DE10353213B3 - Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge - Google Patents

Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge Download PDF

Info

Publication number
DE10353213B3
DE10353213B3 DE2003153213 DE10353213A DE10353213B3 DE 10353213 B3 DE10353213 B3 DE 10353213B3 DE 2003153213 DE2003153213 DE 2003153213 DE 10353213 A DE10353213 A DE 10353213A DE 10353213 B3 DE10353213 B3 DE 10353213B3
Authority
DE
Germany
Prior art keywords
bridge
sleepers
sleeper
yoked
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE2003153213
Other languages
German (de)
Inventor
Richard Baum
Ruediger Goller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DB Bahnbau Gruppe GmbH
Original Assignee
DB Netz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DB Netz AG filed Critical DB Netz AG
Priority to DE2003153213 priority Critical patent/DE10353213B3/en
Application granted granted Critical
Publication of DE10353213B3 publication Critical patent/DE10353213B3/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The rail is separated from the sleeper and the damaged sleepers are dismounted and taken down from the bridge by crane. The new sleeper position is marked on the upper chord of the bridge. The rivet's place is recorded and matched with the corresponding new sleeper. The new, prepared single or yoked sleeper/s(1), with rail/s(14) assembled on them are turned round near the bridge, rails underneath. The rivet arrangement of the corresponding bridge chord (4) is copied onto the sleeper and drawn on, and notches bored, drilled or milled out. The sleeper construction is put in position by crane and the fitting, measuring, drilling and securing onto the upper chord of the bridge completed in large sections.
DE2003153213 2003-11-13 2003-11-13 Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge Expired - Fee Related DE10353213B3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2003153213 DE10353213B3 (en) 2003-11-13 2003-11-13 Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003153213 DE10353213B3 (en) 2003-11-13 2003-11-13 Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge

Publications (1)

Publication Number Publication Date
DE10353213B3 true DE10353213B3 (en) 2005-10-20

Family

ID=35034312

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003153213 Expired - Fee Related DE10353213B3 (en) 2003-11-13 2003-11-13 Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge

Country Status (1)

Country Link
DE (1) DE10353213B3 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926381A (en) * 2016-04-22 2016-09-07 北京瑞威世纪岩土工程有限公司 Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN106758590A (en) * 2016-12-20 2017-05-31 中国神华能源股份有限公司 The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
US11236474B2 (en) 2017-12-12 2022-02-01 Pandrol Limited Railway fastener for use with crossties

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3708549A1 (en) * 1986-08-06 1988-02-11 Plasser Bahnbaumasch Franz Method and installation for fitting and removing track lengths
DE4328185C1 (en) * 1993-08-21 1994-12-08 Krupp Hoesch International Gmb Bridge beam (sleeper) with means for fastening to girders of a steel railway bridge
DE19813258C1 (en) * 1998-03-26 1999-05-27 Krupp Ag Hoesch Krupp Steel railway bridging frame

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3708549A1 (en) * 1986-08-06 1988-02-11 Plasser Bahnbaumasch Franz Method and installation for fitting and removing track lengths
DE4328185C1 (en) * 1993-08-21 1994-12-08 Krupp Hoesch International Gmb Bridge beam (sleeper) with means for fastening to girders of a steel railway bridge
DE19813258C1 (en) * 1998-03-26 1999-05-27 Krupp Ag Hoesch Krupp Steel railway bridging frame

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926381A (en) * 2016-04-22 2016-09-07 北京瑞威世纪岩土工程有限公司 Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN106758590A (en) * 2016-12-20 2017-05-31 中国神华能源股份有限公司 The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN106758590B (en) * 2016-12-20 2020-09-04 中国神华能源股份有限公司 Construction temporary beam for replacing railway track under non-stop condition and construction method
US11236474B2 (en) 2017-12-12 2022-02-01 Pandrol Limited Railway fastener for use with crossties

Similar Documents

Publication Publication Date Title
DE502005007225D1 (en) Partly expanded track superstructure and method for its production
DK1298252T3 (en) Railway sleepers with undercoat
DE10353213B3 (en) Process to change individual or yoked sleepers in railroad bridge construction involves pre-prepared sleepers with rails attached being put in place on girder chord of bridge
DK1026320T3 (en) Process for manufacturing a track system without ballast
TW200639295A (en) Level railway crossing
TNSN06400A1 (en) Ladder sleeper track
ATE389064T1 (en) RAIL CHANGE TRAIN
DE502005007878D1 (en) Nail drawing machine
ATE233845T1 (en) SLEEP FRAME FOR A TRACK SYSTEM FOR RAIL-BOUND VEHICLES, ESPECIALLY FOR A GRAVEL SURFACE
PT1258563E (en) VIA-FERREA WITHOUT BALLAST WITH SOUND ABSORPTION ELEMENTS ELASTICALLY SUPPORTED
ATA163495A (en) RAILWAY RAILWAYS
ATE346980T1 (en) THRESHOLD FOR SUPPORTING RAILWAY RAILS
PL353584A1 (en) Method of using channels in different ways
DE59404355D1 (en) LOCALLY STABLE RAILWAY CONSTRUCTION
BR0202790A (en) Aid basket and tie rod
ATA10372002A (en) DEVICE FOR MEASURING THE REDUCTION OR BZW. SETTING THE RAILING CONSTRUCTION OF RAILWAY RAILS
ATE251255T1 (en) METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL VEHICLES
Wagner et al. Slab track test section for university of pretoria railway research facility
ATE278937T1 (en) WEIGHING DEVICE FOR RAILWAY VEHICLES
ATE248254T1 (en) DEVICE FOR SUPPORTING RAILS IN THE AREA OF A BUILDING JOINT
US699015A (en) Railroad-tie.
ATE227380T1 (en) METHOD FOR JOINING RAILS AND SLEEPERS AND TRACKS FOR RAIL-BOND VEHICLES
Pointner Requirements on rails caused by stresses in the wheel-rail-system
BG105181A (en) Reinforced concrete sleepers with neoprene shoes for rail fastening of non-stressed type
SE0103223L (en) Ways to change concrete slippers

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
8364 No opposition during term of opposition
8327 Change in the person/name/address of the patent owner

Owner name: DB GLEISBAU GMBH, 47279 DUISBURG, DE

8327 Change in the person/name/address of the patent owner

Owner name: DB BAHNBAU GRUPPE GMBH, 10179 BERLIN, DE

R081 Change of applicant/patentee

Owner name: DB BAHNBAU GRUPPE GMBH, DE

Free format text: FORMER OWNER: DB GLEISBAU GMBH, 47279 DUISBURG, DE

Effective date: 20110330

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee