DE102013105412A1 - Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device - Google Patents

Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device Download PDF

Info

Publication number
DE102013105412A1
DE102013105412A1 DE102013105412.9A DE102013105412A DE102013105412A1 DE 102013105412 A1 DE102013105412 A1 DE 102013105412A1 DE 102013105412 A DE102013105412 A DE 102013105412A DE 102013105412 A1 DE102013105412 A1 DE 102013105412A1
Authority
DE
Germany
Prior art keywords
line section
fluid
circuit
arrangement
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102013105412.9A
Other languages
German (de)
Inventor
Stefan Marfilius
Michael Möllgaard
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Endress and Hauser Process Solutions AG
Original Assignee
Endress and Hauser Process Solutions AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Endress and Hauser Process Solutions AG filed Critical Endress and Hauser Process Solutions AG
Priority to DE102013105412.9A priority Critical patent/DE102013105412A1/en
Priority to EP14719717.2A priority patent/EP3004815A1/en
Priority to PCT/EP2014/058108 priority patent/WO2014191137A1/en
Publication of DE102013105412A1 publication Critical patent/DE102013105412A1/en
Priority to ZA2015/08122A priority patent/ZA201508122B/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • G01F25/13Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters using a reference counter

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)

Abstract

Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgerätes (M1), umfassend einen offenen Fluidkreislauf (K1) und einen geschlossenen Fluidkreislauf (K2), wobei zumindest ein erster Leitungsabschnitt (L1) vorgesehen ist, in dem sich der offene und der geschlossene Fluidkreislauf (K1, K2) überlappen, wobei ein zweiter Leitungsabschnitt (L2) vorgesehen ist, der nur Teil des offenen Fluidkreislaufs (K1) ist und wobei ein dritter Leitungsabschnitt (L3) vorgesehen ist, der nur Teil des geschlossenen Fluidkreislaufs (K2) ist.Arrangement for adjusting, calibrating and / or validating a measuring device (M1), comprising an open fluid circuit (K1) and a closed fluid circuit (K2), at least one first line section (L1) being provided in which the open and the closed fluid circuit are located (K1, K2) overlap, a second line section (L2) being provided which is only part of the open fluid circuit (K1) and a third line section (L3) being provided which is only part of the closed fluid circuit (K2).

Description

Die Erfindung bezieht sich auf eine Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgerätes. Ferner bezieht sich die Erfindung auf ein Verfahren zum Justieren, Kalibrieren und/oder Validieren eines Messgerätes. Ferner Betrifft die Erfindung einen Bauteilesatz.The invention relates to an arrangement for adjusting, calibrating and / or validating a measuring device. Furthermore, the invention relates to a method for adjusting, calibrating and / or validating a measuring device. Furthermore, the invention relates to a component set.

Die Offenlegungsschrift EP 2339245 A2 zeigt eine Heiz- bzw. Kühleinrichtung mit einem ersten und einem zweiten Fluidkreislauf, wobei die beiden Fluidkreisläufe über eine erste und eine zweite Verbindungsleitung miteinander verbunden sind, wobei wenigstens eine der Verbindungsleitungen absperrbar ist, d.h. dass der Fluidstrom in beide Richtungen unterbrochen wird.The publication EP 2339245 A2 shows a heating or cooling device with a first and a second fluid circuit, wherein the two fluid circuits are connected to each other via a first and a second connecting line, wherein at least one of the connecting lines is shut off, that the fluid flow is interrupted in both directions.

Zudem ist es bekannt geworden, einen offenen Kreislauf, bei dem das Fluid aus einem Reservoir, wie bspw. einem Tank, in ein Leitungssystem geführt wird, zur Kalibrierung etc. eines in dem Leitungssystem vorhandenen Messgerätes, insbesondere eines Durchflussmessgerätes, zu verwenden.In addition, it has become known to use an open circuit in which the fluid is conducted from a reservoir, such as a tank, into a line system for calibrating, etc., a measuring device present in the line system, in particular a flowmeter.

Anstelle eines offenen Kreislaufes kann auch ein geschlossener Kreislauf verwendet werden, bei dem eine in dem Kreislauf vorhandene Fluidpumpe direkt mit dem über den Kreislauf zurückgeführten Fluid gespeist wird.Instead of an open circuit, it is also possible to use a closed circuit in which a fluid pump present in the circuit is fed directly with the fluid recirculated via the circuit.

Je nachdem, ob der Volumenstrom in einen Behälter fließt oder direkt der Saugleitung der Pumpe zugeführt wird, ist also zwischen offenem Kreislauf (Weg des Fluids: Volumenstrom- bzw. Druckquelle → Behälter → Volumenstrom- bzw. Druckquelle) und geschlossenem Kreislauf (Weg des Fluids: Volumenstromquelle → Volumenstromquelle) zu unterscheiden. Geschlossene Kreisläufe können nur mit Volumenstromquellen betrieben werden. Die Speicherwirkung des Behälters entfällt hier. Geschlossene Kreisläufe erfordern deshalb Anlagen mit wenigstens einer Fluidpumpe, bei welcher der zurückfließende Volumenstrom gleich dem zufließenden Volumenstrom ist.Depending on whether the volume flow flows into a container or directly to the suction line of the pump is supplied, so between open circuit (path of the fluid: volume flow or pressure source → container → volume flow or pressure source) and closed circuit (path of the fluid : Volumetric flow source → volumetric flow source). Closed circuits can only be operated with volume flow sources. The storage effect of the container is omitted here. Closed circuits therefore require systems with at least one fluid pump, in which the flowing back flow is equal to the inflowing flow.

