DE1108621B - Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering - Google Patents

Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering

Info

Publication number
DE1108621B
DE1108621B DEST14388A DEST014388A DE1108621B DE 1108621 B DE1108621 B DE 1108621B DE ST14388 A DEST14388 A DE ST14388A DE ST014388 A DEST014388 A DE ST014388A DE 1108621 B DE1108621 B DE 1108621B
Authority
DE
Germany
Prior art keywords
cell
flat
filled
planks
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEST14388A
Other languages
German (de)
Inventor
Paul Bauer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KARL STOEHR K G BAUUNTERNEHMUN
Original Assignee
KARL STOEHR K G BAUUNTERNEHMUN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KARL STOEHR K G BAUUNTERNEHMUN filed Critical KARL STOEHR K G BAUUNTERNEHMUN
Priority to DEST14388A priority Critical patent/DE1108621B/en
Publication of DE1108621B publication Critical patent/DE1108621B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • E02B3/108Temporary dykes with a filling, e.g. filled by water or sand

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

Verfahren zur Herstellung von mit Kies, Erde od. dgl. gefüllten Flachzellen aus Flachbohlen im Wasser- und Seebau Gegenüber den herkömmlichen biegesteifen Spundwänden wurden in letzter Zeit Flachprofile entwikkelt, mit deren Hilfe es gelang, wirtschaftlichere Dammkonstruktionen und Fangedämme zu bauen. Die Flachbohlen werden kreisförmig eingefädelt und ergeben, mit Hinterfüllungsmaterial gefüllt, einen standfesten Baukörper. Wenn man eine zusammenhängende Konstruktion benötigt, werden die Kreiszellen mit Zwickelzellen verbunden. Der Anschluß der Zwickelzellen ist jedoch statisch nicht einwandfrei, da die Flachbohlen nicht geeignet sind, Biegemomente aufzunehmen. Aus diesem Grunde müssen die Zwickelzellen sehr klein ausgebildet werden. Hierdurch entsteht jedoch eine bleibende Einschnürung der Grundfläche, wodurch die Ausführung einer so gearteten Zellenreihe für viele Bauaufgaben ungeeignet wird. Die unregelmäßige Außenfläche wirkt sich insbesondere im Wasserbau hydraulisch sehr ungünstig aus. Aus den vorgenannten Gründen ist die Ausführung solcher Dämme in Form von Flachzellen oft günstiger. Diese Anordnung ist in gefülltem Zustand durchaus stabil. Jedoch ist die Herstellung der Zellen sehr schwierig, da die Trennwand der Zelle reine Zugwand ist, daher keine Kräfte aufnehmen kann, die sich bei einseitiger Füllung der Zelle aus dem Erddruck ergeben.Process for the production of flat cells filled with gravel, earth or the like made of flat piles in water and sea construction Compared to conventional rigid sheet piling Flat profiles have recently been developed, with the help of which it was possible to create more economical ones To build dam structures and dams. The flat planks are threaded in a circle and, filled with backfilling material, result in a stable structure. if if a coherent construction is required, the circular cells with gusset cells are used tied together. However, the connection of the gusset cells is not statically correct, because the flat piles are not suitable for absorbing bending moments. For this reason the gusset cells must be made very small. However, this creates a permanent constriction of the base, whereby the execution of such a type Cell row is unsuitable for many construction tasks. The irregular outer surface has a very unfavorable hydraulic effect, especially in hydraulic engineering. From the aforementioned For reasons, it is often cheaper to build such dams in the form of flat cells. This arrangement is quite stable when filled. However, the manufacture is of the cells is very difficult, since the dividing wall of the cell is purely a tension wall, therefore none Can absorb forces that result from the earth pressure in the case of one-sided filling of the cell result.

Man stellt Flachzellendämme bis jetzt so her, daß die Zellen langsam steigend gefüllt werden, wobei die erste und die letzte Zelle in Kreisform hergestellt wird. Diese Ausführung ist sehr aufwendig und unwirtschaftlich; denn bis zum Zeitpunkt der Füllung sind die Zellen unstabil und müssen durch Hilfskonstruktionen gehalten werden. Durch den allmählichen Füllungsfortschritt wird eine große Anzahl Hilfskonstruktionen erforderlich. Dieses Verfahren kann nur dort angewendet werden, wo während der Erstellung keine äußeren Kräfte auf das Bauwerk einwirken. Im Seebau ist es infolge des Wellenangriffes unmöglich, nach diesem Verfahren einen Flachzellendamm zu erstellen.Up until now, flat cell dams have been made in such a way that the cells move slowly be filled in increasing numbers, the first and the last cell being made in the shape of a circle will. This design is very complex and uneconomical; because until the time After filling, the cells are unstable and must be held in place by auxiliary structures will. The gradual progress of the filling creates a large number of auxiliary structures necessary. This procedure can only be used wherever during the creation no external forces act on the structure. In the lake construction it is due to the wave attack impossible to build a flat cell dam by this method.

Die Erfindung besteht demgegenüber darin, daß in Richtung des Baufortschrittes zunächst jede Zelle an der Anschlußseite der nächstfolgenden Zelle als im Querschnitt kreisbogenförmiger Körper und gleichzeitig oder anschließend eine, ein Segment dieses Kreiskörpers abschneidende Zugwand gerammt werden. Die beiden durch diese Zugwand gebildeten Zellenräume werden gefüllt und schließlich nach dem in gleicher Weise stattfindenden Rammen und Füllen der nächstfolgenden Zelle die Bohlen der seitlich der Zugwand stehenden, im Querschnitt teilkreisförmigen Schalung gezogen. Zweckmäßig wird in der Weise vorgegangen, daß ein zum Rammen der Bohlen verwendeter Außentisch an den Abzweigbohlen der jeweils vorher erstellten, gefüllten Zelle verankert wird. Durch diese Umklammerung des Außentisches an die bereits verfüllte und dann standfeste Zelle wird gleichzeitig eine große Stabilität der Hilfskonstruktion erreicht. Die Figuren erläutern das erfindungsgemäße Verfahren an einem Ausführungsbeispiel. Es stellt dar Fig. 1 die Anordnung zur Durchführung des Verfahrens im Aufriß, Fig. 2 den Grundriß zu Fig. 1.The invention consists in the fact that in the direction of construction progress initially each cell on the connection side of the next following cell as in cross section circular arc-shaped body and at the same time or subsequently one, a segment of this Circular body cutting tension wall are rammed. The two through this train wall formed cell spaces are filled and finally after that in the same way taking place ramming and filling of the next following cell the planks of the side the tension wall standing, partially circular in cross-section drawn formwork. Appropriate the procedure is that an outside table used for ramming the planks is anchored to the junction piles of the previously created, filled cell. By clasping the outside table to the already filled and then stable Cell a great stability of the auxiliary construction is achieved at the same time. the Figures explain the method according to the invention using an exemplary embodiment. It Fig. 1 shows the arrangement for carrying out the method in elevation, Fig. 2 shows the plan of FIG. 1.

In Richtung des Baufortschrittes wird zunächst jede Zelle :1 aus Bohlen 1' an der Anschlußseite der nächstfolgenden Zelle als im Querschnitt kreisbogenförmiger Körper gerammt. Gleichzeitig oder anschließend wird eine Zugwand 2 gerammt, die ein Segment dieses Kreiskörpers abschneidet. Hierauf werden die durch diese Zugwand 2 gebildeten Zellenräume 3 und 4 mit Kies, Erde od. dgl. verfüllt und schließlich werden, nachdem die nächstfolgende Zelle in der gleichen Weise gerammt und gefüllt ist, die Bohlen des seitlich der Zugwand 2 stehenden Hilfskreisbogens 5 gezogen. Zum Rammen der Bohlen werden ein Außentisch 6 und ein Innentisch 7 verwendet. Der Außentisch wird an den vier Abzweigbohlen 8 der jeweils vorher erstellten, gefüllten Zelle verankert. Die auftretenden Zugkräfte werden hierbei von der Zugwand 2 aufgenommen.In the direction of the construction progress, each cell will initially be: 1 made of planks 1 'on the connection side of the next cell as a circular arc-shaped cross-section Body rammed. At the same time or subsequently a tension wall 2 is rammed, the cuts off a segment of this circular body. Then they will go through this wall 2 formed cell spaces 3 and 4 with gravel, earth or the like. Filled and finally are rammed and filled in the same way after the next cell is, the planks of the side of the tension wall 2 standing auxiliary circular arc 5 drawn. An outer table 6 and an inner table 7 are used for ramming the planks. Of the The outer table is filled on the four branch planks 8 of the one previously created Cell anchored. The tensile forces that occur are absorbed by the tension wall 2.

Claims (2)

PATENTANSPRÜCHE: 1. Verfahren zur Herstellung von mit Kies, Erde od. dgl. gefüllten Flachzellen aus Flachbohlen im Wasser- und Seebau, dadurch gekennzeichnet, daß in Richtung des Baufortschrittes zunächst jede Zelle an der Anschlußseite der nächstfolgenden Zelle als im Querschnitt kreisbogenförmiger Körper und gleichzeitig oder anschließend eine ein Segment dieses Kreiskörpers abschneidende Zugwand gerammt werden, sodann hierauf die beiden durch diese Zugwand gebildeten Zellenräume gefüllt werden und daß schließlich nach dem in gleicher Weise stattfindenden Rammen und Füllen der nächstfolgenden Zelle die Bohlen der seitlich der Zugwand stehenden, im Querschnitt teilkreisförmigen Schalung gezogen werden. PATENT CLAIMS: 1. Process for the production of gravel, earth or The like. Filled flat cells from flat piles in water and sea engineering, characterized in that, that in the direction of construction progress, first each cell on the connection side of the next following one Cell as a body with a circular arc in cross section and at the same time or subsequently a tension wall cutting off a segment of this circular body is then rammed then the two cell spaces formed by this tension wall are filled and that finally after the ramming and filling which take place in the same way The next cell is the planks of the side of the tension wall, in cross-section circular formwork. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß ein zum Rammen der Bohlen verwendeter Außentisch an den Abzweigbohlen der jeweils vorher erstellten, gefüllten Zelle verankert wird.2. The method according to claim 1, characterized characterized in that an outer table used for ramming the planks to the branch planks the previously created, filled cell is anchored.
DEST14388A 1958-10-27 1958-10-27 Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering Pending DE1108621B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEST14388A DE1108621B (en) 1958-10-27 1958-10-27 Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEST14388A DE1108621B (en) 1958-10-27 1958-10-27 Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering

Publications (1)

Publication Number Publication Date
DE1108621B true DE1108621B (en) 1961-06-08

Family

ID=7456348

Family Applications (1)

Application Number Title Priority Date Filing Date
DEST14388A Pending DE1108621B (en) 1958-10-27 1958-10-27 Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering

Country Status (1)

Country Link
DE (1) DE1108621B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2371551A1 (en) * 1976-11-22 1978-06-16 Nat Res Dev EQUIPMENT FOR THE REALIZATION OF DYGES

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2371551A1 (en) * 1976-11-22 1978-06-16 Nat Res Dev EQUIPMENT FOR THE REALIZATION OF DYGES

Similar Documents

Publication Publication Date Title
DE3590196T (en) Offshore construction
DE2434200C3 (en) Process for the production of underground cavities
DE7431406U (en) COMPOSITE SUPPORT PILLAR AND FOUNDATION PILLAR FOR DIFFERENT BUILDINGS
DE2167029A1 (en) PROCESS FOR MANUFACTURING CONCRETE STRUCTURES, SUCH AS DITCH FACES MADE OF LIQUID CONCRETE OR SIMILAR
WO2017089244A1 (en) Protective device
CH617239A5 (en) Building foundation
DE2322711A1 (en) THUNNING PROTECTION DEVICE
CH661955A5 (en) METHOD FOR PRODUCING A STEEL CONCRETE BODY.
DE1108621B (en) Process for the production of flat cells filled with gravel, earth or the like from flat piles in water and marine engineering
DE2635017A1 (en) TRUSS CONSTRUCTION
DE2240935C3 (en) Process for the production of an underwater concrete base secured against buoyancy and device for carrying out the process
DE873978C (en) Fangedaemme, piers and similar structures according to the cellular construction and process for their production
DE2102763A1 (en) Filter layer, especially for a drainage pipe
AT237539B (en) Lining or filling of scoured or scour-endangered lintel basins
DE2041763A1 (en) Form, especially for the production of concrete manhole bases for the connection of pipelines and concrete manhole bases produced by means of this form
DE2625711A1 (en) ANCHOR
DE2613854A1 (en) EXPANSION PLATE
DE2127752C3 (en) Radiation-proof structure
DE2535419C3 (en) Method for equipping an offshore drilling platform with foundation cutting edges and foundation bodies suitable for the method
DE120515C (en)
DE2341846C3 (en) Floatable breakwater
DE860176C (en) Process for the protection of concrete piles against harmful effects
DE1151226B (en) Method and dike post for land reclamation by dike
Standke Pond for wet storage of spent fuel elements
DE1167777B (en) Concrete ring expansion for shafts