral edge areas in the collapse at a distance from each other arranged traveling piers (12) , each to support approximately parallel and at a small distance next to each other, in the brush and in the collapse extending caps (13, 13 a or 14, 14 a) serve greater length. 10. Verfahren nach Anspruch 9, dadurch gekennzeichnet, daß die im Einfallen verlaufenden Kappen (14, 14a) eine sich über mindestens drei benachbarte Wanderpfeiler (12) erstreckende Länge besitzen und daß die Enden (2a) der paarweise nebeneinander angeordneten Kappen (1.4, 14a) jeweils um das Maß des Abstandes zweier Wanderpfeiler (12) gegeneinander versetzt angeordnet werden. 10. The method according to claim 9, characterized in that the collapsing caps (14, 14 a) have a length extending over at least three adjacent hiking pillars (12) and that the ends (2a) of the caps (1.4, 14 a) are each arranged offset from one another by the amount of the distance between two hiking pillars (12). 11. Einrichtung zur Durchführung des Verfahrens nach Anspruch 1 oder einem der folgenden, deren Strebausbaueinrichtung aus über die Streblänge verteilt angeordneten Ausbauwagen besteht, welche am Hangenden und Liegenden anliegende Raupenfahrwerke besitzen, dadurch gekennzeichnet, daß die Raupenfahrwerke der Ausbauwagen (31) durch hydraulisch beaufschlagbare Druckzylinder gegen Hangendes und Liegendes andruckbar sowie durch vorzugsweise ebenfalls hydraulische Antriebsmittel vorrückbar sind. 11. A device for carrying out the method according to claim 1 or one of the following, the longwall construction device of which is distributed over the face length arranged expansion wagons, which have crawler tracks lying on the hanging walls and lying surfaces, characterized in that the crawler tracks of the expansion car (31) by hydraulically actuated pressure cylinders can be pressed against hanging and lying surfaces and can be advanced by preferably likewise hydraulic drive means. 12. Einrichtung nach Anspruch 11, deren Strebausbaueinrichtung eine sich etwa über die gesamte Streblänge erstreckende Blasleitung mitführt, dadurch gekennzeichnet, daß die Ausbauwagen (31) jedes Kurzstrebes (19, 20) eine sich etwa über dessen gesamte Länge erstreckende Blasleitung (32) tragen, welche mit mehreren, im Abstand zueinander angeordneten Ausblasöffnungen (33) versehen ist, die durch Fernbetätigung zu öffnen und zu schließen sind. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 811 341; deutsche Auslegeschriften Nr. 1016 211, 1041444, 1050 709; deutsches Gebrauchsmuster Nr. 1727 213; belgische Patentschrift Nr. 509 466.12. Device according to claim 11, the longwall construction device of which carries a blow line extending approximately over the entire length of the face, characterized in that the expansion carriages (31) of each short strut (19, 20 ) carry a blow line (32) extending approximately over its entire length, which is provided with several blow-out openings (33) which are arranged at a distance from one another and which can be opened and closed by remote control. Documents considered: German Patent No. 811 341; German Auslegeschriften No. 1016 211, 1 041444, 1050 709; German utility model No. 1727 213; Belgian patent specification No. 509 466.
DEM43598A 1959-12-04 1959-12-04 Method and device for the dismantling of float-like deposits, in particular coal fields Pending DE1256180B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEM43598A DE1256180B (en) 1959-12-04 1959-12-04 Method and device for the dismantling of float-like deposits, in particular coal fields

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM43598A DE1256180B (en) 1959-12-04 1959-12-04 Method and device for the dismantling of float-like deposits, in particular coal fields

Publications (1)

Publication Number Publication Date
DE1256180B true DE1256180B (en) 1967-12-14

Family

ID=7304710

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM43598A Pending DE1256180B (en) 1959-12-04 1959-12-04 Method and device for the dismantling of float-like deposits, in particular coal fields

Country Status (1)

Country Link
DE (1) DE1256180B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE509466A (en) *
DE811341C (en) * 1950-03-18 1951-08-20 Gutehoffnungshuette Oberhausen Method and device for introducing backfill in mining
DE1727213U (en) * 1955-06-13 1956-08-02 Gewerk Eisenhuette Westfalia OUTSIDE CONVEYOR ON WHICH A PLANE OR OTHER EXTRACTION DEVICE IS DRIVEN.
DE1016211B (en) * 1955-04-01 1957-09-26 Hemscheidt Maschf Hermann Process for the introduction of backfill in Strebraeume equipped with extension frames
DE1041444B (en) * 1954-02-05 1958-10-23 Maschf Mechanized scraper and conveyor system
DE1050709B (en) * 1959-02-19 Gewerkschaft Eisenhütte Westfalia, Wethmar bei Lünen (WTestf.) Device for reversing or switching the drive on and off for a coal plow that is periodically moved back and forth on the coal face

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE509466A (en) *
DE1050709B (en) * 1959-02-19 Gewerkschaft Eisenhütte Westfalia, Wethmar bei Lünen (WTestf.) Device for reversing or switching the drive on and off for a coal plow that is periodically moved back and forth on the coal face
DE811341C (en) * 1950-03-18 1951-08-20 Gutehoffnungshuette Oberhausen Method and device for introducing backfill in mining
DE1041444B (en) * 1954-02-05 1958-10-23 Maschf Mechanized scraper and conveyor system
DE1016211B (en) * 1955-04-01 1957-09-26 Hemscheidt Maschf Hermann Process for the introduction of backfill in Strebraeume equipped with extension frames
DE1727213U (en) * 1955-06-13 1956-08-02 Gewerk Eisenhuette Westfalia OUTSIDE CONVEYOR ON WHICH A PLANE OR OTHER EXTRACTION DEVICE IS DRIVEN.

Similar Documents

Publication Publication Date Title
DE2930136A1 (en) ROAD DRIVING MACHINE FOR UNDERGROUND CONSTRUCTION
DE10046497C2 (en) Extraction facility for underground ore mining operations and method for extracting mining products in underground ore mining operations
DE2307413C2 (en) Device for the extraction of a floz-like deposit in longwall mining
DE2407584A1 (en) METHOD OF DRIVING TUNNELS
DE4024250C2 (en)
DE1658751A1 (en) Method and device for creating tunnels, tunnels or the like in mountains with changing stability in zones
DE2806767A1 (en) Underground mine coalface working machine - has tool holders swivelling vertically on demolition caps by frame with parallel support arms
EP0257652B1 (en) Method of and device for driving a coal winning gallery partly in the footwall of a seam
DE3335098C2 (en)
DE1256180B (en) Method and device for the dismantling of float-like deposits, in particular coal fields
DE3739680A1 (en) MACHINE AND METHOD FOR CONTINUOUSLY RELEASING STONE OD. DGL. AND RECOVERY OF THE SOLVED, CRUSHED PLANT IN THE MINING, EARTH AND TUNNEL CONSTRUCTION
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE2021839C3 (en) Device for driving advancing structures
DE1002715B (en) Extraction machine movable along the coal face with a group of drill bits arranged on the face
DE1088898B (en) Process for the device and for the mining of coal layers
DE3031113C2 (en)
DE938543C (en) Schraembaggergeraet with shield for mining underground natural resources, preferably lignite
DE2161291A1 (en) Movable ceiling support, especially for mining
DE2057498C (en) Process for the fully mechanical extraction of coal or similar, floz-like formed minerals of the storage of 50 to 100 high g and Einnch device to carry out the process
DE812063C (en) Schraemmaschine
DE1248588B (en) Equipment for the mechanical extraction of coal
DE3024464C2 (en)
DE1197832C2 (en) Extraction machine for mining operations, in particular for wide-opening floez sections or the like.
DE745117C (en) Process and device for extracting coal in quarrying piers, namely in civil lignite mining
DE1109630B (en) Expansion chamber for drifting, especially in underground mining operations