Beim Austausch von zu kalibrierenden Geräten oder auch während der laufenden Kalibrierung können in derartigen Kreisläufen Fluidverluste auftreten, die die Genauigkeit der Kalibrierung beeinflussen können. Im geschlossenen Kreislauf, kann bspw. der Fall eintreten, dass eine Pumpe den Volumenstrom, aus einer Rückflussleitung fördern muss, der jedoch bspw. aufgrund einer Leckage nur einen verringerten Volumenstrom erhält. Eine ähnliche Fehlerquelle bildet in den Kreislauf gelangende Luft.When exchanging devices to be calibrated or even during the current calibration, fluid losses can occur in such circuits, which can affect the accuracy of the calibration. In the closed circuit, for example, the case may occur that a pump has to deliver the volume flow from a return line, which, however, receives only a reduced volume flow, for example due to leakage. A similar source of error is circulating air.

Zudem unterscheiden sich offener und geschlossener Fluidkreislauf in den aus dem Stand der Technik bekannten Ausführungen durch den Anwendungsbereich in dem sie eingesetzt werden. Sollen Messgeräte in einem bestimmten Volumenstrombereich kalibriert werden, müssen Ausgleichsbehälter und Pumpe entsprechend dimensioniert werden. Bei offenen Kreisläufen ist dabei nachteilig, dass das Fluid immer wieder neu beschleunigt werden muss und eine entsprechend leistungsfähige Pumpe erforderlich ist. Geschlossene Kreisläufe wiederum weisen den oben angesprochenen Nachteil einer ungenügenden Leckagekompensation auf.In addition, open and closed fluid circuits differ in the designs known from the prior art from the field of application in which they are used. If measuring instruments are to be calibrated within a certain volumetric flow range, the expansion tank and the pump must be dimensioned accordingly. In open circuits is disadvantageous in that the fluid must be re-accelerated again and again and a correspondingly powerful pump is required. Closed circuits in turn have the above-mentioned disadvantage of insufficient leakage compensation.

Der Erfindung liegt somit die Aufgabe zugrunde, die genannten Nachteile zu überwinden und insbesondere eine Kalibrierung eines Messgerätes bzw. unterschiedlicher Messgeräte in einem großen Volumenstrombereich zu ermöglichen.The invention is therefore based on the object to overcome the disadvantages mentioned and in particular to enable a calibration of a measuring device or different measuring devices in a large volume flow range.

Die Aufgabe wird durch eine Anordnung, einen Bauteilesatz und ein Verfahren gelöst.The object is achieved by an arrangement, a component set and a method.

Hinsichtlich der Anordnung wird die Aufgabe durch eine Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgerätes, umfassend einen offenen Fluidkreislauf und einen geschlossenen Fluidkreislauf gelöst, wobei zumindest ein erster Leitungsabschnitt vorgesehen ist, in dem sich der offene und der geschlossene Fluidkreislauf überlappen, wobei ein zweiter Leitungsabschnitt vorgesehen ist, der nur Teil des offenen Fluidkreislaufs ist und wobei ein dritter Leitungsabschnitt vorgesehen ist, der nur Teil des geschlossenen Fluidkreislaufs ist.With regard to the arrangement, the object is achieved by an arrangement for adjusting, calibrating and / or validating a measuring device comprising an open fluid circuit and a closed fluid circuit, wherein at least a first line section is provided, in which the open and the closed fluid circuit overlap a second line section is provided which is only part of the open fluid circuit and wherein a third line section is provided, which is only part of the closed fluid circuit.

Wird ein höherer Volumenstrom, Massestrom oder allgemein Fluidmenge zur Kalibrierung benötigt, als er durch den Behälter und die Pumpe des offenen Kreislaufs befördert werden kann, oder liegt die dafür benötigte Fluidmenge über einem vorgegebenen Schwellwert, so kann zusätzlich zum offenen Kreislauf der geschlossene Kreislauf genutzt werden, um den gewünschten Volumenstrom, Massestrom bzw. allgemein Fluidstrom in dem ersten Leitungsabschnitt zu befördern.If a higher volume flow, mass flow or generally fluid quantity is needed for calibration, as it can be transported through the container and the pump of the open circuit, or if the amount of fluid required for this is above a predetermined threshold, then in addition to the open circuit of the closed circuit can be used to convey the desired volumetric flow, mass flow or generally fluid flow in the first conduit section.

Der Fluidstrom im ersten Leitungsabschnitt kann also einerseits Teil eines offenen Kreislaufs oder Teil eines geschlossenen Kreislaufs sein und andererseits Teil eines aus offenen und geschlossenem Kreislaufs zusammengesetzten Kreislaufs. Dies kann bspw. von dem jeweiligen Betriebsmodus abhängig sein in dem die Anordnung (Kalibrieranlage) betrieben wird. Bspw. kann bei einem vergleichsweise nur geringen erforderlichen Volumenfluss zur Kalibrierung eines Messgerätes der von dem offenen Kreislauf bereitgestellte Fluidstrom ausreichen. Sollen jedoch Messgeräte in einem großen Fluidstrombereich, wie bspw. einem großen Volumen- oder Massenstrombereich, der über denjenigen der von dem offenen Kreislauf bereit gestellt werden kann hinausgeht, oder ein Messgerät in einem vergleichsweise hohen Fluidstrombereich kalibriert werden, so kann der geschlossene Kreislauf mit hinzugeschaltet.The fluid flow in the first line section can therefore be part of an open circuit or part of a closed circuit on the one hand and part of a circuit composed of open and closed circuits on the other. This may, for example, be dependent on the respective operating mode in which the arrangement (calibration system) is operated. For example. For a comparatively small volume flow required for calibrating a measuring device, the fluid flow provided by the open circuit can be sufficient. However, if gauges are to be used in a large fluid flow range, such as a large volume or mass flow range, that can exceed that provided by the open circuit, or a meter in one Calibrated comparatively high fluid flow range, so the closed circuit can be connected with.

Einerseits kann also der geschlossene Kreislauf als Hilfskreislauf für den offenen Kreislauf bei großen Volumenströmen dienen, während andererseits der offene Kreislauf als Hilfskreislauf für den geschlossenen Kreislauf zur Leckagekompensation dienen kann.On the one hand, therefore, the closed circuit can serve as an auxiliary circuit for the open circuit at high flow rates, while on the other hand, the open circuit can serve as an auxiliary circuit for the closed circuit for leakage compensation.

Der erste, der zweite und der dritte Leitungsabschnitt sind dabei so miteinander verbunden, dass sich die von dem offenen und dem geschlossenen Kreislauf geförderten Fluidströme im ersten Leitungsabschnitt überlagern.The first, the second and the third line section are connected to one another in such a way that the fluid flows conveyed by the open and closed circuits overlap in the first line section.

In einer Ausführungsform der Anordnung umfasst der offene Fluidkreislauf ein Fluidreservoir. Das Fluidreservoir in dem offenen Fluidkreislauf kann zudem auch als Luftabscheider dienen. Das Fluidreservoir kann bspw. aus einem Behälter bestehen, der zur Aufnahme des Fluids dient. Das Fluidreservoir kann insbesondere zum Druckausgleich mit der Umgebung und/oder als Kühlung dienen, um das unter Umständen (durch das Durchlaufen des Kreislaufs) erhitzte Fluid zu kühlen.In one embodiment of the arrangement, the open fluid circuit comprises a fluid reservoir. The fluid reservoir in the open fluid circuit can also serve as an air separator. The fluid reservoir can, for example, consist of a container which serves to receive the fluid. In particular, the fluid reservoir can be used for pressure equalization with the environment and / or as cooling, in order to cool the fluid, which may have been heated (by passing through the circuit).

Der Behälter des offenen Kreislaufs dient dann dazu, beim geschlossenen Kreislauf auftretende Schwankungen oder Leckverluste auszugleichen und kann deshalb wesentlich kleiner ausgelegt werden als wenn nur ein offener Kreislauf (alleine) genutzt wird. Der Behälter des offenen Kreislaufs ist dabei so dimensioniert, dass er einen Fluidstrom in einem ersten Fluidstrombereich vorhalten kann.The container of the open circuit is then used to compensate for the closed circuit fluctuations or leakage and therefore can be designed much smaller than if only one open circuit (alone) is used. The container of the open circuit is dimensioned so that it can maintain a fluid flow in a first fluid flow range.

In einer weiteren Ausführungsform der Anordnung ist zumindest ein Ventil vorgesehen, um den Durchfluss durch den dritten Leitungsabschnitt zu unterbinden bzw. nur in einer Fluidstromrichtung. Das Ventil kann dabei so geschaltet werden, dass es den Durchfluss durch den dritten Leitungsabschnitt, der Teil des geschlossenen Kreislaufs, ist öffnet oder schließt bzw. in Durchlassrichtung zwischen der Pumpe im dritten Leitungsabschnitt und dem Messgerät geschaltet ist.In a further embodiment of the arrangement, at least one valve is provided to prevent the flow through the third line section or only in a fluid flow direction. The valve can be switched so that it is the flow through the third line section, the part of the closed circuit, opens or closes or is connected in the forward direction between the pump in the third line section and the meter.

In einer weiteren Ausführungsform der Anordnung sind der zweite und der dritte Abschnitt parallel zueinander angeordnet. Parallel bedeutet dabei, dass das ggfs. durch den zweiten und dritten Leitungsabschnitt beförderte Fluid an einer Verzweigung in einen ersten und einen zweiten Teilstrom getrennt wird und der erste Teilstrom durch den zweiten Leitungsabschnitt geführt wird, während der zweite Teilstrom durch den dritten Leitungsabschnitt geführt wird, und dass die beiden Teilströme nach Durchlaufen des zweiten bzw. des dritten Leitungsabschnitts wieder zusammengeführt werden, um durch den ersten Leitungsabschnitt befördert zu werden.In a further embodiment of the arrangement, the second and third sections are arranged parallel to one another. Parallel here means that the fluid possibly conveyed through the second and third line sections is separated at a branch into a first and a second partial stream and the first partial stream is led through the second line section, while the second partial stream is led through the third line section, and that the two sub-streams are merged again after passing through the second and the third line section to be transported through the first line section.

In einer weiteren Ausführungsform der Anordnung ist zumindest ein Ventil, vorzugsweise ein Druckhalteventil, vorgesehen, das zum Aufrechterhalten eines Betriebsdrucks in dem gesamten Fluidkreislauf dient. Das Druckhalteventil ist dabei bevorzugt im zweiten Leitungsabschnitt vorgesehen, insbesondere (in Flussrichtung) vor dem Fluidreservoir angeordnet.In a further embodiment of the arrangement, at least one valve, preferably a pressure-maintaining valve, is provided which serves to maintain an operating pressure in the entire fluid circuit. The pressure-maintaining valve is preferably provided in the second line section, in particular (in the flow direction) arranged in front of the fluid reservoir.

In einer weiteren Ausführungsform der Anordnung dient das Fluidreservoir wie gesagt als Luftabscheider.In a further embodiment of the arrangement, the fluid reservoir serves as said air separator.

In einer weiteren Ausführungsform der Anordnung sind das Fluidreservoir und zumindest eine Pumpeinrichtung in dem zweiten Leitungsabschnitt vorgesehen.In a further embodiment of the arrangement, the fluid reservoir and at least one pumping device are provided in the second line section.

In einer weiteren Ausführungsform der Anordnung ist zumindest eine weitere Pumpeinrichtung in dem dritten Leitungsabschnitt vorgesehen.In a further embodiment of the arrangement, at least one further pumping device is provided in the third line section.

Die Pumpeinrichtung in dem zweiten Leitungsabschnitt und die wenigstens eine weitere Pumpeinrichtung in dem dritten Leitungsabschnitt sind dabei so dimensioniert, dass die Pumpeinrichtung in dem zweiten Leitungsabschnitt eine kleinere Pumpleistung, bspw. in [Pam3/h], aufweist, als die weitere Pumpeinrichtung in dem dritten Leitungsabschnitt.The pumping device in the second line section and the at least one further pumping device in the third line section are dimensioned such that the pumping device in the second line section has a smaller pumping capacity, for example in [Pam 3 / h], than the further pumping device in the third line section.

In einer weiteren Ausführungsform der Anordnung ist das Messgerät in dem ersten Leitungsabschnitt anordenbar. Bei dem Messgerät kann es sich bspw. um ein Durchflussmessgerät zur Bestimmung des Masse- und/oder Volumendurchflusses handeln. Das Messgerät kann dabei in den ersten Leitungsabschnitt bspw. über entsprechende Flansche einspannbar sein. Ferner kann in dem ersten Leitungsabschnitt eine Verzweigung vorgesehen sein, um den Fluidstrom durch Teilabschnitte in dem jeweils ein Messgerät angeordnet ist, zu leiten. Die Leitungsabschnitte können dabei durch Ventile in den ersten Leitungsabschnitt zu oder abgeschaltet werden.In a further embodiment of the arrangement, the measuring device can be arranged in the first line section. The measuring device may, for example, be a flowmeter for determining the mass and / or volume flow. The measuring device can be clamped in the first line section, for example, via corresponding flanges. Furthermore, a branch can be provided in the first line section in order to direct the fluid flow through subsections in which a respective measuring device is arranged. The line sections can be switched on or off by valves in the first line section.

In einer weiteren Ausführungsform der Anordnung ist zumindest ein Referenzgerät in dem ersten Leitungsabschnitt angeordnet. Bei dem Referenzgerät kann es sich um ein Messgerät handeln, dessen Messsignale bzw. daraus abgeleitete Messwerte als Referenz für das Messsignal bzw. daraus abgeleitete Messwerte des zu kalibrierenden, zu validierenden bzw. zu justierenden Messgeräts verwendet werden.In a further embodiment of the arrangement, at least one reference device is arranged in the first line section. The reference device may be a measuring device whose measuring signals or measured values derived therefrom are used as a reference for the measuring signal or measured values derived therefrom of the measuring device to be calibrated, to be validated or to be calibrated.

In einer weiteren Ausführungsform der Anordnung sind mehrere Referenzgeräte parallel zueinander in dem ersten Leitungsabschnitt angeordnet. Bei den Referenzgeräten kann es sich um Messgeräte wie bspw. Durchflussmessgeräte handeln, die für verschiedene Fluidstrommengen ausgelegt sind und anhand deren Messsignals bzw. daraus abgeleiteter Messwerte das zu kalibrierende Messgerät kalibriert wird.In a further embodiment of the arrangement, a plurality of reference devices are arranged parallel to one another in the first line section. The reference devices may be measuring devices, such as flowmeters, which are designed for different fluid flow rates and the measuring instrument to be calibrated is calibrated on the basis of its measuring signal or measured values derived therefrom.

Besonders bevorzugt besteht die Anordnung aus dem offenen Kreislauf und dem geschlossenen Kreislauf. Es somit keine weiteren Hilfskreise vorgesehen oder ein weiteres Fluidreservoir vorgesehen.Particularly preferably, the arrangement consists of the open circuit and the closed circuit. It thus provided no additional auxiliary circuits or provided a further fluid reservoir.

Hinsichtlich des Bauteilesatzes wird die Aufgabe durch einen Bauteilesatz zur Herstellung oder Errichtung einer Anordnung nach einem der vorherigen Ausführungsformen gelöst. Der Bauteilsatz kann also Gerätschaften wie Rohrleitungen, Rohrleitungsverzweigungen, Ventile, Messgeräte, insbesondere Referenzmessgeräte, und eine entsprechende Steuereinheit zum Betreiben der Anordnung, vorzugsweise zu dem Zweck der Errichtung bzw. Herstellung eines offenen und eines geschlossenen Kreislaufs, umfassen.With regard to the component set, the object is achieved by a component set for producing or constructing an arrangement according to one of the preceding embodiments. The component set may therefore include equipment such as pipelines, piping branches, valves, measuring devices, in particular reference measuring devices, and a corresponding control unit for operating the arrangement, preferably for the purpose of establishing an open and a closed circuit.

Hinsichtlich des Verfahrens wir die Aufgabe durch ein Verfahren zum Betreiben einer Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgeräts gelöst, wobei ein erster Leitungsabschnitt vorgesehen ist, und wobei Fluid aus einem offenen Fluidkreislauf in den Leitungsabschnitt eingeführt wird, und wobei zumindest zeitweise gleichzeitig Fluid aus einem geschlossenen Fluidkreislauf in den ersten Leistungsabschnitt eingeführt werden kann.With regard to the method, the object is achieved by a method for operating a device for adjusting, calibrating and / or validating a measuring device, wherein a first line section is provided, and wherein fluid from an open fluid circuit is introduced into the line section, and wherein at least temporarily simultaneously Fluid from a closed fluid circuit in the first power section can be introduced.

Vorzugsweise kann dabei der offene Fluidkreislauf getrennt von dem geschlossenen Fluidkreislauf betrieben werden. Es ist somit ein Vorteil der vorliegenden Erfindung, dass für vergleichsweise geringe Durchflussmengen in einem ersten Betriebsmodus nur der offene Kreislauf betrieben werden kann, während für größere Durchflussmengen in einem zweiten Betriebsmodus der geschlossene Kreislauf hinzugeschaltet werden kann.Preferably, the open fluid circuit can be operated separately from the closed fluid circuit. It is thus an advantage of the present invention that for relatively low flow rates in a first mode of operation, only the open circuit can be operated while for larger flow rates in a second mode of operation the closed loop can be added.

Ferner kann dazu ein Steuerprogramm zur Steuerung der Geräte in der Anordnung genutzt werden, das das vorgeschlagene Verfahren ausführt. Dafür können Programmcodemittel, in einer Programmiersprache oder einer maschinenlesbaren Sprache, auf einer Speichereinheit gespeichert sein.Furthermore, a control program for controlling the devices in the arrangement can be used, which carries out the proposed method. For this purpose, program code means, in a programming language or a machine-readable language, can be stored on a memory unit.

Es ist somit von besonderem Vorteil, dass durch die Kombination der beiden Kreisläufe aufgrund der Unterstützung des geschlossenen Kreislaufs durch die Pumpe des offenen Kreislaufs eine geringere Pumpleistung der Pumpe in dem geschlossenen Kreislauf erforderlich ist, um die gewünschte Fluidmenge zu befördern. Durch die vorgeschlagene Anordnung bzw. das vorgeschlagene Verfahren kann insbesondere eine großer Regelbereich bzw. Massendurchflussbereich durch den Kreislauf von 0.05 bis 100 m3/h erreicht werden.It is thus of particular advantage that due to the combination of the two circuits due to the closed-loop support provided by the open-circuit pump, a lower pumping capacity of the pump in the closed loop is required to deliver the desired amount of fluid. The proposed arrangement or the proposed method, in particular, a large control range or mass flow range can be achieved by the circulation of 0.05 to 100 m 3 / h.

Die Erfindung wird anhand der nachfolgenden Zeichnung näher erläutert. Es zeigt:The invention will be explained in more detail with reference to the following drawing. It shows:

1: eine schematische Darstellung einer Ausführungsform der vorgeschlagenen Anordnung. 1 : a schematic representation of an embodiment of the proposed arrangement.

1 zeigt eine Anordnung zur Kalibrierung eines Durchflussmessgerätes. Das Messgerät M1 ist dabei ebenso wie ein Referenzgerät R1 (zur Kalibrierung des Messgerätes) in einem ersten Leitungsabschnitt L1 der Anordnung angeordnet. Anstelle eines Durchflussmessgerätes ist es auch möglich ein Messgerät zur Bestimmung einer anderen physikalischen Messgröße, insbesondere einer von der Durchflussgeschwindigkeit abhängigen Messgröße, zu kalibrieren, justieren oder validieren. 1 shows an arrangement for calibrating a flowmeter. The measuring device M1 is, like a reference device R1 (for calibrating the measuring device), arranged in a first line section L1 of the arrangement. Instead of a flow measuring device, it is also possible to calibrate, adjust or validate a measuring device for determining another physical measured quantity, in particular a measured variable dependent on the flow rate.

Zusätzlich zu diesem ersten Leitungsabschnitt L1 sind ein zweiter und ein dritter Leitungsabschnitt L2, L3 vorgesehen. Der erste und der zweite Leitungsabschnitt L1, L2 bilden dabei einen offen Kreislauf K1, während der erste und der dritte Leitungsabschnitt L1, L3 einen geschlossenen Kreislauf K2 bilden. Da sowohl der zweite Leitungsabschnitt L2 und der dritte Leitungsabschnitt L3 mit dem ersten Leitungsabschnitt L1 verbunden sind, überlappen sich der offene und der geschlossen Kreislauf K1, K2 im ersten Leitungsabschnitt L1. Der Gesamtkreislauf bzw. die Teilkreisläufe K1, K2 kann ein Wasserkreislauf sein. Es ist jedoch auch die Verwendung von anderen Fluiden möglich.In addition to this first line section L1, a second and a third line section L2, L3 are provided. The first and second line sections L1, L2 form an open circuit K1, while the first and third line sections L1, L3 form a closed circuit K2. Since both the second line section L2 and the third line section L3 are connected to the first line section L1, the open and closed circuits K1, K2 in the first line section L1 overlap. The total cycle or the partial cycles K1, K2 can be a water cycle. However, it is also possible to use other fluids.

In dem zweiten Leitungsabschnitt L2 ist dabei nacheinander in Strömungsrichtung des Fluids ein Druckhalteventil V1, ein Behälter B1 zum Vorhalten des Fluids, in diesem Fall ein zur Umgebung offener Wassertank, eine erste Pumpe P1 und ein Ein-Wege-Ventil V2 angeordnet.In the second line section L2 is successively in the flow direction of the fluid, a pressure holding valve V1, a container B1 for holding the fluid, in this case an open to the environment water tank, a first pump P1 and a one-way valve V2 arranged.

Die Entlüftung des (Gesamt-)Kreislaufts kann dabei über das Fluidreservoir B1 erfolgen.The venting of the (total) Kreislaufts can be done via the fluid reservoir B1.

Im dritten Leitungsabschnitt L3 sind in Strömungsrichtung eine zweite Pumpe P2 sowie ein zweites-Ein-Wege-Ventil V3 angeordnet.In the third line section L3, a second pump P2 and a second one-way valve V3 are arranged in the flow direction.

Anstelle nur einer Pumpe P1, P2 in dem zweiten bzw. dritten Leitungsabschnitt L2, L3 können mehrere Pumpen parallel zueinander angeordnet sein. Bspw können im zweiten Leitungsabschnitt L2 anstelle nur einer Pumpe P1 zwei Pumpen parallel zueinander angeordnet sein, um im Falle des gemeinsamen Betriebs eine erhöhte Fluidmenge durch den offenen Kreislauf K1 zu befördern.Instead of just one pump P1, P2 in the second and third line sections L2, L3, a plurality of pumps may be arranged parallel to one another. For example, in the second line section L2, instead of just one pump P1, two pumps may be arranged in parallel to convey an increased amount of fluid through the open circuit K1 in the case of joint operation.

Durch das Druckhalteventil V1 kann in dem Leitungssystem L1, L2, L3 ein Druck erreicht werden, der über dem der Umgebung liegt.By the pressure holding valve V1, a pressure can be achieved in the line system L1, L2, L3, which is higher than that of the environment.

Zudem kann ein Zufluss zu dem Fluidreservoir vorgesehen sein, um das Fluidreservoir mit Fluid zu füllen. In addition, an inflow to the fluid reservoir may be provided to fill the fluid reservoir with fluid.

Anstelle eines Referenzmessgerätes R1 können auch mehrere Referenzmessgeräte parallel zueinander angeordnet sein. Diese Referenzgeräte können bspw. für verschiedene Messbereiche, wie bspw. unterschiedlich große Durchflussmengen, ausgelegt sein und in Abhängigkeit der beförderten Fluidmenge zu- und abgeschaltet, d.h. bspw. über Ventile in den Fluidkreislauf integriert werden. Dabei können die Referenzmessgeräte separat oder gemeinsam in den Kreislauf im ersten Leitungsabschnitt L1 geschaltet werden.Instead of a reference measuring device R1, several reference measuring devices can also be arranged parallel to one another. These reference devices can be designed, for example, for different measuring ranges, such as, for example, different flow rates, and switched on and off depending on the quantity of fluid conveyed, i. For example, be integrated via valves in the fluid circuit. The reference measuring devices can be connected separately or together in the circuit in the first line section L1.

Zudem kann eine Steuereinheit, nicht gezeigt, vorgesehen sein, vermittels der die Messsignale oder daraus abgeleitete Messwerte eines oder mehrerer der Referenzmessgeräte R1 erfasst werden. Ferner kann die Steuereinheit dazu dienen, die Messsignale bzw. daraus abgeleitete Messwerte des Messgerätes M1 das zu kalibrieren ist, zu erfassen.In addition, a control unit, not shown, can be provided, by means of which the measurement signals or measured values derived therefrom of one or more of the reference measurement devices R1 are detected. Furthermore, the control unit can serve to detect the measurement signals or the measured values of the measuring device M1 derived therefrom that are to be calibrated.

Die Steuereinheit kann auch dazu dienen, die Ventile zum Auswählen eines oder mehrerer der Messgeräte M1, R1 zu schalten.The control unit can also serve to switch the valves for selecting one or more of the measuring devices M1, R1.

In dem ersten Leitungsabschnitt L1 können zudem Messvorrichtungen, nicht gezeigt, zur Bestimmung der Fluidtemperatur, des Drucks und des Füllstands des Fluid in dem ersten Leitungsabschnitt vorgesehen sein.Measuring devices, not shown, for determining the fluid temperature, the pressure and the level of the fluid in the first line section can also be provided in the first line section L1.

In dem Fluidbehälter B1 kann außerdem eine Vorrichtung zur Bestimmung des Füllstands vorgesehen sein.In addition, a device for determining the filling level can be provided in the fluid container B1.

Die Messgeräte zur Erfassung der verschiedenen Messgrößen können über ein Bussystem, insbesondere Profibus, miteinander bzw. der Steuereinheit verbunden sein.The measuring devices for detecting the different measured variables can be connected to one another or to the control unit via a bus system, in particular Profibus.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

  • L1L1
    Erster LeitungsabschnittFirst line section
    L2L2
    Zweiter LeitungsabschnittSecond line section
    L3L3
    Dritter LeitungsabschnittThird line section
    K1K1
    Offener KreislaufOpen circuit
    K2K2
    Geschlossener KreislaufClosed circle
    M1M1
    Messgerätgauge
    R1R1
    Referenzmessgerätreference instrument
    P1P1
    Erste PumpeFirst pump
    P2P2
    Zweite PumpeSecond pump
    V1V1
    DruckhalteventilPressure holding valve
    V2V2
    (Ein-Wege-)Ventil im offenen Kreislauf(One way) open circuit valve
    V3V3
    (Ein-Wege-)Ventil im geschlossenen Kreislauf(One-way) valve in closed circuit
    B1B1
    Fluidbehälterfluid container

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • EP 2339245 A2 [0002] EP 2339245 A2 [0002]

Claims (13)

Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgerätes (M1), umfassend einen offenen Fluidkreislauf (K1) und einen geschlossenen Fluidkreislauf (K2), wobei zumindest ein erster Leitungsabschnitt (L1) vorgesehen ist, in dem sich der offene und der geschlossene Fluidkreislauf (K1, K2) überlappen, wobei ein zweiter Leitungsabschnitt (L2) vorgesehen ist, der nur Teil des offenen Fluidkreislaufs (K1) ist und wobei ein dritter Leitungsabschnitt (L3) vorgesehen ist, der nur Teil des geschlossenen Fluidkreislaufs (K2) ist.Arrangement for adjusting, calibrating and / or validating a measuring device (M1), comprising an open fluid circuit (K1) and a closed fluid circuit (K2), wherein at least a first line section (L1) is provided, in which the open and the closed fluid circuit (K1, K2) overlap, wherein a second line section (L2) is provided, which is only part of the open fluid circuit (K1) and wherein a third line section (L3) is provided, which is only part of the closed fluid circuit (K2). Anordnung nach dem vorherigen Anspruch, wobei der offene Fluidkreislauf (K1) ein Fluidreservoir (B1) umfasst.Arrangement according to the preceding claim, wherein the open fluid circuit (K1) comprises a fluid reservoir (B1). Anordnung nach einem der vorherigen Ansprüche, wobei zumindest ein Ventil (V3) vorgesehen ist, um den Durchfluss durch den dritten Leitungsabschnitt (L3) zu unterbinden bzw. nur in einer Fluidstromrichtung zuzulassen.Arrangement according to one of the preceding claims, wherein at least one valve (V3) is provided to prevent the flow through the third line section (L3) or to allow only in a fluid flow direction. Anordnung nach einem der vorherigen Ansprüche, wobei der zweite und der dritte Abschnitt (L2, L3) parallel zueinander angeordnet sind.Arrangement according to one of the preceding claims, wherein the second and the third portion (L2, L3) are arranged parallel to each other. Anordnung nach einem der vorherigen Ansprüche, wobei zumindest ein Ventil (V1), vorzugsweise ein Druckhalteventil, vorgesehen ist, das zum Aufrechterhalten eines Betriebsdrucks in dem offenen Fluidkreislauf (K1) dient.Arrangement according to one of the preceding claims, wherein at least one valve (V1), preferably a pressure-holding valve, is provided which serves to maintain an operating pressure in the open fluid circuit (K1). Anordnung nach einem der vorherigen Ansprüche, wobei das Fluidreservoir (B1) als Luftabscheider dient.Arrangement according to one of the preceding claims, wherein the fluid reservoir (B1) serves as an air separator. Anordnung nach einem der vorherigen Ansprüche, wobei das Fluidreservoir (B1) und zumindest eine Pumpeinrichtung (P1) in dem zweiten Leitungsabschnitt (L2) angeordnet sind.Arrangement according to one of the preceding claims, wherein the fluid reservoir (B1) and at least one pumping device (P1) in the second line section (L2) are arranged. Anordnung nach einem der vorherigen Ansprüche, wobei zumindest eine weitere Pumpeinrichtung (P2) in dem dritten Leitungsabschnitt (L3) vorgesehen ist.Arrangement according to one of the preceding claims, wherein at least one further pumping device (P2) in the third line section (L3) is provided. Anordnung nach einem der vorherigen Ansprüche, wobei das Messgerät (M1) in dem ersten Leitungsabschnitt (L1) anordenbar ist.Arrangement according to one of the preceding claims, wherein the measuring device (M1) in the first line section (L1) can be arranged. Anordnung nach einem der vorherigen Ansprüche, wobei zumindest eine Referenzgerät (R1) in dem ersten Leitungsabschnitt (L1) angeordnet ist.Arrangement according to one of the preceding claims, wherein at least one reference device (R1) in the first line section (L1) is arranged. Anordnung nach einem der vorherigen Ansprüche, wobei mehrere Referenzgeräte parallel zueinander in dem ersten Leitungsabschnitt (L1) angeordnet sind.Arrangement according to one of the preceding claims, wherein a plurality of reference devices are arranged parallel to each other in the first line section (L1). Bauteilesatz zur Errichtung einer Anordnung nach einem der vorherigen Ansprüche.Component set for the construction of an arrangement according to one of the preceding claims. Verfahren zum Betreiben einer Anordnung zum Justieren, Kalibrieren und/oder Validieren eines Messgeräts (M1), wobei ein erster Leitungsabschnitt (L1) vorgesehen ist, und wobei Fluid aus einem offenen Fluidkreislauf (K1) in den ersten Leitungsabschnitt (L1) eingeführt wird, und wobei zumindest zeitweise gleichzeitig Fluid aus einem geschlossenen Fluidkreislauf (K2) in den ersten Leistungsabschnitt (L1) eingeführt werden kann.Method for operating an arrangement for adjusting, calibrating and / or validating a measuring device (M1), wherein a first line section (L1) is provided, and wherein fluid from an open fluid circuit (K1) is introduced into the first line section (L1), and wherein at least temporarily simultaneously fluid from a closed fluid circuit (K2) in the first power section (L1) can be introduced.
DE102013105412.9A 2013-05-27 2013-05-27 Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device Withdrawn DE102013105412A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE102013105412.9A DE102013105412A1 (en) 2013-05-27 2013-05-27 Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device
EP14719717.2A EP3004815A1 (en) 2013-05-27 2014-04-22 Assembly, component set, and method for adjusting, calibrating, and/or validating a measuring device
PCT/EP2014/058108 WO2014191137A1 (en) 2013-05-27 2014-04-22 Assembly, component set, and method for adjusting, calibrating, and/or validating a measuring device
ZA2015/08122A ZA201508122B (en) 2013-05-27 2015-11-03 Assembly, component set, and method for adjusting, calibrating, and/or validating a measuring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102013105412.9A DE102013105412A1 (en) 2013-05-27 2013-05-27 Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device

Publications (1)

Publication Number Publication Date
DE102013105412A1 true DE102013105412A1 (en) 2014-11-27

Family

ID=50588681

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102013105412.9A Withdrawn DE102013105412A1 (en) 2013-05-27 2013-05-27 Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device

Country Status (4)

Country Link
EP (1) EP3004815A1 (en)
DE (1) DE102013105412A1 (en)
WO (1) WO2014191137A1 (en)
ZA (1) ZA201508122B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014102797A1 (en) 2014-03-03 2015-09-03 Endress + Hauser Process Solutions Ag Method for checking a measuring device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3347695A1 (en) * 1983-12-31 1985-07-11 Bopp & Reuther Gmbh, 6800 Mannheim TEST DEVICE FOR FLOWMETER
DE29909879U1 (en) * 1999-05-31 1999-09-09 Ver Energiewerke Ag Device for checking the output of a switching pulse from an electronic flow switch
EP2339245A2 (en) 2009-12-23 2011-06-29 Waterkotte GmbH Heating and cooling devices with a heat pump

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2077892A1 (en) * 1970-02-23 1971-11-05 Penet Pierre Improvements to the calibration of flow measuring devices or the like
EP0700865B1 (en) * 1994-08-16 1998-04-08 Scheidt & Bachmann Gmbh Method and apparatus for monitoring and/or callibration of piston flowmeter in petrol stations
DE19717128A1 (en) * 1997-04-23 1998-10-29 Imcon Ges Fuer Bildverarbeitun Device and method for testing consumption meters, in particular house water meters and apartment water meters
US6360579B1 (en) * 1999-03-26 2002-03-26 Micro Motion, Inc. Flowmeter calibration system with statistical optimization technique

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3347695A1 (en) * 1983-12-31 1985-07-11 Bopp & Reuther Gmbh, 6800 Mannheim TEST DEVICE FOR FLOWMETER
DE29909879U1 (en) * 1999-05-31 1999-09-09 Ver Energiewerke Ag Device for checking the output of a switching pulse from an electronic flow switch
EP2339245A2 (en) 2009-12-23 2011-06-29 Waterkotte GmbH Heating and cooling devices with a heat pump

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SU 1434505 A - Datenbankauszug aus WPI-Thomson und EPODOC-EPO *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014102797A1 (en) 2014-03-03 2015-09-03 Endress + Hauser Process Solutions Ag Method for checking a measuring device

Also Published As

Publication number Publication date
WO2014191137A1 (en) 2014-12-04
ZA201508122B (en) 2016-10-26
EP3004815A1 (en) 2016-04-13

Similar Documents

Publication Publication Date Title
EP3019846B1 (en) Device and method for continuously measuring the dynamic fuel consumption of an internal combustion engine
EP1729100A1 (en) Method and device for continuously measuring a dynamic fluid consumption
EP2726792B1 (en) Method and devices for equalizing a group of consumers in a fluid transport system
DE69706458T2 (en) Compensation method of a network for a non-compressible liquid
EP2936003B1 (en) Method and devices for balancing a group of consumers in a fluid transport system
DE102014210545A1 (en) Method for calibrating flow meters for fluid media
DE102008003315A1 (en) Heating system and method for operating a heating system
WO2008095836A2 (en) Method and device for continuously measuring dynamic fluid consumption
EP3215742B1 (en) Method and device for operating a pump
DE102009050083A1 (en) Method for determining volume stream in closed flow system i.e. heat circuit in wall-mounted heating system, involves determining stream from power correction value and theoretical power consumption characteristic curve for revolution speed
EP3172426B1 (en) Fuel consumption measuring system and method for measuring the fuel consumption of an ic engine
DE102008027039B4 (en) Temperature control unit with flow measurement
AT3350U2 (en) DEVICE FOR CONTINUOUSLY MEASURING THE DYNAMIC FUEL CONSUMPTION OF A CONSUMER
EP2702373B1 (en) Device for measuring a fuel flow and calibrating device therefor
DE102013105412A1 (en) Arrangement, component set and method for adjusting, calibrating and / or validating a measuring device
DE10133910A1 (en) Method and arrangement for the leak test of the main air line on automatic air brakes of railway vehicles
DE102013100099A1 (en) Test arrangement for operating test specimen, has bypass line that branches off from supply line in upstream of test specimen, where resources diverted from bypass line flow back to supply line feeding conveyor
DE102007019601B3 (en) Method for calibrating fluid flow measuring system, involves arranging line for fluid in upstream flow measuring device, and fluid transferring and discharging device is arranged between two upstream flow measuring devices
DE102017115231A1 (en) Method for assigning a heating circuit temperature sensor of a heating and / or cooling system to the relevant heating circuit or for checking the assignment of a heating circuit temperature sensor of a heating and / or cooling system to the relevant heating circuit
DE102013005166A1 (en) Method for measuring small volume flows in floor heating circuit of central heating based heat supply system, involves operating circuit in normal operation so that valve is operated in position in which volume flow flows through heat sink
WO2022099340A1 (en) Measuring device for metering fluids, and method for metering by means of a measuring device of this type
DE4110231A1 (en) Dirt particles proportion measurer for liq. esp. hydraulic oil - uses computer to calculate vol. of dirt particles from flowmeter and counter in continuous flow tap-off
EP1716803A2 (en) Method and device for verifying the patency of elongated hollow bodies, in particular endoscope channels
DE102017125832B3 (en) Method for detecting a fault in a system for the pneumatic adjustment of an actuating element and computer-readable storage medium
DE102010020699A1 (en) Liquid level measuring equipment e.g. water meter has cascade cavitation nozzle unit with cavitation nozzles whose pressure ratio is set according to flow of liquid from container in forward and backward directions

Legal Events

Date Code Title Description
R163 Identified publications notified
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee