DE102009004738A1 - Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required - Google Patents
Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required Download PDFInfo
- Publication number
- DE102009004738A1 DE102009004738A1 DE200910004738 DE102009004738A DE102009004738A1 DE 102009004738 A1 DE102009004738 A1 DE 102009004738A1 DE 200910004738 DE200910004738 DE 200910004738 DE 102009004738 A DE102009004738 A DE 102009004738A DE 102009004738 A1 DE102009004738 A1 DE 102009004738A1
- Authority
- DE
- Germany
- Prior art keywords
- turbine
- snow
- water
- external electrical
- lining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25C—PRODUCING, WORKING OR HANDLING ICE
- F25C3/00—Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow
- F25C3/04—Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow for sledging or ski trails; Producing artificial snow
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25C—PRODUCING, WORKING OR HANDLING ICE
- F25C2303/00—Special arrangements or features for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Special arrangements or features for producing artificial snow
- F25C2303/046—Snow making by using low pressure air ventilators, e.g. fan type snow canons
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)
Abstract
Description
Stand der Technik mit Fundstellen:Prior art with references:
Es ist bekannt, dass Schneeerzeuger, insbesondere sogenannte Niederdruck-Propellermaschinen, einen sehr hohen elektrischen Energieanschluß benötigen.It It is known that snow guns, especially so-called low-pressure propeller machines, need a very high electrical power connection.
In der Regel kommen Maschinen, von 10 kW bis 27 kW elektrischer Anschlußleistung, zum Einsatz. Hierbei werden lange Stromkabel mit hohen Querschnitten und extra dafür vorgesehene Trafostationen benötigt.In usually come from machines, from 10 kW to 27 kW of electrical power, for use. This will be long power cables with high cross sections and extra for it required transformer stations needed.
Die Druckluft, von 3 bar –15 bar, die zur Schneeerzeugung notwendig ist, wird von einem Kompressor, der im Schneeerzeuger enthalten ist, erzeugt, und ebenfalls mit elektrischer Energie betrieben.The Compressed air, from 3 bar -15 bar, which is necessary for snow production, is powered by a compressor, which is contained in the snow gun, produced, and also with operated electrical energy.
Das Wasser zur Schneeerzeugung, wird von zentralen Stationen, mittels Hochruckpumpen, zu den einzelnen Entnahmestellen gefördert.The Water for snow production, is used by central stations, by means of High pressure pumps, conveyed to the individual sampling points.
Die Höhe des Wasserdruckes beträgt meist zwischen 10 bar –60 bar.The Height of Water pressure is usually between 10 bar -60 bar.
Im Durchschnitt beträgt die Anzahl solcher Schneeerzeuger, die in Europa pro Skigebiet betrieben werden, 80 Stück.in the Average is the number of such snowmakers operating in Europe per ski resort be, 80 pieces.
Problem:Problem:
Der im Patentanspruch angegebenen Erfindung liegen folgende Probleme zugrunde,
- 1. Die hohen Errichtungskosten, die durch große Mengen benötigter Stromkabel und den dazu wiederum notwendigen Trafostationen enstehen, drastisch zu minimieren.
- 2. Den hohen Energiebedarf jedes einzelnen Schneeerzeugers, der zu erheblichen, stetig steigenden Betriebskosten führt, um ein vielfaches zu kürzen.
- 1. To drastically minimize the high installation costs that are incurred due to the large quantities of power cables required and the transformer stations necessary for this purpose.
- 2. The high energy requirement of each snow gun, which leads to significant, steadily rising operating costs, to cut many times over.
Lösung:Solution:
Diese Probleme werden durch die im Patentanspruch aufgeführten Merkmale gelöst.These Problems are caused by the features listed in the claim solved.
Erreichte Vorteile:Achieved benefits:
Die mit der Erfindung erzielten Vorteile bestehen insbesondere darin, dass die hohen Errichtungskosten, dass betrifft Stomkabel, Trafostationen, die für die Betreibung dieser Schneeerzeuger unumgänglich sind, stark reduziert werden. Ebenfalls werden zusätzlich die hohen Betriebskosten der Schneeerzeuger um ein vielfaches reduziert.The particular advantages of the invention are that the high construction costs that affects stoma cables, transformer stations, the for the Operation of these snow guns are inevitable, greatly reduced become. Also will be additional The high operating costs of the snow guns are reduced many times over.
Ein weiterer Vorteil liegt in der unkomplizierten Einbindug in vorhandene Beschneiungsanlagen, mit Hochdrucklanzen ohne elektischem Energieanschluss, da der Wasserdruck/Wasseranschluss sowieso vorhanden ist, und somit auf ein zusätzliches Verlegen von Stromkabeln verzichtet werden kann.One Another advantage lies in the uncomplicated Einbindug in existing Snowmaking systems, with high-pressure lances without electrical energy connection, because the water pressure / water connection anyway exists, and thus on an additional laying can be dispensed with power cables.
- 11
- Batterie Energieversorgung der Düsenheizungbattery power supply the nozzle heater
- 22
- Lichtmaschine Energieerzeuger für Batteriealternator energy producers for battery
- 33
- Kompressor Herstellung der Druckluft für die Nukleationsdüsencompressor manufacturing the compressed air for the nucleation nozzles
- 44
- Wasserturbine durch Wasserdruck angetrieben Antrieb aller notwendigen Komponetenwater turbine by Water pressure powered drive of all necessary components
- 55
-
durchgängige Welle
Antrieb der Komponeten,
2 ,3 ,6 continuous shaft drive of the components,2 .3 .6 - 66
- Ventilator Erzeugung eines hohen Lufstromes welcher für die Wurfweite des Schnees benötigt wirdfan generation a high air flow which for the throwing distance of the snow is needed becomes
- 77
- Düsenkranz Wasser- und Luftführung Halterung für Wasser- und Nukleationsdüsennozzle ring Water- and airflow a Mount for Water and nucleation nozzles
- 88th
- Düsen Wasser bzw. Nukleationsdüsenjet water or nucleation nozzles
- 99
- Kabel Übertragung elektrischer Energie zur Batterieelectric wire transmission electrical energy to the battery
- 1010
- Luftleitung Weiterleiten der Druckluft zum Düsenkranzair line Hand off the compressed air to the nozzle ring
- 1111
- Wasserleitung Wasser welches das Abfallprodukt der Turbine ist wird an die Düsen weitergeleitetwater pipe water which is the waste product of the turbine is forwarded to the nozzles
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910004738 DE102009004738A1 (en) | 2009-01-15 | 2009-01-15 | Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200910004738 DE102009004738A1 (en) | 2009-01-15 | 2009-01-15 | Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102009004738A1 true DE102009004738A1 (en) | 2010-09-09 |
Family
ID=42538330
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200910004738 Ceased DE102009004738A1 (en) | 2009-01-15 | 2009-01-15 | Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102009004738A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102853605A (en) * | 2012-10-18 | 2013-01-02 | 牡丹江雪城机械制造有限责任公司 | Snow making machine with adjustable quantity of nozzles of nucleon device |
DE102012006942A1 (en) * | 2012-03-31 | 2013-10-02 | Matthias Hahn | Snow generator of artificial snowmaking system, has compressor to compress air and electricity such that excess energy is supplied to main structure, and generator that is coupled to waterwheel to operate ventilator and propeller |
EP2682692A1 (en) * | 2012-07-03 | 2014-01-08 | Phillip Skacel | Snow machine |
ITVR20120184A1 (en) * | 2012-09-13 | 2014-03-14 | Technoalpin A G S P A | SNOW PLANT |
CN107543347A (en) * | 2017-10-24 | 2018-01-05 | 北京宾度明德滑雪设备有限公司 | Snowmaker |
CN111473559A (en) * | 2019-01-23 | 2020-07-31 | 北京泛华新兴体育产业股份有限公司 | Ice house ice making system |
CN113155432A (en) * | 2021-04-28 | 2021-07-23 | 北京建筑大学 | Method for detecting atomization component of snow making machine |
EP3940318A1 (en) * | 2020-07-15 | 2022-01-19 | Technoalpin France | Facility for producing artificial snow |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4597524A (en) * | 1982-03-22 | 1986-07-01 | Albertsson Stig L | Snow making machine |
-
2009
- 2009-01-15 DE DE200910004738 patent/DE102009004738A1/en not_active Ceased
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4597524A (en) * | 1982-03-22 | 1986-07-01 | Albertsson Stig L | Snow making machine |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012006942A1 (en) * | 2012-03-31 | 2013-10-02 | Matthias Hahn | Snow generator of artificial snowmaking system, has compressor to compress air and electricity such that excess energy is supplied to main structure, and generator that is coupled to waterwheel to operate ventilator and propeller |
DE102012006942B4 (en) * | 2012-03-31 | 2015-11-05 | Matthias Hahn | Snow generator with generator / motor principle for the production of artificial snow in snowmaking systems |
EP2682692A1 (en) * | 2012-07-03 | 2014-01-08 | Phillip Skacel | Snow machine |
ITVR20120184A1 (en) * | 2012-09-13 | 2014-03-14 | Technoalpin A G S P A | SNOW PLANT |
CN102853605A (en) * | 2012-10-18 | 2013-01-02 | 牡丹江雪城机械制造有限责任公司 | Snow making machine with adjustable quantity of nozzles of nucleon device |
CN102853605B (en) * | 2012-10-18 | 2014-09-10 | 牡丹江雪城机械制造有限责任公司 | Snow making machine with adjustable quantity of nozzles of nucleon device |
CN107543347A (en) * | 2017-10-24 | 2018-01-05 | 北京宾度明德滑雪设备有限公司 | Snowmaker |
CN111473559A (en) * | 2019-01-23 | 2020-07-31 | 北京泛华新兴体育产业股份有限公司 | Ice house ice making system |
EP3940318A1 (en) * | 2020-07-15 | 2022-01-19 | Technoalpin France | Facility for producing artificial snow |
FR3112596A1 (en) * | 2020-07-15 | 2022-01-21 | Technoalpin France | Artificial snow production facility |
CN113155432A (en) * | 2021-04-28 | 2021-07-23 | 北京建筑大学 | Method for detecting atomization component of snow making machine |
CN113155432B (en) * | 2021-04-28 | 2022-06-10 | 北京建筑大学 | Method for detecting atomization component of snow making machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102009004738A1 (en) | Snow producer i.e. low pressure prop-airliner, has water turbine driven by lining-up water pressure, where turbine operates devices required for machine snow production, so that external electrical power connection is not required | |
DE102006026287A1 (en) | Two-shaft engine for aircraft with high power requirements | |
RU2010124290A (en) | HYBRID CONTROLLED AIR CONDITIONING SYSTEM BASED ON USING THE ENERGY OF THE SAMPLED AIR | |
DE102006050990A1 (en) | Fuel cell system and method to drive a transmission unit connected to a pipe in a hybrid fuel cell system has a turbine drive and a connected electric motor | |
DE4339402A1 (en) | Converting and storing wind energy using wind power plant with rotor | |
DE112010004880T5 (en) | Turbine with improved efficiency | |
CN102878092B (en) | Novel energy-saving and speed-regulation electric water feeding pump system | |
EP2458180A1 (en) | Method for operating a gas turbine during load control, device for regulating the operation of a gas turbine and power plant | |
DE10236326A1 (en) | Gas storage power station, has power consumption device with static frequency generator that consumes electric power from generator and provides it to additional load | |
EP1898071A2 (en) | Generator-starter assembly for a multi-shaft driving mechanism | |
WO2016131920A1 (en) | Steam power plant and method for operating same | |
EP1895125A2 (en) | Generator-starter assembly for gas turbine driving mechanism | |
EP2061954B1 (en) | Lng-system in combination with gas- and steam-turbines | |
Marchand | Review and prospects of RF solid state power amplifiers for particle accelerators | |
CN103147955B (en) | The feed-water pump of high-speed synchronous motoring | |
EP1752619A2 (en) | Turbo group with starting device | |
DE102008036100A1 (en) | Wind power plant has tower, wind wheel and generator, which is operated in motor operation and drives in operating condition of air compressor with electrical net energy | |
DE2437782B2 (en) | Method for starting up a gas turbine system for generating electricity from fuel gas from a coal pressure gasifier | |
EP1286030B1 (en) | Gas and air turbine powerplant | |
DE102010035229A1 (en) | Method for producing hydrogen used in fuel cell, by electrolysis of water, involves storing waste heat generated during electrolysis of water and converting heat energy into electrical energy by steam turbine process | |
DE102012006942B4 (en) | Snow generator with generator / motor principle for the production of artificial snow in snowmaking systems | |
KR20110058194A (en) | Compressed air generating system by the wind turbine | |
EP3523199B2 (en) | Air start unit for starting and servicing jet engines in aircraft | |
WO2010088980A1 (en) | Internal combustion engine system having exhaust gas energy recapture for floating devices | |
WO2013135691A1 (en) | Method for the reevaporation of liquefied natural gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ON | Later submitted papers | ||
OP8 | Request for examination as to paragraph 44 patent law | ||
8122 | Nonbinding interest in granting licenses declared | ||
8131 | Rejection |