DE102008056942A1 - Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete - Google Patents
Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete Download PDFInfo
- Publication number
- DE102008056942A1 DE102008056942A1 DE102008056942A DE102008056942A DE102008056942A1 DE 102008056942 A1 DE102008056942 A1 DE 102008056942A1 DE 102008056942 A DE102008056942 A DE 102008056942A DE 102008056942 A DE102008056942 A DE 102008056942A DE 102008056942 A1 DE102008056942 A1 DE 102008056942A1
- Authority
- DE
- Germany
- Prior art keywords
- metal shell
- guide rail
- polymer concrete
- shell
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D26/00—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
- B21D26/02—Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
- B21D26/033—Deforming tubular bodies
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16C—SHAFTS; FLEXIBLE SHAFTS; ELEMENTS OR CRANKSHAFT MECHANISMS; ROTARY BODIES OTHER THAN GEARING ELEMENTS; BEARINGS
- F16C29/00—Bearings for parts moving only linearly
- F16C29/005—Guide rails or tracks for a linear bearing, i.e. adapted for movement of a carriage or bearing body there along
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Bearings For Parts Moving Linearly (AREA)
Abstract
Description
Die Erfindung betrifft eine Führungsschiene gemäß dem Oberbegriff von Anspruch 1, ein Linearwälzlager mit einer derartigen Führungsschiene und ein Verfahren zur Herstellung der Führungsschiene. Linearwälzlager sind beispielsweise als Kugelschienenführungen, Rollenschienenführungen oder Kugelbüchsen bekannt.The The invention relates to a guide rail according to the The preamble of claim 1, a linear roller bearing having a Such guide rail and a method for manufacturing the guide rail. Linear bearings are for example as ball rail guides, roller rail guides or ball bushings known.
Aus
der
Die
Metallschale ist mit Polymerbeton
Der Nachteil der bekannten Führungsschiene besteht darin, dass zum Füllen mit Polymerbeton Verschlussmittel notwendig sind, mit denen der Spalt an der Oberseite der Führungsschiene verschlossen werden muss, um ein Auslaufen des flüssigen Polymerbetons zu verhindern. Darüber hinaus müssen die Befestigungsbohrungen nachträglich in die Führungsschiene eingearbeitet werden, was sehr aufwändig ist. Die Befestigungsbohrungen sind überdies nicht sehr belastbar, da die Kraft der Schraubbolzen unmittelbar auf den Polymerbeton einwirkt. Hierbei kommt es zu kleinflächigen Spannungskonzentrationen, wodurch die Bruchfestigkeit des Polymerbetons überschritten wird, was entsprechende Bruchschäden zur Folge hat.Of the Disadvantage of the known guide rail is that necessary for filling with polymer concrete are, with which the gap at the top of the guide rail must be closed to leakage of the liquid To prevent polymer concrete. In addition, the Mounting holes later in the guide rail be incorporated, which is very expensive. The mounting holes are also not very resilient, because the force of the bolt immediately acting on the polymer concrete. Here it comes to small-area Stress concentrations, which exceeded the breaking strength of the polymer concrete which results in corresponding breakage.
Die Aufgabe der Erfindung besteht demgegenüber darin eine Führungsschiene zu schaffen, die einfacher hergestellt werden kann und in der Überwindung der vorgenannten Nachteile.The The object of the invention, by contrast, is a guide rail to create that can be made easier and in overcoming the aforementioned disadvantages.
Als
Lösung wird vorgeschlagen, dass die Metallschale als geschlossenes
Rohr ausgeführt ist. Bei einem geschlossenen Rohr ist kein
Längsschlitz mehr vorhanden, aus dem der Polymerbeton ausfließen
könnte. Die entsprechenden Verschlussarbeiten können
entfallen. Eine derartige Führungsschiene hat überdies
den Vorteil, dass die Torsionssteifigkeit erheblich höher
als bei der bekannten Führungsschiene ist. Dies hat sich
als besonders vorteilhaft herausgestellt, da Torsionsverformungen
bei der bekannten Führungsschiene sehr leicht zu Rissen
im Polymerbeton führen können. Da Polymerbeton
im Wesentlichen nur Druckspannungen gut ertragen kann, (ihren Beanspruchungen,
die andere Spannungsrichtungen hervorrufen, sehr schnell zu Rissen im
Material. Diese Spannungen können bei der erfindungsgemäßen
Führungsschiene problemlos von der Metallschale in Form
des geschlossenen Rohres aufgenommen werden, da diese eine erheblich
höhere Torsionssteifigkeit besitzt als die offene, U-förmige Metallschale
der
Bei der erfindungsgemäßen Führungsschiene kann das bekannte Blechbiegeverfahren zur Herstellung der Metallschale nicht mehr angewandt werden. Gemäß dem selbstständigen Verfahrensanspruch wird daher vorgeschlagen, die Metallschale mittels Innenhochdruckformen aus einem kreiszylindrischen Rohr zu fertigen. Kreiszylindrische Rohre sind, insbesondere in nahtloser Ausführung, am Markt erhältlich. Die entsprechenden Rohre werden üblicherweise gewalzt und besitzen daher die für eine Führungsschiene erforderliche hohe Festigkeit. Beim Innenhochdruckformen werden kreiszylindrische Rohre in die Formausnehmung eines Formwerkzeugs gelegt, wobei erstgenannte die angestrebte Außenform der Führungsschiene aufweist. Anschließend wird das druckdicht verschlossene Rohr unter Druck mit einer Hydraulikflüssigkeit gefüllt, so dass es sich aufbläht und plastisch verformt, bis es schließlich an der Wand der Formausnehmung anliegt.at the guide rail according to the invention can the known sheet metal bending process for the preparation of the metal shell no longer be used. According to the self-employed Process claim is therefore proposed, the metal shell by means Manufacture hydroforming from a circular cylindrical tube. Circular cylindrical tubes are, in particular in a seamless design, available on the market. The corresponding pipes are usually rolled and therefore have the for a guide rail required high strength. When hydroforming be circular cylindrical tubes in the mold cavity of a mold laid, the former the desired outer shape of the guide rail having. Subsequently, the pressure-sealed Tube filled under pressure with a hydraulic fluid, so that it inflates and plastically deforms, until finally rests against the wall of the mold cavity.
Nach dem Formen der Metallschale wird diese gehärtet, damit die Schienenwälzflächen eine für ein Linearwälzlager genügend hohe Härte aufweisen. Das geschlossene Rohr bzw. die Metallschale besteht dementsprechend vorzugsweise aus härtbarem Wälzlagerstahl. Das Härten muss zu diesem Zeitpunkt ausgeführt werden, da ein hartes Rohr nicht plastisch verformt werden kann und weil der später eingefüllte Polymerbeton die hohen Temperaturen beim Härten nicht ertragen würde.To the metal shell is hardened so that it forms the rolling surfaces one for a Linear rolling bearing have sufficiently high hardness. The closed tube or the metal shell is accordingly preferably made of hardenable bearing steel. The Hardening must be done at this time because a hard pipe can not be plastically deformed and because the later filled polymer concrete the high Temperatures during hardening would not stand.
Nach dem Härten wird die Metallschale von einer ersten Stirnseite her mit dem Polymerbeton gefüllt. Um Hohlräume in der Polymerbetonfüllung zu vermeiden, wird die Metallschale von außen her in Schwingung versetzt, so dass Luftblasen im flüssigen Polymerbeton an die Oberfläche aufsteigen. Vorzugsweise wird nicht das gesamte Rohr in Schwingung versetzt, damit das harte Rohr keine Risse bekommt. Es reicht aus, wenn nur der Rohrabschnitt in Schwingung versetzt wird, in dem sich die Flüssigkeitsoberfläche gerade befindet. Beim Einfüllen des Polymerbetons ist das Rohr vorzugsweise parallel zur Richtung der Schwerkraft oder leicht geneigt zu dieser ausgerichtet. Die zweite der ersten gegenüberliegenden Stirnseite des Rohres wird vorzugsweise mit einem Polyurethanschaum verschlossen, um zu verhindern, dass der flüssige Polymerbeton an dieser Seite heraus fließt.After hardening, the metal shell is filled with the polymer concrete from a first end face. In order to avoid voids in the polymer concrete filling, the metal shell is vibrated from the outside so that bubbles in the liquid polymer concrete rise to the surface. Preferably, the entire tube is not vibrated so that the hard tube does not crack. It is enough if only the pipe section in Oscillation is added, in which the liquid surface is straight. When filling the polymer concrete, the tube is preferably aligned parallel to the direction of gravity or slightly inclined thereto. The second of the first opposing face of the tube is preferably closed with a polyurethane foam to prevent the liquid polymer concrete from flowing out at that side.
Nach dem Einfüllen des Polymerbetons werden die Schienenwälzflächen in bekannter Weise geschliffen.To the filling of the polymer concrete become the rolling surfaces ground in a known manner.
In den Unteransprüchen sind vorteilhafte Weiterbildungen und Verbesserungen der Erfindung angegeben.In The dependent claims are advantageous developments and Improvements of the invention indicated.
Innerhalb der Metallschale kann wenigstens ein Stützeinsatz vorgesehen sein, der sich von einem ersten Wandabschnitt der Metallschale bis zu einem zweiten gegenüberliegenden Wandabschnitt der Metallschale erstreckt, wobei der Stützeinsatz, der erste Wandabschnitt und der zweite Wandabschnitt von einer Befestigungsbohrung durchsetzt werden, mit der die Führungsschiene an einer übergeordneten Baugruppe befestigt werden kann. Die Befestigungsbohrung ist vorzugsweise als Stufenbohrung ausgebildet, damit sie eine Zylinderkopfschraube aufnehmen kann, mit der die Führungsschiene an der übergeordneten Baugruppe verschraubt werden kann. Mit dem Stützeinsatz, der vorzugsweise aus ungehärtetem Stahl besteht, soll verhindert werden, dass die Schraubkräfte direkt auf den Polymerbeton einwirken, was zum Bruch desselben führen könnte. Stattdessen werden die Schraubkräfte direkt von dem Stützeinsatz auf die Metallschale übertragen. Der Stützeinsatz erstreckt sich von einem ersten Wandabschnitt bis zu einem zweiten gegenüberliegenden Wandabschnitt des Rohres, damit zwischen der Stirnfläche des Stützeinsatzes und der Rohrwand kein Spalt vorhanden ist, durch den der flüssige Polymerbeton beim Befüllen der Führungsschiene auslaufen könnte. Dies gilt, wenn die Befestigungsbohrungen bereits vor dem Füllen der Führungsschiene gebohrt werden, da hierdurch eine Öffnung in der Rohrwand erzeugt wird. Aber auch, wenn die Befestigungsbohrungen erst nach dem Füllen der Führungsschiene mit Polymerbeton gebohrt werden, sollen zwischen den Stützeinsatz und die Metallschale keine harten Gesteinskörner des Polymerbetons gelangen, da diese das entsprechende Bohrwerkzeug zum Herstellen der Befestigungsbohrung schnell zerstören würden. Der Spalt zwischen Stützeinsatz und Metallschale sollte also in jedem Fall kleiner als die Korngröße der Gesteinskörner im Polymerbeton sein.Within the metal shell can provide at least one support insert extending from a first wall portion of the metal shell to to a second opposite wall portion of the metal shell extends, wherein the support insert, the first wall section and the second wall portion penetrated by a mounting hole be with which the guide rail to a parent Assembly can be attached. The mounting hole is preferably designed as a stepped bore, so they a cylinder head bolt can absorb, with the guide rail to the parent Assembly can be screwed. With the support insert, which preferably consists of unhardened steel should be prevented Be that screwing directly on the polymer concrete act, which could lead to the breakage of the same. Instead, the screwing forces are taken directly from the support insert transferred to the metal shell. The support insert extends from a first wall portion to a second opposite wall portion of the pipe, thus between the End face of the support insert and the pipe wall no Slit exists through which the liquid polymer concrete could leak during filling of the guide rail. This is true if the mounting holes already before filling the guide rail to be drilled, since thereby an opening is generated in the pipe wall. But also if the mounting holes only after filling the guide rail with polymer concrete are to be drilled between the support insert and the Metal shell no hard grains of polymer concrete as they provide the appropriate drilling tool for manufacturing would destroy the mounting hole quickly. The gap between support insert and metal shell should so in any case smaller than the grain size of Be grains in polymer concrete.
Der Stützeinsatz kann ausschließlich über den Polymerbeton mit der Metallschale verbunden sein. Es hat sich gezeigt, dass es nicht erforderlich ist, die Stützeinsätze zusätzlich gegen Verschieben zu sichern, da diese durch den Polymerbeton ausreichend stark in der Metallschale gehalten werden. Um ein Verschieben der Stützeinsätze während des Einfüllens des Polymerbetons zu verhindern, werden die Befestigungsbohrungen vorzugsweise vor dem Einfüllen des Polymerbetons in die Stützeinsätze und in die Metallschale gebohrt. Während des Einfüllens des Polymerbetons werden die Stützeinsätze jeweils mit einem an die Befestigungsbohrung angepassten, demontierbaren Haltedorn in ihrer Einbauposition gehalten. Die Haltedorne können nach dem Aushärten des Polymerbetons problemlos entfernt und bei der nächsten Führungsschiene wieder eingesetzt werden.Of the Support insert can exclusively over the Polymer concrete to be connected to the metal shell. It has shown, that it is not necessary, the support inserts In addition to secure against moving, as this is through held the polymer concrete sufficiently strong in the metal shell become. To move the support inserts during of polymer concrete filling the mounting holes preferably before filling of polymer concrete into the support inserts and into the Metal shell drilled. While filling the Polymer concrete, the support inserts with each one adapted to the mounting hole, removable retaining mandrel kept in their installation position. The holding thorns can easily removed after curing of the polymer concrete and reinstalled at the next guide rail become.
Anstatt
der Befestigungsbohrungen kann an der Metallschale ein schwalbenschwanzartiger
Fortsatz vorgesehen sein, mit dem die Führungsschiene an
einer übergeordneten Baugruppe befestigt werden kann, wobei
die Metallschale keine radialen Durchbrüche aufweist. Bei
dieser Befestigungsart sind überhaupt keine radialen Öffnungen
in der Metallschale erforderlich, so dass keinerlei Vorkehrungen
zu deren Abdichtung notwendig sind, um ein Auslaufen des flüssigen
Polymerbetons zu verhindern. Führungsschienen mit Schwalbenschwanzbefestigung
an sich sind beispielsweise aus der
Der Polymerbeton kann mit Epoxydharz gebunden sein. Hiermit soll verhindert werden, dass zwischen dem Polymerbetonkern und der Metallschale ein Spalt entsteht, während der Polymerbeton aushärtet. Dieser Spalt wird vermieden, weil Epoxydharz im Gegensatz zu ungesättigtem Polyesterharz eine sehr viel geringere Schwindung beim Aushärten aufweist. Eine Schwindung von Epoxydharz ist hierbei nahezu überhaupt nicht feststellbar.Of the Polymer concrete may be bonded with epoxy resin. This is to prevent be that between the polymer concrete core and the metal shell a gap is created as the polymer concrete hardens. This gap is avoided because epoxy resin as opposed to unsaturated Polyester resin has a much lower shrinkage during curing. A shrinkage of epoxy resin is here almost at all not detectable.
Die Erfindung wird im Folgenden anhand der beigefügten Zeichnungen näher erläutert. Es stellt dar:The Invention will be described below with reference to the accompanying drawings explained in more detail. It shows:
In
der Metallschale
Nachdem
die Stützeinsätze
Nach
dem Aushärten des Polymerbetons
- 1010
- Führungsschieneguide rail
- 1111
- Längsrichtunglongitudinal direction
- 1212
- schwalbenschwanzartiger Fortsatzdovetail-like extension
- 1313
- Polymerbetonpolymer concrete
- 2020
- Metallschalemetal bowl
- 2121
- SchienenwälzflächeSchienenwälzfläche
- 2222
- erster Wandabschnittfirst wall section
- 2323
- zweiter Wandabschnittsecond wall section
- 3030
- Stützeinsatzsupport insert
- 3131
- Befestigungsbohrungmounting hole
- 3232
- Haltedornholding mandrel
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- - US 4615569 [0002, 0002, 0002, 0006] - US 4615569 [0002, 0002, 0002, 0006]
- - DE 10328336 A1 [0014] - DE 10328336 A1 [0014]
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008056942A DE102008056942A1 (en) | 2008-11-12 | 2008-11-12 | Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008056942A DE102008056942A1 (en) | 2008-11-12 | 2008-11-12 | Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102008056942A1 true DE102008056942A1 (en) | 2010-05-20 |
Family
ID=42104968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102008056942A Withdrawn DE102008056942A1 (en) | 2008-11-12 | 2008-11-12 | Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102008056942A1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3436977A1 (en) * | 1984-10-09 | 1986-04-10 | Antriebs Steuerungstech Ges | LINEAR ACTUATOR |
US4615569A (en) | 1984-06-12 | 1986-10-07 | Nippon Seiko Kabushiki Kaisha | Linear guide apparatus |
DE4213085C1 (en) * | 1992-04-21 | 1993-09-09 | Ief Werner Gmbh, 78120 Furtwangen, De | Prodn. of carriage guideway - comprises using a thin, elastically deformable casting shell |
JP2002106558A (en) * | 2000-09-29 | 2002-04-10 | Sanyo Electric Co Ltd | Linear guide and electronic parts mounting device |
DE10328336A1 (en) | 2003-06-24 | 2005-01-13 | Rexroth Star Gmbh | Linear guide device with longitudinal guide rail, includes retaining unit concealed by cover unit which is supported with longitudinal edge in undercut of guide rail |
-
2008
- 2008-11-12 DE DE102008056942A patent/DE102008056942A1/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4615569A (en) | 1984-06-12 | 1986-10-07 | Nippon Seiko Kabushiki Kaisha | Linear guide apparatus |
DE3436977A1 (en) * | 1984-10-09 | 1986-04-10 | Antriebs Steuerungstech Ges | LINEAR ACTUATOR |
DE4213085C1 (en) * | 1992-04-21 | 1993-09-09 | Ief Werner Gmbh, 78120 Furtwangen, De | Prodn. of carriage guideway - comprises using a thin, elastically deformable casting shell |
JP2002106558A (en) * | 2000-09-29 | 2002-04-10 | Sanyo Electric Co Ltd | Linear guide and electronic parts mounting device |
DE10328336A1 (en) | 2003-06-24 | 2005-01-13 | Rexroth Star Gmbh | Linear guide device with longitudinal guide rail, includes retaining unit concealed by cover unit which is supported with longitudinal edge in undercut of guide rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1591596B1 (en) | Embedded dowel | |
DE69505978T2 (en) | REEL ASSEMBLY AND METHOD FOR PRODUCTION | |
DE102007024092A1 (en) | camshaft | |
DE102017123874A1 (en) | Anchor element, concrete element with anchoring element and manufacturing process | |
EP2282853B1 (en) | Supporting core and method for producing hollow profiled elements | |
EP3409577B1 (en) | Device for manoeuvring a watercraft and method for producing a manoeuvring device for watercraft | |
CH661955A5 (en) | METHOD FOR PRODUCING A STEEL CONCRETE BODY. | |
AT413269B (en) | HOUSING FOR A DOUBLE SCREW EXTRUDER AND MANUFACTURING METHOD | |
EP3215704A1 (en) | Drilling ram device | |
DE102008056942A1 (en) | Guide rail for use as e.g. ball rail guide for linear roller bearing, has thin-walled metal shell i.e. closed rectangular pipe, including constant cross-section profile such that shell is completely filled with polymer concrete | |
EP0633128B1 (en) | Process to increase the shear loading capacity of mechanical connections | |
DE102016224014B4 (en) | Tensioning device and method for introducing a pretensioning into a tubular hollow profile | |
DE4201419C1 (en) | Rock anchor for location in rock with low cohesion factor - comprises outer bore anchor for making borehole and stabilising hole wall and injection anchor of hardenable material | |
EP2080563A2 (en) | Roller for taking up and/or transferring glue in devices of the tobacco processing industry | |
DE10249818A1 (en) | Surface of a body on which another body in a preferred sliding direction against each other can be slidably arranged | |
DE102012203696A1 (en) | rock bolt | |
DE102006055127B4 (en) | Method of calibrating an elastomeric spring of a bearing and bearing made by this method | |
DE102009008581A1 (en) | Tensioning device on a vibrator and method for tensioning a tube on this tensioning device | |
DE102005054851A1 (en) | Hydraulic bearing and method for producing a hydraulic bearing | |
DE102005008015A1 (en) | Gear shaft with at least one functional element, is formed by preparing a mould unit whose inner contour matches the shaft outer contour, supplying the material and then rotating the mould | |
DE202017105677U1 (en) | Guide unit with two parallel and spaced guide rods | |
EP2840194B1 (en) | Wood component composite and method for manufacturing the same | |
EP3027383A1 (en) | Method for producing a twin screw cylinder provided with a wear-protective layer | |
DE202017105678U1 (en) | Guide unit with two parallel and spaced apart circular cylindrical guide elements | |
EP2123391A2 (en) | Method for manufacturing a linear bearing housing and linear bearing housing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
R012 | Request for examination validly filed | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |