CN85104291A - The fluid jet loom lead latitude monitoring method and device - Google Patents

The fluid jet loom lead latitude monitoring method and device Download PDF

Info

Publication number
CN85104291A
CN85104291A CN85104291.0A CN85104291A CN85104291A CN 85104291 A CN85104291 A CN 85104291A CN 85104291 A CN85104291 A CN 85104291A CN 85104291 A CN85104291 A CN 85104291A
Authority
CN
China
Prior art keywords
signal
fluid
valving
circuit
jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN85104291.0A
Other languages
Chinese (zh)
Other versions
CN1003873B (en
Inventor
石川守
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Automatic Machinery Co ltd
Original Assignee
Toyota Automatic Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Automatic Machinery Co ltd filed Critical Toyota Automatic Machinery Co ltd
Priority to CN85104291.0A priority Critical patent/CN1003873B/en
Publication of CN85104291A publication Critical patent/CN85104291A/en
Publication of CN1003873B publication Critical patent/CN1003873B/en
Expired legal-status Critical Current

Links

Images

Landscapes

  • Looms (AREA)

Abstract

According to the present invention, the fluid pressure of the jet fluid output of each valving is converted to the signal of telecommunication by means of pressure detecting element (for example piezoelectric element).Unless all signals of telecommunication that send from pressure detecting element (these pressure detecting elements interrelate with valving) all reach predetermined value, otherwise just light alarm lamp, or start a steam whistle, or loom is shut down.

Description

The fluid jet loom lead latitude monitoring method and device
The present invention relates to the fluid jet loom, to being used for the jet fluid that parallel imports shed open is supplied with (as gas or water)-control with one or more valvings therein.More particularly, the present invention relates to be used to monitor the method and apparatus of the parallel guiding (also claiming to lead latitude) of this class loom.
In the gas jet loom, be introduced into the parallel guiding channel from leading the parallel that latitude main burner (Weft yarn inserting main nozzle) penetrates, this parallel guiding channel be by so-called correction reed or and the numerous parallel guide member put on center determined.Be provided with a plurality of pilot jets along guiding channel, finish its operation or flight along guiding channel to help parallel.The running status of the parallel that is guided is by the decision of the guiding conditions of parallel in this way, the jet pressure of these conditions such as fluid or main burner or pilot jet synchronously.If these parallel guiding conditions are not carried out gratifying control, just can't in weft insertion process, avoid such as parallel depart from the parallel guiding channel or in guiding channel, form ring such lead the latitude fault, thereby seriously reduce the quality of textiles.
Therefore, need control the synchronous of main burner or pilot jet fluid jet, the kind of these essential conditions such as parallel or the width of cloth etc. according to main weaving condition.This control can by the control valve device open or close carry out synchronously, above-mentioned valving is used to control to the supply of the jet fluid of nozzle separately.This valve adjusted in concert is to carry out when the fluid pressure at nozzle place is tested.For example, announce announced in No. 87372/1980 such in disclosed Japanese Utility Model, the perforation hole of the top part of a tube connector that links to each other with a pressure sensor with pilot jet coupled together hermetically, valve opening is suitably regulated synchronously, so that shown pressure reaches the propradation that tends to peak state on the sensor, this peak state is positioned at the constantly corresponding loom angle of rotation place of the predetermined injection beginning of pilot jet.
Yet,, can not check in actual loom operation process therefore whether the fluid radiation is carried out in the intended manner owing to this open adjusted in concert can realize when loom seizes up.Therefore, when having adopted a valving to control the fluid ejaculation of pilot jet in the loom operation process, the number of leading meridional difference mistake significantly increases.
For example, when the initial signal of magnetic solenoid disappears, or the noise signal-this noise signal that adds when chance is the signal-when causing solenoidal irregular working, will produce this class fault of valving except that initial signal.The sliding shutter piston may be oxidized, thereby cause frictional resistance to increase, and then hinder valve to open reposefully and closed running.In a kind of machinery valve device, valve carries out the motion of forward stroke by a cam, and carries out motion in the backward stroke by a spring.In this machinery valve device, according to the state of oxidation of valve piston, sometimes, spring force can not make valve piston carry out return movement effectively.
Yet, from the obvious increase of leading the wrong number of the meridional difference infer failure cause be the running of one or more valvings not normal be very difficult, and be very time taking.
When air pressure probe being used for the open synchronous adjusting of nozzle (as mentioned above).The spray-hole of pilot jet stopped by the foremost part of pilot jet, thereby makes the radiation fluid pressure in the pilot jet reach maximum at short notice, and no matter the degree of opening of valve piston how.Therefore, on the basis that pressure sensor pressure shows, be exceedingly difficult, and require operating personnel to have superb technology open the adjusting synchronously of valve.
So at present needed is to find a kind of method and produce a kind of device,, and monitor to guarantee the best latitude state of leading leading latitude so that can in the operation process of loom, carry out easy synchronously and detection accurately to the fluid jet of reality.
According to according to the latitude monitoring method of leading of the present invention, the jet fluid pressure conversion in valving exit is become the corresponding signal of telecommunication, and when this signal is lower than the value that presets, alarm just takes place, or stop the running of loom, above-mentioned valving is used to control the supply of radiation fluid, and above-mentioned radiation fluid is used to use parallel to enter shed open.
According to an optimum implementation of the present invention, with pressure detection part-the go out injection fluid pressure of stream end as a plurality of valvings of piezoelectric part-change, and if not from all pressure detection parts-these detection parts with each valving interrelate-the signal of telecommunication all reach the value that presets, just start alarm lamp or steam whistle, perhaps stop the running of loom, the fluid that above-mentioned valving is used to control main burner or pilot jet is supplied with.
The pressure detection part be set at the fluid emission exit of valving and with the fluid conveyance conduit by fluid coupling, and be combined together so that obtain the signal of telecommunication with end fitting.When valving is opened, hold from the stream that goes out of the jet stream direction of flow valving that enters the mouth, thereby fluid pressure is acted on the detection part.Therefore, by an oscilloprobe is connected on the terminal installation of checkout gear, just can on oscillograph, obtain the switching electrical signals of radiation body pressure, and will radiate opening and the closed function of fluid pressure curve, on this oscillograph, depict as valving.
Closed the description that accompanying drawing carries out optimum implementation of the present invention by following, will more deep understanding be arranged the present invention.In the accompanying drawings:
Fig. 1 is a perspective view, has shown the essential part that embodies jet fluid weaving machine of the present invention;
Fig. 2 is the cutaway view of a center, and this center is the center that is adopted in the loom shown in Figure 1;
Fig. 3 is the longitudinal sectional view of the amplification of piezoelectric part and magnet valve door gear, and this piezoelectric part and this magnet valve door gear are used in the loom shown in Figure 1;
Fig. 4 and Fig. 5 are longitudinal sectional views, have shown two different distortion of valving;
Fig. 6 is the transverse sectional view along VI among Fig. 5-VI line;
Fig. 7 has shown a block diagram according to typical circuit of the present invention, and this typical circuit is used to monitoring and leads latitude;
Fig. 8 (a) to (n) is a curve map, has shown the duty of the various piece of circuit;
Fig. 9 and 10 is block diagrams, has shown that according to two different circuit example of the present invention, these circuit are used to monitor leading latitude.
Referring to Fig. 1 to Fig. 3, shown one embodiment of the invention among these figure, this embodiment is used to the machinery such as a gas jet loom.Referring to Fig. 1 to 3, numerous parallel guide member 3 is collocated on the center 1, and it is relative with reed 2, and parallel Y is introduced into parallel guiding channel T, this parallel guiding channel T is determined by the guide slit 3a of row's parallel guide member 3, above-mentioned parallel relies on one forced air to carry, and this strand plus-pressure air-flow is provided by the parallel introducing main burner 4 that is installed on the center 1.Between reed 2 and parallel guide member 3, a plurality of pilot jets 5 up are installed, these pilot jets 5 are along parallel guiding channel T, and install with fixing mutual spacing.Like this, the gas jet that provides of pilot jet 5 operation that helped parallel Y to pass parallel guiding channel T.Be mounted with a plurality of base components 6 on center 1, these pedestals 6 are settled along straight line, and are all carrying the parallel guide member 3 of predetermined number and the pilot jet 5 of predetermined number on each pedestal 6.
Under center 1, the jar 8, jars 7 and 8 that the jar 7 that is used for main burner is installed and is used for pilot jet 5 is used for storing pressurized gas.Between main burner 4 and jar 7, an electricity-magnet valve door gear 9 has been installed by rights, so that by influent stream carrier pipe 10, valving 9 with go out to flow carrier pipe 11 the defeated root of the jet fluid in the jar 7 is delivered to main burner 4, charged into the gas-pressurized that transmits from fluid source in the jar 7, this fluid source is not revealed in the drawings.Similarly, between jar 8 that is connected with fluid source and pilot jet 5, electricity-magnet valve door gear 12A, 12B12C and 12D are got up with base component 6, electricity-magnet valve door gear 12A, 12B, 12C and 12D are similar with valving 9 structurally.In the drawings, four such device 12A to 12D have been shown.Jet fluid in jars 8 is by influent stream carrier pipe 13, valving 12A to 12D and go out to flow carrier pipe 14 and be transported to pilot jet 5, going out to flow conveyance conduit 14 is connected with the fluid conduit systems 6a in the base component 6, this fluid conduit systems 6a then links with pilot jet 5, as shown in Figure 2.From the nearest valving 12A of distance main burner 4, valving 12A to 12D is synchronously open in order with the operation of parallel Y, so that make the jet fluid from being associated in, from pilot jet 5, emit periodically apart from the nozzle 5 on the nearest base component 6 of main burner.These nozzles 5 are that same base component 6 separately interrelates.
Because electricity-magnet valve door gear 9,12A, 12B, 12C have identical structure with 12D, so followingly only the valving 9 of main burner 4 is described.
As shown in Figure 3, valve body 16 is positioned among the shell 15, so that can be left and right-hand slip.Valve body 16 is subjected to the bias effect of spring 17, and this bias effect of spring 17 is along a direction that the fluid passage is closed that makes in the shell 15, and above-mentioned fluid passage is connecting influent stream carrier pipe 10 and going out to flow carrier pipe 11.With proper device cylindrical outer cover 18 is fixed on the left-hand end of shell 15, and solenoid 19 is installed on the interior circumferential surface of cylindrical outer cover 18.In cylindrical outer cover 18, a piston 20 has been installed, this piston 20 can slide along the direction identical with valve body 10.Piston hinged arm 20a leans against on the valve piston 16a of valve body 16.When solenoid 19 was subjected to encouraging, piston 20 was subjected to the attraction of fuse 21, thereby made piston hinged arm 20a cause that valve body 16 produces displacement, and this displacement is the effect of spring 17 of revolting, thereby the dew of the fluid passage in the shell 15 is come out.Solenoid 19 couples together with control device 41 by lead-in wire 9a, as shown in Figure 1.
In the present embodiment, tube connector parts 22 have been installed by going out in tube connector 11 and shell 15 between the circulation road, and the pressure detector, piezoelectric element 23 for example, install in the suitable window on the passage component 22, so that make it to contact, or pass through fluid coupling with this fluid-transporting tubing with the fluid supplying passage in the tube connector parts.Be provided with pair of terminals parts 23a on the outer surface of piezoelectric detector 23, this butted line end part 23a is connected with cable 23b, and the same display unit of cable 23b-for example oscillograph 40-is connected, as among Fig. 1 by way of example as shown in.
As shown in Figure 1, piezoelectric detector 25A, 25B, 25C and 25D are linked on electricity-magnet valve door gear 12A to 12D in a similar fashion.And 12a to 12d is connected to these valvings 12A to 12D on the control device 41, as shown in Figure 1 by lead-in wire.Although in the present embodiment, having adopted piezoelectric element to carry out pressure detects, and pressure change directly is converted into the corresponding signal of telecommunication, but the mode that also can be similar to piezoelectric transducer adopts limit switch, known devices among differential transformer or other prior aries, in the middle of these devices, the variation of pressure causes mechanical displacement, and mechanical displacement is converted into the corresponding signal of telecommunication.
The present invention also can be used for a kind of fluid jet type loom, has adopted the machinery valve device 24 shown in Fig. 4 to replace foregoing electricity-magnetic solenoid in this fluid jet type loom.In this distortion, head components 27 is screwedly mounted on the lower end of the shell 26 of valve body 25, the valve lever 25a that link to each other with valve part 25 stretch out downwards from head components 27.Spring 29 is installed between the lower end of spring space 28 and shell 26, spring space 28 is connected on the valve lever 25a in the head components 27, spring 29 applies active force along a certain direction, so that the fluid passage in the shell 26 is opened by valve body 25 or closure, above-mentioned fluid passage is connecting influent stream carrier pipe 35a and is going out to flow carrier pipe (as described later).In the lower end of valve lever 25a roller free to rotate 30 is installed, this roller 30 rests on the cam face of cam disc 33, and cam disc 33 is fixed on the driving shaft 31 by screw 32, and driving shaft 31 can synchronously rotate with the loom running.By means of screw 32, can the adjustment cam dish with respect to the installation site of driving shaft 31.Be screwed connection head components 34 in the upper end of shell 26, on the circumferential surface that connects head components 34, be screwed out stream carrier pipe 35b, gone out to flow carrier pipe 35b and link to each other with main burner or pilot jet again.Below carrier pipe 35b, piezoelectric element 23 is installed in the suitable window that is arranged on the head components wall, so that directly with the fluid service duct coupling among the carrier pipe 35b, piezoelectric element 23 is provided with terminals parts 23a.
In the present embodiment, fluid in jet nozzle emission pressure curve is by the cam profile decision of camshaft disc 33.Regulate with the relevant jet of the kind of the width of the cloth of being knitted or parallel when synchronous when needs, the fastening degree that will change screw 32 is so that the established angle position of adjustment cam dish 33.By embodiment as the front, on oscillograph 40, obtain the signal of telecommunication from the existing jet pressure of the expression of piezoelectric element 23, just can be easy and realize this angle position adjustments exactly to cam disc 33.
Should be noted that the pressure transducer such as piezoelectric transducer 23 can be installed on any position, as long as this installation site is the downstream that is positioned at valve body 25.Therefore, pressure transducer can be installed among the guiding window 26a, and this guiding window 26a is set on the shell 26, rather than is set on the cover device 34.In addition, can also pressure transducer be installed on the valving, but being installed on the pedestal of main burner 4, or be installed on the pedestal of a needed pilot jet 5, do not show this distortion in the drawings for easy.
Below in conjunction with accompanying drawing 1 to 3 and 7,8, illustrate that loom according to the present invention leads the latitude monitoring mode, above-mentioned loom has the structure shown in Fig. 1 to 3.Should be noted in the discussion above that having the parallel guiding of the loom of valve device structure shown in Figure 4 and 5, can be according to monitoring with the essentially identical mode of following described mode, this is very tangible for the people of the technical ability with present technique field.
In the loom operation process, valving 9 with lead latitude and synchronously open so that launch fluid jet by main burner 4.This makes parallel Y be pushed away nozzle 4 and is introduced into parallel guiding channel T.In addition, front end operation synchronised with parallel Y, the device 12A to 12D of valve is under the control that control device 41 is carried out in a known way, from the nearest valving 12A of distance main burner 4, open according to priority, thereby make pilot jet 5 from the nearest nozzle 5 of distance main burner, launch fluid in order.By means of piezoelectric element 23 and 25A to 25D, valving 9 is become the corresponding signal of telecommunication with jet fluid pressure conversion among the 12A to 12D, these signals of telecommunication are sent in the circuit shown in Figure 7 by a cable, do not show above-mentioned cable among the figure, this cable is different from the foregoing cable 23b that is connected with oscillograph 40.(a) of Fig. 8 shown the mode that these signals of telecommunication or fluid pressure change along with the instant angle of rotation of loom bent axle to (e).
As shown in Figure 7, be sent to set (SET) input of flip-flop circuit F1 by filter amplifier 26 and discriminator circuit 27 from the signal of telecommunication of the representative fluid pressure of piezoelectric transducer 23 output.Discriminating or on-off circuit 27 are worked as signal S1 and are lower than reference level V 0, just turn off switching signal S1, shown in Fig. 8 (a).Be added to " putting 1 " input of steady state multivibrator circuit F2 by filter amplifier 28 and discriminating or on-off circuit 29 from the switching electrical signals S2 of piezoelectric element 25A output.When signal S2 is lower than reference level V 1The time, circuit 29 is just turned off switching electrical signals S2, shown in (b) among Fig. 8.From switching signal S3, the S4 of piezoelectric transducer 25B, 25C and 25D output and S5 respectively by with the same circuit of switching signal S2, promptly same with filter amplifier 28 and discriminator circuit 29 circuit is added to the set input of flop-over circuit F3, F4 and F5 respectively.
When the switching electrical signals S1 to S5 from piezoelectric element 23,25A to 25D is higher than reference level V 0And V 1The time, discriminator circuit 27 and 29 output signals, thus make flip-flop circuit F1 to F5 output high level signal S6, S7, S8, S9 and S10, shown in Fig. 8 (g) to (k), and signal S6 to S10 is added on the NAND circuit 30.When the high level signal S10 from flip-flop circuit F5 was added on the NAND circuit 30, the signal of exporting from circuit 30 just was transformed into low level from high level, shown in (l) among Fig. 8.Be introduced to AND gate circuit 31 from the signal of NAND circuit 30 outputs, and the signal of expression loom angle of rotation is (represented as the P in Fig. 8 (f), below also be referred to as synchronizing signal) also be added on the AND gate circuit 31, this synchronizing signal is from sensor 32.This sensor 32 is used to detect the angle of rotation of frame, as traditional rotary encoder device.In the present embodiment, synchronizing signal P is output immediately after electricity-magnet valve door gear 12D closes.Therefore, the output signal level of AND gate circuit 31 is that the combination by the output signal of synchronizing signal P and bistable multivibrator F1 to F5 is determined, these output signals of flip-flop circuit F1 to F5 are acquisitions at main burner 4 and pilot jet 5 emission fluids and after to the guiding termination of a parallel.When electricity-magnet valve door gear 9 and 12A to 12D normally turned round by method described above, NAND circuit 31 did not have signal output.
Be added to reset (RESET) end of flip-flop circuit F1 to F5 from the synchronizing signal P of sensor 32, at this moment, the output signal of these flip-flop circuits is switched to low level, as (g) among Fig. 8 to shown in (k).
For example, when valving 12C running not normal, thereby be lower than reference level V from the switching electrical signals S4 ' of sensor 25C 1The time, the output signal S9 of flip-flop circuit F4 remains on low level, shown in (j) among Fig. 8.Like this, even when the output signal S10 of bistable multivibrator F5 is added on the NAND circuit 30, the output signal of NAND circuit 30 does not change yet, but remains on the high level, shown in (l) among Fig. 8.When being added to the synchronizing signal P from loom rotation angle sensor 32 on the AND gate circuit 31, just exported fault-signal St from circuit 31, represented as (m) among Fig. 8.Fault-signal St is sent on the set input of flip-flop circuit F6.Flip-flop circuit F6 output alarm signal Sa consequently shown in Fig. 8 (n), and lights alarm lamp 33 by this signal Sa.Like this, when alarm lamp 33 was lighted, the work that operating personnel just are apprised of among valving 9 and the 12A to 12D was not normal, thereby just can set about eliminating the failure cause of valving 12C, and this fault can cause leads meridional difference mistake.
By operation push-button 34, flip-flop circuit F6 is resetted.
By this way, can be at any time in the present embodiment the operating condition of a plurality of electricity-magnet valve door gear of running up be checked, thereby can carry out correct control to the operating condition of electricity-magnet valve door gear, the best is led the latitude operation and is just depended on this correct control.In other words, in the loom operation process, on the basis of valving real-world operation state, can guarantee at any time that the best leads latitude.
As shown in figures 1 and 3, and as mentioned above, by lead-in wire 23b, the terminal portion of the piezoelectric element 23 of valving 9 and 12A to 12D is connected on the oscillograph 40.Suppose when oscilloprobe is connected with the terminal part 23a of the valving 12A shown in Fig. 1, fluid pressure in tube connector 22 is converted to the corresponding signal of telecommunication by piezoelectric element 23, and this signal of telecommunication shows on oscillograph 40 with the form of emission fluid jet pressure curve C.In this way, can understand first and the beginning of last transition status, fluid radiation cycle, jet emission and stopping exactly, and at the fluid at pilot jet 5 places that valving 12A is controlled emission pressure, thereby the actual initial sum that can check the fluid emission of nozzle 5 stop whether to meet synchronously predetermined synchronously.If between the two, exist difference, can suitably revise in the control device 41 control program, thereby the fluid emission of determining this pilot jet exactly synchronously to electricity-magnet valve door gear 12A.Adopted this mode, can understand the emission of in the loom operation process of reality, presetting and how change synchronously.In addition, when being added to the electric control signal from control device 41 on electricity-magnet valve door gear 12A, whether opening and the closure state that just can understand valve body 16 carry out according to this electric control signal.
Also can measure the emission fluid pressure of other valving 12B to 12D similarly, and on the basis of comparing each fluid pressure curve, effective distribution of the jet fluid that the fluid that is identified for carrying out is in order launched is so that reduce the consumption of jet fluid as much as possible.
These various advantages all come from the pressure transducer that has adopted such as piezoelectric transducer 23, so that the corresponding signal of telecommunication that the fluid pressure at the transmitting terminal place of valving 9 and 12A to 12D is converted to.At first, piezoelectric transducer 23 is subjected to the influence of other factors beyond the fluid pressure minimum, these factors such as variation of temperature etc.Simultaneously, owing to needn't carry out the zero compensation of the signal of telecommunication to the emission synchro measure of launching nozzle each time, the operation of piezoelectric transducer 23 is very easy.In addition, the cost of piezoelectric element 23 is lower, a large amount of valvings is being used for the fluid jet loom and piezoelectric transducer 23 is being installed under the situation of each valving, and investment cost can significantly reduce.
Fig. 9 has shown a correction circuit of the present invention, and this circuit is used to monitor the operating condition of electricity of the present invention-magnet valve door gear.In the present embodiment, the switching electrical signals from piezoelectric transducer 23 and 25A to 25D is added on filter amplifier 35 and the discriminator circuit 36.When the switching signal from sensor 23 and 25A to 25D was added on the circuit 36, circuit 36 just sent pulse signal, and this pulse signal is added on the counter circuit 37.For per five pulse signals that are added on the counter circuit 37, counter circuit 37 sends a high level signal, and this high level signal is become low level signal by inverting amplifier 38 paraphase, and this low level signal is added on the AND gate circuit 31.Synchronizing signal from loom rotation angle sensor 32 is added on the AND gate circuit 31 sum counter circuit 37.At this moment, have only counter circuit 37 to be reset, and AND gate circuit 31 does not send output signal.
When one among valving 9 and the 12A to 12D running is not normal, have only four pulse signals to be added to counter circuit 37, and in the moment that synchronizing signal P takes place loom rotation angle sensor 32, two input signals of AND gate circuit 31 all are in high level.Therefore, circuit 31 sends high level signal to steady state multivibrator circuit F6, in order to light alarm lamp 33.
In the shown distortion of Figure 10, can connect each alarm lamp 33 with piezoelectric transducer 23 and 25A to 25D respectively, piezoelectric transducer 23 and 25A to 25D are valving 9 and 12A to 12D setting.
In this distortion, each flip-flop circuit F1 to F5 interrelates with bistable multivibrator F6 shown among inverting amplifier 238, AND gate circuit 31 and Fig. 9, the mode of its contact make when one in the middle of valving 9 and the 12A to 12D for example-when device 12C-work is not normal, just lighted with the alarm lamp 33 that valving 12C interrelates.Adopt this method, just can promptly find the valving that breaks down.
In another distortion of the present invention, can adopt limit switch to replace piezoelectric transducer, this limit switch can be opened when fluid pressure surpasses predetermined value, thereby lights alarm lamp or start a steam whistle, and loom is shut down.
Although adopted electricity-magnet valve door gear in the described in front control circuit, also can adopt the similar control circuit that interrelates with the machinery valve device to come that loom is led latitude and monitor.Above-mentioned machinery valve device can adopt cam shown in the Figure 4 and 5 and cam return idler.In addition, although the top description contact shuttleless loom that carries out carries out, and this shuttleless loom adopts gas-pressurized to push fluid as parallel, but adopting pressure (hydraulic) water as the occasion that pushes fluid, can realize the present invention too by adopting proper method (these methods are conspicuous for the people of the domain knowledge that possesses skills).

Claims (10)

1, fluid jet type loom is led the latitude monitoring method, come the supply of control jet emission fluid therein by valving, above-mentioned jet emission fluid is used to parallel is pushed in the open shed of warp, the jet fluid pressure that it is characterized in that the valving output is converted into the signal of telecommunication, and when this signal is lower than predetermined value, alarm just takes place, or stops the loom running.
2, fluid jet loom parallel pushes the fluid pressure monitoring device, come the supply of control jet fluid therein by valving, above-mentioned jet fluid is used to parallel is pushed in the open shed of radial line, said apparatus is characterised in that the pressure detecting element is installed on the fluid transmitting terminal of valving, and be connected with the fluid supplying passage of carrying the jet fluid, and be provided with the terminals parts that are used for obtaining the signal of telecommunication for above-mentioned pressure detecting element, above-mentioned terminals parts are with the coupling of failure detector circuit phase.
3,, it is characterized in that described pressure detecting element is installed in valving and between the conveyance conduit at the transmitting terminal place of this valving as the desired device of claim 2.
4,, it is characterized in that the pressure detecting element is a piezoelectric transducer as the desired device of claim 2.
5, as the desired device of claim 2, it is characterized in that being provided with a plurality of valvings, and the same independently pressure detecting element of these valvings interrelates, it is characterized in that failure detector circuit comprises: a plurality of identification devices that couple together independently with the described terminals parts pressure detecting element, these identification devices are used to differentiate the described signal of telecommunication that transmits from described terminals parts, and described identification device sends output signal when the described signal of telecommunication is higher than reference level; A plurality of bistable multivibrators that are connected with these identification devices independently, these bistable multivibrators are exported high level signal when receiving described output signal; With the device that described bistable multivibrator links to each other, unless high level signal all takes place all described bistable multivibrators, otherwise this device that is connected with described bistable multivibrator will send fault-signal.
6, as the desired device of claim 5, the described device that it is characterized in that being used for sending fault-signal comprises: the NAND circuit that is in series with described a plurality of bistable multivibrators; With the AND gate circuit that is in series with described NAND circuit.
7,, it is characterized in that being provided with a plurality of described fault-signal generating means, and the same described bistable multivibrator separately of these described fault-signal generating means is in series as the desired device of claim 5.
8, as the desired device of claim 2, it is characterized in that being provided with a plurality of valvings, and these valves independently pressure detecting element interrelate, it is characterized in that failure detector circuit comprises: the discriminator circuit that is connected with the terminals parts of pressure detecting element, this discriminator circuit is used to differentiate the described gas signal that sends from described terminals, and sends output signal when the described signal of telecommunication is higher than reference level; With the counter circuit that described discriminator circuit is connected, this counter circuit is used to count the number from the output signal of described discriminator circuit; With the device that described counter circuit is connected, be used for the signal that when Counter Value is inconsistent with the number of the signal of telecommunication, breaks down.
9,, it is characterized in that described valving is electricity-magnetic device as the desired device of claim 2.
10,, it is characterized in that valving is by cam and cam follower wheel drive systems as the desired device of claim 2.
CN85104291.0A 1985-06-06 1985-06-06 Method and apparatus for monitoring weft insertion in a fluid jet loom Expired CN1003873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN85104291.0A CN1003873B (en) 1985-06-06 1985-06-06 Method and apparatus for monitoring weft insertion in a fluid jet loom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN85104291.0A CN1003873B (en) 1985-06-06 1985-06-06 Method and apparatus for monitoring weft insertion in a fluid jet loom

Publications (2)

Publication Number Publication Date
CN85104291A true CN85104291A (en) 1986-12-03
CN1003873B CN1003873B (en) 1989-04-12

Family

ID=4793753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN85104291.0A Expired CN1003873B (en) 1985-06-06 1985-06-06 Method and apparatus for monitoring weft insertion in a fluid jet loom

Country Status (1)

Country Link
CN (1) CN1003873B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824697A (en) * 2009-03-04 2010-09-08 津田驹工业株式会社 The establishing method of the wefting insertion condition of multicolor weft insertion loom
CN101838881A (en) * 2009-03-09 2010-09-22 津田驹工业株式会社 The establishing method of the wefting insertion condition of multicolor weft insertion loom
CN109943957A (en) * 2017-12-13 2019-06-28 株式会社丰田自动织机 The wefting insertion diagnostic method of jet type loom

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100433883B1 (en) * 2000-10-30 2004-06-04 가부시키가이샤 도요다 지도숏키 A throttle valve and a weft insertion apparatus in a jet loom with said throttle valve

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824697A (en) * 2009-03-04 2010-09-08 津田驹工业株式会社 The establishing method of the wefting insertion condition of multicolor weft insertion loom
CN101824697B (en) * 2009-03-04 2013-12-25 津田驹工业株式会社 Method for setting weft-insertion conditions in multi-color weft insertion loom
CN101838881A (en) * 2009-03-09 2010-09-22 津田驹工业株式会社 The establishing method of the wefting insertion condition of multicolor weft insertion loom
CN101838881B (en) * 2009-03-09 2014-08-27 津田驹工业株式会社 Method for setting weft-insertion conditions in multi-color weft insertion loom
CN109943957A (en) * 2017-12-13 2019-06-28 株式会社丰田自动织机 The wefting insertion diagnostic method of jet type loom

Also Published As

Publication number Publication date
CN1003873B (en) 1989-04-12

Similar Documents

Publication Publication Date Title
US5241218A (en) Armature movement detection circuit
KR20070027720A (en) Device for generating a depression
CN85104291A (en) The fluid jet loom lead latitude monitoring method and device
US4625770A (en) Method and apparatus for monitoring weft insertion in a fluid jet loom
KR880001723Y1 (en) Weft transfer control system in an air jet loom
DE3884085T2 (en) Checking lines.
EP0619694A4 (en) Method of monitoring atmospheric pressure glow discharge plasma.
US4643213A (en) Method and apparatus for controlling leaks in pressurized fluid systems
BE1010015A3 (en) Apparatus for supplying compressed air to a main blower of a weaving machine.
US4233520A (en) Electro optical control to detect a filament passing through a guide eye and using a light emitting diode
KR960012186B1 (en) Device for surveying the insertion of a weft yarn
US3850025A (en) Method of pneumatically controlling a thread or a thread bundle guided at right angles with respect to at least one airstream and apparatus for implementing the method
CN210604551U (en) Flue gas detection device and flue gas monitoring system
US5172540A (en) Apparatus for changing bobbin tubes and tube gripper therefor
CN2410540Y (en) Automatic timing cleaning device for meter measuring element
CN219559939U (en) Coal dust concentration measuring device in coal mill
CN109943957A (en) The wefting insertion diagnostic method of jet type loom
SU1032336A1 (en) Device for checking pressure change
EP0631216A3 (en) Method and control circuit for regulating pressure by means of solenoid valves, e.g. for pressure testing of plastic tubes.
EP0500498A1 (en) Apparatus for displaying weft detecting result in a jet loom
SU1043497A1 (en) Device for checking pressure
CN220304240U (en) Kiln with stable residual oxygen concentration in furnace
CN205024393U (en) Supplementary jet air current control system
CN219160101U (en) Control system of multipath electromagnetic oil feeder
US20080105325A1 (en) Throttle Valve for Weaving Looms

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee