DE1085483B - Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process - Google Patents

Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process

Info

Publication number
DE1085483B
DE1085483B DESCH12951A DESC012951A DE1085483B DE 1085483 B DE1085483 B DE 1085483B DE SCH12951 A DESCH12951 A DE SCH12951A DE SC012951 A DESC012951 A DE SC012951A DE 1085483 B DE1085483 B DE 1085483B
Authority
DE
Germany
Prior art keywords
wall
steep
mining
offset
tensile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DESCH12951A
Other languages
German (de)
Inventor
Dipl-Berging Dr-Ing Gu Schulze
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DIPL BERGING DR ING GUNTHER SC
Original Assignee
DIPL BERGING DR ING GUNTHER SC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DIPL BERGING DR ING GUNTHER SC filed Critical DIPL BERGING DR ING GUNTHER SC
Priority to DESCH12951A priority Critical patent/DE1085483B/en
Publication of DE1085483B publication Critical patent/DE1085483B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

Versatzverfahren, insbesondere für steile und halbsteile Flözlagerung, und Vorrichtung zur Durchführung des Verfahrens Beim Abbau von Flözabschnitten, z. B. beim Strebabbau, ist es üblich, entlang der jeweiligen Versatz-und Abbaufront das Hangende im Abbau- und Förderfeld abstützende Stempel oder Pfeiler aufzustellen, im Förderfeld die abgebauten Mineralien, wie Kohlen, undden Versatz für das anschließende Versatzfeld zu fördern sowie an die Hangend-Tragvorrichtungen gegenüber dem Versatzfeld eine Verkleidung, z. B. aus Papier-Versatzleinengewebe, Blechen, Gurten, Drahtgeflecht u. dgl. vor dem Einbringen des Versatzes anzuhängen. Die Verkleidung hat dabei die el Aufgabe, den Versatz und den sich beim Einbringen desselben bildenden Staub vor einem Eindringen in das Förderfeld abzuhalten. Der Nachteil des bekannten Abbau- und Versatzverfahrens besteht aus den Arbeiten für die Anordnung und Wiedergewinnung der Tragvorrichtungen, deren Transport entsprechend dem Fortschritt des Abbaus und dem Anhängen der Versatz-Verkleldungen. Ein beachtlicher weiterer Nachteil ist darin zu sehen, daß vielleicht der Abbau und der Versatz sich gegenseitig so stören, daß beide Verfahren nicht zu gleicher Zeit vorgenommen werden können und somit also immer diskontinuierlich gearbeitet werden muß, der Abbau somit nicht zügig erfolgen kann.Backfilling methods, especially for steep and half-steep seams, and device for carrying out the process When mining seam sections, z. B. in longwall mining, it is common to run along the respective offset and mining front erecting stamps or pillars supporting the hanging wall in the mining and conveying field, the mined minerals, such as coal, and the offset for the subsequent To promote offset field as well as to the hanging support devices opposite the offset field a cladding, e.g. B. made of paper offset linen fabric, sheet metal, belts, wire mesh and the like before adding the offset. The disguise has the el task, the offset and the dust that forms when it is introduced to prevent penetration into the conveying field. The disadvantage of the well-known degradation and offsetting procedure consists of the works for placement and retrieval the carrying devices, their transport according to the progress of the dismantling and appending the offset notifications. Another notable disadvantage is therein to see that perhaps the dismantling and the displacement mutually interfere so that both procedures cannot be carried out at the same time and therefore must always be worked discontinuously, so the dismantling does not take place quickly can.

Aus diesem Grunde ist es bekanntgeworden, mit den Tragvorrichtungen für das Hangende eine wandernde Versatzwand zu verbinden, die, gegebenenfalls durch den Druck des Versatzgutes, andernfalls durch zusätzliche Kräfte, dem fortschreitenden Abbau folgend vorgerückt wird. Die Erfindung hat sich die Aufgabe gestellt, bei möglichst mannlosem Abbau von Flözabschnitten, wie Strehabschnitten unter Verwendung einer Versatzwand auf die Hilfe von Stempeln, Pfeilern oder sonstigen Hangendtragvorrichtungen verzichten zu können und so bei zu stützendem. Bergeversatz die Vorteile eines ausbaulosen Abbanverfahrens zu erreichen, wie es beim hängenden Abbau, bei dem die Berge einen Böschungswinkel bilden, an sich bekannt ist.For this reason it became known with the carrying devices to connect a moving offset wall for the hanging wall, which, if necessary, through the pressure of the backfill, otherwise by additional forces, the advancing Removal is advanced following. The invention has the task at If possible unmanned mining of seam sections, such as face sections using an offset wall with the help of stamps, pillars or other hanging support devices to be able to do without and so with something to be supported. Bergeversatz the advantages of a dismountable To achieve the removal method, as it is with the hanging mining, in which the mountains one Form slope angle, is known per se.

Die Erfindung betrifft ein Versatzverfahren, insbesondere für steile und halbsteile Flözlagerung, bei dem in bekannter Weise mit Abstand vor dem Kohlenstoß eines Flözabschnittes, wie Abbaustreb, eine Wanderwand zur Abstützung von hinterfülltem Versatz angeordnet und dem fortschreitenden Abbau folgend vorgerückt wird, und besteht darin, daß als Wanderwand eine zugfest ausgebildete, flexible Wand (Matte) durch Haltevorrichtungen zwischen Kopf-und Ladestrecke gespannt und durch ein dem fortschreitenden Abbau folgendes Vorrücken der Haltevorrichtung vorgerückt wird.The invention relates to an offset method, in particular for steep and half-steep seam storage, in which in a known manner at a distance in front of the coal face of a seam section, such as mining struts, a wall to support the backfilled Offset arranged and advanced following the progress of degradation, and exists in that a flexible wall (mat) designed for tensile strength as a traveling wall Holding devices stretched between the head and loading section and through one of the advancing Dismantling following advancement of the holding device is advanced.

Die durch die Erfindung erreichten Vorteile sind darin zu sehen, daß bei gleichzeitigem Abbau und Versatz undVorrücken derVersatzwand entsprechend dem Abbaufortschritt durch Betätigung einzelner Vorrückvorrichtungen sich Hangendtragvorrichtungen erübrigen, so daß besonders einfach mannlos Flözabschnitte, auch bisher abbauunwürdige Flöze, abzubauen sind. Der Abstand der zugf esten flexiblen Wanderwand von derAbbaufront kann nach der Erfindung brenisend oder beschleunigend durch ihre Halte- und Verschiebevorrichtung geregelt werden. Wer in besonderen Fällen noch Hangendtragvorrichtungen, wie Stempel, zwischen Abbaufront und Verschiebewand zusätzlich anwenden will, kann zumindest deren Zahl selbst bei brüchigem Han#genden oder bei sehr großer Flözmächtigkeit verringern, Bei dem durch die Erfindung ermöglichten Versatzverfahren können völlig unpräparierte, vor allem ungebrochene Berge als Versatz zur Verwendung kommen.The advantages achieved by the invention can be seen in the fact that with simultaneous dismantling and displacement and moving of the substitute wall in accordance with the Dismantling progress by actuating individual advancing devices superfluous, so that particularly easy unmanned seam sections, also previously unworthy of mining Seams to be mined. The distance between the tensile flexible traveling wall and the dismantling front can according to the invention burning or accelerating by its holding and displacement device be managed. If, in special cases, hanging support devices such as stamps, between the dismantling front and the sliding wall can at least apply their number even in the case of fragile hilt or with very large seams Reduce, with the offset method made possible by the invention can completely unprepared, especially unbroken mountains are used as offsets.

Zur Ausführung des Verfahrens nach der Erfindung kann die zwischen Haltevorrichtungen an Kopf- und Ladestrecke gespannte, flexible Wanderwand in der Länge von Flözabschnitten aus Gummi- od. dgl. Band, Drahtgeflecht, Gelenkrosten oder aus mit Belag belegten Zugmitteln (Seilen, Ketten od. dgl.) ausgebildet werden. Es ist ferner möglich, daß die zugfeste und flexible Wand ganz oder teilweise gegen Torsionwandversteifende Anhänger aufweist.To carry out the method according to the invention, the between Holding devices at the head and loading section, stretched, flexible hiking wall in the Length of seam sections made of rubber or similar tape, wire mesh, articulated gratings or from traction means (ropes, chains or the like) covered with a covering. It is also possible that the tensile strength and flexible wall completely or partially against Has torsion wall stiffening trailers.

Außerdem ist es vorteilhaft, die Wanderwand durch schlittenartige Verschiebemittel verschiebbar zu gestalten.In addition, it is advantageous to use the hiking wall by sledge-like To make shifting means displaceable.

Im folgenden wird das Verfahren nach der Erfindung an Hand von - Ausführungsbeispiele für Vorrichtungen darstellenden - Zeichnungen erläutert. Es zeigt Fig. 1 eine Ausführung einer Wanderwand nachder Erfindung in. Seitenansicht, Fig. 2 eine Anordnung einer Wanderwand in einem steilen Kohlenstreb, Fig. ' ) eine andere Befestigungsart einer Wanderwand in einem Steilstreb, Fig. 4 und 5 eine Seitenansicht von Spannvorrichtungen gemäß Fig. 3, Fig. 6 schematisch die Darstellung eines Abbauverfahrens mit einer Wanderwand nach der Erfindung und Fig. 7 die schematische Darstellung eines anderen Abbauverfahrens mit zwei Knäppen und ein-er Wanderwand bei Beginn des Abbaus von einem Aufhauen aus.Embodiments for performing devices - - In the following, the method according to the invention at hand is of drawings. 1 shows an embodiment of a wall according to the invention in side view, FIG. 2 shows an arrangement of a wall in a steep coal face, FIG. 1) another type of fastening of a wall in a steep wall, FIGS. 4 and 5 show a side view of clamping devices according to FIG 3, 6 schematically the representation of a dismantling process with a traveling wall according to the invention and FIG. 7 the schematic representation of another dismantling process with two knobs and a traveling wall at the beginning of dismantling from a hacking up.

Nach der Fig. 1 besteht die Wanderwand nachder Erfindung aus drei Stahlseilen 1, 2 und 3, die parallel im Abstand voneinander angeordnet und mit einem verzinkt-en Maschendraht4 belegt sind. In Abständen sind Querstangen 5 angeordnet, die zum Querversteifen der zugfesten flexiblen Wanderwand dienen.According to FIG. 1 , the wall according to the invention consists of three steel cables 1, 2 and 3, which are arranged in parallel at a distance from one another and covered with a galvanized wire mesh 4. Cross bars 5 are arranged at intervals, which serve to transversely stiffen the tensile flexible traveling wall.

Die Fig. 2 zeigt die Grundstrecke 6 und die Kopfstrecke 7, die durch eiserne Bögen 8 ausgebaut und im Flöz aufgefahren sind. Die Grund- und Kopfstrecke werden oftmals auch Unter- und Oberstrecke genannt. Zwischen den beiden Strecken liegt der Abbaustreb ein-es Flözes. Zur Abgrenzung des Abbaufeldes 25 (s. Fig. 7) gegenüber dem Versatzfeld 24 ist die flexible Wanderwand gespannt, wie sie in Fig. 1 dargestellt ist und die Sammelbezeichnun- 10 erhalten hat. Aus der Fig. 1 ist des weiteren erkennbar, daß die Zugseile 1, 2 und 3 in einem Zughaken 11 an ihren Enden vereinigt und mittels einer Rolle 12 auf in Streckenrichtung verlaufenden Schienen 13 verschiebbar sind. Die Schienen 12 werden am Ausbau 8 gegebenenfalls unter Hilfe von Laschen 14 oder Traversen 15 befestigt.Fig. 2 shows the base section 6 and the head section 7, which are expanded by iron arches 8 and driven in the seam. The base and head sections are often also called the lower and upper sections. Between the two stretches there is the mining strut of one seam. To delimit the mining field 25 (see FIG. 7) from the offset field 24, the flexible traveling wall is stretched, as it is shown in FIG. 1 and has received the collective designation 10 . From Fig. 1 it can also be seen that the pulling cables 1, 2 and 3 are combined at their ends in a pulling hook 11 and can be displaced by means of a roller 12 on rails 13 running in the direction of the route. The rails 12 are attached to the extension 8 with the help of brackets 14 or cross members 15, if necessary.

Fig. 3 zeigt ebenfalls die Grundstrecke 6 und die Oberstrecke 7 mit dem Eisenausbau 8, wobei die Wanderwand10 in den Strecken mittels Spannvorrichtungen 16 verschiebbar ist, die in Fig. 4 und 5 in Seitenansicht erkennbar sind. Von dem Einband 17 der Wanderwand10 sind die Seile 1, 2 und 3 über eine Traverse 18 zu einem Schloß 19 und von hier aus einmal zu einem Zu,-seil 20 mit Haken 21 und zum andern über ein Losseil 22 zu Ausbauteilen geführt. Das Losseil 22 tritt dann in Funktion und hält die Matte fest, wenn das Seil 20 an einem anderen Ausbatiteil 8 befestigt werden muß. Eine ähnliche Ausbildung ist aus Fig. 5 nur mit dem Unterschied ersichtlich. daß nach Fig. 5 noch ein Zughuh23 eingezeichnet ist, um die notwendigen Zugkräfte zum Verschieben der Wanderwand 10 ausüben zu können.Fig. 3 also shows the base section 6 and the upper section 7 with the iron lining 8, the moving wall 10 being displaceable in the sections by means of clamping devices 16, which can be seen in side view in FIGS. 4 and 5. From the binding 17 of the hiking wall 10 the ropes 1, 2 and 3 are led via a cross member 18 to a lock 19 and from here once to a supply rope 20 with hook 21 and on the other via a loose rope 22 to extension parts. The loose rope 22 then comes into operation and holds the mat firmly when the rope 20 has to be attached to another training part 8. A similar design can be seen from Fig. 5 only with the difference. that, according to FIG. 5, another Zughuh23 is shown in order to be able to exert the necessary tensile forces for moving the traveling wall 10.

Fig. 6 zeigt schematisch ein Abhauverfahren, bei dem zwischen den beiden Strecken 6 und 7 das Versatzfeld 24 durch die Wanderwand 10 von dem Abbaufeld25 getrennt ist. Das Seilschrämgerät26 wird in bekannter Weise durch Häspel 27 in der Kopfstrecke 6 entlang dem Kohlenstoß 28 auf- und abgezo-"en. Die Wanderwand 10 ist in den Strecken 6 und 7 an den Schienen 13 verschiebbar gespannt. Sie wird mit dem fortschreitenden Abbau entsprechend den gestrichelten Linien 29 und 30 verschoben, wobei der Versatz in der Grundstrecke 7 auf den Kappen der Strecke aufruht. Die Wanderwand 10 hat die Aufgabe, den Seitendruck des Versatzes zu halten, weshalb sie als eine zugfeste Wanderwand ausgebildet ist. Der Seitendruck des Versatzes ist nicht übergroß, wie die Praxis gelehrt hat. Auf die Wanderwand nach der Erfindung wirken nur insofern Kräfte, weil der Versatz beim Verrückender Wanderwand laufend am oberen Teil der Kopfstrecke einen Trichter bildet, der nur allein aufzufüllen ist, um einen Vollversatz in steiler Lagerung durchzuführen. 6 shows schematically a cutting method in which the offset field 24 is separated from the mining field 25 by the moving wall 10 between the two stretches 6 and 7. The rope cutting device 26 is pulled up and down in a known manner by the hook 27 in the head section 6 along the coal pile 28. The traveling wall 10 is tensioned in the sections 6 and 7 on the rails 13 so that it can be moved dashed lines 29 and 30 , with the offset in the base section 7 resting on the caps of the section. The task of the moving wall 10 is to keep the lateral pressure of the offset, which is why it is designed as a tensile moving wall On the wall according to the invention forces act only insofar as the offset when moving the wall continuously forms a funnel at the upper part of the head section, which only needs to be filled in order to carry out a full offset in steep storage.

Der Vorteil nach der Erfindung besteht darin, daß keinerlei Ausbau benötigt wird, wobei unabhängig und gleichzeitig mit dem Abbau der Versatz in bekannter Weise erfol 'gen kann und auch der Abbau voll mechanisch durchführbar ist, was gerade für die steile Flözlagerung von allergrößtem Vorteil ist.The advantage of the invention is that no expansion whatsoever is needed, being independently and simultaneously with the reduction of the offset in known Wise can take place and the dismantling can also be carried out fully mechanically, whatever is of the greatest advantage for the steep seams.

Die Fig. 7 zeigt ein anderes Abbauverfahren für ein Flöz 28, nach dem im Abbaufeld 25 des Flözes Metallstempel 31 mit Kopfholz verwendet werden und der Abbau in zwei Knäppen32 und 33 erfolgt. Der Stempel 34 wird laufend an die Stelle 35, die mittels der gestrichelten Linie 36 dargestellt ist, gesetzt, ebenso der Stempel 37 an die durch Linie 38 gekennzeichnete Stelle 39. Auch hierbei ist die Wanderwand, die von dem mit Ausbau 40 versehenen - Aufhauen ausgeht, zwischen den Strecken 6 und 7 gespannt und mittels der Schienen 13 in den beiden Strecken 6 und 7 laufend dem fortschreitenden Abbau entsprechend verschiebbar und ein Vollversatz auch in der Kohlenschi,cht einbringbar, so daß bei ununterbrochenem Betrieb an den Ausbau an der Abbaufront, sofern ein solcher überhaupt erforderlich ist, keine so hohen Anforderungen wie bei einer nicht gemäß der Erfindung gespannten Wanderwand zu stellen sind. 7 shows another mining method for a seam 28, according to which metal punches 31 with headwood are used in the mining field 25 of the seam and the mining takes place in two knobs 32 and 33. The stamp 34 is continuously set at the point 35, which is shown by the dashed line 36 , as is the stamp 37 at the point 39 marked by the line 38. Here, too, is the wall that starts with the removal 40 - hewing up , stretched between the lines 6 and 7 and by means of the rails 13 in the two lines 6 and 7 continuously displaceable according to the progressive dismantling and a full offset can also be introduced in the coal layer, so that, with uninterrupted operation, the expansion at the mining front, if such is necessary at all, the requirements are not as high as in the case of a traveling wall that is not tensioned according to the invention.

Die während der Schicht in den Strecken 6 und 7 anfallenden Streckenberge können unmittelbar nach ihrer Gewinnung versetzt werden, so daß Entlastungen des Förderwagenparks sich ergeben. Man kann eine vollmaschinelle Kohlengewinnung in steiler und halbsteiler Lagerung durch Seilschrämgeräte, Bohrmaschinen, Hobel und sonstige bekannte Abbaumaschinen durchführen. Durch die Erfindung wird bei hoher Sicherheit eine wesentliche Vereinfachung erzielt.The peaks of the line occurring during the shift in lines 6 and 7 can be relocated immediately after they have been extracted, so that the load on the truck fleet is relieved. A fully automated coal extraction can be carried out in steep and semi-steep storage by means of rope cutters, drills, planes and other known mining machines. The invention achieves a substantial simplification with a high level of security.

Claims (2)

PATENTANSPRÜCHE: 1. Versatzverfahren, insbesondere für steile und halbsteile Flözlagerung, bei dem mit Abstand von dem Kohlenstoß eines Flözabschnittes, wie Abbaustreb, eine Wanderwand zur Abstützung von hinterfülltem Versatz angeordnet und dem fortschreitenden Abbau folgend vorgerückt wird, dadurch gekcnnzeichnet, daß als Wanderwand eine zugfest ausgebildete, flexible Wand (Matte) durch Haltevorrichtungen zwischen Kopf- und Ladestrecke gespannt und durch ein dem fortschreitenden Abbau folgendes Vorrücken der Haltevorrichtung vorgerückt wird. PATENT CLAIMS: 1. Offset method, in particular for steep and semi-steep seams, in which a wall to support the backfilled offset is arranged at a distance from the coal face of a seam section, such as mining struts, and is advanced following the progressive mining, characterized in that a tensile wall is a tensile wall formed, flexible wall (mat) is stretched by holding devices between the head and loading section and is advanced by advancing the holding device following the progressive dismantling. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß der Abstand der zugfesten flexiblen Wanderwand von der Abbaufront bremsend oder beschleunigend durch ihre Haltevorrichtung geregelt wird. 3. Verfahren nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß zwischen Abbaufront und Wanderwand Tragevorrichtungen angeordnet werden. 4. Vorrichtung zur Durchführung des Verfahrens nach den Ansprüchen 1 bis 3, dadurch gekennzeichnet, daß die zwischen Haltevorrichtungen an Kopf- und Ladestrecke gespannte Wanderwand aus Gummi- od. dgl. Band, Drahtgeflecht, Gelenkrosten oder aus mit Belag belegten Zugmitteln (Seilen, Ketten od. dgl.) gebildet ist. 5. Vorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die zugfeste und flexible Wand ganz oder teilweise gegen Torsion wandversteifende Anhänger aufweist. 6. Vorrichtung zur Durchführung des Verfahrens nach den Ansprüchen 1 bis 3, dadurch gekennzeichnet, daß die Wanderwand durch schlittenartige Verschiebemittel verschiebbar ist. In Betracht gezogene Druckschriften: Deutsche Patentschriften Nr. 542 608, 572 889, 814 435, 827 486, 865 584, 867 083, 875 795, deutsche PatentanmeldungenP34004VI/SeW(bekanntgemacht am 23.11.50); W2371VI/5c (bekanntgemacht am 17.7.52); »Glück-auf«, 1949, S. 704; Heise-Herbst-Fritzsche, Lehrbuch der Bergbaukunde, Bd. 1, 1949, S. 392 u. 403.2. The method according to claim 1, characterized in that the distance of the tensile flexible traveling wall from the mining front braking or accelerating is regulated by its holding device. 3. The method according to claims 1 and 2, characterized in that support devices are arranged between the dismantling front and moving wall. 4. Device for performing the method according to claims 1 to 3, characterized in that the stretched between holding devices at the head and loading path made of rubber od or the like.) Is formed. 5. Device according to one or more of the preceding claims, characterized in that the tensile and flexible wall has wholly or partially wall-stiffening trailers against torsion. 6. Device for performing the method according to claims 1 to 3, characterized in that the traveling wall is displaceable by slide-like displacement means. Considered publications: German Patent Nos. 542 608, 572 889, 814 435, 827 486, 865 584, 867 083, 875 795, German patent applications P34004VI / SeW (published 11/23/50); W2371VI / 5c ( posted 7/17/52); "Glück-auf", 1949, p. 704; Heise-Herbst-Fritzsche, Textbook of Mining Studies, Vol. 1, 1949, pp. 392 and 403.
DESCH12951A 1953-07-03 1953-07-03 Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process Pending DE1085483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DESCH12951A DE1085483B (en) 1953-07-03 1953-07-03 Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DESCH12951A DE1085483B (en) 1953-07-03 1953-07-03 Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process

Publications (1)

Publication Number Publication Date
DE1085483B true DE1085483B (en) 1960-07-21

Family

ID=7426887

Family Applications (1)

Application Number Title Priority Date Filing Date
DESCH12951A Pending DE1085483B (en) 1953-07-03 1953-07-03 Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process

Country Status (1)

Country Link
DE (1) DE1085483B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE542608C (en) * 1932-01-27 Ruhr Akt Ges Fuer Finanz Und T Delay material for the mountain offset
DE572889C (en) * 1928-08-02 1933-03-24 Albert Ilberg Equipment for conveying, relocating and dismantling
DE814435C (en) * 1946-05-25 1951-09-24 Anton Loebbert Limiting or holding means to be used for the recovery of the recovery and the method for its application when introducing recovery
DE827486C (en) * 1950-08-15 1952-01-10 Gewerk Eisenhuette Westfalia Progressive expansion for mining operations
DE865584C (en) * 1949-09-16 1953-02-02 F W Moll Soehne Interchangeable shed for back-up mountains in the mine
DE867083C (en) * 1951-12-29 1953-02-16 Helmut Keienburg Moving tray for blowing or flushing underground
DE875795C (en) * 1944-04-13 1953-05-07 Anton Loebbert Limiting or holding means for the mountain offset

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE542608C (en) * 1932-01-27 Ruhr Akt Ges Fuer Finanz Und T Delay material for the mountain offset
DE572889C (en) * 1928-08-02 1933-03-24 Albert Ilberg Equipment for conveying, relocating and dismantling
DE875795C (en) * 1944-04-13 1953-05-07 Anton Loebbert Limiting or holding means for the mountain offset
DE814435C (en) * 1946-05-25 1951-09-24 Anton Loebbert Limiting or holding means to be used for the recovery of the recovery and the method for its application when introducing recovery
DE865584C (en) * 1949-09-16 1953-02-02 F W Moll Soehne Interchangeable shed for back-up mountains in the mine
DE827486C (en) * 1950-08-15 1952-01-10 Gewerk Eisenhuette Westfalia Progressive expansion for mining operations
DE867083C (en) * 1951-12-29 1953-02-16 Helmut Keienburg Moving tray for blowing or flushing underground

Similar Documents

Publication Publication Date Title
DE2120178B2 (en) LINING SEGMENT AND METHOD OF LINING A TUNNEL
DE2307413C2 (en) Device for the extraction of a floz-like deposit in longwall mining
DE2216643C3 (en) Method and device for assembling roadworks, in particular for machine heading with roadheaders in mining
DE1085483B (en) Offset process, especially for steep and semi-steep floor bearings, and device for carrying out the process
DE607429C (en) Dismantling device
DE728577C (en) Wandering expansion to secure the hanging wall
DE678589C (en) Procedure for dismantling camps
DE2704222C3 (en) Procedure and multi-purpose platform for the expansion of sections of mining and tunneling that were excavated by blasting
DE3621274A1 (en) Belt conveyor installation for underground conveyance
DE815955C (en) Wandering pit support
DE69629796T2 (en) Short-front mining device for the pillar extraction of an underground hard coal mining
DE977137C (en) Guide and conveyor device for peeling extraction devices
DE2541534A1 (en) Mine rise heading protection - has lagging mat at machine front drawn from stock and deflected back as machine advances
DE1952893B2 (en) Folding wall for offsetting on striding longwall structures
DE1153707B (en) Suspension of blow-off pipes on the rear cap of a hydraulic support frame
DE919521C (en) Plant for mining coal or the like using a peeling extraction device
DE1035082B (en) Device for mechanical dismantling in steep and half-steep storage
DE976598C (en) Device for mining coal or the like in half-steep and steep storage
DE2250978C3 (en) Device for expanding mining areas in steep seams
DE803535C (en) Method and device for free pre-paving in moving longwall mining with shell iron
DE1215633B (en) Hiking pillar extension for strut in inclined storage
DE660961C (en) Mining and conveying processes in the struts of the copper shale
DE1080946B (en) Process for the extraction and promotion of coal in low struts of small length and device for carrying out this process
DE1758939C (en) Moving hydraulic support frame for underground mining operations
DE760324C (en) Method of excavating struts underground using ropes carried by rammers