DE102014015303A1 - Multiple use of railway lines together with magnetic levitation railway and HVDC power lines - Google Patents
Multiple use of railway lines together with magnetic levitation railway and HVDC power lines Download PDFInfo
- Publication number
- DE102014015303A1 DE102014015303A1 DE201410015303 DE102014015303A DE102014015303A1 DE 102014015303 A1 DE102014015303 A1 DE 102014015303A1 DE 201410015303 DE201410015303 DE 201410015303 DE 102014015303 A DE102014015303 A DE 102014015303A DE 102014015303 A1 DE102014015303 A1 DE 102014015303A1
- Authority
- DE
- Germany
- Prior art keywords
- wheel
- use according
- common use
- rail system
- maglev train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/30—Tracks for magnetic suspension or levitation vehicles
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Current-Collector Devices For Electrically Propelled Vehicles (AREA)
Abstract
Der überwiegende Anteil des Gütertransports erfolgt mit Lastwagen. Eine Zunahme wird erwartet. Die vorhandenen Verkehrswege sind überlastet, was zu Stauungen und wirtschaftlichen Verlusten führt. Außerdem entsteht dadurch ein vermehrter Verschleiß bei den Fahrbahnen und Brücken. Daraus resultierende Baustellen verstärken die Staus und wirtschaftlichen Verluste. Deshalb wird gefordert, wesentlich mehr Güterverkehr auf die Schiene zu verlagern. Um einen schnellfahrenden Zug vorbeizulassen, muss ein langsamer auf ein Ausweichgleis fahren und dort anhalten. Abhilfe könnten weitere Gleise schaffen, wodurch die Trassen aber breiter werden. Dagegen gibt es Widerstände aus der Bevölkerung. Bei schnellen Zügen verschleißen Gleise und Bahnkörper schneller und müssen häufiger repariert werden. Das führt zu Baustellen und der gewünschte schnelle Transport wird wieder langsamer. Ein System, das diese Nachteile nicht hat, ist die hier entwickelte Magnetschwebebahn. Bei oberirdischen Stromtrassen ist es ähnlich: Widerstände aus der Bevölkerung, die derartige Bauwerke aus verschiedenen Gründen nicht haben wollen. Einsprüche und Klagen führen zu langen Verzögerungen. Auch hier müssen neue Techniken und Transportwege zur Anwendung kommen. Ziel der Erfindung ist, die beschriebenen Behinderungen wesentlich zu verbessern. Beim Rad-Schiene-System wird eine Aufständerung der Magnetschwebebahn über bestehende Gleise vorgeschlagen. Für neue Stromtrassen sowie für die gesonderten Netze der Bahn werden Vorschläge gemacht, diese als HGÜ an den Rändern der Magnetschwebebahn-Trassen unterzubringen.The bulk of freight transport is by truck. An increase is expected. The existing traffic routes are overloaded, which leads to congestion and economic losses. In addition, this results in an increased wear on the roads and bridges. The resulting construction sites increase congestion and economic losses. Therefore, it is demanded to shift considerably more goods traffic to the railways. To pass a fast-moving train, one has to slow down to an evasion track and stop there. Remedy could create more tracks, but the routes are wider. On the other hand, there are resistance from the population. On fast trains, track and track wear faster and need to be repaired more frequently. This leads to construction sites and the desired fast transport is slower again. A system that does not have these disadvantages is the maglev train developed here. For above-ground power lines, it is similar: Resistance from the population who do not want such buildings for various reasons. Appeals and complaints lead to long delays. Again, new techniques and transport routes must be used. The aim of the invention is to significantly improve the described disabilities. In the wheel-rail system, an elevation of the maglev train over existing tracks is proposed. Proposals are being made for new power lines as well as for the separate rail networks to accommodate these as HVDC at the edges of the maglev train tracks.
Description
Stand der TechnikState of the art
Bisher gibt es in Deutschland und überwiegend auch in anderen Ländern, für den Transport von Menschen und Gütern nur das Rad-Schiene-System. Getrennt und völlig unabhängig von den Bahntrassen wurden für den Transport großer Mengen elektrischer Energie oberirdische Leitungsnetze auf der Basis der Wechselstrom-Technik installiert. Diese Netze unterteilen sich in Höchstspannungsnetze (380 und 220 kV), Hochspannungsnetze (110 kV) und Mittelspannungsnetze (1 bis 50 kV).So far, there is only the wheel-rail system for transporting people and goods in Germany and predominantly in other countries. Separate and completely independent of the railway lines, above ground electrical networks based on AC technology were installed for the transport of large quantities of electrical energy. These grids are subdivided into high voltage grids (380 and 220 kV), high voltage grids (110 kV) and medium voltage grids (1 to 50 kV).
Der überwiegende Anteil des Güter-Ferntransports erfolgt mit Lastwagen auf den Autobahnen und Bundesstraßen. Eine Zunahme wird erwartet. Aber bereits heute schon sind die vorhandenen Verkehrswege überlastet, was zu Stauungen und wirtschaftlichen Verlusten führt. Außerdem führt der dichte Verkehr, insbesondere aber die hohen Radlasten der Lastwagen, zu einem vermehrten Verschleiß von Fahrbahnen und Brücken. Daraus resultierende Baustellen verstärken wiederum die Staus und wirtschaftlichen Verluste. Deshalb wird angestrebt, den Gütertransport wesentlich mehr auf die Schiene zu verlagern und dadurch Autobahnen und Bundesstraßen nachhaltig zu entlasten.The overwhelming proportion of freight transport takes place by truck on the motorways and federal highways. An increase is expected. But already today the existing traffic routes are overloaded, which leads to congestion and economic losses. In addition, the dense traffic, but especially the high wheel loads of the trucks, leads to increased wear of roadways and bridges. The resulting construction sites, in turn, increase congestion and economic losses. Therefore, the aim is to shift freight transport much more to rail and thereby relieve the strain on motorways and federal highways.
Bei dem an Schienen gebundenen Verkehr ist das nun aber leichter gesagt als getan, denn auf der Schiene kann nicht, wie auf der Straße, einfach überholt, sondern es muss auf einem parallelen Ausweichgleis ein schnellfahrender Zug vorbeigelassen werden. Der langsamere Zug, z. B. ein regionaler Personenzug oder ein Güterzug, muss dazu auf das Ausweichgleis fahren und dort anhalten. Das ist auch der Grund dafür, dass bisher nicht mehr erreicht wurde und auch so in der Zukunft nicht erreicht werden kann, es sei denn, es werden für die schnellen Züge neue, gesonderte Gleise verlegt. Dafür ist aber häufig der Platz nicht vorhanden und gegen einen Zukauf zur Verbreiterung der Bahntrassen gibt es Widerstände aus der Bevölkerung. Jetzt kommt die nächste Hürde: Gleise und Bahnkörper für schnelle Züge wie auch die Wagen selbst, verschleißen schneller und müssen darum sehr viel häufiger repariert oder erneuert werden. Das erfordert Baustellen und der gewünschte schnelle Transport wird im Durchschnitt wieder langsamer. So zeichnet sich auch hierbei eine natürliche Grenze für das Ausgangsziel, mehr Güterverkehr auf die Bahn zu verlagern, ab, wenn beim schnellen Personentransport das schienengebundene System beibehalten werden soll. Deshalb muss ein neues System her, dass diese Nachteile nicht hat und das ist die in Deutschland entwickelte und in China erfolgreich erprobte Magnetschwebebahn.However, this is easier said than done with the rail-bound traffic, because on the rail can not, as on the road, simply overhauled, but it must be on a parallel siding a fast-moving train pass. The slower train, z. For example, a regional passenger train or freight train has to drive to the siding and stop there. This is also the reason that has not been achieved so far and can not be achieved in the future, unless it be relocated for the fast trains new, separate tracks. However, the space is often not available and against an acquisition to broaden the railway lines there are resistance from the population. Now comes the next hurdle: tracks and tracks for fast trains as well as the cars themselves, wear out faster and therefore have to be repaired or renewed much more frequently. This requires construction sites and the desired fast transport is on average slower again. Thus, a natural limit to the initial objective of relocating more goods traffic to the railways is apparent here, if the rail-bound system is to be retained in the fast passenger transport. Therefore, a new system has to be produced that does not have these disadvantages and that is the magnetic levitation train developed in Germany and successfully tested in China.
Mit diesem System kann ein Sprung nach oben zu mehr Gütertransport auf dem langsameren, aber hierfür bewährten Schienensystem, erreicht werden. Schnelle Gütertransporte, die für besondere Waren höhere Transportpreise rechtfertigen, lassen sich schnelles Magnetschwebe-Transportsystem auch der Kurzstrecken-Luftverkehr verringert und gewünscht entlastet. Denkbar ist auch eine Weiterentwicklung der Magnetschwebebahn zu einem System mit automatischer Führung und Überwachung ohne Lokführer an Bord.This system can be used to jump up to more freight transport on the slower but proven rail system. Fast goods transport, which justify higher transport prices for special goods, fast magnetic levitation transport system also reduce the short-range air traffic and relieved desired. Also conceivable is a further development of the maglev train to a system with automatic guidance and monitoring without train driver on board.
Für die oberirdischen Stromtrassen ergibt sich im dicht besiedelten Deutschland das gleiche Problem wie für die Magnetschwebebahn: Widerstände aus der Bevölkerung, die aus verschiedenen Gründen derartige Bauwerke nicht in ihrer Nähe haben wollen. Bürgerinitiativen, Einsprüche und Klagen führen zu langen Verzögerungen und teuren Kompromissen. Auch hier müssen neue Techniken und Transportwege zur Anwendung kommen.For the above-ground power lines, the same problem arises in densely populated Germany as for the maglev train: resistors from the population who, for various reasons, do not want such structures in their vicinity. Citizens' initiatives, objections and complaints lead to long delays and costly compromises. Again, new techniques and transport routes must be used.
Aufgabenstellungtask
Die Aufgabe der Erfindung ist es, die bestehenden Gegebenheiten so zu ändern, dass zunächst einmal wesentlich mehr Güter von den Zügen transportiert werden können, wodurch der Straßenverkehr stau- und unfallärmer sowie billiger im Unterhalt wird. Des Weiteren können viele der vorhandenen und geplanten oberirdischen Höchst- und Hochspannungsnetze sowie die gesonderten Netze der Bahn rückgebaut werden oder entfallen.The object of the invention is to change the existing conditions so that, initially, significantly more goods can be transported by the trains, making the traffic congestion and accident and cheaper to maintain. Furthermore, many of the existing and planned above-ground high and high voltage grids as well as the separate rail networks can be dismantled or eliminated.
Ausführungsbeispieleembodiments
Die Lösung dieser Aufgabe erfolgt erfindungsgemäß durch die Mehrfachkombination des Anspruches 1.The solution of this object is achieved according to the invention by the multiple combination of claim. 1
In den Zeichnungen sind Ausführungsbeispiele vereinfacht dargestellt. Eine gewisse maßstäbliche Darstellung ist dadurch gegeben, indem beim Rad-Schiene-System die Gleisbreite auf die in Deutschland geltende Normalspur von 1435 mm festgelegt wurde. Es zeigen:In the drawings, embodiments are shown simplified. A certain scale representation is given by the track-width of the wheel-rail system was set to the applicable standard gauge of 1435 mm in Germany. Show it:
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201410015303 DE102014015303A1 (en) | 2014-10-15 | 2014-10-15 | Multiple use of railway lines together with magnetic levitation railway and HVDC power lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE201410015303 DE102014015303A1 (en) | 2014-10-15 | 2014-10-15 | Multiple use of railway lines together with magnetic levitation railway and HVDC power lines |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102014015303A1 true DE102014015303A1 (en) | 2015-04-02 |
Family
ID=52673254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE201410015303 Withdrawn DE102014015303A1 (en) | 2014-10-15 | 2014-10-15 | Multiple use of railway lines together with magnetic levitation railway and HVDC power lines |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102014015303A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115027507A (en) * | 2022-06-07 | 2022-09-09 | 中铁二院工程集团有限责任公司 | Railway line structure additionally arranged in existing railway land boundary and train running method |
-
2014
- 2014-10-15 DE DE201410015303 patent/DE102014015303A1/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115027507A (en) * | 2022-06-07 | 2022-09-09 | 中铁二院工程集团有限责任公司 | Railway line structure additionally arranged in existing railway land boundary and train running method |
CN115027507B (en) * | 2022-06-07 | 2024-05-28 | 中铁二院工程集团有限责任公司 | Railway line structure additionally arranged in boundary of existing railway land and train running method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69932847T2 (en) | MONORAIL SYSTEM | |
DE60201341T2 (en) | HOCHBAHN | |
WO2002094589A2 (en) | Multipurpose vehicle for various types of travel ways | |
EP0156304A2 (en) | Apparatus for the inspection of the underside of bridges | |
EP2479079B1 (en) | Municipal cableway | |
DE19629126A1 (en) | Device for the power supply of an electric locomotive | |
DE102010014596A1 (en) | Vehicle for carrying out construction work in the railway track area | |
EP2000384B1 (en) | Service area for a rail vehicle | |
EP1670671B1 (en) | Fully automatic traffic system | |
DE102014015303A1 (en) | Multiple use of railway lines together with magnetic levitation railway and HVDC power lines | |
EP1619324A1 (en) | Barrier for construction sites | |
DE102007011709A1 (en) | Arrangement for supplying electricity to trace-bound vehicle, has bus bar, which runs in upper open channel along drive of vehicle | |
DE102018110907A1 (en) | Suspended transport system | |
DE102020000076B3 (en) | Section for the operation of electrically powered rail vehicles | |
DE102017121603A1 (en) | Conveying and transport system for tunnel structures | |
EP3178717A1 (en) | Rail vehicle, preferably for use in automated container sorting plants with centrally arranged interim storage areas | |
DE102017012072A1 (en) | Method, device, apparatus and method for prefabrication, attachment, construction and the like Installation, commissioning and maintenance of the underground extra-high voltage cables (extra-high voltage underground cable) for electrical energy Transmission networks over long distances to the countryside | |
DE102005032230A1 (en) | Railway system for use on railway tracks of different widths, has conical or tapered annular step formed around rim of each twin-track wheel | |
DE202013102525U1 (en) | Wheel-rail system | |
DE2810964A1 (en) | Dual purpose elevated hollow profile rail system - has self-propelled wagons coupled to motor chassis for different level release | |
DE602004003094T2 (en) | Track construction for a tracked by a linear motor traffic system for magnetic levitation vehicles | |
DE19723768C2 (en) | Means of transport for people and materials in underground mining and tunneling | |
RU2633092C1 (en) | Suspended way with carriage-lift | |
DE202005010846U1 (en) | Railway system for transporting passengers or other cargo, uses twin track wheels, each having half of track width difference wider than track width of certain track rail | |
EP3535455A1 (en) | Rail vehicle having crane rails for a gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R230 | Request for early publication | ||
R021 | Search request validly filed |
Effective date: 20150427 |
|
R163 | Identified publications notified | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |