DE1235380B - Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks - Google Patents

Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks

Info

Publication number
DE1235380B
DE1235380B DE1964S0094466 DES0094466A DE1235380B DE 1235380 B DE1235380 B DE 1235380B DE 1964S0094466 DE1964S0094466 DE 1964S0094466 DE S0094466 A DES0094466 A DE S0094466A DE 1235380 B DE1235380 B DE 1235380B
Authority
DE
Germany
Prior art keywords
route search
network
assigned
markings
outputs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE1964S0094466
Other languages
German (de)
Inventor
Helmuth-Joachim Bock
Dipl-Ing Ralf Kaehler
Dipl-Ing Franz Loeffler
Dipl-Ing Hans-Joach Jabczynski
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE1964S0094466 priority Critical patent/DE1235380B/en
Priority to NL6515240A priority patent/NL151240B/en
Priority to FR40276A priority patent/FR1468961A/en
Priority to CH1665665A priority patent/CH440387A/en
Priority to SE15701/65A priority patent/SE326216B/xx
Priority to BE673265D priority patent/BE673265A/xx
Priority to GB5160365A priority patent/GB1081593A/en
Publication of DE1235380B publication Critical patent/DE1235380B/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q3/00Selecting arrangements
    • H04Q3/0008Selecting arrangements using relay selectors in the switching stages
    • H04Q3/0012Selecting arrangements using relay selectors in the switching stages in which the relays are arranged in a matrix configuration

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Exchange Systems With Centralized Control (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Telephonic Communication Services (AREA)

Description

SUNDESREPUBLIK DEUTSCHLANDSUNDIAL REPUBLIC OF GERMANY

DEUTSCHESGERMAN

PATENTAMTPATENT OFFICE

/VUSLEGESCHRIFT/ VUSLE FONT

Int. CL:Int. CL:

Nummer:
Aktenzeichen:
Anmeldetag:
Auslegetag:
Number:
File number:
Registration date:
Display day:

H04gH04g

Deutsche Kl.: 21 a3 - 38German class: 21 a3 - 38

S 94466 VIII a/21 a3
5. Dezember 1964
2. März 1967
S 94466 VIII a / 21 a3
5th December 1964
March 2, 1967

In Vermittlungsanlagen, wie sie insbesondere für üe Fernsprechtechnik benutzt werden, sind die her- :ustellenden Verbindungswege über Sprechwegenetze η Form von sogenannten Koppelfeldern zu führen, lierfür ist eine Wegesuche und Auswahl freier Ver-)indungswege in dem betreffenden Koppelfeld durchführen. An das Koppelfeld sind einerseits zu den feilnehmerstationen führende Teilnehmerleitungen ingeschlossen, andererseits zu anderen Ämtern fühende Abnehmerleitungen, z.B. Ortsleitungen sowie Fernleitungen, über die an andere Ämter über Teillehmerleitungen angeschlossene Teilnehmerstationen irreichbar sind. Bei der Herstellung einer Verbindung wischen einer am gegebenen Koppelfeld angeschlosienen Teilnehmerstation und einer an einem anderen Wt angeschlossenen Teilnehmerstation sind daher licht nur Verbindungswege zu berücksichtigen, die iber das betreffende Koppelfeld führen, sondern auch iolche, die von dort zum betreffenden anderen Amt uhren. Es ist nun bekannt, die zuerst genannten Ver-)indungswege im Zuge einer Wegesuche und -ausvahl zu berücksichtigen. Ferner ist es bekannt, die :um betreffenden anderen Amt führenden Verbinlungswege im Zuge einer sogenannten Leitwegenkung zu berücksichtigen. Diese wird angewendet, veil in der Regel von dem Amt, in dem das berachtete Koppelfeld liegt, mehrere verschiedene Ver-)indungswege zu dem zu erreichenden Amt führen, lämlich direkt dorthin führende Querverbindungsvege, ferner Wege, die über ein oder mehrere andere hinter führen, und schließlich noch ein sogenannter legelweg oder Kennzahlenweg. Bei Benutzung des Cennzahlenweges wird der Verbindungsweg über die hinter geführt, die durch bestimmte Ziffern derRuflummer der zu erreichenden Teilnehmerstation angegeben werden (siehe z. B. deutsche Patentschrift . 028 623, Spalte 1). Durch die Leitweglenkung wird :rreicht, daß bei der Herstellung eines von einem Amt tbgehenden Verbindungsweges der Belegungszustand ler zu den in Frage kommenden Ämtern führenden Umehmerleitungsbündel berücksichtigt wird und da- >ei jeweils der kürzeste mögliche Verbindungsweg >enutzt wird.In switching systems, such as those used in particular for telephone technology, the : to provide connecting routes via speech network η in the form of so-called switching fields, For this purpose, a route search and selection of free connection routes must be carried out in the relevant switching network. On the one hand, subscriber lines leading to the subscriber stations are connected to the switching matrix included, on the other hand, customer lines leading to other offices, e.g. local lines as well Long-distance lines via which to other offices via partial teacher lines connected subscriber stations are inaccessible. When establishing a connection wipe a subscriber station connected to the given switching matrix and one to another Wt connected subscriber stations are therefore only light to take into account the connection paths lead via the relevant switching network, but also those that lead from there to the relevant other office clocks. It is now known the first-mentioned connection routes to be taken into account when searching for and selecting a route. It is also known that the : connection routes leading to the relevant other office in the course of a so-called routing to consider. This is applied, usually by the office in which it is considered Switching network, several different connection paths lead to the office to be reached, Lämlich cross-connecting paths leading directly there, furthermore paths that go through one or more other ones behind lead, and finally a so-called legelweg or key figure path. When using the Cennzahlweges, the connection path is led through the behind, through certain digits of the call number of the subscriber station to be reached (see e.g. German patent specification . 028 623, column 1). The routing ensures that: when establishing one of an office The occupancy status ler leading to the offices in question Umnehmerleitungsbündel is taken into account and there-> ei the shortest possible connection route > is used.

Für die Wegesuche und -auswahl in einem Koppeleld sind nun verschiedene Verfahren bekannt (siehe ;. B. deutschePatentschriften 1048 956 und 1107 726). Vuch für die Durchführung der Leitweglenkung sind 'erschiedene Methoden bekannt (siehe z. B. die Zeitchrift »Der Ingenieur der Deutschen Bundespost«, .956, Heft 2, S. 58 bis 64· »Siemens-Zeitschrift«, .957, Heft 3, S. 101 bis 106). Bei diesem Stand der Technik ist jeweils vorgesehen, die Wegesuche und Schaltungsanordnung für Fernmelde-,
insbesondere Fernsprechvermittlungsanlagen zur Leitweglenkung über mehrstufige Koppelfelder
Various methods are now known for searching for and selecting routes in a coupling field (see; B. German patents 1048 956 and 1107 726). Various methods are also known for carrying out routing (see, for example, the magazine "Der Ingenieur der Deutsche Bundespost", .956, issue 2, pp. 58 to 64, "Siemens-Zeitschrift", .957, issue 3 , Pp. 101 to 106). In this state of the art, the route search and circuit arrangement for telecommunication,
in particular telephone exchanges for routing over multi-level switching networks

Anmelder:Applicant:

Siemens Aktiengesellschaft, Berlin und München, München 2, Witteisbacherplatz 2Siemens Aktiengesellschaft, Berlin and Munich, Munich 2, Witteisbacherplatz 2

Als Erfinder benannt:
Helmuth-Joachim Bock, München;
!5 Dipl.-Ing. Ralf Kahler, München-Solln;
Dipl.-Ing. Franz Löffler, München;
Dipl.-Ing. Hans-Joachim Jabczynski,
München-Solln
Named as inventor:
Helmuth-Joachim Bock, Munich;
! 5 Dipl.-Ing. Ralf Kahler, Munich-Solln;
Dipl.-Ing. Franz Löffler, Munich;
Dipl.-Ing. Hans-Joachim Jabczynski,
Munich-Solln

-auswahl und die Leitweglenkung in voneinander getrennten Einrichtungen vor sich gehen zu lassen. Eine unmittelbare gegenseitige Beeinflussung von Wegesuche im Koppelfeld und Leitweglenkung in den dafür vorgesehenen Umwertungs- und Wahleinrichtungen ist nicht vorgesehen.
Die Erfindung zeigt nun einen Weg, wie eine Wegesuche und eine Leitweglenkung in Kombination durchgeführt werden können, wobei besonders günstige Effekte erzielt werden. Es wird nämlich dabei einerseits mit Sicherheit in jedem Fall vermieden, daß im Zuge der Leitweglenkung ein Amt bestimmt wird, zu dem vom Koppelfeld freie Abnehmerleitungen hinführen, die von dem Eingang des Koppelfeldes aus, an dem die Teilnehmerstation angeschlossen ist, für die ein Verbindungsweg herzustellen ist, nicht über freie Zwischenleitungen des Koppelfeldes erreichbar ist. Andererseits wird auch mit Sicherheit vermieden, daß im Zuge der Wegesuche und -auswahl ein über das Koppelfeld führender Verbindungsweg ausgewählt wird, der zu einem Ausgang des Koppelfeldes führt, an den keine freie Abnehmerleitung angeschlossen ist, über die das Zielamt direkt oder über andere Ämter erreichbar ist. Statt dessen wird durch die Kombination der Wegesuche und Leitweglenkung von vornherein ein über das Koppelfeld führender benutzbarer Weg zu einer freien Abnehmerleitung desjenigen Leitungsbündels festgelegt, daß zu dem am günstigsten zu benutzenden nächsten anderen Amt hinführt. Dabei ist der Zeitbedarf für die kombinierte
-selection and routing to go ahead in separate facilities. Direct mutual influencing of route searches in the switching network and routing in the conversion and selection facilities provided for this is not provided.
The invention now shows a way in which a route search and a routing can be carried out in combination, with particularly favorable effects being achieved. On the one hand, it is definitely avoided in any case that an office is determined in the course of routing to which subscriber lines free from the switching network lead, which establish a connection path from the input of the switching network to which the subscriber station is connected is not accessible via free intermediate lines of the switching matrix. On the other hand, it is also avoided with certainty that in the course of the route search and selection a connection route leading via the switching matrix is selected, which leads to an output of the switching matrix to which no free customer line is connected via which the destination office can be reached directly or via other offices is. Instead, through the combination of route search and routing, a usable route leading via the switching matrix to a free customer line of that trunk group is determined from the outset that leads to the next other office to be used most cheaply. Here is the time required for the combined

709 517/94-709 517 / 94-

Wegesuche und Leitweglenkung praktisch nicht größer als derjenige, der für die Wegesuche allein benötigt wird, obwohl zugleich die jeweils günstigste Reihenfolge für die bei der Leitweglenkung jeweils in Frage kommenden verschiedenen Wege berücksichtigt wird.Route search and routing is practically no greater than what is needed for route search alone is, although at the same time the most favorable order for the routing in question different paths are taken into account.

Die Erfindung betrifft demgemäß eine Schaltungsanordnung für Fernmelde-, insbesondere für Fernsprechvermittlungsanlagen, bei denen unter Leitweglenkung zu anderen Ämtern führende Verbindungswege herzustellen sind, die über mehrstufige Koppelfelder führen. Diese Schaltungsanordnung ist dadurch gekennzeichnet, daß dem betreffenden Koppelfeld ein mit Wählern versehenes Wegesuchnetzwerk zugeordnet ist, das außer der Wegeführung und den Betriebszustand der zugehörigen Zwischenleitungen und zu abgehenden Leitungsbündeln gehörenden Abnehmerleitungen auch die Reihenfolge der zu den Zielämtern hinführenden Wege, wie unter anderem Querweg und Kennzahlenweg, erfaßt, daß zum Suchen und Auswählen eines von einer am Koppelfeld angeschlossenen Zubringerleitung, z. B. Teilnehmerleitung mit Teilnehmerstation, zu einem Zielamt hinführenden Verbindungsweges eine der betreffenden Zubringerleitung zugeordnete Markierung an der Eingangsseite des Wegesuchnetzwerkes und eine dem Zielamt zugeordnete Markierung an der Ausgangsseite des Wegesuchnetzwerkes angelegt werden, so daß unter Ausnutzung der im Wegesuchnetzwerk von beiden Außenseiten her daraufhin zusammentreffenden Markierungen sowie der an den den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes auftretenden Markierungen durch eine einzige Wegeauswahl die zu benutzenden Zwischenleitungen und die zu benutzende Abnehmerleitung wählbar sind.The invention accordingly relates to a circuit arrangement for telecommunications, in particular for telephone switching systems, where routes leading to other offices are to be established under routing via multi-level switching fields to lead. This circuit arrangement is characterized in that the relevant switching network is a Route search network provided with selectors is assigned, which apart from the routing and the operating status the associated intermediate lines and subscriber lines belonging to outgoing trunk groups also the order of the paths leading to the destination offices, such as cross paths and code path, detected that for searching and selecting one of one connected to the switching matrix Feeder line, e.g. B. subscriber line with subscriber station leading to a target office Connection path a marking assigned to the relevant feeder line on the input side of the route search network and a marker assigned to the destination office on the exit side of the route search network are created, so that taking advantage of the route search network of Markings that meet on both outer sides as well as those at the exits of the switching network associated points of the route search network through markings a single route selection, the intermediate lines to be used and the subscriber line to be used are selectable.

Da nur eine einzige Wegeauswahl für die Wegesuche und Leitweglenkung durchzuführen ist, werden diese Vorgänge hier bei geringem Zeitaufwand in Kombination abgewickelt. Dabei wird auch in jedem Fall unter den freien in Frage kommenden Verbindungswegen ein jeweils günstiger ausgewählt.Since only a single route selection has to be carried out for route search and routing, these processes are handled here in combination with little expenditure of time. It is also in everyone If one of the free possible connection routes is selected, one that is more favorable in each case.

Die Schaltungsanordnung kann z. B. in der Weise aufgebaut sein, daß zwischen der Ausgangsseite des Wegesuchnetzwerkes, an welche die dem Zielamt zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes Knotenpunkte vorgesehen sind, welche den über Abnehmerleitungen direkt erreichbaren Ämtern zugeordnet sind und über die angelegte Markierungen in geeigneter Weise übertragen werden. Es können aber auch statt dessen dort den verschiedenen Verkehrsrichtungen, in denen die Zielämter erreichbar sind, zugeordnete Gatterschaltungen eingefügt sein, mit deren Hilfe über ein Verzögerungsglied Markierungen geliefert werden. Der zwischen der Eingangsseite des Wegesuchnetzwerkes, an welche die der betreffenden Teilnehmerstation zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes liegende Teil der Schaltungsanordnung ist nach Maßgabe des anzuwendenden Wegesuchverfahrens aufzubauen. Es können z. B. die Wegesuche und -auswahl mit Hilfe von durch das Wegesuchnetzwerk gelegten Schnittstellen vorgenommen werden, an denen angelegte Markierungen zusammentreffen und an denen jeweils Wegestücke ausgewählt werden, bis der gesamte Verbindungsweg von der betreffenden Zubringerleitung bis zum vorgegebenen Zielamt festgelegt ist. Es kann aber auch statt dessen an den Schnittstellen die Übertragung von Markierungen an geschnittenen Wegestücken beeinflußt und ausgangsseitig durch Ermittlung des Zusammentreffens einer eingangsseitigen Markierung mit einer ausgangsseitigen Markierung bei der Ausgangsseite des Wegesuchnetzwerkes überprüft werden, bis so viele Wegestücke festgelegt sind, daß auch in diesem Fall der angeforderte Verbindungsweg bestimmt ist.The circuit arrangement can, for. B. be constructed in such a way that between the output side of the Route search network to which the marking assigned to the destination office is applied, and the Points of the route search network nodes assigned to outputs of the switching matrix are provided which are assigned to the offices directly accessible via customer lines and via the created Markings are transferred in a suitable manner. But there can also be the Gate circuits assigned to different traffic directions in which the destination offices can be reached be inserted, with the help of which markings are delivered via a delay element. The between the input side of the route search network to which the subscriber station in question is assigned Marking is applied, and the locations of the routing network assigned to the outputs of the switching matrix The lying part of the circuit arrangement is in accordance with the route search method to be used build up. It can e.g. B. the route search and selection with the help of through the route search network laid interfaces are made at which applied markings meet and at each of which sections of the path are selected until the entire connection path from the relevant Feeder line to the specified destination office is set. But it can also be sent to the Interfaces influences the transmission of markings on cut sections of the road and on the output side by determining the coincidence of an input-side marking with an output-side Markings on the exit side of the route search network are checked until there are so many route sections are specified that the requested connection path is also determined in this case.

ίο Das Wesen der Erfindung wird in der Beschreibung an Hand einiger Figuren näher erläutert. Im einzelnen zeigtίο The essence of the invention is in the description explained in more detail on the basis of some figures. In detail shows

F i g. 1 einen Netzplan mit verschiedenen Vermittlungsämtern zur Verdeutlichung der Leitweglenkung; Fig. 2a zeigt in schematischer Darstellung das Koppelfeld eines der Vermittlungsämter sowie am Koppelfeld angeschlossene Teilnehmerstationen und zu den anderen Ämtern führende Abnehmerleitungen; Fig. 2b zeigt ein Beispiel für den Verlauf eines Verbindungsweges zwischen einer Teilnehmerstation und einem über eine Abnehmerleitung erreichbaren Vermittlungsamt;F i g. 1 shows a network plan with various switching offices to illustrate the routing; Fig. 2a shows a schematic representation of the switching matrix of one of the central offices and on Subscriber stations connected to the switching network and customer lines leading to the other offices; Fig. 2b shows an example of the course of a connection path between a subscriber station and an attendant exchange via a subscriber line;

F i g. 2 c zeigt ein Blockschaltbild für die zugehörige Schaltungsanordnung zur Wegesuche und Leitweglenkung; F i g. 2 c shows a block diagram for the associated Circuit arrangement for route search and routing;

F i g. 3 a zeigt ein Beispiel für den Aufbau des ausgangsseitig liegenden Teiles dieser Schaltungsanordnung; F i g. 3 a shows an example of the structure of the part of this circuit arrangement on the output side;

Fi g. 3 b zeigt auszugsweise den Verlauf von Wegesuchadern zwischen der Eingangs- und der Ausgangsseite der Schaltungsanordnung sowie der in die Schaltungsanordnung eingelagerten Wähler;Fi g. 3 b shows excerpts of the route search veins between the input and the output side of the circuit arrangement as well as that in the circuit arrangement stored voters;

F i g. 4 a zeigt ein anderes Beispiel für den Aufbau des ausgangsseitigen Teiles der erfindungsgemäßen Schaltungsanordnung;F i g. 4 a shows another example of the structure the output-side part of the circuit arrangement according to the invention;

F i g. 4 b zeigt auszugsweise den Verlauf von Wegesuchadern zwischen einem Eingang und Ausgängen der in F i g. 4 a gezeigten Schaltungsanordnung sowie die zugehörigen Wähler.F i g. 4 b shows excerpts of the route search arteries between an input and an output the in F i g. 4 a circuit arrangement shown and the associated selector.

Um das Verständnis der erfindungsgemäßen Schaltungsanordnung zu erleichtern, wird zunächst der in F i g. 1 gezeigte Netzplan erläutert, der ein mehrere Vermittlungsämter verbindendes Leitungsnetz ausschnittsweise zeigt, welches sowohl einen sternförmigen Netzaufbau als auch einen maschenförmigen Netzaufbau aufweist. In der F i g. 1 sind zunächst die Vollämter 33, 34, 71 und 82 gezeigt. An das Vollamt 71 ist noch das Teilamt 715 und an das Vollamt 33 das Teilamt 331 angeschlossen. Die Vollämter 33, 34, 71 und 82 sind an das Ortsknotenamt 3 angeschlossen. Das Vollamt 71 ist außerdem an das Ortsknotenamt 7 angeschlossen. Beide Ortsknotenämter sind auch untereinander verbunden. Es bestehen ferner noch andere Verbindungen zwischen den genannten Ämtern, insbesondere ist eine Querverbindung zwischen den Vollämtern 71 und 33, ferner zwischen den Vollämtern 71 und 82 sowie eine Querverbindung zwischen dem Vollamt 71 und dem Teilamt 331 vorgesehen. Wenn von dem Vollamt 71 aus eine Verbindung zu dem Teilamt 331 herzustellen ist, so gibt es hierfür verschiedene Möglichkeiten. Die kürzeste Verbindung stellt die mit α bezeichnete Querverbindung zum Teilamt 331 dar. Sie führt über kein anderes Amt. Ein etwas längerer Weg stellt der vom Vollamt 71 über das Vollamt 33 zum Teilamt 331 führende Weg dar, der mit b bezeichnet ist. Noch langer ist derjenige Weg, der vom Vollamt 71 zunächst zum Ortsknotenamt 3 und von dort über dasIn order to facilitate the understanding of the circuit arrangement according to the invention, the first step in FIG. 1 explains the network plan shown, which shows a network of lines connecting several exchanges, which has both a star-shaped network structure and a mesh-shaped network structure. In FIG. 1 the full offices 33, 34, 71 and 82 are shown first. The partial office 715 is connected to the full office 71 and the partial office 331 is connected to the full office 33. The full offices 33, 34, 71 and 82 are connected to the local node office 3. The full office 71 is also connected to the local node office 7. Both local node offices are also connected to one another. There are also other connections between the offices mentioned, in particular a cross connection between the full offices 71 and 33, furthermore between the full offices 71 and 82 and a cross connection between the full office 71 and the partial office 331 are provided. If a connection to the sub-office 331 is to be established from the full office 71, there are various possibilities for this. The shortest connection is the cross connection to the sub-office 331 marked with α . It does not go through any other office. The path leading from full office 71 via full office 33 to partial office 331, which is designated with b , represents a somewhat longer path. The path from Vollamt 71 to local node office 3 and from there via the

5 65 6

Vollamt 33 zum Teilamt 331 führt. Er ist mit c be- Koppelvielfaches D m abgeht, sowie eine zum Ortszeichnet. Der zuletzt beschriebene Weg stellt einen knotenamt 3 führende Abnehmerleitung, welche von sogenannten Kennzahlenweg dar. Es gibt außerdem der mit η bezeichneten Zeilenleitung des gleichen noch die Möglichkeit, vom Vollamt 71 eine Verbin- Koppelvielfaches abgeht. Weitere Abnehmerleitundung zunächst zum zugehörigen Ortsknotenamt 7 und 5 gen, die zu den Vollämtern 33 und 82 führen, sind von dort zum Ortsknotenpunkt 3 herzustellen, die in der Figur angedeutet. Es sind dort schließlich auch dann über das Vollamt 33 zum Teilamt 331 weiter- noch die die einzelnen Ämter verbindenden Leitungszufuhren ist. Das Ortsknotenamt 3 kann vom Voll- bündel eingezeichnet, und zwar als besonders dicke amt 71 auch über das Vollamt 82 erreicht werden. Linien. Ein derartiger Leitungsbündel führt auch vom Der vorstehend beschriebene Netzplan zeigt Vermitt- io Ortsknotenpunkt 3 zum Vollamt 34.
lungsämter eines Ortsnetzes. Die Schaltungsanord- Die Fig. 2b zeigt den Verlauf eines Verbindungsnung zur kombinierten Wegesuche und Leitweg- weges von der Teilnehmerstation TIj bis zum Teilamt lenkung gemäß der Erfindung kann auch angewendet 331. Er führt zunächst über die die Teilnehmerwerden, wenn Femämter zum betreffenden Netzplan Stationen T Ij mit dem Vollamt 71 verbindende Teilgehören. In diesem Fall kann als Zubringerleitung 15 nehmerleitung, dann über den Koppelpunkt ka Ij 1, statt einer Teilnehmerleitung eine von einem jeweils der in der Koppelstufe A liegt, dann über je einen anderen Vermittlungsamt herführende Leitung bzw. Koppelpunktkontakt der anderen drei Koppelstufen B, eine Fernleitung dienen. C und D, nämlich über die Koppelpunktkontakte Die Fig. 2a zeigt das zum Vollamt 71 gehörende kblll, kellt und Mill. Der Verbindungsweg ver-Koppelfeld sowie dort angeschlossene Teilnehmer- 20 läuft dann weiter über eine vom Vollamt 71 zum Stationen und zum Teil diejenigen Abnehmerleitun- Ortsknotenamt 3 führende Abnehmerleitung. Die vom gen, die zu den dort direkt angeschlossenen anderen Verbindungsweg benutzten im Ortsknotenamt 3 lie-Ämtern führen, also zu den Ämtern 715,1, 82, 3, 33 genden Koppelpunktkontakte sind durch Striche an- und 331. Zu den am Vollamt 71 angeschlossenen gedeutet, bei denen das Bezugszeichen /c3 steht. Der Teilnehmerstationen gehören die Teilnehmerstationen 25 Verbindungsweg geht dann weiter über eine vom TIj und TIj. Für das zum Vollamt71 gehörende Ortsknotenamt 3 zum Vollamt 33 führende Verbin-Koppelfeld ist der Übersichtlichkeit halber ein Bei- dungsleitung und über die mit £33 bezeichneten und spiel gewählt, welches vier Koppelstufen, nämlich die durch Striche angedeuteten Koppelpunktkontakte die-Koppelstufen A ... D aufweist. Vielfach wird ein der- ses Vollamtes. Schließlich wird das Teilamt 331 über artiges Koppelfeld aber noch mehr Koppelstufen auf- 30 eine vom Vollamt 33 zu diesem Teilamt führende weisen. Jede der vier gezeigten Koppelstufen enthält Verbindungsleitung erreicht. Die dort liegenden bemehrere Koppelvielfache, wobei jedes Koppelvielfach nutzten Koppelpunktkontakte sind mit &331 bedurch einen Koordinatenschalter realisiert wird. So zeichnet.
Full office 33 leads to partial office 331. He is going with c loading switching matrix D m, and a Local Records. The path described last represents a subscriber line leading to the node office 3, which is of so-called code number path. There is also the row line labeled with η of the same still the possibility of a connection coupling multiple going off from the full office 71. Further customer lines initially to the associated local node office 7 and 5, which lead to the full offices 33 and 82, are to be established from there to local node 3, which is indicated in the figure. Finally, there are also then via the full office 33 to the partial office 331 - the line feeds connecting the individual offices are still there. The local node office 3 can be drawn in from the full bundle, and specifically as a particularly thick office 71, can also be reached via the full office 82. Lines. Such a trunk group also leads from the network diagram described above shows switching local node 3 to full exchange 34.
offices of a local network. The Schaltungsanord- Fig. 2b shows the course of a connection busbar for the combined route search and routing code path from the subscriber station TIJ to partial exchange steering according to the invention can 331. Also applied He starts via the participants are when Femämter to the respective network stations T Ij with the full office 71 connecting parts. In this case, as a feeder line 15 subscriber line, then via the coupling point ka Ij 1, instead of a subscriber line, one from a respective line that is located in the switching stage A , then via a different switching exchange each line or crosspoint contact of the other three switching stages B, a long-distance line to serve. C and D, namely via the crosspoint contacts. Fig. 2a shows the kblll, kellt and Mill belonging to the full office 71. The connection path ver-coupling field as well as the subscriber 20 connected there then runs on from the full office 71 to the stations and partly those customer lines - Local exchange office 3 leading customer line. The crosspoint contacts from the gene that lead to the other connection path directly connected there in the local node office 3 lie offices, i.e. to the offices 715, 1, 82, 3, 33 are indicated by dashes and 331. To those connected to the full office 71 interpreted, in which the reference character / c3 is. The subscriber stations belong to the subscriber stations 25. The connection path then continues via one of the TIj and TIj. For the local node exchange 3 belonging to Vollamt71, which leads to Vollamt 33, an extension line is selected for the sake of clarity and via the one labeled £ 33, which has four coupling stages, namely the crosspoint contacts indicated by dashes, the coupling stages A ... D has. Often one of these becomes full office. Finally, the sub-office 331 will have even more switching stages via a switching network - one leading from the full-office 33 to this sub-office. Each of the four coupling stages shown contains connecting line reached. The multiple switching matrices located there, whereby each switching matrice used crosspoint contacts are implemented with & 331 by means of a cross switch. So draws.

enthält z. B. die Koppelstufe A die Koppelvielfache Al Die für Fernmeldevermittlungsanlagen bestimmte bis AI, die Koppelstufe B die Koppelvielfache B1 bis 35 Schaltungsanordnung gemäß der Erfindung, mit deren BI usw. Die Eingangsseite des Koppelfeldes liegt bei Hilfe eine Wegesuche im Koppelfeld und eine Leitder Koppelstufe A, dort sind die Teilnehmerstationen weglenkung zugleich durchführbar ist, ist in der über Teilnehmerleitungen angeschlossen. Die Koppel- Fig. 2 c in Form eines Blockschaltbildes angedeutet, vielfache der verschiedenen Koppelstufen sind nach Bei der Eingangsseite dieser Schaltungsanordnung einem bestimmten Gruppierungsplan über Zwischen- 40 liegen die Eingänge tlj bis tlj. Bei der Ausgangsseite leitungen miteinander verbunden. Dadurch wird er- dieser Schaltungsanordnung liegen die Ausgänge reicht, daß jeder Eingang des Koppelfeldes mit jedem 0/3... 1/3, 0/2... 1/2 und 0/1... 1/1. Die der beAusgang des Koppelfeldes verbunden werden kann. treffenden Teilnehmerstation zugeordnete Markierung Die Ausgänge des Koppelfeldes liegen bei den Kop- wird jeweils bei einem der Eingänge tlj... tlj anpelvielfachen der Koppelstufe£>. Die Koppelvielfache 45 gelegt. Eine dem zu erreichenden Zielamt zugeordsind in der Darstellung nur schematisch angedeutet, nete Markierung wird an der Ausgangsseite des Wege- und die Zwischenleitungen sind nur zum Teil einge- suchnetzes angelegt, also bei den vorstehend angezeichnet. An den Kreuzungspunkten der Zeilenleitun- gebenen Ausgängen 0/3.. .1/1. Die als Blockschaltgen (waagerecht) und der Spaltenleitungen (senk- bild dargestellte Schaltungsanordnung enthält ein recht) der Koppelvielfache, also an den Koppelpunk- 50 Wegesuchnetzwerk, das die Wegeführung und den ten, befinden sich in den Koordinatenschaltern Kon- Betriebszustand der zum Koppelfeld des Vollamtes takte, die diesen Koppelpunkten zugeordnet sind und 71 gehörenden Zwischenleitungen und zu abgehendaher im folgenden auch Koppelpunktkontakte ge- den Leitungsbündeln gehörenden Abnehmerleitungen, nannt werden. So befindet sich z. B. im Koppelviel- die zu den Ämtern 715, 7, 82, 3, 33 und 331 führen, fach Al an der Kreuzungsstelle der /-ten Spalten- 35 erfaßt. Auch die Reihenfolge der zu diesen als Zielleitung und der ersten Zeilenleitung der Koppelpunkt ämtern dienenden Ämtern hinführenden Wege ist aljl, dem der Koppelpunktkontakt/ca Z/1 und andere durch dieses Wegesuchnetzwerk erfaßt. Die an die zugeordnet sind. An die Ausgänge der Koppelviel- beiden Außenseiten der Schaltungsanordnung und fache Dl bis Dm der Koppelstufe D sind die bereits damit an den beiden Außenseiten des zugehörigen erwähnten Abnehmerleitungen angeschlossen. Die an 60 Wegesuchnetzwerkes angelegten Markierungen trefden mit η bezeichneten Zeilenleitungen der Koppel- fen innerhalb des Wegesuchnetzwerkes zusammen vielfache D 1,D h und D ζ angeschlossenen Abnehmer- und treten auch an den Ausgängen des Koppelfeldes leitungen führen zum Teilamt 715. Die an den mit 1 zugeordneter Stellen des Wegesuchnetzwerkes auf. bezeichneten Zeilenleitungen der gleichen Koppelviel- Diese Stellen sind zugleich den Ausgängen der Kopfache angeschlossenen Abnehmerleitungen führen 65 pelvielfacheDl...Dmzugeordnet.IndeminFig. 2c zum Teilamt 331. Es ist ferner noch eine zum Orts- gezeigten Blockschaltbild sind diese Ausgänge durch knotenamt 7 führende Abnehmerleitung gezeigt, Anschlüsse an Vielfachschaltungszeichen vertreten, welche von der mit 1 bezeichneten Zeilenleitung des wobei diese Anschlüsse genauso wie die Ausgängecontains e.g. For example, the switching stage A, the switching matrices Al The for telecommunications switching systems, the switching stage B specific to Al, the switching matrices B 1 to 35 circuitry according to the invention, with the BI, etc. The input side of the switching matrix is help a route search in the switching network and a Leitder switching stage A , there are the subscriber stations routing can be carried out at the same time, is connected via subscriber lines. The coupling Fig. 2c indicated in the form of a block diagram, multiple of the different coupling stages are according to a certain grouping plan over 40 the inputs tlj to tlj on the input side of this circuit arrangement. Lines connected to each other on the output side. This circuit arrangement has enough outputs that each input of the switching network with each 0/3 ... 1/3, 0/2 ... 1/2 and 0/1 ... 1/1. Which the output of the switching matrix can be connected. taken subscriber station associated mark The outputs of the switching matrix are in the LAD is TLJ each at one of the inputs of the coupling stage ... TLJ anpelvielfachen £>. The switching matrix 45 is placed. A destination office to be reached is only indicated schematically in the illustration, the marking is on the exit side of the route and the intermediate lines are only partially applied, that is to say in the case of the ones indicated above. At the crossing points of the line cables, there are outputs 0/3 .. .1 / 1. The circuit arrangement shown as block circuits (horizontal) and the column lines (vertical diagram contains a right) of the switching matrices, i.e. at the coupling point, the routing network and the network are located in the coordinate switches Kon clocks that are assigned to these crosspoints and 71 belonging intermediate lines and, in the following, also crosspoint contacts belonging to the trunk lines belonging to the line bundles. So is z. B. in the coupling matrix which lead to the offices 715, 7, 82, 3, 33 and 331 , fold A1 at the intersection of the / th column 35 detected. The order of the paths leading to these offices serving as target lines and the first row line of the crosspoint offices is also the same as that recorded by the crosspoint contact / ca Z / 1 and others through this path search network. Which are assigned to. At the outputs of the coupling array both outer sides of the circuit arrangement and times Dl to Dm of the coupling stage D are already connected to the two outer sides of the associated customer lines mentioned. The voltages applied to 60 route search network markings trefden with η designated row lines of the coupling fen within the routing network together multiple D 1, D h and D ζ connected Customers and also contact lines at the outputs of the switching matrix lead to partial exchange 715. The the 1 assigned locations of the route search network. designated row lines of the same switching matrix These points are also assigned to the outputs of the header lines connected to the subscriber lines that lead 65 pelvielfacheDl ... Dm.IndeminFig. 2c to the sub-office 331. There is also a block diagram for the location shown, these outputs are shown by node office 7 leading customer line, connections to multiple circuit characters represented by the row line denoted by 1, these connections being the same as the outputs

der Koppelvielfache Dl. ..Dm mit den Bezugszeichen 1... η versehen sind. Die beim selben Vielfachschaltungszeichen liegenden Anschlüsse sind jeweils zu einem Markierknoten zusammengefaßt, nämlich zu den Markierknoten /Dl...fDm. Jeder dieser Markierknoten ist jeweils einem Koppelvielfach des Koppelfeldes zugeordnet. Die an den beiden Außenseiten des Wegesuchnetzwerkes angelegten Markierungen haben zur Folge, daß auch an den den Ausgängen des Koppelfeldes zugeordneten Stellen bzw. an den vorstehend beschriebenen Markierknoten Markierungen auftreten. Auf Grund aller dieser innerhalb des Wegesuchnetzwerkes auftretenden Markierungen sind durch eine einzige Wegeauswahl die zu benutzenden Zwischenleitungen und die zu benutzende Abnehmerleitung auswählbar.the switching matrices Dl. ..Dm are provided with the reference numerals 1 ... η . The connections located at the same multiple circuit symbol are each combined to form a marker node, namely to the marker node / Dl ... fDm. Each of these marking nodes is assigned to a switching matrix of the switching matrix. The markings applied to the two outer sides of the route search network result in markings also appearing at the points assigned to the outputs of the switching matrix or at the marking nodes described above. On the basis of all these markings occurring within the route search network, the intermediate lines to be used and the subscriber line to be used can be selected by a single route selection.

An Hand der Fig. 3a und 3b wird nun ein Beispiel dafür gezeigt, wie die vorstehend erwähnten Markierungen innerhalb eines Wegesuchnetzwerkes ausgenutzt werden können und insbesondere wie dieses Wegesuchnetzwerk im einzelnen aufzubauen ist.With reference to FIGS. 3a and 3b, an example will now be shown, such as those mentioned above Markings can be used within a route search network and in particular like this Route search network is to be set up in detail.

Die Fi g. 3 a zeigt zunächst den Aufbau des Wegesuchnetzwerkes zwischen seiner Ausgangsseite, an welche die dem Zielamt zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes, die bei den erwähnten Markierknoten liegen. In diesem Teil des Wegesuchnetzwerkes sind den über Abnehmerleitungen direkt erreichbaren Ämtern zugeordnete Knotenpunkte angeordnet, die mit /715^715, HIg-I, ..., /82/^82, ..., /3/g3, /33/^33 und /331/ g331 bezeichnet sind. Diese Knotenpunkte sind einerseits mit den den Ausgängen des Koppelfeldes zugeordneten Stellen über den Abnehmerleitungen zugeordnete Wegesuchadern verbunden. So führt vom Knotenpunkt /7/g7 ein Paar Wegesuchadern zum Markierknoten fDm und dem dazugehörigen Und-Gatter Udm. Vom Knotenpunkt /331/g331 führen mehrere Paare von Wegesuchadern zu den Markierknoten /D1, fD h und /D i und den damit verbundenen Und-Gattern UdI, Udh und UdL Die Knotenpunkte sind andererseits außerdem noch über Wegesuchadern mit den Zielämtern zugeordneten Ausgängen des Wegesuchnetzwerkes verbunden, die über die den Knotenpunkten zugeordneten Ämter erreichbar sind. Als den Zielämtern individuell zugeordnete Ausgänge des Wegesuchnetzwerkes können auch die Schaltungspunkte ζ 715, ζ 7, ζ 82, ζ 3, ζ 33 und z 331 angesehen werden. Der Schaltungspunkt ζ 331 ist dem Teilamt 331 zugeordnet. Dieses Teilamt ist vom Vollamt 71 aus (s. F i g. 1) über die dort mit a, b und c bezeichneten Verbindungswege erreichbar, also nicht nur direkt, sondern auch über das Ortsknotenamt 3 und das Vollamt 33. Demgemäß ist der Schaltungspunkt ζ 331 über eine Wegesuchader mit dem dem Teilamt 331 zugeordneten Knotenpunkt /331, ferner über eine andere Wegesuchader mit dem dem Vollamt 33 zugeordneten Knotenpunkt /33 und über eine dritte Wegesuchader mit dem dem Ortsknotenamt 3 zugeordneten Knotenpunkt /3 verbunden. In entsprechender Weise sind die anderen Zielämtern zugeordneten Schaltungspunkte gegebenenfalls über mehrere Wegesuchadern mit verschiedenen Knotenpunkten verbunden. So ist z. B. der dem Vollamt 33 zugeordnete Schaltungspunkt ζ 33 sowohl über eine Wegesuchader mit dem Knotenpunkt /33 als auch über eine Wegesuchader mit dem Knotenpunkt /3 verbunden. Die zwischen den Schaltungspunkten z715... z331 und den Knotenpunkten /715... /331 liegenden Wegesuchadern bilden hier für die Zwecke der Leitweglenkung die zwischen den verschiedenen Vermittlungsämtern liegenden Verbindungswege im Wegesuchnetzwerk ab.The Fi g. 3a initially shows the structure of the route search network between its output side, on which the marking assigned to the destination exchange is applied, and the points of the route search network assigned to the outputs of the switching matrix, which are located at the mentioned marking nodes. In this part of the route search network there are nodes assigned to the offices that can be reached directly via subscriber lines, which are marked with / 715 ^ 715, HIg-I, ..., / 82 / ^ 82, ..., / 3 / g3, / 33 / ^ 33 and / 331 / g331. On the one hand, these nodes are connected to the points assigned to the outputs of the switching matrix via route search wires assigned to the subscriber lines. A pair of path search wires leads from the node / 7 / g7 to the marker node fDm and the associated AND gate Udm. From the junction / 331 / g331 several pairs of route search cores lead to the marker nodes / D1, fD h and / D i and the associated AND gates UdI, Udh and UdL connected, which can be reached via the offices assigned to the nodes. The switching points ζ 715, ζ 7, ζ 82, ζ 3, ζ 33 and z 331 can also be viewed as outputs of the route search network that are individually assigned to the destination offices. Switching point ζ 331 is assigned to sub-office 331. This sub-office can be reached from the full office 71 (see Fig. 1) via the connecting paths marked there with a, b and c , i.e. not only directly, but also via the local node office 3 and the full office 33. Accordingly, the switching point is ζ 331 is connected via a route search artery to the node / 331 assigned to the sub-office 331, furthermore via another route search artery to the node / 33 assigned to the full office 33 and via a third route search artery to the node / 3 assigned to the local node office 3. In a corresponding manner, the switching points assigned to other destination offices are optionally connected to various nodes via several route search cores. So is z. B. the circuit point ζ 33 assigned to the full office 33 both via a route search artery to the node / 33 and via a route search artery to the node / 3. The route search wires between the switching points z715 ... z331 and the nodes / 715 ... / 331 map the connection paths between the various switching offices in the route search network for the purposes of routing.

Bei dem in Fig. 3a gezeigten Beispiel für ein Wegesuchnetzwerk sind jedoch die den Zielämtern zugeordneten Schaltungspunkte ζ 715 ... ζ 331 selber nicht als Ausgänge des Wegesuchnetzwerkes benutzt,In the example shown in Fig. 3a for a The route search network, however, are the switching points ζ 715 ... ζ 331 assigned to the destination offices themselves not used as outputs of the route search network,

ίο sondern es sind hier diese Schaltungspunkte entkoppelt an Leitungen von Leitungsbündeln angeschlossen, welche den Ziffern der Teilnehmernummern angerufener Teilnehmer und deren Leitungen den verschiedenen Werten dieser Ziffern zugeordnet sind.ίο but these switching points are decoupled here connected to lines of line bundles which contain the digits of the subscriber numbers called subscribers and their lines are assigned to the various values of these digits.

Es dienen dann diese Leitungen als Ausgänge des Wegesuchnetzwerkes. Diese drei Leitungsbündel sind mit Nl, N 2 und N 3 bezeichnet. Zum Leitungsbündel Nl gehören die Leitungen 0/1... 1/1, zum Leitungsbündel Nl gehören die Leitungen 0/2 ... 1/2, und zum Leitungsbündel N 3 gehören die Leitungen 0/3 ... 1/3. Die Teilnehmernummer einer Teilnehmerstation, welche am Teilamt 331 angeschlossen ist, enthält die Ziffern 3, 3, 1. Wenn diese Teilnehmernummer vorliegt, so wird daher im Leitungsbündel Nl die der Ziffer 3, im Leitungsbündel Nl die der Ziffer 3 und im Leitungsbündel JV3 die der Ziffer 1 entsprechende Leitung markiert. Diese Markierungen werden über das Und-Gatter K331 zum Schaltungspunkt ζ 331 weitergeleitet. In entsprechender Weise wird durch Markierung der Leitung 7 des Leitungsbündels Nl, der Leitung 1 des Leitungsbündels Nl und der Leitung 5 des Leitungsbündels N 3 über das Und-Gatter X 715 im gegebenen Fall eine Markierung zum Schaltungspunkt ζ 715 weitergeleitet. In entsprechender Weise können zu den anderen Schaltungspunkten zl... ζ33 über hier nicht dargestellte Und-Gatter an Ausgänge des Wegesuchnetzwerkes angelegte Markierungen weitergeleitet werden. Es sei bemerkt, daß diese Markierungen unter Umständen auch direkt an die Schaltungspunkte ζ 715 ... ζ 331 mit Hilfe anderer Einrichtungen angelegt werden können. In jedem Fall tritt vor einer Wegesuche und Leitweglenkung an der Ausgangsseite des Wegesuchnetzwerkes eine dem Zielamt zugeordnete Markierung auf.These lines then serve as outputs of the route search network. These three trunk groups are designated N1, N 2 and N 3 . For trunk groups include the Nl lines 0/1 ... 1/1, the line bundle include the Nl lines 0/2 ... 1/2, and the bundle of lines N 3 include the lines 0/3 ... 1/3. The subscriber number of a subscriber station which is connected to the part Office 331, containing the numerals 3, 3, 1. When this subscriber number is present, therefore, in the trunk group Nl the numeral 3, in the trunk group Nl which the numeral 3 and in the trunk group JV3 which the Number 1 corresponding line is marked. These markings are forwarded to circuit point ζ 331 via AND gate K331. In a corresponding manner, by marking the line 7 of the line bundle Nl, the line 1 of the line bundle Nl and the line 5 of the line bundle N 3 via the AND gate X 715, a marking is passed on to the switching point ζ 715 in the given case. In a corresponding manner, markings applied to outputs of the route search network can be forwarded to the other circuit points zl ... ζ33 via AND gates (not shown here). It should be noted that under certain circumstances these markings can also be applied directly to the circuit points ζ 715 ... ζ 331 with the help of other devices. In any case, a marking assigned to the destination office occurs before a route search and routing on the exit side of the route search network.

Unter Ausnutzung der an Ausgänge des Wegesuchnetzwerkes angelegten Markierungen sind über die betreffenden Wegesuchadern und über die in sie eingefügten Knotenpunkte auch Markierungen zu denUsing the markings applied to the outputs of the route search network, the relevant path search veins and also markings to the

so den Ausgängen des Koppelfeldes zugeordneten Stellen übertragbar. An Eingänge des Wegesuchnetzwerkes angelegte Markierungen sind unabhängig davon an die den Ausgängen des Koppelfeldes zugeordneten Stellen, also auch zu den Markierknoten /Dl ...fDm sowie den zugehörigen Und-Gattern UdI ... Udm übertragbar. Von dort gelangen sie ebenfalls unabhängig von den an den Ausgängen des Wegesuchnetzwerkes angelegten Markierungen zu den Knotenpunkten /331/g331... /715/g715. Dies wird hier dadurch ermöglicht, daß zwischen den den Ausgängen des Koppelfeldes zugeordneten Stellen und diesen Knotenpunkten jeweils ein Paar parallellaufender Wegesuchadern vorgesehen ist, wobei über die eine dieser beiden Wegesuchadern die Markierung weitergeleitet wird, die unter Ausnutzung der an Ausgänge des Wegesuchnetzwerkes angelegten Markierungen auftritt, während über die andere Wegesuchader die von den Eingängen des Wegesuchnetzwerkesplaces assigned to the outputs of the switching matrix can thus be transmitted. Markings applied to inputs of the route search network can be transmitted independently of this to the points assigned to the outputs of the switching matrix, that is to say also to the marking nodes / Dl ... fDm and the associated AND gates UdI ... Udm . From there you can get to the nodes / 331 / g331 ... / 715 / g715 regardless of the markings placed at the exits of the route search network. This is made possible here by the fact that a pair of parallel path search wires is provided between the points assigned to the outputs of the switching network and these nodes, one of these two path search wires being used to forward the marking that occurs using the markings applied to the outputs of the path search network, while via the other route search artery those from the inputs of the route search network

herrührende Markierung weitergeleitet wird. So wird z. B. über die vom Markierknoten /Dl zum Knotenpunkt /331/g 331 führende Wegesuchader gegebenenfalls eine von der Eingangsseite des Wegesuchnetzwerkes herrührende Markierung übertragen, während zugleich unabhängig davon über die vom gleichen Knotenamt zum Und-Gatter UdI führende Wegesuchader eine Markierung unter Ausnutzung der an Ausgänge des Wegesuchnetzwerkes angelegten Markierungen übertragbar ist. Es sei bemerkt, daß dies auch möglich ist, wenn jeweils nur eine einzige Wegesuchader vorhanden ist, wobei dann aber z. B. die von der Eingangsseite des Wegesuchnetzwerkes herrührenden Markierungen vor der Übertragung der unter Ausnutzung der an der Ausgangsseite des Wegesuchnetzwerkes angelegten Markierungen auftretenden anderen Markierungen unterbrochen werden müssen (s. deutsche Auslegeschrift 1177 693).originating marking is forwarded. So z. B. via the path search artery leading from the marking node / Dl to the node / 331 / g 331, if necessary, a marking originating from the input side of the path search network can be transmitted, while at the same time independently of this a marking using the path search artery leading from the same node office to the AND gate UdI Outputs of the route search network applied markings can be transmitted. It should be noted that this is also possible if only a single path search vein is available, but then z. B. the markings originating from the input side of the path search network must be interrupted before the transmission of the other markings that occur using the markings applied to the output side of the path search network (see German Auslegeschrift 1177 693).

Die bei den Knotenpunkten j 115IgIlS ... /331/ g 331 angeschlossenen Wegesuchadem sind mit Entkoppelgleichrichtern versehen. Dadurch wird verhindert, daß ein eine Markierung darstellendes elektrisches Potential über die bei den Markierknoten, Knotenpunkten und Schaltungspunkten ζ715.. .ζ331 auftretenden Verzweigungen in unzulässiger Weise entgegen seiner ursprünglichen Übertragungsrichtung zurück übertragen wird. Diese Entkoppelgleichrichter sind mit G, Gl, IG und mit R sowie Rl bezeichnet. Ferner sind in die zwischen den Markierknoten /Dl .. .fDm bzw. den Und-Gattern UdI... Ddm und den Knotenpunkten /331/g331... /715/g715 liegenden Wegesuchadem Belegungskontakte eingefügt, die mit IaI, lall und 2al, lall bezeichnet sind. Diese Belegungskontakte sind geschlossen, wenn die dem betreffenden Paar von Wegesuchadem zugeordnete Abnehmerleitung frei ist, dagegen aber geöffnet, wenn die betreffende zugeordnete Abnehmerleitung bereits belegt und damit für einen herzustellenden Verbindungsweg nicht mehr verfügbar ist. Wenn ein Belegungskontakt geöffnet ist, wird verhindert, daß über diese Wegesuchader eine Markierung übertragen wird, wodurch bei der Wegesuche und -auswahl die zugehörige Abnehmerleitung nicht berücksichtigt wird. In die meisten der zwischen den Schaltungspunkten ζ 331... ζ 715 und den Knotenpunkten /331/g331... f 115/gllS liegenden Wegesuchadem sind ebenfalls Belegungskontakte eingefügt, wozu die Belegungskontakte 1&3/33, 2£3/33 und &33/331 gehören. Mit Hilfe dieser Belegungskontakte kann der Belegungszustand der andere Ämter verbindende Leitungsbündel bei der Wegesuche mit berücksichtigt werden. Sind z. B. alle Leitungen des vom Ortsknotenamt 3 zum Vollamt 33 führenden Leitungsbündels belegt, so werden die Belegungskontakte 1&3/33 und 2 £3/33 geöffnet. Es werden dann über die von den Schaltungspunkten ζ 33 und ζ 331 ζμΐη Knotenpunkt /3/g3 führenden Wegesuchadem gegebenenfalls keine Markierungen übertragen. Dies hat zur Folge, daß bei einer Wegesuche und -auswahl das vom Ortsknotenamt zum Vollamt 33 führende Leitungsbündel nicht berücksichtigt wird. In die vom Schaltungspunkt ζ 331 zum Knotenpunkt /3/g3 führende Wegesuchader ist außerdem noch der Belegungskontakt k 33/331 eingefügt. Er ist geöffnet, wenn alle Leitungen des vom Vollamt 33 zum Teilamt 331 führenden Leitungsbündels besetzt sind. Es wird dadurch verhindert, daß, falls zwar das Vollamt 33 über das Ortsknotenamt 3 vom Vollamt 71 aus erreichbar ist, aber von dort keine freie Leitung zum Teilamt 331 führt, im Zuge der Leitweglenkung der in Fig. 1 mit c bezeichnete Weg eingeschlagen wird. Durch sinngemäße Betätigung der vorstehend betrachteten Belegungskontakte kann mit Sicherheit verhindert werden, daß im Zuge der Leitweglenkung ein Weg eingeschlagen wird, der vor Erreichen des Zielamtes zu einem zwei Vermittlungsämter verbindenden Leitungsbündels führt, dessen Leitungen The path search ladder connected at junction j 115IgIlS ... / 331 / g 331 are provided with decoupling rectifiers. This prevents an electrical potential representing a marking from being transmitted back in an inadmissible manner contrary to its original direction of transmission via the branches occurring at the marking nodes, nodes and circuit points ζ715 ... 331. These decoupling rectifiers are labeled G, Gl, IG and R and Rl. Further, in between the Markierknoten / Dl .. .fdm or ... / 715 / G715 lying Wegesuchadem Occupancy Contact pasted the AND gates UdI ... Ddm and the nodes / 331 / G331, with IaI, lall and 2al , lall are designated. These occupancy contacts are closed when the subscriber line assigned to the relevant pair of route searchers is free, but open when the relevant assigned subscriber line is already occupied and is therefore no longer available for a connection route to be established. If an occupancy contact is open, a marking is prevented from being transmitted via this route search artery, which means that the associated customer line is not taken into account in the route search and selection. Allocation contacts have also been inserted into most of the path searches between the switching points ζ 331 ... ζ 715 and the nodes / 331 / g331 ... f 115 / gllS , including the allocation contacts 1 & 3/33, 2 £ 3/33 and & 33 / 331 belong. With the help of these occupancy contacts, the occupancy status of the trunk groups connecting other offices can be taken into account when searching for a route. Are z. If, for example, all lines of the line bundle leading from local exchange office 3 to full office 33 are occupied, the occupancy contacts 1 & 3/33 and 2 £ 3/33 are opened. If necessary, no markings are then transmitted via the path search ladder leading from the switching points ζ 33 and ζ 331 ζμΐη node / 3 / g3. As a result, the trunk group leading from the local node office to the full office 33 is not taken into account when searching for and selecting a route. In addition, the assignment contact k 33/331 is inserted into the path search artery leading from the switching point ζ 331 to the node / 3 / g3. It is open when all lines of the trunk group leading from full office 33 to partial office 331 are busy. This prevents that, if the full office 33 can be reached via the local exchange office 3 from the full office 71, but no free line leads from there to the sub office 331, the route denoted by c in FIG. 1 is taken in the course of routing. By analogous actuation of the occupancy contacts considered above, it can be prevented with certainty that in the course of routing a path is taken which, before reaching the destination office, leads to a trunk group connecting two switching offices, its lines

ίο alle besetzt sind. Wenn die vorstehend betrachteten Belegungskontakte eingespart werden, muß hierauf verzichtet werden.ίο all are occupied. If the above considered Occupancy contacts are saved, must be dispensed with.

Zur Ausnutzung der an den Ausgängen und an den Eingängen des Wegesuchnetzwerkes angelegten Markierungen und zur Berücksichtigung der Reihenfolge der zu einem Zielamt führenden Wege sind in die Knotenpunkte /331/g 331... /715/g715 Und-Gatter mit ihren Eingängen eingeschleift. Es sind dies die Und-Gatter E/331... UIlS. An die Ausgänge dieser UND-Gatter sind die Eingänge des Leitwegwählers LW angeschlossen, der den Knotenpunkten zugeordnete Ausgänge hat und zur Auswahl unter den Knotenpunkten nach einer vorgegebenen Bevorzugungsreihenfolge seiner Eingänge bzw. Ausgänge dient. Die Bevorzugungsreihenfolge kann z. B. derartig sein, daß bei gleichzeitiger Markierung mehrerer Eingänge des Leitungswählers der am meisten rechts liegende Eingang bzw. Ausgang ausgewählt wird, indem der zugehörige Ausgang marleiert wird. Gelangen daher beispielsweise über die drei Und-Gatter Z7331, E/33 und t/3 gleichzeitig Markierungen zu den zugehörigen drei Eingängen des Leitwegwählers LW, so wird der mit dem Knotenpunkt #33! verbundene Ausgang des Leitweg-Wählers LW markiert. Damit der Leitwegwähler die Leitweglenkung in zweckmäßiger Weise durchführt, sind die den Zielämtern zugeordneten Ausgänge des Wegesuchnetzwerkes über Wegesuchadem mit den betreffenden Knotenpunkten derart verbunden, daß bei einer Auswahl durch den Leitwegwähler LW zu nächst der kürzeste Weg, insbesondere der Querweg, dann längere Wege und zuletzt der Kennzahlenweg berücksichtigt wird. Wenn z. B. der Schaltungspunkt ζ 331 über die betreffenden Ausgänge des Wegesuchnetzwerkes und über das Und-Gatter K331 markiert wird, weil ein Verbindungsweg zum Teilamt 331 herzustellen ist, so gelangt diese Markierung, falls die drei dorthin führenden Verbindungswege α, b und c gemäß F i g. 1 verfügbar sind, über die von dort abgehenden drei Wegesuchadem zu den Knotenpunkten /331, /33 und /3. Sind die diesen Knotenpunkten zugeordneten Vermittlungsämter auch über das zum Vollamt 71 gehörende Koppelfeld und über die von dort zu diesen Vermittlungsämtern abgehenden Abnehmerleitungen erreichbar, so gelangt die bei dem betreffenden Eingang des-Wegesuchnetzwerkes angelegte Markierung über das Wegesuchnetzwerk ebenfalls zu den Knotenpunkten /331, /33 und /3. Die dort eingeschleiften Und-Gatter U331, U 33 und U3 werden daher jeweils an beiden Eingängen markiert, wodurch diese Markierung zu den betreffenden drei Eingängen des Leitwegwählers LW weitergeleitet wird und worauf dieser, wie bereits beschrieben, einen Auswahlvorgang durchführt, durch den der Knotenpunkt g331 markiert wird. Es ist damit bereits festgelegt, daß der Verbindungsweg über eine vom Vollamt 71 direkt zum Teilamt 331 führende Abnehmerleitung führenTo utilize the markings placed at the exits and entrances of the route search network and to take account of the sequence of routes leading to a destination office, AND gates with their entrances are looped into the nodes / 331 / g 331 ... / 715 / g715. These are the AND gates E / 331 ... UIlS. The inputs of the route selector LW are connected to the outputs of these AND gates. The order of preference may e.g. B. be such that when several inputs of the line selector are selected at the same time, the input or output that is most to the right is selected by marrying the associated output. If, for example, the three AND gates Z7331, E / 33 and t / 3 are used to simultaneously get markings to the associated three inputs of the route selector LW, the node with node # 33! connected output of the route selector LW marked. So that the route selector carries out the routing in an expedient manner, the outputs of the route search network assigned to the destination offices are connected to the relevant nodes via Wegesuchadem in such a way that when a selection is made by the route selector LW, first the shortest route, in particular the cross route, then longer routes and last the key figure path is taken into account. If z. B. the node ζ 331 is marked via the relevant outputs of the route search network and via the AND gate K331 , because a connection path to the sub-office 331 is to be established, this marking is applied if the three connection paths leading there α, b and c according to F i G. 1 are available via the three paths to the junctions / 331, / 33 and / 3. If the switching exchanges assigned to these nodes can also be reached via the switching network belonging to the full exchange 71 and via the subscriber lines going from there to these switching exchanges, the marking created at the relevant input of the route search network also reaches the nodes / 331, / 33 via the route search network and / 3. The AND gates U 331, U 33 and U3 looped in there are therefore marked at both inputs, whereby this marking is forwarded to the relevant three inputs of the route selector LW and whereupon, as already described, the latter carries out a selection process through which the node g331 is highlighted. It is thus already established that the connection route leads via a customer line leading from the full office 71 directly to the partial office 331

709 517/94-709 517 / 94-

wird. Wäre ζ. B. keine derartige Abnehmerleitung Es ist hier also die beim Leitwegwähler LW vorfrei gewesen, so wären die in den zum Knotenpunkt gesehene Bevorzugungsreihenfolge nach Maßgabe /331 von der Eingangsseite des Wegesuchnetzwerkes des zu erreichenden Zielamtes umschaltbar. Es kann her hinführenden Wegesuchadern liegenden Be- hierbei auch noch eine ganz andere durch Umschallegungskontakte, wie der Belegungskontakt IaI 1 ge- 5 tang erzielbare Bevorzugungsreihenfolge unter den öffnet gewesen, und es wäre das Und-Gatter U 331 Eingängen bzw. Ausgängen des Leitwegwählers vorbeim Knotenpunkt/331 nicht an beiden Eingängen gesehen werden, damit in jedem Fall bei der Leitmit Markierungen versorgt worden. Es hätte dann weglenkung die günstigste Reihenfolge der vornicht der dem Knotenpunkt/331/^331 zugeordnete gesehenen Wege berücksichtigt wird.
Eingang des Leitwegwählers LW markiert werden io In der F i g. 3 b ist unter anderem ein Ausschnitt können, und dieser Eingang wäre daher beim Aus- aus dem Teil des in Fig. 3a gezeigten Wegesuchwahlvorgang, der durch diesen Leitwegwähler durch- netzwerkes dargestellt, der zwischen dem Markiergeführt wird, nicht berücksichtigt worden. Statt des- knoten /Dl... /Dm und seinen Ausgängen liegt, sen wäre der mit dem Und-Gatter t/33 des Mar- Darüber hinaus ist dort auch ein Ausschnitt aus kierknotens /33 verbundene Eingang berücksichtigt 15 demjenigen Teil in allen Einzelheiten gezeigt, der worden. Es wäre daher in diesem Fall dann der zwischen den erwähnten Markierknoten und seinen nächstlängere Weg b gemäß Fig. 1 für den herzustel- Eingängen liegt. Dieser Teil des Wegesuchnetzlenden Verbindungsweg berücksichtigt worden. In werkes ist in an sich bekannter Weise aufgebaut entsprechender Weise wird die Leitweglenkung sinn- (s. deutsche Patentschrift 1 048 956, insbesondere gemäß vorgenommen, wenn der Belegungszustand 20 Fig. 5). Auch der zwischen den Markierknoten und der am Vollamt 71 angeschlossenen Abnehmer- den Knotenpunkten liegende Teil des Wegesuchnetz-Ieitungen und der Belegungszustand der zwischen werkes hat einen dementsprechenden Aufbau. Der in den verschiedenen Vermittlungsämtern liegenden F i g. 3 b gezeigte Ausschnitt aus dem Wegesuchnetz-Leitangsbündel anders als bei dem vorstehend werk zeigt die zu einem bestimmten Verbindungsweg beschriebenen Beispiel ist. 25 zwischen dem Eingang tlj und dem Schaltungspunkt
will. Would be ζ. B. no such subscriber line So here the one at the routing selector LW was pre-vacant, so the order of preference seen in the node point would be switchable according to / 331 from the input side of the routing network of the destination office to be reached. There can also be a completely different order of preference among the opens that can be achieved through switching contacts, such as the occupancy contact IaI 1 tangible, and the AND gate U 331 inputs or outputs of the route selector would have passed the node / 331 cannot be seen at both entrances, so that they have been provided with markings at the Leit in each case. The most favorable order of the routes not assigned to the node / 331 / ^ 331 would then be taken into account.
Input of the route selector LW can be marked io In the F i g. 3b can, among other things, be an excerpt, and this input would therefore not have been taken into account when selecting the part of the route search selection process shown in FIG. Instead of the node / Dl ... / Dm and its outputs, sen would be the one with the AND gate t / 33 of the Mar- In addition, there is also an excerpt from the kierknotens / 33 input taken into account 15 that part in all details shown who has been. In this case, it would therefore be the one between the mentioned marker nodes and its next longer path b according to FIG. 1 for the inputs to be produced. This part of the route search network end connection route has been taken into account. In Werks is constructed in a manner known per se, the routing is sensible (see German patent specification 1 048 956, in particular carried out according to when the occupancy status 20 Fig. 5). The part of the routing network lines located between the marker nodes and the consumer nodes connected to the full office 71 and the occupancy status of the between plants also have a corresponding structure. F i g. FIG. 3 b shows the excerpt from the routing network routing bundle, different from the one in the previous work, which is the example described for a specific connection route. 25 between the input tlj and the node

Das Teilamt 331 ist vom Vollamt 71 aus auch ζ 331 gehörenden Wegesuchadern sowie die jeweilsThe partial office 331 is from the full office 71 also ζ 331 belonging route search arteries as well as the respective

über das Ortsknotenamt 7 erreichbar. Wenn auch einer Koppelstufe des Koppelfeldes des Vollamtes 71can be reached via the local exchange office 7. Even if a switching stage of the switching network of the full office 71

dieser Weg bei der Leitweglenkung berücksichtigt zugeordneten Wähler, die mit KVB, KVC, KVD this way in the routing takes into account assigned voters, those with KVB, KVC, KVD

werden soll, so muß noch die in der F i g. 3 a durch bezeichnet sind, und den Leitwegwähler LW. Ferneris to be, then the one in FIG. 3 a are denoted by, and the routing selector LW. Further

eine gestrichelte Linie angedeutete Wegesuchader 30 ist noch gezeigt, wie der Schaltungspunkt z331 übera dashed line indicated path search vein 30 is also shown how the circuit point z331 over

vorgesehen v/erden, die vom Schaltangspunkt ζ 331 Und-Gatter K331 an die betreffenden Ausgänge desprovided v / ground, which is sent from the switching point ζ 331 AND gate K 331 to the relevant outputs of the

zum Knotenpunkt/7/g7 führt. In diese Wegesuch- Wegesuchnetzwerkes angeschlossen ist. Vom Ein-leads to junction / 7 / g7. In this route search route search network is connected. From a

ader sind auch ein Entkoppelgleichrichter sowie ge- gang tlj, bei dem sich der Kontakt ItIj befindet,veins are also a decoupling rectifier and gang tlj, where the contact ItIj is,

gebenenfalls Belegungskontakte einzufügen. Da der führen Wegesuchadern über den Koordinatenschal-if necessary, insert occupancy contacts. Since the route search veins lead over the coordinate map

über das Ortsknotenamt 7 führende Weg der längste 35 tern bzw. Koppelvielfachen zugeordnete Markier-Via the local exchange 7, the longest 35 tern or coupling matrices associated marking path

Weg ist, so wird er bei der vorstehend beschriebe- knoten, die mit j Al, jBl, /Cl und /Dl bezeichnetPath is, it is referred to in the above-described node, which is denoted by j Al, jBl, / Cl and / Dl

nen Leitweglenkung als letzte Wegemöglichkeit sind, zum Knotenpunkt /331. Dieser KnotenpunktRouting is the last possible route to the junction / 331. This junction

berücksichtigt. ist noch über eine Wegesuchader mit dem Schal-considered. is still via a path search artery with the switch

Mit Hilfe des Leitwegwählers LW ist nun aber tungspunkt z331 und über das Und-Gatter K331 auch eine Leitweglenkung vorzunehmen, wenn das 40 mit den bei Ausgängen des Wegesuchnetzes liegen-Teilamt 715 zu erreichen ist. Dorthin führt ein direk- den Markierkontakten /c3/1, k3/2 und kl/3 verter Weg sowie ein über das Ortsknotenamt 7 führen- bunden. Andere Wegesuchadern führen vom beder Weg. Im Zuge einer ausgangsseitigen Markierung treffenden Ausgang des Leitwegwählers LW über ist in diesem Fall der Schaltungspunkt ζ715 zu den Knotenpunkt g331 zu den Wählern KVD, KVC markieren. Wenn beide vom Vollamt 71 zum Teil- 45 und KVB. Der dem Koppelfeld des Vollamtes 71 amt 715 führenden Wege verfügbar sind, so werden zugeordnete Teil des Wegesuchnetzwerkes hat einen die Und-Gatter U7 und U715, die zu den Knoten- Aufbau, der der Wegeführung im Koppelfeld selber punkten /7/g 7 und /715/g715 gehören, an beiden entspricht. Die Markierknoten des Wegesuchnetz-Eingängen markiert und leiten ihre Markierungen werkes sind daher in der gleichen Weise durch Wegezu den an ihren Ausgängen angeschlossenen Ein- 50 suchadern miteinander verbunden wie die Koordigängen des Leitwegwählers LW weiter. In diesem natenschalter bzw. Koppelvielfache des Koppel-Fall ist nun bei dem durch den Leitwegwähler durch- feldes durch Zwischenleitungen. Diese Wegesuchgeführten Auswahlvorgang nicht der am meisten ädern können daher als besondere Adern dieser rechts liegende markierte Eingang zu bevorzugen, Zwischenleitungen betrachtet werden,
sondern der am meisten links liegende markierte 55 Die bereits genannten Wähler KVB, KVC und Eingang. Es ist daher für die Leitweglenkung die KVD befinden sich an sogenannten Schnittstellen, Bevorzugungsreihenfolge beim Leitwegwähler LW die quer durch das Koppelfeld gelegt sind. Mit umzuschalten. Hierzu dienen die Eingänge ρ 3 und Hilfe dieser Wähler wird jeweils ein zum Koppelfeld ρ7 des Leitwegwählers. Die jetzt benötigte Bevor- gehörendes und zu benutzendes Wegestück auszugungsreihenfolge wird eingehalten, wenn der 60 gewählt. Es sind hier so viele Schnittstellen parallel Eingang ρ 7 markiert wird. Er ist an die Leitung 7 zu Koppelstufen durch das Koppelfeld gelegt, daß des Leitungsbündels Nl angeschlossen und wird da- durch Auswahl je eines Wegestückes bei jeder dieser her auch markiert, wenn eine Markierung bei dem Koppelstufen ein über das Koppelfeld führender Ver-Schaltungspunkt z715 auftritt. Bei dem vorher be- bindungsweg eindeutig festgelegt wird. Die ausschriebenen Beispiel, bei dem die ursprüngliche Be- 65 gewählten Wegestücke stellen hier jeweils Koppelvorzugungsreihenfolge benötigt wird, wird der Ein- vielfache dar, die beispielsweise jeweils einem Kogang ρ 3 des Leitwegwählers markiert, der an die ordinatenschalter entsprechen. Die Wähler können Leitung 3 des Leitungsbündels iVl angeschlossen ist. daher hier auch als Koppelvielfachwähler bezeichnet
With the help of the route selector LW , however, routing point z331 and via the AND gate K331 can also be routed if the 40 can be reached with the sub-office 715 located at the exits of the route search network. A direct marker contact / c3 / 1, k 3/2 and kl / 3 verter path as well as a via the local exchange 7 leads there. Other path search arteries lead from the beder path. In the course of a marking on the output side of the route selector LW via, the switching point ζ715 to the node g331 to the selectors KVD, KVC is to be marked in this case. If both from full office 71 to part 45 and KVB. If the routes leading to the switching matrix of the full exchange 71 are available at 715, the assigned part of the route search network has an AND gates U 7 and U 715, which point to the node structure of the routing in the switching matrix itself / 7 / g 7 and / 715 / g715 correspond to both. The marker nodes of the route search network inputs marked and forward their markings are therefore interconnected in the same way by routes to the input wires connected to their outputs as the co-ordinates of the route selector LW . In this network switch or switching matrix of the coupling case, the field is now through the routing selector through intermediate lines. This route-search-guided selection process cannot be regarded as the most common wires to prefer this marked input on the right, intermediate lines,
but the one most left marked 55. The already mentioned voters KVB, KVC and entrance. It is therefore for the routing that the KVDs are located at so-called interfaces, the order of preference for the routing selector LW that are placed across the switching network. To switch with. The inputs ρ 3 are used for this purpose, and with the help of these selectors, one becomes the switching matrix ρ 7 of the route selector. The order of the path segment to be used and which is now required is adhered to if the 60 is selected. There are so many interfaces parallel input ρ 7 is marked. It is connected to the line 7 to coupling stages through the switching matrix that is connected to the line bundle Nl and is therefore also marked when a marking occurs at the switching stage at a switching point z715 leading via the switching matrix . The route of connection is clearly defined in advance. The written-out example, in which the original route sections selected represent the preferred coupling sequence is required here, is the single multiple which, for example, marks a Kogang ρ 3 of the route selector that corresponds to the ordinate switch. The voters can line 3 of the line bundle iVl is connected. therefore also referred to here as a matrix switch

werden. Der Leitwegwähler LW hat innerhalb des dieser Koppelvielfache ist auch eine Wegeführung Wegesuchnetzwerkes eine ganz ähnliche Funktion im zum Vollamt 71 gehörenden Koppelfeld festwie die Koppelvielfachwähler. Er ist in der gleichen gelegt und damit ein einziger Verbindungsweg von Weise wie bei dem bekannten Wegesuchnetzwerk an der betreffenden Teilnehmerstation bis zu dem vorKnotenpunkte angeschlossen, die den dort vor- 5 her ausgewählten anderen Vermittlungsamt festgesehenen Markierknoten entsprechen, welche an gelegt. Den Eingängen dieser weiteren Koppelvielder sogenannten ersten Schnittstelle liegen. Im Zuge fachwähler sind ebenfalls Und-Gatter vorgeschaltet, der Wegesuche und -auswahl wird zunächst ein die mit U bezeichnet sind. Deren Eingängen werden Wegestück an dieser ersten Schnittstelle ausgewählt die jeweils zusammentreffenden Markierpotentiale und markiert. Durch diese Schnittstelle werden hier io zugeführt. Diese Markierpotentiale werden über die Knotenpunkte /331/g331... /7/g7 betroffen. Wegesuchadern übertragen, in die ebenfalls Be-will. The routing selector LW has within this switching matrix is also a routing routing network a very similar function in the switching network belonging to the full exchange 71 as the switching matrix. It is laid in the same way and thus a single connection path is connected in the same way as in the known route search network at the relevant subscriber station up to the pre-node points that correspond to the previously selected other switching office marked marker nodes that are connected to. The inputs of this additional switching network are the so-called first interface. In the course of subject selector, AND gates are also connected upstream, the path search and selection is initially marked with a U. Their entrances are selected at this first intersection and the marking potentials that come together are selected and marked. Through this interface, io are fed in here. These marking potentials are affected via the nodes / 331 / g331 ... / 7 / g7. Transfer route search veins into which also

Zur Einleitung der Wegesuche werden zunächst legungskontakte eingefügt sind, die mit 2 b bezeichdie Markierkontakte IiZ/, £3/1, £3/2 und kl/3 ge- net sind. Auch diese Belegungskontakte dienen dazu, schlossen. Dadurch werden Markierungen in Form den Belegungszustand der zugehörigen Zwischenpositiven Potentials an das Wegesuchnetzwerk an- 15 leitung zu berücksichtigen, denn auch diese Begelegt. Dieses positive Potential wird über Wege- legungskontakte sind nur dann geschlossen, wenn die suchadern und Markierknoten unter anderem bis zu zugehörigen Leitungen gerade frei sind,
den beiden Eingängen des Und-Gatters Γ7331 über- Damit die vorstehend beschriebene Wegesuche zu
To initiate the route search, laying contacts are first inserted which are marked with 2 b denoting the marking contacts IiZ /, £ 3/1, £ 3/2 and kl / 3 . These occupancy contacts are also used to close. As a result, markings in the form of the occupancy status of the associated intermediate positive potential to the route search network are to be taken into account, because these are also covered. This positive potential is only closed via routing contacts if the search wires and marking nodes are currently free, including up to the associated lines,
the two inputs of the AND gate Γ7331, so that the route search described above can be carried out

tragen und gelangt von dort zu einem Eingang des einem eindeutigen Ergebnis führt, bei dem nicht nur Leitwegwählers LJF. Auch in die zum Koppelfeld 20 alle zu benutzenden Zwischenleitungen im Koppeides Vollamtes 71 gehörenden Wegesuchadern sind feld des Vollamtes 71, sondern auch die zu benoch Belegungskontakte, die mit 1 b bezeichnet sind, nutzende Abnehmerleitung individuell festgelegt wereingefügt, welche nur dann geschlossen sind, wenn den, ist hier vorausgesetzt, daß von den von einem die dazugehörige Zwischenleitung noch nicht belegt Knotenpunkt zu den Ausgängen des Koppelfeldes ist. Das erwähnte positive Potential gelangt daher 25 zugeordneten Stellen des Wegesuchnetzwerkes fühzum Leitwegwähler LW nur dann, wenn mindestens renden Wegesuchadern jeweils höchstens eine bzw. ein freier Verbindungsweg zwischen der zum mar- ein Paar zu den den am selben Koppelvielfach des kierten Eingang gehörenden Teilnehmerstation und Koppelfeldes liegenden Ausgängen zugeordneten dem zu erreichenden Zielamt vorhanden ist. In die Stellen führt. Das bedeutet, daß von einem einem Wegesuchadern, die bei dem zum Koppelfeld ge- 30 Knotenpunkt zugeordneten Vermittlungsamt jeweils hörenden Teile des Wegesuchnetzwerkes vorgesehen nur eine Abnehmerleitung zu ein und demselben sind, sind ebenfalls Gleichrichter eingefügt, die ver- Koppelvielfach der Koppelstufe D des Koppelfeldes hindern, daß das positive Markierpotential von Mar- des Vollamtes 71 führt. Diese Voraussetzungen sind kierknoten aus in unzulässiger Weise durch das auch bei dem Wegesuchnetzwerk, wie es in F i g. 3 a Wegesuchnetzwerk weitergeleitet wird. In einem 35 dargestellt ist, erfüllt, da auch dort z. B. vom Knoten-Markierknoten treffen nämlich jeweils alle diejenigen punkt /331/g331 nur ein einziges Paar von Wege-Wegesuchadern zusammen, die zu den am zugehöri- suchadern zum gleichen Markierknoten, nämlich zum gen Koppelvielfach bzw. Koordinatenschalter an- Markierknoten /Dl, dem das Und-Gatter UdI zugeschlossenen Zwischenleitungen gehören. Die er- geordnet ist, führt. Wenn diese Voraussetzung nicht wähnten Gleichrichter sind mit Gw und Rw 40 erfüllt ist, so kann die an Hand der Fig. 3a und 3b bezeichnet. beschriebene Wegesuche auch durchgeführt werden,carry and arrives from there to an input which leads to a clear result, in which not only routing selector LJF. Also in the interconnection lines to be used in the Koppeides Vollamtes 71 belonging to the switching field 20, the field of the Vollamt 71, but also the customer line using the occupancy contacts, which are designated with 1 b , are individually specified, which are only closed when the , it is assumed here that the associated intermediate line is not yet occupied by one of the nodes to the outputs of the switching network. The above-mentioned positive potential therefore reaches 25 assigned points of the route search network for routing selector LW only if at least one route search artery or a free connection path between the pair of the subscriber station and switching matrix belonging to the same switching matrix of the marked input Exits assigned to the destination office to be reached is available. Leads to the places. This means that from one of the route search cores, which are provided at the switching center assigned to the switching network, there is only one subscriber line to one and the same, rectifiers are also inserted which prevent the coupling stage D of the switching network that the positive marking potential of Mardes full office 71 leads. These prerequisites are kierknoten in an inadmissible manner by the route search network, as shown in FIG. 3 a route search network is forwarded. Is shown in a 35, met, since there z. B. from the node-marker node, namely, all those dot / 331 / g331 meet only a single pair of path-path search cores that go to the on the associated search cores to the same marking node, namely to the gene coupling matrix or coordinate switch - marking node / Dl, the intermediate lines connected to the AND gate UdI belong. Which is ordered leads. If this prerequisite is not mentioned rectifiers with Gw and Rw 40 is met, then it can be designated with reference to FIGS. 3a and 3b. described route search can also be carried out,

Wie bereits beschrieben wurde, ist im allgemeinen es ist dann jedoch noch eine zusätzliche Maßnahme damit zu rechnen, daß zu mehreren Eingängen des zu treffen, z. B. sind die Koppelvielfache der Koppel-Leitwegwählers LW das positive Markierpotential stufe D zu zerlegen, und zwar in der Weise, daß dagelangt. In dem in F i g. 3 b gezeigten Ausschnitt aus 45 nach die zunächst gemachte Voraussetzung wieder dem Wegesuchnetzwerk sind nur das eine an einen erfüllt ist. Statt dessen kann auch eine zusätzliche Eingang angeschlossene Und-Gatter £7331 und der Wahleinrichtung vorgesehen werden, die unter den zugehörige Knotenpunkt /331/g331 gezeigt. Wenn verschiedenen zwischen dem gleichen Koppelvielan mindestens einem Eingang des Leitwegewählers fach und dem gleichen Vermittlungsamt liegenden LW das positive Markierpotential eintrifft, führt er 50 Abnehmerleitungen zusätzlich eine Auswahl voreinen Auswahlvorgang durch, durch den dasjenige nimmt.As has already been described, in general, however, an additional measure must be taken into account that several inputs of the must be met, e.g. B. are the coupling multiples of the coupling routing selector LW, the positive marking potential step D to be broken down, in such a way that there is. In the one shown in FIG. FIG. 3 b shown excerpt from 45 according to the initially made requirement again the route search network are only one thing that is fulfilled for one. Instead, an additional input connected AND gate £ 7331 and the selection device can be provided, which is shown under the associated node / 331 / g331. If different arrives the positive Markierpotential between the same Koppelvielan at least one input of the Leitwegewählers times and the same central office located LW, it executes the trunk lines 50 is a selection voreinen selection operation by, taking the one by the.

Vermittlungsamt festgelegt wird, zu dem der Ver- Die mit Hilfe des in den F i g. 3 a und 3 b dar-Mediation office is determined, to which the agent with the help of the in F i g. 3 a and 3 b

bindungsweg vom Vollamt 71 aus hinzuführen hat. gestellten Wegesuchnetzwerkes vorgenommene Der Leitwegwähler LW legt daraufhin eine erneute Wegesuche und -auswahl wurde mit Hilfe einer Markierung an das Wegesuchnetzwerk an, die hier 55 ersten durch das Wegesuchnetzwerk gelegten Schnittbei dem Knotenpunkt g331 auftritt. Diese Markie- stelle vorgenommen, an der auf Grund dort zurung wird in Richtung zur Eingangsseite des Wege- sammentreffender Markierungen ein erstes der in Suchnetzwerkes zu weiteren Schnittstellen übertragen, Frage kommenden Wegestücke ausgewählt wird, woalso gegenläufig zu den in diesem Teil des Wege- rauf dort eine weitere Markierung angelegt wird. An suchnetzwerkes bisher angelegten Markierungen. An 60 weiteren Schnittstellen werden dann unter Ausdiesen weiteren Schnittstellen wird mit Hilfe von hier nutzung ursprünglicher und weiterer gegenläufiger nunmehr zusammentreffenden ursprünglichen Mar- Markierungen in entsprechender Weise weitere Wegekierungen und der gegenläufigen Markierung jeweils stücke ausgewählt, bis der gesamte Verbindungsweg ein v/eiteres in Frage kommendes Wegestück aus^ von der betreffenden Teilnehmerstation bis zum gewählt. Hierzu dienen die bei den betreffenden 65 vorgegebenen Zielamt festgelegt ist. Das Wegesuch-Koppelstufen vorgesehenen Koppelvielfachwähler netzwerk kann aber auch in etwas anderer Weise KVD, KVC und KVB, die jeweils ein Koppelviel- aufgebaut werden, um die Wegesuche in anderer an' fach auswählen und markieren. Mit der Auswahl sich bekannter Weise durchzuführen (s. deutschebinding path from full office 71 has to lead. The route selector LW then creates a new route search and selection with the help of a marker on the route search network, which occurs here at the junction g 331 for the first time through the route search network. This marking point is carried out at which, due to the markings meeting the entry side of the path, a first of the path segments coming into question in the search network to further interfaces is selected, so that it is opposite to the path up there in this part of the path another marker is created. At the search network previously created markings. At 60 further interfaces, further path markings and the counter-directional markings are selected in a corresponding manner with the help of the original and further opposing, now coinciding, original Mar markings, until the entire connecting path is a further possible one Distance from ^ from the relevant subscriber station to selected. The target office specified for the 65 concerned is used for this purpose. The routing coupling stages provided switching multiple selector network can, however, also in a somewhat different way KVD, KVC and KVB, each of which is a coupling multiplex, in order to select and mark the routing in another to 'fold. With the selection to be carried out in a known manner (see German

Patentschrift Nr. 1107726). Auch in diesem Fall werden mehrere Schnittstellen durch das Wegesuchnetzwerk gelegt. An diesen Schnittstellen wird dann die Übertragung von Markierungen an geschnittenen Wegestücken beeinflußt und ausgangsseitig durch Ermittlung des Zusammentreffens einer eingangsseitigen Markierung mit einer ausgangsseitigen Markierung bei der Ausgangsseite des Wegesuchnetzwerkes überprüft, bis so viele Wegestücke festgelegt sind, daß ein Verbindungsweg zwischen der betreffenden Teilnehmerstation und dem vorgegebenen Zielamt bestimmt ist.Patent No. 1107726). In this case, too, there are several interfaces through the route search network placed. The transfer of markings is then cut at these interfaces Paths influenced and on the output side by determining the coincidence of an input side Marking with a marking on the exit side at the exit side of the route search network checked until so many sections of the path are determined that a connection path between the relevant Subscriber station and the specified target office is determined.

Bei der Wegesuche und Leitweglenkung, soweit sie bisher beschrieben wurde, wurde der Verbindungsweg im einzelnen nur bis zum nächsten über an das Vollamt 71 angeschlossenen Abnehmerleitungen erreichbaren Vermittlungsamt bestimmt. Durch weitere Ausgestaltung der in den Fig. 3a und 3 b dargestellten Schaltungsanordnung läßt sich auch erreichen, daß auch der weitere Teil eines ao Verbindungsweges, sofern er noch über andere Ämter führt, im einzelnen festgelegt wird. Hierzu haben die die Ausgänge des Wegesuchnetzwerkes und die bisher vorgesehenen Knotenpunkte verbindenden Wegesuchadern über weitere Knotenpunkte zu führen, denen die Ämter zugeordnet sind, über welche die den Ausgängen zugeordneten Zielämter zu erreichen sind. Auch in diese Wegesuchadern sind gegebenenfalls noch Belegungskontakte und Entkoppelgleichrichter einzufügen.In the route search and routing, as far as it has been described so far, the connection route in detail only until the next one via customer lines connected to the full office 71 attainable exchange office determined. By further refinement of the in FIGS. 3a and 3 b shown circuit arrangement can also be achieved that the further part of an ao Connection path, if it still leads through other offices, is determined in detail. For this have that connect the outputs of the route search network and the previously planned nodes To lead route search veins over further nodes to which the offices are assigned which the target offices assigned to the exits can be reached. Also in these path search arteries are If necessary, add occupancy contacts and decoupling rectifiers.

An Hand der Fig. 4a und 4b ist ein anderes Beispiel für eine Schaltungsanordnung gemäß der Erfindung zur kombinierten Wegesuche und Leitweglenkung dargestellt. Wie aus der F i g. 4 a hervorgeht, sind hier zwischen der Ausgangsseite des Wegesuchnetzwerkes, an welche die dem Zielamt zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes den verschiedenen Verkehrsrichtungen, in denen die Zielämter erreichbar sind, zugeordnete Gatterschaltungen eingefügt. Bei der Ausgangsseite des Wegesuchnetzwerkes liegen die mit 0/3 ... 1/1 bezeichneten Ausgänge. Die den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes sind in F i g. 4 a durch die Anschlüsse 1... η vertreten, die, wie aus der Fig. 4b hervorgeht, zu Markierknoten gehören, von denen in F i g. 4 b der Markierknoten fD 1 gezeigt ist. Die erwähnten Gatterschaltungen sind mit £331, K33, K3 ... K82... K715 bezeichnet. Sie liefern gegebenenfalls an denjenigen Ausgängen des Koppelfeldes zugeordnete Stellen des Wegesuchnetzwerkes Markierungen, an die in der betreffenden Verkehrsrichtung abgehende Abnehmerleitungen angeschlossen sind. Hierzu sind die Ausgänge dieser Gatterschaltungen mit den Schaltungspunkten ζ 331.. 715 verbunden, von denen Wegesuchadern zu den Anschlüssen 1... η führen. Es sei bemerkt, daß die Anordnung dieser Wegesuchadern mit der Anordnung der zwischen den Knotenpunkten /331/ g331... /715/g715 und den Anschlüssen 1.., η bei dem in F i g. 3 a gezeigten Wegesuchnetzwerk übereinstimmen. Dies ist deshalb der Fall, weil sich beide Wegesuchnetzwerke auf den gleichen in F i g. 1 gezeigten Netzplan beziehen. Auch in die zur Schaltungsanordnung gemäß F i g. 4 a gehörenden Wegesuchadern sind Entkoppelgleichrichter und Belegungskontakte eingefügt, wie aus Fig.4b erkennbar ist, wo in die dort dargestellte und vom Schaltungspunkt ζ 331 zum Markierknoten fDl führende Wegesuchader der Entkoppelgleichrichter Gl und der Belegungskontakt IaZl eingefügt sind. Diese Schaltelemente haben hier die gleichen Aufgaben wie die entsprechenden Schaltelemente bei den entsprechenden Wegesuchadern des mittels der F i g. 3 a und 3 b dargestellten Wegesuchnetzwerkes. Mit der Lieferung einer Markierung durch eine Gatterschaltung wird nun hier jeweils ein in das Wegesuchnetzwerk eingelagertes Verzögerungsglied angelassen, das nach seiner Verzögerungszeit die vorher angelegte Markierung unterdrückt und die Anlegung von Markierungen durch eine andere Gatterschaltung an nachher zu berücksichtigende Stellen bewirkt. Es sind hier für diesen Zweck mehrere Verzögerungsglieder vorgesehen, von denen einige auch in der F i g. 4 a gezeigt sind, nämlich die Verzögerungsglieder V3, F33 und F331. Die Anlegung von Markierungen durch eine andere Gatterschaltung erfolgt jeweils, wenn die vorher angelegte Markierung in dem Wegesuchnetzwerk nicht mit einer an einen Eingang des Wegesuchnetzwerkes angelegten Markierung zusammentrifft, weil zwischen dem dem markierten Eingang des Wegesuchnetzwerkes zugeordneten Eingang des zugehörigen Koppelfeldes und den durch Markierungen bezeichneten Ausgängen des Koppelfeldes kein freier Verbindungsweg besteht. Durch diese Maßnahme wird erreicht, daß im Zuge der Wegesuche durch den Belegungszustand des Koppelfeldes hervorgerufene Blockierungen dazu führen, daß die Wegesuche rechtzeitig variiert wird. Die gegebenenfalls zu liefernden weiteren Markierungen werden nun von solchen Gatterschaltungen geliefert, die den im Zuge einer Leitweglenkung nacheinander in Frage kommenden Verkehrsrichtungen zur Erreichung des vorgegebenen Zielamtes zugeordnet sind. Hierdurch werden bei der weiteren Abwicklung der Wegesuche die durch die verschiedenen zu dem Zielamt hinführenden Verbindungswege gegebenen Verbindungsmöglichkeiten in vollem Umfange ausgeschöpft.Another example of a circuit arrangement according to the invention for combined route search and routing is shown with reference to FIGS. 4a and 4b. As shown in FIG. 4 a, gate circuits assigned to the different traffic directions in which the destination offices can be reached are inserted between the output side of the route search network, to which the marking assigned to the destination exchange is applied, and the points of the route search network assigned to the outputs of the switching matrix. The outputs marked 0/3 ... 1/1 are on the output side of the route search network. The locations of the route search network assigned to the outputs of the switching matrix are shown in FIG. 4 a represented by the connections 1 ... η , which, as can be seen from FIG. 4 b the marker node fD 1 is shown. The gate circuits mentioned are labeled £ 331, K33, K3 ... K82 ... K715 . If necessary, they deliver markings to those points of the route search network assigned to those outputs of the switching matrix, to which outgoing customer lines are connected in the relevant traffic direction. To this end, the outputs of these gate circuits are connected to the circuit points ζ 331 .. 715 connected, of which routing wires leading to terminals 1 ... η. It should be noted that the arrangement of these path search cores with the arrangement of the nodes / 331 / g331 ... / 715 / g715 and the connections 1 .., η in the case of the one shown in FIG. 3 a match the route search network shown. This is the case because both route search networks refer to the same in FIG. 1 refer to the network diagram shown. Also in the circuit arrangement according to FIG. 4 a belonging path search cores, decoupling rectifiers and occupancy contacts are inserted, as can be seen from Fig. 4b, where the decoupling rectifier Gl and the occupancy contact IaZl are inserted into the path search wire shown there and leading from circuit point ζ 331 to the marking node fDl. These switching elements here have the same tasks as the corresponding switching elements in the corresponding path search cores of the means of FIG. 3 a and 3 b shown path search network. With the delivery of a marking by a gate circuit, a delay element embedded in the route search network is started, which after its delay time suppresses the previously applied mark and causes markings to be applied by another gate circuit at points to be considered later. Several delay elements are provided here for this purpose, some of which are also shown in FIG. 4 a are shown, namely the delay elements V3, F33 and F331. The creation of markings by another gate circuit takes place whenever the previously created mark in the route search network does not coincide with a mark applied to an input of the route search network, because between the input of the associated switching matrix assigned to the marked input of the route search network and the outputs indicated by markings there is no free connection path of the switching matrix. This measure ensures that in the course of the route search blockages caused by the occupancy state of the switching matrix lead to the route search being varied in good time. The further markings to be supplied, if necessary, are now supplied by such gate circuits which are assigned to the traffic directions which come into question one after the other in the course of routing in order to reach the specified destination office. As a result, in the further processing of the route search, the connection possibilities given by the various connection routes leading to the destination office are fully exhausted.

Die Tätigkeit der Gatterschaltungen wird noch an Hand der Gatterschaltungen £331, IC 33 und K 3 erläutert. Die Gatterschaltung K 331 ist dem Teilamt 331, die Gatterschaltung K 33 ist dem Vollamt 33 und die Gatterschaltung K3 dem Ortsknotenamt 3 zugeordnet. Diese Gatterschaltungen haben jeweils Eingänge, die an die zu den Leitungsbündeln Nl, N 2 und N 3 gehörenden, als Ausgänge des Wegesuchnetzwerkes dienenden Leitungen angeschlossen sind. So ist die Gatterschaltung K331 an die Leitung 3 des Leitungsbündels iVl, an die Leitung 3 des Leitungsbündels N2 und an die Leitung 1 des Leitungsbündels N 3 angeschlossen. Die im übrigen als Und-Gatter arbeitende Gatterschaltung K 331 weist noch einen Sperreingang auf, dessen Versorgung noch später erläutert wird. Die Gatterschaltung K33 ist ein Und-Gatter mit drei Eingängen. Der eine Eingang ist an die Leitung 3 des Leitungsbündels Nl, der zweite an die Leitung 3 des Leitungsbündels N 2 und der dritte über das Oder-Gatter M33 unter anderem an die Leitungen 2 bis 0 des Leitungsbündels iV3 angeschlossen. Die Gatterschaltung K3 ist ein Und-Gatter mit zwei Eingängen, von denen der eine an die Leitung 3 des Leitungsbündels Nl und der andere über das Oder-Gatter M3 unter anderem an alle Leitungen des Leitungsbündels iV2 an-The activity of the gate circuits will be explained with reference to the gate circuits £ 331, IC 33 and K 3 . The gate circuit K 331 is assigned to the sub-office 331, the gate circuit K 33 is assigned to the full office 33 and the gate circuit K3 is assigned to the local exchange office 3. These gate circuits each have inputs which are connected to the lines belonging to the line bundles N1, N 2 and N 3 and serving as outputs of the route search network. The gate circuit K331 is connected to the line 3 of the line bundle iVl, to the line 3 of the line bundle N2 and to the line 1 of the line bundle N3. The gate circuit K 331, which otherwise operates as an AND gate, also has a blocking input, the supply of which will be explained later. The gate circuit K33 is an AND gate with three inputs. One input is connected to line 3 of line bundle Nl, the second to line 3 of line bundle N 2 and the third via OR gate M33, among other things, to lines 2 to 0 of line bundle IV3. The gate circuit K3 is an AND gate with two inputs, one of which is connected to the line 3 of the line bundle Nl and the other via the OR gate M3, among other things, to all lines of the line bundle IV2.

geschlossen ist. Ist nun z. B. ein Verbindungsweg artige Wegesuche wurden bereits verschiedene Beizwischen einer am Vollamt71 angeschlossenen Teil- spiele an Hand der Fig. 3a und 3b beschrieben, nehmerstation und dem Teilamt 331 herzustellen, so Bei den dort verwendeten Wegesuchnetzwerken sind werden die den Ziffern 3, 3 und 1 entsprechenden Schnittstellen vorgesehen, bei denen das Zusammen-Leitungen der Leitungsbündel Nl, N2 und N 3 und 5 treffen eingangsseitig und ausgangsseitig angelegter damit drei Ausgänge des Wegesuchnetzwerkes mar- Markierungen mit Hilfe von Und-Gattern ausgekiert, wodurch die Gatterschaltung £331, welche an wertet wird. Von besonderer Bedeutung ist hier die diese Ausgänge angeschlossen ist, eine Markierung dort vorgesehene sogenannte erste Schnittstelle, zum Schaltungspunkt ζ 331 liefert. Außerdem wird Wenn von mindestens einem der dort vorgesehenen der der betreffenden Teilnehmerstation zugeordnete lo Und-Gatter über dessen Ausgang eine Markierung Eingang, beispielsweise der Eingang ti), des Wege- weitergegeben wird, so bedeutet dies zugleich auch suchnetzwerkes markiert. Treffen diese beiden Mar- eine Meldung über die Übertragung von Markierunkierungen innerhalb des Wegesuchnetzwerkes zu- gen über das ganze Wegesuchnetzwerk. Faßt man sammen, so existiert ein Verbindungsweg zwischen alle Ausgänge der bei dieser Schnittstelle liegenden der betreffenden Teilnehmerstation und dem Teil- 15 Und-Gatter über Entkoppelgleichrichter zusammen, amt 331, der über eine direkt vom Vollamt 71 zu so wird über den Verbindungspunkt dieser Entdiesem Teilamt hinführende Abnehmerleitung führt. koppelgleichrichter die benötigte Meldung geliefert. Treffen die an das Wegesuchnetzwerk angelegten In der Fig. 4b ist diese Maßnahme vorgesehen. Markierungen der Wege nicht zusammen, so· ist kein Dort ist an den Ausgang des. Und-Gatters UcI der geeigneter über das Koppelfeld führender Verbin- 20 Entkoppelgleichrichter M angeschlossen. Das Vieldungsweg verfügbar. In diesem Falle wird die von fachschaltungszeichen m deutet an, daß derartige der Gatterschaltung £331 gelieferte Markierung Entkoppelgleichrichter auch an die Ausgänge der unterdrückt und statt dessen eine andere Markierung, übrigen zu dieser Schnittstelle gehörenden Und- und zwar mit Hilfe der Gatterschaltung IC 33, an den Gatter angeschlossen sind. Es wird dann die bebetreffenden Ausgängen des Koppelfeldes zugeord- 25 nötigte Meldung über die Klemme χ geliefert. Diese neten Stellen des Wegesuchnetzwerkes angelegt. Klemme ist auch in die F i g. 4 a eingezeichnet. Zur Zwei der Eingänge der als Und-Gatter wirkenden Schaltungsanordnung zur Auswertung dieser MeI-Gatterschaltung£33 sind bereits markiert, der dritte düngen gehören die bereits erwähnten Verzögerungs-Eingang wird in diesem Falle über das Oder-Gatter glieder. Es ist hier einem Verzögerungsglied jeweils M33 noch zusätzlich markiert. Über den Sperr- 30 eine bistabile Kippschaltung nachgeschaltet, die über eingang der Gatterschaltung £331 wird die von dort dieses Verzögerungsglied in Arbeitslage gebracht vorher gelieferte Markierung unterdrückt. Falls die wird und dabei die vorgesehene Unterdrückung und an das Wegesuchnetzwerk angelegten Markierungen Anlegung von Markierungen aufrechterhält, bis sie auch jetzt noch nicht zusammentreffen, so wird in nach Abschluß der Wegesuche und -auswahl wieder entsprechender Weise die von der Gatterschaltung 35 in Ruhelage gebracht wird. Ferner wird durch ein £33 gelieferte Markierung unterdrückt, und statt Verzögerungsglied jeweils die spätere Anlegung von dessen wird-eine Markierung von der als Und-Gatter Markierungen durch die zugehörige bistabile Kippwirkenden Gatterschaltung £3 geliefert. Der eine schaltung so lange gesperrt, bis sicher die UnterEingang dieser Gatterschaltung ist bereits markiert, drückung der vorher angelegten Markierungen erder andere wird über das Oder-Gatter M3 zusätzlich 40 folgt ist. Die Verzögerungszeit eines Verzögerungsmarkiert. Die Reihenfolge, in der Ausgänge des gliedes ist jeweils mindestens so lang, wie die bis zur Koppelfeldes zugeordnete Stellen im Wegesuchnetz- Meldung der Übertragung von Markierungen erwerk nacheinander markiert werden, ist hier offen- forderliche Zeitspanne andauert,
sichtlich derart, daß zunächst diejenigen Ausgänge Diese ganze Schaltungsanordnung ist in das in berücksichtigt werden, von denen aus das zu er- 45 F i g. 4 a dargestellte Wegesuchnetzwerk eingelagert, reichende Zielamt 331 auf dem kürzesten Wege er- Ihre Arbeitsweise wird nun im Zusammenhang mit reichbar ist, nämlich über den Querverbindungswega, dem bereits beschriebenen Beispiel für die abdanach werden Ausgänge berücksichtigt, von denen wechselnde Anlegung von Markierungen über die aus der etwas längere Weg 6 dorthin führt, bis die- Gatterschaltungen £331, £33 und £3 im einzelnen jenigen Ausgänge berücksichtigt werden, von denen 50 beschrieben. Die vom Ausgang des Und-Gatters aus der sogenannte Kennzahlenweg c abgeht (vgl. £331 bzw. von dem Schaltungspunkt ζ 331 gelieferte F i g. 1). Markierung gelangt auch über das Oder-Gatter Im folgenden werden Beispiele noch dafür ange- 331M und das Koinzidenzgatter 331£ zum Vergeben, wie das Zusammentreffen bzw. das Nicht- zögerungsglied F331. Es ist hierbei vorausgesetzt, zusammentreffen von an das Wegesuchnetzwerk an- 55 daß dem Koinzidenzgatter 331 £ zugleich über die gelegte Markierungen einen Wechsel der angelegten Klemme w eine Markierung zugeführt wird, so daß Markierungen zustande bringt und wie z. B. eine dies die von der Gatterschaltung £331 gelieferte Marzustande bringende Schaltungsanordnung aufzubauen kierung auch tatsächlich zum Verzögerungsglied ist. Hierbei wird durch eine mit Hilfe des Wegesuch- F 331 weitergeleitet wird. Diese Markierung gelangt netzwerkes erfolgende Meldung der Übertragung von 60 über die aus einem Oder-Gatter und einem Sperr-Markierungen über das ganze Wegesuchnetzwerk die gatter bestehende bistabile Kippschaltung B 331 nach erwähnte Unterdrückung und Anlegung erneuter Ablauf der Verzögerungszeit des Verzögerungs-Markierungen verhindert, dagegen aber die Auswahl gliedes V331 zum Sperreingang des Sperrgatters des zu benutzenden Verbindungsweges mit Hilfe des £331 und verhindert von diesem Zeitpunkt ab, daß Wegesuchnetzwerkes und der zugehörigen Wähler 65 die Gatterschaltung £331 weiterhin eine Markierung veranlaßt. Wie diese Meldung zustande kommt, liefert. Der Ausgang des zur Kippschaltung B 331 hängt davon ab, in welcher Weise die Wegesuche in gehörenden Sperrgatter ist mit einem Eingang des dem Wegesuchnetzwerk stattfindet. Für eine der- ebenfalls dazugehörenden Oder-Gatters verbunden,
closed is. Is now z. B. a connection route-like route search, various between a sub-games connected to the Vollamt71 have already been described with reference to Figs corresponding interfaces are provided, in which the lines of the bundles of lines Nl, N2 and N 3 and 5 meet on the input side and on the output side, thus three outputs of the route search network mar- markings are marked out with the help of AND gates, whereby the gate circuit £ 331, which evaluates will. Of particular importance here is that these outputs are connected, a marking provided there, so-called first interface, to circuit point ζ 331 provides. In addition, if a marking input, for example input ti), of the route is passed on via its output from at least one of the lo AND gates provided there and assigned to the subscriber station in question, this also means that the search network is marked at the same time. If these two marks hit a message about the transmission of marker markings within the route search network, over the entire route search network. If you summarize, there is a connection path between all outputs of the subscriber station in question at this interface and the sub-15 AND gate via decoupling rectifier, amt 331, which is via a direct from Vollamt 71 to so over the connection point of this Entdiesem Teilamt leading customer line leads. coupling rectifier delivered the required message. This measure is provided in FIG. 4b. Markings of the paths do not coincide, so there is no. There is connected to the output of the AND gate UcI the suitable connection rectifier M leading via the coupling network. The multiple path available. In this case, the special circuit symbol m indicates that such marking supplied to the gate circuit £ 331 is also suppressed at the outputs of the decoupling rectifier and instead another marking, other marking belonging to this interface, namely with the aid of the gate circuit IC 33 connected to the gates. The relevant outputs of the switching network are then supplied via terminal χ. These places of the route search network are created. Terminal is also in the fig. 4 a is drawn. Two of the inputs of the circuit arrangement acting as an AND gate for evaluating this MeI gate circuit £ 33 are already marked; M33 is also marked here for each delay element. A bistable flip-flop circuit is connected downstream via the blocking circuit 30, which via the input of the gate circuit £ 331 suppresses the marking previously supplied by this delay element, which has been brought into the working position. If this is maintained and the intended suppression and markings applied to the path search network are maintained until they do not coincide either, the gate circuit 35 is brought to rest again in a corresponding manner after the path search and selection has been completed. Furthermore, a marking supplied by £ 33 is suppressed, and instead of a delay element, the subsequent application of this is supplied - a marking of the AND gate markings by the associated bistable toggle-acting gate circuit £ 3. One circuit is blocked until the sub-input of this gate circuit is already marked, pressing the previously applied markings, the other is followed by an additional 40 via the OR gate M3. The delay time of a delay marked. The sequence in which the outputs of the element is at least as long as the points in the routing network that are assigned to the switching matrix are marked one after the other, here is the obvious time span,
obviously in such a way that first of all those outputs are taken into account in FIG. 4 a shown routing network incorporated, reaching target Office 331 by the shortest route ER- your operation will now be associated with reichbar, namely taken into account the cross-path a, the example already described for the will abdanach outputs of which alternate application of markings on the from the somewhat longer path 6 leads there until the gate circuits £ 331, £ 33 and £ 3 are taken into account in particular those outputs, of which 50 are described. Which goes off from the output of the AND gate from the so-called code path c (cf. £ 331 or Fig. 1 supplied by the switching point ζ 331). Marking can also be made via the OR gate In the following, examples are also given for this 331M and the coincidence gate 331 £ for allocation, such as the coincidence or the non-delay element F331. It is assumed here that the route search network meets 55 that the coincidence gate 331 £ is at the same time supplied with a change of the applied terminal w a marking via the markings placed, so that markings are brought about and such as e.g. B. to build up a circuit arrangement which brings the Marstatuse supplied by the gate circuit £ 331 to the delay element. This is forwarded by using the route search F 331. This marking arrives through the network message of the transmission of 60 via which the gate existing bistable flip-flop B 331 prevents the delay time of the delay markers from running again after the above-mentioned suppression and application of an OR gate and a blocking markers over the entire route search network, but on the other hand the selection member V 331 for the blocking input of the blocking gate of the connection path to be used with the help of the £ 331 and prevents from this point in time that the path search network and the associated selector 65 continue to cause the gate circuit £ 331 to mark. How this message comes about provides. The output of the flip-flop circuit B 331 depends on the way in which the route search is taking place in the locking gate belonging to the route search network. Connected for one of the or-gates that also belong to it,

was zur Folge hat, daß diese beiden Gatterschaltungen eine bistabile Kippschaltung zusammen bilden. An den Ausgang des zur Kippschaltung £331 gehörenden Sperrgatters ist ferner noch das Sperrgatter 533 angeschlossen. Die von der Kippschaltung B 331 gelieferte Markierung wird über das Sperrgatter 333 immer erst dann weitergegeben, wenn vom Verzögerungsglied F331 keine Markierung mehr geliefert wird, da ein Sperreingang des Sperrgatters 533 an den Ausgang des Verzögerungsgliedes F331 angeschlossen ist. Die Markierung verschwindet dort nach der Verzögerungszeit dieses Verzögerungsgliedes, da inzwischen von der Gatterschaltung K331 keine Markierung mehr geliefert wird. Mit dem Verschwinden der Markierung am Ausgang des Verzögerungsgliedes F331 wird das Sperrgatter 533 entsperrt, und es liefert über das Oder-Gatter M 33 eine Markierung zur Gatterschaltung K33. An allen drei Eingängen dieser Gatterschaltung liegt nunmehr eine Markierung, so daß auch an seinem Ausgang ao und dem damit verbundenen Schaltungspunkt ζ 33 eine Markierung liegt. Damit ist nach der Verzögerungszeit des Verzögerungsgliedes F 331 die an Ausgänge des Koppelfeldes vorher angelegte Markierung unterdrückt, und es sind an die nachher zu berücksichtigenden Ausgänge Markierungen angelegt.with the result that these two gate circuits together form a bistable multivibrator. The blocking gate 533 is also connected to the output of the blocking gate belonging to the flip-flop circuit £ 331. The marking supplied by the flip-flop B 331 is only passed on via the blocking gate 333 when the delay element F331 no longer supplies a marking, since a blocking input of the blocking gate 533 is connected to the output of the delay element F331. The marking there disappears after the delay time of this delay element, since in the meantime the gate circuit K331 no longer supplies any marking. When the marking at the output of the delay element F331 disappears, the blocking gate 533 is unlocked and it supplies a marking to the gate circuit K33 via the OR gate M 33. There is now a marking at all three inputs of this gate circuit, so that there is also a marking at its output ao and the circuit point ζ 33 connected to it. Thus, after the delay time of the delay element F 331, the marking previously applied to outputs of the switching matrix is suppressed, and markings are applied to the outputs to be taken into account afterwards.

Wenn die Verzögerungszeit des Verzögerungsgliedes F331 hinreichend lang ist, so war in der Zwischenzeit die Gelegenheit gegeben, die Meldung der Übertragung von Markierungen über das ganze Wegesuchnetzwerk an die Klemme χ zu liefern. Trifft eine derartige Meldung tatsächlich ein, so wird das Sperrgatter 3315 gesperrt, und zwar bevor das Sperrgatter 533 entsperrt wird. In diesem Fall wird durch die erfolgende Meldung die beschriebene Unterdrückung der vorhergehenden Markierungen und die Anlegung von weiteren Markierungen verhindert. Mit Hilfe des Verzögerungsgliedes F 331 und der erwähnten anderen Gatterschaltungen hat also bereits eine Leitweglenkung in gewissem Umfang stattgefunden. Dem Verzögerungsglied ist dabei unter anderem eine aus zwei Gatterschaltungen bestehende bistabile Kippschaltung nachgeschaltet, die über dieses Verzögerungsglied in Arbeitslage gebracht wird und dabei die vorgesehene Unterdrükkung und Anlegung von Markierungen aufrechterhält. Sie wird wieder in Ruhelage gebracht, nachdem eine Meldung über die Übertragung von Markierungen über das ganze Wegesuchnetzwerk aufgetreten ist, jedoch erst nach einer zusätzlichen Verzögerungszeit, die durch das Verzögerungsglied F bestimmt wird. Dieses Verzögerungsglied ist an die Klemme χ und über das Oder-Gatter Q an den Sperreingang des zur Kippschaltung 5331 gehörenden Sperrgatters angeschlossen. Seine Verzögerungszeit ist so groß, daß eine vorzeitige Aufhebung von Markierungen, die an Ausgänge des Koppelfeldes angelegt sind, verhindert wird.If the delay time of the delay element F331 is long enough, the opportunity was given in the meantime to send the message of the transmission of markings over the entire route search network to terminal χ . If such a message actually arrives, the blocking gate 3315 is blocked, to be precise before the blocking gate 533 is unblocked. In this case, the message that occurs prevents the described suppression of the previous markings and the application of further markings. With the aid of the delay element F 331 and the other mentioned gate circuits, routing has already taken place to a certain extent. The delay element is followed by, among other things, a bistable multivibrator consisting of two gate circuits, which is brought into the working position via this delay element and thereby maintains the intended suppression and application of markings. It is brought back to the rest position after a message about the transmission of markings over the entire route search network has occurred, but only after an additional delay time, which is determined by the delay element F. This delay element is connected to the terminal χ and via the OR gate Q to the blocking input of the blocking gate belonging to the toggle circuit 5331. Its delay time is so great that premature cancellation of markings that are applied to outputs of the switching matrix is prevented.

Die vom Ausgang der Gatterschaltung K33 und dem Schaltungspunkt ζ 33 gelieferte Markierung gelangt über das Oder-Gatter 33 M und die Gatterschaltung 33 K zum Verzögerungsglied F33 und von dort über das Sperrgatter 335 zur bistabilen Kippschaltung B 33, von der sie über das Sperrgatter 53 über das Oder-Gatter M3 zur Gatterschaltung K3 weitergegeben wird. Dies geschieht aber erst, nachdem die dem Verzögerungsglied F 33 eigene Verzögerungszeit abgelaufen ist. Sie gelangt auch erst dann zu einem Sperreingang des Sperrgatters 533, wodurch die von diesem gelieferte Markierung unterdrückt wird. Von da ab wird dem Verzögerungsglied F33 keine Markierung mehr zugeführt. Die von seinem Ausgang dem Sperreingang des Sperrgatters 53 zugeführte Markierung verschwindet erst nach Ablauf der Verzögerungszeit dieses Verzögerungsgliedes. Erst von da ab kann vom Sperrgatter 53 die an ihm bereits vorher anstehende Markierung über das Oder-Gatter M3 und die Gatterschaltung K3 zum Schaltungspunkt ζ3 weitergegeben werden. Die Anlegung von Markierungen durch die zugehörige bistabile Kippschaltung wird also auch hier mit Hilfe eines Verzögerungsgliedes so lange gesperrt, bis sicher die Unterdrückung der vorher angelegten Markierungen erfolgt ist.The marking supplied by the output of the gate circuit K33 and the node ζ 33 reaches the delay element F33 via the OR gate 33 M and the gate circuit 33 K and from there via the locking gate 335 to the bistable flip-flop circuit B 33, from which it passes via the locking gate 53 the OR gate M3 is passed on to the gate circuit K3 . However, this only happens after the delay time inherent to the delay element F 33 has expired. It also only then reaches a blocking input of the blocking gate 533, whereby the marking supplied by this is suppressed. From then on, the delay element F33 is no longer supplied with a marker. The marking fed from its output to the blocking input of the blocking gate 53 only disappears after the delay time of this delay element has expired. Only from then on can the blocking gate 53 forward the marking already pending on it via the OR gate M3 and the gate circuit K3 to the circuit point ζ 3. The application of markings by the associated bistable multivibrator is also blocked here with the aid of a delay element until the previously applied markings have been reliably suppressed.

Wenn eine Meldung über die Übertragung der nunmehr an das Koppelfeld angelegten Markierungen über alle seine Stufen über die Klemme* erfolgt, wird nach der durch das Verzögerungsglied V bewirkten Verzögerungszeit die Kippschaltung B 33 in die Ruhelage gebracht. Erfolgt eine derartige Meldung nicht, so erfolgt diese Rückstellung mit Hilfe der vom Ausgang der Gatterschaltung K 3 bzw. von dem Schaltungspunkt z3 gelieferten Markierung, welche auch über das Oder-Gatter 3 M, die Gatterschaltung 3 K, das Verzögerungsglied F 3 und das Sperrgatter 35 sowie über das Oder-Gatter β zu den Sperreingängen der zu den Kippschaltungen B 33 und B 331 gehörenden Sperrgatter gelangt. Die Verzögerungszeit des Verzögerungsgliedes F3 muß so groß sein, daß Gelegenheit für das Eintreffen der erwähnten Meldung gegeben ist. An den Ausgang des Sperrgatters35 ist noch die Klemmey angeschlossen, welche die dort in diesem Fall auftretende Markierung dazu benutzt, die Lieferung eines Besetztzeichens auszulösen. Es wird also mit der letzten Anlegung von Markierungen ein Verzögerungsglied, nämlich das Verzögerungsglied F 3 angelassen, welches beim Ausbleiben der Meldung über die Übertragung von Markierungen über das Wegesuchnetzwerk die Lieferung eines Besetztzeichens auslöst. Damit werden auch weitere Wiederholungen von Verbindungsversuchen durch den Markierer verhindert. If there is a message about the transmission of the markings now applied to the switching matrix over all its stages via the terminal *, the toggle switch B 33 is brought into the rest position after the delay time caused by the delay element V. If such a message does not occur, this resetting takes place with the aid of the marking supplied from the output of the gate circuit K 3 or from the node z3 , which is also transmitted via the OR gate 3 M, the gate circuit 3 K, the delay element F 3 and the blocking gate 35 and via the OR gate β to the blocking inputs of the blocking gates belonging to the flip-flops B 33 and B 331. The delay time of the delay element F3 must be so long that there is an opportunity for the message mentioned to arrive. Terminaly is also connected to the output of the blocking gate35, which uses the marking that occurs there in this case to trigger the delivery of a busy signal. With the last application of markings, a delay element, namely the delay element F 3, is started, which triggers the delivery of a busy signal if there is no message about the transmission of markings via the route search network. This also prevents further repetitions of connection attempts by the marker.

Die vorstehend beschriebene kombinierte Wegesuche und Leitweglenkung kann auch derart ergänzt werden, daß mehr als drei verschiedene Wege zu dem zu erreichenden Zielamt berücksichtigt werden. Hierzu ist die in F i g. 4 a gezeigte Schaltungsanordnung sinngemäß auszugestalten. In der derart ausgestalteten Anordnung treten keine andersartigen Funktionen auf als in dem bereits beschriebenen Teil.The combined route search and routing described above can also be supplemented in this way that more than three different ways to the target office to be reached are taken into account. For this is the one shown in FIG. 4 a shown circuit arrangement accordingly. In the designed in this way Arrangement do not have any different functions than in the part already described.

Ferner kann auch die Leitweglenkung beim Suchen von Verbindungswegen zu anderen Ämtern vorgesehen sein. Dementsprechend sind dann weitere Gatterschaltungen vorzusehen, von denen die Gatterschaltungen K82 und K715 bereits in die Fig. 4a eingezeichnet sind. Statt dabei die Anzahl der Verzögerungsglieder zu vergrößern, kann man auch vorsehen, daß durch zusätzliche Umschaltemaßnahmen bei den Wiederholungen der Verbindungsversuche jeweils das gleiche Verzögerungsglied benutzt wird. Da derartige Umschaltungen an sich nichts besonderes sind, sind die dazu erforderlichen Schaltelemente in der F i g. 4 a nicht dargestellt, damit diese Figur nicht zu unübersichtlich wird. Es sei noch bemerkt, daß die drei Gatterschaltun sen 3 K, 33 K undIn addition, routing can also be provided when searching for connecting routes to other offices. Accordingly, further gate circuits are then to be provided, of which the gate circuits K 82 and K 715 are already shown in FIG. 4a. Instead of increasing the number of delay elements, provision can also be made for the same delay element to be used in each case by means of additional switching measures when the connection attempts are repeated. Since such switchings are in themselves nothing special, the switching elements required for this are shown in FIG. 4 a not shown so that this figure does not become too confusing. It should also be noted that the three Gatterschaltun sen 3 K, 33 K and

21 2221 22

331K über die Klemme w mittelbar derart mit einer wird der über das Koppelfeld des Vollamtes 71 füh-Markierung versehen werden, daß die mit der Wege- rende Teil des Verbindungsweges jeweils vollständig suche kombinierte Leitweglenkung erst dann einsetzt, bestimmt. Wenn von dem ausgewählten Koppelvielwenn so viele Leitungen der Leitungsbündel JVl, N2 fach der Koppelstufe D zu dem nächsten Vermitt- und N3 markiert sind, daß das zu erreichende Ziel- 5 lungsamt, über den der Verbindungsweg zu führen amt, z. B. das Teilamt 331, bestimmt ist. Wenn auch hat, nur eine einzige Abnehmerleitung hinführt, ist eine Leitweglenkung für andere als die vorstehend in damit auch diese Abnehmerleitung festgelegt. Führen Betracht gezogenen Ämter vorgesehen ist, so kann dorthin jedoch mehrere Leitungen, so sind zur Festdies dadurch berücksichtigt werden, daß die Aus- legung der zu benutzenden Abnehmerleitung diegänge der in diesen Fällen Markierungen liefernden io selben Maßnahmen erforderlich, wie sie bereits an-Gatterschaltungen an besondere Eingänge der Oder- läßlich der Beschreibung der Fig. 3a angegeben Gatter 3 M, 33 M und 331M sinngemäß angeschlos- wurden.331 K via the terminal w indirectly in such a way as to be provided with a routing mark via the switching matrix of the full exchange 71 that the routing combined with the end of the connection path only then starts. If so many lines of the trunk group JVl, N 2 times of the switching stage D to the next switching and N3 are marked from the selected switching network that the target 5 lungsamt to be reached, via which the connection path is to lead, z. B. the partial office 331 is determined. Even if only a single subscriber line leads there, a routing for other than those above is thus also defined in this subscriber line. If the offices under consideration are provided, several lines can go there, but this must be taken into account by the fact that the design of the customer line to be used requires the same measures as those already provided for gate circuits special inputs of the gates 3 M, 33 M and 331 M indicated in the description of FIG. 3a were connected accordingly.

sen werden. Die bei der Schaltungsanordnung für die kombiin der Fig. 4b ist ein Ausschnitt aus dem in nierte Wegesuche und Leitweglenkung gemäß Fig. 4a gezeigten Wegesuchnetzwerk dargestellt, das 15 Fig. 4a erforderliche Meldung über die Übertradieselbe Eigenart hat wie das ausschnittsweise in gung von Markierungen über das gesamte Wegesuch-F i g. 3 b gezeigte. Es ist daher bei diesem Ausschnitt netzwerk kann auch erhalten werden, wenn die Wegeauch der Teil des Wegesuchnetzwerkes berücksich- suche in etwas anderer Weise als bei der Schaltungstigt, der dem Koppelfeld des Vollamtes 71 zugeord- anordnung gemäß Fig. 4b durchgeführt wird. Sie net ist und der in der Fig. 4a mit /71-g71 bezeich- 20 kann nämlich auch dann erhalten werden, wenn bei net ist. Dieser Teil des Wegesuchnetzwerkes ist daher den Schnittstellen, die durch das Wegesuchnetzwerk ebenfalls in an sich bekannter Weise aufgebaut (s. gelegt sind, die Übertragung von Markierungen an deutsche Patentschrift 1 048 956, F i g. 5), nämlich geschnittenen Wegestücken beeinflußt und ausgangsin der gleichen Weise wie das an Hand der Fig. 3b seitig durch Ermittlung des Zusammentreffens einer beschriebene. Der dazugehörige Teil der Fig. 4b 25 eingangsseitigen Markierung mit einer ausgangsstimmt daher im Prinzip mit dem betreffenden Teil seitigen Markierung bei der Ausgangsseite des Wegeder F i g. 3 b überein, so daß auch die für diese Figur Suchnetzwerkes überprüft wird (s. deutsche Patentgegebenen Erläuterungen hier weitgehend zutreffen. schrift 1 107 726). Die Ermittlung des Zusammen-Es ist jedoch insofern ein Unterschied vorhanden, als treffens einer eingangsseitigen Markierung und mit die erste Schnittstelle diesmal parallel zur Koppel- 30 einer ausgangsseitigen Markierung läßt sich nämlich stufe C geführt ist, so daß in die dieser Schnittstelle genauso wie bei der in Fi g. 4 b gezeigten Schaltungszugeordneten Markierknoten Und-Gatter eingefügt anordnung zur Meldung der Übertragung von Marsind, an welche der Koppelvielfachwähler KVC mit kierungen über das gesamte Wegesuchnetzwerk ausseinen Eingängen angeschlossen ist. Von diesen Mar- nutzen.be sen. The circuit arrangement for the combination in Fig. 4b is a section of the route search network shown in ned route search and routing according to Fig. 4a, the 15 Fig entire route search F i g. 3b shown. It is therefore network can also be obtained with this section if the route search also takes into account the part of the route search network in a somewhat different manner than with the circuit which is assigned to the switching matrix of the full exchange 71 according to FIG. 4b. It is net and that in Fig. 4a with / 71-g71 can namely also be obtained if is at net. This part of the route search network is therefore influenced by the interfaces, which are also set up by the route search network in a manner known per se (see, the transfer of markings to German patent specification 1 048 956, FIG. 5), namely cut parts of the route the same way as that described with reference to FIG. 3b by determining the coincidence of a. The associated part of FIG. 4b 25 on the input side with an output therefore in principle coincides with the relevant part-side marking on the output side of the path of F i g. 3 b, so that the search network for this figure is also checked (see explanations given in German patents largely apply here. Document 1 107 726). There is, however, a difference in the determination of the combined-es in that when an input-side marking meets with the first interface this time parallel to the coupling-30 an output-side marking can namely stage C, so that this interface is exactly the same as with the in Fig. 4b circuit-associated marking nodes and gates inserted arrangement for reporting the transmission of Marsind, to which the switching matrix selector KVC with markings over the entire route search network is connected to its inputs. From these mar- benefit.

kierknoten ist der Markierknoten/Cl und von diesen 35 Für die kombinierte Wegesuche und Leitweg-Und-Gattern das Und-Gatter UcI in der Fig. 4b lenkung können außer den vorstehend betrachteten gezeigt. Die Ausgänge des Koppelvielfachwählers Wegesuchverfahren auch noch andere Wegesuchver- KVC führen zu der gleichen Schnittstelle zugeord- fahren angewendet werden. So kann die Wegesuche neten Markierknoten, von denen einer gezeigt ist, z. B. auch anstatt mittels eines Wegesuchnetzwerkes nämlich der Markierknoten gCl. Von dort führen 40 mit Hilfe von Speichern durchgeführt werden. Es ist Wegesuchadern zu den Koppelvielfachwählern KVB nämlich bereits bekannt (s. belgische Patentschrift und KVD. Diese beiden Koppelvielfachwähler 627 298), die für die Wegesuche benötigten Inforwerden in der gleichen Weise mit Markierpotential mationen zwei voneinander unabhängigen Speichern versorgt wie der Koppelvielfachwähler KVD in der zu entnehmen, von denen der erste als Belegungs-F i g. 3 b. Von dem bei der Eingangsseite des Wege- 45 speicher veränderbare Informationen lediglich über suchnetzwerkes Markierpotential anlegenden Kon- den jeweiligen Betriebszustand von Wegestücken und takten ist der Kontakt IiZ/ und von dem bei der der zweite als Lagespeicher Informationen lediglich Ausgangsseite Markierpotential anlegenden Kon- über die gegenseitige Lage von Wegestücken abfragtakten sind die Kontakte k3/1, &3/2 und Kl/3 ge- bar aufbewahren. Im Zuge einer Wegesuche werden zeigt. Die angelegten Markierpotentiale treffen gege- 50 dann diesen beiden Speichern wechselweise Inforbenenfalls bei den Markierknoten der Koppelstufe C mationen über den Betriebszustand und über die zusammen. Zum Markierknoten /Cl gelangen sie Lage von Wegestücken entnommen und ausgewertet, hier im gegebenen Fall von der Eingangsseite her Hierbei ergeben sich auch Informationen, die denüber die Markierknoten fA I und jB I und von der jenigen entsprechen, welche bei der Übertragung von Ausgangsseite des Wegesuchnetzwerkes her über die 55 Markierungen über ein Wegesuchnetzwerk selber auf-Gatterschaltung K331, den Schaltungspunkt ^331 treten. Es kann daher auch eine kombinierte Wege- und den Markierknoten fD 1. Von der Schaltungsan- suche und Leitweglenkung, sofern die erforderlichen Ordnung zur wechselnden Anlegung von Markie- Speichermittel vorgesehen sind, in analoger Weise rangen an den Ausgängen des Koppelfeldes zugeord- durch wechselweises Abfragen dieser Speicher durchneten Stellen des Wegesuchnetzwerkes ist in der 60 geführt werden, nämlich entsprechend wie auf diese Fig. 4b ebenfalls nur ein Auszug dargestellt, näm- Weise eine Wegesuche ohne Leitweglenkung in belich das Oder-Gatter 331M, das Und-Gatter 331K, kannter Weise durchführbar ist. das Verzögerungsglied F331 und das Sperrgatter Bei Benutzung eines nicht direkt zum Erreichen 3315. Ferner ist noch gezeigt, wie eine Meldung des Zielamtes führenden Verbindungsweges, also über die Übertragung von Markierungen über das 65 eines Verbindungsweges, welcher über mindestens ganze Wegesuchnetzwerk dieser Schaltungsanord- ein weiteres Amt führt, sind diesen weiteren Ämtern nung über die Klemme χ zugeführt wird. Mit Hilfe einige der bereits vorliegenden Ziffern der Teilnehder Koppelvielfachwähler KVB, KVC und /CFD mernummer zu übermitteln. Hierzu sind die Wege-kierknoten is the marker node / Cl and of these 35 for the combined route search and routing and gates the AND gate UcI in Fig. 4b routing can be shown in addition to those considered above. The outputs of the switching matrix switch route search method also other route search methods KVC lead to the same interface can be used. So the Wegesuche Neten marker nodes, one of which is shown, z. B. instead of using a route search network namely the marking node gCl. From there run 40 can be done with the help of memories. Route search cores to the switching multiples KVB are already known (see Belgian patent specification and KVD. These two switching multiplexers 627 298), the information required for the route search is supplied in the same way with marking potential mations to two independent memories as the switching matrix KVD in the to inferior, of which the first as an occupancy F i g. 3 b. Of the information that can be changed on the input side of the path memory only via search network marking potential, the respective operating state of path sections and clocks is the contact IiZ / and of the contact IiZ / and of which the second as position memory applies only the output side of the marking potential via the mutual The contacts k 3/1, & 3/2 and Kl / 3 are to be kept in a safe place. In the course of a route search will be shown. The applied marking potentials then meet these two memories alternately, if necessary, at the marking nodes of the coupling stage C information about the operating state and about the combined. To the marking node / Cl, the location of sections of the route is taken and evaluated, here in the given case from the input side.This also results in information that corresponds to the marking nodes fA I and jB I and from the one that is transmitted from the output side of the route search network over the 55 markings via a route search network itself on-gate circuit K331, switch point ^ 331. There can therefore also be a combined route and marker node fD 1. From the circuit search and routing, provided the necessary order for the alternating creation of marker storage means are provided, wrestle in an analogous manner at the outputs of the switching matrix by alternately polling this memory by Neten points of the routing network is managed in the 60, namely, according as 4b also shown in this Fig., only an extract, namely, a route search without routing in ima the OR gate 331M, the AND gate 331 K, known per Way is feasible. the delay element F331 and the blocking gate When using a not directly to reach 3315. It is also shown how a message from the destination office leading connection route, i.e. via the transmission of markings over the 65 of a connection route, which over at least the entire route search network of this circuit arrangement another Office leads, these additional offices are supplied via terminal χ. With the help of some of the digits already available from the subscribers, the multiplexer KVB, KVC and / CFD number to be transmitted. For this purpose, the ways

suchnetzwerke zur kombinierten Leitweglenkung und Wegesuche noch auszugestalten. Ein Beispiel für eine derartige Ausgestaltung ist bei dem in F i g. 4 a gezeigten Wegesuchnetzwerk vorgesehen. Bei dieser Ausgestaltung werden diejenigen Leitungsbündel, bei 5 denen für den Verbindungsaufbau bereits Leitungen entsprechend noch nicht ausgewerteter Ziffern markiert sind, zu Nachsendeeinrichtungen, welche diese Ziffern zum bereits erreichten Amt übermitteln, durchgeschaltet, indem mit der im Zuge der kombinierten Wegesuche und Leitweglenkung erfolgenden Anlegung weiterer Markierungen in diesen Leitungen liegende Gatterschaltungen entsperrt werden. Diese Gatterschaltungen sind in der Fig. 4a mit NKIl ...NKlQ und NK31... NK30 bezeichnet. Wenn z. B. erst die vom Ausgang der Gatterschaltung K 33 bzw. von dem Schaltungspunktz33 gelieferte Markierung dazu führt, daß ein geeigneter freier Verbindungsweg gefunden wird, so wird nicht direkt eine zum Teilamt 331 führende Verbindung, sondern zunächst nur eine zum Vollamt 33 führende Abnehmerleitung mit dem über das zum Vollamt 71 gehörenden Koppelfeld führenden Teil des Verbindungsweges verbunden. Die Ziffer 1 der bereits vorliegenden Ziffern 331 muß in dem Vollamt 33 noch ausgewertet werden und ist daher dorthin zu übertragen. Diese Übertragung wird hier dadurch zustande gebracht, daß die am Ausgang der Gatterschaltung K33 liegende Markierung über das Oder-Gatter 33 NM an die einen Eingänge der Und-Gatter ΛΤί 31... NK3Q zugeführt wird. Die an der Leitung 1 des Leitungsbündels N3 liegende Markierung kann dann über das Und-Gatter NK31 zur Klemme η 31 gelangen, von der aus sie zum Vollamt 33 weitergeleitet wird.To develop search networks for combined routing and route search. An example of such a configuration is shown in FIG. 4 a path search network shown provided. In this embodiment, those trunk groups in which lines have already been marked for the connection setup according to digits that have not yet been evaluated are switched through to forwarding devices which transmit these digits to the office already reached, by creating additional ones in the course of the combined route search and routing Markings in these lines lying gate circuits are unlocked. These gate circuits are designated NKIl ... NKlQ and NK31 ... NK30 in FIG. 4a. If z. B. only the marking supplied by the output of the gate circuit K 33 or by the Schaltpunktz33 leads to the fact that a suitable free connection path is found, then not a connection leading to the sub-office 331, but initially only a subscriber line leading to the full-office 33 with the connected via the part of the connection path leading to the full office 71 switching network. The number 1 of the already existing numbers 331 must still be evaluated in the full office 33 and must therefore be transferred there. This transfer is thereby brought here concluded that the marker present at the output of the gate circuit K33 via the OR gate 33 NM to the one inputs of the AND gates 31 ... ΛΤί is supplied NK3Q. The marking on the line 1 of the line bundle N3 can then reach the terminal η 31 via the AND gate NK31, from which it is forwarded to the full office 33.

Es wird nun der Fall behandelt, bei dem ein verfügbarer Verbindungsweg erst gefunden wird, wenn die Gatterschaltung K 3 eine Markierung liefert. Diese Markierung gelangt über das Oder-Gatter 3 NM zu den einen Eingängen der Und-Gatter NK21... NK20. Außerdem gelangt es auch über das Oder-Gatter 33NM zu den einen Eingängen der Und-Gatter NK31... NK30. Dadurch wird zustande gebracht, daß Markierungen, die an einer Leitung des LeitungsbündelsAr2 und an einer Leitung des Leitungsbündels N 3 liegen, über das zugehörige Und-Gatter zum Ortsknotenamt 3 weitergegeben werden, damit sie dort noch zur weiteren Herstellung des gewünschten Verbindungsweges ausgenutzt werden. Im Zusammenhang mit dem vorstehend beschriebenen Betriebsbeispiel werden derartige Markierungen über das an die Leitung 3 des Leitungsbündels JV2 angeschlossene, allerdings nicht dargestellte Und-Gatter und über das Und-Gatter NK31 weitergegeben werden. Die hier nicht dargestellten Nachsendeeinrichtungen für diese Ziffern sind an die Klemmen η 21... η 20 und η 31... π 30 sinngemäß anzuschalten. Zweckmäßigerweise werden jeweils solche Nachsendeeinrichtungen in Anspruch genommen, die an die Betriebserfordernisse angepaßt sind, welche durch die jeweils vorgegebene Verkehrsrichtung vorgeschrieben sind, also daran angepaßt sind, ob z. B. Ortsverkehr oder Fernverkehr vorliegt. Die Nachsendeeinrichtungen haben nämlich bei Ortsverkehr z. B. weniger Ziffern als bei Fernverkehr nachzusenden. Dementsprechend sind jeweils Nachsendeeinrichtungen zu benutzen, die sich dadurch unterscheiden, daß sie mehr oder weniger Ziffern vorübergehend speichern und nachsenden können. Es sei noch bemerkt, daß die für die Leitweglenkung ausgenutzten Ziffern, gemäß denen Markierungen an die Leitungsbündel Nl, N 2 und iV3 angelegt sind, aus der Teilnehmernummer auch durch Umwertung gewonnen werden können. Dabei können auch Kurzwahlnummern umgewertet werden.The case is now dealt with in which an available connection path is only found when the gate circuit K 3 supplies a marking. This marking reaches one of the inputs of the AND gates NK21 ... NK20 via the OR gate 3 NM. In addition, it also reaches one of the inputs of the AND gates NK31 ... NK30 via the OR gate 33NM. This ensures that markings on a line of the trunk group A r 2 and on a line of the trunk group N 3 are passed on to the local node office 3 via the associated AND gate so that they can be used there to further establish the desired connection path . In connection with the operating example described above, such markings are passed on via the AND gate connected to the line 3 of the line bundle JV2, but not shown, and via the AND gate NK31 . The forwarding devices not shown here for these digits are to be connected to the terminals η 21 ... η 20 and η 31 ... π 30 accordingly. Appropriately, such forwarding devices are used which are adapted to the operating requirements which are prescribed by the respective predetermined traffic direction, so are adapted to whether, for. B. local traffic or long-distance traffic. The forwarding facilities have namely in local traffic z. B. to send fewer digits than for long-distance traffic. Accordingly, forwarding devices are to be used, which differ in that they can temporarily store and forward more or fewer digits. It should be noted that the unused for routing digits, according to which marks the trunk Nl, N2 and iV3 are applied, can be obtained from the subscriber number by re-evaluation. Abbreviated dialing numbers can also be converted.

Claims (19)

Patentansprüche:Patent claims: 1. Schaltungsanordnung für Fernmelde-, insbesondere für Fernsprechvermittlungsanlagen, bei denen unter Leitweglenkung zu anderen Ämtern führende Verbindungswege herzustellen sind, die über mehrstufige Koppelfelder führen, dadurch gekennzeichnet, daß dem betreffenden Koppelfeld ein mit Wählern versehenes Wegesuchnetzwerk zugeordnet ist, das außer der Wegeführung und den Betriebszustand der zugehörigen Zwischenleitungen und zu abgehenden Leitungsbündeln gehörenden Abnehmerleitungen auch die Reihenfolge der zu den Zielämtern (z. B. 331) hinführenden Wege, wie unter anderem Querweg (α) und Kennzahlenweg (c), erfaßt, daß zum Suchen und Auswählen eines von einer am Koppelfeld angeschlossenen Zubringerleitung (z. B. Teilnehmerleitung mit Teilnehmerstation (TIj) zu einem Zielamt (331) hinführenden Verbindungsweges eine der betreffenden Zubringerleitung zugeordnete Markierung an der Eingangsseite des Wegesuchnetzwerkes und eine dem Zielamt zugeordnete Markierung an der Ausgangseite des Wegesuchnetzwerkes angelegt werden, so daß unter Ausnutzung der im Wegesuchnetzwerk von beiden Außenseiten her daraufhin zusammentreffenden Markierungen sowie der an den den Ausgängen des Koppelfeldes zugeordneten Stellen (fDl.. .fDm) des Wegesuchnetzwerkes auftretenden Markierungen durch eine einzige Wegeauswahl die zu benutzenden Zwischenleitungen und die zu benutzende Abnehmerleitung wählbar sind.1. Circuit arrangement for telecommunications, in particular for telephone exchanges, in which routing to other offices leading connection paths are to be established, which lead via multi-level switching networks, characterized in that the switching network in question is assigned a path search network provided with selectors, which apart from the routing and the Operating status of the associated intermediate lines and subscriber lines belonging to outgoing trunk groups also the order of the routes leading to the destination offices (e.g. 331), such as cross route (α) and code route (c), recorded that for searching and selecting one of one Feeder line connected to the switching matrix (e.g. subscriber line with subscriber station (TIj) to a connection path leading to a destination office (331) a marking assigned to the relevant feeder line on the input side of the route search network and a mark assigned to the destination office on the exit side of the route search network, so that using the markings that then come together in the path search network from both outer sides and the markings that occur at the points (fDl .. .fDm) of the path search network assigned to the outputs of the switching network, the intermediate lines to be used and the to user line using can be selected. 2. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß zwischen der Ausgangsseite des Wegesuchnetzwerkes, an welche die dem Zielamt (z. B. 331) zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen (fDl.. .{Dm) des Wegesuchnetzwerkes den über Abnehmerleitungen direkt erreichbaren Ämtern (331... 715) zugeordnete Knotenpunkte (f331fg331... /715/g715) angeordnet sind, die einerseits mit den den Ausgängen des Koppelfeldes zugeordneten Stellen (fDl... fDm) über diesen Abnehmerleitungen zugeordnete Wegesuchadern verbunden sind und die andererseits über Wegesuchadern mit den Zielämtern (331.. . 715) zugeordneten Ausgängen (z 331... ζ 715 bzw. 0/3... 1/1) des Wegesuchnetzwerkes verbunden sind, die über die den Knotenpunkten zugeordneten Ämter erreichbar sind, so daß einerseits unter Ausnutzung der an Ausgänge des Wegesuchnetzwerkes angelegten Markierungen auch Markierungen zu den den Ausgängen des Koppelfeldes zugeordneten Stellen (/Dl... fDm) übertragbar sind und andererseits an Eingänge des Wegesuchnetzwerkes angelegte Markierungen unabhängig davon von den den Ausgängen des Koppelfeldes2. Circuit arrangement according to claim 1, characterized in that between the output side of the route search network, to which the marking assigned to the destination office (e.g. 331) is applied, and the locations assigned to the outputs of the switching matrix (fDl ... {Dm) In the route search network, nodes (f331fg331 ... / 715 / g715) assigned to the offices (331 ... 715) that can be reached directly via subscriber lines are arranged, on the one hand with the points (fDl ... fDm) assigned to the outputs of the switching network via these subscriber lines assigned route search wires are connected and on the other hand via route search wires with the destination offices (331 ... ζ 715) assigned outputs (z 331 ... ζ 715 or 0/3 ... 1/1) of the route search network are connected via the Offices assigned to nodes can be reached, so that, on the one hand, using the markings applied to the outputs of the route search network, also markings to the points assigned to the outputs of the switching matrix (/ Dl .. . fDm) and on the other hand markings applied to inputs of the routing network regardless of the outputs of the switching matrix zugeordneten Stellen (fD 1... fD m) zu den erwähnten Knotenpunkten (/331/g331... /715/ g715) übertragbar sind.assigned positions (fD 1 ... fD m) to the mentioned nodes (/ 331 / g331 ... / 715 / g715) can be transferred. 3. Schaltungsanordnung nach Anspruch 2, dadurch gekennzeichnet, daß die den Ausgängen des Koppelfeldes zugeordneten Stellen (fD 1.../Dm) des Wegesuchnetzwerkes und die erwähnten Knotenpunkte (/331/g331... /715/g715) jeweils über ein Paar parallel verlaufende, mit Entkoppelgleichrichtern (Gl, G, R, Rl) und Belegungskontakten (la 11, IaI, 2 al, 2all) versehene Wegesuchadern verbunden sind, die zur Weiterleitung gegenläufiger Markierungen dienen.3. Circuit arrangement according to claim 2, characterized in that the points (fD 1 ... / Dm) of the route search network assigned to the outputs of the switching matrix and the aforementioned nodes (/ 331 / g331 ... / 715 / g715) each have a pair Path search cores running in parallel and provided with decoupling rectifiers (Gl, G, R, Rl) and occupancy contacts (la 11, IaI, 2 al, 2all) are connected, which serve to forward counter-rotating markings. 4. Schaltungsanordnung nach Anspruch 2 oder 3, dadurch gekennzeichnet, daß von den von einem Knotenpunkt zu den Ausgängen des Koppelfeldes zugeordneten Stellen des Wegesuchnetzwerkes führenden Wegesuchadern jeweils höchstens eine bzw. ein Paar zu den den am selben Koppelvielfach des Koppelfeldes liegenden Ausgängen zugeordneten Stellen führt.4. Circuit arrangement according to claim 2 or 3, characterized in that of the from a node to the points of the route search network assigned to the outputs of the switching matrix leading path search cores in each case at most one or a pair of those lying on the same switching matrix of the switching matrix Outputs assigned positions leads. 5. Schaltungsanordnung nach einem der Ansprüche 2 bis 4, dadurch gekennzeichnet, daß zur Ausnutzung der an den Ausgängen und an den Eingängen des Wegesuchnetzswerkes angelegten as Markierungen und zur Berücksichtigung der Reihenfolge der zu einem Zielamt führenden Wege (z.B. a, b, c) in die erwähnten Knotenpunkte (/331/g331... f 115IgIlS) Und-Gatter (i7331. .. UIlS) mit ihren Eingängen eingeschleift sind, an deren Ausgänge die Eingänge eines Leitwegwählers (LW) angeschlossen sind, der auch den Knotenpunkten (/331/^331... /715/g715) zugeordnete Ausgänge hat und zur Auswahl unter Knotenpunkten nach einer vorgegebenen Bevorzugungsreihenfolge seiner Eingänge bzw. Ausgänge dient.5. Circuit arrangement according to one of claims 2 to 4, characterized in that in order to utilize the as markings applied to the outputs and to the inputs of the path search network and to take into account the order of the paths leading to a destination office (eg a, b, c) in the aforementioned nodes (/ 331 / g331 ... f 115IgIlS) and gates (i7331. .. UIlS) are looped in with their inputs, to whose outputs the inputs of a route selector (LW) are connected, which is also connected to the nodes (/ 331 / ^ 331 ... / 715 / g715) has assigned outputs and is used to select from nodes according to a predetermined order of preference for its inputs or outputs. 6. Schaltungsanordnung nach Anspruch 5, dadurch gekennzeichnet, daß die den Zielämtern zugeordneten Ausgänge des Wegesuchnetzwerkes über Wegesuchadern mit den betreffenden Knotenpunkten derart verbunden sind, daß bei einer Auswahl durch den Leitwegwähler (LW) zunächst der kürzeste Weg, insbesondere Querweg (ω), dann längere Wege und zuletzt der Kennzahlenweg (c) berücksichtigt wird.6. A circuit arrangement according to claim 5, characterized in that the outputs of the route search network assigned to the destination offices are connected to the relevant nodes via route search cores in such a way that, when selected by the route selector (LW) , the shortest route, in particular the cross route (ω), is first longer paths and finally the key figure path (c) is taken into account. 7. Schaltungsanordnung nach Anspruch 5 oder 6, dadurch gekennzeichnet, daß die beim Leitwegwähler (LW) vorgesehene Bevorzugungsreihenfolge nach Maßgabe des zu erreichenden Zielamtes umschaltbar ist.7. Circuit arrangement according to claim 5 or 6, characterized in that the order of preference provided for the routing selector (LW) can be switched over according to the destination office to be reached. 8. Schaltungsanordnung nach einem der Ansprüche 2 bis 7, dadurch gekennzeichnet, daß in die die Ausgänge (z 331... ζ 715 bzw. 0/3... 1/1) des Wegesuchnetzwerkes und die erwähnten Knotenpunkte (/331/g331... /715/g715) verbindenden Wegesuchadern Belegungskontakte (l/c3/ 33, 2 k 3/33, /c 33/331) eingefügt sind, welche geöffnet sind, wenn keine von dem den betreffenden Knotenpunkte zugeordneten Amt zum Zielamt führende Leitung mehr frei ist.8. Circuit arrangement according to one of claims 2 to 7, characterized in that the outputs (z 331 ... ζ 715 or 0/3 ... 1/1) of the route search network and the mentioned nodes (/ 331 / g331 ... / 715 / G715) connecting routing wires occupancy contacts (l / c3 / 33, 2 k 3/33, c are inserted 33/331) / which are opened when any of the the respective nodes associated Official leading to the destination trunk is more free. 9. Schaltungsanordnung nach Anspruch 8, dadurch gekennzeichnet, daß die die Ausgänge des Wegesuchnetzwerkes (z 331... ζ 715 bzw. 0/3 ... 1/1) und die erwähnten Knotenpunkte (/331/ g331.../715/g715) verbindenden Wegesuchadern über weitere Knotenpunkte führen, denen Ämter zugeordnet sind, über welche die den Ausgängen zugeordneten Zielämter zu erreichen sind.9. Circuit arrangement according to claim 8, characterized in that the outputs of the route search network (z 331 ... ζ 715 or 0/3 ... 1/1) and the mentioned nodes (/ 331 / g331 ... / 715 / g715) lead connecting route search arteries via further nodes to which offices are assigned via which the destination offices assigned to the exits can be reached. 10. Schaltungsanordnung nach Anspruch 1, dadurch gekennzeichnet, daß zwischen der Ausgangsseite des Wegesuchnetzwerkes, an welche die dem Zielamt (z. B. 331) zugeordnete Markierung angelegt wird, und den den Ausgängen des Koppelfeldes zugeordneten Stellen (.. .,jDl, ...) des Wegesuchnetzwerkes den verschiedenen Verkehrsrichtungen, in denen die Zielämter erreichbar sind, zugeordnete Gatterschaltungen (i£331 .... £715) eingefügt sind, welche gegebenenfalls an denjenigen Ausgängen des Koppelfeldes zugeordnete Stellen (...., fDl, ....) des Wegesuchnetzwerkes Markierungen liefern, an die in der betreffenden Verkehrsrichtung abgehende Abnehmerleitungen angeschlossen sind, daß mit der Lieferung einer Markierung durch eine Gatterschaltung jeweils ein in das Wegesuchnetzwerk eingelagertes Verzögerungsglied (V 331, V 33, V 3) angelassen wird, das nach seiner Verzögerungszeit die vorher angelegte Markierung unterdrückt und die Anlegung von Markierungen durch eine andere Gatterschaltung an nachher zu berücksichtigenden Stellen bewirkt, welche erfolgt, wenn die vorher angelegte Markierung in dem Wegesuchnetzwerk nicht mit einer an einen Eingang des Wegesuchnetzwerkes angelegten Markierung zusammentrifft, weil zwischen dem dem markierten Eingang des Wegesuchnetzwerkes zugeordneten Eingang des zugehörigen Koppelfeldes und den durch Markierungen bezeichneten Ausgängen des Koppelfeldes kein freier Verbindungsweg besteht, und daß solche Gatterschaltungen gegebenenfalls weitere Markierungen liefern, die den im Zuge einer Leitweglenkung nacheinander in Frage kommenden Verkehrsrichtungen zur Erreichung des vorgegebenen Zielamtes (z. B. 331) zugeordnet sind.10. A circuit arrangement according to claim 1, characterized in that between the output side of the route search network to which the destination office (z. B. 331) assigned marking is applied, and the outputs of the switching matrix assigned locations (..., JDl,. .) of the routing network, allocated gate circuits (i £ are. the different transport directions in which the target positions are reached inserted 331 .... £ 715) which is associated, optionally at those outputs of the switching matrix points (...., FDL. ... supply) of the routing network markings are connected to the outgoing in the relevant direction of traffic trunk lines, that the supply of a mark by a gate circuit, respectively an intercalated in the routing network delay element (V 331, V 33, V is started 3) after its delay time, the previously created marking is suppressed and the creation of markings by another gate circuit is continued it causes points to be taken into account, which occurs when the previously created marking in the route search network does not coincide with a mark applied to an input of the route search network, because between the input of the associated switching network assigned to the marked input of the route search network and the outputs of the switching network indicated by markings There is no free connection path, and that such gate circuits may supply further markings that indicate the traffic directions that come into question one after the other in the course of routing to reach the specified destination office (e. B. 331) are assigned. 11. Schaltungsanordnung nach Anspruch 10, dadurch gekennzeichnet, daß bei der Leitweglenkung zunächst die Ausgänge des Koppelfeldes durch Markierungen der zugeordneten Stellen im Wegesuchnetzwerk berücksichtigt werden, von denen das zu erreichende Zielamt (z. B. 331) auf dem kürzesten Wege erreichbar ist (z. B. Querverbindungsweg a) und danach gegebenenfalls Ausgänge berücksichtigt werden, von denen aus immer längere Wege (b) dorthin führen, bis die Ausgänge berücksichtigt werden, von denen aus der sogenannte Kennzahlenweg (c) abgeht.11. A circuit arrangement according to claim 10, characterized in that in the routing first the outputs of the switching matrix are taken into account by markings of the assigned points in the routing network, from which the destination office to be reached (e.g. 331) can be reached by the shortest route (e.g. B. Cross-connection path a) and then, if necessary, outputs are taken into account, from which ever longer paths (b) lead there until the outputs are taken into account, from which the so-called key figure path (c) starts. 12. Schaltungsanordnung nach Anspruch 10 oder 11, dadurch gekennzeichnet, daß durch eine mit Hilfe des Wegesuchnetzwerkes erfolgende Meldung von der Übertragung von Markierungen über das ganze Wegesuchnetzwerk die erwähnte Unterdrückung und Anlegung erneuter Markierungen verhindert wird, dagegen aber die Auswahl des zu benutzenden Verbindungsweges mit Hilfe des Wegesuchnetzwerkes und der zugehörigen Wähler veranlaßt wird.12. Circuit arrangement according to claim 10 or 11, characterized in that by a with the help of the route search network, notification of the transmission of markings the above-mentioned suppression and creation of new markings over the entire route search network is prevented, but the selection of the connection path to be used with Help of the route search network and the associated voters is initiated. 13. Schaltungsanordnung nach einem der Ansprüche 10 bis 12, dadurch gekennzeichnet, daß einem Verzögerungsglied jeweils eine bistabile Kippschaltung (B 331) nachgeschaltet ist, die über dieses Verzögerungsglied in Arbeitslage gebracht wird und dabei die vorgesehene Unterdrückung und Anlegung von Markierungen aufrechterhält,13. Circuit arrangement according to one of claims 10 to 12, characterized in that a delay element is followed by a bistable multivibrator (B 331), which over this delay element is brought into working position and thereby the intended suppression and maintains the application of markings, 709 517/94709 517/94 bis sie nach Abschluß der Wegesuche und -auswahl wieder in Ruhelage gebracht wird, und daß ein Verzögerungsglied (F331) jeweils die spätere Anlegung von Markierungen (z33) durch die zugehörige bistabile Kippschaltung so lange sperrt, bis sicher die Unterdrückung der vorher angelegten Markierungen (z331) erfolgt ist.until it is brought to the rest position again after the route search and selection has been completed, and that a delay element (F331) blocks the subsequent application of markings (z33) by the associated bistable flip-flop circuit until the suppression of the previously applied markings (z331 ) has taken place. 14. Schaltungsanordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die den Zielämtern bzw. den Verkehrsrichtungen zugeordneten Schaltungsteile (Fi g. 3 a — Knotenpunkte /331/g331 . . . f 115IgIlS; Fig. 4a — Gatterschaltungen £331.. . KIlS) an Leitungen von Leitungsbündeln (Nl N2, N3) angeschlossen sind, welche den Ziffern der Teilnehmernummem und deren Leitungen und den verschiedenen Werten dieser Ziffern zugeordnet sind und nach Maßgabe der für eine Verbindungsanforderung gewählten Ziffern markiert werden, wobei die letzteren Leitungen als Ausgänge (0/3 ... 1/1) des Wegesuchnetzwerkes dienen, und daß die mit der Wegesuche kombinierte Leitweglenkung erst dann einsetzt, wenn so viele Leitungen (3,3,1) der Leitungsbündel (Nl, N2,N3) markiert sind, daß das zu erreichende Zielamt (331) bestimmt ist.14. Circuit arrangement according to one of the preceding claims, characterized in that the circuit parts assigned to the destination offices or the traffic directions (Fig. 3 a - nodes / 331 / g331... F 115IgIlS; Fig. 4a - gate circuits £ 331 ... KIIS) are connected to lines of trunk groups (Nl N2, N3) , which are assigned to the digits of the subscriber numbers and their lines and the various values of these digits and are marked according to the digits selected for a connection request, the latter lines as outputs ( 0/3 ... 1/1) of the route search network, and that the routing combined with the route search only begins when so many lines (3, 3, 1) of the line bundle (Nl, N2, N3) are marked that the target office (331) to be reached is determined. 15. Schaltungsanordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Wegesuche und -auswahl mit Hilfe einer ersten durch das Wegesuchnetzwerk gelegten Schrittstelle vorgenommen werden, an der auf Grund dort zusammentreffender Markierungen eines der in Frage kommenden Wegestücke (z. B. Koppelvielfache, Ämter) ausgewählt wird, worauf dort eine weitere Markierung angelegt wird, und daß an weiteren Schnittstellen unter Ausnutzung ursprünglicher und weiterer Markierungen in entsprechender Weise weitere Wegestücke ausgewählt werden, bis der gesamte Verbindungsweg von der betreffenden Zubringerleitung bis zum vorgegebenen Zielamt festgelegt wird.15. Circuit arrangement according to one of the preceding claims, characterized in that that the route search and selection with the help of a first laid through the route search network Step point can be made at the due to the coinciding markings there one of the possible sections of the route (e.g. switching matrices, offices) is selected, whereupon there another marking is applied, and that at other interfaces under utilization original and further markings selected in a corresponding manner further sections of the road until the entire connection path from the relevant feeder line to predetermined target office is determined. 16. Schaltungsanordnung nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, daß mehrere Schnittstellen durch das Wegesuchnetzwerk gelegt sind, an denen die Übertragung von Markierungen an geschnittenen Wegestücken beeinflußt und ausgangsseitig durch Ermittlung des Zusammentreffens einer eingangsseitigen Markierung mit einer ausgangsseitigen Markierung bei der Ausgangsseite des Wegesuchnetzwerkes überprüft wird, bis so viele Wegestücke festgelegt sind, daß ein Verbindungsweg zwischen der betreffenden Zubringerleitung und dem vorgegebenen Zielamt bestimmt ist.16. Circuit arrangement according to one of claims 1 to 14, characterized in that several interfaces are placed through the routing network, at which the transmission of Markings on cut sections of the road influenced and on the output side by determining the Coincidence of an input-side marking with an output-side marking at the exit side of the route search network is checked until as many route sections are determined are that a connection path between the relevant feeder line and the specified Target office is determined. 17. Schaltungsanordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Wegesuche mittels Speicher durchgeführt wird, die Informationen über den Betriebszustand und die Lage von Wegestücken des sonst durch das Wegesuchnetzwerk erfaßten Wegenetzes (Koppelfeld und Leitwege) aufbewahren und durch deren Abfragen die Übertragbarkeit von Markierungen über dieses Wegenetz feststellbar ist.17. Circuit arrangement according to one of the preceding claims, characterized in that that the route search is carried out by means of memory, the information about the operating status and the location of parts of the route otherwise recorded by the route search network Route network (switching network and routes) and the portability by querying them can be determined by markings on this network of trails. 18. Schaltungsanordnung nach einem der Ansprüche 14 bis 17, dadurch gekennzeichnet, daß bei Benutzung eines nicht direkt zum Zielamt führenden Verbindungsweges (z. B. c), also eines Verbindungsweges, welcher über mindestens ein weiteres Amt (3, 33) führt, diejenigen Leitungsbündel (N 2, N3), bei denen für den Verbindungsaufbau bereits Leitungen (3/2, 1/3) entsprechend noch nicht ausgewerteter Ziffern markiert sind, zu Nachsendeeinrichtungen, welche diese Ziffern zum bereits erreichten Amt übermitteln, durchgeschaltet werden, indem mit der im Zuge der kombinierten Wegesuche- und Leitweglenkung erfolgenden Anlegung weiterer Markierungen (z33, ζ 3) in diesen Leitungen liegenden Gatterschaltungen (NK21... NK20; NK31... NK30) entsperrt werden.18. Circuit arrangement according to one of claims 14 to 17, characterized in that when using a connection path not leading directly to the destination office (z. B. c), ie a connection path which leads via at least one further office (3, 33), those Line bundles (N 2, N3), in which lines (3/2, 1/3) are already marked for the connection setup according to digits that have not yet been evaluated, are switched through to forwarding devices that transmit these digits to the office already reached by using the in the course of the combined route search and routing, the creation of further markings (z33, ζ 3) in these lines (NK 21 ... NK20; NK31 ... NK30) are unlocked. 19. Schaltungsanordnung nach Anspruch 18, dadurch gekennzeichnet, daß jeweils solche Nachsendeeinrichtungen in Anspruch genommen werden, die an die Betriebserfordernisse angepaßt sind, welche durch die jeweils vorgegebene Verkehrsrichtung (Ortsverkehr bzw. Fernverkehr) vorgeschrieben sind.19. Circuit arrangement according to claim 18, characterized in that such forwarding devices are used, which are adapted to the operational requirements, which are determined by the given traffic direction (Local traffic or long-distance traffic) are prescribed. Hierzu 3 Blatt ZeichnungenIn addition 3 sheets of drawings 709 517/94 2.67 © Bundesdruckerei Berlin709 517/94 2.67 © Bundesdruckerei Berlin
DE1964S0094466 1964-12-05 1964-12-05 Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks Withdrawn DE1235380B (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE1964S0094466 DE1235380B (en) 1964-12-05 1964-12-05 Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks
NL6515240A NL151240B (en) 1964-12-05 1965-11-24 CIRCUIT FOR A CONNECTION SYSTEM, PARTICULARLY FOR A TELEPHONE SYSTEM, WHERE CONNECTION ROADS RUNNING TO OTHER CENTRALS MUST BE ESTABLISHED.
FR40276A FR1468961A (en) 1964-12-05 1965-11-30 Assembly for telecommunication systems, and in particular telephony
CH1665665A CH440387A (en) 1964-12-05 1965-12-02 Circuit arrangement for switching systems, in particular telephone switching systems
SE15701/65A SE326216B (en) 1964-12-05 1965-12-03
BE673265D BE673265A (en) 1964-12-05 1965-12-03
GB5160365A GB1081593A (en) 1964-12-05 1965-12-06 Improvements in or relating to telecommunications systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1964S0094466 DE1235380B (en) 1964-12-05 1964-12-05 Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks

Publications (1)

Publication Number Publication Date
DE1235380B true DE1235380B (en) 1967-03-02

Family

ID=7518711

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1964S0094466 Withdrawn DE1235380B (en) 1964-12-05 1964-12-05 Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks

Country Status (7)

Country Link
BE (1) BE673265A (en)
CH (1) CH440387A (en)
DE (1) DE1235380B (en)
FR (1) FR1468961A (en)
GB (1) GB1081593A (en)
NL (1) NL151240B (en)
SE (1) SE326216B (en)

Also Published As

Publication number Publication date
NL6515240A (en) 1966-06-06
CH440387A (en) 1967-07-31
FR1468961A (en) 1967-02-10
BE673265A (en) 1966-06-03
SE326216B (en) 1970-07-20
NL151240B (en) 1976-10-15
GB1081593A (en) 1967-08-31

Similar Documents

Publication Publication Date Title
DE3921637A1 (en) Telephone exchange system for mobile units - uses stored information relating to positions of mobile units to establish required calls
DE1934097B2 (en) Large capacity interconnection network for PCM time division multiplex switching systems
DE2940259A1 (en) SWITCHING MATRIX
DE1235380B (en) Circuit arrangement for telecommunications, in particular telephone exchanges, for routing via multi-level switching networks
DE1062761B (en) Method and circuit arrangement for the selection of connection paths which lead over multi-stage fields of crosspoints
DE1052470B (en) Method for searching, selecting and establishing free connection paths in a specific field of crosspoints
DE3122172C2 (en)
AT257700B (en) Circuit arrangement for switching systems, in particular telephone switching systems
DE3023205A1 (en) CONNECTING DEVICE FOR A TIME-MULTIPLEX TELEPHONE SWITCHING SYSTEM
EP1303993B1 (en) Method for transmitting information signals in a transmission network independent of the user channel
DE1487858C3 (en) Method and circuit arrangement for increasing the traffic performance of the network of connecting lines between switching offices in telecommunications, in particular telephone systems
DE1512858A1 (en) Telecommunication, in particular telephone exchange system with separate message and character channels
DE3626870A1 (en) Method for operating a digital telecommunications network with common-channel signalling
CH658156A5 (en) Method of route searching in a meshed telecommunication network
DE2148411C3 (en) Method for searching for free connection paths in a telecommunications network
DE2147796C3 (en) Circuit arrangement for telecommunications switching systems, in particular telephone switching systems, with multi-stage switching matrices
DE3343280A1 (en) MESSAGING SYSTEM
DE2251598C3 (en) Circuit arrangement for telecommunications switching systems, in particular telephone switching systems, with switching matrices with reverse grouping
DE1939448A1 (en) Circuit arrangement for monitoring electronic crosspoint elements for functionality in telecommunications switching systems
DE1762491C (en) Method for searching for free connection paths in a telecommunications network
DE1487930C3 (en) Circuit arrangement for telecommunication systems, in particular telephone switching systems, with multi-stage switching networks
DE2048037C3 (en) Method and circuits for the synchronization of a telecommunications network operated in a time division
DE1487891C (en) Procedure for setting up connections in a telecommunications network
DE2542814C2 (en) Telecommunication, in particular telephone branch exchange, with a crosspoint multiple connected to line transmissions and a coupling network for through connections
DE1191001B (en) Method for route search and selection of free connection routes in a multi-level field of crosspoints

Legal Events

Date Code Title Description
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee